Following are the moves underway resulting from the PDA findings
of high levels of PCS in fish taken from Choccoloceo Creek down**
stream from It's confluence with Snow Creek. '
'
STATUS ^
i (1) We are presently discharging to Snow Creek about l6#/day
i
i..of,,PC3 (down;1.*>om.t250#/day. .in.^59)... Measurements of .departmental. ,j
"" waste' at'reaiw'"ahow'"a' tdtsi''loss','o'f''ohiy' 2^/aay. ''''Tne'iiiBcrepancy
Is believed due to; (a) sampling problems In departmental'waste
. streams where two-phase systems of water and free aroolors may
be present, and (b) possible pickup 0/ PCS by laaehing previously
deposited PCB from the limestone neutralisation pit which also
acts as a settling basin,
-
(2) Work to further reduce losses presently underways
a) Sump is being Installed at the aroo1 or.department to cap
ture free aroelora from the 275 gpm flow. Ohls Is believed to be the largest departmental source of sewer loan because of the liquid aroolors frequently observed. However, sampling
work did not confirm the belief because, no doubt, of inherent
sampling problems, the project was due for completion on 9/1,
and had been delayed because of an underground spring.
b) curbing is being installed at drum loading area with dry pick up of spilled aroolors planned.
e) Investigation of treatment methods * adsorption by acti
n vated carbon showing most promise to date. 1
V.u;-,/
A* V-i
3) Joe Crockett, Secretary of the Alabama water Improvement
1
Commission, will try to handle the problem quietly without release :>
nt t ,the. Information., to, the public at this .time. He believes that $
PDA will not precipitately in' this matter "(lie aia hot advise how '""'":
PWQA might react). Dr. Myers, Director of public Health of Alabama,
wants toxoity information on FC9*s and this will be conveyed per
sonally to him by Jack Garrett next week.
'
a
DEFENDANT'S
HONS 023851
EXHIBIT
J
WATER PCB-SD0000055012
H. S,, Bergen, Jr. August 7, 1570
Page 2
PBOOfWt
.
(A) Public delations - S, V. John developed * proposed state
ment to be used in event of public disclosure but, aftsr consul tation with legal, felt It should not be used begiuae of the recent lawsuit Instituted against the plant by&jl/ Therefore,
an innocuous, essentially "no concent'' type at&*nne is being drafted.
(B) Operator Education - All Anniston personnel have been reedvised of the 'necessity to avoid sewering of any arecl.or. .
(fl) Mechanical Progress
.
(1) Departmental Sump - at extra cost of $2,000, work is
froceeding on an overtime basis with completion*expected /L2/70. This will eliminate the possibility of. large.-.la a-
' ees- from the operating area.
.-
:
. .
(2} loading Area - Vaahup of spilled aroclor-has .beep stopped .-
and-dry piele via sand instituted. .'Curbing project-.-is being :.
expedited.
-. ......... v
(3) Neutralization -Pit Clean out
'' "
. ' iz * . * *: (a) Immediately, the settled material downstream of the limestone will be removed as well as poeslble by
pushing, with minimum stirring of the water. The solids
{and aroclors) will be landfilled.
-
(b) By-Pass of Neutralization Pt. - Co.crash basis, trenches will be dug to allow diversion of all water from the limestone pit. This will talcs 1-2 weeks
and will coat about $10,000.
In addition, It will be necessary to provide cauntie neutralization of the add wastes. This will be handled In the aroelor department via installation of a pff con troller and valve with temporary piping and trucking
facilities. Cost.will be about $5,000 plus about $500 per day for caustic during the period when, the alternate neutralization is required. During this period, PCS
losses should be no more than 5-10 lbs,/day.
A
HONS 033&52
WATER PCB-SD0000055013
H. S. Bergen, Jr.
August 7, 1570
Pag* 3
(c) Cleanout - The pit vill be thoroughly cleaned cue . with probable removal of the present deteriorated asphalt membrane and replacement (possibly) by a plas tic membrane which can resist aroclors, The plant will consider possible structural changes to permit more affective operation and ability to make future cleanouts
without the present by-pass steps, Recommendations rel* stive to this will follow,
'
(4) water Plow Seduction - Present total flow through pit is 700 gpm, for at least several of the streams, reduction of flow will result ia immediate reduction of PCS to Snow Creek. More important, reduction of flow will minimize future treat ment costs.
In conjunction with the pit by-pase work in 3(a) above, approx
imately 200 gpm of aroclor free water, will be permanently diver
ted. Included in the first reduction are the chlorineter cool
ing screams and most of the water coming from the Hiran flare
tower. Details of how this will be accomplished will be. avail
able by 8/1V70.
"
''
Over the naxt 3 - * 'months, further water conservation projects
- will be installed with objective of reducing the" stream-to the
lowest practical amount,'now estimated to be about 300 - .boo
gpm. The projects will involve multiple use of .`water and far
ther diversions of aroclor free water,
' ' `. '
1(5) final Treatment - Based on some indications 'C and' much'hope), V jjf
by Septem'ber, t"he actions a`bov..e....m...a..y....a..pproac'h t`h' e present plant
,r,h i-cti.va of40 oob of. PCS* s in 7w gpm ..(or 0.1 #/day) . . .The ,.......J;
hope ia raised because" dissolved`arocibr Tiaa'shown I pronounced
affinity for surface adsorption (as on walla of sample bottles).
The solids generated by the limestone neutralization are believed
to retain aroclor passing by them. Therefore, adequate sattling and/or filtration following neutralization with periodic removal
of the solids
accomplish the necessary treatment (along with
water flow reduction). The plant will proceed on preliminary
design of filtration facilities with and without carbon treatment
between neutralization and filtration, ihe design will oe avaii-
able for action in case the reduction is not as great as hoped-
for or in case the control agencies demand more complete removal
(control agency requirements are a completely unknown factor at present). By the ti a decision must be made relative to final treatment, we-should have better information on requirements and
methods.
K0N5 033853
WATER PCB-SD0000055014
; ;'
H. S. Bergen, Jr.
August 7j 1970
Page 4
'
(D)yish, Mud and Water sampling - Sine# our fiah saoplas Proa nearby Chcccoloceo Creek also showed high levels p* Pea1*, we at* institu ting wrt sampling to dotormina extant of the problem. Early during the week of 8/10, legal size fish will be caught in Cfaoecolocco Creek
near to confluence with the Coosa Ittver (login Martin Lake). Pish will also be taken from the lake, Xf theae samples show high (*>5 0
ppm} level* of PCS,- sampling will be extended to point* down the Coosa River. A high priority will be given these samples by Scott tucker,
progress reports will fellow at suitable Intervals,
-
Paul 8. Hodges /np