Document NGaMk3EmkeeZn3G9LGLGgqkoy

COMPANY CONFIDENTIAL ) MniKantn Anniston Plant TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Anniston C. K. Eastman C. A. Rose J. C. Landwehr L. J. Boesch G. W. Miller W. B. Papageorge W. F. Taffee H. L. Williams Summary April, 1969 Cost Improvement Results Month Est. Act. $14,520 Target $46,645* % of Target 31.2 i YTD $95,385 $128,045* 74.4* Genera 1 Offices H. C. Carder w. R. Robirds D. Danna (5) P. B. Hodges D. B. Hosmer (2) w. A. Kuhn c. F. Luecke N. L. Sample J. E. Smith R. J. Stratmeyer H. S. Trail Organic Division *Targets revised upward from $31.9 M, month and $94.6 M YTD. Sharply reducing % target YTD from March 141. All long term delivery items on the Santowax R column controls project have arrived. Installation is expected in May. The Solid Aroclor instrumentation project to increase 5460 yield is 50% installed. The State Health Department license for radioactive source has not been received and could delay project completion. Construction of central Chlorine Unloading and Biphenyl Hydro gen Purification complete. Instrument check out and cali brations are underway. Start-up of facilities will be in early May with demonstration to follow by May 15. OTHER LOCATIONS D. W. Jackson-WGK T. M. Patrick - So. 2nd St. A. H. Forsten - Alvin, Texas First phase of water white Muriatic Acid project completed and off-gas catch pot has been put into operation. Training sessions were held with all operators on the new concept and methods of PNP reactor depressurization control. A 30-day demonstration was started. The control system has functioned perfectly to prevent plugging and clean-outs during a period of exceptionally high solids. Circumstantial evidence points to excessive foaming of reactor as cause of continuing high solids. Agricultural Division Tentative amendment "K" to the Methyl Parathion process for Acetone Recovery was approved 4/21. Plant test on number three condensation reactor to follow in May. AN-306 REV. COMPANY CONFIDENTIAL INFORMATION DSW 551345 "This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written aoDroval and the recinient is arcnuntahle for its safe keenincr pypmtina nr ntherwise rlisrlnsina nf its rnntpnts anrl fnr its nrnnpr Hisnnsal " STLCOPCB4089762 Company Confidential 2. Design and Drafting Emergency radio communications installation completed April 23 and suc cessfully utilized in emergency plan test run on April 3O. Preparation for chlorine shutdown included preliminary design for system to fill 2200 mercury flasks and liaison vith Surplus Property Disposal. Santowax R column instrumentation being checked out prior to installation. Pollution Control Waste audit for Aroclor Department scheduled for May. Quality The Plant Quality Score was 84.0, down 10.0 from March with a YTD score of 91.6 against a target of 95.0 minimum. A drop in quality uniformity was general through most departments. A decline in benzol raw material quality was revealed. . C. Landwehr jw DSVV 551346 STLCOPCB4089763 ORGANIC DIVISION 1969 TSD COST IMPROVEMENT ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Sol.Aro. Li-Still SpG. AFE 3015 Sp.Solid Aro. TAR EST ACT TAR 2250 2250 ^250 2250 2250 2250 225.Q. 2250. 2250 - 2600 2600 P600 2600 P600 2600 2600 2600 2600 - -- Lower 5060 EST: ACT 1500 5490 4390 215C 1500 5490 4890 Sol .Aro.-Still TAR Coolout temp. EST. 160 170 160 170 160 170 160 170 160 AFE 3015 ACT Sol.Aro.-Chlortcr TAR Batch End EST: 390 390 390 590 390 390 390 390 390 - AFE 3015 ACT SW/R Composition TAR 2750 2750 2750 2750 2750 2750 2750 2750 EST. AFE 3016 ACT Solid Aro. ' TAR 1080 1080 1080 1080 1080 1080 1080 1080 Montar 5 Flake EST AFE 2949 ACT Sol.Aro. Blend 4465 TAR EST ACT 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 1690 1920 1680 1490 1690 1920 1630 Sol.Aro.-Verti- TAR cal Still Cond. EST' AFE 2324 ACT 70 80 70 80 70 70 90 90 9 0 70 90 90 Sol.Aro.Cl2 T/C Dock AFE 2342 TAR EST; ACT 940 940 950 0 0 Cl2 Pit.Down No TAR Unload EST- 950 940 950 940 950 940 950 CED 1831 ACT Solid Aro.-Flake TAR & Drum EST. CED 1430 ACT 3000 *,000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 0 0 looo 2000 0 0 10 00 Liq.Aro. TAR 3000 3000 - - - - - - - - - - 48-53 M #/yr. AFE 2545 EST. ACT 0 550C 0 5500 Liq.Aro."No.2 TAR Still Entrain Sep. EST: AFE 3093 ACT 3000 3000 Liq.Aro. -Montar TAR Disposal EST: AFE 2952 ACT 1080 1080 1080 1080 1080 1080 1080 1080 1080 1080 00 0 Warehouse CEA 1452 TAR EST: ACT 2000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 200C 3000 2000 200C 200C Liq.Aro.New TAR Burners #3 Still EST ACT 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 00 0 Biphenyl Relocate TAR No. 1 Preheat EST CEA 1892 ACT 500 500 500 500 500 500 500 500 500 500 500 500 1500 0 1560 1870 1500 0 6 10 HB-40 2 A/C's AFE 3102 TAR EST ACT 3000 2230 3490 3000 3000 2580 0 242C 0 3000 3000 600 3000 3000 3000 3000 3OOO 3000 3000 --------------- . . --- - - DSW 551347 STLCOPCB4089764 ORGANIC DIVISION 1969 TSD COST IMPROVEMENT ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bi<t Improve TAR 450 450 450 450 450 450 450 450 Tower Treat. EST AFE 5155 Improve Pit. Power Factor ACT ' TAR EST 9Q0 900 900 900 900 900 900 900 ACT Central Air TAR 1000 1000 1000 1000 System EST ACT Optimize Rx Time TAR 3500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 EST 0 3420 PNP ACT 0 Reduce Mole TAR 4000 4000 4000 4000 4000 4000 4000 4000 4000 Ratio NaOH/PNCB PNP EST ACT New Wash Water Pump PNP AFE 2998 TAR EST ACT 25 50 25 50 50 50 50 50 50 50 50 Automatic pH TAR 500 500 500 Control EST PNP ACT HC1 Filter Pump TAR EST ACT 33 330 540 330 33O 340 330 33 New Blow Tank HC1 TAR EST ACT 200 200 200 200 200 200 200 200 200 200 200 150,000 Gal.-HCl Storage Tank AFE 2468 TAR EST ACT 17$0 1760 1780 1760 1760 1780 1760 1760 1780 Produce Staley Grade Acid TAR EST 790 790 790 790 790 790 AFE 5076 ACT Cla Plt. Shutdown TAR EST 9980 880 8880 8880 8880 8880 8880 , CEA 1851 ACT Hg Recover from Residue TAR EST ACT 250 250 250 250 3910 0 0 3910 0 Hg Wash Tank AFE 2802 Biphenyl Productivity TAR EST ACT TAR EST ACT 250 250 250 250 00 00 0 5600 5600 5600 5600 5600 5600 5600 5^00 5600 5600 5^00 5600 0 9U0U 15,0a 5150 10,800 Rs Total Organic By Mon th M $ TAR EST ACT 26.8 29.3 37.5 42.3 51.1 51.6 51.6 51.6 52.7 53,5 .5.0.6 27.1 30.2 19.8 2S.7 Total Organic YTD M $ TAR EST ACT 23.3 50.1 79.4 116.9 159,2 210.3 26U 31?-5 3&.1 417.8 471.3 521.9 46.9 78.8 19.8 48.5 DSW 551348 STLCOPCB4089765 AG DIVISION 1969 TSD COST IMPROVEMENT ANNUAL JAN FEB MAR APR MAY JtJN JUL AUG SEP OCT NOV DEC Cooling Tower TAR 420 420 410 410 420 420 410 420 420 Rep iping EST 0 AFE 2598 -ACT Optimize N2 & TAR 6600 6700 6700 6600 67 00 6700 Cl2 Levels EST 0 ACT Increase Waste TAR 400 300 300 400 300 3OO 400 300 300 Acid Sales EST' ACT 0- Chlorinator R.I. TAR 250 250 250 250 250 250 EST AFE 2244 ACT EVOP Condensation TAR 750 750 500 500 750 750 Rx. EST 0 0 12,615 ACT 0 0 12,615 Cl2 Unloading TAR 5000 5000 5000 2000 2000 2000 EST CEA 1831 ACT Recycle Wash TAR 290 290 290 290 290 290 Water EST AFE 2960 ACT Parathion Recovery TAR 5800!58001 5800 AFE 2655 EST ACT . i i Reduce Acetone Losses Formulations TAR EST ACT. TAR EST 4300|4300 4300 1' 1600 1600 1600 1600 1600 1600 3000 ! AFE 2897 ACT Change Cooling Item 737 TAR EST 125 125 125 125 125 125 125 125 125 120 AFE 3067 ACT Well H^O to Jets TAR 500 500 500 EST ACT Ag. Division by Month Ag. Division YTD TAR EST ACT TAR EST ACT 750 750 50C 9145 9145 9135 14675 14685 1 4685 14575 1 448 5 14485 1205 3^2 C 0 0 1205 750 1500 2000 11145 20290 292?; 441 no 58785 7347 d 38045 10255C 117015 12,615 15,735 0 0 12,65 TAR EST ACT TAR EST ACT DSW 551349 STLCOPCB4089766 ) AROCLOR - Company Confidential 3- E. E. Bowles, C. R. Mcllwain (V. R. Haupt) Evaluate Quaterphenyl 1969 Savings $63*200 TSD Objective Polyphenyl Effects on NFC $14,000 B - 8 (a) Solid Aroclor Yields___________ _____________'__________________________ ;_______________ Project is 50% complete. Still awaiting license from State Health Department before radioactive source for $4 still level alarm can be shipped. Design for second part of project, Still Condenser Coolant Control, will be transmitted in May. Montar 5 Flaking Savings $11,500 TSD Objective NFC $10,000______________________ B - 8 (c) Design package transmitted to planning and scheduling April 25th. Project will allow flaking of Montar 5 which is now drummed in bulk and hand crushed for special customers. Therminol System Potential TSD Objective ;___________________________ ________ Lost Sales;B - 8 (h) AFE No. 3216 is being prepared and will be issued for approval in May. This pro ject will cover the cost of a new circulating pump and the piping changes nec essary to improve the present Therminol system. Liquid Aroclor Evaluation TSD Job No. 455 Chlorinator Study________________________________________ ______________________________________ The effect of increased catalyst concentration on thermal chlorides in liquid Aroclor was studied in a plant test during June, 1968. The increased catalyst concentration test run for 34 days without a significant change in the thermal chlorides. TSD Progress Report No. 370:455 (2) gives the detailed results of the test. BIPHENYL-SANTOWAX W. G. Niemeyer, D. A. Self (V. R. Haupt) Debottleneck Bij>henyl Capacity Stills to 87.6m lbs/yr.Increase;B - 7 (a) TSD Objective An attempt was made to put the new Santowax C surge tank and pump into service on - April 4. Problems were encountered with the existing burner capacity of the Santo wax reboiler furnace. After a 24 hour trial, the new surge tank and pump were isolated and the feed to the Santowax column was returned as it was before. The Santowax column has been fed directly from the level control loop on the bottom of Che biphenyl column. CED has assisted the plant on burner and furnace modifications and when these are completed a demonstration test run will be conducted on the biphenyl/Santowax distillation area by the end of May. ......... ........ ................ DSW 551350 STLCOPCB4089767 ) No. 1 Furnace Upgrade Liaison (CEA-1892) : Capacity Increase The plant punch list Items are about 80% complete. Company Confidential 4. TSD Objective B - 7 (c) Improve Santowax R . Quality TSD Objective Quality with New B - 7 (d) Distillation Column_______ .____________________________________________________________ All long delivery instrumentation items have been received. Installation of instru mentation on this project should begin during the week of May 5 pending verbal approval of additional money needed to complete the project. Improve Biphenyl Process Study TSD Objective Process Knowledge_____________________________________________________;______ B - 7 (e) A second attempt was made to conduct a designed experiment on No. 1 biphenyl furnace on April 28. However; after six hours, the test had to be stopped due a plugged pressure gage line which could not be unplugged while the furnace was running. CHLORINE ~ HB-40 D. W. Dudley, J. L. Brown (A. G. McCarty) Central Chlorine Savings $53,300 Unloading TSD Back-up of __________ _______________________ Mfg. Rep.; TSD Objective B - 6 (a) Construction of central chlorine unloading and hydrogen purification facilities are complete. Calibration of instruments and instrument check-out are underway. Start up manual for entire project (CEA-I83I) was published in April. Pre-startup safety audit was conducted 4/24. Minutes published 4/25. HC1 0. J. Norris, J. M. Jones (A. G. McCarty) Production of Staley Grade Acid-Prolect 3076______________ New Earnings $28.8 M TSD Objective Potential Savings $71 MB - 10 (c). Catch tank put in service morning of 4/3O with no problems. Several small items on punch list need to be completed on Phase I. Coalscer for Phase II arrived week of 4/28. Prefabrication of piping scheduled for week of 5/5, TSD and Mainten ance schedules are set for installation of coalscer in May to meet June 1 target on completion of Phase II. Muratic Acid StorageSavings $21.200 ______ TSD Job No. 497 Painting completed, piping work approximately 501 complete. Completion possible by June. DSW 551351 STLCOPCB4089768 ) Company Confidential * 5. PNP 0. J. Norris, J. M. Jones (A. G. McCarty) Debottleneck to 1.8 M l/mo; $27.500 Capacity Savings ____________________ TSD Objective B - 9 (a) Reactor process control program initiated with results clouded initially. Proposed method to reduce solids (NaPNP) level by dropping PNCB charge to 7000$ for 2 batches had no effect. Currently investigating cause of high solid carry over which appears to be an entrainment problem. April production was 1.27 M $ at 67.451 OST (Down for parathion turnaround). Study has been initiated to determine cause of poor yields, production raised reaction time to 76 minutes to test effect of extended reaction time on yield. Revise PNP MIP______________________ ,_______________________ _ Typing complete. Will be issued by 5/15. NIRAN K. G. Hale, D. W,, Dudley (A. G. McCarty) Demonstrate Parathion Savings $17,500 Recovery 10-15% Reduced CODB - 5 (a) TSD Objective Drafting has begun for pilot test of precoat filter and fiberglass coalescing media for parathion recovery. Test has been tentatively scheduled for July if construction is completed in June. Project 3IO6 is to be revised to incorporate experimental expense for tests. Acetone Recovery Savings $12,900 TSD Objective ' 40-50% COD ReductionB - 5 (i) Tentative amendment "K" to the Methyl Parathion Standard Manufacturing Process was approved 4/21/69. Plant test will be conducted in May on condensation reactor number three to reduce Acetone losses to waste treatment. __ Recycle Wash Savings $3,500 Water;______________________________________________ B - 5 (g) TSD Objective Piping revisions necessary for plant test of recycling wash water from wash column to prewasher were installed during Niran turn-around. Tests will be conducted during June. DSW 551352 STLCOPCB4089769 ) . Company Confidential 6. NIRAN (Cont'd) Sulfur Recovery $271,000/yr. Savings From Residue 40% Reduction in S0oB - 5 (d) TSD Objective CED is still working on higher priorities. Anniston TSD continues to work on scope, equipment selection and P & I diagram. Quotes on all major equipment are expected by 5/15. Anniston PR&D is continuing work on corrosion tests with the assistance of WGK materials technology group. Submerged Pump for Savings $1500 TSD Objective Refractive Index (Potential Automation) B - 5 (c) Control of Chlorination______;_______________________ _________________________________ A representive from Anniston Maintenance Engineering group is scheduled to be at the "Taber" factory during May. He will at this time discuss the problems and alternates for modifications to the refractometer pump with Taber engineers. Plant test were halted when internal mechanical seals failed. Methyl-Ethyl Alcohol Cross Contamination Savings $3200 TSD Job No. 918 _______________________________________________ ___________________ Alcohol handling facilities were evaluated to determine sources of cross contamination. Recommendations are being prepared on an alternate procedure for handling the alcohol to minimize this cross contamination. ENGINEERING DESIGN AND SERVICES Mechanical/Electrical/instrument Design and Drafting J. C. Price. J. A, Veazey, R. L. Brewer. J. K. Rennie. R. V. Carlisle. (W. F. Taffee) Installation of Emergency Radio Communications system (AFE 2951 - $14 M) was completed 4/23/69. All units operated satisfactorily during simulated plant emergency test on 4/30/69. A successful control system start-up was made on the catch tank portion on the Coa lescing Unit at HC1 (AFE 3076 - $16 M). Completion of this project is necessary to achieve Staley-Grade HCl. Work is continuing on preparation for Dismantling and Removal of Chlorine Manufacturing Facilities at Anniston (AFR 3214). Check-out of new control panel received from vendor, for Santowax-R Still Control. (AFE 3OI6 - $33 M) has been completed. All other necessary instruments have been received. Demonstration of this project is necessary to increase Santowax yield and uniformity of quality thus increasing Solid Aroclor and HB-40 production. OSIN 55M*3 STLCOPCB4089770 ) Company Confidential 7. ENGINEERING DESIGN AND SERVICES (Cont'd) Projects forwarded for approval: Provide Fire Pump Capacity Check Equipment (AFE 3227 - $.4.1 M). Projects approved during April: Provide Partitions For New TSD Personnel (AFE 3212 - $3.6 M), Purchase Office Equipment for TSD (AFE 3250 - $1.4 M), Protect City Water Main From Corrosion (AFE 3O88 - $8.7 M), and Replace TSD Office Lighting (MRO 48570 - $0.5 M). Construction drawings were completed for the following projects: Lighting for Acetone and Benzene Tank Farm (AFE 3205 - $1.0 M), Lighting at Niran Tank Farm (AFE 3124 - $7.0 M), Replace Santowax Pump (AFE 3228 - $3.7 M), and Replace TSD Office Lighting (MRO 48570 - $0.5 M). UTILITIES ENGINEERING J. C. Price, L. 0. Chambers (W. F. Taffee) Completed preliminary study of potential utilities saving in HC1 department and forwarded results for inclusion in HCl MIP. Started preliminary efficiency studies of Biphenyl furnace and therminol furnaces in Aroclor, Santowax and P^S^ departments. Forwarded Capacitor Relocation and Biphenyl Cooling Tower Treatment project drawings for review. The two projects have a savings potential or $16,200 per year and the design packages will be transmitted early in May. PLANT IMPROVEMENT G. C. Goodwin (W. F. Taffee) AFE's forwarded for HCl area drainage, PNP Item 216 tank, and design package forwarded for curbing and trenches in the Niran department, a total expenditure of $8,350 to improve control of liquid wastes. POLLUTION CONTROL E. G. Wright (W. F. Taffee) Budgets The 1970 budget for 913.41 was prepared during April. TSD Objective F- 1 Contacts With Regulatory Agencies Community and Govt. Relations TSD Objective F- 2 Dr. Dave Hill and Mr. Tom Sargent of the F.W.P.C.A. Southeast Water Laboratory in Athens, Georgia visited the plant on April 28. They were here to discuss treatment of Pesticide Wastes. They were given a tour of our waste treatment facilities and a discussion on the operation of the treatment plant. DSW 551354 i STLCOPCB4089771 > POLLUTION CONTROL (Cont'd) Company Confidential 8. Contacts With Regulatory Community and Govt. TSD Objective Agencies;Relations F - 2______________________________________________________________________________, Visited the city treatment plant and discussed the improved solids situation. Solids have not been a source of complaint since we began sewering a steady stream to them instead of intermittent discharge. Waste Audits Pollution Abatement __________ ____ _______________ __________________________ F - 5 TSD Objective ________________ . A meeting was held during April with Production, TSD and the Laboratory to discuss the P.C.B. (Poly-Chlorinated Biphenyl) problem. Agreement was reached on sampling points to be tested within the Aroclor department. Laboratory personnel will contact Organic Research concerning the analytical method to be used. Spills and Emissions Reporting;F - 4 Pollution Abatement TSD Objective _____ Two emissions were reported during April. Both were from the HC1 department. Solids Removal Pollution Abatement Equipment at Waste Treatment_____________________________________________________ Construction was begun on this project in April. TSD Objective F-4 _______________ Waste Treatment All wastes were effectively treated during April. One of the new liners for the influent splitter boxes was put in during the Niran turnaround. Average daily values for Monsanto's effluent are as follows: Average Daily Specifications PNP 1.0 ppm 5 ppm COD 51 ppm 200 ppm Parathion .07 ppm 1.0 ppm BOD 5.0 ppm 200 ppm DSW 551355 STLCOPCB4089772 ) . .. i Company Confidential : 9. PROCESS AND QUALITY ANALYSIS W. B. Dunlap Quality The Plant Quality Score was 84.0, down 10.0 from March with YTD score of 91.6 against a target of 95.0 minimum. A drop in quality uniformity was general through most departments. A decline in benzol raw material quality was revealed. PNP - Monitor Potential Savings TSD Objective- Critical Variables $60,000 C-3 _____________________________________________________________________ Job 879_______________ Training sessions were held with all operators on the new concept and methods of PNP reactor depressurization control. A 30-day demonstration was started. The control system has functioned perfectly to prevent plugging and clean-outs during a period of exceptionally high solids. Circumstantial evidence points to excessive foaming of reactor as cause of continuing high solids. DSW 551356 STLCOPCB4089773 ) ' ' .' PLANT LABORATORIES G. W. Miller '. .Company Confidential 10 '' % ii ! PROCESS RESEARCH AND DEVELOPMENT J. T. Bell For the month of April, 42 mandays were expended on projects scheduled in the 1969 PR&D Program. The remaining 35 mandays were utilized on the Biphenyl Hydrogen Purification start-up and on the expanded Sulfur Recovery investigation. p-NitrophenolReduce Cycle Times_____ W. H. Howard A retarded cool-down rate in the laboratory PNP .reactor analogous to plant difficulties has been generated by the combination high reactant volume and high solids (added sodium PNP). The reduction of either factor, volume or solids, results in normal cooling rates. Evaporative cooling as controlled by the depressurization rate essentially determines the cooling period for the reactor contents. The addition of the ortho isomer of nitrophenol has had no effect on cooling rates. Sulfur Recovery____________ Sulfur Refinement for Reuse,I. Ransaw Corrosion studies for nickel, carbon steel, and monel in the wash effluent from the first wash following a pH adjustment to 7-8 has been completed. Nickel appears unsatisfactory with carbon steel and monel results not yet received from St. Louis. A colorimetric technique for measuring H.S off-gas generated in the wash steps has been developed but results are incomplete. A carbon train for analysis of Sulfur samples has been assembled and results are satisfactory and essentially complete. Blend Scavenger Refinement (Aroclor)______ Improved Aroclor Electrical Properties______________ J. L. Brown The project has been delayed indefinitely by the Biphenyl Hydrogen Purification start-up. Parathion Isomer ReductionImprove YieldsG. L. Arnett Laboratory studies indicate that isomer formation in ethyl intermediate results from chlorination rather than from impurities in plant ethyl thio acid. The assay of crude intermediate is a function of chlorination conditions . with yield improvements observed at lower temperatures utilizing both methyl and ethyl thio acids. Higher assays are apparently the result of reduced residue rather than reduced low boiling isomers. Nitrogen sparging through out the chlorination did not alter the isomeric distribution over that currently obtained by sparging during the last 1/3 of chlorine addition. HC1 and air used to replace the Nitrogen had essentially no effect on isomer formation or intermediate assay. Attempts to utilize residue and forecuts of plant material to suppress isomer formation were unsuccessful. DSW 551357 STLCOPCB4089774 ) PLANT LABORATORIES (Cont'd) Company Confidential 11. PROCESS RESEARCH AND DEVELOPMENT (Cont'd) Hydrogen Purification Unit Start-up Purified Hydrogen for HB-40 J. L. Brown Construction of the Biphenyl Hydrogen Purification Unit has been completed as scheduled. Operator classroom training, pressure testing, adsorption bed charging, and initial valve operations check-out are complete. On stream operation is scheduled for 5/1/69 with extensive performance evaluation to follow. ANALYTICAL AND QUALITY CONTROL S. 0. Kemp Aroclor Preparation of analytical equipment for electrical quality measurements on Aroclors is approximately 907. complete. HB-40 A new product color specification (180 APHA) was issued and approved. All color determinations for HB-40 will be reported as APPARENT APHA as determined on the Hellige Aqua Test equipment. ' Complaint Report Quality None YTD Quality Complaints/100 Shipments 0.09 Target 0.20 DSW 551358 STLCOPCB4089775 )' ' ' .Company Confidential 12 COMMUNITY RELATIONS. PERSONNEL. RECRUITING. AND DEVELOPMENT Personnel 1. R. V. Carlisle transferred into TSD as Instrument/Electrical Technician on April 21. 2. J. H. Brooks and D. W. Blackstone transferred to Lab effective May 1, 1969 as Laboratory Analysts. 3. D. W. Dudley and J. L. Brown conducted training, carried out start-up preparation and safety reviews on Central Chlorine Unloading and Biphenyl Hydrogen Purification projects. 4. D. W. Dudley was promoted to Process Engineer II 4-1-69. 5. D. W. Dudley, K. G. Hale, and A. G. McCarty presented TSD plans to Ag Crop Protection Business Group. Development 1. E. G. Wright and W. F. Taffee attended a Corporate Pollution Control Seminar at the General Offices April 1-3. 2. D. B. Hosmer discussed Technical Lines of Promotion at a meeting with all technical personnel. 3. S. 0. Kemp and I. Ransaw attended Gas Chromatography Course (HewlettPackard) in Orlando, Fla. week of April 21. Visitors 1. D. B. Hosmer, Manager of Manufacturing Technology, visited with L. E. Weeks, TPM of MCL. 2. R. Alexis visited concerning Biphenyl Hydrogen Purification start-up week of 4/28/69. 1 j j 1 DSW 551359 STLCOPCB4089776 ) - .. ' DISTRIBUTION OF TIMS BY -TECHNICAL SERVICE Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. PROCESS IMPROVEMENT :w PRODUCTS PLANT IMPROVEMENT ASSIST OPERATIONS 30 --p-- SPECIAL 20 1 ENGINEERING SERVICES 10 ____ L 0 _J__1____ !____ TECHNICAL MANPOWER MISCELLANEOUS ACTIVITIES AND riD i lj iYu ---=-- ----- STLCOPCB4089777 600 IN MAINTENANCE FOR CONSTRUCTION 500 400 300 200 100 00 600 IN MAINTENANCE COMPLETED NOT CLOSED 500 400 500. 200 3 oQ 100 o0 CO PROJECTS SUBMITTED FOR APPROVAL company i^ontiaenciai TSD PROJECT SUMMARY ~E APPROVED PROJECTS IN TSD STLCOPCB4089778 LABORATORY ADMINISTRATION ANALYTICAL SAMPLES 2400 2300 2200 ANALYTICAL MANPOWER 2100 2000 1900 1800 1700 Manpower/sample r-- i i i i 1 i i 1 -C3C ssGSfcj 11 __ ^ 1 ______ L_ 1 1. j | g 1 I 8 $/Manhours % Total Plant Operating Cost Overtime 7, STLCOPCB4089779