Document NGaMk3EmkeeZn3G9LGLGgqkoy
COMPANY CONFIDENTIAL ) MniKantn
Anniston Plant
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Anniston
C. K. Eastman C. A. Rose J. C. Landwehr L. J. Boesch G. W. Miller W. B. Papageorge W. F. Taffee H. L. Williams
Summary April, 1969
Cost Improvement Results
Month
Est. Act. $14,520
Target $46,645*
% of Target 31.2
i
YTD
$95,385
$128,045*
74.4*
Genera 1 Offices
H. C. Carder
w. R. Robirds
D. Danna (5) P. B. Hodges D. B. Hosmer (2)
w. A. Kuhn c. F. Luecke
N. L. Sample J. E. Smith R. J. Stratmeyer H. S. Trail
Organic Division
*Targets revised upward from $31.9 M, month and $94.6 M YTD. Sharply reducing % target YTD from March 141.
All long term delivery items on the Santowax R column controls project have arrived. Installation is expected in May.
The Solid Aroclor instrumentation project to increase 5460 yield is 50% installed. The State Health Department license for radioactive source has not been received and could delay project completion.
Construction of central Chlorine Unloading and Biphenyl Hydro gen Purification complete. Instrument check out and cali brations are underway. Start-up of facilities will be in early May with demonstration to follow by May 15.
OTHER LOCATIONS
D. W. Jackson-WGK T. M. Patrick -
So. 2nd St. A. H. Forsten -
Alvin, Texas
First phase of water white Muriatic Acid project completed and off-gas catch pot has been put into operation.
Training sessions were held with all operators on the new concept and methods of PNP reactor depressurization control. A 30-day demonstration was started. The control system has functioned perfectly to prevent plugging and clean-outs during a period of exceptionally high solids. Circumstantial evidence points to excessive foaming of reactor as cause of continuing high solids.
Agricultural Division
Tentative amendment "K" to the Methyl Parathion process for
Acetone Recovery was approved 4/21. Plant test on number
three condensation reactor to follow in May.
AN-306 REV.
COMPANY CONFIDENTIAL INFORMATION
DSW 551345
"This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written aoDroval and the recinient is arcnuntahle for its safe keenincr pypmtina nr ntherwise rlisrlnsina nf its rnntpnts anrl fnr its nrnnpr Hisnnsal "
STLCOPCB4089762
Company Confidential 2.
Design and Drafting Emergency radio communications installation completed April 23 and suc cessfully utilized in emergency plan test run on April 3O. Preparation for chlorine shutdown included preliminary design for system to fill 2200 mercury flasks and liaison vith Surplus Property Disposal. Santowax R column instrumentation being checked out prior to installation.
Pollution Control Waste audit for Aroclor Department scheduled for May.
Quality The Plant Quality Score was 84.0, down 10.0 from March with a YTD score of 91.6 against a target of 95.0 minimum. A drop in quality uniformity was general through most departments. A decline in benzol raw material quality was revealed.
. C. Landwehr jw
DSVV 551346 STLCOPCB4089763
ORGANIC DIVISION 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Sol.Aro. Li-Still SpG. AFE 3015 Sp.Solid Aro.
TAR EST ACT TAR
2250 2250 ^250 2250 2250 2250 225.Q. 2250. 2250 -
2600 2600 P600 2600 P600 2600 2600 2600 2600 -
--
Lower 5060
EST: ACT
1500 5490 4390 215C 1500 5490 4890
Sol .Aro.-Still TAR Coolout temp. EST.
160 170 160 170 160 170 160 170 160
AFE 3015
ACT
Sol.Aro.-Chlortcr TAR
Batch End
EST:
390 390 390 590 390 390 390 390 390 -
AFE 3015
ACT
SW/R Composition TAR
2750 2750 2750 2750 2750 2750 2750 2750
EST.
AFE 3016
ACT
Solid Aro. '
TAR
1080 1080 1080 1080 1080 1080 1080 1080
Montar 5 Flake EST
AFE 2949
ACT
Sol.Aro. Blend 4465
TAR EST
ACT
2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500
1690 1920 1680 1490 1690 1920 1630
Sol.Aro.-Verti- TAR
cal Still Cond. EST'
AFE 2324
ACT
70 80 70 80 70 70 90 90 9 0 70 90 90
Sol.Aro.Cl2 T/C Dock AFE 2342
TAR EST; ACT
940 940 950 0
0
Cl2 Pit.Down No TAR
Unload
EST-
950 940 950 940 950 940 950
CED 1831
ACT
Solid Aro.-Flake TAR
& Drum
EST.
CED 1430
ACT
3000 *,000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 0 0 looo 2000 0 0 10 00
Liq.Aro.
TAR 3000 3000 - - - - - - - - - -
48-53 M #/yr. AFE 2545
EST. ACT
0 550C 0 5500
Liq.Aro."No.2
TAR
Still Entrain Sep. EST:
AFE 3093
ACT
3000 3000
Liq.Aro. -Montar TAR
Disposal
EST:
AFE 2952
ACT
1080 1080 1080 1080 1080 1080 1080 1080 1080 1080 00 0
Warehouse CEA 1452
TAR EST: ACT
2000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 200C 3000 2000 200C 200C
Liq.Aro.New
TAR
Burners #3 Still EST
ACT
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 00 0
Biphenyl Relocate TAR
No. 1 Preheat EST
CEA 1892
ACT
500 500 500 500 500 500 500 500 500 500 500 500 1500 0 1560 1870 1500 0 6 10
HB-40 2 A/C's AFE 3102
TAR
EST ACT
3000
2230 3490
3000 3000
2580 0 242C 0
3000 3000 600
3000
3000
3000
3000
3OOO 3000 3000
---------------
. . --- - -
DSW 551347
STLCOPCB4089764
ORGANIC DIVISION 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Bi<t Improve
TAR
450 450 450 450 450 450 450 450
Tower Treat.
EST
AFE 5155 Improve Pit. Power Factor
ACT ' TAR
EST
9Q0 900 900 900 900 900 900 900
ACT
Central Air
TAR
1000 1000 1000 1000
System
EST ACT
Optimize Rx Time TAR
3500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500
EST 0 3420 PNP ACT 0
Reduce Mole
TAR
4000 4000 4000 4000 4000 4000 4000 4000 4000
Ratio NaOH/PNCB PNP
EST ACT
New Wash Water Pump PNP AFE 2998
TAR EST ACT
25 50 25
50 50 50 50 50 50 50 50
Automatic pH
TAR
500 500 500
Control
EST
PNP ACT
HC1 Filter Pump
TAR EST ACT
33 330 540
330 33O 340 330 33
New Blow Tank HC1
TAR EST ACT
200 200 200 200 200 200
200 200 200 200 200
150,000 Gal.-HCl Storage Tank AFE 2468
TAR EST ACT
17$0 1760 1780 1760 1760 1780 1760 1760 1780
Produce Staley Grade Acid
TAR EST
790 790 790 790 790 790
AFE 5076
ACT
Cla Plt. Shutdown TAR EST
9980 880 8880 8880 8880 8880 8880
,
CEA 1851
ACT
Hg Recover from Residue
TAR EST ACT
250 250 250 250
3910 0
0
3910 0
Hg Wash Tank
AFE 2802 Biphenyl Productivity
TAR EST
ACT
TAR EST ACT
250 250 250 250
00 00
0
5600 5600 5600 5600 5600 5600 5600 5^00 5600 5600 5^00 5600
0 9U0U 15,0a
5150 10,800
Rs
Total Organic By Mon th M $
TAR
EST ACT
26.8 29.3 37.5 42.3 51.1 51.6 51.6 51.6 52.7 53,5 .5.0.6
27.1 30.2 19.8 2S.7
Total Organic YTD M $
TAR EST ACT
23.3 50.1 79.4 116.9 159,2 210.3 26U 31?-5 3&.1 417.8 471.3 521.9 46.9 78.8
19.8 48.5
DSW 551348
STLCOPCB4089765
AG DIVISION 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JtJN JUL AUG SEP OCT NOV DEC
Cooling Tower
TAR
420 420 410 410 420 420 410 420 420
Rep iping
EST
0
AFE 2598
-ACT
Optimize N2 &
TAR
6600 6700 6700 6600 67 00 6700
Cl2 Levels
EST
0
ACT
Increase Waste
TAR
400 300 300 400 300 3OO 400 300 300
Acid Sales
EST' ACT
0-
Chlorinator R.I.
TAR
250 250 250 250 250 250
EST
AFE 2244
ACT
EVOP Condensation TAR 750 750 500
500 750 750
Rx. EST 0 0 12,615 ACT 0 0 12,615
Cl2 Unloading
TAR
5000 5000 5000 2000 2000 2000
EST
CEA 1831
ACT
Recycle Wash
TAR
290 290 290 290 290 290
Water
EST
AFE 2960
ACT
Parathion Recovery TAR
5800!58001 5800
AFE 2655
EST ACT .
i
i
Reduce Acetone Losses
Formulations
TAR EST ACT. TAR EST
4300|4300 4300
1'
1600 1600 1600 1600 1600 1600 3000
!
AFE 2897
ACT
Change Cooling Item 737
TAR EST
125 125 125 125 125 125 125 125 125 120
AFE 3067
ACT
Well H^O to Jets
TAR
500 500 500
EST
ACT
Ag. Division by Month
Ag. Division YTD
TAR EST ACT
TAR
EST ACT
750 750 50C 9145 9145 9135 14675 14685 1 4685 14575 1 448 5 14485 1205 3^2 C
0 0 1205 750 1500 2000 11145 20290 292?; 441 no 58785 7347 d 38045 10255C 117015
12,615 15,735 0 0 12,65
TAR
EST ACT
TAR EST ACT
DSW 551349
STLCOPCB4089766
)
AROCLOR
- Company Confidential 3-
E. E. Bowles, C. R. Mcllwain (V. R. Haupt)
Evaluate Quaterphenyl
1969 Savings $63*200
TSD Objective
Polyphenyl Effects on
NFC $14,000
B - 8 (a)
Solid Aroclor Yields___________ _____________'__________________________ ;_______________
Project is 50% complete. Still awaiting license from State Health Department before radioactive source for $4 still level alarm can be shipped.
Design for second part of project, Still Condenser Coolant Control, will be transmitted in May.
Montar 5 Flaking
Savings $11,500
TSD Objective
NFC $10,000______________________ B - 8 (c)
Design package transmitted to planning and scheduling April 25th. Project will allow flaking of Montar 5 which is now drummed in bulk and hand crushed for special customers.
Therminol System
Potential
TSD Objective
;___________________________ ________ Lost Sales;B - 8 (h)
AFE No. 3216 is being prepared and will be issued for approval in May. This pro ject will cover the cost of a new circulating pump and the piping changes nec essary to improve the present Therminol system.
Liquid Aroclor
Evaluation
TSD Job No. 455
Chlorinator Study________________________________________ ______________________________________
The effect of increased catalyst concentration on thermal chlorides in liquid Aroclor was studied in a plant test during June, 1968. The increased catalyst concentration test run for 34 days without a significant change in the thermal chlorides. TSD Progress Report No. 370:455 (2) gives the detailed results of the test.
BIPHENYL-SANTOWAX
W. G. Niemeyer, D. A. Self (V. R. Haupt)
Debottleneck Bij>henyl
Capacity
Stills to 87.6m lbs/yr.Increase;B - 7 (a)
TSD Objective
An attempt was made to put the new Santowax C surge tank and pump into service on -
April 4. Problems were encountered with the existing burner capacity of the Santo
wax reboiler furnace. After a 24 hour trial, the new surge tank and pump were
isolated and the feed to the Santowax column was returned as it was before. The
Santowax column has been fed directly from the level control loop on the bottom of
Che biphenyl column. CED has assisted the plant on burner and furnace modifications
and when these are completed a demonstration test run will be conducted on the
biphenyl/Santowax distillation area by the end of May.
......... ........ ................
DSW 551350
STLCOPCB4089767
)
No. 1 Furnace Upgrade Liaison (CEA-1892)
: Capacity Increase
The plant punch list Items are about 80% complete.
Company Confidential 4.
TSD Objective B - 7 (c)
Improve Santowax R .
Quality
TSD Objective
Quality with New
B - 7 (d)
Distillation Column_______ .____________________________________________________________
All long delivery instrumentation items have been received. Installation of instru mentation on this project should begin during the week of May 5 pending verbal approval of additional money needed to complete the project.
Improve Biphenyl
Process Study
TSD Objective
Process Knowledge_____________________________________________________;______ B - 7 (e)
A second attempt was made to conduct a designed experiment on No. 1 biphenyl furnace on April 28. However; after six hours, the test had to be stopped due a plugged pressure gage line which could not be unplugged while the furnace was running.
CHLORINE ~ HB-40
D. W. Dudley, J. L. Brown (A. G. McCarty)
Central Chlorine
Savings $53,300
Unloading
TSD Back-up of
__________
_______________________ Mfg. Rep.;
TSD Objective B - 6 (a)
Construction of central chlorine unloading and hydrogen purification facilities are complete. Calibration of instruments and instrument check-out are underway. Start up manual for entire project (CEA-I83I) was published in April. Pre-startup safety audit was conducted 4/24. Minutes published 4/25.
HC1 0. J. Norris, J. M. Jones (A. G. McCarty)
Production of Staley Grade Acid-Prolect 3076______________
New Earnings $28.8 M
TSD Objective
Potential Savings $71 MB - 10 (c).
Catch tank put in service morning of 4/3O with no problems. Several small items on punch list need to be completed on Phase I. Coalscer for Phase II arrived week of 4/28. Prefabrication of piping scheduled for week of 5/5, TSD and Mainten ance schedules are set for installation of coalscer in May to meet June 1 target on completion of Phase II.
Muratic Acid StorageSavings $21.200 ______
TSD Job No. 497
Painting completed, piping work approximately 501 complete. Completion possible by June.
DSW 551351
STLCOPCB4089768
)
Company Confidential
*
5.
PNP 0. J. Norris, J. M. Jones (A. G. McCarty)
Debottleneck to 1.8 M l/mo; $27.500
Capacity Savings ____________________
TSD Objective B - 9 (a)
Reactor process control program initiated with results clouded initially. Proposed method to reduce solids (NaPNP) level by dropping PNCB charge to 7000$ for 2 batches had no effect. Currently investigating cause of high solid carry over which appears to be an entrainment problem. April production was 1.27 M $ at 67.451 OST (Down for parathion turnaround). Study has been initiated to determine cause of poor yields, production raised reaction time to 76 minutes to test effect of extended reaction time on yield.
Revise PNP MIP______________________ ,_______________________ _ Typing complete. Will be issued by 5/15.
NIRAN
K. G. Hale, D. W,, Dudley (A. G. McCarty)
Demonstrate Parathion
Savings $17,500
Recovery 10-15% Reduced CODB - 5 (a)
TSD Objective
Drafting has begun for pilot test of precoat filter and fiberglass coalescing media for parathion recovery. Test has been tentatively scheduled for July if construction is completed in June. Project 3IO6 is to be revised to incorporate experimental expense for tests.
Acetone Recovery
Savings $12,900
TSD Objective
' 40-50% COD ReductionB - 5 (i)
Tentative amendment "K" to the Methyl Parathion Standard Manufacturing Process was approved 4/21/69. Plant test will be conducted in May on condensation reactor number three to reduce Acetone losses to waste treatment.
__
Recycle Wash
Savings $3,500
Water;______________________________________________ B - 5 (g)
TSD Objective
Piping revisions necessary for plant test of recycling wash water from wash column to prewasher were installed during Niran turn-around. Tests will be conducted during June.
DSW 551352 STLCOPCB4089769
) .
Company Confidential 6.
NIRAN (Cont'd)
Sulfur Recovery
$271,000/yr. Savings
From Residue 40% Reduction in S0oB - 5 (d)
TSD Objective
CED is still working on higher priorities. Anniston TSD continues to work on scope, equipment selection and P & I diagram. Quotes on all major equipment are expected by 5/15.
Anniston PR&D is continuing work on corrosion tests with the assistance of WGK materials technology group.
Submerged Pump for
Savings $1500
TSD Objective
Refractive Index
(Potential Automation)
B - 5 (c)
Control of Chlorination______;_______________________ _________________________________
A representive from Anniston Maintenance Engineering group is scheduled to be at the "Taber" factory during May. He will at this time discuss the problems and alternates for modifications to the refractometer pump with Taber engineers. Plant test were halted when internal mechanical seals failed.
Methyl-Ethyl Alcohol Cross Contamination
Savings $3200
TSD Job No. 918
_______________________________________________ ___________________
Alcohol handling facilities were evaluated to determine sources of cross contamination. Recommendations are being prepared on an alternate procedure for handling the alcohol to minimize this cross contamination.
ENGINEERING DESIGN AND SERVICES
Mechanical/Electrical/instrument Design and Drafting
J. C. Price. J. A, Veazey, R. L. Brewer. J. K. Rennie. R. V. Carlisle. (W. F. Taffee)
Installation of Emergency Radio Communications system (AFE 2951 - $14 M) was completed 4/23/69. All units operated satisfactorily during simulated plant emergency test on 4/30/69.
A successful control system start-up was made on the catch tank portion on the Coa lescing Unit at HC1 (AFE 3076 - $16 M). Completion of this project is necessary to achieve Staley-Grade HCl.
Work is continuing on preparation for Dismantling and Removal of Chlorine Manufacturing Facilities at Anniston (AFR 3214).
Check-out of new control panel received from vendor, for Santowax-R Still Control. (AFE 3OI6 - $33 M) has been completed. All other necessary instruments have been received. Demonstration of this project is necessary to increase Santowax yield and uniformity of quality thus increasing Solid Aroclor and HB-40 production.
OSIN 55M*3
STLCOPCB4089770
) Company Confidential
7.
ENGINEERING DESIGN AND SERVICES (Cont'd)
Projects forwarded for approval:
Provide Fire Pump Capacity Check Equipment (AFE 3227 - $.4.1 M).
Projects approved during April:
Provide Partitions For New TSD Personnel (AFE 3212 - $3.6 M), Purchase Office Equipment for TSD (AFE 3250 - $1.4 M), Protect City Water Main From Corrosion (AFE 3O88 - $8.7 M), and Replace TSD Office Lighting (MRO 48570 - $0.5 M).
Construction drawings were completed for the following projects:
Lighting for Acetone and Benzene Tank Farm (AFE 3205 - $1.0 M), Lighting at Niran Tank Farm (AFE 3124 - $7.0 M), Replace Santowax Pump (AFE 3228 - $3.7 M), and Replace TSD Office Lighting (MRO 48570 - $0.5 M).
UTILITIES ENGINEERING
J. C. Price, L. 0. Chambers (W. F. Taffee)
Completed preliminary study of potential utilities saving in HC1 department and forwarded results for inclusion in HCl MIP. Started preliminary efficiency studies of Biphenyl furnace and therminol furnaces in Aroclor, Santowax and P^S^ departments. Forwarded Capacitor Relocation and Biphenyl Cooling Tower Treatment project drawings for review. The two projects have a savings potential or $16,200 per year and the design packages will be transmitted early in May.
PLANT IMPROVEMENT
G. C. Goodwin (W. F. Taffee)
AFE's forwarded for HCl area drainage, PNP Item 216 tank, and design package forwarded for curbing and trenches in the Niran department, a total expenditure of $8,350 to improve control of liquid wastes.
POLLUTION CONTROL
E. G. Wright (W. F. Taffee)
Budgets The 1970 budget for 913.41 was prepared during April.
TSD Objective F- 1
Contacts With Regulatory Agencies
Community and Govt. Relations
TSD Objective F- 2
Dr. Dave Hill and Mr. Tom Sargent of the F.W.P.C.A. Southeast Water Laboratory in Athens, Georgia visited the plant on April 28. They were here to discuss treatment of Pesticide Wastes. They were given a tour of our waste treatment facilities and a discussion on the operation of the treatment plant.
DSW 551354
i
STLCOPCB4089771
> POLLUTION CONTROL (Cont'd)
Company Confidential
8.
Contacts With Regulatory
Community and Govt.
TSD Objective
Agencies;Relations F - 2______________________________________________________________________________,
Visited the city treatment plant and discussed the improved solids situation. Solids have not been a source of complaint since we began sewering a steady stream to them instead of intermittent discharge.
Waste Audits
Pollution Abatement
__________ ____ _______________ __________________________ F - 5
TSD Objective ________________ .
A meeting was held during April with Production, TSD and the Laboratory to discuss the P.C.B. (Poly-Chlorinated Biphenyl) problem. Agreement was reached on sampling points to be tested within the Aroclor department. Laboratory personnel will contact Organic Research concerning the analytical method to be used.
Spills and Emissions Reporting;F - 4
Pollution Abatement
TSD Objective _____
Two emissions were reported during April. Both were from the HC1 department.
Solids Removal
Pollution Abatement
Equipment at
Waste Treatment_____________________________________________________
Construction was begun on this project in April.
TSD Objective F-4
_______________
Waste Treatment
All wastes were effectively treated during April. One of the new liners for the influent splitter boxes was put in during the Niran turnaround. Average daily values for Monsanto's effluent are as follows:
Average Daily
Specifications
PNP 1.0 ppm
5 ppm
COD 51 ppm
200 ppm
Parathion
.07 ppm
1.0 ppm
BOD 5.0 ppm
200 ppm
DSW 551355 STLCOPCB4089772
)
.
..
i
Company Confidential
:
9.
PROCESS AND QUALITY ANALYSIS
W. B. Dunlap
Quality
The Plant Quality Score was 84.0, down 10.0 from March with YTD score of 91.6 against a target of 95.0 minimum. A drop in quality uniformity was general through most departments. A decline in benzol raw material quality was revealed.
PNP - Monitor
Potential Savings
TSD Objective-
Critical Variables
$60,000
C-3
_____________________________________________________________________ Job 879_______________
Training sessions were held with all operators on the new concept and methods of PNP reactor depressurization control. A 30-day demonstration was started. The control system has functioned perfectly to prevent plugging and clean-outs during a period of exceptionally high solids. Circumstantial evidence points to excessive foaming of reactor as cause of continuing high solids.
DSW 551356
STLCOPCB4089773
)
'
'
.'
PLANT LABORATORIES G. W. Miller
'.
.Company Confidential 10
'' %
ii
!
PROCESS RESEARCH AND DEVELOPMENT J. T. Bell
For the month of April, 42 mandays were expended on projects scheduled in the 1969 PR&D Program. The remaining 35 mandays were utilized on the Biphenyl Hydrogen Purification start-up and on the expanded Sulfur Recovery investigation.
p-NitrophenolReduce Cycle Times_____
W. H. Howard
A retarded cool-down rate in the laboratory PNP .reactor analogous to plant difficulties has been generated by the combination high reactant volume and high solids (added sodium PNP). The reduction of either factor, volume or solids, results in normal cooling rates. Evaporative cooling as controlled by the depressurization rate essentially determines the cooling period for the reactor contents. The addition of the ortho isomer of nitrophenol has had no effect on cooling rates.
Sulfur Recovery____________
Sulfur Refinement for Reuse,I. Ransaw
Corrosion studies for nickel, carbon steel, and monel in the wash effluent from the first wash following a pH adjustment to 7-8 has been completed. Nickel appears unsatisfactory with carbon steel and monel results not yet received from St. Louis. A colorimetric technique for measuring H.S off-gas generated in the wash steps has been developed but results are incomplete. A carbon train for analysis of Sulfur samples has been assembled and results are satisfactory and essentially complete.
Blend Scavenger Refinement (Aroclor)______
Improved Aroclor Electrical Properties______________
J. L. Brown
The project has been delayed indefinitely by the Biphenyl Hydrogen Purification start-up.
Parathion Isomer ReductionImprove YieldsG. L. Arnett
Laboratory studies indicate that isomer formation in ethyl intermediate results from chlorination rather than from impurities in plant ethyl thio acid. The assay of crude intermediate is a function of chlorination conditions . with yield improvements observed at lower temperatures utilizing both methyl and ethyl thio acids. Higher assays are apparently the result of reduced residue rather than reduced low boiling isomers. Nitrogen sparging through out the chlorination did not alter the isomeric distribution over that currently obtained by sparging during the last 1/3 of chlorine addition. HC1 and air used to replace the Nitrogen had essentially no effect on isomer formation or intermediate assay. Attempts to utilize residue and forecuts of plant material to suppress isomer formation were unsuccessful.
DSW 551357
STLCOPCB4089774
)
PLANT LABORATORIES (Cont'd)
Company Confidential 11.
PROCESS RESEARCH AND DEVELOPMENT (Cont'd)
Hydrogen Purification Unit Start-up
Purified Hydrogen for HB-40
J. L. Brown
Construction of the Biphenyl Hydrogen Purification Unit has been completed as scheduled. Operator classroom training, pressure testing, adsorption bed charging, and initial valve operations check-out are complete. On stream operation is scheduled for 5/1/69 with extensive performance evaluation to follow.
ANALYTICAL AND QUALITY CONTROL
S. 0. Kemp
Aroclor
Preparation of analytical equipment for electrical quality measurements on Aroclors is approximately 907. complete.
HB-40
A new product color specification (180 APHA) was issued and approved. All
color determinations for HB-40 will be reported as APPARENT APHA as determined
on the Hellige Aqua Test equipment.
'
Complaint Report
Quality
None
YTD Quality Complaints/100 Shipments 0.09
Target 0.20
DSW 551358
STLCOPCB4089775
)'
'
'
.Company Confidential 12
COMMUNITY RELATIONS. PERSONNEL. RECRUITING. AND DEVELOPMENT
Personnel
1. R. V. Carlisle transferred into TSD as Instrument/Electrical Technician on April 21.
2. J. H. Brooks and D. W. Blackstone transferred to Lab effective May 1, 1969 as Laboratory Analysts.
3. D. W. Dudley and J. L. Brown conducted training, carried out start-up preparation and safety reviews on Central Chlorine Unloading and Biphenyl Hydrogen Purification projects.
4. D. W. Dudley was promoted to Process Engineer II 4-1-69.
5. D. W. Dudley, K. G. Hale, and A. G. McCarty presented TSD plans to Ag Crop Protection Business Group.
Development
1. E. G. Wright and W. F. Taffee attended a Corporate Pollution Control Seminar at the General Offices April 1-3.
2. D. B. Hosmer discussed Technical Lines of Promotion at a meeting with all technical personnel.
3. S. 0. Kemp and I. Ransaw attended Gas Chromatography Course (HewlettPackard) in Orlando, Fla. week of April 21.
Visitors
1. D. B. Hosmer, Manager of Manufacturing Technology, visited with L. E. Weeks, TPM of MCL.
2. R. Alexis visited concerning Biphenyl Hydrogen Purification start-up week of 4/28/69.
1
j
j
1
DSW 551359
STLCOPCB4089776
) -
..
'
DISTRIBUTION OF TIMS BY -TECHNICAL SERVICE
Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec.
PROCESS IMPROVEMENT
:w PRODUCTS
PLANT IMPROVEMENT
ASSIST OPERATIONS
30 --p--
SPECIAL
20
1
ENGINEERING SERVICES
10
____ L
0 _J__1____ !____
TECHNICAL MANPOWER
MISCELLANEOUS ACTIVITIES
AND riD i lj iYu
---=--
-----
STLCOPCB4089777
600
IN MAINTENANCE
FOR CONSTRUCTION
500 400 300
200
100
00 600
IN MAINTENANCE COMPLETED
NOT CLOSED
500 400
500.
200
3 oQ 100
o0 CO
PROJECTS
SUBMITTED FOR
APPROVAL
company i^ontiaenciai TSD PROJECT SUMMARY
~E
APPROVED PROJECTS IN TSD
STLCOPCB4089778
LABORATORY ADMINISTRATION
ANALYTICAL SAMPLES
2400
2300
2200
ANALYTICAL MANPOWER
2100 2000
1900 1800
1700
Manpower/sample
r--
i i i i 1 i
i 1 -C3C ssGSfcj
11
__ ^
1 ______ L_
1
1. j |
g 1 I
8
$/Manhours
% Total Plant Operating Cost
Overtime 7,
STLCOPCB4089779