Document NGMORVp6EkpQaz7YmRDV4YzGy

ROBINSON REFINERY MODERNIZATION PROJECT MARATHON OIL COMPANY ROBINSON, ILLINOIS PROJECT HISTORICAL REPORT BECHTEL JOB NO. 14053 BECHTEL PETROLEUM INC. 1980 - 1982 GARRARD 00000489 PROJECT STATISTICS GARRARD 00000490 10 PROJECT SUM M A, Y GARRARD 00000491 PROJECT SUMMARY PAGE job no_____ 14Q53______________,_________ JOB TITLE RRMP____________________ JOB LOCATION ROBINSON. ILLINOIS CLIENT MARATHON OIL COMPANY CLIENT HOME OFFICE LIMA. OHIO EPC CONTRACT CPB LIST FACILITIES CONSTRUCTED: PLANT DESCRIPTION 9 AMINE TREATING 16 HYDROTREATER/PLATFORMER 23 SATURATES GAS 28 LPG TREATING 29 REFORMER FEED SPLITTER 20,21,30-99 OTHER OFFPLOTS 50 TDC CONSTRUCTION 60 TDC CONVERSION BECHTEL SPONSORING DIVISION____il.ff._-l SUBASSIGNMENTS R&E SPONSORING OFFICE HOUSTON PARTICIPATING OFFICES SAN FRANCISCO , LOUISVILLE. EDMONTON. ANN ARBOR. GAITHERSBURG CAMP SIZE ~ CAPACITY 30,000 BPSD 20 mm SCFD 11200 BPSD ENGINEERED BY BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL CONSTRUCTED BY BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL FINAL JOB COSTS MAJOR EQUIPMENT OTHER DIRECTS DISTRIBUTABLES HOME OFFICE TOTAL BECHTEL SETTLEMENTS TOTAL $ MM 20.3 58.7 19.6 14.2 112.8 ( -3) 112.5 SCHEDULE AWARD START DESIGN ENGR'G. ENGR'G. 90% START CONSTRUCTION START FOUNDATIONS START A/G PIPING FINAL MECH. COMPL. DATE 03/80 03/80 09/81 10/80 12/80 06/81 04/82 MANHOURS M RPCHTFI OIRFCT MANUAL 1 383.1 BECHTEL DISTRIB. MANUAL 293.3 SUBCONTRACT 258.3 NON-MANUAL 350.6 HOME OFFICE 499.0 FINAL PRODUCTIVITY (DIRECTS) 1 .63 MANPOWER (PEAK) BECHTEL MANUAL SUBCONTRACT NON-MANUAL HOME OFFICE DURATION 18.5 82 1241 266 121 169 PHR 1.0-1 GARRARD 00000492 Page 2 RATIO ANALYSIS Normal Historical Range Your Project .1 Non-Manual Manhours as a % of Manual Manhours 20.9% Domestic Projects 15-20% Remote/Camp Projects 22%-28% 2. Distributable Costs as a % of Direct Labor Costs 72.9% 68%-85% N/A 3. Home Office Costs as a % of Total Field Costs 11.7% 8%-12% .5%-12% 4. Distributable Manual Manhours as a % of Direct Manual Manhours 21.2% 18*-23% N/A 5. Engineering Tech Manhours Per Piece of Major Equipment 1,180 950-1150 1000-1200 6. Peak Construction % Complete Per Month 8% 7%-9% 6%-8% Comments: .1 The non-manual manhours for the project (350,600) includes 53,500 manhours of design engineering work performed at the jobsite for the TDC-2000 conversion. If these hours are excluded, item 1 above is 17.7%. 2. One factor that caused item 5 above to be high is the large revamp content in the project scope. GARRARD 00000493 11 SUMMAg-V COST DATA GARRARD 00000494 JOB NO. {JOB DESCRIPTION CLIENT LOCATION 14053 ROBINSON REFINERY MODERNIZATION MARATHON OIL COMPANY ROBINSON, ILLINOIS PROJECT COST SUMMARY BY CATEGORY Dollars & Manhours In Thousands COLUMNS & VESSELS TANKS EXCHANGERS FIRED HEATERS PUMPS COMPRESSORS SPECIAL EQUIPMENT SUBTOTAL MAJOR EQUIPMENT INSTRUMENTS PIPING STRUCTURAL STEEL INSULATION ELECTRICAL CONCRETE WORK BUILDINGS SITE WORK PAINTING SUBTOTAL OTHER DIRECTS SCAFFOLDING TOTAL DIRECT FIELD COSTS TEMPORARY CONSTRUCTION MISC. CONSTRUCTION SERVICES CONSTRN. EQUIP., TOOLS, SUPPLIES FIELD OFFICE COSTS (NONMANUAL MHRS OTHER OPERATIONS REMOTE AND OFFSHORE ASSOC. COSTS MANHOURS Bechtel 13.5 0.3 11 .1 30.6 13.1 21 .3 4.9 94.8 S/C 6.6 - 3.0 1 .6 2.0 13.2 152.6 288.9 53.4 16.6 288.7 97.9 3.6 60.6 962.3 _ 0.6 77.1 0.8 10.0 6.4 9.3 9.1 113.3 43.4 - 1100.5 126.5 57.2 168.2 274.9 24.9 14.4 1 ? . _ FINAL BUDGET BECHTEL COSTS Material Labor 4958.1 98.8 4969.2 4972.7 1417.5 4088.5 1013.6 21518.4 298.0 11.5 230.3 675.8 261 .8 418.7 77.3 1 973.4 9383.2 6194.9 1680.9 19.6 4269.8 1010.6 74.6 229.0 3206.1 6279.9 1111.5 355.4 5940.4 1615.3 74.2 1019.7 22862.6 1 9602.5 787.6 44381.0 22363.5 631 .2 244.2 4281 .6 1416.3 _ 1209.3 3185.8 11.0 6093.3 _ S/C COSTS 494.7 389.1 42.7 116.0 1042.5 TOTAL COSTS 5750.8 110.3 5588.6 5691.2 1 679.3 4623.2 1090.9 24534.3 - 62.8 _ 3196.4 42.4 556.8 557.7 565.3 658.5 5539.9 12589.3 12537.6 2792.4 3571 .4 10252.6 3182.7 706.5 1814.0 558.5 48005.n 787.6 5582.4 73326.9 689.1 10.3 _ 2529.6 3440.3 4292.6 7509.6 MANHOURS Bechtel S/C 24.2 .1 13.4 82.3 8.6 15.3 1.6 145.5 7.1 - 2.8 12.2 1 .3 1.3 0.3 25.0 65.7 416.5 60.7 2.1 269.1 223.1 7.2 66.5 1110.9 4.5 100.5 1.9 81 .8 1 .1 1 .4 7.9 12.5 3.4 215.0 126.7 1383.1 240.0 60.6 206.? 350.6 26.5 16.2 2.0 _ .1 PAGE _. CONST. nflTFS 10/80 TO 04/82 PREPARED BY____________________ ACTUAL COSTS BECHTEL COSTS Material 4873.0 36.5 4430.1 5028.6 1192.2 4066.1 703.5 20330.0 Labor 515.6 2.0 281 .4 1760.3 162.7 287.9 31.7 3041.6 S/C COSTS 606.8 0.3 224.6 433.6 38.0 38.R 8.8 1350.9 TOTAL COSTS 5995.4 38.8 4936.1 7222.5 1392.9 4392.8 744.0 24722.5 7400.3 7843.4 1 677.5 5.7 3783.0 1795.9 57.1 431 .8 1 .3 22996.0 _ 1368.4 8731.6 1181.6 48.3 5241.0 3861.6 122.2 1084.9 .3 216.39.9 2155.9 131 .4 2999.3 83.4 2811.6 45.9 74.9 574.1 682.6 111.9 7616.1 8900.1 19574.3 2942.5 2865.6 9069.9 5732.4 753.4 2199.3 113.5 62161 .0 2155.9 43326.0 26837.4 8866.0 79029.4 788.0 153.9 4974.8 1570.4 106.9 1071 .9 3647.0 _ 6125.0 468.7 612.8 38.0 1 .0 12.2 _ 2472.7 3838.9 4975.8 7707.6 575.6 TOTAL DISTRIBUTABLE FIELD COSTS TOTAL FIELD COSTS (Reim. ) DIVISION TECHNICAL SERVICES ENGINEERING PROCUREMENT OTHER DIVISIONAL SERVICE DEPARTMENTS TOTAL,H.O. fReim.i BURDEN CONTINGENCY NEGOTIATED SETTLEMENTS TOTAL PROJECT COSTS (Reim.) {Excludes Gross Margin) 525.2 1 62?.? 22.0 273.6 40.6 13.0 7.5 356.7 1 982.4 15.6 T727T 6573.3 50954.3 10499.4 32862.9 82.9 631 .5 127.9 98.5 24.3 405.3 5143.3 695.2 314.8 129.2 _ 965.1 6687.8 1908.7 7641.4 142.1 61469.5 39550.7 699.4 7281.8 17772.1 91099.C 488.2 5774.f 823.1 413.: 153.E _ 7652.5 1 908.7 7641 .4 7281.8 108302.r 2027.0 26.7 383.8 48.5 22.1 17.9 499.0 2526.0 PROJECT COST SUMMARY BY CATEGORY Tfi.S 258.3 _ _ _ _ _ _ 258.3 7550' 11312.6 50920.0 38150.0 113.5 1596.0 200.4 238.3 84.4 489.5 7110.8 802.7 585.5 265.9 2232.6 9254.4 2763.0 (310.0 55605.6 47404.4 664.0 1 9570.6 9530.0 98600.C 603.0 _ 8706.8 1003.1 82.3.8 360.3 _ 11487.0 2763.C (310.0 9530.0 112540.C PHR 1.1-1 JOB NO. 14053 JOB DESCRIPTION . ROBINSON MODERNIZATION PROJECT CLIENT MARATHON OIL COMPANY LOCATION ROBINSON, ILLINOIS PROJECT COST SUMMARY BY PLANT Dollars & Manhours In Thousands PLANT NUMBER & DESCRIPTION 5 HYDROGEN COMPRESSOR MANHOURS Bechtel - S/C 2.0 FINAL BUDGET BECHTEL COSTS Material - Labor - S/C COSTS 116.0 TOTAL COSTS 116.0 9 AMINE TREATING 30.6 1 .8 1114.1 559.6 84.0 1757.7 16 HYDROTREATER/PLATFORMER 448.3 73.4 26688.4 8909.1 3539.3 39136.8 20/21 INTERCONNECTING PIPELINE 108.1 13.0 1234.2 2573.4 343.5 4151.1 23 SATURATES GAS 135.7 8,0 4 0 98.1 2475.8 340.6 6914.5 50/60 TDC-2000 CONVERSION 266.9 16.3 6962.3 5573.4 1097.7 13633.4 28 LPG TREATING 28.8 1 ,5 1527.4 638.3 167.0 2332.7 29 REFORMER FEED SPLITTER 30 ELECTRICAL DISTRIBUTION 31 IITII 1TY GENERATION 23.8 5.4 11.5 5.6 732.8 - 375.5 _ 451 .8 486.8 110.2 240,4 160.6 - 290.7 1380.2 485.7 982.9 32 COOLING TOWER 99 MISC. OFFPLOT PLANTS 40.5 0.9 3.9 1194.7 1.0 1 .7 794.4 2.1 443.0 - 2432.1 3.8 CONST. OATFS PREPARED BY PAGE 10/80 TO 04/82 MANHOURS Bechtel S/C _ 15.1 812.5 109.9 180.5 181 .3 20.8 11.8 4.1 2.7 43.1 1.3 18.8 131 .2 26.6 14.3 13.2 3.0 12.3 - 3.3 13.8 3.5 ACTUAL COSTS BECHTEL COSTS Material Labor 4.0 1151 .8 276.9 25688.8 15800.4 3535.1 2244.7 3543.1 3372.4 6784.0 3568.4 856.0 415.9 529.6 229.6 4.5 80.1 114.3 50.7 865.6 772.3 249.2 26.0 S/C COSTS _ TOTAL COSTS 4.0 545.7 1974.4 5229.7 46718.9 769.5 6549.3 398.3 7313.8 704.9 11057.3 85.6 1357.5 383.3 1142.5 . 84.6 96.9 261 .9 555.7 2193.6 96.4 371 .6 TOTAL DIRECT FIELD COSTS 1100.5 126.5 44381.0 22363.5 6582.4 73326.9 PROJECT COST SUMMARY BY PLANT 1383.1 240.0 43326.0 26837.4 8866.0 79029.4 PHR 1.1-2 l4o5'3 JOB DESCRIPTION KKHP____________________ CLIENT MAKATIPLI <3>l i_ COHPAW LOCATION TtoBR'LSoiJ. -1MOI -b QUANTITY & UNIT RATE SUMMARY TOTAL PROJECT PAGE CONST. DATES IofbQ TO___ 4/81-____ PREPARED BY C.'jRCKSou /p- LEE UNIT RATES AND RATIO ANALYSIS HOME OFFICE 1. ENGINEERING TECH MHRS 2. ISOMETRIC DRAWINGS 3 ENGINEERING TECH MHRS 4. NO. OF H.O. ISSUED PO'S 5. PROCUREMENT MANHOURS 6. TOTAL H.O. COSTS 7. FIELD NON-MANUAL MANHOURS 8. ENGINEERING TECH MHRS COLUMN NO. PIECES OF EQUIPMENT 18"U NO. PIECES OF EQUIPMENT llrAteCO TOTAL NO. OF DRAWINGS 277 NO. PIECES OF EQUIPMENT 4fi,Soo NO. H.O. ISSUED P.O.'S ST TOTAL FIELD COSTS 350 TOTAL H. 0. MHRS ZCrfjteOO TOTAL H.O. MANHOURS COLUMN A4B B n>oi \\80 5.^6 'Z0^0 H7. e> 3 27.3 m.i *18600 .iz ^M.000 .70 4^430 FIELD MANPOWER & MANHOURS 9. MON-MANUAL MANHOURS 10. NON MANUAL MANHOURS 11. DISTRIBUTABLE MANUAL MHRS 12. NM MANPOWER PEAK 13. MANUAL MANPOWER PEAK 14. NM MANPOWER PEAK 15. BECHTEL DIRECT MANUAL MHRS 35 0,(pOO DIRECT + DISTRIB MANUAL MHRS 1G76100 .21 350, (cOO DIRECT + DISTRIB + S/C MAN. MHRS m-47CO . 1 \7.\ DIRECT MANUAL MANHOURS MANUAL MANPOWER PEAK 1383100 .21 [2A\ .10 MANUAL MANPOWER AVERAGE 5\0 l-Z-l NM MANPOWER AVERAGE so 1,51 1363.1OO FINAL PRODUCTIVITY FACTOR (DIRECTSI L.63 81(^528 FIELD COSTS 16. OTHER DIRECT MATL & S/C COSTS 30SU.I 17. OFFPLOT MATL & S/C COSTS L2IS.U? 18. OFFPLOT MANUAL MHRsG*^1--^ -48 19. TOTAL DIRECT MATL & S/C COSTS 20 DISTRIBUTABLE COSTS 135 TO (t> MAJ. EQUIPT MATL & S/C COSTS PROCESS UNITS MATL & S/C COSTS PROCESS UNITS MANUAL MHRS COST INDEX TO CONVERT TO 1970 $ DIRECT LABOR COSTS 16111.1 l.fel 30116.5 ."15 ,s\ 'in \R330 ^T3_ BULK MATERIAL RATIOS 21. INSTRUMENT MtACTKLcu& .St/Cc>CeOjfSTS 22. LINEAL FEET OF PIPE NO. OF CONTROL LOOPS na653 NO. PIECES OF EQUIPT 23. TOTAL PIPING MANHOIIRR(loa4) 5H.OOO LINEAL FEET OF PIPE 24. TOTAL PIPING COSTS 1157-1.3 LINEAL FEET OF PIPE 25. TOTAL PIPING MATL & S/C COSTS I05V42.T MAJ. EQUIPT MATL & S/C COSTS LIN FT SMALL PIPE 73156 LIN FT LARGE PIPE 27. LIN FT SHOP SPOOLED PIPE 28. NUMBER OF SPOOLS W-ll 27-10 LINEAL FEET OF PIPE NO. PIECES OF EQUIPT 29. LIN FT OF WIRE (P31 & P32) CONNECTED HORSEPOWER 30. LIN FT OF WWE (P31, P32 & P33) ^57^07 LIN FT OF CONDUIT 31. PWR & CONTROL EQUIPT COSTS TOTAL ELECT ACCT MATERIAL COSTS 32. CUBIC YARDS CONCRETE 33. TONS OF STRUCTURAL STEEL 34. EQUIV L.F. INSULATION 5127 517, 1 \3VM3 NO. PIECES OF EQUIPT NO. PIECES OF EQUIPT LIN FT A/G PIPE 35. CUBIC YDS EXCAVATION + B.F. CUBIC YDS CONCRETE 216 lo.^l 301 578 H66S3> z-ai 116633 .11 lerm 157 isn 1 \78653 ?>o<\ *17 -zg 8-07 <1116 15.1 2M/p5S 3183 . 22 3 0*1 7.01 ii 1.87 MJM 63 1.5L QUANTITY AND MANHOUR DETAIL Item MAJOR EQUIPMENT Columns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt. Quantity &Bechtel S/C Unit Manhours Manhours IZi&70A EA TON 5 EA BBL 76. EA 4*>e5, EA BTU 6*7 EA BHP &(,<II,! EA BHP 75EA 3o1EA 31315 4473%4M 120 24.00 l9f Z 0 6= z 13.24 <14386 19877/ . ^ 99 2 1 146.01 1 CeCpOlp 1*50?-0-4/ 182.9 25,4 6 Item STEEL Quantity Bechtel & S/C Manhours Structural Steel 383.8 t 20360 Platforms, Ladders 193.3 T 19281 Other Steel Total Steel 464.1 7 1041,5 T 23067 INSULATION Pipe Ins. 9Ft Avg.*$ 13994Self 56'S6 7 Equipment Insul. Fireproofing 4167? sf 17236 SF 18121 5QOZ> INSTRUMENTS Field Mounted Instr. Panel Instruments "i6>44EA 3644ea - EA 1022 1 Zt, 435 - Control Valves Package Control Syst. - EA \3 EA 733 PIPING 2" & Under CS 214"-6" St. Run CS ^ 5 lf LF I50ZI8 8"-12" St. Run CS LF 14"-24" St. Run CS '45230 lf 26" & Over St. Run ds Vti` - 6" Spools CS^) LF LF 44313 8" - 12" Spools CS 4-77 79LF 14" - 24" Spoofs CS LF 26" & Over Spools CS LF 2*3640 Total A/G CS 10.4704 LF Underground Pipe 4719 lf SP<K,.lityPin^;^, 1904 OLF 4Dfol7l 13390 545 3 19 27 725 3858 Z.Z] ,48 4ZU l 47 1.60 .29 ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Tray CONCRETE WORK Formwork Rebar Concrete Total Q Acct BUILDINGS SITE WORK Excavation Backfill Sewers/Drains 1927 ea Z34799LF 26856-lf LF 6I5Z9ea 12790 lf I3Z24LF 25273 1232.68 6.320 4B2Z1 -31266 50 34 19&9Z I52662SF 116941 9887 t 49149 9251 CY ZS947 II6Z4cy ZZ2 659 272/ sf l5o8l: 21I83cy Z3Z5Zcy 6230 LF 21592 20 243 119 17 Unit Manhours 52,7699.75 49 70 60 IO .40 43 34 13.12 . 55 24 OS 51 39 I.60 .77 49 7 l 3- 13. 19.1.5 5.64 .94 .87 1.9 1 Alloy Pipe Steam Tracing Hangers/Supports Test/Inspect Material Handling -4Z30LF 4D6.IOLF EA 19 31 53 LF 31155 Z.IB49 1. 37 .54 With Pi PI JJCr z63oz- . 13 Al/A NOTES: GARRARD 00000497 QUANTITY & UNIT RATE SUMMARY PREPARED RY PHR 1.1-3 1 COST BREAKDOWN gy categ-orv GARRARD 4- PHR 1.1-4 PAGE GARRARD 00000499 & JOB NO. HQ5S DESCRIPTION CLIENT MARftTVVQto 0(0 CO. LOCATION (?Q&'uSc^ , H_ COSTS AND COMMITMENT HISTORY CONST. DATES l of SO m 4/s2^ PREPARED BY 5. l. LEE YEAR CUTOFF DATE 19-i 19 42. 19____ March 31 June 30 Sept. 30 Dec. 31 March 31 APR 30 Sept. 30 Dec. 31 March 31 June 30 Sept. 30 Dec. 31 PROJECT COSTS (CASH FLOW) Major Equipment 2.4 04 6244 1244^ !4l3o 14784 2oo24 Other Direct Material 3853 J?472 14524 1444?. 224(2 22442. rl l__ Direct Labor AuCl, Disyrib.LfM3cl 1 6.5 U4ocj 14 345" 24287 3l4o Subcontracts _-- U 7b 2540 2o48p 4507 6no3 Subtotal Directs 8244 2069 42467 60665 75445 80427 Distributables (Exd. Non-Manual) Non-Manual Labor 144 O 4247 6185 7523 78 77 1310 3184 3457 6446 5803 Subtotal Field Costs l 544 bl4 4 50 17 i 71376 83464 44107 Home Office 5S6G 8128 467 / 13745 t i '224 1(330 TOTAL PROJECT Il54 34272 54842 82\2\ 100(88. 105437 PROJECT COMMITMENTS Direct Material Major Equipment Instruments Piping Structural Steel Electrical Concrete Work All Other Direct Material . TOTAL DIRECT MATERIAL Direct Subcontracts 18720 14438 20128 20177 20235 -20274 5030 644 7017 7471 7564 7514 3458 4431 5228 6374 7573 7874 (733 1716) 1444 1640 1646 1645 1474 soon 3328 35,85 3886 3434 )4'33 1217 1843 1428 1445 i 82 1 (pOO 3i3 444 478 440 443 32353 3b 631 344 F77 41653 4 338A 4361.0 PIP HOC:-Insulation Buildings Other (List Major S/C) ',STPLOORK RfcftCToR ILiTERWfllf ________ dlklELB___________________________ TOTAL DIRECT SUBCONTRACTS -- 557 - 620 'ZicS 'Zi u> 1 658> -- 537 4W 630 205 (66, <205(3 - 2673 447 628 478 S\8 4744 400 3773 570 628 5oZ 414 674 2. 2480 2450 9640 3640 67n 570 601 60 1 544 548 154 3 1557 4378 486b Distributable Material & S/C 3123. 4737 5604 6884 744.3 82 ( PAGE Oi GARRARD 00000500 COSTS AND COMMITMENT HISTORY PHR 1.1-5 ) JOB WO. & TITLE IHO^ Rofolt^Oti RlffrlttefcN WflhflLlJ. CONSTR. DATES TO ,4l&L. CLIENT___________ MA^jKT\Ao4 Oil CjD .________________ PREPARED BY WY GmJJDvAfN____ "C"- COLUMNS & VESSELS JOB LOCATION ft Qfo U^60t4 Xl^I t-4a\5 SUMMARY OF COLUMNS & VESSELS INSTALLED QUANTITIES FINAL MANHOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. S/C L&M CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR 1.2. V- '2_-^2_ 2-2. 1-2-2 PAGE 2- VL-ft'fcST PAGEl 3/4/fT ^ PAGE 2_ p L AhiT 1.1 PAGE ^ WfsvAX 2/h CARRY FORWARD FROM PHR \-2-Z. CARRY FORWARD FROM PHR 1 2-2- PAGE PAGE ^ ^ VLCWjfV "LS pt Akj-p 2 [ CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR PAGE PAGE ^ EA 731 4*0 EA \av*>(0 - \4t-\ - 3&lld 44a ^ 1 EA -- \\ <4- - \<h EA 447S 6o \ 1 - 6 EA Hi - zo^n -- | EA 4t //oC 16 - h LjL'S, EA EA PAGE -------- 777 - 03 GARRARD "IS rv/ TOTAL COLUMNS & VESSELS / S / 10 EA v\z^ 12m 4arrvc oocoooon "C" ACCOUNT - COLUMNS & VESSELS PHR 1.2-1 1,S COST CEAKD0\WN CY PLANT GARRARD JOB wn 140*53 CONST. DATES >/60 TO A /&2 JOB DESCRIPTION RRHP CLIENT MARACTHOkJ. C>IL eoHPAUV LOCATION RQBhUson) , ILLiMOia PLANT SUMMARY Dollars & Manhours In Thousands PLANT NUMBER_2 DESCRIPTION AMIklE ~reeATIM6 CAPACITY OVERALL SUMMARY MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E- Exchangers F--Fired Heaters G--Pumps K- Compressors T-- Special Equipt. SUBTOTAL Material | COSTS Labor | S/C | Total MANHOURS Bechtel | S/C I4Z.I - Z45.7 -- Z 3.3 77.9 3.0 492.0 i5.6 -- 4 .5 - 4 .5 2A .6 - -- -- _ 0,2 0.3 - 0.5 157 .7 - 250.2 - 23.5 82.7 3 .0 517,1 ,7 -- .2 -- .3 - 1 .2 __ -- - -- QUANTITY AND MANHOUR DETAIL Item MAJOR EQUIPMENT Columns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt. 11 Qauuaanntt,ittVy 1| Mahntehl o&urSs/C 11 ManUhnoiut rs Cf EA 34."5 TON TfT ~ BBL 9 ea , EA BTU 3 BE,,AP ivr bhp 3 ea 7 33 i22/ZI4 -- 213 24 -- 1o 3 252 Z*2/ ,8 w/.c w 22 EA -- 1 |BeMtnL&u,S./C| M.ffinr, STEEL Structural Steel Platforms, Ladders 7.6 T 7.1 T Other Steel Total Steel 43-Ot 57. 7t INSULATION PPiipne. IInns*. ------ FtflA- vFga,c<*p 337 7 elf Equipment Insul. l 530SF Fireproofing (CQVl fT) 1602 SF 210 1039 1496 2745 1 520 753 176 27.6 1463 34 & 47.6 0 45 0.49 O. 11 OTHER DIRECTS J--Instruments L--Piping M--Steel N--Insulation P- Electrical Q--Concrete Work R--Buildings S-Site Work X--Painting SUBTOTAL 134.9 304.2 100,0 - 79.7 2 5.0 - 16 ,0 -- 65 9.8 2& II .6 52 .7 - OO. \ 42 .7 -- 47 .5 217 4 2 8 .0 4464 1 .1 0.7 .7 --. _ 545.2 165.7 764.2 153.& 67.7 I39.& 67 .7 - 63.5 -- I4ZZ.4 .1 .5 2.7 -- 3.1 2.5 -- 2 .9 -- II .& 1 .0 154 24 -- _ 1&.8 | TOTAL DIRECT COSTS | MSI .&| 242.o\ S45.7|l939 -5| 13.o| \&~S\ INSTRUMENTS 93 EA Field Mounted Instr. Panel Instruments 93 ea - EA Control Valves EA Package Control Syst. - EA PIPING 2" & Under CS 214"-6" St. Run CS ' 35oOLf LF 8"-12" St. Run CS , 14"-24" St. Run CS f LF LF 26" & Over St. Run CS 2W - 6" Spools CS^ LF LF 8" - 12" Spools CS 14" - 24" Spools CS 26" & Over Spool* CS 226ILF LF LF 106 2 306 - 4909 6947 114 3-29 - 1 4o 3 07 ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Tray CONCRETE WORK Formwork Rebar Concrete Total Q Acct BUILDINGS SITE WORK 39 ea 5250LF - LF Z0665-f l&OEA 30 LF -- LF 241 1&40 632 172 42 - 6.18 0.35 - 0.031 .96 .84 - 269O F 6.7 T 133 cy 208 cy - SF 1024 715 390 246& -- -36 106.7 2.93 11-87 H.O. ENGINEERING I Total A/G CS 5761 LF U&56 2.06 Excavation 653 CY 1324 2.03 Other Direct Material 8t S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire IP31 & P32) Total Piping Manhours Peak Manual Manpower Col A UNIT RATES AND RATIO ANALYSIS Col B Af B 1205 -- 5688 136 133 IT-4 OO I 5 881 U/A 492.5 2.45 Major Equipment Material & S/C $ No. Pieces of Equipment No. Pieces of Equipment No. Pieces of Equipment Connected Horsepower 22 26,8 22 (o.2 22 (q.o 53 497.14 Lineal Feet of Pipe 5&B8 2 7O Area in Battery Limits (SF) >4080 _ Underground Pipe Speciality Pipe CS Valves [2%" 8c Larger) 127 LF - LF - EA Alloy Pipe Steam Tracing Hangers/Supports 623 LF 3981 LF W/ L" EA Test/Inspect 9292 lf Material Handling 286 - 117 1 1499 1074 YY/.-u" 2 25 - 1.88 0.38 12 BackfiH Sewers/Drains PAINTING 49 9 CY 287 <-F - SF 310 1209 - . 62 4.21 -- Job Overall Labor Productivity 16 3 PLANT SUMMARY PREPARED by S - ^ AP^C^AvUAV PHR 1.3-1 JOB WO 4063 CONST. DATES `/gO TO -4 /&2 JOB DESCRIPTION RRHP CLIENT HMTA.-TXQM <PU- tSPFlFAUV LOCATION RoBIMoOlJ ILi-ugOI-S PLANT SUMMARY Dollars & Manhours In Thousands PLANT NUMBEH_lk DESCRIPTION 004 PLATFORHgK HAPTHA HV<70-r~Re-ATE~f; CAPACITY 30.000 BP6C OVERALL SUMMARY Materiel | COSTS Labor | S/C | Total MANHOURS Bechtel | S/C Item QUANTITY AND MANHOUR DETAIL | Quantity |B*S,,&urS/C| Mlffiur, ^ 1 |B,M.nhn&urS/C| M.^ur, MAJOR EQUIPMENT C--Columns & Vessels D-Tanks E-Exchangers F--Fired Heaters G--Pumps K-- Compressors T-- Special Equipt. SUBTOTAL 3899.1 5.7 3492 .9 4769.7 745.2 3964.2 ZZ4.5 17121 .3 384>. 4 1. * 227.3 1660. 1 91 .5 283.4 22 A 2072 .2 540.5 4&34_o - tp '8> 8.6. 3728.8 417.5 6847.3 28.0 865.3 38.5 4306. 1 - 246 .9 lo4! .7 20835.2 l&.l 0.1 io .9 77 .6 4 .9 i5 .0 1 .1 127 .7 (2? o -- o,3 n .7 i .0 i .3 -- 20.3 MAJOR EQUIPMENT Columns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt. -40 EA Soy. <* TON 2 EA - BBL 46 EA . -4 EA 40l.4HrtBTU 2 EA 1990. 8HP O EA 0524 BHP 59 EA 169 EA toOZ/tr*- 2407 9 ZX*>/TOKl 54 27/<?A. III 31 Z4Z/&A89 257 Z2*Af/&A. 5 824 16354 107 5 18/fey. STEEL Structural Steel Platforms, Ladders Other Steel Total Steel INSULATION Pip. In.' Equipment Insul. Fireproofing 366T 14 Ot 22 T 52 8 T 19 305 13144 1024 33473 52-75/ran 9 3-8B/TOM AIp ^5/rotS (*3Ao/roti 7 2 671 elf 293^1 SF 7489 sf 30564 11957 371S O-^it/eL F 0.407/sr 0.496/5F OTHER DIRECTS J-- Instruments L-Piping M-Steel N--Insulation P--Electrical 0--Concrete Work R--Buildings S-Site Work X--Painting SUBTOTAL 1608.5 455.5 24 .3 2038.3 3282.4 5573.9 1339.4 10195.7 795.4 6.3 go .4 1492.1 3 .7 23. 1 1800.3 1627. 1 12197 1780. 1 6 .O 3005.8 1440.2 2913 .9 74.9 4429.0 28 .9 56.3 73.0 I5S 2 188 .3 .4 387.9 .3 632.4 1258 -6 107.3 log.o 8567.5 II6o7.3 4188.0 24562.8 21.8 265.9 31.7 i .O 91 4 168.3 3-3 2 3 .8 -- 607.2 43.5 l .8 46.3 o.Z 1 .4 1 .2 12 .5 3 .2 uo.9 TOTAL DIRECT COSTS |z 5688. fc| 144 7 9 ,S| 5229.7145398 ,Q | 734.91 131 H INSTRUMENTS II03EA 22719 206^, Field Mounted Instr. Panel Instruments 1103 EA -- EA 6959 6.3/fey. Control Valves -- EA Package Control Syst. 15 EA PIPING 2" & Under CS 37050 LF 2tf"-6" St. Run CS \ LF 627 10 3617 4\V<ta. 2.8' o/zf 8" 12" St. Run CS ^ LF 14" 24" St. Run CS f 9436 LF 7 592 O.81/2/= 26" & Over St. Run CS 2W - 6" Spool* / LF LF 8" - 12" Spools CS 14" - 24" Spools CS 26" & Over Spools 23538 lf LF LF in 395 499/iF ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Trey CONCRETE WORK Formwork Rebar Concrete Total Q Acct BUILDINGS SITE WORK 8I3EA 10242 1260 7ea -79819 LF 4*=>96pO 0.59 /|_F 176*74, LF 4 183 0-24 /lf 379I55LF 14882 0.04 /lf J3I57EA 2 5O0LF 8981 2011 ^^ O.BO /|_f 895lf 1268 1 42/lf II4843sf 92591 0.8f 881 t 39034 4A-3 fe=foa 7645 CY 22 119 2.9062; y 8997 cy 168 307 18.71 xfcY 1841 sf 4500 244 H.O. ENGINEERING Other Direct Material & S/C $ Lineal F Bet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity Total A/G CS 7002-4 LF 228804 3. 2 7/fer Excavation 020867 cv 92 99 45 Col A UNIT RATES AND RATIO ANALYSIS AfB Underground Pipe 6IB8 LF 9177 1.48,^ BackfiH 415578 CY 12103 0-78 /y i -15934 UR 1319 Major Equipment Material & S/C S !,&'63 No. Pieces of Equipment IB9 No. Pieces of Equipment 169 .70 402 Sp^ilityPip 19040 lf CS Valves (2fc" & Larger} -- EA Alloy Pipe 3607 lf 5453 29 9 84 0.29,/// Sewers/Drains PAINTING ( 3/C~) 3161 lf iS)HO SF 3415 1.08 3262 0.047 8 3I/f NOTES: 2QL5 /VC55EL5 --* VUT - A5 LIFTEP 764 5 Cy 271 190 lf 3o94 OO No. Pieces of Equipment Connected Horsepower Lineal Feet of Pipe i69 404 IQ5I9.5 2578 75934 4-08 Steam Tracing Hangers/Supports Ten/Inspect 15901 lf (itJCL.) EA 92989 lf 9413 (iMCt,.) 16 547 0.59//T 0.18 /n" RETSA^-y MHR<. IKJCt- FAB. RETSAR CQTV UOT IklOL . >. _____________ 6lTfc WO KX- ~ exCAVATlOhi -t i A Meu Area in Battery Limits (SF) Toooo 0.0102 Material Handling (PlM-fllSS) cockier sv :5/<c . 1 6?^) PUNT SUMMARY PREPAREQ BY M- Mltl-gR PHR 1.3-1 JOB WO 14Q57> CONST. DATES tO/feo TO 4/82- JOnBn nDrEoSoCnRiInP-TrIiOnNii OF^CRut-tCfT7 1 CLIENT MAsKA't-HokA Q\l COMP^MV LOCATION MSOil h-IikIqi-s PLANT SUMMARY Dollars & Manhours In Thousands paoe ' PLANT NUMBER 2 1 / 20 DESCRIPTION IMTRt:i;mici:Tln& g>\ pgyyAV & TA.KXVS FYS-gC M CAPACITY. ZM~~ SUMMARY MAJOR EQUIPMENT Material Labor S/C Total Bechtel S/C Item MAJOR EQUIPMENT QUANTITY AND MANHOUR DETAIL Quantity Bechtel & S/C Unit Manhours l..m STEEL | Quantity | ^ioVa* 1 Manhour, C--Columns & Vessels D--Tanks E--Exchangers F-Fired Heaters G--Pumps K- Compressors T-- Special Equipt. SUBTOTAL 11.4 44. 8 562 i-3 - 1.0 23 -- 7.7 1.1 12.7 - 53-5 - .1 - .i - - _ o. 3 - 0.3 Columns/VesseU Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt. * /Z3 TON EA BBL EA EA BTU (j> EA BHP EA BHP EA 7 ea 69 59/2.5 T 314 52 Structural Steel Platforms, Ladders Other Steel T T 332.5 T 16551 Total Steel 332.5 T 16551 INSULATION Pip. In,. --FavF.*5 31762ELF Equipment Insul. SF 10991 Fireproofing 145 sf 18 49.8 49.8 .346 0.125 OTHER DIRECTS J-- Instruments L--Piping M-Steel N--Insulation P- Electrical Q--Concrete Work R-Buildings S-Site Work X-Painting SUBTOTAL - ZMu>.\ 572.4 1624-8 322 4 - 10.1 4U 25.2 23.4 46.7 - 9.1 23.5 -- 34789 z 006-0 446-2 - 4917.1 2-94. & 3'5.6 - 340.5 33.6 - 57. a -- - 32.6 -- 761 8 63007 77.5 1.2 2.7 14 99.4 15.3> II O - 26.3 I TOTAL DIRECT COSTS I 3 535.11 2068.3 | 769.5 | <* 372 .*? | 99 5 | 26-6 I INSTRUMENTS Field Mounted Instr. X EA EA Panel Instruments Control Valves Package Control Syst. >________ 2.WITH PtAW T 99 EA EA PIPING 2" & Under CS ^ I526Z LF 2W-&" St. Run CS 8"-12" St. Run CS l LF 16556 1.08 14"-24" St. Run CS 35T94LF 26" & Oeer St. Run CS LF LF2W - 6" Spools CS * 8" - 12" Spools CS \,906l lf f14" - 24" Spools CS 26" & Over Spools CS I lf 367 2 1 32944 1-03 3-64 H.O. ENGINEERING Col A II UNIT RATES AND RATIO ANALYSIS I Total A/G CS Underground Pipe ' 60IITLF - LF 86221 - 143 - Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity 4240.7 6011 7 A2A Z IT 1200 1180& n/a Tc3" Major Equipment Material & S/C $ ^3-9 ^ No. Pieces of Equipment No. Pieces of Equipment No. Pieces of Equipment Connected Horsepower Lineal Feet of Pipe Area in Battery Limits (SF) _____7 _____ 7 CoO.b 51 16-5 T.2T 60117 1.54 m/a. Speciality Pips - LF - - CS Valves |2%"& Larger) EA Alloy Pipe - LF - - Steam Tracing Hangers/Supports 8&03LF 3984 45 EA WITH F'if ?lMi Test/I nspect Material Handling 59055LF 2 567 M/a 043 PLANT SUMMARY ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Tray CONCRETE WORK Formwork \ Rebar ^ Concrete Total QAcct | ^ BUILDINGS SITE WORK Excavation Backfill Sewers/Drains PAINTING 8 EA 600 LF LF 1 ZOO LF 50 EA 28oolf -- LF 97 291 74 1 26 621 - 12.13 49 062 Z 52 22 - SF T COHPOt.lt e Accrr CY ZI7 CY 2698 12.43 - SF - - 469 CY 288 CY - LF - SF H07 333 - 2.36 1.16 - PREPARED BY 1 r KM7(7AWAV PHR 1.3-1 JOB MO 14055 CONST. DATES lo/SO TO 4/bz JOB DESCRIPTION <7 FK Mg CLIENT HMTATPOU. CnL- eCoMPAFlV LOCATION RPSIM5QU , u-6,FAQig PLANT SUMMARY Dollars Er Manhours In Thousands PI AMT NUMBER ^ PAGE. DESCRIPTION SAtu^AtE'5 RLKHT CAPACITY _ OVERALL SUMMARY MAJOR EQUIPMENT C--Columns & Vessels D-Tanks E-Exchangers F-- F ired Heaters G-Pump$ K- Compressors T--Special Equipt. SUBTOTAL Material | COSTS Labor | S/C | Total MANHOURS Bechtel | S/C 595.1 - 6 18.7 255.9 198-1 -4 16,71 2 95.3 40.5 ioo2 26,. 3 l.fc 264.2 1.5 - i -1 1-5 19.1 6.919 4.5 -- -. - - 659-5 19 - 375.2 225.9 47 14 0.5 - -- 2.0 ...... -1 1959.5 12-6, - - 0.5 MAJOR EQUIPMENT Columns/Vassets Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt. QUANTITY AND MANHOUR DETAIL Quantity I Bechtel & S/C I Manhours 14- EA 3Z57T0N EA BBL 17 ea vwr-B% "^5 BHP EA BHP 2. ea 55 ea * ^ 5 25 3Z3,/l39 19-43 H4 jis o 5110 / 140 -O /MAX. 14 43 72 a2 -li -- I Duiniity ]'\ STEEL Structural Steel 74' 6 50 67.6 Platforms, Ladders Other Steel 33 6 T 17-3 r 4054 816 1 20 6, 47. 2 Total Steel 58.3 t 5520 94 .7 INSULATION Pip. In,. ------ F,"a^.0 & M l elf 3651 0 45 Equipment Insut. 8712SF Fi reproofing(E'Qo1P] 574ZSF 4407 1642 O . -506 O.Z86 OTHER DIRECTS J--Instruments L--Piping M-Steel N--Insulation F^-- Electrical Q--Concrete Work R--Buildings S-Site Work X--Painting SUBTOTAL 375A nil 725.1 1059. 5 100.1 106.3 1,3 4404. 1 3o.6> 17.0 3479 530.1 (2 9 1177 390 6 * (f - 187/ .9 2 5524 18.9 943 1.9 252.2 - 7-1 O. 2 -4-4> 379.2 505.1 1&789 206-3 253.5 752 3 37 O 508 5 5.2 4609-5 5 3 5o.5 5-5 1.1 17.g -30.7 8 23 9 I 35 6 on 3-3 O. I 94 - - 0.1 - 0.2 1-3-6 INSTRUMENTS Field Mounted Instr. Panel Instruments Control Valves Package Control Syst. 257 ea 257 ea - EA EA 1 ea 59 79 zo 99 6 2" & Under CS 790 4 EE 2V4"-6" St. Run CS S LF 8"-12" St. Run CS LF 14"-24" St. Run CS / LF 26" & Over St. Run CS LF 2%" -- 6" Spools CS > \ LF8" - 12" Spools CS 1/429 ef 1 &60 0 Rack pi Flt z\ 25356 23 3 <5.1/ 6 2.35 iid 3 41 ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracinq Cable Tray CONCRETE WORK Formwork Rebar Concrete Total Q Acct 2 55 ea 2<^5o0Lf 3470lf 99445LF 3>736ea - LF - LF 1913 10472 563 3257 1293 - 750 40 16 033 . 35 - 21067 sf 65 t 13861 6030 695 CY 3088 l Z 11 CY 3061 5 .66 92.6 4.44 2L*5Z& | total direct COSTS I 3543 I | 2822.6| 398-31 6764 Q| H.O. ENGINEERING I LZZZE 1 Col A UNIT RATES AND RATIO ANALYSIS 148 2 1 143 1 1I Col B A -f- B 114" - 24" Spools CS 26" & Over Spools CS / L^F Total A/G CS Underground Pipe 15333EF 9 90 LF 43956 1236 287 1-25 BUILDINGS SITE WORK Excavation Backfill 196 sf 866 3745 CY 3676 CY 44 9 0 367 1 4.43 1 2o 1.00 Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity 2251-1 16.323 AT o 6,9 5 6 5 700 53776. M/A 1.03 Ko9a3 Major Equipment Material & S/C $ No. Pieces of Equipment 54 1 33 3o2 No. Pieces of Equipment 51 8.7 No. Pieces of Equipment 54 12.87 Connected Horsepower Lineal Feet of Pipe 2&l8z Z33.I3 16.323 3-29 Area in Battery Limits (SF) 21990 - Speciality Pipe CS Valves (2%" & Larger) - LF EA - Alloy Pipe - LF - Steam Tracing 4440EF 300 5 Hangers/Supports EA WITH plf Test/Impact 24212 lf 4195 Material Handling M/A PLANT SUMMARY - .68 . 17 Sewers/Drains PAINTING 1 537 ef 4900SF 3366 1 50 Z 19 0031 NOTES: REBAR MHR5 ILlOLlJiPe: M-<Sire: FA&RlCAT-loig___ c H " Q-OI ' AS WELL A5 *Q- 21, 22. 6.2" "F?revafaP fxi-st BuilpiMCi - MO. 5>-Ff PREPARED BY SRfc HAC^IPAWAY JOB MQ I4Q`53 CONST. OATES lo/6 TO 4/82- JOB DESCRIPTION KTMP CLIENT MKRA-rHOtd C^l_ <=c>LOCATION ROBIU50K1 , ' l_v_ 1VAO1 *S PLANT SUMMARY Dollars & Manhours In Thousands PLANT NUMBER 26 DESCRIPTION kggj rREWIM^ CAPACITY _ OVERALL SUMMARY MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E- Exchangers F--Fired Heaters G--Pumps K-- Compressors T-- Special Equipt. SUBTOTAL Material COSTS Labor s/c Total MANHOUR' Bechtel | Tj-u 209.7 ie.3 - 2037 4317 16.4 7 - 3.2 20 3 - _ 1.1 1.1 2261 - IS.O - 207.4 452.5 8 -- .... - 2 IO - _ - Item MAJOR EQUIPMENT Columns/VesseIs Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt. QUANTITY AND MANHOUR DETAIL Quantity Bechtel & S/C Unit Manhours T EA 1 2(eTON EA " BBL EA - BTU EA - BHP - EA BHP ) EA IO EA >m 77 1 - 34- 2.21 uo/W 17 - 221 STEEL Structural Steel Platforms, Ladders Other Steel Total Steel INSULATION Rip. In, Equipment Insul. Fireproofing 1 Quantity 1.4 T 1 2.6 T T 14.07 65 1044 1109 Z.432 elf <S>49 SF i^n sf 1094 235 167 Manhour* 46-4 82-9 74 2 o 45 O. 36 O. II OTHER DIRECTS J-- Instruments L --Piping Q-Concrata Work R--Building! S&.3 2t3. 3 24- 6 15. 6 zz&.a 216. 7 7.' 16. i 83.? 31.3 21 346' 47.S 106.. O 479 7 46 2 478 161 5 47.4 .8 lo. 8 I. I 4.3 1-8 0.1 1.2 1.7 INSTRUMENTS Field Mounted Instr. Panel Instruments (pO E* 60 ea _ EA 82! 370 - 137 6. 17 - Control Valves EA Package Control Syst. - EA - - PIPING 2" & Under CS 3495 LF 7195 2.06 2V4"-6" St- Run CS N \ 8" 12" St. Run CS 1 LF LF With PLj mjt 2i ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Trecinq Cable Tray CONCRETE WORK 39 ea 5 OCLF - LF 15445LF 5ooEA 5 300LF - LF Tl 1672 334 99 19 30 - 1.82 11 - 021 Zo 3(p - X--Painting 424.9 37 9.2 84-5 6&8.C, IS.& 3-0 14"-24" St. Run CS / 26" & Over St. Run CS I Th" -- 6" Spools CS ^ LF LF LF Formwork Rebar Concrete ZI9I sf 3-7 T 81 cv 1120 435 250 51 117-6 309 [ TOTAL DIRECT COSTS | BSla.O | 39 9. 5 j 86-fi. ] ' 34 1 - 1 | l9.8| 3-0 ] 8" - 12" Spools CS V llOZLf 14" - 24" Spools CS / LF 26" & Over Spools CS . LF 3475 375 Total Q Acct BUILDINGS SITE WORK 81 CY - SF 1606 - 2 2. 3 - I 11.0. ENGINEERING | j [ I I V I Total A/G CS 4597 ef 10670 2-32 Excavation ----------- -- "" , --' Col A UNIT RATES AND RATIO ANALYSIS Col B A v B Underground Pipe LF< VUirH UT 2 3~) BackfiH Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity 5(79.4 4597 61 I 2ooo 4997 U/A 1-6.3 432.2 1.18 Major Equipment Material & S/C $ No. Pieces of Equipment IO 460 No. Pieces of Equipment IO 6 -4 No. Pieces of Equipment IO 87 Connected Horsepower 4/a Lineal Feet of Pipe 4597 2.6,1 Area in Battery Limits (SF) Speciality Pipe CS Valves [2%" & Larger) - LF EA - - Alloy Pipe Steam Tracing Hangers/Supports - LF 333 lf EA 1327 With Pk 149 Test/Inspect Material Handling LF YJitH m/a Kir- z "3 Sewers/Drains PAINTING NOTES: 6lTWOC^K PLAMT 23 ... _________ "" INCLUPI? WITH PLANT SUMMARY PREPARED BY JOB no '4053 CONST. DATES lo/flo TO 4/g3- JOB DESCRIPTION _____________________________ CLIENT MM^A-r-HCJU- OM-- COMPMslV LOCATION RoG'^iSoM I L-LI N_1 Q 1 S___________ PLANT SUMMARY Dollars & Manhours In Thousands PLANT NUMBER 2 9_________________ DESCRIPTION REFORm&R, ^Fa>L.\ 1 >fc-F=^ CAPACITY jJ7 4r 0 OVERALL SUMMARY MAJOR EQUIPMENT C-Columns & Vessels D--Tanks E-Exchangers F--Fired Heaters G--Pumps K-- Compressors T-- Special Equipt. SUBTOTAL Matarial COSTS Labor | S/C | Total MANHOURS Bechtel 1 S/C 166. - 53.7 - 54.1 - 123.4 & 1 ' 4.3 _ 2 13.2 56. 5 _ - 56.-8 T3-0 - 6.1 8 - 58.4 -- o. 2 193-4 -- -- .4 ~ 2 - U i.i _ 1. 1 Item MAJOR EQUIPMENT Columns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt. | Quantity 2 , EA 2TON EA ' BBL l ea . EA BTU 5 EA ^ BHP EA " BHP 1 EA > EA QUANTITY AND MANHOUR DETAIL m^R*,,, 1148 574/izt3,8 30 3 383 ZZ9 45.8 12 12 IMtem STEEL 11 Quanttittvy 11 BeMchatenlh&ouSrs/C 1l Structural Steel Platforms. Ladders Other Steel 1.4 T -T -T 20 - Total Steel 1-4 T 20 INSULATION Pip. In.. ------ F*a5S 1B94 elf 652 Equipment Insul. 514 SF 245 Fireproofi ng (Ed*01P) 742 sf 82 MaUnnhoiturs 14 3 - 14.3 0.45 O. II OTHER DIRECTS J- Instruments L-Piping M-Steel N--Insulation ^-Electrical Q--Concrete Work R--Buildings S-- Site Work X--Painting SUBTOTAL 110.3 ni-5 16 114,4 6.4 3-0 - 40 <c>.2 Ce-Cp 79.7 4 90.1 10.5 - Z&.& - Z 14.7 30.1 2.14-0 82 4 326.-5 147.0 465.2 20 82.4 Z06-I 15.9 ~ 29.8 -- 947.4 3 3.8 - 4.7 Cp 1.7 - ill 1-0 7.3 Z9 M2 INSTRUMENTS 76. EA 1356 17.84 Field Mounted Instr. Panel Instruments 36. ea - EA 4 13 - 5.43 - Control Valves EA Package Control Syst. - EA - - PIPING 2" & Under CS 2J4" 6" St. Run CS 8"*12" St. Run CS 1760 lf ' \ LF ''LL 14"-24" St. Run CS i26" & Over St. Run CS ef 2037 t-14 WITH PLP bKiT Zl7 2W -- 6" Spools cS\ LF ELECTRICAL Equipment A/G Conduit U/G Conduit Wire 8t Cable Connections Elect. Ht. Tracing Cable Tray CONCRETE WORK Formwork Rebar [ j Concrete ) 55 EA 75C7XF - LF 600 ea - LF - LF 463 2 895 932 365 - 8.42 39 - 033 61 - SF T COHk'OSjTTj l ACiT. CY TOTAL DIRECT COSTS [ 5 \ ZZ 7-9 [ 383.3[ U^Og>| ll.T 8"- 12" Spools CS \ 1600 lf 14"-24" Spools CS ) LF 26" 8i Over Spools CS LF 7267 4.03 Total Q Acct BUILDINGS SITE WORK 30 CY - SF 606 - . 15.95 - H.O. ENGINEERING Total A/G CS ' 3580lf 9304 . 2-6.0 Excavation IZ0> CY 9 16 7. Z7 Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Col A UNIT RATES AND RATIO ANALYSIS Col B A * B 732.7 *3794 _____ II9_ ____ 29 12400 11115 M/A. I&o ? 4.07 Major Equipment Material & S/C $ No. Pieces of Equipment No. Pieces of Equipment & 474 a i4.9 No. Pieces of Equipment & -3.6 Connected Horsepower 165 75.15 Lineal Feet of Pipe 3794 Z.93 Area in Battery Limits {SF) nI/a*. _ Underground Pipe Speciality Pipe CS Valves (2%" & Larger) 214 lf - LF EA 54 5 - 2 55 - Alloy Pipa - LF - - Steam Tracing Hangers/Supports Test/Inspect Material Handling 478 lf 537 1.12 EA WITH Pll =*INi<3 4481 lf 729 16 m/a Backfill Sewers/Drains PAINTING 88 CY 179 lf __ SF 261 39 9 - 2 97 2.23 -- NOTES: FLAUT 2*9 WORK E-MTAMl-j HOi^CKUliCATIDIJ OF- EXI-ST-inJgr, IJMir Job Overall Labor Productivity l.(3 PLANT SUMMARY PREPARED BY 3- HARDAWAY job noH1!!l5_ const, dates lg/go to alSiL JOB DESCRIPTION ftRHP CLIENT HKKM-ILoM O'L- goMP'RyFAY LOCATION ROaiUSOU , )(_UMQIS PLANT SUMMARY Dollars fr Manhours In Thousands OVERALL SUMMARY MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E-Exchangers F--Fired Heaters G--Pumps K-- Compressors T-- Special Equipt. SUBTOTAL Material COSTS Labor S/C ~ - - - - MANHOURS Total Bechtel S/C _ - -- -- Item MAJOR EQUIPMENT Columns/VesseU Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt. OTHER DIRECTS J--lnstruments L--Piping M-Steel N--Insulation 9- Electrical Q--Concrete Work R--Buildings S--Site Work X--Painting SUBTOTAL -- -- _ - --- - - -- - -- 4) 80. a _ 64 .1 -- _ - 4.1 - - - -- - 4 A, *5 .J - 6o.l - 05 - -- - 84.u 4. 1 - - - _ - -- - INSTRUMENTS Field Mounted Instr. Panel Instruments Control Valves Package Control Syst. PIPING 2" fit Under CS 2K"-6" St. Run CS 8"-12" St. Run CS 14"-Z4" St. Run CS 26" & Over St. Run CS 2'A" - 6" Spools CS 8" - 12" Spools CS TOTAL DIRECT COSTS 4 5 00.1 84.c. 4-1 14" - 24" Spools CS 26" & Over Spools CS H.O. ENGINEERING Total A/G CS Col A UNIT RATES AND RATIO ANALYSIS Underground Pipe Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity 45 -- -- ___ ___ -- M/a 1.6.3 Major Equipment Material & S/C $ . No. Pieces of Equipment . No. Pieces of Equipment _ No. Pieces of Equipment _ Connected Horsepower - Lineal Feet of Pipe .. Area in Battery Limits (SF) _ Speciality Pipe CS Valves (2^" & Larger) Alloy Pipe Steam Tracing Hangers/Supports Test/Inspect Material Handling PLANT SUMMARY PLANT NUMBER. 3"0' PAGE f DESCRIPTION. ELECTRICAL. C? I S~TF3 ' SUT IOU QUANTITY AND MANHOUR DETAIL CAPACITY__ !L Quantity Bechtel & S/C __ Manhours EA TON EA BBL EA EA BTU EA BHP EA BHP EA EA EA EA EA EA EA LF LF LF LF LF LF LF LF LF LF LF LF EA LF LF EA LF Unit Manhours Item STEEL Structural Steel Quantity Bechtel & S/C Manhours T Platforms, Ladders Other Steel Total Steel T T T INSULATION Pip# Ins. Equipment Insul. ELF SF Fireproofing SF ELECTRICAL Equipment & EA A/G Conduit Z45 LF U/G Conduit - LF Wire & Cable CF 50) 1340O LF Connections (P- 35) 36. ea Elect. Ht. Tracing - LF 359 Ml _ 3Z4 S 300 - Cable Tray CONCRETE WORK - LF - Formwork SF Rebar T Concrete CY Total Q Acct BUILDINGS IO CY - SF z- SITE WORK Excavation BackfiH Sewers/Drains PAINTING IO CY 0 CY _ LF - SF s - NOTES: Unit Manhours 44.9 45 . 24 8.33 - .2 . 8o - B. HKPC?aw.'aV PREPARED BY. JORND l4ob2> CONST. DATES lofco TO Al2 JOB DESCRIPTION R.2.MP CLIENT MiXRKTWOrl OIL coN)P/v44 LOCATION fi.i>&lKl-bcisl XLL, PLANT SUMMARY Dollars a Manhours In Thousands PLANT NUMBER 31 PAGE__J__ DESCRIPTION UTIL. 6t4. A.KiC5 Cal^T- CAPACITY (S>E. UolCb; OVERALL SUMMARY Material | COSTS (ooas 4} Labor | S/C | Total MANHOURS (ocg's) Bechtel J S/C Item | Quantity | QUANTITY AND MANHOUR DETAIL 1 M.nSi'ur, 1 Qu*n,i,y Manhour, MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E--Exchangers F--Fired Heaters G--Pumps K- Compressors T-- Special Equipt. SUBTOTAL -- -- - - _ it -- 7,6 _ - life 1 Co . S 0.4- \(p. 3 0,4- MAJOR EQUIPMENT ColumnsA/esseIs Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt. EA TON EA BBL EA LA BTU 2. EA BHP EA ? EA -- -- -- -- Ao5 -- -- -- -- -- -- 202/6A -- -- OTHER DIRECTS J--Instruments L--Piping M--Steel N-lnsulation P--Electrical Q--Concrete Work R--Buildings S-Site Work X--Painting SUBTOTAL 12.3 54. 6 32 -- TU-(e 1.8 1T - 105,\ 56 5.8 4.1 - \5,.5 7-6 - 4.5 43.1 0.6 3~l 3> - 90 - 96.9 18.5 147 X,, 12-3 90 42. 1 9.4 Op. 2 245.1 0.3 Oo 0.2 -- 0.& o.4 0,3 -- 2.3 ----- 3,0 - 0.3 _ 3.3 INSTRUMENTS (.TOY.') ^ EA Field Mounted Instr. Panel Instruments EA EA Control Valves . Package Control Syst. EA EA PIPING 2" & Under CS 556 lf 2%"-6" St. Run CS LF 8"-12" St. Run CS / \ 14"-24" St. Run CS < O LF LF 26" & Over St. Run CS >__________LF Th" - 6" Spools CS\ LF 281 114 -- -- M3 3 ,as/A I2,fa/EA -- -- I.2S /LF 8" - 12" Spools CS ( LF | TOTAL DIRECT COSTS' | H.O. ENGINEERING Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity 114.3 | r'Xf | 96 9 1 Z6I 9 I 2,7 I 3.3 | 14" - 24" Spools CS 26" & Over Spools CS^ LF 2.S48 LF 4,35/lf I Total A/G CS Col A UNIT RATES AND RATIO ANALYSIS Col B 20 2__ Major Equipment Material & S/C $ 9Z I \AZ LF 37 No. Pieces of Equipment No. Pieces of Equipment 2. 2 12. cv No. Pieces of Equipment 2. fa4oo> LF Connected Horsepower -- A -f B 21.96. 57/ \3,S 6 -- 3,2&2 Lineal Feet of Pipe 1,142 Area in Battery Limits (SF) Underground Pipe Speciality Pips CS Valves (2%"& Larger) Alloy Pipe Steam Tracing Hangers/Supports Test/Inspect Materiel Handling I ,Ub PLANT SUMMARY 1,142. LF LF 3,242 2.64-/2F LF EA LF LF IMCL. EA -- -- 1.(42 EF 4.0 O,0.'r-/CF (DIS-TRUJi.) STEEL Structural Steel Platforms, Ladders T T Other Steel 5T Total Steel 5T INSULATION Pip. In,. --1e\^ 491 elf Equipment Insul. - SF J Si 20 7 2 54 41, ft ho t4 4|,&hi=t4 O. 3Z '- Fireproofing - SF ELECTRICAL (cOYlPOi H E. /\CCT,) 1 Equipment A/G Conduit U/G Conduit 7 EA 1706 LF ---- LF Wire & Cable Connections Elect Ht. Tracing 65,400 lf Sfc> ea BOO LF Cable Trey ------ LF CONCRETE WOHK (COpo5,1 Tt ACCY) total Formwork Rebar Concrete Total Q Acct BUILDINGS IHlL. sf WAO-- T \Z CY 12 ------- CY SF 4i<6 36,5 /cV SITE WORK Excavation BackfiH Sawers/Drains PAINTING (oO CY .-0 =Y ____LF SF 24-5 34--- 4.,05/cy 0M%\CH --. NOTES: UNllT LOcATE.T> Klo'R.TH cs4- ?(_T. \b Loire.(^TiMLr, OF 3. PoHP^, A sTLL PVPe XAOL COMWLU TFoH T>LT, 16, \sbooPVtfc> vMTMrAfc*. f\WR,oX 4oo* 5o MHC 7A?? 1 U(a INTO x. &KLTH4C, PREPARED BY (4. NAIL-LG.E- PHR 1.3-1 JOB NO 140*5 3 _ CONST. DATES 1o/6Q TO ^/82> JOB DESCRIPTION krmp_________________________________ CLIENT HAtSA-Ti+oia PIL COMfAHV LOCATION Rosmsou , illiMOI'S. PLANT SUMMARY Dollars & Manhours In Thousands PLANT NUMBER. 32 DESCRIPTION ^OOUIM-di i-OVsl E. CAPACITY _ OVERALL SUMMARY MAJOR EQUIPMENT C--Columns & Vessels D-Tanks E-Exchangers F-- Fired Heaters G-Pumps K-- Compressors T-- Special Equipt. SUBTOTAL Material | COSTS Labor | S/C | Total MANHOURS Bechtel | S/C 3 o.8 3 117.5 129.8 278.9 9 32.0 34 30.3 - oz> -ZUe.O - 0. (p Z22 9 - 32 O 210-8 - 149.5 139.& 535.1 - - 1.7 - o.z 1-9 - 25 - - O. 2a 2.7 Item MAJOR EQUIPMENT Coiumns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt. QUANTITY AND MANHOUR DETAIL Quantity Bechtel & S/C Unit Manhours EA TON 3 EA BBL 1 EA EA BTU 3 EA BHP EA BHP & EA 1 5 EA (p(a 2502 169 6 39 O 22 Z5o2 505 48.8 1,,m 1 |B*Ma"LSu,S/C| Manhoun STEEL Structural Steel T Platforms, Ladders T Other Steel ZZ. 3T Total Steel 22.3 t INSULATION Pip. In., -- F,aK 1514 elf Equipment Insul. 141 SF Fireproofing - SF 1030 1030 681 1 29 - 7 3-1 73 1 o.45 09Z - OTHER DIRECTS J-- Instruments L--Piping M-Steel N--Insulation P-Electricil Q--Concrete Work R-Buildings S-Site Work X--Painting SUBTOTAL 70 -5 132.5 3T.7 toio.3 I2&.8 0.1 94.8 - S60-.7 ZO 98 .3 317 24-3 27 17 - 113.9 254-8 ZZ.Z 182.9 - 706-4 22.9 - i3 9 - 332.8 105.4 54>2-5 M-4 22 9 2 20.2 383.6. 44. 2 277.7 10259 1 4.7 1.6 5.9 14.7 13 11.2 39- 5 0.6 9.3 0.8 _ 0.2 II.l INSTRUMENTS 53 EA Field Mounted Instr. Panel Instruments Control Valves Package Control Syst. 53 EA - EA EA 3 EA PIPING 2" & Under CS \ 1742 LF 2%"-6" St. Run CS LF 8"-12" St. Run CS 14"-24" St. Run CS s / 26" fit Over St. Run CS 2'V - 6" Spoola CS LF LF LF LF 903 225 - 98 3597 182 4 25 - 32 7 2.06 ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Tray CONCRETE WORK Formwork Rebar Concrete 34 EA 7000 lf 3ZOLF 33595LF 354 ea lipOO LF - LF 849 2955 46 1333 283 383 - 10.1 -42 14 039 . 80 . 24 IZOTI SF 3Z.3 T 085 cy 8345 29 35 3100 69 90.9 4.53 8" - 12" Spools CS U20LF 5502 4.91 Total Q Acct TO 1 CY |4~T 1 8 zt.o [ TOTAL DIRECT COSTS | Q>(p5.(p\ '"lAZ'l | 555.1 [ Z\(j,A -O | | HO. ENGINEERING [ I I 7! ^4-i.4| ' 13.6 | | 14" - 24" Spools CS LF 26" & Over Spools CSy LF Total A/G CS ' 286Z lf 909 9 3.18 BUILDINGS SITE WORK Excavation 084 sf 1545 3O&0CY 3365 2.20 1.09 Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire <P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity Col A UNIT RATES AND RATIO ANALYSIS Col B Af B Underground Pipe 919-5 600=2 54 6 85 Z82TO | 4006 4/a. 1 -0=3 Major Equipment Material & S/C $ ^^1 1 No. Pieces of Equipment 15 337 No. Pieces of Equipment 15 3-6 No. Pieces of Equipment Connected Horsepower 15 45-7 550 51.4 Lineal Feet of Pipe 5QQ2 2 77 Area in Battery Limits (SF) Speciality Pipe CS Valves (214" & Larger) Alloy Pipe Steam Tracing Hangers/Supports Test/Inspect Material Handling PLANT SUMMARY 2 20oLF - LF EA - LF 350 LF EA 1790 LF 4346 - - 417 WITH fit 144 M/A 1.98 BackfiH Z9 58cv 3207 1.1 O - Sewers/Drains 9 70LF 3339 3-42 PAINTING -- SF -- -- NOTES: E'YCRAU^ER 32E-4- COOL,lUp 1.19 TOWER ERECTED I3Y IS. A. PRiTtrHARC? >08C0MTI?^CTOR 08 FOUMRATIONi, F3P7NJ6; . 6hiP 5>n~T- yJoP?K IBV PREPARED BY S HKPPAWAV JOB NO ^0 3 ^ CONST. DATES lo/go TO A/fit JOB DESCRIPTION RR MP* CLIENT HARKTtoU OIL OOf^F7,>M.V LOCATION ROfelU-^Oig . U-(-lfJCH<h, PLANT SUMMARY Dollars & Manhours In Thousands PLANT NUMBER. 99 DESCRIPTION Ml-SC OrrPLOT PLftUT-S CAPACITY . OVERALL SUMMARY MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E --Exchangers F-- Fired Heaters G-Pumps K-- Compressors T~ Special Equipt. SUBTOTAL Material | COSTS Labor S/C >4.0 I4Z t 14 (r-~\ -- 4 1.1 9 M Totai | MANHOURS | Bechtel | S/C 4.0 144-7 I4B.7 - - -- - - - o.t O.) QUANTITY AND MANHOUR DETAIL Iltteemm 11 OQuiiaanmti,ttuy 11 BeMchatnahlo&urSs/C I1 ManUhnoiut rs MAJOR EQUIPMENT Columns/Vessels Tanks EA TON EA BBL Exchangers EA Fired Heaters Pumps Compressors EA BTU EA BHP EA BHP Special Equipment 1 EA 49 49 Total Major Equipt. | EA lt.m STEEL 1 Quantity 1 Seehtalfii S/G | Unit 1 1 Manhours 1 Manhours Structural Steel T Platforms, Ladders T Other Steel T Total Steel -T - - INSULATION Pip. In,--1 Equipment Insul. Fireproofing (EQ y \ff) 6.81 elf 742 SF -- SF 306. 4o6 o.45 0.55 OTHER DIRECTS J--Instrument* L--Piping M-Steel N-- Insulation P--Electrical Q--Concrete Work R--Buildings S--Site Work X--Painting SUBTOTAL 44,1 6Z.4 lot-, 6 4.2 1 Ce-O - - - 31 23.3 3.1 03.4 2&.S - 95-3 51.4 141-8 - 2B-& - 3-1 ZZ5.1 z -8 - 2 1-2 0-1 zz 11 - 34 INSTRUMENTS 31 ea Field Mounted Instr. Panel instruments 31 ea ^ EA Control Valves EA Package Control Syst. - EA PIPING 2" & Under CS \ 40U> lf 2V'-6" St. Run CS 1 LF 8"-12" St. Run CS If LF .(HE14"-24" St. Run CS ;26" & Over St. Run CS - 2%" - 6" Spools CS * LF ^io 125 - - 8 03 1 o.o -4.03 - ' 1 98 ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Tray CONCRETE WORK Formwork Rebar Concrete EA LF LF LF EA LF LF SF T CY I |TOTAL DIRECT COSTS 253-Z.| 24.2 | 96.-41 3T3.6 | I H.O. ENGINEERING [ j Col A I " ITM 1 UNIT RATES AND RATIO ANALYSIS 1-2 I 3-5 | II 8" - 12" Spools CS L B8Z LF 114" - 24" Spools CS LF 26" & Over Spools CSV LF Total A/G CS IZ&&LF Underground Pipe LF 2205 3008 2-50 2-34 Total Q Acct BUILDINGS SITE WORK Excavation Backfill CY SF CY CY Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity ZOl.6 IZ88 36. 3oi4 M/A 16.3 Major Equipment Material & S/C $ ^' Speciality Pips No. Pieces of Equipment No. Pieces of Equipment No. Pieces of Equipment Connected Horsepower Lineal Feet of Pipe Area in Battery Limits (SF) i \zz>& CS Valves (2'A" & Larger} ' 3(p Alloy Pipe Steam Tracing u/a ize>& Z'34- Hangers/Supports Test/Inspect Material Handling LF EA LF LF EA WITH PlF tace> LF Ni/\ PLANT SUMMARY 03 Sewars/Drains PAINTING 9O LF SF 1S9 210 NOTES: PL.AMT 99 cCoU f>l ST-S ORMl-sC. lU^TOHfASTATIOlJ AK1C? PlRlMCj FROM PLWJT'b I.Z.T.S. ZO, U PREPARED By S HAPRAWAV GARRARD 00000512 JOB NO 140' CONST. DATES 1 o/Q TO 4/g2- JOB DESCRIPTION RRHP CLIENT HLRutHpu Oil. Cohpauv LOCATION HOE.lMS.OKJ, ILUUOia, PLANT SUMMARY Dollars & Manhours In Thousands PAGE il PLANT NUMB5E0R^ DESCRIPTION ~TI?g - 2000 dOKJ^rrrRUd-r LQq (\tr> yy, ? 4^ CAPACITY _ OVERALL SUMMARY MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E-Exchangers F--Fired Heaters G-Pumps K- Compressors T-- Special Equipt. SUBTOTAL Material | COSTS Labor | S/C | Total MANHOURS Bechtel J S/C - Item MAJOR EQUIPMENT Columns,'Vets*Is Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt. QUANTITY AND MANHOUR DETAIL Quantity Bechtel & S/C Unit Manhours EA TON EA BBL EA EA BTU EA BHP EA BHP EA EA Item STEEL 1 Quantity 1 Bacht.l & S/C 1 1 1 Manhours 1 Structural Steel T Platforms. Ladders Other Steel H-^O T 22 T \ Total Steel M -40 22 t 1 34 1 INSULATION Pipe Ins. FtflAvn^ W/rnOELF 5944 Equipment Insul. Fireproofing (EQO'f7/1 - SF - SF -- OTHER DIR i CIS J-- Instruments l Piping M-Steel N- Insulation P- Electrical Q--Concrete Work R-Buildings S--Site Work X-Painting SUBTOTAL 4948.3 204.9 4fo 4 10-6 3 T. 5 26.1 7 1740 O 2396-0 <59 3.1 24.0 3o. 8 8 l&. O .3 - tT84.0 2710.4 - 5I53.Z 9-9 - 57.0 5 - 63 6 1-3 184.9 185.6 - 39.9 - 41759 30.9 12 3-0 1-4 480.1 - 514.0 18.8 1-8 1.1 - 0.3 - 704-9 10199-3 139.0 - - 59 09 - 0>. 4 - 13.2 INSTRUMENTS Field Mounted Instr. Panel Instruments 2 87 EA 207 EA EA Control Valves EA Package Control Syst. EA PIPING 2" & Under CS 2K"-6" St. Run CS - LF LF 8"-12" St. Run CS 14"-24" St. Run CS LF LF 26" & Over St. Run CS 2W -- 6" Spools CS LF LF 9 843 4 1 19 34.30 14.35 II ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Tray CONCRETE WORK Formwork Rebar Concrete ip 19 EA 900I8LF ^39>LF 4I66.2TLF 2 503 4* A - LF IZ*3Z9LF U038 52408 1528 22613 i3to9 15 1&624 SF T CY 8" - 12" Spools CS LF Total Q Acct 149 cy 902 TOTAL DIRECT COSTS | <6784-Q| Z7IO-41 70 4, 9 [ IQ I*? 9- 3 I 139.0 I 13.Z h.o. engineering jjN, ;Ml-nLHM|o;: I j :y N--^ N; M, ; hi |l MOM; N; i; N N: .;[ni ': ;i;,; il!; N}m;| | Col A UNIT RATES AND RATIO ANALYSIS Col B Other Direct Materiel & S/C $ 74&8.9 Major Equipment Material & S/C $ _ Lineal Feet of Pipe No. Pieces of Equipment - Number of Spools Cubic Yards of Concrete Lin. Ft, Wire (P31 & P32) Total Piping Manhours 36 105325 ________eoce No. Pieces of Equipment No. Pieces of Equipment Connected Horsepower Lineal Feet of Pipe _ _ . Peak Manual Manpower Area in Battery Limits (SF) _ ~ A{l 14" -24" Spools CS 26" & Over Spools CS Total A/G CS Underground Pipe Speciality Pipe CS Valves (214" & Larger) Alloy Pipe Steam Tracing Hangers/Supports Test/Inspact Material Handling LF LF LF LF LF EA LF 874 LF EA LF ll 595 BUILDINGS SITE WORK Excavation BackfiH Sewers/Drains PAINTING .57 revahp'sf 8168 165 cy 107 CY - LF - SF 837 264 - Job Overall Labor Productivity 1.03 PLANT SUMMARY PREPARED BV B M Unit Manhours to .95 <60.95 .3ft, -- 17-83 58 ZB . 054 55 - 1.51 6-C>5 5 07 2.47 - PHR 1.3-1 JOB NO 14053 CONST. DATES \oj%o TO -4/62- JOB DESCRIPTION RRUP_________ ________________ CLIENT M^RftTHO^J <010 c^nl^Af^A UO LOCATION ftoaiUSOkl U-l.iuoi'5_________ PLANT SUMMARY Dollars H Manhours In Thousands PAGE. PLANT NUMBER. GD DESCRIPTION 2000 ^QMvgrR-biDhl CAPACITY K !A OVERALL SUMMARY Material | COSTS Labor | S/C MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E--Exchangers F-- Fired Heaters G--Pumps K-- Compressors T-- Special Equipt. SUBTOTAL OTHER DIRECTS J--instruments L--Piping M-Steel N--Insulation P-- Electrical O--Concrete Work R--Buildings S--Site Work X--Painting SUBTOTAL A........... 1 itdCLOpsi? ltd 5595 24-u> - - PL A WT Z49.5 50 - - " - 8334> - _ - - j Total MANHOURS Bechtel j S/C _ _ _ _ - 559.5 Z4.& 249.5 - - 833-& Zd. 9 1.2 - 12.8 - - 5o-9 - - - QUANTITY AND MANHOUR DETAIL item MAJOR EQUIPMENT Columns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Quantity | **<*,$/C EA TON EA BBL EA EA BTU EA BHP EA BHP EA Total Major Equipt. INSTRUMENTS Field Mounted Instr. Panel Instruments EA ILpT5ea Z^BBI ILfT 5 EA ino5 EA Control Valves EA Package Control Syst. EA PIPING 2" fie Under CS 2% " 6" St. Run CS 8"-12" St. Run CS 14"-24" St. Run CS 26" fit Over St. Run CS LF LF LF LF LF 2- 6" Spools CS LF Unit Manhours Up.05 &99 Item STEEL Structural Steel Platforms, Ladders Other Steel Total Steel Quantity Bechtel fie S/C Manhours T T T T INSULATION Pipe Ins. FtfliL8rf ELF Equipment Insul. SF Fireproofing SF ELECTRICAL Equipment EA A/G Conduit U/G Conduit Wire fie Cable Connections Elect. Ht. Tracing Cable Tray UUpl LF - LF 15547 lf I7820>A AO LF - LF 44<j>4 - 9IU 5938 32 - CONCRETE WORK Formwork SF Rebar T Concrete CY 8" - 12" Spools CS LF Total Q Acct CY I TOTAL DIRECT COSTS | I H.O. ENGINEERING j | 833-(o| \1 | 8 5>3Cg | 4-0. 9 [........ i 14" - 24" Spools CS 26" & Over Spools CS Total A/G CS LF LF LF BUILDINGS SITE WORK Excavation SF CY Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Col A UNIT RATES AND RATIO ANALYSIS L-O^TC^ ltd p't*T' ______ Major Equipment Material & S/C $ Col B ---------------------------- No. Pieces ol Equipment __________________ No. Pieces of Equipment No. Pieces of Equipment m/a Connected Horsepower Lineal Feet of Pipe Area in Battery Limits (SF) A -J- B Underground Pipe LF Speciality Pips CS Valves (2J4" fie Larger) LF ea liBiii Alloy Pipe LF Steam Tracing 4895 lf inz Hangers/Supports EA Test/Inspect LF Material Handling 24 Backfill Sewers/Drains PAINTING NOTES: CY LF SF Job Overall Labor Productivity l< PLANT SUMMARY PREPARED BY P.LJE.E./ <3 . Unit Manhours . 4o - 059 33 So - PHR 1.3*1 "C" - COLUMNS & VESSELS JOB NO. & TITLEROBiMSOM REmNertfV l4QpEmil2ATIOlJ CLI ENT V\AS=^~rvAOr4 oil. ^OMpAtdy * 14053 jo LOCATION RC>B.IKi>OM . ILL.\n103 CONSTR. Iiatfs 10ISo to A\ar PREPARE!) BY PUT. EQUIP NO. NO SERVICE ASTM SPEC. Diameter FT-IN HEIGHT - FEET Shell Tangent Thickness to OVERALL Inches Tangent WEIGHT-TONS Bare -- Excluding Internals AS LIFTED 9 6-9. ME-A AB50RB6R SA- 2850 5'0`' c-10 FETf? 6A-S KO Pf?UM 54-2" 62 "-J" W 10.5 1-5 14-*f c-13 CARS 0EP ABSOR0 6 5 6/ C- \(fi WASH COLUHW 3-5 4-f c-17 COMPR KO PRUM /'5 /5 6-18 STWV Pal 0*5 0 S t-R Pf?O0 OOLTRAVS tvSCJC . FINAL MANHOURS Bechtel S/C /s'S //3 33" DIRECT COST S 1000 Bechtel Matl. S/C L& M 48.9 2 3.6 2 7.8 2 1. 5 8- 1 5.3 4.3 C~ He Pf?C> COLTRA't'S 'rvcur^ VafcfcAMaeR ' IFjLV S4--2,r 733 2. 1 0.5 -- \4z-y - i\ t-2 Zbr 3-? -- l\ .4 PAGE 2 GARRARD 00000515 TOTALS ALL OTHERS ( FA) C" <J1_EA> "C" ACCOUNT - COLUIWIAIS & VESSELS 7?A -- -- phr 1.22 JOB NO. & TITLERQglMSOM Rt-F~lMtTR V LAQPtERMlZATIOhJ CONSTR. OATES TO 41&L "C" - COLUMNS & VESSELS CLIENT M^RatHOM c>)t- COMPM-iV job location R'os'msom ilhuois PREPARED BY PLT. EQUIP NO. NO SERVICE ASTM SPEC. Diameter FT-IN HEIGHT - FEET Shell Tangent Thickness to OVERALL Inches Tangent WEIGHT - TONS Bare -- Excluding Internals AS LIFTED 1 (P c- 1 STRIPPER SA-515-70 --- - C-Z HYPRO FZCP 50R<& SK-5/5-70 12 '-or C -4 HYPPO Pf?PT SEPR 5A-5/0-TO b'-Ce* C-5 ttflM recycle oomp suer 96-0)" 35'-0" 25o" 121'-3" 51'-O" - 3/4" 2 Mu ~7I 31 44 2G 86 31 44 1 0-6 HYPRO FLASH PRR SK-5)5-70 9'- 0 '' 25'-0" 34- ll" 1 '/&* 23 23 C-7 STRPR OH RETOVR 9G if - G 0-3 URPTHA REACTOR SK-38T- II 9 'O" 18'- Q" 24'-5/*" 2.29' 0-9 PLKTFRH ROACTR SA-3S7-II fl'O" lO'O" 8'6" iz'o" -' 1-61 IBI 187 '-9" |.TI 2.08 O-IO ppops 0-11 \ST STACrtt ttaroP. SOCJTVO*! llftlllft SA-515-70 lO'-fe" 20-0" 43'-5" 3/4" 55 213 22 Llz 55 2>00 22 0-12 lUTE'RSTCt RCVR 0-/4 Hl<SH Pf?"S ROVR 0-15 PEe.UTAUIZE'R 5A-5P3-70 IO'- 0)" 5K-5I5-70 io'-o>" SA-515'70 I0>'-0" 24'- 6" 1 Vfe" l5'-5fc* 24'- 5 36 5`/av 7(0-6" 97'- I" O'"! '/& 2-1 5T*. 63 713 5! 7G '0- |(j> pesut pcciFve'R ' o-|9 iutcrmittakit 66 I-?? l'?7 FINAL MANHOURS DIRECT COST $ 1000 Bechtel S/C Bechtel Matl. s/c L&M I64& 201-4 5*1 `G 94Z 4o 121.8 _> -Cs 492 loo 10. 9 IH7 27.0 1 127 + 697.1 1819.5 64a.-\ 41 1 53 .1- 92 1 6. 3 5fi>4|o7B 1626 G2>. 1 117.6, 141.2, |o7 4o 15.6 6-3 `, PAGE GARRARD 00000516 TOTALS ALL OTHERS UliS V^CiG. ( EA) < EA) "C" ACCOUNT - COLUMNS & VESSELS ., \U>6ArCp ^7-1 2972-5 642>' l PHR 1.2-2 UZJS "C" - COLUMNS & VESSELS JOB NO. & TITLEROBI^SOM RCFIMCRV MOPCRUIg-ATiOM 14053 CLIENT T'*A.VRaot\qn> CML- CotAPA^V PREPARED BY job location . RQSlMSOKi , musAQlS CONSTR OATES \o\e>c> TO A\.e/C rv PLT. EQUIP NO. NO SERVICE ASTM SPEC. Diameter FT-IN HEIGHT - FEET Tangent to Tangent OVERALL Shell Thickness Inches WEIGHT-TONS Bare -- Excluding Internals AS LIFTED 16 C-ZQ C/aACv*^UaCA> C-Z\ c/k-r collector 1 *'? 2.-I \>7? 2.' 1 c-iz LOCK UOPPRtt o-a O '* C-Z 3 LOCK EM<3AOCR*l c-z4 l\oP? 2_ C-Z5 CAT RCrSEM TOVUCR 0-16,8 Z><5'-6," - 53'-5" 3/4" o *<s 3*4 23.6 O *9 v4 23.6 C-27 `SORCiC' HORP"IR a-a c-z a LOCK RoPPCR#2 C-29 LOCK CLJ6MSE:R*2. c7^ CAT app>\l Pfomhcl Hoia> I6P*- &>>: vcc-T i *i /' o /*9 M c-31 LOCK HOPPER -32 VCMT RROH ^ 1 -33 VCMT PROH *2 0 2. 0*21 0*2. 0*2. O * 7. O 2- C-34 vcur ' -35 VlTMT PROM M <>z 0*2 o* 2 O- 2. FINAL MANHOURS Bechtel s/c Ik 4-0 Z4 z4 4o 50 S i&a 3Z. 24 -- Ik 16 Ik 16 DIRECT COST S ICOO Bechtel Mail. S/C L&M 6.7 6.2 (o . 3 16.5 609-4 36.2 6 .2 7 .5 - 3 -7 1 *8 EC l\- 1 .8 1 -8 1 .8 PAGE GARRARD 00000517 TOTALS ALL OTHERS -TvV^ ?<XOu. ( EA) <J4_ea) "C" ACCOUNT - COLUMNS ft VESSELS 161 Ik , ,, , -R4-5 o -4 phri.2 2 COLUMNS & VESSELS JOB NO. & TITLE POBlUSOKl REFWcRV KQP-t'RtOi\A~\OU CLIENT MARfrTHQO CPlL COHPAUS* 4r o JOB LOCATION RoB.lMSoM , ILUKiOVS C0NSTR. DATES >o/go TO "t/g?. PREPARED BY_____________________ PLT. EQUIP NO. NO SERVICE ASTM SPEC. Diameter FT-IN HEIGHT - FEET Tangent to OVERALL Tangent Shell Thickness Inches WEIGHT - TONS Bare -- Excluding Internals AS LIFTED 1 U> -36 EP. IMJCCT TAMK C-37 MT GAS WASH TVJFJ Z' u XIZ $ /z ? C-41 PUST GC-LLCCTORS -42 PCGASSIMG PRUH o-9 O'! o? 0*7 C-43 FULL GAS KO PRM C-44 H compgst Pot -4 a Flash prom h9 /* /? M h-h /* c-49 0FW PETARATcpr (j-1 ipl C-50 ATTEMTR. STR\?f( t'-h.... C-l If.nct . C->6 TRAY'S t f'T L . c-a 13 ASK TS Rc.c>cju2. Gas CL&At .escjg.iL O 2_ > X C.-4L foODStfulft. Gas, Ca* LllSCLlL .'rVVJD VGftXAKbCL' ) (k_\ g-i xVkJG 'Gj 50\^W\ a.jr\ sir ~rA\B rt\Gc. o.2 O Z. FINAL MANHOURS Bechtel S/C 4o 2.71 l(o Ifc? 3Z 34 34 13o 32, IG I4> DIRECT COST SI000 Bechtel Matl. s/c L&M U.4 42,2 9.8 6,5 |3.5 9-4 9.4 26.9 -X zvi 18.7 a.ft Vft 7X - , PAGE GARRARD 00000518 ' TOTALS ALL OTHERS 0 ~TO-TA t_ VI A K>T \U C ^ ( EA) t -M-EA) 'C" ACCOUNT - COLUMNS & VESSELS l&t% "bw. 1 PHR 1.2 2 JOB NO. & TITLE POBIU5om REFtWeRV MOPERKUCATIOM # \405"3 CLIENT MKRATnQU Oil COMPAMV *C" - COLUMNS & VESSELS job location ROg.lUSQM, ILUMQtS) C0NSTR. DATES \o(eo TO 4/&Z PREPARED BY____________________ PLT. EQUIP NO. NO SERVICE 23 6-1 FP 6'OMlUGLER 6-2 absorber 6-3 PC-CTHAUl'Z.ER ASTM SPEC. Diameter FT-IN SA-515-70 |P- O" SA-5I5-7Q 5'-0" SA-515-70 7'- O" HEIGHT - FEET Tangent to Tangent OVERALL Shell Thickness Inches 33'-6)" 40'- 4" i M ao'-o" 163'- 4" 9/W' 64'-9" V4" WEIGHT - TONS Bare -- Excluding Internals AS LIFTED 39-4 1 lo% a J6o% 60 'b W -9 6-4 SEC ABSORBER 1G 1 6-5 PRC SATURATOR 6-6 P'CSOTAVJI^ER SA-515-70 92-9" III-II" i 4-' Cp 43-i iL) > 1 6-7 PCBOT OVHP f?EC 9% 9V 6-S PC PRO PAUPER SA-515-70 89i a" 108-6* 40 4 46*G 6-9 PEPRR OVHP REC la & G &. 6-10 PETHM2R SOUR C-l 1 T-T COKJPWS POT O' t? Z1) 69*5 f.% 6-12 FUEL 6AS KO PR O 'la O' 6 6-13 STM CortbtklS Sfc>T O' $ 0. 6-14 STm CX0\>C)S 'ftsT ' 1 6-41 STRP KO PROM 6>?v T. OV 6T Tn.Ri <b V. vo>te.o_^{^.a 0 > `C O' 6 - - FitiL't* 'po(&ota<bc.* -- FINAL MANHOURS Bechtel s/c S'a/ 102 736 .2/7 8>o /S'o s? 7? &/ 77 77 77 a s S /<=> & DIRECT COST SI000 Bechtel Matl. s/c L& M 71.0 6*, 2 O T61.2 o.% 25. e O 7- 25.8 0 1 % 1 20.4 O 23.1 97.8 O ~L^ 20. t 3.a 9.0 7.5 5.2 5.4 4 .3 Si.*) Z .7. PAGE GARRARD 00000519 TOTALS ALL OTHERS ~Tk-T*A l_ PL aoT "2?jC ( EA) < EA) Z50r W7$ 5"o 'C" ACCOUNT - COLUMNS & VESSELS ,, 5^.\ \ 5 PHR 1.2-2 ^ "C" - COLUMNS & VESSELS JOE NO. & TITLE RO&IUSOU RCPlUERY MOPeRMIZATlotJ t* 140^=1 "A CLI ENT M*>i?ATHOM Oil COKPAMY joe LOCATION R0BUJ6OKI lumM-Olb CONSTR. IJATES lo/e>o TO 5/82. PREPARE!) BY . PLT. EQUIP NO. NO SERVICE ASTM SPEC. 2g> 6-1 prop: coaler .c-z PROP. MEA T<teAT:( C-3 PRCtCAO.WA^H CL, c- 4 PROP, VUTFJ.VUS.COL 6-5 &OT, C AO %.VM6 H COL C-(j> BOTAHE EXTBCTR 6-7 SurALie s.Erri.e:K L-Z PROC col travS C-L> COL TRAS'6 \rttuYi *PiA (LjLA Rfsit CJ > ^|T Diameter FT-IN HEIGHT - FEET Shell Tangent Thickness to OVERALL Inches Tangent WEIGHT - TONS Bare -- Excluding Internals AS LIFTED C> *> \b '1 6-4 4 c>' *3 1 b' k *5-$ 56 10 z Zl 7 22. 2liy ,G> /9-0 /AJtC-. FINAL MANHOURS Bechtel S/C -26 /7JT <rs~ ss~ /oS /3/ ~ 72 V 77/ -- DIRECT COST $1000 Bechrel Mati. S/C lam 5.4 40. & ZZ. 1 23. 1 33. S 44. 7 3i . 2 1 .5 if. 3 0- 8 zo<n -- 2<* C-l a (L-2. o/^ 4CC.VMlii^ - _ _ _ _ _ k--! (AJ'*) rcve />/ 1H(L ( * Gj&Wdfej tJDZiLt 6 exvert -Tir^T G&iJAc k*34u n > 61 - ' fs* 2r - AV WOlfl 16.u SI#1 & PAGE GARRARD 00000520 TOTALS ALL GTHERS ( EA) w | k ,, ( A EA) \OTAl_ rL.AuVt 7& 1 24 C. "C" ACCOUNT - COLUMNS & VESSELS 815 //oG ZZ.G'h phr 1.2-2 *C" COLUMNS & VESSELS TRAYS JOB NO. & TITLE f?'fi:lM'RV HOpg'RkllgATlonJ. CLIENT H> ARATR CAl QIC CQHpAhW * 140*5 3 JOB LOCATION RQQlU^Q*-1 It-LlMOl^___________ ' CONST. DATES \ <=>/&<=> TO 4/e2. PREPARED BY C- J^CKSQK EQUIP. No. TYPE OF TRAY 9C-9 SVlK^ULaVLe^r f*"A*5 9C-\0> SViAkiLGViLG PASS \UO 1 two PASS VAvJ 1 i*C-8> d(SisAt'SrKibEuTtSor- {(j>C-\6 5lM6cC PA65/ -y-vy o vAuve ^*S5 ASTM SPECS Deck Caps or Valves 01AM. FT-IN No. TRAYS EACH DIAM. AREA-SF Per Tray Per Vessel cr 5 410 SS 5'-0" __2_ 15.9 33 1 3,-o" l o \ 9'-6" 31 3lu> SS - 56 T4I0SS 7-0"^-' 't-rr 3.9 ! 33.9 43-5 1349 -- -""!3T-4 948 WEIGHT-TONS Per Tray Per Vessel .11 2.25 .06 !0.55 .48 l4. 7 - 0.25 8.1 FINAL MAN HOURS Bechtel S/C DIRECT COST $1000 Bechtel Mail. S/C L&M 4.3 2.1 23.1 ia.7 14.9 Z3C-Z TWO PKSS VALV/S Z3C-3 -rWO PASS VAlVO 230-4 SVIKAAL6VL.SC PASS Z3C-6> two Pass valvs 23 C-& TWO ^ SlKJ6Le PAS S^PASS VALVE 2&6-Z SIMSI6ELVCE PASS 232-6 PSlENVRGroLlHe APTASSISD \1 41C.65 5'-d" 34 12.5 425.7 .14 4.75 T'tO" \lo 21.2 338.6 .29 4.6 3 -0" 24 4 97 119-3 .<944 1 .05 ^flo" 'S-Tf -<31 4 1257.5 10.15 ' ' V--'1VS''_-O_* -^$3 721.4 l7-J--r-^-- 5.75 - A'-o'' 3 - 5'- 6* 7 75 228 .092 .275 20 140 16 1 . l& (p6 9 .9 3.4 Zo. o H.4 l. 5 6. 3 PAGE GARRARD \L>C-8 ikhcrmAl basket's ( JlBToo) TOTALS o o o o o "C" ACCOUNT -TRAYS cn IU waupoi? WITH . CveOsUs-e/l. 00 PHR 1.2-3 UC" -- COLUMNS & VESSELS VESSEL PACKINGS ' ROSiKlSoa FuaeRV JOB NO. & TITLE 140*5 3) MQC?'RkUr.ATtot4 CLIENT MARAVUOKt Q>L. P/Vi I V JOB LOCATION FvOG^SotJi , luuuvlQVS EQUIP. NO. DESCRIPTION OF PACKING (TYPE-MATERIAL-SIZE) VOLUME CF 9<:-i5 iuc- a i gc-8 \lffC - & \(aC-31 2&C- Z 286-3 Z8C-4 2&C-5 ACTIVA-reF CTHARCOAI. -PITTSBURGH TYP" 66L*8x30 PeMt)TOM IOO - Va" (rf rTAT/kLV6T SO^OKT Peu5towe loo * 'A" <$ catalyst support (7Mt.TOd IOO - 3A" (OATAUV SUPPORT" IKiTAV-OK (2") POKCTLA'Kj 6>APpL.S imtauox (1 *9 poRcei-Auu -sapc?lets. I1/?" PAUU. Ri>46tS IKTPxUOX 1 Vz") PiOROCLAlkl 'oAPlpuc'S ' ll/z" PAUL. * 360 Cod 60 95 ZOO 335 65 65 i 25 WEIGHT TONS 5-4 CONST. DATES K>/eo TO 4/(32. PREPARED BY ^ OAK6oi4 FINAL MAN HOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. suf"pf.ur<? ev <aioMT s/c L&M * ' i PAGE GARRARD 00000522 TOTALS Includes Inert Packing, Catalysts and Chemicals When Furnished and/or Installed By Bechtel C" ACCOUNT - VESSEL PACKINGS ^9 -- PHR 1.2 5 \ JOB NO. & TITLE ^?\sg<Cl U\a^ifi.AvU~feilcONSTR. DATES A&\jSSt_ TO &2L TANKS CLIENTKRfrfi.frTvLad Qu-- Clo.___________________________ JOB LOCATION 0-rih>N ~X1 ^_v_y ______________ prfparfr by H. <2,F\uL.ocjJifty PLT. EQUIP. NO. NO. SERVICE ROOF TYPE MATL IF NOT CARBON STEEL DIAM. FT HEIGHT CAPACITY FT BBLS WEIGHT TONS ' FINAL MAN HOURS Bechtel S/C DIRECT COST $ 1000 Bechtel Matl. S/C L&M '5'L Q-\U Ov^Pc&AfrvSr STdfii\GrE.TfrviL \*>2. t>-va CAa&WsKfe 1^Csi_hi t)K TfrvOiic *>Z. 0-r*> Cjq^C . *W**Oa ^rcsOA6t. Tf NYL 51 Jl________ q V B<\ *1^ l4- L O . 'b ____ 4 Plant `b2_ ?>0` & b-T. AytsfLaVsKvA VW.L'Xf^ M \h Ch7<P-> APoavoM Funnel O.Z 54 z& ... 1 PAGE ALL OTHERS TOTALS ( .......... EA) IsTL ^H,/NOTE: Spheres and bullets should be listed on vessel sheet 111 *D" ACCOUNT - TANKS 1 5 O 'h o PHR 1.2 7 & "EM - EXCHANGERS J01 1 NO. & TITLE CL ENT JOI S LOCATION .... SUMMARY OF EXCHANGERS ............ CONSTR. D ATES I0(& TO PREPAREC BY \ INSTALLED QUANTITIES FINAL MANHOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. S/C L& M -*0 m> CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR 1 r CARRY FORWARD FROM PHR ll2~IZ CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR PAGE PAGE &JBr. page PAGE PAGE - '2. M PAGE PAGE ........ PAGE \=uAvit lli, puhwyr 2L& V\ *3%*- 4(b 17 JL 1 / EA io,6>t EA /?V5 V ..&JLl U& *! EA - EA - EA -- ^Sa^. O'B 'Ll 6 0 EA EA PAGE GARRARD 00000524 TOTALS "E" ACCOUNT - EXCHANGERS 1 G EA 13, 4-|o ZIW 4-U 30*1 r&'b phr 1.2-8 ^0 JOB NO. & TITLE CONSTR. DATES SHELL b TUBE "E" -- EXCHANGERS CLIENT _____ ------------------------------------------------------------------job location _______________________________________________ PREPARED BY lY\ * PLT. EQUIP. NO. NO. SERVICE S H SHELL SIDE E L L Malarial S Flange Rating TUBE SIDE Flanga Material Rating MVBTU HR PER SERVICE SURFACE AREA SF Per Shell Par Service WEIGHT (TONS) PER SERVICE FINAL MANHOURS Bechtel S/C -.t (\UvkW. ^LtAt^Cnii ,1 *6 CthA Cbou.1 ./ \ZA kUM^t 'cTCAt\ViGE -10 ktAtttE CjoousiA. / / -a >&l JL<L JterU'O'k ~ Glfte CbOl JB .. 1 *lr ?L^r 4 \6at5 VA LAS iSoV P/ I6'6 <"<3 // O. of lUC,?, /? /V 3V / eP-> /y ^2/3 TO &Pa Lftto/Ov DIRECT COST S 1000 Bechtel Matl. S/C L& M 2V4 l4 ^ && a 2/1 $ lVV l 11 <1 4-1 146'1 PRQPAvj P0Efc> 2& e-i Z-tzaLxZA / i *2 / T `blr 3? <3.& // 3</ >4 10`S PAGE GARRARD 00000525 ALL OTHERS I0TALS 1 FAl -r-, ,,- TT-U*b PfcCrl* i H eai "E" ACCOUNT - SHELL b TUBE EXCHANGERS ? 2(4 PHR 1.2 9 JOB NO. & TITLE IATES ^\ao TO 4\&x CONSTR. t SHELL & TUBE "E" - EXCHANGERS CLIENT JOB LOCATION PREPARE! BY U . Ctt\ AsCMh} PLT. EQUIP. NO. NO. IL SERVICE S H SHELL SIDE E L L Material S Flange Rating TUBESIDE Material Flange Rating MMBTU HR PER SERVICE SURFACE AREA SF Per Shell Per Service WEIGHT (TONS) PER SERVICE fFuilf (o t TF'bl.t ls< ifi C$ AoGO*Rjr Wb C> 26lo sse4c e-\fc rPlVG teCoW LocJ1 (U? J e-i. 4 \\3tfin ?0ib0a3 Tg4tA CflOLg/l 1 ^tkj. pPtiL o w TEiia faawitfe l1 CJDtATLiiJsSrpefet* * FFU>evAT* l^tA. - z 1'LN\ol(- 3te* IOL- ^CC>^2 %-<\h wraift TdiiA Cjcs'oUJk. z K\VMJ> tiit a* LMVAtS/ fcfcAMfl- Sox fl'5 SoVU teOtn 4l\fc n% iiiL i'\b 4fotr-cPefLsfcMousfoti .. utX \ 1 Kn-C.b Ch iJcJ'ejF AbtAtfiL (cC^iF \AvA\b AViM\IL -i4 DtbuTftai (L<1 K^?WTfeT(Vlo5r P U\s ffcm C-okJb, 4 \ Ch IcO* U,f dTcBtfmtmot"r re^>rw\f,<eL 1 \ i`ic POtL 6tf ClA ea u^r CrAt auaut Li 6*21 id T t-2l .KV\fvHi.t X>a!KiiCA'rti.K, >. V-e.GllAlUl OCtl. l^o1 && 2*64 wiv su<lv 3*34 4oeO U'Xt 2/3 &W2 FINAL MANHOURS Bechtel S/C 440 'L'OD 80 e>o 500 BO 80 zoo 11 10 70 32. 80 DIRECT COST $1000 Bechtel Matl. S/C L&M 82.7^ U<6** s4.v \6` \ aa^M \2lV l4* *3 &v 4t*4 4i_i to- 6 4- - 4 1-4 60 <8 (3 PAGE GARRARD 00000526 ALL OTHERS TOTALS ( EA) ____ TiW^ I 33 pal ` E" ACCOUNT - SHELL & TUBE EXCHANGERS 31 3.1 Z14 asn-t S-L. PHR 1.2-9 JOB NO. & TITLE Rt&uybfhA Rjl CONSTR. DATES TO 4r\|.t AIR COOLED CLIENTEAl\ft.ATl46i4 &U- Cb, JOB LOCATION (^Qfib^So4 , XuLl ikTCVS PREPARED BY ff\. Cl ___ PLT. EQUIP. NO. NO. SERVICE OVERALL DIMENSIONS Lw FT FT MOTORS No. HP/EA MMBTU HR SURFACE AREA WEIGHT Bare Extended TONS SF ESF FINAL MAN HOURS Bechtel s/c DIRECT COST SIOOO Bechtel Matl. s/c L&M VVd iL-S Pn-Obocrs CotJfctfjW L \lo e-s ^TlLlPPeiLOM CDdb. *>2 H* i ^CJtolL^OJbvXTS Ct o IU z-vs Gt&vyThtoA. dA C&tll . 40 4o \U e-n UL 4tO lU> -21 ?&l*ikRATtOhl CjD0U< lb t:\0 VJ\fvcT C*A*a VTAGiL CDN^O^olZ, lOTUIUmuD! 4er I u -17 I'44* Mhtit CoouilL S\t Pu^yT lb "1 4o 4b Z.& \1. Sb z& i4 *S i4 i4 4- z a 4 7_ 4 16 IS 2o IS IS -- to l 44-a 9ao& 211249 &b7 2.IES 4z\l\ G4* 3 mbs S74bS2 IS- 2- 6lSV \q74U TVO 4&4R &A426 l-ZA <MU WL 27Vh 4%70 Lo *3 6 2H9 99573 \& 7.1-S 7.0 2 4*0 4 soo 700 Ifcoo ftDO ftco 5"OD 700 700 (J&O \4\t ss-z S4&-S \\1'4 Vo Vo *4 1ZI 4-7 l <47-V Moi 2Z 4A|ft uib issmas Z4 52. & VO 27>S sn4 njoo *7 (a //oc> -- 209 -6 zr la-4 EaoTYorA^ Cto t ii. bz_ II z. lo II * 152? wza s 383 -- 6V1 PAGE 3 $ 1 (3 GARRARD 00000527 ALL OTHERS TOTALS T\\\ cj 1-------------- 1 i 1 (.......... A> ' . Note: Under Each Item. Define Extent V^kClCL (vAUA ) Of Field Assembly Required. "E" ACCOUNT - AIR COOLED TUBULAR EXCHANGERS VWVft P duo i o.in SHELL & TUBE JOB NO. & TITLE. CLIENT________ CONSTR. DATES TO PREPARED BY ttV (iMABVl PLT. EQUIP. NO. NO. SERVICE S H SHELL SIDE E L L Malarial S Flange Rating zs e-i ll y ML* / -** T)foorf\Wi.etC pjrfcj LtuOLO.iL ?tnijAroft-KTo(iL l-L s-t.b Coqu(L / / i -1 &Cil. \_o.tJ 1 2jlcpLe'-e Oil-- CJDOUTCXil, *io TXvia tJOOUtllX i / / l-l| i tb0TA^_WJ^cT i Qfcfftja'P 6/pI t*|* CjdOV3H*3A. i 1 ^P^,(bC>tL-l.(L i TUBE SIDE Flanga Material Rating MMBTU HR PER SERVICE //6t /o3J S ? S/8 J./S 26/ p.a? uJFtnsr KcJW PltsvUd IVC SURFACE AREA SF Per Shell Per Service Mt <41^ WEIGHT (TONS) PER SERVICE FINAL MANHOURS Bechtel S/C //a 7S' 7S S~3 3Z 3^ <cT 3i" yo //? DIRECT COST $1000 Bechtel Matl. S/C L&M 94`Q 2.1' l ?.& *0 Co * (o lE-'V >(* "VlT TV'S TV-6 PAGE GARRARD 00000528 Al l OTHERS TOTALS ( EAl TV, PA<V i |B EA) E" ACCOUNT - SHELL & TUBE EXCHANGERS <FV3 - Mora <J\ PHR 1.2-9 JOB NO. & TITLE frA<i>WLlh4, CONSTR. DATES *E" -- SURFACE CONDENSER CLIENTtA^(LKTlA<SK> OiU CJC>. PREPARED BY KV fefrUJ*.^ job location XuLihtoif? PLANT NO. EQUIPMENT NO Wfi'i.- \*\ WEIGHT TONS FINAL MAN HOURS Bechtel s/c BARE CONDENSER (ATTACH 814" x 11" SKETCH NEXT PAGE} GPM Wifi ; C.W. IN fo F, OUT H 6 F; ASTM SPEC: SHELL .? . TUBESHEETS SIZE: l2.\-2-V, W 4`-4-M.H ; \\ \oo Ttl 4l&:L DIRECT COST $1000 Bechtel Matl. s/c L&M \\S`\ TUBES - INSTALLED IN SH0P/R6fe> (CROSS OUT ONE). NUMBER feti'b EA; O.D. IN; LENGTH 1& FT; GAGE *V1`5 ; ASTM SPEC TOTAL AREA 'fe'SLtD S.F. SEC \loG-U TOTALS ACCESSORY EQUIPMENT INCLUDED WITH CONDENSER PRICE: MAIN EJECTOR 1 EACH HOGGING EJECTOR TYPE t4af EACH C.W. PUMPS GPM/EACH . TDH . EACH MOTORS FOR C.W. PUMPS HP/EA . RPM COND. PUMPS GPM/EACH TDH . EACH MOTORS FOR COND. PUMPS HP/EA , RPM , ___ . _ "E" ACCOUNT - SURFACE CONDENSER >L \\ i -A <_4 10>0 "\ \\6 A | i PAGE GARRARD 00000529 1 OTHER JOB NO. & TITLE. CLIENT_________ *E"-HEAT EXCHANGERS job location PLT. EQUIP. NO. NO. SERVICE DESCRIPTION AND DIMENSIONS lU CH\#A^fT\Ot4 ULATliL u2.tTIUC ^"o.b V PlG UlZAriL ^ O VCW t yvkadAti. lood L.jkrtv\r CONSTR. DATES 10 So jq 41 St- PREPARED BY ^ CiALUa^tO/ DRIVER WEIGHT HP TONS FINAL MAN HOURS Bechtel S/C go DIRECT COST $1000 Bechtel Matl. s/c L&M \U iluscrtuc. ----- Vjgfyr&K-________ i6&Vp e^,\ FLG V-WATC& ?>6>WL\AJ Mrk?vJ ^ PtU*j \ Ac L loQA - U-Taftil A. or lli -16 k\(L \\k<<L ~ \(3&y(Ur fc>Uv$t> -r\P. y^Taoobut ic^knJ \UUA>ioe1 ' MrTo1 tsiA Vv^COLdV U2lMoe>oT^ . fto Ar> ft-o * PAGE GARRARD 00000530 TOTALS . ALL OTHERS ___ _ . ( EAl too E" ACCOUNT - OTHER HEAT EXCHANGERS \?CH- PHR 1.2-27 jfi'Ltfl ^ MECHANICAL DRAFT "E" -- COOLING TOWER JOB NO. & TITLE \4rtfab fcgjFvt^lfcN CLIENT_>U- Oa. PBFPARFD BY MV C*KVXfi>v4^ j0B location o t ~X tuk^v*>______________ PLANT NO........ 'Kl? DUTY IN MM8TU/HR. l^ WATER TEMP. IN F lO~), EQUIP. NO.'SGPM^jLop DESIGN WET BULB F "J& L WATER TEMP. OUT F tfc* lift ^ CONSTR. DATES 16 1 TQ U-i&l. FINAL MAN HOURS Bechtel s/c DIRECT COST $1000 Bechtel Matl s/c L&M O & Xi La OUTSIDE DIMENSIONS: width : HEIGHT LENGTH FOR 1 CELL TA^X ft IS Z& FT FT TOTAL FOR CELLS ZQ'b ft 2.S, FT //X FT : FAN DRIVERS: . J EACH/CELL 7' B EACH/TOWER HP/EACH MATERIALS OF CONSTRUCTION: frame 'Oe.tise kLi SIDING fijOt. Cja.llCkCffi,M* Fl(l. ClTI\R.'ti(i^f fill ^O'fshKTVc- CjALcfLlbe. Filta Vy P. pwl iiljjiiijjr ---------------- - 1 PAGE GARRARD TOTALS TCiTfV L_ CJZZd L_v Cg U.ft_ - Z*>0 2, O 'S *L\L'C "E" ACCOUNT - MECHANICAL DRAFT COOLING TOWER PHR 1.2-12 "F" - FIRED HEATERS JOB NO. & TITLE CONSTR. OATES CLIENT PREPARED BY m. QAl.VJPWtt| JOB location SUMMARY OF FIRED HEATERS TO INSTALLED QUANTITIES FINAL MANHOURS Bechtel s/c DIRECT COST $1000 Bechtel Matl. S/C L&M CARRY FORWARD FROM PHR l'2-7T PAGE CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR /2>|$' PAGE PAGE CARRY FORWARD FROM PHR h'2-IS' CARRY FORWARD FROM PHR 1.2-iC PAGE PAGE CARRY FORWARD FROM PHR PAGE CARRY FORWARD FROM PHR PAGE CARRY FORWARD FROM PHR PAGE 2.0 Z-/ 2 2- /2J5 ^ UqF'V \Lf-2. V *4 7^f-[ \ EA ^(oCofe? 1^0 TlBfVL TIL'"L \ ea vib*4 1 EA 4&`$44 c|6r*4- 2>>54^ l EA 'UL' 7- l ea U,'\ EA EA EA PAGE TOTALS "F" ACCOUNT - FIRED HEATERS EA &n$o 5o!fc?l< `V^vk PHR 1.2-14 JOB NO. & TITLE ^QbeAfeK\bAcoNSTR. DATES TO t AX- FIELD ASSEMBLED "F" - PROCESS HEATER clienttAMLivrUod job location chi-- C_*>. prepared by , kMxbuA>_______________________________ equip.no. \lo'F-\ HEAT ABSORBED 2.B ") MMBTU/HR ATUBE ASTM SPECS: RADIANT *Vb6 SERVICE R. elkCfo <2 .Ak<\_66. \\Ckfis.<L P\\ EFFICIENCY ^!*S % FUEL Oil- 1 GA& CONVECTION k *W3 Pll FINAL MAN HOURS Bechtel S/C FINAL DIRECT MATL. US SI.000 Bechtel S/C FURNISH MATERIALS HEATER ASSEMBLY STEEL FRAME QUANTITIES METAL WEIGHT (TONS) CASING RADIANT TUBES &*L INCH DIAMETER CONVECTION TUBES 8> L> INCH DIAMETER HEADERS & CROSSOVERS TUBE SUPPORTS W)*iSF ZL EA 56 EA za LF STRESS RELIEVING ^ _, EA RADIOGRAPHS BURNERS \OQ*L EA Or EA BURNER PIPING REFRACTORY - BRICK - CONCRETE \j Tv\v block^' 0(2.Rn\\C_ 2jC^\\<LJC R(b(L.. ( \*jz. Y . LF STACK - DESCRIPTION: TJ'L.O 1 583-2 .feSIL is* a f 1 { fb / 30Vd GARRARD 00000533 STACK LINING - DESCRIPTION: \^LATv^G BREECHING BREECHING LINING DESCRIPTION: (NOTE: ATTACH, AS NEXT SHEET. SIMPLE SKETCH SHOWING PREASSEMBLY) loo a SF 5,6 SF "60 SF \ ' T0TALS \ cirrA v__ vWoceXL t \<\d. 4,F" ACCOUNT - FIELD ASSEMBLED PROCESS HEATER 75o 58fl *2- 22. 2_ ........... PHR 1.2-15 JOB NO. & TITLE ^atogrt-^viATlicnJ FIELD ASSEMBLED *F" - PROCESS HEATER CLIENTKA&ftJVfiActnl QiL. Cfc>> JOB LOCATION ^-fcfot ^*js>J t X ___________ . EQUIP. NO. llfl F-L SERVICE ^TL-vPPtKL ^(VCi. QjLP.iOVUgiL HEAT ABSORBED MMBTU/HR EFFICIENCY % FUEL O\L-iCxA^ TUBE ASTM SPECS: RADIANT C& A-loL Cr!L B CONVECTION C& Alob Alt Ha CONSTR. DATESTO PREPAREO BY ^ FINAL MAN HOURS Bechtel S/C FINAL DIRECT MATL. US SI.000 Bechtel S/C FURNISH MATERIALS HEATER ASSEMBLY STEEL FRAME CASING RADIANT TUBES INCH DIAMETER CONVECTION TUBES INCH DIAMETER HEADERS & CROSSOVERS TUBE SUPPORTS STRESS RELIEVING RADIOGRAPHS 7oo% BURNERS BURNER PIPING REFRACTORY BRICK (V,-rrn C 7.V*. XL CONCRETE Xa\.c ^ BLOCK 4gRM. A v c STACK DESCRIDPTTIIHOMN<: fClt?Q\ tKf\ATs3na(, . \ AA-TTTla_ _sIi iV.alil l\ll>rF-\\ ji * i QUANTITIES METAL WEIGHT (TONS) \2.b \U-OD SF dr it, EA IcO EA too LF EA EA EA LF VfrT- SF M>U (obi Sth. & STACK LINING DESCRIPTION: ^^LAYUoG Cj&*JULT. BREECHING BREECHING LINING DESCRIPTION: (NOTE: ATTACH, AS NEXT SHEET, SIMPLE SKETCH SHOWING PREASSEMBLY) *>i AifC*a\ SF bO SF bO SF \ TOTALS "YoTf\L_ Ue kTui <L \lfl Vr-'L. \z.s Tbo yj84 PAGE GARRARD 00000534 *F" ACCOUNT - FIELD ASSEMBLED PROCESS HEATER PHR 1.2-15 JOB NO. & TITLE uj-iy/*) 9-tt.PvwfcCy MatoHUlhi, EONSTR DATES \&i&0 TO 4 i FIELD ASSEMBLED "F" -- PROCESS HEATER client__________ MAa.KTA<atV Ow Ct>- prepared by Wv job location T.ia_u^>v*>, equip.no. \t*'?:-`33{4Sb\Q.\Ts HEAT ABSORBED '^Yq^Jf'lSiW^TU/HR service 'pL-KT'FOft-IAu-'Xjr CjAkftJtiv* vW&ft (L EFFICIENCY % FUEL _ TUBE ASTM SPECS: RADIANT K?)V5 <30-9^ CONVECTION K'Vb'o CtIL P4 FINAL MAN HOURS Bechtel s/c ____ FINAL DIRECT MATL. US$1,000 Bechtel s/c FURNISH MATERIALS HEATER ASSEMBLY STEEL FRAME CASING RADIANT TUBES U*V' INCH DIAMETER CONVECTION TUBES^^iiNCH DIAMETER 1<J2* <?(,+ lL> QUANTITIES -- METAL WEIGHT (TONS) ZZoo ZLOOG sf ll& EA 4&,0T? bo 4 EA *>S'Vv`2> HEADERS & CROSSOVERS TUBE SUPPORTS STRESS RELIEVING RADIOGRAPHS *>7(5 tOG^l* aV^TU LF EA EA ?)\n 0 BURNERS BURNER PIPING REFRACTORY BRICK foU C- n l6oO ^ *4* ^^ONCRETE LOMhifTC 1 ^KY lilt^/\JafLUUtj^uT. ILV U-C, EA LF 4w>8S -BLOCK Cji^mc V^VWLlL ^'-To"lW STACK - DESCRIPTION: STACK LINING - DESCRIPTION: LvitVvAl CtL - fAWblHi \k* SF SF / 4 t^v \/ L i\ _Co&_W z44^. BREECHING 600 SF BREECHING LINING DESCRIPTION: (^oCAt^C, CMUltfe. 6oO SF (NOTE: ATTACH, AS NEXT SHEET, SIMPLE SKETCH SHOWING PREASSEMBLY) >' T0TALS Udkrc-A- tU-'^Alfcldb *2..Z*D 1 f PAGE GARRARD 00000535 **F" ACCOUNT - FIELD ASSEMBLED PROCESS HEATER PHR 1.2 15 JOB WO. & TITLE XA&'ob WVSt^.CLLh nflMSTR DATES \qWot11 FIELD ASSEMBLED "F" - PROCESS HEATER clientUvMUon-V6^ Oil Cb................................... ......... prepared by ^ H4 job location RO&\C&aiV XiL.iAaA __ EQUIP.NO. Uo'F-U- SERVICE HEAT ABSORBED #V4 lO MMBTU/HR TUBE ASTM SPECS: RADIANT t\ AIOL Ctth RFa<LAAC<L AlifvtcLft. EFFICIENCY %$% FUEL 01 CONVECTION C4# A/OC> l CrA$ fi/lS FINAL MANHOURS Bechtel S/C FINAL DIRECT MATL. US$1,000 Bechtel S/C FURNISH MATERIALS HEATER ASSEMBLY STEEL FRAME CASING RADIANT TUBES 4'46 INCH DIAMETER CONVECTION TUBES 4 *56# INCH DIAMETER HEADERS & CROSSOVERS TUBE SUPPORTS STRESS RELIEVING RADIOGRAPHS lOO *h QUANTITIES METAL WEIGHT (TONS) \A**4 ILoqo sf m-& EA Uo EA loo LF EA EA .Cg^ZL >m BURNERS BURNER PIPING REFRACTORY - BRICK CA^ zV' TWti -CONCRETE yA* ^V\. Spj -l LF -6A -BLOCK 41' CvTCtvAvr \AV ,V V: ta/.vA Y*?'U SF STACK -DESCRIPTION: STACK LINING DESCRIPTION: BREECHING BREECHING LINING DESCRIPTION: (NOTE: ATTACH, AS NEXT SHEET, SIMPLE SKETCH SHOWING PREASSEMBLYI *0 --------- \-------- SF -------- ii -- SF r t ' \ I TOTALS . vW.kTVYL \vl0 T^i 'Ziz. ~c PAGE GARRARD 00000536 "F" ACCOUNT - FIELD ASSEMBLED PROCESS HEATER PHR 1.2-15 FIELD ASSEMBLED "F" - PROCESS HEATER JOB NO. & TITLE VAo1^ P QPjufoOti CLIENTVvAKR_(\TAq<4 Q>L . JOB LOCATION Rafov^OtA Xlu MftbuitU EQUIP. NO. 'SL'bV^- \ SERVICE HEAT ABSORBED MMBTU/HR TUBE ASTM SPECS: RADIANT G2.Tb ____ EFPICIENCY Bft-U % CONVECTION A .llfo<3U-- kL.0-- FUEL C.(L fo FURNISH MATERIALS HEATER ASSEMBLY STEEL FRAME CASING RADIANT TUBES Ia^B INCH DIAMETER CONVECTION TUBES La*fa INCH DIAMETER QUANTITIES METAL WEIGHT (TONS) Uoo \aeoSF +> EA o4 EA HEADERS & CROSSOVERS TUBE SUPPORTS loo LF STRESS RELIEVING RADIOGRAPHS BURNERS lOD4T EA EA 4- EA BURNER PIPING LF REFRACTORY - BRICK ^.AAr\ C CONCRETE 47% -ftKY.. - BLOCK STACK - DESCRIPTION: At Cv^AA'X o \~-\V. am :. 6j4* 1 Y, ^'b1' D.b, EA *J?CF sr- STACK LINING DESCRIPTION: IZEuD sf BREECHING IOC?? BREECHING LINING DESCRIPTION: iOOSF INOTE: ATTACH, AS NEXT SHEET, SIMPLE SKETCH SHOWING PREASSEMBLY) CONSTR. DATES! Yq 4 i&Z. PREPAREO BY ^ CrftUJaOP^ FINAL MAN HOURS Bechtel S/C FINAL DIRECT MATL. USS1.000 Bechtel S/C L \u\ TOTALS "TS-tal- iW.ftft.r'L zHi - \(i)0 +/&S- 2> 4-4-0 2^4 PAGE GARRARD 00000537 T- ACCOUNT - FIELD ASSEMBLED PROCESS HEATER PHR 1.2-15 (&$ JOB NO. & TITL E CLIENT "G" - PUMPS & DRIVERS job location SUMMARY OF EXCHANGERS C0NSTR. EIATES^/a^> TO PREPARECIRY H. (SA(_l_C5boAV INSTALLED QUANTITIES FINAL MANHOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. S/C L& M CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR PAGE 2-(r> PAGE ^ CARRY FORWARD FROM PHR PAGE 2- CARRY FORWARD FROM PHR 1.2-22. PAGE 2-- CARRY FORWARD FROM PHR i >2-2.3 PAGE ?>2- CARRY FORWARD FROM PHR L2z23> PAGE 33> CARRY FORWARD FROM PHR LPAGE ^3> CARRY FORWARD FROM PHR PAGE T'L.AkJiT 9 Pu.A*^~r 1 La , -r |, , Z.**3 2.S (j ZC> 0 "52 Pu A kj f* 9 O *j Z EA -- /a EA 4a4k EA *5T - EA EA J22-9' EA -- - EA 4o5 * EA -- 2V6 O 7. 146*2 t&u 44* a mi 64-1 m-5 1*7 - ... PAGE GARRARD 00000538 TOTALS EA "G" ACCOUNNT - PUMPS & DRIVERS 13oZ phri2* JOB NO. & TITLE Z4053 , CONSTR. OATES Ql6a.T0 ^^2- G** - PUMPS chfiit MARATHOA/ OtL- CO, JOB LOCATION ROFZiA/SQA//A L PREPARED BY PIT. EOUIP. NO. NO. SERVICE PUMP: DRIVER: pump impsu&s PUMP (toil/ 75( tlacuL. urntt DRIVER PUbpiMPSUJS, PUMP Refill*. PL/MW) DRIVER GPM TDH DISCH. PSIG F CASE MAT'L RPM TYPE M ST - ENGINE DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT o BHP HP FINAL MAN HOURS Bechtel S/C B y/Yioc. By tfJoc: DIRECT COST $1000 Bechtel Matl. S/C L&M 3i5L 2,$ &-/2 Z0K/ PRSSS. AHth'lS PUMP 5ou& h/ATSfL LecYCLC PUMPfse, PUMP DRIVER PUMP DRIVER I 1 /S' \22S | jft# | too | . | 3too MOTOfZ- 1 fej U, c> \ s to., d? \ TcsTal PUMP PM/Jr f DRIVER PUMP DRIVER ot> itfiiPhlTilA PUMP IA t_4A<2Sifc Zo G-qai'll 1/2? POAAP*, DRIVER 2^ Cr ShjflCTp/AftJr^ PUMP /j C+lAtiCtlL /. pUM^ DRIVER I LosUtel AAOTEppJ/2. uoAl^fa^l M.ofbiia, no I \4oJ g..huip iTfcpf _ .| lVLp \J J2*. ufr hu-o c,7. h(poa U0`4 rfeyc. | *4-6 o n/ ")5 c2V <2/ ,ZQ_ //S Z*>-+9 O "L-- tS< $ n^ "2-1 6 * 9/r.i Te-AtA^e:. PUMP DRIVER ALL OTHERS IV\OTbl^_ ~Tdrrfc*L- PiAof Z^l 2-1 irV 3 io i 4. .EA) ro ?<=>Y iVvi a PAGE GARRARD 00000539 TOTALS 'T'cArui "TTAv 5 Pf\tG. "04 b&> I N On "G" ACCOUNT - PUMPS PHR 1.2-23 m "G" - PUMPS JOB NO. & TITLE PRMfF_____________ CLIENT MAtUTtfO/U O/c. CIO, ______________ JOB LOCATION gOB/fi/SOM, iL(_ , CONSTR. DATES I0|&QTO ^ 1 PREPARED BY A.T- / M-MiLUEfc- PLT. EQUIP. NO. NO. SERVICE PUMP: DRIVER: GPM TDH DISCH. PSIG p ^$5* MAT L RPM TYPE M -ST ENGINE DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT BHP HP FINAL MAN HOURS Bechtel s/c DIRECT COST $1000 Bechtel Mail. s/c L8.M HYDRO <?-tM PUMP lii. 'Ms 'PUmPLi spm DRIVER hOTOfL W-i IVo C.S. 3m 636 | W Pi/ 2$OO UPLTS TOO 5*3 IK1 J_ (&_ U/ATGfi- to 5-2 //y7W2?A.' PUMP PUMP DRIVER 'll iss7 Motor. 67/ | IZD | STEBL | teoo V&fc /too volts 13 ts~ 2>6 3*3 %U 1 1 0 Zrnipps-g. PUMP /37 2$"Y I G-3$ ' % hGFLUX. PUMP. DRIVER Motor. | too | STtXL | 3600 I repc/ p&o volts iDWl 3^6.... 33 is 10,7 I* 6 STRtpPGfL ' Borrows PUMP 777/? 70 1 772- 41$0 \etgol /goo 276 34-6 35 88.1 1 ( ib 5 PUHPC*smt) DRIVER MOTOR - U/P- / Thoo VOLK. Boo CHEMICAL- PUMP lA/j&rr/oP v. Sr-5. PUMp DRIVER s'=ert fvccT. =^t IH 4.i HepcTofL PUMP ProD, SBVAPaT. 1SG Hz i(a 5-6 PUMP ORIVER motor. BOO | TOO S7ESL $600 67 . UP-l/ T$oo volts. 600 VU6 33 50.8 , I L> DB&UTANlZR PUMP !(, 5-7$ ' REFLUX . 3 Sflaef, DRIVER 36Z- 2i7 | M07Z>g. 3/6 1 too . d'. s. $600 1 T&F^ /tfLO VOLTS 73 $C 2 4^ 63 IjS 1 * Lp bGbLCTAN(Z~GfL < /Le&oitstz-- PUMP m& Hi 1 3*72. 5$o if-rttiL $600 3*44 35 1*1*3 1 ' Lp It, 5, fW^VYs**.} DRIVER Motor, TBfcJ %o volts. fsv AS7 /4T 6AS Ct$fAUfCP~, PUMP 166 65 9*o 1 * La / 5-? bkim PUMP DRIVER PAGE GARRARD 00000540 ALL OTHERS TOTALS 1 TciT'hL. TyU^ 'PLLrlL "G" ACCOUNT - PUMPS EA Zo lo L\ 03'C rd-a PHR 1.2-23 JOB NO. & TITLE 74*63 3 R&.MF* CLIENT MAfLJSTtfOAJ O/L, <SCK CONSTR. DATES. .TO. PREPARED BY fcT> / h,M|Ug_ `G" - PUMPS PLT. EQUIP. NO. NO. SERVICE PUMP: DRIVER: GPM TDH DISCH. PSIG F CASE MAT'L RPM TYPE M - ST ENGINE DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT BHP HP FINAL MAN HOURS Bechtel S/C <6 SHO*A/iP/UIH WMBfL PUMP as-/ I 3 3f| iso I VI8 Hop DRIVER le^Ti(KA/Ac/Horoc boo/fft pfigj7&ft -`iCOr. *5^ ISO, >*> tUUffiCB tome*i$iL i_ is STWJtP CUBM/C. WJ- y, PUMP, OHm** tovb&rs 1t> S-/3 UfJ, PuHp. PUMP DRIVER PUMP DRIVER PUMP DRIVER % |/r<7 | UA J^//&hMO. TOnfC l nzr SV I nr 1 C.l 13600 Iso/t-i rv\> )/v'TE~rF^CCj~^ ~-Vtl/6/0*> k\*- o 6.08 IS 3>lk 6*S StJfc. sv^vc 1* 2- IM V Aco' T 6ft$, NfLO^Oe lH1BZTh>V PUNK PUMP DRIVER |MS# WAT&K- PUMP it S~/^5 CiRc. puMp ____ m*& DRIVER WA$t( TOW&& PUMP ik OU&.S& , PUPP h SM') DRIVER CAUSTIC /A/?, PUMP JZ&16 PUMP i - WAke DRIVER STAR l UP 16't- CAUSTIC S-18 )//3 Pk'Mp. PUMP DRIVER Z3?P 5G \*3>o> SE5i:iD rt-4 ih "T" ACCT. Sfc-E. S\r\l< 44 s u-\ T" AjCCT. ~7 DIRECT COST $1000 Bechtel Matl. S/C L&M Ioi.u \ * W.9 6? Tfnf /7 lik \ Co !%& 7*3 S-S PAGE GARRARD ALL OTHERS TOTALS o o o o o cn 4^ Total.- TiUfe 'G" ACCOUNT - PUMPS .EA) 1 176*3 \Z <& TLi> PHR 1.2-23 & "G" - PUMPS JOB NO. ft TITLE foOSQ RsTiMF? CLIENT MARj&TffO/J &/LJOB LOCATION &0&/AJ$OA/, ILL. - PLT. EQUIP. NO. NO. SERVICE PUMP: DRIVER: fLAUB * HBLIBT PUMP K,0> oRMff !(, zr~2?> Uor pum DRIVER DC fa S-X> PUHfi. su/[//AeP&HiTrH, A, (6 &0O\T&PAUMP- toftp. lA/it/eiro/iW3. PUMP PUMP DRIVER PUMP DRIVER PUMP DRIVER dtWO&f4fiS TP&Aizr. fa S-~3? PUMP PUMP DRIVER fa \ ATTEHpBfVODP PUMP /peep pump d>. \ ^PAll % DRIVER (U<EtM/T /F0 (WP fa K j-v/; $_ * %PABjc ' fGi SODjuM y $uLF/re p fe^dPuhp o, - seAm. PUMP DRIVER PUMP DRIVER BoiLe/L F&zjD PUMP \J U/AfEP PUMP tti r-W, g. y %?Ae' DRIVER GPM TDH DISCH. PSIG F RPM TYPE M ST ENGINE ZJD t*M *S,T DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT XT (00 CrJ. 2ttt> i&> /sv MS/&. 1 ir i i i i Hi JL0OO Motor. %'! 2X0 CJ- 3600 wp-l/tsoo foots- BHP HP 6t o fat C0NSTR. 0 ATES M/8& TO PREPARED HV AT. /m.milled FINAL MAN HOURS Bechtel s/c z4& 66 DIRECT COST $1000 Bechtel Mali. S/C L&M It. 0 1* Lp 16*1 4e> 3.3 l 6 ?-\e> 66 fl3_ l -U> SEE. SIC V ,LT" 7S ccT \ 60 4-1 5;* 1 6> *n SE& V-Z. -X"N1CX- l1_____ 66 /&X , WJtLukJ 1 v/-olc> ' * ^5 <41 4~c>U U0.o*=o'^ 66 i * Cj) t ___ L*1 GARRARD 00000542 ALL OTHERS totals TaTw,<V3. 1 "To X A *r EA> V~>^66i> *>ia UflO-3 0/.L4&4fe> ^1% l45-2 T&L "G" ACCOUNT - PUMPS PHR 1.2-23 & "0" - PUMPS JOB NO. & TITLE tWSA/*/? CONSTR. DATESTO_____________________ CLIENT ftArfLATkD/J &tt- C. PREPARED BY AiT> /MILLER JOB LOCATION fcOS/A/tSOM fu-- PLT. EQUIP. NO. NO. SERVICE PUMP: DRIVER: M'A/ LUBGdL. PUHp FO^/iK-2. PUMP 16 -45* & DRIVER PACKING H0TDII. PUMP tOOQMSr WT. iiL &% PUHP foe. l&K-f. DRIVER GPM TDH DISCH. PSIG F CASE MAT'L RPM TYPE M-ST-ENGINE DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT $T- /noTt>tL '1 wunjoen oaa& tOOLiHB, - PUMP ....... 'l 16 S-17 pump foe- fox-i. DRIVER HOTOiL l meeottrf'iHp PUMP lb 5-VB fU U>K-$A- DRIVER ttvrotL 1 LU&B OIL PUMP PUHP &>* fclt-38 DRIVER MA/AJ LMt&Oii-- PUMP PUHP ft)ft &-SO MK-3A DRIVER ii HotoR- H&AsLU&e~ PUMP s Uo -5/ DRIVER PUMP 16 5 -Sit / dOb'Us/vT PiiHf 5. fie m-3% DRIVER PAOtfUSCC>J^AfjT~ PUMP' PUMP 16 5-53 R>e DRIVER ii hcr&tc 11 HotoL- BHP HP FINAL MAN HOURS Bechtel S/C DIRECT COST $1000 Bechtel Mail. s/c L&M IkH l W. .. ALL OTHERS totals ^|K\CLODEP !M KCCTS.) 1 EAl I V c5 PAGE GARRARD 00000543 "G" ACCOUNT - PUMPS PHR 1.2 23 JOB MO ft TITLE RfcMF*,____________ CONSTR. OATESTO CIIEMT M.&PATROaJ OIL- CO, PREPARED BY "G" -- PUMPS ________ JOB LOCATION kOtZ/AiSPAJ, !LQr, PLT. EQUIP. NO. NO. SERVICE PUMP: DRIVER: Dt-erHAMzep PUMP n <J"/^ ! FESD P////P 5. 4 sparg: . ORIVER , Absohpbr 323 Sri.) ' f&0 PUMP * se*ae pdM& OIL- 53 S-3$f 5 PUtHP 4 SPA&5 PUMP DRIVER PUMP DRIVER GPM TDH DISCH. PSIG f RPM TYPE M ST ENGINE DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT MOTO/l 1 r MOTOR, 1 Motor 1 1 BHP HP FINAL MAN HOURS Bechtel S/C 5^ r 7~ /^O T D66UtArhtiZSfL PUMP n $-4 HBFLUtC PUMP DRIVER MCTOfL I 1 </o s. D&U7kfi//Z&- PUMP 23 5-5^ ' kB>tU=:e~ ---- .... / 5, PuNPn^n) DRIVER OSPROPAMZeg. PUMP 53 '5,FEG4DsPmUitMeP' LAfiJ 0>i- n s-7^ 5. PUMP -s smae DRIVER PUMP DRIVER bBPRDpmzetL PUMP 6L M PUMP 5 Y SPA^t' DRIVER t'll3 w | MOTOR. I motor r Motor, horotL* 1 3#> I^.S. /#> WP-l/ POLK I . * i 2/3 .^ss- 2S> _I______ J-OCs r r TX%~ L...- r / PRebUCj n 6-9/ 1, PUMP DRIVER Motor, r ALL OTHERS Ml<bCtUl_ /j()k(?iv.' ( i <i/ T*4> 1 / / EAl DIRECT COST $1000 Bechtel Mail. s/c L&M 4 Ct?' ^ ID-4 ii*3 G-S (olo* 3 P.i-T z/ o is IO-1 l! 4 i on 9 o> PAGE GARRARD 00000544 TOTALS ' fcsf A. t__ *TA \ 4> 2. /.272 Vl'Vl ! "G" ACCOUNT - PUMPS PHR 1.2-23 *G" - PUMPS JOB NO. & TITLE n if mt mmWOAJ JOB LOCATION t OIL, >, { ILL. C0NSTR. DATES. PREPARED BY _ PLT. EQUIP. NO. NO. SERVICE tXteM. . 23 S-W AWiTtlffs PUMP 13 Gr~ // Aoomus K. PUMP: DRIVER: PUMP DRIVER PUMP DRIVER GPM TDH DISCH. PSIG F CASE MAT'L RPM TYPE M ST - ENGINE DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT Motor, nn Motor . t~~i r BHP HP MdRO&AR&C*/ PUMP tO tSj | if IQO rS. \3266 i 23 G-iZ Tk&HSF PUMP. DRIVER irmsf: tupb, 'TqTAI_____ PUMP Itro/sro psfs >`Z, ArAT DRIVER PUMP I DRIVER FINAL MAN HOURS Bechtel S/C PO ( 50 Z3 6-1% 3UVvP t>PAei PUMP DRIVER Q'J&Lh b PUMP 29 6~2fo pLft"W DRIVER txsiC.^oiic>fJ PUMP 29 fr-'b lOi^itb rrc/2. , DRIVER 12^9 1^90-1 Moro/t I /4-6 I I C. 6.1 /^So /zz_ TEl^C / ^(oo / 5o ^7 jfO /O TibTTvG ?l^T aA PUMP DRIVER .TO DIRECT COST $1000 Bechtel Matl. S/C L&M &2_ 'L 1i*o \A&*i 1*4 %'/ //>& L *2_ 50-' ALL OTHERS TOTALS .EA) PAGE GARRARD 00000545 *G" ACCOUNT - PUMPS PHR 1.2-23 * JOB NO. & TITLE f^OS 3 r.MFNT fl&RATtiOAJ RfZMF? CONSTR. OATES ______________________ TO ____________________ PREPARED BY "G" - PUMPS JOB LOCATION IL-l~ . PLT. EQUIP. NO. NO. SERVICE PUMP: DRIVER: GPM TDH DISCH. PSIG F CASE MAT'L RPM TYPE M ST - ENGINE DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT BHP HP FINAL MAN HOURS Bechtel s/c it pH MPi'j j$Cs, PUMP ORIVER ' DISPEkSAKfT wj. PUMP- PUMP ~/5~ M3, DRIVER HiWfcJ PUMP W-L n J-/8 U IB , .PUMP * $PAM6 DRIVER 4 v-t. HftnoMknsj kj tiNt ZOL, PUMP n <5-30 70. '"VA. DRIVER /06&0 WO 6/ . % DT. .W Nt(mp //d$'T hrp-2- Itoo vouk, Uookvp^ r- S'OO n i //>? O -- 'XU"/ MOTO/ZL, m ii Pu/77/ vi l(S-2 M-OTD/e . 11 / 7W i/-2 MctvZ r T2b~mL_ 22_ PUMP DRIVER 1 O ;)l Cj PUMP 1 DIRECT COST $1000 Bechtel Matl. Ill, S/C L& M IV^CjuVil 'bl'T-l uMJL Ui / `bz.'j-z uS..c.ZlO..T1 l>z_v- 1 Ul-6 ORIVER (sO 7>A&LATa/L , PUMP 9o Or-/Si fa u FtstL Pom/?^ 'driver PUMP \ 4o 9*2- DRIVER PUMP DRIVER PAGE GARRARD 00000546 ALL OTHERS TOTALS 1 EAl "G" ACCOUNT - PUMPS Ziol -- PHR 1.2 23 ) "K" -- COMPRESSORS JOB NO. & TITLE CLIENT job location . SUMMARY OF COMPRESSORS C0NSTR. CIATES .lG> \fiQT0 PREPAREC RY H GPLCOloA^ INSTALLED QUANTITIES IHP) FINAL MANHOURS Bechtel S/C DIRECT COST SI000 Bechtel Mail. SIC L& M CARRY FORWARD FROM PHR /*2~2^" PA6E Z>*T CARRY FORWARD FROM PHR PAGE CARRY FORWARD FROM PHR h1~2~ PAGE 3^ \,C- \ ^ l ^ iLVd- ^ CARRY FORWARD FROM PHR l<2'2-S" PAGE 3<3 \(J)lC'a> ^ Vb ' CARRY FORWARD FROM PHR j.?*:2r RAGE 31 ..... *? !l WuV ___________________ '_______________________ CrvtvKPQ . CffOVaS ALL OTHER ' K"ACCOUNT -- fa ,5 V/ 2bl* Ti<*7 1*154- // O'7? \C= &>2tQ o. \o&c 20fc VPWW Co * ^ 17 VlO-L Of. cj 0 PAGE I Trr GARRARD 00000547 TOTALS "K" ACCOUNT - COMPRESSORS ISZHp \320 4-oUlo- \ -a phr 1.2 24 "K" - COMPRESSORS JOB NO. & TITLE RflfolLWQtA nCiLPIEMNTT___________K__M__v_$_L__A_T__V_\_f_.i_d____O___i_l____f__i___. ___ JOB LOCATION fl6afoUOft.3J ^~XL.L- UO&l1! tAfi>hi4.hL CONSTR. DATES ^X^SL TO _ _ _ _ _ _ _ PBFPflRFnry VK:Gi{\ &.1 CYLINDER OR CASE SERVICE 1 &QO(i. C}t\h Cjdw(?U554<L 2 3 4 5 6 7 8 9 CASE MAT'L. CLX ACFM WEIGHT (TONS) COMPRESSOR DRIVER: TYPEMI^OfO/L HP ?Q RPM 1 & CONDITIONS (2): GEAR: BOTTLES: INTERCOOLERS: HP RPM To RPM EACH EACH With/Without Piping OTHER ACCESSORIES TOTAL FOR I SET Ck\&Xs& GKS coufrfr. t^tuJkT\at\ TOTALS FOR IDENTICAL SETS SUCTION PSIG F \ot> FINAL MAN HOURS Bechtel s/c // JL K"ACCOUNT - COMPRESSORS DISCHARGE PSIG F \<*& MOL. WT. W Cp/Cv \'W BHP I2)*l FINAL DIRECT MATL. US$1,000 Bechtel s/c o DRIVER TYPES: STM TURB, INDUCT. MOTOR, SYNCH. MOTOR, GAS TURB, ETC. (2) DRIVER CONDITIONS: MOTOR VOLTAGE. STEAM PSIG/ F IN & OUT, ETC. 'LL a tv*! o 'h |VaJ h PHR 1.2-25 PAGE GARRARD 00000548 *K" - COMPRESSORS job no. & title CLIENT__________ Mf\C<L.ATyAc>*4 C-*> JOB LOCATION P. XCi2dU^60n^ . LU ^ CONSTR. DATES! jo 'A-l&.l. PREPARED BY LA . K.H\ LUeK- CYLINOER OR CASE 1 2 3 4 5 6 7 8 9 SERVICE CsK5 CASE MAT'L. ACFM C-.T . rjtf wnw\ WEIGHT (TONS) COMPRESSOR DRIVER: TYPE (lltAoiTcA- HP RPM CONDITIONS (2): GEAR: HP RPM To RPM BOTTLES: EACH INTERCOOLERS: EACH With/Without Piping OTHER ACCESSORIES ^\KlG fc NAV^Cjtxl>. PtuL'la ViMLlAt\( tiliui CP TOTAL FOR 1 SET TOTALS FOR a!' IDENTICAL SETS T SUCTION PSIG F la* DISCHARGE PSIG F -HO l*VI MOL. WT. tb.\ Cp/Cv BHP \At> *u4 FINAL MAN HOURS Bechtel s/c Z3Z5 I (o FINAL DIRECT MATL. US$1,000 Bechtel s/c (II DRIVER TYPES: STM TURB, INDUCT. MOTOR, SYNCH. MOTOR, GAS TURB, ETC. (2) DRIVER CONDITIONS: MOTOR VOLTAGE, STEAM PSIG/ F IN & OUT, ETC. i rvzG -V 1 Z&O ZZi-c 0"7 |UJ 'K"ACCOUNT - COMPRESSORS PHR 1.2-25 PAGE GARRARD 00000549 A J COMPRESSORS JOB NO. & TITLE CLIENT... JOB LOCATION RjcLFI^BlV CDNSTR. OATES TO 4-1 &Z. PREPARED BY t<V GKUJauMsI CYLINDER OR CASE SERVICE 1 fci-.eiu_e.Gte (i\2.v\\e.N 2 3 4 5 6 7 8 9 CASE MAT'L. *T(2\_ COMPRESSOR DRIVER: TYPE (1) &T CONDITIONS (21: L>00 HP 4 RPM 1^*3 <L Gr / 4" tU MLA . GEAR: HP RPM To RPM BOTTLES: EACH INTERCOOLERS: EACH With/Without Fiping OTHER ACCESSORIES FllLb TOTAL FOR 1 SET TOTALS FOR 1 (l-USL.'b <U-P ) IDENTICAL SETS ACFM SUCTION PSIG F DISCHARGE PSIG F MOL. WT. 03?^ Cp/Cv BHP WEIGHT Vi \ FINAL MAN HOURS Bechtel S/C 3S&4 10^0 1 FINAL DIRECT MATL. US$1,000 Bechtel S/C V\W8> (II DRIVER TYPES: STM TUR8, INDUCT. MOTOR. SYNCH. MOTOR, GAS TURB, ETC. (2) DRIVER CONDITIONS: MOTOR VOLTAGE, STEAM PSIG/ F IN & OUT. ETC. '' \o *5 [i lO&o 1^5 "K" ACCOUNT - COMPRESSORS PHR 1.2-25 PAGE GARRARD 00000550 *K" - COMPRESSORS JOB WO. & TITLE CLIENT_________ U.k(lJ\Tl-4s4 fcdy.ytiVSft-N Md:> C>\L- Cib , JOB LOCATION ti^e.ti ~X*~UtiXj>4/ CONSTR. DATES \<>\^ TO ^t\ feV PREPARED BY W\ . (%hl l ^ ^ CYLINDER OR CASE SERVICE 1 UlTT 2 Kldr 6a*> &L 3 4 5 6 7 8 9 CASE ACFM \ MAT'L. cx. e%8\ t.x. WEIGHT (TONS) COMPRESSOR 5yqa\ DRIVER: TYPE 11) ftAeriV>fe- HP 6 SOO RPM boCi CONDITIONS (2): GEAR: BOTTLES: HP EACH RPM To RPM INTERCOOLERS: EACH With/Without Piping OTHER ACCESSORIES t\A \ TOTAL FOR 1 SET ' TOTALS FOR *iU lV.b. ? O. UCA Ai> *> IDENTICAL SETS \4v SUCTION PSIG F lo^ loo loo DISCHARGE PSIG F ^4-o 3 MOL. WT. Cp/Cv BHP VivfeS!' 10^ FINAL MAN HOURS Bechtel s/c 1ZG1 bob FINAL DIRECT MATL. US$1,000 Bechtel s/c \23kJ (1) DRIVER TYPES: STM TURB, INDUCT. MOTOR, SYNCH. MOTOR, GAS TURB, ETC. (2) DRIVER CONDITIONS: MOTOR VOLTAGE, STEAM PSIG/ F IN & OUT, ETC. v 02zk_l %-Z Z6U \<&A`Z b o PAGE 00 K"ACCOUNT - COMPRESSORS PUR 1 ?.?S \ 0 & "K" - FANS J0B NO. & TITLE ^DftuiSOli Hll<jl2Y CLI E NT t\A MlA rUi'i lT Oil C l> - job LOCATION jQP.3 S t t-J ~X UL_* kW) ($ TAob PLT. EQUIP NO. NO. SERVICE Ufr Cak* TbL&uUX FAN DRIVER FAN ACFM P,SCH PRESS. TYPE M -ST ENGINE TO *3 il *M- IL lb V Cj-IloRLi k) ATiorJ ?jLOUtfL DRIVER MoTIML. FAN Z&\c>c> 71'1 DRIVER |L V (lGtlv^GATvoKi IbuaOtt FAN 2LB4oo 2o \ *cPA0 DRIVER MaTo (2. FAN i4vvo fciVjaoviVtKSL. ^ AiPML*. DRIVER FiOkCb KjcIiaoJac VOL L. will<1 ^ >P*<L FAN DRIVER FAN CASE MAT'L RPM RPM DESCRIPTION i3!ai*F ,,1^ ------*41toy-- \J - &lT "OC-Vlu. IS=o vaP-l e.Mx. Z\cnai "1Sa- UlP-\ d-.t. l&OO BHP HP &*fe lO 2CiCS no Zoo 11 loo \Z \6 DRIVER ^rZpCj>^ OcjlaP. FAN 3 ^T'tf'CsT C Ps<2. Xv*af ISOO*P^ DRIVER FAN DRIVER FAN DRIVER ATES\b\e>=> TO ^\&V CONSTR. D PREPARED BY VA. G'KLLhVj-'i^T FINAL MAN HOURS Bechtel S/C 323 DIRECT COST $1000 Bechtel s/c Matl L & M ta-5 333 m-iJ 333 3Z3 _____ 1&S-5 243 322 2. 113 n 3lo Id G 2^ 4o ALL OTHERS TOTALS < EA) -- THIS p/M^L CPLT- Mo)----------------- ns 4- n i 1 _________ i_________ "K" ACCOUNT - FANS PHR 1.2 26 PAGE GARRARD 00000552 JOB NC1. & TITLE CLIEN1r "T"-SPECIAL EQUIPMENTJOBLC CATION SUMMARY OF FIRED HEATERS C0NSTR. EIATES `MS TO M- &x PREPAREC1 RY H . 6ftLLOU) INSTALLED QUANTITIES FINAL MANHOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. S/C L& M CARRY FORWARD FROMPHR I-2-^ CARRY FORWARD FROM PHR ------ CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR 'r CARRY FORWARD FROM PHR PAGE 41 pL-AvOTT PAGE _4J----- AV^T1 PAGE igzAk PL.AK1T PAGE page AL_ PAGE pL Ar4T A.page .. Plant PAGE q iL> / ea V/ 33 \ 3 EA l^/T/1 / T/Z^S'-JCt Vo 6^ EA \cn*S` .tovkla 2 EA - oA / ea /&4 Z 03'1 l . 1 & EA /6S' / EA ;2P-S" izq-s U La --- EA PAC GARRARD 00000553 TOTALS EA "T" ACCOUNT - SPECIAL EQUIPMENT Zoo 8>.. phri.214 w |*T* - SPECIAL EQUIPMENT JOB NO. & TITLE CLIENT J0B L0CATmN CONSTR. DATES Jol&OTO 1 Mrlax. ^ PREPARED BY PLT. EQUIP. NO. NO. SERVICE \l - \ ?ACJcAG DESCRIPTION ANO DIMENSIONS DRIVER WEIGHT HP TONS . ^VtAb v^Lv, 'U-'bQ^ltb GrMj C-tovitoC^biLlL. "lE-bl. ' ' ~ -- - ? -- ,,..... . ................ C.JCa^L.e'aOlft- t, Okh A<ZkT(L ^|-V> \& FINAL MAN HOURS Bechtel S/C V/ .... DIRECT COST $1000 Bechtel Mail. s/c L& M I'Vz.-n 4 y~n /Wiks CMUC<LK\*Ct 'l-Zt F\LTL vv r-uXklL ^ A Sb Cr*W\ V\ \n / / a/ /Ay a/cS~ I'O Au> \ o. 2.V T- 1 ~XXis>\JUc^i Fo*. th .-va AT vo-iiiu&p vc^ATste a^ L& bfc'AI >\ ---------- =-------- T~---- ----- 1----- 1---- -- o4 Zh n/-\ PRoPMG bttcR , NvOtiwmats. OotT \vCvLX_ P&E&Avit bCYv&tr 2fe*C-\bKlfe C*M> ' 1----------------- CJb^L-e^CtTL ?al*\A CtoAbeW ZL. 2.SssGl-`1 uaXuUvTt^ G VvW ^e>C*~4 V (----------------------- _ T V<`ivO--?-or o,, T X?^vkP'.....i^L1 S .fi-'' a" ^ GrAa ' *faTA*A UKTt2.tL 2.B.-6^ PJUtlCSVAfc. \ickXaL ALL OTHERS \io /<s4 ~ -- 2oVl ,x_ 1. \ --- -- --.-- -- 1 EA) TOTALS . ~TLvtKu -n\\S PAGd ZV? I1 pM-1- 2.2 "T" AnnnillUT _ $PFniAI FnillPMFNT PHR 1 2 27 GARRARD 00000554 *T' - SPECIAL EQUIPMEN1^ JOB NO. & TITLE CLIENT JOB LOCATION CONSTB. 01\TES \&\&^T0 *\&Z. PREPARED PLT. EQUIP. NO. NO. SERVICE lU 'i- \ kuL ^92liL DESCRIPTION AND DIMENSIONS DRIVER WEIGHT HP TONS lAdj^KiTii.^ i^U-Otii&fo TWia 'DO.'VfcK.b Pfej9\v_rtl. v. lX\lL KACil h>r&& IrtTslC-Atbfc. 9 oriteA lA*tfYUtaM X** O FINAL MAN HOURS Bechtel S/C Kb DIRECT COST $1000 Bechtel Mali. S/C L&M &*6 J- l OCAULfL F S.G.'t* SfcAvl fKculuiTr> V^tJLtitaCkG CiUlAiM' tjjw vAkreft.'IteKT. TftKilC (lUb-ll^ f\iUPvfi t>K1 TKOW. 1 U/b-il.^ Ffc> \L>M\ \ UM- 0. k \UGrvvrtfcUlor-4l-K<fo 1 r-6 (jAivutio- mow F^lfc. l-ltAutaU3r 66 &AL.U?4 iilLOM^ tvl.t (u"4 x V "\ r-n klft. M&Tbft, i^v^r *1Ti*k) *'6<ao'u^l* - CAviC-LL(\TI6Ni U\ /**fUj (L , (\\ Q\**T lAarMC (lilC6\vkb\ o* nT \Z ^o*l \Sv5tmjce P t>eL,TP 1*0 cmcecLf t *O iL r-4 FfcWT -rcR9 ITT^kI * LdaJ uv* r to PPM --Ab--iht ,---------P--p--t-v-s=--'V=--<--i-c-->---u--u--- `i-i------- -- A|0? *^\ Q-1$-' roA\juM VL TOTALS ALL OTHERS . ' ni ( (\cj i. "T" ACCOUNT - SPECIAL EQUIPMENT EA) bl B3lOJ -------- -- 14-9:3 _J PHR 1.2 27 & "T" - SPECIAL EQUIPMEN'*" JOB NO. & TITLE CLIENT JOB LOCATION CONSTR. 0/MES IpISOTR --- 4-1 8.1----- \ PREPARED PLT. EQUIP. NO. NO. UflJ SERVICE DESCRIPTION ANO DIMENSIONS DRIVER WEIGHT HP TONS FINAL MAN nouns Bechtel s/c El.ctic- oli-l \0 Ttawi V. SIa' U GT \ 51 h zi o.Ta . ------ ;---------- 1----------------- =-i------- x--- =*-- ^<UY>6t J1...._ UL{& Soft. ^xubCct. \5c> \5c> \-PtA 'T^jca_\_'/ 5c>\-VtA l TdUV -- VLl^-Z. LixtJNL. vA^v^sr 7.2. Ff>w\ 15 Total- uitrT s DIRECT COST $ 1000 Bechtel Mall. s/c LSM 4^7, -- -- 4oi VAaobt * LCA-l4o*--'hltfJ`afi IriU.. iwrc> Ao^fi. e3Th<L#vCj`G, GUI Ur>*j Pfti eS \-CU\LA KltiS-itUi lift , -- l- zr -CU6KT- -- -- ------------ * lU * * * 1 TtuaueV Pofc VUfe^ ^tTvS.' ---- fcOoP \ V4kuV - -- &EMfc, -- '----......... .----- 7X1 ,K\ * - \\*<-& * LV * - tL-2*5 * * td b>Rl>P , * * " t-^ v ' V *^ 4 " .-a-......*....\l. 1T T w1 Mbp *' - * * \ * VVo^-tp nS ^ v\ 1% 1 rri T- 2.1^ * T-r? * Xu "2- tioP PC^A T ,* J1 " tii ' 1 * vVi-ZM * T \Ci * v ,- kl * T'2.5 K\fi ^.'aTiait^Aaivr vr< 86* ug-t Cmmat* f X>eu i?E?X \oo loo \z YL |oO lOO VL__ p&_&TeP ----------- f o * * Q5 |.C) u > ^ Cu!h. 2.>l -- TOTALS ALL OTHERS Moot^Tltv'ib oMt- Z4-r3l R/VD To Be L?LCieD t>Jfc To PaoC. D&\LU. TT\V^ e'KCiC ( ..... ................. -- EA) A-UD Lpi n PAGE "T" APPniIMT CDCPIAl CnillDAflCMT * #41 *T* - SPECIAL EOUIPMEN1^ JOB NO. & TITLE CLIENT JOB LOCATION PLT. EQUIP. NO. NO. SERVICE DESCRIPTION ANO DIMENSIONS \Vq "EzZ V-Z> T-4- T-"l 5L1L CfvrACy^T C^L6AT=>\VCiCt "To CArtvJfc** To ssju-S C#WvOf*X L&ttovv^C* 'X&we.a. vJ CfiTfrO/ST LOih Tdin}& C-ftd0*5 T `o^bes. UO) : . ' '* CONSTR. DlUTES \p\fe.CiTO PREPARE0 RY M.6iftLLOWAW/M. MlUc DRIVER HP WEIGHT TONS FINAL MAN HOURS DIRECT COST $IOOO ' Bechtel S/C Bechtel Mall S/C L& M *>0?PUQc \z -- cutm CUE*JT __i_____ -- -- & YL ... ---- -- ~~r~ % ------------- - PAGE GARRARD 00000557 TOTALS _ __ ALL OTHERS .i *T" ACCOUNT - SPECIAL EQUIPMENT i -------- --------- ( EAI ?>G? `b&Wutl PHR 1.2 27 -- SPECIAL EQUIPMENT JOB NO. & TITLE t4oS?a -fc-HP CDNSTR DATES \0>ls>Q TO 4 In CLIENT hAARATHoiq DtL, ____________________ PREPARED BY J0B location ILoBIHSpia tj_l. MU-Ug, PLT. EQUIP. NO. NO. SERVICE DESCRIPTION AND DIMENSIONS \L> CUEM. ADD.SUD 1 IKidJUT^-S, ItoP-IO, u, fci-S AtAT> |b6i - 30> DRIVER WEIGHT HP TONS FINAL MAN HOURS Bechtel s/c qo DIRECT COST $ 1000 Bechtel Matl. s/c L& M VV/lGfc,-S 4 CAe/i. /W?omu6 mCLODeS \bu~2> } \lctn-12. 4 40 V*WZ 4 U.6-13A CUGKFtt>T>mvJ6 iNl_ope. U^D-S, \bto-Unb\b <;vuo 4 cu&rt, ADDlTHJB mcLoDes. \bD-4r \ itlD AO qo > 4 fc,fa- ift PAGE GARRARD 00000558 TOTALS ALL OTHERS "T" APPOIINT _ SPFHIAI FfllllPMFNT ( EA) 3(^0 A 04 PHR 1.2-27 1 ii ["T" - SPECIAL EQUIPMENT JOB NO. & TITLE CLIENT J0B L0CAT10N CONSTR. OiMES A9V&4T0 PREPARED BY NVAAU^wM /Vl,M\LUE. PLT. EQUIP. NO. NO. SERVICE DESCRIPTION ANO DIMENSIONS DRIVER WEIGHT HP TONS VU_ T-M recjiLT ec>(L r-Va K M ll 4 To *4 *\lv' t * . " 4 \ttAAA . "- r-u " V *1 N '< H U H T-V? 4 1* k\ < ll l\ *t r- Vi .i 1 r-v\ u ,, 11 > .. S , M ** " M " M 1. rvua;*Jk ^iCjIlc A,W CPRJTfcJt.^ *iL A vlbJhl uM* ^ to ulk ____*____ A_________H___ ---------------------"--------------- 1-------t---------------i-i-------- *> * ** tl 7-1 CAfc-TiJ-ib6 ' c,| \?A 7-a * H " A i\ lA \-4 II % R ' . 1* t v-4 cbTiAtA 'It-uiAT* ^`blL-Ol.-. 4*- (eoo^dP hbo>V >5 SXcMA KTCeaPtaCK v>tt laoc^ 6J? xfc (a >5<&l 4 oooc> ^ M- l FINAL MAN HOURS Bechtel S/C It It YL YL It YL DIRECT COST $ 1000 Bechtel Mail. * s/c L&M 1^4 ------------ ^ \0 ' \0 . r__ 1 *J to IO * |o 0._L \o ^a ------ --- \o w 1 P\M ?u.OblL blKc p U- -- 4o I-6L PAGE GARRARD 00000559 TOfALS ALL OTHERS . '"ToTAU __i 1 EA) t ~Z- ^. V L-AkAT i La \oT5 "T" ACCOUNT - SPECIAL EQUIPMENT i\i*J 1 zi4>6 PHR 1.2 27 00 JOB NO. & TITLE /Vc>S~^ /> HONSTR. OATES \offi,o TO "T/82^ A ) t*LT. EQUIP. NO. NO. SERVICE si S6y j\ "T" - SPECIA*L/EQUIPMENT DESCRIPTION ANO DIMENSIONS Z s*<Z/Lu>s ^^ Y CLIENT /S/sJ -Xi */.w J0B L0CATS^0SN G'/O DRIVER WEIGHT HP TONS ^To,,, f__________ FINAL MAN HOURS DIRECT COST $ 1000 Bechtel SIC Bechtel Matt. S/C L&M -- -- PREPARED BY ^/A'.VW^ ^ CslS/if --V33 X&/ *> -J~ 'V` S --SZ) -- y , ~J\j 5*7 - l,, vul G- W 2? GcjR.&d s/ass/ Z"a'/\ / ~ss / <3'<? -&/ A/ } V y z<s \r? J2- ? (S" ~ 5 tiJ CU . /zx. - PAGE GARRARD 00000560 TOTALS ALLOTHERS ( EA) `7" ACCOUNT - SPECIAL EQUIPMENT -f^ -- +J PHR 1.2-27 ; SPECIAL EQUIPMENT JOB NO. & TITLE. CLIENT_________ JOB LOCATION CONSTR. OATES PREPARED BY_ PLT. EQUIP. NO. NO. SERVICE DESCRIPTION AND DIMENSIONS DRIVER WEIGHT HP TONS FINAL MANHOURS Bechtel S/C bZ. Sib br(uiA Chfc&C)ti VT.L. TM < ^T.*4 * 'H 't'tVy ti 1 CrAtib `bfv.vi'b ^ F^Tk\ftAssvL._ ba >yy WL-I k\<L VACAavk ^ \OVnO 69 Wv "I *^0- ^-C- Pn \ cb...b...V...*..*.\.A,\--;------------------------ st : /z (C .TO DIRECT COST , $ 1000 Bechtel Mall. s/c L&M 11 "5.e> -5 *>Z T-l if TRouuy 'Poft. \T*\>1 'feltbP, S IbS PM T-Z2` vmujZy cAtcxuvte. C/u^t & A PviVi CitfMUlta kt* '8 Tcstav_ -tA\*3 VAC* gl t Pi - - \ .o //y . /*r ^3 PAGE GARRARD ALLOTHERS 1 EAJ ooooocon> TOTALS '~r^-r fs i- Vc. av^-t h i-- **T" ACCOUNT - SPECIAL EQUIPMENT -fA O u* /3~" zi^-sr 12^.8 t#'Cp PHR 1.2 2? .If! R NR.ft TITI F MOS3> RRMP7 CONSTR. 0/1ltfs IO /g>o m 4/82. "S' -- INS TRUMENTS CLIENT MAf?A"TWOkl Oil-- job location RoBiklsoki , COMPAKiV PREPARED BY H.HILLER MATL. LABOR REQ. CODE JUT J11 ri J12 J14 J10' J16 INSTRUMENT ACCOUNT DESCRIPTION rntrAU. INSIHUMcNr SUPPORTS ( lOOO) final INSTALLED MANIHOURS QUANTITIE Bechtel S/C :::::::: , l '*A1 DIRECT COST $1000 Bechtel Matl. S/C L&M TRANSMITTERS. RECEIVERS. AND CONTROLLERS FLOW INSTRUMENTS 1229 E A ............ 1 loo4.o \ EA telllii 84-1 LEVEL INSTRUMENTS J*lO = PKE.AS'&EHBLE' X-MlTTeRS (Z044HHfi5> 1668 e A ' 25-3 > II 162.2 32.6 PRESSURE INSTRUMENTS E a i 300.1 J18 TEMPERATURE INSTRUMENTS J19 , MISCELLANEOUS INSTRUMENTS J-IT - 119, J-19=610 J21 J21 MAIN CONTROL PANEL & RACK J22 J22 MAIN PANEL INSTRUMENTS MAMOkLC tATOR'a J26 J26 PROCESS CONTROL COMPUTER J31 J31 LOCAL CONTROL PANELS J32 J32 LOCAL PANEL MOUNTED INSTRUMENTS J41 "L"ACCT CONTROL VALVES J Ea i 53.0 129 e A 1050 Cx> E:a 6 -- 32312 IIIO UNIT6 12 -- 1 70 UKllTr5 3 -- 659.9 2300 UUITs EA 9 169.0 - EA j 5730 J43 J44 J50 J60 J65 J71 J72 J95 J74 J7S - - "LT'ACCT `L"ACCT J50 J60 J60 J71 J72 J 95 J74 - J81 J82 PRESSURE REGULATORS RELIEF VALVES INSTRUMENT SHELTERS ANALYZERS PACKAGE CONTROL SYSTEMS SINGLE TUBING MULTITUBING INSTRUMENT AIR SUBHEADERS INSTALLATION MATERIALS LOOP CHECK CALIBRATE & TEST TOTALS EA EA x 277 E A \ l9 E A f * A ' 13558 i-f - iF - iF 919 o i f LCIT a "" t A -SURPLUS Z.6 . Cf> \ A4 - 4 52 152 T-6 6.6.T .1 .1 * 1.5 -- -- 5 12 -- 4.5 7 1460 !5o.&. 360- O -- 30 30 4-4.4 - - 14.8 469.0 33.6 <too.o> 7400.3 131.4 8 PAGE GARRARD 00000562 J" ACCOUNT - INSTRUMENTS PHR 1.2-28 m "M" - ST 3UCTURAL STEEL JOB NO.R TITI f 14053 RRMR CLIENT MAKATV^Oki OIL- OOMPAM-V job location R&'kisoKi , \l_lim.oi45 MATL. LABOR REQ. CODE CONSTR. Dj1TFS 0/00 TO 4/82 PREPARED RY H. MIL.LEIR INSTALLED QUANTITIES Clooo) FINAL MAN HOURS Bechtel s/c DIRECT COST $1000 Bechtel s/c Matl. L&M Ml* M10 STEEL STRUCTURES AND CLOSURES M2* M20 PLATFORMS, STAIRS, LADDERS & HANDRAILS M3* M30 STEEL PIPE STANCHIONS M4* M40 ' MISCELLANEOUS STRUCTURAL STEEL M5* M50 OTHER STRUCTURES PlPfi'VU'AV RETLOCATlOkl 317 T 18.4 t94 t 19. 2 A14 t zo.o 49 t 3.1 (j>Lp T - -- 1428.0 .1 340 5-0 _ k7.9 -- 74.5 1.6 13.1 60 4 TOTALS I040T &0.7 "M" ACCOUNT - STRUCTURAL STEEL 19 Up77.5 83.4 PHR 1.2-30 &1 JOB NO.8, TITLE MC>S"S> f?MP _____ CONSTR. D/4TES lo/ao TO "U" liiCIII ATIOU & FIREPROOFING CLIENT job location MATL. LABOR REQ. CODE N1* N10 PIPE INSULATION % CAL SJL 9& Vo AVERAGE DIAMETER ^" OIL. COHf'AkJV ( Illinois AVERAGE THICKNESS 2 */z " FITTING FACTOR \A~l PREPARED BY H- 6RLLDtoftV INSTALLED QUANTITIES FINAL MAN HOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. s/c L&M 139942 elf IB 55657 35 1850.3 % MINERAL FIBER 2/'o 30" (? " | 2A % OTHER ~ N1* N20 N30 N30 N40 N40 NSO N50 EQUIPMENT INSULATION % CAL SIL 2% % MiMe?AL WOOL <>7.7% 2 S/g_ " -a, * Vo lusoupcriaa c:oMC.f?ere' 2-1% 2s(xl FIREPROOF EQUIPMENT SUPPORTS MAMPEPdeAt. P- 50 ( PNEUMATICALLY appliep) FIREPROOF STRUCTURAL STEEL HMAPEP5P A.L P 6 O (fWETO HAT) CALLS' APPLIEP) MISCELLANEOUS FIREPROOFING ( Z" ) (2") 4lfrT9 SF i7Z3fr sf 39 5 cf LF 303 17829 3993 4l25 o.3 73l,o - 1132 o. 1 116-6 N60 N60 SOUND PROOFING SF WerLpifJG FiRerPRooF'iMei LgdrS to veisS^'L. -skirts 17230 5F 1809 lO l.<3 o.3 PAGE TOTALS ' 2130 B1814 57 Zflll.fr j-i N"ACCOUNT - INSULATION ft FIREPROOFING PHR 1.2-31 JQBNQ.& TITLE 140*5 3 RR.MF* CQMSTR DATES >0/go TO * /&Z R BUILDINGS CLIENT HARACT-HoKi OIL, CQHPAkJV______________ jqb location T?os>iNASokl , iccikictiib PREPARED BY MAIL. LABOR REQ. CODE II0> t?OIOO AKKZpO FOR ALL PERMANENT BUILDINGS DESCRIPTION AND USE PITT U* SATeLUTE- ^OUTROL KooH INSTALLED QUANTITIES FINAL MAN HOURS Bechtel S/C i3oo DIRECT COST $1000 Bechtel Matl. S/C L& M z-4 NO. STORIES \ SO. FOOTAGE 763 ST CU. FOOTAGE 86> 3 6 MATERIALS OF CONSTRUCTION " c:oiacRere BLOCt lie#. BZ3 f4*n e IIu R4000 nu RlrOoc iil R*?ooo ill* ROIOO TOTALS HVAC DESCRIPTION AlK HauplikW* Upvr.TlSZS BTUH f44ZO CFH ROOF TYPE OTHER DETAILS Ml SC.. PAiid-rikl^ DESCRIPTION AND USE REVAMP OFFPLOT SWITCH 6FAK KM. u'~4" x n'~4" x i-z'-o" NO. STORIES l SO. FOOTAGE 19G-SF CU. FOOTAGE Z 35t# MATERIALS OF CONSTRUCTION 2 `tz. " BRlOK S>/T HVAC DESCRIPTION ROOF TYPE ' other details RerpuAce: exisTiwie, poors wth uevu t)TEEL POORS . BREAK -thro LATER, REPAIR HOLE'S For BUS root ^oilpufT *M~rRY Carry Forward From Pages____ _ Through 3/T 5>/'T' fHI'S PAGE1 wx 6 3 0 i 3oo "XS0> 31 4iB -- 2-4 17.0 07 54-B ~ r HZ 7. I 750 Zo'Sifi HZ 1030 17.0 7.1 19-4 k 4 (.) "R"ACCOUNT-BUILDINGS PHR 1.2 34 PAGE GARRARD 00000565 'R" - BUILDINGS JOBNO.&TITLE l4o53 RKMT CLIEMT QH- CEOM.PA rT Y JOB LOCATION ROBlMSOhi , ILClMOt> MATL. LABOR REQ. CODE Ilk All* K03Q0 R tO FOR ALL PERMANENT BUILDINGS DESCRIPTION AND USE PLTT Up BOlLF'R FEEP' WATER K*'-4 X 13'- 4" X IZ'-O' l_P'<it. NO. STORIES l SO. FOOTAGE 21ft 5F CU. FOOTAGE ZUiZ MATERIALS OF CONSTRUCTION &*' BL.OC.K CONSTR. OATES IO/ __ TO 4 (SlPREPARED BY H-HIUME.rM GRU-OUJft) INSTALLED QUANTITIES FINAL MAN HOURS Bechtel S/C 65o DIRECT COST $1000 Bechtel Matl. S/C L& M 1.5 nv/Ar nccrmPTiOM ^ACTEER UH-T> I2-40OFM HVAC DESCRIPTION g y~rRAFAkA-Y-A^B P KOTCaFt. ROOF TYPE Sutler-up Roof ota l*/t" KETAL tP'ETC-K OTHER DETAILS ROLL - OF7 POOR 94 24 I -3 I ILr 6 12 Ro3oo R IO III* Rotoo DESCRIPTION AND USE dUgMlCAL D4 JeC'r'tOd BLCPGt. 23'- 4" A 29 '4" > 11-4*' NO. STORIES I SQ. FOOTAGE (&34 CU. FOOTAGE ~l 6Ep9 MATERIALS OF CONSTRUCTION g>" 2:0 m Crete: !3,i_oe.U. UMiT FEATeRb OH-I 0(4-2. RooF HVAC DESCRIPTION gC*K(/t4I AI l\OI tI>~T AI T ROOF TYPE trrg L F~RAHE~ , Q.IPETg.K IKlCt, BUICT-UP RqqF' OTHER DETAILS Rout- UP POOTR S/T &5o 130 2 U6 1.5 8-1 *1-9 11 1 12. 9.8 4l PAGE TOTALS Carry Forward From Pages. Through. S/-T 1302 Z43 S/T THIS PACET 'R" ACCOUNT -BUILDINGS 1952 &1 13.9 9^ 218 CP PHR 1.2 34 m **fl" - BUM .DINGS JOB NO.& TITLE >40*33 R^KP CLIENT MKR>/VT'How1 oil_ COHPALIV JOB LOCATION RoSiMSoki * iLLudolSi CQNSTR. D,ftJFS 1 / 60 TO -4 l2>t PREPARED BY H-HILLER /n-6H*-1-C>WAf MATL. LABOR REQ. CODE FOR ALL PERMANENT BUILDINGS \ZLf fioipo CoORol DESCRIPTION AND USE ZLMTRAL. ^OKiTKOU -ROOM KIZAOUoo MOP'lMCA'TIOid ot^e'XlS'T- FoRT^ LOkLf>OL.eS INSTALLED QUANTITIES FINAL MANHOURS Bechtel S/C l &0(e 6773 DIRECT COST $1000 Bechtel Matl. s/c L& M 31 438-0 NO. STORIES SO. FOOTAGE CU. FOOTAGE MATERIALS OF CONSTRUCTION tM STALL. WATER CHIllcR, PAIK1T|M^' OTHER DETAILS piRFCr HURL MHRS LR^KtSiLS MMfU-V F-"ofR Ke-F'o5i-rionmi of raised floor so5P'aji>:(?>- creiuMdi III/ RPieo A> u - Re>-i TILLS FOR ecECrRiOAL COuiPHERT ACCESS DESCRIPTION AND USE ft ALT Up EUCTF?\CAL SOI2.-STATIOkl 35'-4"X 24/-4"A |2'>" NO. STORIES 1 SO. FOOTAGE 80>O ST cu. FOOTAGE lo3ZO O F" MATERIALS OF CONSTRUCTION 2 ^z. " BRICK il Ip Lo. A Z1 s/~r 1 &OCp 5953 1345 31 4*17.1 25-0 - HVAC DESCRIPTION AlR HAMPLIMCj UUlT 32COCFH (-3 rtf Hotor\ ROOF TYPE BUILT-UP OtJ PPCTOvST COklC . UMIT^, OTHER DETAILS 97 Ce Cp 72 A. 1 TOTALS Carry Forward From Pages--..... Through Sly "THIS "R" ACCOUNT -BUILDINGS `S/T 1345 3161 li*9 6>22 Z5.D 10.7 \ . Z&.l 457.8 \ JOB NQ.& TITLE 4PS3 _____________________ CONSTR. DATES IO/g TO ^ ... "R" " BUILDINGS MATL. LABOR REQ. CODE CL1EMT HUF^V-HQld c=>iLjQg tOCATION RQBiM&OiQ lULiMOib FOR ALL PERMANENT BUILDINGS ________________ PREPARED BY H MH-t-&R/n-6f>U-Q^ny INSTALLED QUANTITIES FINAL MAN HOURS Bechtel S/C DIRECTC OST $1000 Bechtel Matl. S/C L&M DESCRIPTION AND USE REVAMP HVAO |kl eMOSTHUdi 5ATeu,ire: comtrol Room^ NO. STORIES -- SQ. FOOTAGE -- CU. FOOTAGE -- MATERIALS OF CONSTRUCTION -- ^OMTROL ROOM ^ 3 : ID TOM A.C.UUirO'aOoo btom) ^omtRol. Hooh*^ RtvUoRKEl7 p'OCTlMt* ^>Ke:R ^oUrftou Room : ~t */2. "TokI utJrr {&o 300 E ,-rovO> 2Z5 148 Z3.D Z.3 7.8 DESCRIPTION AND USE */~T - -40? - 33.I NO. STORIES SQ. FOOTAGE MATERIALS OF CONSTRUCTION CU. FOOTAGE HVAC DESCRIPTION ROOF TYPE OTHER DETAILS ' PAGE GARRARD 00000568 TOTALS Carry Forward From Pages........... Through............... TTDTA >' p, *' "R" ACCOUNT-BUILDINGS 79Z2 m 51-1 574-1 <s> PHR 1.2-34 "S"- SITE WORK MATL. LABOR REQ. CODE JOBMO.& TITLE <4o5 3 P.^HP CONSTB. DATES `/TO AjJUL CLIENT t\P\Kkrc\\C>t^ g?|L- CqhPAUY__________________ PRFPARFfl BY M- MU-Lg~K________ JOB LOCATION R6i^oM . U-t-IMQlS INSTALLED QUANTITIES FINAL MAN HOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. S/C L&M SOI S02 S03 S11 S12 su ^IZ. SOI CLEARING AND GRUBBING S02 STRIPPING AND ROUGH GRADING S03 DEWATERING S11 EXCAVATION I Clarify Qty. Basis and Construction Methods : S12 BACKFILL ) 5>ll MASS ex-^Av/AnnotJ AUP P'lSP^-a.AL- 5IZ HAS-s, 6ACKFH-L, dOMPA^TIOKJ <*T UK AVlOiU AC CY 4970 0MHi? s UZUp CY 136^7 CY 1796-7 90>96cy 9-0 17. 1 14-1 4.5 6.1 164-5 193.1 40(e.& S20 S31 S32 S41 S42 S43 S51 S52 S59 500 S20 PILING LF S31 SEWERS AND DRAINS S32 PRECAST MANHOLES AND CATCHBASINS S41 FINE GRADING S42 PLACE & LEVEL SUB BASE 6,2 30 lf 39 EA 74962 sf SF S43 ASPHALT PAVING SF S51 DIKES CY S52 FENCING C M^TETF? I/M- OKU-Y ) LF S59 LANDSCAPING SF 59o MISCELLANEOUS SITEWORK S-98 P6TMOL. prioU loo OMITS PPMOt-rno/d OF^/5T|ia6 PlpfiTRACfc- \kici-. <j/dt PI re 1 T*CAVAT"IOk1 FTOR ME W PoUUIPA~nOU k LJ/tS PlPET / TOTALS "S" ACCOUNT-SITE WORK n.9 4.5 53 2212 24.3 16.6 o. 2. 2.1 Ce. ip 1.9 I.I 8z-5 PAGE cs\ (p(p*5 12.5 431 6 682.6 O PHR 1.2-35 "X" - PAINTING JOB RIO. & TITLE ^0 5 3 RRHP CLIENT OIL OOHPAUV JOB LOCATION Roe>WvJ>OU , CONSTR. Ciates 10/80 rn -4/82 PREPARE!IRY H (SALLOtOftY MATL. LABOR REQ. CODE - - PAINTING SUBCONTRACT INSTALLED QUANTITIES Ciooo) final MANHOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. S/C L&M Structural Steel Piping Major Equipment All Other SF SF 7^010 SF SF UklT ay MT" -*>4 III 9 X10 - FURNISH PAINTING MATERIALS GAL 1.-5 - XII PAINT STRUCTURAL STEEL (Direct Labor) - X12 PAINT PIPING (Direct Labor) - X13 PAINT MAJOR EQUIPMENT (Direct Labor) - X14 PAINT ALL OTHER (Direct Labor) SF SF SF SF PAGE GARRARD 00000570 TOTALS - "X" ACCOUNT - PAINTING - 2> A 13 ill.9 PHR 1.2 36 GARRARD 00000571 "P" - ELECTRICAL MATL. LABOR REQ. CODE JOB NO. & TITLE ______________ CLIENT MARATLVPkl OU_ ctomPAnJV JOB LOCATION Ro&msokl , ILLIMO'5 INSTALLED QUANTITIES ( IOOO) FINAL MAN HOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. S/C L& M P11 P11 DISTRIBUTION EQUIPMENT Substation 1 -- EA II EA .& 26,3.6 Power Transformers ff -- EA 15 KV Switchgear 2 -- EA BMT^RV ISOILI?IUt BATrE-RiEt, ^ CHARUCR 1 - EA 1 - Lot PI 2 PI 2 POWER & CONTROL EQUIPMENT 5KV & 600V Switchgear -- EA 63 EA 12-4 Motor Control Centers -- EA - EA - EA - EA PUp P13 P13 P14 P14 P15 R. TO S'- <-\ P15 P21 Pro^RKhkk^le; cowtrolcr EMERGENCY AND STANDBY EQUIPMENT LIGHTING EQUIPMENT OTHER ELECTRICAL EQUIPMENT PURCHASE RIGID METALLIC CONDUIT INSTALL RIGID A/a METALLIC CONDUITyzo 4 105 EA .7 20 EA 978 ea ZoA ea 2-1 6.6 39 LF 234,8oolf 124.(5 P22 INSTALL RIGID U/G METALLIC CONDUIT 6710 LF l.6> P23 P23 NON-METALLIC CONDUIT - UNDERGROUND Zl, 1-4(0 LF 4 7 P24 P24 THINWALL METALLIC CONDUIT P21-24 Subtotal Installed Conduit 0.49 / i_F~ -- LF ZW,(56>lf 130.3 P25 P25 CABLE TRAYS AND CHANNELS P29 INSTALLATION MATERIALS 13,224 lf i?.9 LOT P31 P31 600V & 1000V WIRE 49464 (a LF 13-5 P33 P33 ELECTRONIC AND THERMOCOUPLE WIRE ff30 e?3T 428.576.LF 20.8 P31 + P33 Subtotal Wire 0.0-5B MHRs/lf 923.223LF 34.3 P32 P32 5KV& OVER CABLE 343S5 lf Z-5 844.6 147.1 155.2 724.2 456.5 31.0 - 105.0 20-5 187.8 239.8 59.7 MATL. LABOR REQ. CODE P34 CONNECTIONS - 600V & 1000V WIRE P35 CONNECTIONS - 5KV & OVER CABLE P36 CONNECTIONS - ELECT. & THERM. WIRE P39 WIRE & CABLE INSTALLATION MATL. P41 P41 GROUNDING P42 P42 6kouw(7vlIell5 g," gS x i5o/ P43 P43 ELECTRIC HEAT TRACING P50 P50 OVERHEAD DISTRIBUTION P80 TESTING P90 MOTOR DRIVERS P-90 etle:c:t OidiC Pi SCOUEJECTS f- 95 ETLETCT PEMOLiriDlJ P-99 MATERIAL HAEip-LllUG ELECT. RELAY CAuBRATIOM 6lJR Plus TOTALS P" ACCOUNT -ELECTRICAL PAGE C0NSTR. DATES ip/Bo to A 16 ZPREPARED BY M. Hiller. INSTALLED QUANTITIES ( IOOO) FINAL MAN HOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. S/C L&M IOT47 EA 213 EA 50513 ea (6.2 9 24.1 LOT 56)246 LF 7 ea 8.0 2-4 >38.0 766 1-0 - 41.9 12290 lf 1 5125 lf 419 limits 5-0 3.5 29 166. 8 108.0 12Z0 ETA too UKirps ZOOO LIMITS i5 4 1.8 o.[ 4.0 izoo.o'? 269.1 14 3783.0 45.9 PHR 1.2-32 PAGE 1"- PIPING MATL. LABOR REQ. CODE JOB NO. & TITLE 1-4053 BRHP__________ CLIENT HAKA-t-HOKI OIL. COHPAMV JOB LOCATION RoRi^sokl , ILLikloi^ INSTALLED QUANTITIES f IQOO') FINAL MAN HOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. S/C L&M MATL. LABOR REQ. CODE CONSTR. DATES lo/eo TO 4 > 8ZPREPARED BY H. H'tLgR___ INSTALLED QUANTITIES / looo > FINAL MAN HOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. S/C L&M L01 FIELD FABRICATE CS PIPE-2 ' & UNDER L02 FIELD FABRICATE CS PIPE-2%' & OVER LF O LF o L21 INSTALL ALLOY PIPE-2" & UNDER L22 INSTALL ST. RUN ALLOYPIPE-2%"-6" 206 Z lf LF 1.0 28 81.5 L03 FIELD FABRICATE ALLOY PIPE-2" & UNDER L04 FIELD FABRICATE ALLOY PIPE - T/2" & OVER LF LF L23 INSTALL ST. RUN ALLOY PIPE-8"-12" L24 INSTALL ST. RUN ALLOY PIPE-14"-24" LF LF L05 FIELD FABRICATE SPECIALITY PIPE LF L25 INSTALL ST. RUN ALLOY PIPE 26" & OVER LF L09 FIE LD FABRICATE PIPE HANGERS AND SUPPORTS II4CL. EA L21-25 L26 SUBTOTAL N INSTALL SPOOLED ALLOY PIPE-2^"-6" ' LF LF L11 LI 3 L14 L15 L11-15 L16 L18 L19 L16-19 L70 L11-19 + L70 INSTALL A/G CS PIPE-2" & UNDER (L-IOi LMI) INSTALL A/G ST. RUN CS PIPE-2%" - 6 " " -10 315 lf LF INSTALL A/G ST. RUN CS PIPE-8"-12" INSTALL A/G ST. RUN CS PIPE-14"-24" L - IT ( t-S. BORE rack pi re 42470LF LF INSTALL A/G ST. RUN CS PIPE-26" & OVER LF SUBTOTAL y LF INSTALL A/G SPOOLED CS PIPE-2^"-6"^ LF INSTALL A/G SPOOLED CS PIPE-8"-12" | L.-IZ 4&280lf INSTALL A/G SPOOLED CS PIPE-14"-24"f ^.s^tooTs LF INSTALL A/G SPOOLED CS PIPE-26"& OVER SUBTOTAL * LF LF INSTALL U/G CS PIPE TOTAL INSTALLED A/G & U/G CS PIPE 5834 lf 166899 lf 12 5.0 32.8 38.5 4.0 16.79 32.3 12.0 .7 343.4 6.9 8 956.-4 U U ./p 941.& 20-4 2035.2 L- U L- 12 L01 L11 + L01 PURCHASE CS rife SM. L.6. SOI?e FABRICATE CS SPOOLED PIPE TOTAL PURCHASED CS PIPE L-OI.L-U, L- 12. I98T9Z lf LF LF U32.2 2(*(etOO 3792.2 L12 L151 L152 LI 7 PURCHASE CS FITTINGS & FLANGES L-|3tO$ L'1320 49 950 ea PURCHASE CS VALVES-SCREWED & SW L~ 1600 7451 ea PURCHASE CS VALVES FLANGED & BW L- UpOO 2372 ea PURCHASE CS PIPE SPECIALITIES J0OO 3536ea 392.9 26.4 5 126.0.0 Z45.0 L27 INSTALL SPOOLED ALLOY PIPE-8"-12" \ L-*Z LCa.&ORe 2169 LF 27.3 -- L28 INSTALL SPOOLED ALLOY PIPE-14--24" ( LF L29 INSTALL SPOOLED ALLOY PIPE-26" 8t OV(ER ---------------------------------------------------------------------- 7----------------------- L26-29 SUBTOTAL LF LF L-21 L - 22 L21-29 TOTAL INSTALLED ALLOY PIPE CUETMICAL CLCAMIM6 O P* coMPeresoR PURCHASE ALLOY PIPE k, LG. BO RE L02 FABRICATE ALLOY SPOOLED PIPE L21 + L02 TOTAL PURCHASED ALLOY PIPE L-27 PUF1CHA-6E Alloy SPECIALTIES 4231 LF 283 2.8 81.5 24 46-7 4030 LF 54.0 LF 858.0 LF 912 o 23 EA. 156.0 L-23 PURCHASE ALLOY FITTINGS 8t FLANGES 84 EA 24.0 L-25 PURCHASE ALLOY VALVES-SCREWED & SW 6.39 EA 39.9. L-34 L80 L80 SPECIALTY PIPING STEAM TRACING'^kA.^KAc'e * 34 ea FOG L>5-*. 59 LF *-F _ \5.5 _ 11.8 zoo 5.0 341.8 344.4 L91 L91 L92 L92 L93 L94 L94 STRESS RELIEF RADIOGRAPHY. DYE CHECK, MAGNAFLUX REVAMP & TIE-IN WORK HANGERS & SUPPORTS 2411 PX EA 50 EA EA 3.0 o.& .8 o.4 1.7 .1 - 28.2 - 48-6 410.0 2 -9 L95 BOLTS 8i GASKETS LOT 130.1 L98 TEST & INSPECT 193 153 LF >9.0 6.2 l&o,8 L99 MATERIAL HANDLING IU6L. VJ/ WAREHOUSE LOT PiPey/ay Re-LccATioii-o/iSi f os pipe: U/A- 3866 LF A/Cl --4140 LF 5-3 232 O TOTALS BACKCHARSCS MISC. 5/c. accts. SURPLUS L" ACCOUNT - PIPE St MOTE'-- PURCHASED 38,262 LF OF FfKATRAce Kr 4 Z.6S/l_F 5.7 <l5C.O> LF 416.5 \oo.5 7843.4 2999.3 PHR 1.2-29 CONCRETE WORK MATL. LABOR REQ. CODE JOB NO. & TITLE I4o'5~5 RRMP'__________ CLIENT HKT^ATUOVl Oil- gQI-IFTKVW JOB LOCATION ROBIk1sq>-1 , Ii-UKLOIS INSTALLED QUANTITIES ( |000> FINAL MAN HOURS Bechtel S/C Q01 002 FABRICATE REBAR FABRICATE FORMS 55 T SF zu Q10 PURCHASE CONCRETE 5>5Z.08/-Y %%0-- I4IZ4 cv Q11 PLACE FDN. CONC FOR EGUIPT., STRUCT & PIPEWAYS 593T CY 10.9 Q12 PLACE STRUCTURAL CONCRETE 2 389 CY 95 Q13 PLACE BUILDING SUBSTRUCTURE CONCRETE CY Q14 PLACE BUILDING SUPERSTRUCTURE CONCRETE CY Q61 Q71Hf Q72 Q73 Q74 Q75 Q11-75 PLACE PRECAST CONCRETE PLACE CONCRETE PAVING MISC. CAST IN PLACE CONCRETE PLACE U/G CONDUIT ENVELOPE S61 CY 6*2*570 SF 11*59 CY EA CY <?3Z CY PLACE SEAL SLABS G} - 16 333 CY PLACE ALL OTHER CONCRETE (?-40 COMPOS VTE 294 CY SUBTOTAL CONCRETE INSTALLED URi5.11 MHRS/lF 11025 CY ZA TO 5-5 .2 A L& Ale- 1 DIRECT COST $1000 Bechtel Matl. S/C L& M 741.4 Q2* PURCHASE FOUNDATION REBAR PlfR-- ^lZO$ T Q21 Q22 Q23 PLACE FOUNDATION REBAR PLACE STRUCTURAL REBAR PLACE BUILDING SUBSTRUCTURE REBAR 4TI T 351 T T 024 PLACE BUILDING SUPERSTRUCTURE REBAR T Q62 021-24 + Q62 PLACE REBAR FOR PRECAST CONCRETE SUBTOTAL >41.II MHF7S /tofI ALL OTHER REBAR (PAVING, ENVELOPES, ETC.) TOTAL REBAR INSTALLED 107 T 989 T IMG 1-- T 989 t * <}-T|-A6SUMe G>" IMCLUPe-S VUIRET He-5H n.7 23.2 57 4fc5.2 PAGE _L CONSTR. DATES lo-B TO 4-gZ. PREPAREO BY M. MilLER MATL. LABOR REQ. CODE Q3* Q31 032 033 Q34 Q63 031-34 + Q63 PURCHASE FORMS & FORM MATERIAL PLACE & STRIP FOUNDATION FORMS PLACE & STRIP STRUCTURAL FORMS PLACE / STRIP BUILDING SUBSTR.FORMS PLACE & STRIP BUILDING SUPERSTR FORMS PLACE & STRIP PRECAST CONC. SUBTOTAL O.T7 HHRS/5F ALL OTHER FORMWORK TOTAL FORMWORK 04* Q64 090 Q69 FURNISH ANCHOR BOLTS/ EMBEDS PURCHASE PRECAST STRUCT COMPONENTS PLACE PRECAST STRUCT CONC. ITEMS FURNISH SHIMS & GROUT INSTALLED QUANTITIES / IOOO) FINAL MAN HOURS Bechtel S/C DIRECT COST $1000 Bechtel Matl. S/C L&M SF 55807 SF 70439 SF SF 4 3.3 68.1 344.0 SF 20550 SF 152 602. SF SF 15.6 -- Ul-O I5Z802SF LB EA 583 c V LOT -- Hf! IS 3.2 u.o 10.8 41-1 gouc^ste: e soii-s rrsrma F'OUUFWTtOlJS FOR PlpTWAV f?eLOCAT\ OM loo cy f.Lf 14.4 CeO. *5 ---- TOTALS 0" ACCOUNT - CONCRETE WORK .........- - -- -- 223.1 1-4 1795.9 74 9 PHR 1.2-33 MAnu M_ manpower Data GARRARD 00000574 R1/C71E-37C MANPOWER SCHEDULE lob Nn. 14053. MAN MONTHS \(e^ M HRS.^V^) AVERAGE FORCE CRAFT BOILERMAKER BRICKLAYER CARPENTER CEMENT-FINISHER ELECTRICIAN IRON WORKER LABORER MILL WRIGHT OPERATING ENGR. PAINTER PIPEFITTER PIPE WELDER 0CmTfoN.OV DfcC il. ian FEB MAR APR. /W JON 0(1L AU5- ser i 6/. ocr NOV. DGC 1982.IAN Fes BRIG. BUOGET ACTUAL/TOGO 4 6 12 IS" ir 25 3 3 57 86 "83" 27 /TlHf" jv/y O 1 _ - - - 23 2 - - 4 t - - / O 4" 8 IS' If} sv 43 51 92- 106 104 64 69 SI 62 id 92 73 46 4 1 3 r 5 4 8 12 16 (0 9 6 4 5 4 7O 12/ 43 ~W ~w 10 69 112 84 'It Ii2 152 156 133 12/ no 104 178 /74 /A*y 24 5 lb 14 13 44 50 J9_ 92 94 70 64 64 60 33 ao zat /6 3 S jLL n - il27 JfL 60 10/ -- - I 117 149 85 JFL 72 82 89 110 /of //p. IT. 6 *4 II 7 8 (3 22 py 00 C? 1 _3_ 18 22 29 i2_ 52 59 is- 62 JfL 11 76 6$ 2.5 S'5 4 - 1 3 4 14 18 24 3/ id 62 "57" 126 172 226 35o 392 l TW1 4, 3 5" 8 i'i /& 35 39 To- 88 97 jssv /3s" 5 tsz 70 3 TEAMSTER SURVEYOR, CHAINMAN 1 JL_ & | _a_. _!2_ 15" 10 /#23 13 21 23 22 IS 18 / 3 _2_ --fe_ 6 6 JU S' 7 5 5 4 6 5 5" 4 A i TOTAL MANUAL SUBCONTRACTORS TOTAL MANPOWER % 0. B. EXP. ACTUAL TOGO %0. B. EXP. ACTUAL TO GO m m12/ 55 IlH 113 140" 346 m 632 Isd 68/ 113 788 913 1046 |l5f> s?/ 6Y0 64 40 % 46 bO $1 28 3 2 7 3 5" 15" 16 ir 27 |23 205 .zrp 27V 1/3 %0. B. EXP. ACTUAL 52, I0| m 194 KH tsi 343 348 9% 635 963 646 929 sis TOGO TIW 1355 111 ihid 1 Month Ending Ry A-l' Q3t^ f&2- , Q-Pn 5*-i6 >u) Supt. ReviewDate MAN MONTHS ORIG. BUOGET ACTUAL TO GO 46.8 FORE CAST 14 ioo~r lol Zo58 753 1349 134- 144 2304 89o 289 80 10197 tze.5 11482 Jtz* BSa7 .iDR ND \4os^> description CLIENT bAAe/\T HotA OVU LOCATION 3LL . LABOR DISTRIBUTION AND FINAL PRODUCTIVITY P4rB 2 CONST. DATES IoI&oto 4. PREPARED BY M. N\\ LLSZ/ C.u ' DISTRIBUTION PRODUCTIVITY ACCOUNT DESCRIPTION C Columns & Vessels 0 Tanks E Exchangers F Fired Heaters G Pumps & Drivers K Compressors T Special Equipment SUBTOTAL MAJOR EQUIPMENT FINAL MANHOURS 2AZS> 2. 111 \VT2>S 8 (o S1 Lp 7.421 \53\o4 PERCENT FINAL BUDGET FINAL PERFORMANCE PRODUCTIVITY PRODUCTIVITY 14 7o -- 0.55 rcr Libs' 2.75 0.71 0,37o 1.27 2..IO 4.8To 2-82. 4,45 0 > (o/o 0.80 1.35 on 0.75 1.27 o.rk 5.30 1.41 ' f_____ LbS O.SO 2. 66> J Instruments L Piping M Structural Steel N Insulation P Electrical 7OT 5C1,7.\ 5 6oT?2 oMLY ) t\AO 2(ae\\o'Z. 4,z>% 2JbSlo \A% o-1% \s\l=> 0.48 l.GI I.3S (, oo 0-51 1.41.3 1.5 -- \ i G=> o.un 2.70 2.03 -- (.30 Q Concrete ZZ%047 1.(42, l.b 2.47 R Buildings S Site Improvements X Painting 7,(57 (p(aS\o (0 on 3.8% -- Z,/4 !. 17 l-.oo -- {.IS --------- -- 2.0 6 SUBTOTAL OTHER DIRECTS 120^,2.43 (47, g% /,/7 L(a2> (.7/ Y c^Po<_t>lN<=r 7.1% 2, O.ICL-*r) o.iurap) SUBTOTAL DIRECTS 148(4,013 S3.s% 6X Offshore Related -- 71 Temporary Facilities 72 Miscellaneous Services (40,432. 2.04 j (o0>3 3.7% iu% 73 Tools & Equipment -- 74 Field Office -- 75 Other Operations 2/,,,586 (,s% SUBTOTAL DISTRIBUTABLES |4.S%> TOTAL PROJECT 117780(4 100% 1.27 1, <43 2.07 PHR 1.4-2 GARRARD 00000576 JOB NO. 11053 description _.saaE----------- CLIENT q\l CO. LOCATION RoRIUSQU,. ((- MANUAL LABOR CRAFT DISTRIBUTION BY LETTER GROUP .. CONST. OATES 1Q/&Q TO 4/82. PREPARED BY > "C" "D" "E" "F" "G" "K" "T" SUBTOTAL 8M CARP cm45l ELECT IW LAB MW OE PF TEAM X M HRS % M HRS X M HRS % M HRS X M HRS X M HRS X M HRS X M HRS X M HRS X M HRS m H223 >9 224 3.7 104 * tp ISG> 6 120 2.3 5S4 , 7 41 Z&i *4446 T.4 H41 .( (236 7/2- > - --- - - - 27 3 0.1 4 - 3.6* 4 5T.1 64 12-6 14 li.3 3<pl3 5 14 1.9 20>0 - 3 9.1 12-43 6* 70 5.7 771 1.} \4a J*4 S277 5.1 6.11 42/HI 2 131 .7 S6b 1-0 654 10.9 4426 z.5 2(toO 3-0 2516 m LI 640 ID.9 1433 1.4 12.0.0 .1 6 2.7 2V? 5.9 68 8 -1 5 - - 3.0 217 5721 Z,4 243 (37 I3S1 13 131 - - 2.2 3oe Z.fc 458 10.0 UoSf .1 13 Z.3 313 54,0 89(63 7.5 1245 12.1 20(5 l.o (to 6 - a S3 13 44 1 ,u> 3o Sj6 1(3 -7.4 4S 4to| 123 237 3^ 63 S .8 IS )P* 6V713 .7 mi 1.9 2831 i,e 2702 77 (0414 7-3 3542 12*/ |e>5fc! 13.0 14931 13.4 20562 z-3 3S23 5V *>IC TO &\6.CT & TOTAL X M HRS X M HRS MANHOURS - 3 Co CjD 24283 -- 8.1 1 - 2.1 214 V V1 (373s 4-9 42B6 lc*3 - |3.I (3o2 112.) - 3,o (330 \<p(to6> 63 - is-5 3oo H33 - 5,0 ISBl 1531OA "J" "L" "M" 'N" "P" Q" R" "S" -X" SUBTOTAL V TOTAL DIRECT DISTR. TOTAL MANUAL -- - H4 9.7 t?8TI & Hit -- -3 .1 85 .2 152. 31.1 21643 .1 4o .2 HO - - .1 47 fcl.7 43331 11 .1 2S>4 ,2 6e>7 A 2.027 ,2 714 .7 33o7 - 48 7,0 35T16 73^ 37ol4 .5~ 2685 J 44 .7 414 Up 487 37614 .8 SIS 4,1 2473 14.0 854-1 4.1 2480 73 (722 - - - - - - 12. - ~ - - 15.1 324 - - .1 3 &744 ,/ 355 2to(71J .( 24 1 >9 -224u> - 36 A \to(e I .z 53Z ,5 *433 7152-1 3 11652 - 42. 54o45 /J 51806 ./ ISSO o,l 14 LIST A 72> z.u 5721 -- >,4 4S28 10-2.7 7 - (7.9 10688 SoZ 2.1 - 10 3 too 77Z - 5 lO -2(30 - --- - -- 2.23047 - - il* (57to 19$ 1417 1.5 247 15.7 11/2.5 34.1 f----- 2440 - - 1.0 15 5.3 -2.-5 <tJ * ip 43 - - ,L 142 1.5 447 17 1121 1 so 341to7 - 12/770 t'to 136.12 4-/ 2763 -- - --- - - .0 Ift - - 78c-/ ipX- 743 in 1.3 1 to 07f 226*39 a* 9Jo4l 80 loilll 17.0 7 6.1 73350 y>P 1.2 144-^8 .7 126 u0r 75677 ' 1 .4 Slo 9 1168 3Z? 4H51 - - .1 nu> 4.0 5(05 14 1701 4.1 7o53o 142 15 ii a t 1.3 1692? (94 27/347 75 ill 14b 10.0 143*72 14 2fZ78 i>*3 97457 45749 1.3 19700 -- - "T(S 1 -- & -- l& 7*9 95337 (206243 -- - (26?toto6> 4>.9 102924 14^6-/" 3 1.4 42ol 5.9 VT3S2 -Z CoSti 14-5 42507 50 HS87 rr.i 79725 .1 34S 10.0 21.4 214/S^ 62121 93 28826 4.4 (2824 .2 411 213&S3 47 H73\ 9.6 I(e8 733 /I 14682 18^ 33382.- T.l 12.8 (2ST35 227837 11 21to23 >0 12.2672 52co7C 17 18S26 7 12624 5.8 10 i4 (S 1771870(0 CRAFT DISTRIBUTION PHR 1.4-3 PAGE JOB NO. I4QSS DESCRIPTION CLIENT MMSAtHokI o'LCQ. LOCATION EdBiHSoi^.TlI.. f/cSTtofei" . CRAFT WAGE RATE DEVELOPMENT CONST. DATES \/8o TO 4/g>7- PREPAREDBY M, ___ CRAFT BOILERMAKERS CARPENTERS CEMENT MASONS ELECTRICIANS IRONWORKERS LABORERS MILLWRIGHTS OPER. ENGINEERS f SIZE OF FORCE AVERAGE PEAK 24,6 52.8 5.6 ioG.e> 31.5 7o.4 T,l 3&.1 2>6 106 16 life XL 141 &4r 76 FINAL MANHOURS 14.73 1 \6&,T53 17.153, 323.656 125,735 277,877 21,673 122872 X OF TOTAL 4.2/o 7.s% l.O"/o l&.8^ 7.1 % 12,8% U% 6,7% OVERTIME ASX OF cm. 241% 3.2(o% 476% 2,15% 0.51 % 2,30% 2.16% 5.26% ABSENT EEISM I+V. S7 IE. % lo ^ 11 9 7. w 8% CRAFT AVERAGE WAGE RATE BASE (A) FRINGES PLUS T & 1 TRAVEL TOTAL 17.67 471 Ml 2371 14.64 3.5b -- 1^,22 13.56 3.4-0 \S.27 4.26 13,21 5.64- -- -- 16.46 1%53> 17,53 11.36 2,55 -- 13.71 1574 3.5g> 18.72 13.22 3.21 -- 16.51 JOURNEYMAN n.os 13.67 13,80 |6,oc> 14.15 11.20 (4.47 14.65 AfB l,o41,06 0.78 0.75 0,7 fo l ,o 1 l.OS o.lo -PAINTERS PIPE FITTE RS/WELDERS 167.7 SURVEYORS 4,2 TEAMSTERS mcvi layers \s.\ 0.1 541 1 73 4 520010 \2,824 4&5Z3 274% 0.7% 2,7% o. 1% 4,41% -- 1,67% OU% -- 17.2 s 4.22 -- 21,47 16.30 1,05 10.56 3.G& -- 14.74" lo.l^ o .77 13.55 4.14- -- 17,61 IMS.., l.o] 1536 26g> -- \&.o4- ISlo 1,02 PAGE GARRARD 00000578 totals: t.Cl\ieL 533.4 5/c>ou "TOT PlRcT-4i>t^Tie \\5o l 676.45 1 74.2 7o 3.14% 5.87o 1T77,66 IDO /o u 1 IS. 05 4.oA- CRAFT WAGE RATE DEVELOPMENT 0.00 11.01 1S.03 1,00 PHR 1.4-4 JOB NO. 140 5 3 JOB DESCRIPTION RRMP GHENT MARNTHOlL 2>IL- COHrfc Ktv LOCATION ROB-lUSOkJ . H-LlNlOIS ACCOUNT DESCRIPTION 71.XX 71.10 Rechtel Direct Manhours Direct Labor Dollars TEMPORARY CONSTRUCTION FACILITIES TEMPORARY buildings Field Offices Fa. I4-.9 Total SF Warehouses Change Houses All Other Total l Ife 3 2.C* Fa Ea. Ea. Ea. 13. Total SF \Z - & Total SF -<r Total SF 31.3 Total SF 71.20 71.30 71.40 71.50 71.60 71.70 71.80 71.90 TEMPORARY WORK AREAS & BAYS TEMPORARY ROADS. WALKS. PARKING. FENCES TEMPORARY RAILROAD & BARGE UNLOADING TEMPORARY POWER. LIGHT & COMMUNICATION TEMPORARY AIR. WATER & SEWAGE MINOR TEMPORARY CONSTRUCTION SCAFFOLDING. CRIBBING. DUNNAGE WINTERIZATION & WEATHER PROTECTION BECHTEL 14.2 (p 2 l9.o Z.5 3. 5 IK 3 DISTRIBUTABLES Dofois In Thousands MANHOURS SUB CONTRACT TOTAL TOTAL AS A % OF BECHTEL DIRECT MHRS MATERIAL 24.> 1 . U? 149 . O DOLLARS LABOR SUBCONTRACT (Matl. & Labor) TOTAL 231.2 410,9 811. 1. 1.4 3 .O 1.3 -4 .3 (o.Z. 5.3 Z.2 . O 3- s 3. 9 U . U> 4 4 i-4 3 .a 42. 3 49. 8 184.9 4o.o 18. T z5z>.o 533 te>9.7 69.0 384.0 44. Z 61.9 199-9 51 .9 7?.7 549.4 49.7 13.2 l5z, C> 170.7: 594. fc 140. 45 8T.3 250-0 266. 4. PAGE 1 CONST. DATES lofeo TO 4/8 7. PREPARED BY <. J/SC.KSOM__________ %DF I)IRECT LABOR DOLLARS MATERIAL AND SUB CONTRACT TOTAL Z- 1 3-0 REMARKS PiRCT MUIRS S/2 t4m MHKS 14-89, 37 c>iKerco-r labor 4 . 3 20.837-4 -Z 6 .4 . 7 1.0 .3 .( .9 .2 Z- 2 -5 3 -9 1.0 71.XX TOTAL TEMP. CONST. FACILITIES 72.XX 72.10 72.20 72.31 72.32 72.40 72.50 72.60 72.70 72.80 MISCELLANEOUS CONSTRUCTION SERVICES GENERAL & FINAL JOB CLEAN UP MAINTENANCE OF TOOLS & EQUIPMENT MATERIAL HANDLING WAREHOUSING SECURITY UNALLOCATED SERVICE l ABOR ON & OFF EXPENSES SURVEYING ON SITE TRANSPORTATION UO. 44 -O ZZ 5 13. 9 ?4. S 27. 6 9. S (3. 4 l(o(2 .3 -5 .5 .5" 76.6 44.5 ZZ. 5 14.4 74. 8 ze.3 9.8 13.9 ^ . 2. 7&.0 1071. 9 3-0 1-5 .0 5.0 i-9 .7 -9 133.0 (1 .2 7.7 778.Z 393.0 2458 I3Z3.0 491. 7 J72. 3 237-0 612 . & Z41Z.7 14 <? 7.4 8- 1 8.5 T9Z. 2 5330 Z 53 . Z 1323.0 499. 8 184-5 253- 2 5.2. .1 -5 .o .o .o .0 -1 9- Z 3 .0 2-0 .9 4 .9 1.9 .7 .9 72.XX TOTAL MISC. CONST. SERVICES Z.O<0. z 73.XX 73.10 73.21 73.22 73.30 73.40 73.50 CONSTRUCTION EQUIPMENT & TOOLS CONSTRUCTION EQUIPMENT Bechtel Equipment Rentals Third Party Rentals -- Bare Third Party Rentals -- Operated & Maintained Job Owned Equipment CnitHB3.fc Resale To.O Subtotal Const. Equipment SMALL TOOLS PURCHASE Cost Z7T-3 Resale '112 RENTAL TOOLS PURCHASE Cost Resale 3 0 FREIGHT ON CONST. EQUIP. & TOOLS CONSUMABLE SUPPLIES - WELD ROD & GAS Aftt-e 6UPfUE5-UWT e>HAUU TOOL6 - UUIT Pi PURCHASED UTILITIES 73.XX TOTAL CONST EQUIPMENT & TOOLS 7- . O 208.-2. 14 . O l4-S 9 364-7.0 3 6. O 9.838. 9 A 14-3 I 30. o 914.0 12. 3 03. 2 8-317. 5 170. 3 (,. 8 153.4. 330. o 958. 5 950.5 79 . 49T4- & DISTRIBUTABLES 1.0 1.0 1300. O 914. O 18- 3 83- z Z 3>|8 . 5 170. 3 4,. 8 158.4. 830.0 968. 6 958-5 79.6 \.o 4973.a 4.9 3.4 .1 ,8> 6.7 .6 .O 6 I.Z 36 3.0, .8 ie>. t. 4.9 3.4 .1 -3 6 .7 -6 .o O 1 .z 3.6 3.O' .3 I&.6 PHR 1.6-1 JOB NO. 140 53 JOB DESCRIPTION BHHP CIIENT HARyrHOlJ Oil- COHPAM.V LOCATION FfoaiMSQNl , IL.L.UJQ13 ACCOUNT 74.XX 74.1X 74.11 74.12 74.13 74.14 74.15 74.16 74.17 74.18 74.19 DESCRIPTION Bechtel Direct Manhours Direct Labor Dollars FIELD OFFICE NON-MANUAL Supervision Engineering Project Control Administration Warehousing & Purchasing Computer Services T PC. iOWSTROCTIOH tpc SUBTOTAL NON-MANUAL Paid Absences | Social & Retirement Benefits} Payroll Taxes and Insurance 1 Additives SUBTOTAL -w Completion Bonus Foreion Service Premium Hardship Allowance Cost Differential Other Benefits and Allowances Education and Other SUBTOTAL ' 74.30 74.40 74.51 74.52 74.53 74.61 74.62 74.63 74.64 74.71 74.72 MEDICAL & SAFETY SUPPLIES PERSONNELTRAINING AIDS COMPUTER EQUIPMENT & SOFTWARE COMPUTER OUTSIDE SERVICES COMPUTER SUPPLIES OFFICE SUPPLIES OFFICE EQUIPMENT REPRODUCTION SUPPLIES TELEPHONE, TELEGRAPH, POSTAGE RELOCATION EXPENSE TRAVEL & ENTERTAINMENT 74.XX TOTAL FIELD OFFICE 75. 75.10 75.20 75.30 75.40 75.50 75.60 75.70 75.80 75.90 75.XX 60.XX OTHER OPERATIONS WELDERS TESTS CRAFTTRAINING SHOW UPTIME VOTING & OTHER TIME OFF MANUAL TRAVEL STATE & LOCAL TAXES PERMITS PROJECT INSURANCE PRELIMINARY STARTUP OPERATIONS t6ta'l 6ther opEftATifiWi TOTAL REMOTE & OFFSHORE ASSOC. COSTS TOTAL DISTRIBUTABLES BECHTEL 35.0 71.0 29.7 04.4 38. I 30.1 53. 5 *$50. (p l .5 IT.4 .2 20. 5 6.43.9 DISTRIBUTABLE Dolars In Thousands MANHOURS SUB CONTRACT TOTAL TOTAL AS A % OF BECHTEL DIRECT MHRS MATERIAL DOLLARS LABOR SUBCONTRACT (Mad. & Labor) TOTAL 35.0 Z.4 71.O 4. 0 z9. 7 z. o i 04. 5 30. 1 5.7 z. 5 30. 1 Z. 5 53. 5 3.6. .1 350, 7 2*3. 5 748.9 .2 990. 7 354.0 Z 765.7 305. 8 5IZ.7 5 .4 4504.3 1540.7 l*Z.2 748.9 9 90.9 354.0 77ft. i 385. & 12.7- 5IZ.7 010. 5 4596.9 1540. 7 .1 ia.3 *%*&. 7 -Z--3. 5 7-0 90. 4 S'. 4 I 3 .6 90. Z M2,5 46.7 I0Z .3 673. B | 1 -4 OiZG. O 1*2.Z 7. O 90.4 5.4 1*5. 90.2 112. 5 40.7 102. 3 673. 0 346. | 7707. to 7.4 1.5 n .4 .z .5 .1 1.2 .O 56.Z .3 .4 130.9 Z6. 5 307. & 3. 5 107.1 26. & ^07,0 3.5 4 50.0 \.& 106.. 9 Z 44. 5 7594.0 DISTRIBUTABLES 46 0.7 iisiz..6> 50. O <664 .O 575. 6 19 57 O, is PAGE_i2_ CONST. DATES \o[&Q TO 4/g.Z PREPARED BY J\CK5Qkl %0f [ IRECT LABOR DOLLARS MATERIAL AND SUB CONTRACT TOTAL 2. & . a 3.7 1.3 .a Z. 9 1.4 1.9 3. 1 17.1 5.7 REMARKS .& .4 .o 1 .3 .4 .Z .7 2. 5 1,3 5- 9 .o .4 .0 .I .3 .4 -2 .7 2.5 1.3 26.7 .2 .7 . . 1 .0 l. 1 .o .0 -O .2 .4 *30. & .2 2. i 7Z. 9 PHR 1.5 2 JOB NO. & TITLE CLIENT________ CONSTRUCTION EQUIPMENT SCHEDULE JOB LOCATION _ Job Owned, Bechtel Rental & Third Party Rental rmNrRY MO!Jf.'!?N!2,\TIOis' f-RO.iL'C7 --M>WfHON 'Jit CO.----- roainson. m. EQUIPMENT DESCRIPTION EQUIPMENT COUNT BY PERIOD 1980 1981 1982 CHFV. V-8 4DR. SEDAN A $ 0 N D J F M A M J J A s 9 N D J F M A M ,1 ,i 1 1 1 1i 1 1 i11 1 1 1 1 11 1 1 i1 11 1 PLYMOUTH HORIZON 2 DR. 1 1 1 1i 1/2 TON VR. VB PICK-UP TRUCKS -2_ 2 TON FLATBED TRUCKS -5_ _6_ 8 in 13 JL8 1 fi JLZ. 18 18 18 20 ?n 2D 19 13 13 13 12 fi 2 1 2 3 3 444 5 5 7 888 7 7 7 43 3 1 DUMP TRUCKS 6, 10, 12 CY. 333344331 1 1 MECHANICS TOOL TRUCK FUEL TRUCK LUBE TRUCK "A" FRAME TRUCK 2222222222233321 1 1 111i1 1i1 1 1 11 1 i1 1 1111i 1i1 1 11 1 1 i1 11 2 2 2 22 2 2 HD 4X6 TRACTOR LD 2X4 TRACTOR SEMI TRACTOR FIFTH WHEEL TRACTOR OFFICE TRAILERS 24X60 FIRST AID TRAILER 8X36 COMFORT TRAILERS TIMEKEEPER/GUARD TRAILER CHANGE ROOM TRAILERS SEA VANS 8X32 TOOL VAN TRAILER HI-TANDEM TRAILERS LO-BOY TRAILERS SEA VANS 8X20 WELDING DEPT. TRAILER EXPANDABLE 11i11i111i 1 431 1 1 1 11i1 1 22 3 3 3 3 3 3 3 3 3 3 3 3 .3 3 3 3 3 3 ? 2 2 11 1 11 1 i 1 1 111 1i i i iii i 2 22 2 2 2 22 222 2 2 22 2 2 2 2 2 2 2 2 22 2 2 2 2 22 2 22 2 2 2? 2 2 3 3 5 5 9 9 10 11 13 14 14 14 13 13 13 15 15 13 10 333333 4 677 7 5444 4455 5 443 333 1 2222222222222222 1 1 1 1 22222221 1 1 1 1 i fi6 13 13 24 24 37 37 37 34 34 34 34 34 34 1111111 11111111 TOTALS THIS PAGE CONSTRUCTION EQUIPMENT SCHEDULE CONST R. DATES . PREPAREO BY PURCHASED EQUIPMENT Purchase Cost Less Resale RENTAL EQUIPMENT Total Months Average Rental $/Mo. RENTAL COST 23 5 ... 288 91 --- ---------- . 29 35 17 18_ 14 210 . 300 4,830 _ 1 ,500 24Q 69,120____ ROD 4fi 5nn 650 __ 18,850____ 175 __ 6,15_0____ 1650 28,050 800. 14,400____ 700 q.ftfin . TO 12 5 4 1450 700 700 700. 14,500 8,400____ 3,500___ 2,800 Inclu led w/Ts iperary ulldlngs 20 180 3.600 38 300 _ 11,400____ iperary 1 uildtngs 202 240 18 150 48.480 2,700 91 . 90, 8.190 6.200 (29001 500 I2.QQ1 18 500 ___ 6.500 3R3Rnn 11-7600). _..... 7 ._ 170 . ... ______8__ ___ 2Z5L . 1.190 2,200 45,200 (20700) 312,660 PHR 1.5 3 PAGE JOB NO. & TITLE CLIENT________ ^^CONSTRUCTION EQUIPMENT SCHEDULE JOB LOCATION _ Job Owned, Bechtel Rental & Third Party Rental MU;VJ.UOJ KOBiMSO!'! REflWLRY -----MODERNIZATION I'RUJICI " MARATHON Oil CO. ROBINSON* 11! . EQUIPMENT DESCRIPTION FLATBED TRAILERS BOX TRAILER OFFICE TRAILER (CIPSl MAECO FLATBED 40 ft. FLATBED TRAILERS COMPACTOR WACKER RAMP COMPACTOR VIBRO PLATE EQUIPMENT COUNT BY PERIOD 1 980 1981 1982 A S 0 N DJ FMA M J j A S0 N D J FMAM j j 4 8 15 16 17 23 23 14 7 2 i 1 1i 1 i1 1 1 1 1 i 1 22 2 2 1i11i11 34 999999999993 3 444 68888844441 1 I 22222344641 1 1 CRAWLER DOZER FRONT END LOADER W/RUBBER TIRE. BACKHQE FRONT END LOADER CRAWLER - 450B CASE HYDRAULIC GRADALL CRAWLFR - 660 BACKHOE 50 TON STEERING TRAILER &BOOSTEF BOBCAT 6 TON DROTT PICKER 8 TON PICKER 10 TON CHERRY PICKER 12-14 TON PICKER 15. 18, 20 TON PICKER 50 TON PICKER 70-85 TON CRANES 140 TON HYDROLIC CRANE 200 TON CRAWLER 1 1i111 1 22244421 1 1 1 11 i 111i1 111 111 1 1 1 i 1 1 1 11 1 1111 11 111 11111 11i 1 1 1 1 i 1 1 1 1 1 1 ?22 34A55 3?? 2 2 2 2 4 6 8 9 m 12 14 14 14 13 10 7 6 ? 1 i 4444332 1 1 38777774?ii 1 11 i1 1 i1 i 11 iii i ? 2 ?2 ? ? ? ? ? ? ? i TOTALS THIS PAGE CONSTRUCTION EQUIPMENT SCHEDULE CONSTR. DATES OCTOBER. 19S0 TO APRIL. 1982 PREPARED BY______________________________________________ PURCHASED EQUIPMENT Purchase Cost Less Resale RENTAL EQUIPMENT Total Months Average Rental $/Mo. RENTAL COST 36*000 (164Q0) 129 9 12 7 77 34 270 Z5_ 115 250 34l,830 fi7fl ]_,38Q 1.750 60 M2Q 125 4,250 8 1230 28 1000 9,840 28,000 11 1370 15,070 3*200 ___(1500) 9 1 4 2 3 8 17 33 137 26 51 15 23. 2500 22,500 900 900 500 2,000 750 1,500 1250 1000 3*750 8.000 1300 22,100 1450 47,850 2250 308.250 5500 143.000 6001) 306.000 .6500 _ 97,500 10500 . 241,500 39,200 (17900) 1,305,260 PHR 1.5 3 PAGE 0B ^^CONSTRUCTION EQUIPMENT SCHEDULE Job Owned, Bechtel Rental & Third Party Rental .inRNn RTITIF 14Q53-OuO ROBINSON REFINERY ' MODERNIZATION PROJECT CLIENT______________ aa A l? ft i HQN r>;t rr> JOB LOCATION________________ ROBINSON, III.__________ EQUIPMENT DESCRIPTION CRANE MATS (200T) CRANE MATS (140T) EQUIPMENT COUNT BY PERIOD 1980 1981 1982 A S 0 N DJ F MAMJ J A s0N D J FMAM0 J 24 24 24 24 24 24 24 24 24 24 24 10 25 25 25 25 25 25 25 25 10 10 10 CONCRETE MIXER 9CF CONCRFTF BUCKET 3/4 CY. C0N0RFTF RMOKFT 1-1/? f,Y. -CONCRETE PUMP TRUCK w/BOOM CONCRETE TROWEL 42" . ___________ CONCRETE VIBRATORS CONCRETE BUCKET 1 YD. CONCRETE MIXER 6 CF. HI-RANGER BUCKET TRUCK SCISSOR LIFT #2000 MANLIFTS & SNORKEL LIFTS 40' HGT. MANLIFTS - 40' TELESCOPING MANLIFTS - 60' TELESCOPING JLG TELECSOPING LIFT FORKLIFT 2-1/2 TONS HYDROLIC PALLET-LIFT TRUCM4500 AIR TUGGERS #2000 & #5000 8 PAK WELDERS 200 AMP WELDERS 200 & 300 AMP PORTABLE GAS WELDERS 300 A 400 AMP MOTOR GENERATOR WELDERS 1ii \1 11 ii1 1 1i1 1 1 1 i1 i ii1 1 1 i1 1 iii111i11 ??222222 n2 4 6 8 8 8 n 77777 2 22 ?22 1i11 11111 22222222222221 1 1 1 1 1 3222222222234441 1 1 4 6666666333443 11 1 1 1 i i 1 1 1 1 1 11 ii 111 1 1111ii11 11111ii111111 1111 2 2 222222 2 2 2 222 2 22 32222 1 i 3 5 5 10 18 17 17 14 7 2 10 22 39 41 58 82 83 89 94 128 124 124 39 44 3 2 5 11 15 15 11 6 6 4 4 4 2 2 2 2 2 1 1 1 2 TOTALS THIS PAGE CONSTRUCTION EQUIPMENT SCHEDULE CONSTR. DATES OCTOBER. 1980 to APRIL. 1982 PREPARED BY_____________________________________________ PURCHASED EQUIPMENT Purchase Cost Less Resale RENTAL EQUIPMENT Total Months Average Rental $/Mo. RENTAL COST 15,800 in qnn 172001 (50001 5 150 13 50 7.100 132001 11 10 LQO 6000 inr.luH includ :d w/Sma 1 Tnnls 4 100 5 300 32 3100 41 5GO 66 non 16 1450 7 1200 10 1450 1.250 (600) 19 n 675 310 750 650 1 .100 .60,000 400 1 .500 99,200 2D_J)Q0 72,600 23,200 8.400 14T500 12,830 3.410 ion 325 3?.500 ifnn 70 72,100 96 ?40 2 840 1 .680 35,050 (16000) 448,360 PHR I S 3 JOB NO. & TITLE CLIENT________ ^^CONSTRUCTION EQUIPMENT SCHEDULE JOB LOCATION. Job Owned, Bechtel Rental 0 Third Party Rental EQUIPMENT DESCRIPTION EQUIPMENT COUNT BY PERIOD 1 980 1981 1981 A S 0N DJ FMAM J JAs0N DJ FMAMjj 1PO/4RO V. POWER DISTRIB. PANEI! 2 4 6 6 10 10 10 12 15 15 15 15 15 12 10 6 4 i 120/480 V. POWER DISTRIB. PANEL! 4 44 4 4 4 i 350 W. GAS GENERATORS 55 5443 1 1 1 1 3500 W. GAS GENERATORS 1 33333333333333 33 35 W. GAS GENERATOR 11 1 i 1-1/2" CENTRIF. GAS PUMP 3" CENTRIF. GAS PUMP 2" & 3" SUBMERSIBLE ELECTRIC PUMPS 3" HOMFLITE DIAPHRAGM PUMPS . SPRAGUE TEST PUMPS ____________ AIR COMPRESSOR - 175 CFM GAS 4444 4443 44 4 44 222222222233311 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 ? ?22 22 2 ? R88888888a8 88 888 3321 1 222221 1 1 RADIAL ARM-SAW 18" BAND SAW 36" ABRASIVE CIITTFRS PIPE THREADERS 1/2" - 2" REBAR BENDER/SHEAR SKYCLIMBERS__________________________ WFT RAND SAW PIPE BEVELER_________________________ HI-PRESSER WASHER ICE MACHINES CRANE WORK BASKETS f3 man) 1 1i1 11 111 1 1i1 ? 2 6 6 65 6 6 6 7 7 7 7 33 i 5 5 9 9 9 8 a 13 13 15 15 15 15 15 15 15 2 1i1111i11 1 8 99977 22 2222222222 2 222 7 7 7 77 7 7 7 7 7 7 7 7 1777 11111 1 1 111 2 2 33 3444444444 2222 2444444444 OTHER MISCELL. EOUIPMENT & SHOR' Ti RM RFI TA s RENTAI REPAIRS TOTALS THIS PAGE TOTAL EOUIPMENT CONSTRUCTION EQUIPMENT SCHEDULE CONSTR. OATES PREPARED BY OCTOBER. 1980 TO APRIL, 1982 PURCHASED EQUIPMENT Purchase Cost Less Resale RENTAL EQUIPMENT Total Months Average Rental $/Mo. RENTAL COST 2.200 nooo) 750 (300) 16R 25 30 12R 325 678 21,nnn 8.130 20.340 51 __ ^ 38 3? 40 150 (100) ____ 32___ 20 40 9.600 (4400) 23 . 340 i finn i 3nn i Ann 800 7,82L____ 10 3 include d w/Smal 1 Tools include d w/Smal 1 Tools 9 54 include d w/Smal 1 Tools include d w/Smal 1 Tools 10 8.350 (38001 7,000 (32001 170 295 ?nn 505 3.36 1 ,700 ____ 900 i ^nn 27.270 5.700 (2600) 33,750 (15400) 153.200 (70000) 30.200 40.000 168,020 2.234.300 PHR 1.5-3 PAGE 15 DiSTP-lS U T ft 6 L 5 GARRARD 00000585 CONSTRUCTION NONMANUAL MANPOWER AND MANHOURS hr 14053description ROBINSON REFINERY MODERNIZATION PROJECT LOCATION ROBINSON, ILLINOIS CUTOFF DATE; I. NONMANUAL MANHOUR SUMMARY TO DATE ______________ TO GO ______________ FORECAST II. NONMANUAL MANPOWER SUMMARY LOCAL HIRE PERMANENT HIRE CONSTRUCTION PERMANENT HIRE SERVICES TOTAL J 19 80 FM AM J J A S 0 N 0J 19 81 F M AM J J AS 0N 0 2 4 11 14 17 21 27 28 29 30 32 34 34 32 32 32 32 33 6 7 13 20 21 23 28 41 42 56 65 68 70 67 66 66 62 62 65 1 5 6 14 14 14 15 15 15 16 17 17 16 16 18 17 18 18 6 10 22 37 49 54 63 83 85 100 111 117 121 117 114 116 111 112 116 LOCAL HIRE PERMANENT HIRE CONSTRUCTION PERMANENT HIRE SERVICES o o o TOTAL o o FORM RCCF 1 cn 1982 J F M A M J J A S 0 N 0 J F M AM J J A S 0 N 0 34 34 32 29 24 13 5 62 65 60 50 36 8 3 17 17 18 14 8 8 5 113 116 no 93 68 29 13 V" +1 GARRARD GARRARD 00000587 BECHTEL CORPORATION ** LOCAL HIRE * HOUSTON PAYROLL CLASSIFICATION i SITE MGR. ? FIELD SUPT. in AREA SUPT. ii AREA SUPT. i? PIPE SUPT. 13 PIPE SUPT. 14 ELEC. SUPT. 15 ELEC. SUPT. (A) (B) (A) (B) (A) (B) 17 CIVIL SUPT. 16 CIVIL SUPT. 18 RIG/BM. SUPT. 19 MECH. SUPT. 128 CIVIL SUPT. (Al (Bl (A) (A) (A) 139 FIELD SUPT. 140 TNSTR. SUPT. (A) 141 NIGHT SHIFT SUPT. (A) 142 NIGHT SHIFT SUPT. (B) PIPE SUPT. (A) INSTR. SUPT. (B) NIGHT SHIFT SUPT. (A) | r~ --r~ Total Account _ SUPERVISION Job Ho. 14053 NON-MANUAL LABOR SCHEDULE MONTH ENDING________ BYDATE. REVIEWED______ DATE . PAGE S' OF. SCHEDULED PERIOD | TO GO | .. _ j 19*50 iyai iyt I$ M J J A s O N D J F M A M J j A s o N 1= J F M AM AM so N J F M M J J A s o N D J F M A M MO. M HRS. -- - mm 1 " ~ " == "~ m--m B B " B s ____ mm 24 18 17 15 13 15 -- i 15 wmm i 11 Ua : - = mpm 3 13 9 - --- iSB r __ i r i__ --- r i 3 3 "_ _ _ m" mi m 13 pBi 11 4 6 4 __ 6 6 4 t----^ 2 i................... 2 ........ ............ ~ -- - ---ii i _d_ j . (__ (__ "- -- I 2__ | T ~2 2 3 T T T 10 1113 13 12 n 13 2 17 T3 T '2 T . .. . _i ~ _I = ;__ 208 i___________ BECHTEL CORPORATION ** LOCAL HIRE * HOUSTON PAYROLL FIELD ENGINEERING CLASSIFICATION 146 PIPE ENG. 147 PIPE ENG. (B) * (A) * 148 PIPE ENG. (A) * 144 TURN OVER COORDINATOR INSTR. DESIGN INSTR. DESIGN * DRAFTSMAN DRAFTSMAN DRAFTSMAN ** ** ** DRAFTSMAN DRAFTSMAN PIPE ENG ** * PIPE ENG. PIPE ENG. ELECT. ENG. INSTR. DESIGN * INSTR. ENG. Tota 1 Account. FIELD ENGINEERING Job No. 14053 NON-MANUAL LABOR SCHEDULE MONTH ENDING_________ BYDATE_ CHECKEDDATE _ REVIEWED______ DATE _ PAGEjj2_OF_ M MO. @M HRS/MO 1 9BO SCHEDULED PERIOD ------------ M j J A s o N D j F M A M J J A S o N D j F M A M J J A S o N Ld J Jf|m a!m J A s o N D J F M A -j -- i M _" z3 " _ m u _i h rn u 1 n i J nc t: _l L\ L LLi i rt 11---- u i L. LL_ [F r L 1 1 l\ _ L_ 1 1 _"_ 1 1 3 L __ r\L._ 1__ J 1__ r [I L 1 M MO. | 6 6 4 2 3 4 1 3 8 7 3 3 5 5 5 3 3 TO GO M HRS. $ j \__ rr | j !__ L- i_ L_ r __ ! T J 6 l 7 7 13 17 19 19 19 20 22 24 29 30 33 40 40 36 26 S_ L _ I__ _ _ _ . 433 BECHTEL CORPORATION ** LOCAL HIRE * HOUSTON PAYROLL ACCOUNT ADMINISTRATION AND OTHER SUPPORT PERSONNEL Job No.. 14053 NON-MANUAL LABOR SCHEDULE MONTH ENDING_________ BYDATE_ CHECKEDDATE _ REVIEWED_______ DATE _ PAGE ' I OF _M HRS/MO BECHTEL CORPORATION LOCAL HIRE HOUSTON PAYROLL J0b NO. 14053 NON-MANUAL LABOR SCHEDULE MONTH ENDING__________ BYDATE__ CHECKEDDATE__ REVIEWED______ DATE__ PAGE_i^OF.,,. ArrniiNT ADMINISTRATION AND OTHER SUPPORT PERSONNEL(contlnued)__________________________________ M M0 0________ M HRS/mo CLASSIFICATION CLERK CLERK ** ** SCHEDULED PERIOD 9130 1981 9E 2 M j j A S O N D j F M A M J J A s o N D J F M A M J J A s o N D J F M A M J J A s O N D j F j M| A ! M MO. 3 5 - TO GO M HRS. [| $ - .... - GARRARD Total A ADMINISTRATIO O O o o o cn CD - - .... - - - ....... -- --- 4 7 12 14 6 9 21 22 23 25 26 26 28 28 27 27 29 30 31 31 27 18 12 6 ii -- 509 BECHTEL CORPORATION ** LOCAL HIRE * HOUSTON PAYROLL account PROCUREMENT 6 FIELD PROCUREM'T MGR. 62 PUR. SPEC. 63 SR. EXPEDITOR 64 MAT. SUPV/FMCS 65 PROCUREMENT SUPV. L PUR. SPEC. 67 PROJECT EXPEDITER 95 FMCS CLERK ** 71 SECRETARY 72 CLERK/TYPIST 110 CLERK/TYPIST 115 CLERK/TYPIST ** ** ** ** 136 MATRL. SPEC. 137 MATRL. SUPV.______________ I3 PUR. SPEC. * 1_______________________________ Total Account PROCUREMENT Job No. 14053 NON-MANUAL LABOR SCHEDULE MONTH ENDING______________ BYDATE CHECKED________ DATE REVIEWED_______ DATE________ PAGE 13 OF______ M MO. _______ M HRS/MO SCHEDULED PERIOD 1j .... 1981 ______ IS 82 M j j A S o N D j F M A M J J A s o|n D j f|m|a(m|j| j|a|s|o N1D j F M A M J J A s O N D j F M A M MO. B BB i i B 1 1 22 TTP p^pB B BB B B B p -- p i B BB PttP p - i BB bb - up III s PP m --i--t~~ r ---__ r ' _ S mm _S m u - m-m p mm B B B B 1 tm S " mm _ _ ~ m m m " mm B " B === Si "m u BB uB BB u 1 19 14 18 12 21 16 22 22 19 18 14 11 6 4 TO GO M HRS. Ji ] 1 1 $ ' - __i --i -- ---- .... __ __ _ T T L[ T__ __ SSI T = = __ = _ _ ___ 3 8 9 io:ff rf n 12 12 12 n 11 13 13 14 If 12 12 12 6 238 i________________ BECHTEL CORPORATION * HOUSTON PAYROLL ACCO int PROJECT CONTROLS CLASSIFICATIOfv 5 PROJECT CONTROLS SUPV. 55 LEAD COST ENG. 56 COST/SCHD. ENG. PLTFRM 57 COST/SCHD. ENG. OFFPLT 59 60 .-61 70 DATA PROCESS K. P. 0. LEAD SCHFD. ENG. COST TECHNICIAN ** ** 117 127 118 __"1| DISTRB/MAT'L COST ENG. K. P. 0. AREA COST ENG. SUPV. &FIELD P S ENG. Total Account PROJECT CONTROLS Job NO. 14053__ NON-MANUAL LABOR SCHEDULE MONTH ENDING________ BYDATE. CHECKEDDATE. REVIEWED_____ --DATE - pageJ+lof. M MO. @ M HRS/Mn SCHEDULED PERIOD 1 TO GO 1 l 98 1981 1 382 M J J A s o N D j F M A M J J A s O N D jjF m|a[m|j| j Q Z O V) J F m|a M J J A s o N D j F M A --i -- --i= 1 _ s _.__ MM 1 a : mm --m S s" B B Si =-- S m 1BS "3 :B B == _T B t B m B ! F r Bi Bfi Pi B T " B BP B -- -- B B B B B B B ^B B PB B BB JM MO. M HRS. || $ 10 20 17 16 18 17 11 20 17 12 j jj 19 4 f-----------------1[- ------------i P ^jjT;f7ML ui 1 c =A J |_ r l___ J- : -- -- - - n -- r; - - fo}n T 3 ~6 If 3ll` n fl lTrr TT FiTo iof10 J 8" 4 y JJ -- -- _ j 181 j! L....... " --------- 1 BECHTEL CORPORATION ** LOCAL HIRE * HOUSTON PAYROLL arrm int TDC CONSTRUCTION AREA SLJPT. 39 ASST. SUPT. 40 ASST. SUPT. 4L ASST. SUPT. 116 INSTR. SUPT. 120 CONVERSION SUPV. 42 AREA ENG. 43 ASST. ENG. 44 SR. ELECT. ENG. 96 ELECT. ENG. - miw. 97 ELECT. FNG. 98 INSTR. ENG. 99 ELECT. ENG. . CONV. 1QQ_ INSTR. ENG. 101 SR. INSTR. ENG. 102 INSTR. ENG. 121 CALIBRATION ENG. 58 FIELD COST/SCHED. ENG. 90 INSTR. ENG.. rONV. 53 INSTR. ENG. - CONV. * 104 INSTR. ENG. - CONV. * 130 CONV. DRAFTER ** ] Total Account TDC CONSTRUCTION Job No. _ 14053 NON-MANUAL LABOR SCHEDULE MONTH ENDING______________ BY.DATE CHECKEDDATE REVIEWED______ DATE_______ PAGE I OF______ M MO. @_______M HRS/mo SCHEDULED PERIOD ib i nr\ i 13 M j j A s o N D j F M A M J J A S o|n D J F M A MalaBaaiaaB D J F M A M j j A SO N D j F M A -- a __ _____ Haaaaiiiiii Maanpap UbU ---- "TFT M MO. | 18 14 16 16 9 10 TO GO M HRS. 11 $ ji______ H j__ i 1 r i ... -- aa s a 8 IIIH B == a m ~ 1 1 ma -- B a mmmmm ~~ "II jj r I-t ; aa a a _j n -- j ri 1 a r *a i J Tn BBj r ra au --- r T--- 1 j__ Sa MB c 18 15 16 14 iSlitlPilil Bjssssm 11 10 7 lllllli 1 12 6 13 7 4 5 i|lill 6 1J_--_-- i r [j ji WSSm i _ T J 5 7 7 8 TO ~9 14:16 17 Ts 17 18 16 17 13 12 IT Y 228 ______ BECHTEL CORPORATION ** LOCAL HIRE * HOUSTON PAYROLL ACCOUNT. TDC DESIGN ENGINEERING 4 TDC DESIGN SUPV. 45 SR. INSTR. DESGR. 46 ASST. DRAFTSMAN 47 INSTR. DESIGNER * 48 INSTR. DESIGNER * 49 SR. ELECT. DESGR. * 50 ELECT. DESIGNER 51 ASST. DRAFTSMAN ** 52 ASST. ELECT. DRAFT.** 53 DRAFTSMAN * 130 ASST. DRAFTSMAN ** qn ASST. TNSTR. DFS. ** 91 DRAFTSMAN 9? DRAFTSMAN ** ** 93 DRAFTSMAN ** 103 INSTR. DESIGNER 104 INSTR. DESIGNER * 105 FI FCT. DESIGNER 106 ELECT. DESIGNER J07 ELECT. DESIGNER * * * m DRAFTSMAN 89 CLERK TYPIST * ** 111 CONTROLS COORD. 54 SFCRFTARY 94 ELECT. DESIGNER ** ** Trt+.i TDC DESIGN ENGINEERING Job NO.14052 NON-MANUAL LABOR SCHEDULE MONTH ENDING_________ BYDATE _ CHECKEDDATE __ REVIEWED______ DATE __ PAfiF 1^ OF M MO. 4 _M HRS/MO | -- 1 98 ( mmM j j A s o N D j F M A M11 -- SCHEDULED PERIOD ___ 1981 iO mml nId j|f|m|a|m|j] j|a s 12 N D i F M A M aa s _ = B r * *-------------- 1 m . __ U+WMm j TO GO A S 0 N D j F M A M MO. M HRS. 1 21 20 ,,_________ i i 12 15 16 $ zzzzzmw fftrL tt 13 7 18 12 a- s ytrtwr mz* 14 7 n 13 3 MB! yyy yy 11 18 y1 11 yyy n ~i y h lL rTTi yyyj " __1 L _J ...J 1 yyy - wZZZZzzzwi__1__ L 1 1-- n [_ L-- rTrT1 yyy -- -- w1 1 - 1L u 1_ r II" hirn - 4_ P -- M- i 1'" 1___ 1i r Lt. ruuy Lu l_ i_ 1 9 11 9 12 _7 4 - 5 ------ --.--_ 13 10 1___ r 1[ . '5 7 10 14 15 14 14 2422 2222 232120 u 30y 7 6 T y = _ _ = __ __ _ _ 289 SUBCOfMTR-A CTS GARRARD 00000596 n SUBCONTRACTS SUMMARY S/C NO. SUBCONTRACTOR JOB NO.& TITLE 14053-R0BINSON MODERNIZATION PROJECT CONSTR. 0 ATES 10/80 TO 04/82 niFNT MARATHON OIL COMPANY PREPAREE BY JOB LOCATION ROBINSON, ILLINOIS DESCRIPTION OF WORK INSTALLED QUANTITIES S/C MAN HOURS MATL. S/C COSTS $1000 OTHER COSTS TOTAL 1 Ledo Constr. Co. Central Control Room & TemD. Field Office/We rehouse 2 Potter Electric Temporary Electrical Power 3 Sheehan Pioeline Co. Mobilization & Temporary Facilities 5 Morris Constr. Co. Relocate Pipewav incl. A/G & U/G pipe 6 Faqqetti & Associates Concrete and Soils testinq 8 Central 11. Public Sen .1500 KVA substation for temp, power 9 Connor & Connor Inc. Survey services 10 Reliance Truck Co. Equipment for reactor erection 11 AAA Godfrey 13 MAECo Septic Tank services Plant 16 mass excavation . 14 Sheehan Pipeline Temporary facilities and services 15 S & S Inspection 16 MAECo Weld radioqraphy for FSC-5 Drill qroundwells 17 Potter Electric Construction Equipment 18 Insulation & Materials Thermal insulation of TDC-2000 instrument p ping 19 Sturm Heatinq and A/C Temporary steam supply header 20 Fuller Truckinq Trash removal services 21 Brand Insulation, Inc. Plant 16 Equipment and pipino insulation 22 S & S Inspection, Co. Weld Radiography 23 Sturm Heatinq and A/C HVAC for new buildings & control rooms 10148 400.2 349J_ .749.1 2648 14.1 ___4HJL ___ 54.9 3205 11948 376 ___41Li_ ___ 27.0 ..498,8 _ 525..B ___LL!_ ___ ILA. 11.3 7.5 18.8 464 ____ 8.8. 331 .8 331 .8 11317 142.5 3323 _ 8.2 ________ ILiL 484.4 626.9 50.5 50.5 1024 _ ____ LJl 41.9 41 .9 6263 ________ (LfL ___ Q^fL 19.3 175.6 194.9 165 2.5 4.6 ____ UL 28.1 28.1 40656 646.0 --97.fl.IL JilflJl 1662 46.1 46.1 1770 67.6 49.2 116.8 PAGE GARRARD 00000597 TOTALS TOTAL THIS PAGE 94969 1330.5 3161.3 4491 .8 SUBCONTRACTS SUMMARY SUBCONTRACTS SUMMARY JOB NO.& TITLE 14053-R0BINS0N MODERNIZATION PROJECT ciient MARATHON OIL COMPANY JOB LOCATION ROBINSON. ILLINOIS CONSTR. C ATES 10/80Tfl 04/82 PREPARES BY s/c SUBCONTRACTOR NO. DESCRIPTION OF WORK INSTALLED QUANTITIES S/C MAN HOURS MATL. S/C COSTS $1000 OTHER COSTS TOTAL 24 A & M Insulation, Co. Off Plot pipino & equipment insulation 26 Nooter Corporation Install reactor internals 27 MAECo Temp, construction road south of Plant 16 28 Western Stress. Co. Stress relievinq 29 Gillisoie & Powers. Inc Install heater refactorv 30 Bac-Pritchard Furnish and erect Coolinq Tower 31 Quality Fenco, Co. Install qate in existinq refinery fence 32 Sturm Heatinq & A/C Water chiller for Central Control Room 33 General Electric, Co. Electrical relay cali bration 34 Martinsville Roofinq Install built-uo composite roofinq 35 Lark Commercial Paintinq Equipment paintinq 36 Halliburton Services Chemical cleaninq of compressor pipinq 37 Lee Kinter & Sons 38 Brooks Erection Asphalt spray of parkinq lot Rework existing 29C-1 39 MAECo Snow removal 40 Lark CommerialPaintino Paint heater stacks 41 MAECo Remove backfill for FSC-10 42 Morris Construction.Co. Pipefitter Labor 43 Hoke Construction. Co. Pipefitter Labor 44 J. L. Allen, Co. Pipefitter Labor 25167 280.0 420.0 __ZQCLQ. 5927 212.8 212.8 80 3.4 . k.,0 ____ 1A 361 7531 2502 165.8 28.2 ___ 2&^ 275.6 ..275JI 50.2 216.0 16 0.7 0.3 1.0 64 ' 4.8 1 .6 6.4 40 4.0 4.0 1 68 2650 2443 5,2 ___ AA. ____ 9A 7.2 87.8 95.0 _ 45.7 45.7 16 1106 111 0.6 . Q.6 ____ LA 7.2 49.6 56.8 -- 6.1 6.1 899 4.6 15.7 20.3 28854 36725 3.5 ____ IAl 844.0 844.0 _ 1072.0 1072.0 33046 960.0 960.0 PAGE GARRARD 00000598 TOTALS TOTAL THIS PAGE 147706 479.5 4088.0 4567.5 SUBCONTRACTS SUMMARY PHR 1.6-1 & SUBCONTRACTS SUMMARY S/C NO. SUBCONTRACTOR 45 Busch & Latta 46 Duneqan/Endevco 47 Nelson & Keatinq 48 Sheehan Pipeline, Co. 49 Sheehan Pipeline, Co. 50 Sheehan Pipeline, Co. 51 Sheehan Pipeline, Co. T5A-1 DR. PELLEY 52 JOB NO. & TITLE 14053-R0BINS0N MODERNIZATION PROJECT miFNT MARATHON OIL COMPANY CONSTR. 0 ATES 10/80Tn 04/82 PREPARED BY JOB LOCATION ROBINSON, ILLINOIS DESCRIPTION OF WORK INSTALLED QUANTITIES S/C MAN HOURS MATL. S/C COSTS $1000 OTHER COSTS TOTAL Fireproofing steel & vessel supports Acoustic Emissions Testinq Pipefitters labor for loop checkinq Demo bilization 8118 338 1173 2200 114.5 - 115.5 31 .7 33.6 50.0 230.0 31 .7 33.6 50.0 Boilermaker Labor Boilermaker Labor Boilermaker Labor 1696 1699 222 -- - 49.9 49.9 7.0 49.9 49.9 7.0 Medical Services Road Repairs '. 122 12.2 12.2 129 1 .1 5.3 6.4 SIIRTOTAI 15697 115.6 355.1 470.7 PAGE GARRARD 00000599 TOTALS TOTAL SUBCONTRACTS 258372 1925.6 7604.4 9530.0 SUBCONTRACTS SUMMARY PHR 1.6-1 BECHTEL INCORPORATED REFINERY & CHEMICAL DIVISION SUBCONTRACT ANALYSIS JOB NO 14053 CLIENT Marathon Oil Company__________________ LOCATIONRobinson, Illinois PROJECT Robinson Refinery Modernization CONSTR. DATES 10/80 - 3/81 SUBCONTRACT NO. & TYPE 14053-FSC-l Lump Sum NAME &A00RESS OF SUBCONTRACTOR LeDo Construction Company, Inc.___________________________ 609 North Jackson Street Robinson, Illinois 62454 COMP LETE DESCRIPTION OF CONTRACT Revamp of existing Cafeteria into Central Control Root for TDC-2000 and construction of temporary field office facilities REMA RKS Field Supervision verv poor due to lack of experience and home office quidlance. Bechtel was required to virtually direct most phases of the work in an effort to maintain schedule. ACCT. NO. 26R01 7m in DESCRIPTION & SPECIFICATION DATA CENTRAL CONTROL ROOM TEMPORARY FIELD OFFICE/WAREHOUSE UNIT LOT LOT <si.OOP'S QUANTITY TOTAL DOLLARS 1 438.0 1 311.3 S/UNIT MANUAL MANHOURS MH/UNIT 438.0 5773 311 .3 4375 5773 4375 None TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED 1 AVERAGE .- I FORCE 1 RCSC 5.17 PEAK . ,, FORCE 18 . HOME OFFICE ' supervision 749.3 10148 RATINGS ,, Average SUPERVISION , MATERIAL * PROCUREMENT . SCHEDULING ** AND PLANNING e PRICING AND processing changes fi. SHOP DRAWINGS 7. LABOR RELATIONS a ADEQUACY OF EQUIPMENT Poor gqqH <Joa _ Poor Average ,,. Good Good NA 9. COOPERATION 1rt QUALITY 10* OF work Averaae Average GARRARD 00000600 BECHTEL INCORPO RATED REFINERY & CHE MICAL DIVISION SUBCONTRAC:t an;\LYSIS JOB P40. CL1EFSIT LOCkTION 14053 Marathon Oil Company Robinson, Illinois PR OJECT Robinson Refinery Modernization CO NSTR. DATES 8/80 - 1/81 SUBCC NTRACT NO. & TYPE 14053-FSC-2 T &M NAME R AnnRFSS OF SUBCONTRACTOR Potter Electrical Engineering and Construction Co, Inc P. 0. Box 3188 Terre Haute, Indiana 47803 COMP LETE DESCRIPTION OF CONTRACT Provide labor and material for temoorarv electrical cons truction as directed by Bechtel REMA RKS ACCT. NO. 7015C DESCRIPTION & SPECIFICATION DATA INSTALL TEMPORARY POWER FACILITIES $1,000`s UNIT QUANTITY TOTAL DOLLARS LOT 1 54.9 S/UNIT 54.9 MANUAL MANHOURS MH/UNIT 2648 2648 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED Boom Truck Hypot AVERAGE ,, FORCE 4 FtCSC 5.17 PEAK ,, FORCE 8 54.9 2648 RATINGS , HOME OFFICE supervision ,, ,, Excellent 2. SFUIEPLEDRVISION MATERIAL A PROCUREMENT . SCHEDULING AND PLANNING Good _ -- . Excellent NA = PRICING AND PROCESSING CHANGES NA S. SHOP DRAWINGS NA 7. LABOR RELATIONS Excellent ,, ADEQUACY OF " EQUIPMENT Excellent 9. COOPERATION Excellent of wkjrk Excellent GARRARD 00000601 BECHTEL INC ORPO RATED REFINERY & CHEMICA!. DIVISION SUBCONTRACrr an>^LYSIS job r\JO. CLIEIMT LOC/kTION 14053 Marathon Oil Company Robinson, Illinois PR OJECT Robinson Refinery Modernization CC NSTR. DATES 08-12-80 thru 09-30-80 SUBCC1NTRACT NO. A TYPE 14053-FSC-3&14 TIME & MATERIAL NAME a ADDRESS OF SUBCONTRACTOR Sheehan Pipeline Construction Company, p. 0. Box 352, 1924 South Utica Avenue. Robinson, Illinois 62454 COMP LETE DESCRIPTION OF CONTRACT Construction of iobsite temporary facilities at the __direction of Bechtel.____ _____________________ ____ _________________________________________________ REMA RKS All work as directed by Bechtel ~ Labor, Material & Rental Equipment __ at c ost plus 10%. __ _______ ________________ ___ ACCT. NO. 70110 70130 7016C 7017C 70231 7025C DESCRIPTION & SPECIFICATION DATA TEMPORARY BUILDINGS TEMPORARY ROADS AND PARKING TEMPORARY WATER. AIR & SEWERS MINOR TEMPORARY CONSTRUCTION FIRST DROP MATERIAL HANDLING UNALLOCATED LABOR (JANITORIAL) UNIT $1,000's QUANTITY TOTAL DOLLARS 49.6 7.3 20.1 6.7 7.4 8.1 S/UNIT MANUAL MH/UNIT MANHOURS 3264 480 ' 1320 440 489 535 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED 12* Ton Mobile Crane Case 580 Backhoe Weldinq Machines Water Pump (3 inch) AVERAGE FORCE RCSC 5.17 6 PEAK FORCE 12 99.2 - HOME OFFICE ' supervision RATINGS Excellent 1 supervision o MATERIAL * PROCUREMENT . SCHEDULING ** AND PLANNING Excellent _ ., . Excellent . N/A ePRICINGAND PROCESSING CHANGES N/A a SHOP DRAWINGS , N/A 7. LABOR RELATIONS Excellent a ADEQUACY OF equipment ,, ,. ^ Excellent 9. cooperation QUALITY of work Excellent Excellent 6528 - GARRARD 00000602 BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION SUBCONTRACrr an>M.YSIS JOB sJO. CUE SIT LOCftmON 14053 MARATHON OIL COMPANY ROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION ccINSTR. DATES 1 0/80-02/81 PKUdttJ 1 SUBCCintract no. a type 14053-FSC-5 LUMP SUM NAME & address of subcontractor MORRIS CONSTRUCTION COMPANY, INC. P.0. BOX 3. TUSCOLA, ILLINOIS 61953 COMP LETE DESCRIPTION OF CONTRACT R^lpcate Plant 16 underqround pipe; Relocate pipe rack; TDC-2000 Data Highway Civil and Structural work. REMA RKS ACCT. NO. mn 16L12 16L70 16M30 16N10 16011 16S95 DESCRIPTION & SPECIFICATION DATA SMALL BORE RACK PIPING LARGE BORE RACK PIPING UNDERGROUND PIPING STRUCTURAL STEEL PIPERACK PIPE INSULATION FOUNDATIONS DEMOLITION AND EXCAVATION 1 .000's UNIT QUANTITY TOTAL DOLLARS S/UNIT MANUAL MANHOURS MH/UNIT LF 1380 20.3 14.7 483 0.35 LF 2760 82.5 29.9 1875 0.68 LF 3885 129.2 33.3 2914 0.75 TN 66 80.4 1218.2 1828 27.70 ELF 7147 70.4 9.9 1600 0.22 CY 100 60.5 605.0 1376 13.76 LOT 1 82.5 - 1872 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED CHERRY PICKERS BACKH0E AVERAGE FORCE RCSC 5.17 PEAK FORCE -- . ' HOME OFFICE SUPERVISION 525.8 - RATINGS GOOD 11 948 supervision EXCELLENT 1 procurement EXCELLENT . SCHEDULING * AND PLANNING AVERAGE s PRICING AND PROCESSING CHANGES ,,GO,,O,,D ,, SHOP "* DRAWINGS NA 7. LABOR RELATIONS EXCELLENT a ADEQUACY OF 8- equipment EXCELLENT 9. cooperation EXCELLENT 10- ofwkSrk EXCELLENT - GARRARD 00000603 BECHTEL INCORPO RATED REFINERY & CHE MICAL DIVISION SUBCONTRAG:t an/\LYSIS JOB 40. 14053 CLiEfMT MARATHON OIL COMPANY LOGAiTION ROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION CO NSTR. DATES 11/80-02/82 PRJECT SUBCC NTRACT NO. & TYPE 14053-FSC-6 UNIT PRICE NAME aAnnRFSS of subcontractor FAGGETTI AND ASSOCIATES 1700 E. MAIN STREET, OLNEY, ILLINOIS 62450 COMP lete description of contract Perform soils and concrete testinq. REMA RKS ACCT. NO. 16099 DESCRIPTION & SPECIFICATION DATA CONCRETE AND SOILS TESTING 1 ,000's UNIT QUANTITY TOTAL DOLLARS - 14.4 S/UNIT MANUAL MANHOURS MH/UNIT - NONE TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE RCSC 5.17 PEAK FORCE 14.4 , HOME OFFICE 'SUPERVISION RATINGS FYCFI | FNT tAUCLLLm supervision EXCELLENT 1 procurement EXCELLENT . SCHEDULING _ * AND PLANNING EXCELLENT k PRICING AND PROCESSING CHANGES s. SHOP DRAWINGS .N.A. EXCELLENT 7. LABOR RELATIONS ^ a ADEQUACY OF 8` equipment EXCELLENT 9. cooperation EXCELLENT 10- OF WORK EXCELLENT - GARRARD 00000604 JOB VJO. CLIE MT LOC/^TION BECHTEL INC,ORPO RATED REFINERY & CHE MICA!. DIVISION SUBCONTRAt3T AN/ALYSIS 14053 Marathon Oil Company Robinson, Illinois PR OJECT Robinson Refinery Modernization CC)NSTR. DATES 10/80 - 11/8d SUBCCINTRACT NO. & TYPE 14053 -FSC-8 Lump Sum NAME & ADDRESS OF SUBCONTRACTOR Central Illinois Public Service Company (CIPS) 711 South Ninth Street Mattoon, Illinois 61938 COMP LETE DESCRIPTION OF CONTRACT Supply and install 1500 KVA Substation for tpmpnra-ry __ consstruction power____________ _________ _____________________________________________________ ______ ___ REMA RKS ACCT. NO. DESCRIPTION & SPECIFICATION DATA 7015q Supply and install Substation Sl.OOO's UNIT QUANTITY TOTAL dollars Each 1 18.S S/UNIT NA MANUAL MANHOURS MH/UNIT 376 NA TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE RCSC 5.17 PEAK FORCE 18.8 376 RATINGS , HOME OFFICE ' supervision , FIELD supervision , MATERIAL * PROCUREMENT . SCHEDULING and planning s PRICING AND PROCESSING CHANGES c SHOP ^ DRAWINGS Excellent E,, xce. l.len.t ,, ,, ^ Excellent Excellent NA NA 7. LABOR RELAT.ONS Excellent ,, ADEQUACY OF equipment Excellent 9. COOPERATION Good 10- of work Excellent GARRARD 00000605 BECHTEL INC ORPO RATED REFINERY & CHE Ml CAL. DIVISION SUBCONTRAC:t AN>!\LYSIS JOB sJO. 14053 CLIE \IT Marathon Oil Company LOC>flkTION Robinson, Illinois PR OJECT Robinson Refinery Modernizatior ccINSTR. DATES SUBCCJNTRACTNO. & TYPE 14053-FSC-9 Time & Material NAME a ADDRESS OF SUBCONTRACTOR Connor & Connor, Inc. Robiicison, Illinois 62454 209 North Cross Street COMP LETE DESCRIPTION OF CONTRACT Perform professional survey services for installation of p ermanent monuments, boundaries and elevations and other survey services as directed by Bechtel. REMA RKS None. ACCT. NO. DESCRIPTION & SPECIFICATION DATA :$1, pop's___________________________________________ UNIT QUANTITY TOTAL DOLLARS S/UNIT MANUAL MH/UNIT MANHOURS All survey oartv members on hourly 70270 rate - All material at cost plus 5% NA NA 8.5 NA 464 NA None TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE 0 FORCE J RCSC 5.17 PEAK r FORCE 5 8.5 464 RATINGS , HOME OFFICE ' supervision , FIELD supervision , MATERIAL A PROCUREMENT . SCHEDULING AND PLANNING b PRICING AND PROCESSING CHANGES .6 SHOP " DRAWINGS Excellent . Excellent >, yta ... NA >T, NA 7. LABOR RELATIONS JJA ,, ADEQUACY OF " equipment Excellent 9. cooperation Excellent of work Excellent GARRARD 00000606 BECHTEL INC ORPO RATED REFINERY & CHEMICAL. DIVISION SUBCONTRA(rr an>ALYSIS JOB MO. CUE MT LOG/!TION 14053 MARATHON OIL COMPANY ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION cc NSTR. DATES 02/82-03/82 PKUJtU SUBCCINTRACT NO. & TYPE 14053-FSC-T 0 LUMP SUM NAME & ADDRESS OF SUBCONTRACTOR RELIANCE TRUCK COMPANY 2500 N. 24th AVENUE. PHOENIX, ARIZONIA 85009 COMP lete description of contract Provide EauiDment and Supervision to offload. haul, riq and erect Platformer Reactor. REMA RKS ACCT. NO. 16C09 1 fiC09 DESCRIPTION & SPECIFICATION DATA ERECT PLATFORMER REACTOR TEST WEIGHTS (EXCLUDES BACKCHARGE FOR $28,600 CREDITED TO BECHTEL LABOR AND CONSTRUCTION EQUIPMENT1 UNIT 1,000's QUANTITY TOTAL DOLLARS 319.1 .. 13.7 S/UNIT MANUAL MANHOURS MH/UNIT TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED HEAVY LIFT CRANE AVERAGE FORCE RCSC 5.17 PEAK FORCE 331 .8 RATINGS 1 HOME OFFICE SUPERVISION nAUvtCKDAflCbCt 1 supervision EXCELLENT > MATERIAL ____ * PROCUREMENT GOOD . SCHEDULING AND PLANNING GOOD = PRICING ANO PROCESSING CHANGES AVERAGE a SHOP * DRAWINGS AVERAGE 7. LABOR RELATIONS a ADEQUACY OF " EQUIPMENT GOOD 9. COOPERATION AVERAGE 10- of wkJrk EXCELLENT GARRARD 00000607 't1'! - BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRAC:t AN/\LYSIS job r^0. 14053 CLIEiMT MARATHON OIL COMPANY LOCAkTION ROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION CC NSTR. DATES 09/80-04/82 HKUJtU SUBCCINTRACT NO. & TYPE 14053-FSC-11 UNIT PRICE NAME a AnnRFSS df subcontractor AAA GODFREY SEPTIC TANK SERVICE P.0. BOX 583. VINCENNES. INDIANA 47591 COMP lete description of contract Seotic Tank Service REMA RKS . _1 .OOP's ACCT. NO. DESCRIPTION & SPECIFICATION DATA 70160 SEPTIC TANK PUMPING UNIT QUANTITY TOTAL DOLLARS 8.2 S/UNIT MANUAL MANHOURS MH/UNIT NONE TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE FICSC 5.17 PEAK FORCE 8.2 , HOME OFFICE ' SUPERVISION RATINGS ,, . iNA Z supervision EXCELLENT MATERIAL PROCUREMENT NA . SCHEDULING AND PLANNING FXf!FI 1 FNT b PRICING AND ... PROCESSING CHANGES NA DRAWINGS NA 7. LABOR RELATIONS B ADEQUACY OF 8- equipment EXCELLENT 9. COOPERATION pxf!Fl 1 FNT 10-of work EXCELLENT - GARRARD 00000608 . BECHTEL INC ORPO RATED REFINERY & CHE MICA1. DIVISION SUBCONTRAt:t an>4LYSIS JOB NO. CLIE NT LOC/kTION 14053 Marathon Oil Company Robinson, Illinois PR OJECT Robinson Refinery Modernization ccINSTR. DATES 11/80-3/81 SUBCCINTRACT NO. & TYPE NAME & address of subcontractor 14053-FSC- 13 T&M MAECo P. 0. Box 504 Lawrencevil 1 e, Illinois 6243 COMP lete description of contract Mass excavation of Plant 16 Acid Soil, haulinq contami nated soil to offsites disposal area includinq qradinq and covering with lime. haulinq aDproved backfill from MAECo suopliers and compaction to minimum of 9M modified proctor.: REMA RKS Backfill operations included mixino hvdrated lime (supplied bv Bechtel) for neutralization of acidic soil. Sl.OOO's ACCT. NO. DESCRIPTION & SPECIFICATION DATA UNIT QUANTITY TOTAL DOLLARS S/UNIT MANUAL MANHOURS MH/UNIT 70130 TEMPORARY ROADS AND PARKING CY 16S11 EXCAVATION AND DISPOSAL (calculated CY volume) 1263 17967 27.0 193.1 21.4 10.7 670 4495 0.25 16S12 BACKFILL MATERIAL-CLAY SAND ROCK&GRAVEL (For buildino road to disposal area) CY CY CY 855(1 5234 3319 57.7 45.0 39.8 6.75 8.60 12.00 15S12 BACKFILL & COMPACTION (calculated CY 9695 264.3 ... 27.3 6152 0.64 volume) NOTE: Approximately 2500 CY of newl v ola ed sa turated fill wa s remov id and r solaced. -- Remainino volume discreoencv resul .s fro m differ ence be tween c. il cul ate i com- pacted volume and loose purchased ol ume TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED 5 Dumptrucks, 4 End Loaders, 3 Dozers, 2 Backhoes, 1 Vibratory Roller, 1 Farm Tractor with disc. AVERAGE FORCE RCSC 5.17 ,_ 15 PEAK FORCE ,,,, ^ 626.9 RATINGS 11317 1- supervision supervision 1 procurement . SCHEDULING * AND PLANNING 5. PRICING AND processing changes a. SHOP DRAWINGS 7. LABOR RELATIONS 8a- AEDQEUQIPUMAECNYT OF 9. cooperation Excellent Excellent Excellent Nfl tFxycreeilli epnnct Mfl Excel 1 ent Ftxxcreeililepnnct Excellent 10-OF WORK Excellent GARRARD 00000609 JOB MO. CLIE NY LOC/kTION BECHTEL INC:orpo RATED REFINERY & CHE MICAl. DIVISION SUBCONTRAt:t an><\LYSIS 14053 Marathon Oil Company Robinson. Illinois PR OJECT Robinson Refinery Modernization cc)NSTR. DATES 2/81 - 4/81 SUBCCJNTRACT NO. & TYPE 14053-FSC-15 T & M and UP NAME & ADDRESS OF SUBCONTRACTOR S & S Inspection Company P. 0 Rnx 671 Lawrenceville, Illinois 62439 COMP LETE DESCRIPTION OF CONTRACT Provide weld radiography for Subcontract 14053-FSC-5 pipe5rack relocation as directed by Bechtel. REMA RKS ACCT. NO. 16L92 DESCRIPTION & SPECIFICATION DATA Weld RadioaraDhy UNIT $1,000's QUANTITY TOTAL DOLLARS S/UNIT 2.5 MANUAL MANHOURS MH/UNIT * - TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED Radiographic Equipment AVERAGE FORCE RCSC S.17 ,, 2 PEAK ,, FORCE 2 2.5 RATINGS , HOME OFFICE supervision ,, ,, ^ Excellent 2* supervision Excellent , MATERIAL * PROCUREMENT . SCHEDULING AND PLANNING = PRICING AND PROCESSING CHANGES a SHOP DRAWINGS NA NA NA ,,N,,A 7. LABOR RELATIONS ^ % - ADEQUACY OF equipment ,, Excellent 9. cooperation Excellent ln QUALITY 10- OF WORK . Good GARRARD 00000610 BECHTEL INCORPORATED , REFINERY & CHEMICAL DIVISION SUBCONTRACT ANALYSIS JOB NO. 14053 CLIENT . Marathon Oil Company LOCATION Robinson, Illinois PROJECT Robinson Refinery Modernization CONSTR. DATES Jan. 81 - April 81 subcontract no. & type 14053-FSC-16 hump Sum w/Unit Price adds & deducts NAME & ADDRESS OF SUBCONTRACTOR MAECo Lawrenceville, Illinois 62439 500 N. 15th Street P. 0. Box 504 complete description OF CONTRACT Drilling of Groundwells 120' to 180' deep and providing and installing casing in each well - total of seven (7) wells (8" 0) REMARKS__ The overall abilities, desire for cooperation and performance of work to high standards of workmanship makes MAECo a desirable Subcontractor. They will rgnain on our Bidder's List for any work within their area of interest. ACCT. NO. DESCRIPTION & SPECIFICATION DATA UNIT QUANTITY TOTAL DOLLARS S/UNIT MANUAL MANHOURS MH/UNIT Drilling 7 Wells 150' Deep Each Add/L.F. for Wells over 150' Deep Deduct/L.F. for Wells Less Than 1507 Deep Lot 42.000 NA. LF 30 LF "TSO 1.200 $40 (1600) $20 1024 NA NA NA Standby Time for BPI Testins of Well k hr 12 son $50 NA Extra Mobilization to Clear Wall TS Tot 1 r534 NA NA TOTAL 41 ,934 1024 ALLOCATION 16P41 PLANT 16 fl welll 26P41 PLANT 50 (6 well si TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED 1 Each Well Drilling Rig AVERAGE FORCE RCSC 5.17 PEAK FORCE 6.0 35.9 146 878 41 .9 1024 RATINGS . HOME OFFICE ' SUPERVISION FIELD SUPERVISION MATERIAL PROCUREMENT SCHEDULING AND PLANNING Excellent Excellent Excellent Excellent PRICING AND PROCESSING CHANGES SHOP DRAWINGS Excellent NA 7. LABOR RELATIONS .8 ADEQUACY OF EQUIPMENT Excellaat Excellent 9. COOPERATION Excellent .10 QUALITY OF WORK Excellent GARRARD 00000611 BECHTEL INC ORPO RATED . REFINERY & CHE MICAL. DIVISION SUBCONTRAC:t an>!\LYSIS JOB MO. yj-j- CLIE 14053 Marathon Oil Company LOCfikTION Rt)inson, Illinois PR OJECT Robinson Refinery Modernizatic INSTR. DATES Pr0:]eCt 12/80 to 4/81 CC SUBCCINTRACT NO. & TYPE 14053-FSC-17 Unit Price NAME & ADDRESS OF SUBCONTRACTOR Rotter Electrical Eng. a Construction Co. Inc. COMP LETE DESCRIPTION QF CONTRACT Ren tal Aareement. Operated & Maintained Construction Equipment REMA RKS ACCT. NO. 700313 DESCRIPTION & SPECIFICATION DATA Power Pole Earth Auqer Rental (Pole Cat) (Total of 14 hours) tl .nnn'c UNIT QUANTITY TOTAL DOLLARS 1 Lot NA 0.6 S/UNIT NA MANUAL MANHOURS MH/UNIT NA NA TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED 1 Each Pole Cat AVERAGE FORCE i FtCSC 5.17 PEAK FORCE 1 0.6 RATINGS , HOME OFFICE SUPERVISION 2. field SUPERVISION j woa G__O__O_d. , MATERIAL A PROCUREMENT ,, NA . SCHEDULING AND PLANNING NA 5. PRICING AND PROCESSING CHANGES "e SHOP DRAWINGS NA Ml 7. LABOR RELATIONS 9* ADEQUACY OF equipment Good Excelilen+t 9. COOPERATION Excellent in QUALITY of work _ .. . Excellent GARRARD 00000612 BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRACIT AN/\LYSIS JOB PJO. 14053 CLIEIMT MARATHON OIL COMPANY LOCAkTION ROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION CC NSTR. DATFS 04/81-01/82 PROJECT SUBCCINTRACT NO. & TYPE 1 4053-FSC-1 8 T&M NAME a address of subcontractor INSULATING AND MATERIALS CORPORATION 1042 CENTRAL INDUSTRIAL DRIVE. ST. LOUIS. MISSOURI 63110 COMP lete description of contract Provide labor and material for thermal insulation of TDC-2000 Instrument Pi Dina. REMA rks Field Supervision made little effort in obtaining the desired level of Droductivitv from insulators. ACCT. NO. 16N1 0 DESCRIPTION & SPECIFICATION DATA PI ANT 16 PIPE INSULATION UNIT FI F 1 ,000's QUANTITY TOTAL DOLLARS 2268 10.0 S/UNIT MANUAL MANHOURS MH/UNIT 4.41 . 319 o;t4 26N10 TDC-2000 INSTRUMENT PIPING ELF 16709 184.9 11 .07 5944 INSULATION 0736 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED NONE AVERAGE FORCE RCSC 5.17 PEAK FORCE ELF 18977 194.9 10.27 RATINGS . HOME OFFICE 1- supervision , FIELD SUPERVISION 3^ MATERIAL A PROCUREMENT . SCHEDULING ** AND PLANNING AVERAGE POOR pGnOnOnD ... NA b PRICING AND PROCESSING CHANGES .N.A. e. shop DRAWINGS NA 7. LABOR RELATIONS GOOD ADEQUACY OF M. EQUIPMENT NA 9. COOPERATION pQQR 1100* QUALITY OF WORK nGnOnOD 6263 0.33 GARRARD 00000613 BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRAC:t AN;ALYSIS JOB MO. 14053 CLIE NT Marathon Oil ComDanv LOCAkTION Robinson, Illinois PR OJECT Robinson Refinery Modernization cc1NSTR. DATES 1/9/81 -8/31/81 SU8CCINTRACT NO. & TYPE 14053-FSC-19 T & M NAME & address of subcontractor Sturm Heating and Air Conditioning 501 S outh Webster Robinson, Illinois 62454 COMP lete description of contract Furnish material, fabricate and erect temoorarv stecim suddIv header for winter concrete Drotection. REMA RKS Extremely well aualified and cooDerative Subcontractor. Oualitv of worknlanship and follow-up on warranty repairs excellent.' ACCT. NO. 701 90 DESCRIPTION & SPECIFICATION DATA TEMPORARY STEAM HEADER UNIT SI,OOP's: QUANTITY TOTAL DOLLARS 7.1 S/UNIT MANUAL MANHOURS MH/UNIT 165 None TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE co aCSC 5.17 PEAK FORCE ,,^ 7.1 RATINGS 165 1- supervision z supervision x procurement . SCHEDULING and planning 5. PRICING AND PROCESSING CHANGES S". SHOP DRAWINGS 7. LABOR relations 3. ADEQUACY OF EQUIPMENT 9. cooperation Excellent Excellent Excellent Excel 1 ent FycpIIPnt 1 1 ent .N. /,A. Excellent m/a 'v Excellent 10-ofw)RK Excellent GARRARD 00000614 BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRAC:t an>^LYSIS JOB MO. 14053 CUE MT ___ MARATHON OIL COMPANY LOCAmON ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION CCINSTR. DATES 01 /81 -04/82PROJECT SUBCCINTRACT NO. & TYPE 14053-FSC-20 UNIT PRICE NAME & ADDRESS OF SUBCONTRACTOR FULLER TRUCKTNfi P.0. BOX 201. ROBINSON. ILLINOIS 62454 COMP lete description of contract Trash removal services. REMA RKS ACCT. NO. DESCRIPTION & SPECIFICATION DATA / 0 1 60 HTOTKEHOVAL SERVICES--------------------- UNIT 1,000's QUANTITY TOTAL DOLLARS 28.1 S/UNIT MANUAL MANHOURS MH/UNIT NONE TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE RCSC 5.17 PEAK FORCE 28.1 . HOME OFFICE SUPERVISION RATINGS AA\V/FtKPAflbrFt 2. FIELD SUPERVISION ma NA *, MATERIAL PROCUREMENT . SCHEDULING ** AND PLANNING .N.A. NA = PRICING AND PROCESSING CHANGES NA a SHOP DRAWINGS IMA 7. LABOR RELATIONS |y|A ,, ADEQUACY OF . EQUIPMENT AVERAGE 9. COOPERATION AVERAGE 10" QUALITY OF WORK NA GARRARD 00000615 BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION SUBCONTRAC:T AN;ALYSIS JOB MO. 14053 CLIE NIT MARATHON OIL COMPANY LOCfimON ROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY M0DERNT7ATT0N CCINSTR. DATFR 10/81 - 09/82 PROJECT SUBCC3NTRACT NO. & TYPE 14053-FSC-21____LUMP SUM & UNIT PRICE_______________________________ NAME & ADDRESS OF SUBCONTRACTOR ____ BRAND INSULATIONS. INC'.___________________________________________ 1420 RENAISSANCE DRIVE PARK RIDGE, ILLINOIS 60068 COMP letedescription of contract Thermal Insualtion of eauiDment and DiDina in Area "A". REMA RKS ACCT. NO. 16N10 16N20 DESCRIPTION & SPECIFICATION DATA PIPE INSULATION EOUIPMENT INSULATION $1,0001s UNIT ELF SF QUANTITY TOTAL DOLLARS 64047 1035.0 29391 581 .0 S/UNIT MANUAL MH/UNIT MANHOURS 16.2 28899 0.45 19.8 11757 0.40 - NONE TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE ft CSC 5.17 JO PEAK FORCE ,J,o- 1616.0 40656 RATINGS - HOME OFFICE 1* supervision , FIELD supervision , MATERIAL PROCUREMENT . SCHEDULING AND PLANNING 5 PRICING AND PROCESSING CHANGES e SHOP DRAWINGS cEXvCrcEiLLi EcNmTt __ ___ GOOD ROOD AVERAGE AVERAGE NA 7. LABOR RELATIONS , o ADEQUACY OF EQUIPMENT 9. COOPERATION QUALITY 10- of work IMfl AVERAGE EXCELLENT GARRARD 00000616 BECHTEL INC ORPO RATED REFINERY & CHE M1CA1.DIVISION SUBCONTRACrr an>ALYSIS JOB MO. 14053 CLIE NT MARATHON OIL COMPANY LOCfimON ROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATIO!^ CCINSTR. DATES 06/81-05/82 PROJECT SUBCCINTRACT NO. & TYPE 14053-FSC-22 UNIT PRICE NAME & ADDRESS OF SUBCONTRACTOR S & S INSPECTION COMPANY P.0. BOX 671, LAWRENCEVILLE, ILLINOIS 62439 COMP lete description of contract Weld X-Ray Services REMA RKS ACCT. NO. 16L92 DESCRIPTION & SPECIFICATION DATA WELD RADIOGRAPHY UNIT LOT 1 .000's QUANTITY TOTAL DOLLARS 1 46.1 S/UNIT MANUAL MANHOURS MH/UNIT 46.1 1662 1662 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED X-RAY UNIT AVERAGE FORCE RCSC 5.17 o ^ PEAK FORCE c 0 46.1 1662 .' HOME OFFICE SUPERVISION RATINGS AVFRAfiF AVtKAbt z supervision AVERAGE X PROCUREMENT EXCELLENT . SCHEDULING ^ AND PLANNING EXCELLENT c PRICING AND PROCESSING CHANGES AVERAGE 15 SHOP DRAWINGS ... NA 7. LABOR RELATIONS 8 ADEQUACY OF equipment 9. cooperation cv... , .... EXCELLENT EXCELLENT 10- ofwrk EXCELLENT GARRARD 00000617 BECHTEL INC ORPO RATED REFINERY & CHE MICA1. DIVISION SUBCONTRAt:t AN/ALYSIS JOB NO. CUE NT LOCAkTION 14053 MARATHON OIL COMPANY ROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATIOP' CC1NSTR. DATFR 10/81-04/82 TMJECT SUBCCintract no. & type 14053-FSC-23 LUMP SUM NAME & address OF subcontractor STURM HEATING AND AIR CONDITIONING Rm S WFRSTFR. ROBINSON. ILLINOIS 62454 COMP lete description of contract Air conditioninq and pressurization units for new Dermanent plant buildings and rework of Air Conditioning systems in pviat.ing plant control rooms. REMA RKS _1 .OOP's ACCT. NO. DESCRIPTION & SPECIFICATION DATA 16R70 PLANT 16 CONTROL ROOM HVAC 16R70 PLANT 16 SUBSTATION BLDG. HVAC 16R70 PLANT 16 BOILER FEEDWATER BLDG. HVA 23R70 PLANT 23 SWITCHGEAR ROOM HVAC 32R70 PLANT 32 CHEM. INJECT. BLDG. HVAC 26R70 REVAMP CONTROL ROOM #3 HVAC 2fiR7n REVAMP CONTROL ROOM #4 HVAC 26R7C REVAMP COKER CONTROL ROOM HVAC UNIT LOT LOT LOT LQT LOT LQT 1 OT LOT QUANTITY TOTAL DOLLARS 1 53.6 1 6.6 1 6.6 1 7.1 1 9.8 1 23.0 1 2.3 1 7.8 S/UNIT MANUAL MANHOURS MH/UNIT 887 97 94 112 171 225 36 148 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED NONE AVERAGE FORCE aCSC 5.17 PEAK FORCE > 116.8 i HOME OFFICE 1- supervision RATINGS EXCELLENTrYpci i pkit z supervision MATERIAL a PROCUREMENT , SCHEDULING AND PLANNING EXCELLENT EXCELLENT GOOD = PRICING AND PROCESSING CHANGES G,,O,,,,O,,D C SHOP drawings AVERAGE 7. LABOR RELATIONS EXCELLENT ADEQUACY OF EQUIPMENT ... NA 9. cooperation EXCELLENT 10- ofwSk excellent 1770 GARRARD 00000618 I _> BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION SUBCONTRAC:T AN;ALYSIS JOB MO. 14053 CUE MT MARATHON OIL COMPANY LOC/OTON RQBINSQN. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATIC CCINSTR. DATES 12/81 - 07/82 PR0JEC SUBCCintractnd rtypp 14053-FSC-24 LUMP SUM & UNIT PRICE NAME & ADDRESS OF SUBCONTRACTOR A. & M INSULATION CO. ' 261 4 CLYBOURN AVENUE CHICAGO. ILLINOIS 60614 COMP lete description of contract Thermal Insulation of equipment and pipinq in Area "B* REMA RKS ACCT. NO. Nin N?n DESCRIPTION & SPECIFICATION DATA PIPE INSULATION FQIITPMFNT TN^Ill atton ' UNIT ELF SF si.ooo's QUANTITY TOTAL DOLLARS S/UNIT 49771 550.0 11 .1 12288 150.0 12.2 MANUAL MANHOURS MH/UNIT 1 9095 0.38 6072 0.49 NONE TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE RCSC 5.17 PEAK FORCE 700.0 25167 u, HOME OFFICE SUPERVISION RATINGS GOOD , supervision MATERIAL PROCUREMENT . SCHEDULING 4- AND PLANNING 5 PRICING AND PROCESSING CHANGES EXCELLENT AVERAGE ROOD ROOD 6 SH0P DRAWINGS .N.A. 7. LABOR RELATIONS ROOD a ADEQUACY OF EQUIPMENT NA 9. cooperation EXCELLENT 10- of work EXCELLENT GARRARD 00000619 4- BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION SUBCONTRA(:t an>^LYSIS JOB MO. CLIE \IT LQCfikTION 14053 MARATHON OIL COMPANY ROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATIOI CCINSTR. DATES 10/81-04/82 PKUJtU SUBCCJNTRACT NO. & TYPE 14053-FSC-26 LUMP SUM NAME & ADDRESS OF SUBCONTRACTOR NOOTER CORPORATION 1400 S. THIRD STREET. ST. LOUIS, MISSOURI 63166 COMP lete description of contract Weld skirt to Platforming Reactor and install ________ Reactor internals.______________ _____________________________________ REMA RKS ACCT. NO. DESCRIPTION & SPECIFICATION DATA 16C09 INSTALL REACTOR INTERNALS UNIT 1,000's QUANTITY TOTAL DOLLARS 212.8 S/UNIT MANUAL MANHOURS MH/UNIT 5927 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED NONE AVERAGE FORCE RCSC 5.17 . PEAK FORCE 21778 5927 , home office SUPERVISION RATINGS rUnUnUnU z supervision EXCELLENT 1 PROCUREMENT . SCHEDULING * AND PLANNING K PRICING AND PROCESSING CHANGES 8". SHOP DRAWINGS EXCELLENT ______ GOOD AVERAGE NA 7. LABOR RELATIONS EXCELLENT a ADEQUACY OF EQUIPMENT NA 9. cooperation EXCELLENT ,n QUALITY ** of work____________ EXCELLENT_______________ GARRARD 00000620 --- job rslO. CLIETsjt LOCAiTlON BECHTEL INCORPO RATED REFINERY & CHE MICAL DIVISION SUBCONTRAC:t an;\LYSIS 14053 Marathon Oil Company Robinson, Illinois PR OJECT Robinson Refinery Modernization CO NSTR. DATES 6/15/81 - 6/19/81 SUBCCINTRACT NO. & TYPE aNAME address of subcontractor 14053-FSC-27 LUMP SUM MAECo P. 0. Box 504 Lawrencevi 11 e, Illinois 6243 COMP lete description of contract PI arit 16 Construction of temporary road on south side of REMA RKS ACCT. NO. DESCRIPTION & SPECIFICATION DATA Cnnst.riiction of temporary road $1,000's UNIT QUANTITY TOTAL DOLLARS S/UNIT TONS 340 9.4 27.6 MANUAL MH/UNIT MANHOURS 80 0.24 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED 2 Dumptrucks, 1 End Loader, 1 Grader, 1 Rol 1 er ; AVERAGE FORCE ftCSC 5.17 - 5 PEAK FORCE c P TONS 340 9.4 27.6 80 RATINGS ,`HsuOpMeErOvFisFiIoCnE FtxycrepUuepnntt z supervision , MATERIAL x procurement * SCHEDULING AND PLANNING *C PRICING AND processing changes S. SHOP drawings 7. labor relations a ADEQUACY OF 8> equipment 9. cooperation Excellent Excel 1 ent Fxrpl 1 pnt tXCe 1 1 txceiient NAM/I Excellent ctxycrPeni ipenmt; Excellent 10-of work Excellent 0.24 GARRARD 00000621 BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRAC:t an>^LYSIS JOB NO. 14053 CLIE \IT MARATHON OIL COMPANY LOCAkTIONROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION ccINSTR. DATES 10/81-04/82 PROJECT SUBCCINTRACT NO. & TYPE 14053-FSC-28 UNIT PRICE NAME & ADDRESS OF SUBCONTRACTOR WESTERN STRESS, INC. 3215 W. 127th STREET. BLUE ISLAND. ILLINOIS 60406 COMP LETE DESCRIPTION OF CONTRACT StrgSS relieving of 1-1/4% Chrome Pipe weld-;. REMA rks Western Stress provided the equipment and a technician. Bechtel provided the 1 abor (3000 mhrsl to run the cables and wrap the pipe. ACCT. NO. DESCRIPTION & SPECIFICATION DATA 16L91 STRESS RELIEVING UNIT Dl 1,000's QUANTITY TOTAL DOLLARS 2417 28.2 S/UNIT n .7 MANUAL MH/UNIT MANHOURS 361 0.15 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED SELF CONTAINED STRESS RELIEVING UNIT. AVERAGE FORCE RCSC S.17 PEAK FORCE Dl 2417 20" 'll .7 361 0.15 RATINGS supervision EXCELLENT supervision EXCELLENT 3_ MATERIAL . * PROCUREMENT NA . SCHEDULING '* AND PLANNING EXCELLENT 5. PRICING AND PROCESSING CHANGES NA 6. SHOP DRAWINGS NA. 7. LABOR RELATIONS^^ 9 ADEQUACY OF 3- equipment EXCELLENT 9. cooperation EXCELLENT 10* of w5k EXCELLENT GARRARD 00000622 BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION SUBCONTRAC:t an>^LYSIS JOB NO. 14053 CLIE NT MARATHON OIL COMPANY LOCfikTION ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATIOI' ccINSTR. DATRS 02/82-04/82 PRWECT SUBCCINTRACT NO. & TYPE 14053-FSC-29 LUMP SUM NAME & ADDRESS OF SUBCONTRACTOR GILLESPIE AND POWERS, INC. 9550 TRUE DRIVE, ST. LOUIS, MISSOURI 63132 COMP lete description of contract Install refractory In fired heaters. REMA RKS ACCT. NO. DESCRIPTION & SPECIFICATION DATA 6F40 INSTALL REFACTORY 16F-1. 2. 4 16F40 INSTALL REFACTORY 16F-3 23F40 INSTALL REFACTORY 23F-1 UNIT $F SF 5F 1.000's QUANTITY TOTAL DOLLARS 1188 22068 1875 10.2 249.3 16.1 S/UNIT MANUAL MANHOURS MH/UNIT 8.60 11 .30 8.60 280 6811 440 0.24 0.31 0.24 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED NONE AVERAGE FORCE RCSC 5.17 PEAK FORCE SF 25131 275.6 10.97 .'* HOME OFFICE SUPERVISION RATINGS rnnn faUUU supervision , MATERIAL A PROCUREMENT . SCHEDULING ** AND PLANNING EXCELLENT .NA AVERAGE k PRICING AND PROCESSING CHANGES 6. SHOP DRAWINGS .N.A. AVERAGE 7. LABOR RELATIONS Q000 a ADEQUACY OF EQUIPMENT . NA 9. cooperation EXCELLENT QUALITY 10-of work EXCELLENT 7531 0.30 GARRARD 00000623 \ BECHTEL INC ORPO RATED REFINERY & CHE MICAL.DIVISION SUBCONTRAC:t an;\LYSIS JOB PJO. CLIEIMT L0C4kTION 14053 Marathon Oil Company Robinson, Illinois PR OJECT Robinson Refinery Modernization CO NSTR. DATES 8/18/81 - 11/27/81 SUBCCINTRACT NO. R TYPE 14053-E-30 Lump Sum NAME & ADDRESS OF SUBCONTRACTOR BAC-Pritchard, Inc. P. C). Box 7322 Baltimore, Maryland 21227 COMP LETE DESCRIPTION QF CONTRACT Furnish and erect Coolincr Tower REMA RKS The ratines shown below are for after BAG chanqe in suoervision on Sept.ember 8, 1981. Field Supervision and Labor Relations poor prior to this date. ACCT. NO. DESCRIPTION & SPECIFICATION DATA Lump Sum Price 51 ,000's UNIT QUANTITY TOTAL DOLLARS 216.0 S/UNIT MANUAL MANHOURS MH/UNIT 2502 None TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE RCSC 5.17 ,,, 12 PEAK FORCE ,,, 18 216.0 2502 . RATINGS . HOME OFFICE 1- supervision 2. field SUPERVISION _ ., Excellent Excellent x PROCUREMENT . SCHEDULING and planning Excellent _, Excellent 5 PRICING AND PROCESSING CHANGES a SHOP " drawings NA Excellent 7. LABOR RELATIONS a ADEQUACY OF EQUIPMENT Excellent NA - 9. cooperation Excellent in QUALITY 10- of work _ ... Excellent GARRARD 00000624 T\ ^ . -"1 JOB MO. CLIE NT LOC/3kTION BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRACIT AN>iVLYSIS 14053 Marathon Oil Company Robinson, Illinois PR OJECT Robinson Refinery Modernizatior CCINSTR. DATES 8/1/81 - 9/1/81 SUBCCINTRACT NO. & TYPE 1405 3-FSC-31 Lump Sum NAME & ADDRESS OF SUBCONTRACTOR 'Quality Fence Company 1515 Lafayette Avenue Terre Haute, Indiana 47804 COMP LETE DESCRIPTION OF CONTRACT Refinery perimeter fence. Install one double leaf 32 foot crate in existincr REMA RKS ACCT. NO. DESCRIPTION & SPECIFICATION DATA 1 Ea. 32' fiatfar Pahri rs-ha anH Install UNIT $1,000's QUANTITY TOTAL DOLLARS 1 .0 S/UNIT MANUAL MANHOURS MH/UNIT 16 None TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE 3CSC 5.T7 3 PEAK FORCE 3 I .d RATINGS 16 supervision ^ supervision , MATERIAL A PROCUREMENT . SCHEDULING and planning e PRICING AND PROCESSING changes B SHOP " DRAWINGS 7. LABOR RELATIONS a ADEQUACY OF " EQUIPMENT 9. COOPERATION Excellent Excellent _ .. , Excellent n .. . Excellent na NA Good NA Excellent of work Excellent GARRARD 00000625 "N JOB MO. CLIE MT LOC4kTIQN BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRAC:t an>i\LYSIS 14053 Marathon Oil Company Robinson, Illinois PR OJECTRobinson Refinery Modernization CCINSTR. DATFS 7/15/81 - 8/15/81 SUBCC1NTRACTNO. R TYPE 14053-FSC-32 Lump Sum NAME & ADDRESS OF SUBCONTRACTOR Sturm Heating and Air Conditionina 501 South Webster Robinson, Illinois COMP LETE DESCRIPTION OF CONTRACT Supolv and install one chilled water air conditioning unit: in Central Control Room Battery Room REMA RKS ACCT. NO. 26R70 DESCRIPTION & SPECIFICATION DATA Supply anH install nnp rhillf=d water unit $1,000's UNIT QUANTITY TOTAL DOLLARS S/UNIT 1 LOT 6.4 - MANUAL MANHOURS 64 MH/UNIT * None TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE . FORCE l RCSC 5.17 PEAK FORCE . 3 6.4 64 RATINGS . HOME OFFICE . supervision 2 FIELD supervision , MATERIAL * PROCUREMENT . SCHEDULING and planning e PRICING AND PROCESSING CHANGES fi. SHOP DRAWINGS ,, , ,Excellent Excellent _ .. . Excellent ,, ,, ^ Excellent NA ,, NA 7. LABOR RELATIONS Excellent ADEQUACY OF EQUIPMENT NA 9. COOPERATION 1ft QUALITY OF work Excellent ,, Excellent GARRARD 00000626 BECHTEL INC:orpo RATED REFINERY & CHE MICAl. DIVISION SUBCONTRA(:T ANi4LYSIS JOB MO. 14053 CLIE NT ___ MARATHON OIL COMPANY LOG/MION ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATIOf CC)NSTR. DATES 1 2/81 -03/82 PR0JECT SUBC(intract no. & type 14053-FSC-33 UNIT PRICE NAME & ADDRESS OF SUBCONTRACTOR GENERAL ELECTRIC COMPANY 1811 EXECUTIVE DRIVE. SUITE A INDIANAPOLIS, INDIANA 46241 COMP lete description of contract Calibration and testing of electrical relays. REMA RKS ACCT. NO. 26P DESCRIPTION & SPECIFICATION DATA ELECTRICAL RELAY CALIBRATION UNIT ,000's QUANTITY TOTAL DOLLARS 4.0 S/UNIT MANUAL MANHOURS MH/UNIT 40 NONE TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE RCSC 5.17 PEAK FORCE 4.0 40 .'SHUOPMEERVOIFSFIOICNE RATINGS FLAYCCFLILL1 LEIN'I T1 1 supervision EXCELLENT *, MATERIAL PROCUREMENT .N.A. . SCHEDULING * AND PLANNING NA = PRICING AND PROCESSING CHANGES NA. b SHOP * drawings EXCELLENT 7. LABOR RELATIONS a" ADEQUACY OF equipment EXCELL, E..N.T. 9. cooperation EXCELLENT ,0- of work___________ EXCELLENT________________ GARRARD 00000627 BECHTEL INC ORPO RATED REFINERY & CHE MICAL.DIVISION SUBCONTRAC:t an>ALYSIS JOB MO. 14053 CUE MT MARATHON OIL COMPANY LOCAmON ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION' CC NSTR. DATES 10/81-03/82 PROJECT SUBCCintract no. ft type 14053-FSC-34 LUMP SUM NAME &A0DRESS OF SUBCONTRACTOR MARTTNSVTI 1 F ROOFTNR COMPANY 26 S. WASHINGTON STREET, MARTINSVILLE, ILLINOIS 62442 COMP lete description of contract Install built-up composition roofing on new Dermanent Diant buildinas. REMA RKS ACCT. NO. 16R30 1 RR30 32R30 DESCRIPTION & SPECIFICATION DATA UNIT PLANT 16 SUBSTATION ROOFING PI ANT Tfi RFW RIITI OTNR ROOFTNR PLANT 32 CHEMICAL INJ. BLDG. ROOFIN G 1.000's quantity total DOLLARS 4.1 13 4.1 $/UNIT MANUAL MANHOURS MH/UNIT 72 24 72 NONE TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE RCSC 5.17 PEAK FORCE 9.5 .' HOME OFFICE supervision RATINGS rEvXrCcEiLLi EcNmTt 1 supervision EXCELLENT * PROCUREMENT EXCELLENT SCHEDULING AND PLANNING rnnn bUUU s PRICING AND ... PROCESSING CHANGES NA 6". SHOP DRAWINGS .N.A. 7. LABOR RELATIONS ADEQUACY OF 8` EQUIPMENT 9. cooperation ln QUALITY 10> of work GOOD EXCELLENT EXCELLENT 168 GARRARD 00000628 BECHTEL INC ORPO RATED REFINERY & CHE MICA!. DIVISION SUBCONTRAC:t A!\I>o. LYSIS JOB MO. CUE NT LOCFkTION 14053 ` MARATHON OIL COMPANY ROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION CC)NSTR. DATES 10/28/82 - 12/1 5/8?R0JEC SUBCCINTRACT NO. & TYPE 1 4053-FSC-35 LUMP SUM NAME a ADDRESS OF subcontractor LARK COMMERCIAL PAINTING AND BLASTING, INC. P.0, BOX 2233. 2628 KUSSNER STREET. TERRE HAUTE. INDIANA 47808 COMP LETE description OP contract Painting permanent plant equipment. REMA RKS ACCT. NO. 16X10 .23X1 .C DESCRIPTION & SPECIFICATION DATA PAINT EOUIPMENT - PLANT 16 PAINT EOUIPMENT - PLANT 23 UNIT SF SF SI .000's QUANTITY TOTAL DOLLARS 54110 91 .7 3650 3.3 S/UNIT MANUAL MANHOURS MH/UNIT 2558 92 * TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED SPRAY EQUIPMENT COMPRESSOR AVERAGE FORCE BCSC 5.17 PEAK FORCE 57760 95.0 1 .65 2650 1 HOME OFFICE 'SUPERVISION RATINGS rypri 1 FNT tALC.LLt.tN 1 supervision EXCELLENT 3- procurement EXCELLENT 4* AND PLANNING EXCELLENT c PRICING AND PROCESSING CHANGES tt SHOP DRAWINGS rtXvrLtt-Li Li tnNiTT .N.A. 7. LABOR RELATIONS . EXCELLENT 8` equipment 9. cooperation 10- F WORK EXCELLENT EXCELLENT EXCELLENT 0.05 GARRARD 00000629 BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION SUBCONTRACrr an;ALYSIS JOB MO. 14053 CLiE NT MARATHON OIL COMPANY LO CAmON ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION ccINSTR. DATES 03/82-04/82 PROJECT SUBCC)NTRACT NO. & TYPE 14053-FSC-36 T&M NAME & ADDRESS OF SUBCONTRACTOR HALLIBURTON SERVICES P.0. BOX 380. CROSSVILLE. ILLINOIS 62827 COMP lete description of contract Prpvide chemi cals and eauioment to chemically cl pan carbon steel compressor piping.___________________________________ REMA RKS ACCT. NO. TO DESCRIPTION & SPECIFICATION DATA chEmical CLEANING UNIT 1.000's QUANTITY TOTAL DOLLARS 45.1 S/UNIT MANUAL MANHOURS MH/UNIT 2443 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED CIRCULATING PUMP AVERAGE FORCE RCSC 5.17 PEAK FORCE 45.7 HOME OFFICE ' supervision RATINGS EXCELLENT ^ supervision EXCELLENT 3- procurement EXCELLENT . SCHEDULING AND PLANNING GOOD s PRICING AND . PROCESSING CHANGE^A SHOP ^ DRAWINGS NA 7. LABOR RELATIONS a ADEQUACY OF EQUIPMENT 9. cooperation Fym 1 FNT EXCELLENT OF WORK EXCELLENT 2443 GARRARD 00000630 BECHTEL INC ORPO RATED REFINERY & CHE Ml CAL. DIVISION SUBCONTRA(:t AN>4LYSIS JOB MO. CUE NT LQCAvTION 14053 Marathon Oil Company Robinson, Illinois PR OJECT Robinson Refinery Modernization CCINSTR. DATES 10/3/81 SUBCCINTRACT NO. & TYPE 14053-FSC-37 Unit Price NAME a. address of subcontractor Lee Kintner & Sons. Inc. P. C). Box 128 Oblong, Illinois 62449 COMP LETE DESCRIPTION OF contract Apply MC-30 asphalt prime coat to roadways in Mam.lal Parking Lot REMA rks None ACCT. NO. DESCRIPTION & SPECIFICATION DATA 70130 AddIv prime coat $1,000's UNIT QUANTITY TOTAL DOLLARS Gal 600 1 .2 S/UNIT MANUAL MANHOURS MH/UNIT S2.10 16 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED 1 each 5,000 Gallon Spray Truck AVERAGE FORCE RCSC 5.17 -I x PEAK FORCE x 1 .2 RATINGS 16 supervision supervision 1 procurement . SCHEDULING AND PLANNING e PRICING AND PROCESSING CHANGES S. SHOP DRAWINGS 7. labor relations a ADEQUACY OF 8- equipment 9. cooperation Excellent Excellent Excellent ... INA ... NA NA. Excellent 1E7Vxocoe1l1lent Excellent 10- OF work Excellent GARRARD 00000631 BECHTEL INC ORPO RATED REFINERY & CHE MICAt. DIVISION SUBCONTRAC:t an LYSIS JOB MO. 14053 CUE \1T MARATHON OIL COMPANY LOCfimON ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATIOf cc)NSTR. DATES 10/81-12/81 PKUJEUT SUBCCiNTRAirrNn a typf 14053-FSC-38 LUMPSUM NAME a address OF subcontractor BROOKS ERECTION AND CONSTRUCTION COMPANY 1100 MACKLIND AVENUE, ST. LOUIS, MISSOURI 63110 COMP LETE description OF contract Rework existing vessel 29C-1. REMA RKS ACCT. NO. 29C01 . DESCRIPTION & SPECIFICATION DATA REPLACE VESSEL INTERNALS UNIT 1.000's QUANTITY TOTAL DOLLARS 56.8 S/UNIT MANUAL MANHOURS MH/UNIT 1106 . TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED MOBILE CRANE AVERAGE FORCE RCSC5.17 PEAK FORCE 56.8 1106 t HOME OFFICE ' SUPERVISION RATINGS GOOD z supervision MATERIAL * PROCUREMENT SCHEDULING AND PLANNING EXCELLENT EXCELLENT rnnn bUUU 5. PRICING AND PROCESSING CHANGES AflWVtCKDAfblrrt c* SHOP DRAWINGS GOOD 7. LABOR RELATIONS GOOD ,, ADEQUACY OF EQUIPMENT GODD 9. COOPERATION .1_0-QofUAwLoITrYk cEXvCrnELLi EcNuTt GARRARD 00000632 a t BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRAC:t an;\LYSIS JOB vIO. 14053 CUE SIT MARATHON OIL COMPANY LOCATION ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION CC NSTR. DATES 11/81-3/82 PKUJtU SUBCCINTRACT NO. & TYPE 14053-FSC-39 T&M NAME & ADDRESS OF SUBCONTRACTOR MAECO 500 N. 15th STREET LAWRENCEVILLE, ILLINOIS 62439 COMP lete description of contract Labor and equipment for snow removal services. ' REMA RKS ACCT. NO. 70190 . DESCRIPTION & SPECIFICATION DATA SNOW REMOVAL 1,000's UNIT QUANTITY TOTAL DOLLARS 6.1 S/UNIT MANUAL MANHOURS MH/UNIT 111 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED END LOADER DUMP TRUCKS ROAD GRADER SAND SPREADER AVERAGE FORCE RCSC 5.17 PEAK FORCE 6.1 , HOME OFFICE ' supervision RATINGS EXCELLENT SUPERVISION FXOFI 1 FNT X PROCUREMENT EXCELLENT . SCHEDULING AND PLANNING NA = PRICING AND ... PROCESSING CHANGES NA " SHOP DRAWINGS ,N.A 7. LABOR RELATIONS 000 *3. ADEQUACY OF equipment 9. cooperation CEXYrCPE1LL, ErMNTT EXCELLENT 10- 2f wJr EXCELLENT 111 GARRARD 00000633 ' ! "* BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRAC:T AIM;4LYSIS JOB MO. CUE NIT LOC/TION 14053 MARATHON OIL COMPANY ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION CCINSTR. DATF.q 1 0/28/81-1 2/1 5/81 PR0JECT SUBCCINTRACT NO. a TYPE 14053-FSC-40 LUMP SUM NAME & address OF SUBCONTRACTOR LARK COMMERCIAL PAINTING AND BLASTING, INC. P .0. BOX 2233, 2628 KUSSNER STREET TERRE HAUTE, INDIANA 47808 COMP letedescription of contract Painting heater stacks and flue gas ducts (on ground). REMA RKS ACCT. NO. 16X10 23 XIC 26R50 16R50 DESCRIPTION & SPECIFICATION DATA PAINT HEATER STACKS & DUCTS PAINT HEATER STACKS TOUCH UP PAINT IN CENTRAL CONTROL R* TOUCH UP PAINT IN SATELLITE CONT. Rf< UNIT SF SF SF SF $1 .OOP's QUANTITY TOTAL DOLLARS 15000 15.6 1250 1.3 2500 675 2.7 0.7 S/UNIT MANUAL MANHOURS MH/UNIT 694 58 116 31 " TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED SPRAY EQUIPMENT COMPRESSOR AVERAGE FORCE RCSC 5.17 PEAK FORCE 19425 20.3 1 .05 899 ^i HOME OFFICE SUPERVISION RATINGS CLXYPLCt.ILL1 tC.NMIT ^ supervision EXCELLENT 3' PROCUREMENT . SCHEDULING 4` AND PLANNING e PRICING AND PROCESSING CHANGES a SHOP " DRAWINGS 7. LABOR RELATIONS 8`o ADEQUACY OF equipment 9. cooperation EXCELLENT EXCELLENT EXCELLENT NA FXCELLENT PV.C, . EXCELLENT EXCELLENT 10- of work EXCELLENT 0.05 GARRARD 00000634 BECHTEL INCORPO RATED REFINERY & CHE MICAL DIVISION SUBCONTRAC:T AN/iLYSIS JOB PslO. CUE!\JT LOCA^TION 14053 Marathon Oil Company Robinson, Illinois PR OJECT Robinson Refinery Modernization CC NSTR. DATES 11/16/81 - 11/30/81 SUBCCINTRACT NO. & TYPE 14053-FSC-41 Lump Sum NAME & ADDRESS OF SUBCONTRACTOR MAECo P. C). Box 504 Lawrenceville, Illinois 62439 COMP LETE DESCRIPTION OF CONTRACT Removal of backfill placed by Reliance Truck Company (FSC>10) from Reactor off-loading area and restore Railroad right of way REMA RKS ACCT. NO. 16C09 DESCRIPTION & SPECIFICATION DATA Lump Sum UNIT <n .ooo1 s QUANTITY TOTAL DOLLARS 3.5 S/UNIT MANUAL MANHOURS MH/UNIT TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED 1 Front End Loader 2 Dump Trucks AVERAGE FORCE RCSC 5.17 _ 5 PEAK ^ FORCE 5 3.5 . HOME OFFICE ' supervision RATINGS _ .. . Excellent supervision , MATERIAL A PROCUREMENT . SCHEDULING ** AND PLANNING k PRICING AND PROCESSING CHANGES 8. SHOP " DRAWINGS 7. labor relations a ADEQUACY of 8> equipment 9. cooperation Excellent .,, NA NA NA .... NA Excellent Excelilent Excellent 10* of wfelRK Excellent GARRARD 00000635 J t_ BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION SUBCONTRAC:T AN/4>LYSIS job rMO. 14053 CUE NT MARATHON OIL COMPANY LO CfimON ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION CCINSTR. DATES 1102//0811-0n5c//8o2o PROJECT SUBCCINTRACT NO. & TYPE 14053-FSC-42 T&M aNAME AnnRF.ss nF subcontractor MORRIS CONSTRUCTION COMPANY P.0. BOX 3 TUSCOLA. ILLINOIS 61593 COMP lete description of contract Pipefitter labor for pipe installation. REMA RKS ACCT. NO. DESCRIPTION & SPECIFICATION DATA PIPEFITTER LABOR * 1 ,000's UNIT QUANTITY TOTAL DOLLARS 844.0 S/UNIT MANUAL MHAJNIT MANHOURS 28854 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED MOBILE CRANE WELDING MACHINES AVERAGE FORCE RCSC 5.17 PEAK FORCE 844.0 28854 < HOME OFFICE supervision RATINGS CEXYCr'CEILL1 ECNMTT supervision EXCELLENT O' MATERIAL PROCUREMENT .N.A. SCHEDULING AND PLANNING NA s PRICING AND . PROCESSING CHANGESNA ,,' SHOP DRAWINGS NA 7. LABOR RELATIONS EXCELLENT o ADEQUACY OF 8- equipment EXCELLENT 3. COOPERATION FXCFI.I.ENT 10- of work EXCELLENT GARRARD 00000636 BECHTEL INC:orpo RATED REFINERY & CHE MICAl. DIVISION SUBCONTRAtrr AN;ALYSIS JOB NO. 14053 CUE NT MARATHON OIL COMPANY LOG/mON ROBINSON. ILLINOIS PF OJECT ROBINSON REFINERY MODERNIZATION ccJNSTR. DATES 12/81-05/82 PROJECT SUQCCINTRACT NO. ft TYPE 14053-FSC-43 T&M NAME ft ADDRESS OF SUBCONTRACTOR HOKE CONSTRUCTION COMPANY P.0. BOX 190 TUSCOLA. ILLINOIS 61953 COMP lete description of contract pip-fitter labor for Dioe installation. REMA RKS ACCT. NO. DESCRIPTION a SPECIFICATION DATA PIPEFITTER LABOR UNIT 1.000's QUANTITY TOTAL DOLLARS 1072.0 S/UNIT MANUAL MANHOURS MH/.UNIT 36725 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED MOBILE CRANE WELDING MACHINES AVERAGE FORCE RCSC 5.17 PEAK FORCE 1072.0 36725 RATINGS . HOME OFFICE supervision EXCELLENT supervision EXCELLENT MATERIAL PROCUREMENT .N.A. . SCHEDULING AND PLANNING ,,. NA c PRICING AND .... PROCESSING CHANGESNA G SHOP DRAWINGS .N.A. 7. LABOR RELATIONS EXCELLENT a ADEQUACY OF a- equipment EXCELLENT 9. cooperation EXCELLENT 10- ofwork EXCELLENT GARRARD 00000637 BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRAC:t AN;\LYSIS job r40. 14053 CUE!NT MARATHON OIL COMPANY LOCAmON ROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATIO!^ CC NSTR. DATES 12/81-5/82 PROJECT SUBCCINTRACT NO. & TYPE 14053-FSC-44 T&M NAME 8. ADDRESS OF SUBCONTRACTOR J.L. ALLEN COMPANY P.0. BOX 341, TUSCOLA, ILLINOIS 61953 COMP lete description of contract Pipefitter labor for pipe installation. REMA RKS ACCT. NO. DESCRIPTION & SPECIFICATION DATA PIPEFITTER LABOR 1,000's UNIT QUANTITY total dollars 960.0 S/UNIT MANUAL MANHOURS MH/UNIT 33046 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED MOBILE CRANE AVERAGE FORCE RCSC 5.17 PEAK FORCE 960.0 33046 - HOME OFFICE SUPERVISION RATINGS rypri 1 FNT LAUtLLtm z supervision EXCELLENT , MATERIAL A PROCUREMENT .N.A. . SCHEDULING * AND PLANNING NA e PRICING AND PROCESSING CHANGES NA a SHOP DRAWINGS NA 7. LABOR RELATIONS 8 ADEQUACY OF equipment 9. cooperation pYPFl 1 FNT FEYXFCFEILL1 EFNNTT EXCELLENT 10* of work EXCELLENT ' GARRARD 00000638 .3 .`i j BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRAC:t an>ALYSIS JOB vIO. 14053 CLIEIMT MARATHON OIL COMPANY LOCAkTION ROBINSON, ILLINOIS PR OJECTR0BINS0N REFINERY MODERNIZATION CC ISISTR. DATES 03/82-06/82 PR0JEeT SUBCC1NTRACT Nfl. ft TYPE 14053-FSC-45 LUMP SUM NAME aAnnnFSS of subcontractor BUSCH & LATTA PAINTING CORPORATION 1360 N. PRICE ROAD. ST. LOUIS. MISSOURI 63132 COMP lete description OF CONTRACT Labor and material to aDolv fireoroofinq to structural steel and vessel suDDorts. REMA RKS ACCT. NO. DESCRIPTION O SPECIFICATION DATA 23N30 FIREPROOF EOUIPMENT SUPPORTS-OFFPLOT 23N40 FIREPROOF STRUCTURAL STEEL-OFFPLOT 16N30 FIREPROOF EOUIPMENT SUPPORTS PLANT16 16N40 FIREPROOF STRUCTURAL STEEL PLANT 16 UNIT SF CF SF CF 1 .000's TOTAL QUANTITY DOLLARS 9747 2893 7489 1022 30.5 86.6 82.7 30.2 S/UNIT 3.13 29.93 11.04 29.55 MANUAL MANHOURS MH/UNIT 1075 o.n 3057 1 .06 2918 0.39 1068 1.05 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED NONE AVERAGE FORCE RCSC 5.17 PEAK FORCE 230.0 RATINGS .'* HOME OFFICE SUPERVISION flVCDflPP HVCKHUC. supervision AVERAGE 3> procurement EXCELLENT . SCHEDULING AND PLANNING POOR c PPRROICCINESGSAINNGDCHANGES.rSnOnDnD 6" SHOP DRAWINGS .N.A. 7. LABOR RELATIONS pf)Qp 8118 8` EQUIPMENT 9. COOPERATION AVERAGE AVERAGE 10- of work AVERAGE GARRARD 00000639 14053-FSC-45 FIREPROOFING BUSCH & LATTA PAINTING CORPORATION Planning and scheduling efforts were poor in that, of the three (3) schedules submitted, none were maintained. Un able to consistantly maintain the desired level of product ivity. Labor Relations were poor in that Busch & Latta initially assigned all work to the painters. Ironworkers claimed application of reinforcing mesh; labor's claimed vessel preparation, mixing materials and clean-up; cement masons claimed finishing of applied fireproofing material. In ternational representatives were required to resolve the disputes. Busch & Latta also initially refused to sign Union Agreements with the ironworker, laborers, cement masons and operating engineers. GARRARD 00000640 BECHTEL INC ORPO rated REFINERY & CHE MICAl. DIVISION SUBCONTRAtrr an/ALYSIS JOB sjO. 14053 CUE \1T MARATHON OIL COMPANY LOCfikTION ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION CC NSTR. DATES 03/82-04/82 PROJECT SUBCCINTRACT NO. & TYPE 14053-FSC-46 T&M NAME & ADDRESS OF SUBCONTRACTOR DUNEGAN/ENDEVCO RANCHO VIEJO ROAD. SAN JUAN CAPISTRANO. CALIFORNIA 92675 COMP lete description of contract Acoustic Emissions testinq of Reactor transfer pipinq under pnuematic testinq. REMA RKS ACCT. NO. DESCRIPTION & SPECIFICATION DATA T6F40 ACOUSTIC EMISSIONS TESTING UNIT 1 .OOP's QUANTITY TOTAL DOLLARS 31 .7 S/unit manual MANHOURS MH/UNIT 338 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED VAN WITH NECESSARY COMPUTER AND MONITORING EQUIPMENT AVERAGE FORCE RCSC 5.17 0 J PEAK 0 FORCE -J 31 .7 . HOME OFFICE '* SUPERVISION RATINGS FCY.AOLFtILLI LFIN'lT1 z supervision EXCELLENT , MATERIAL * PROCUREMENT .N.A. . SCHEDULING * AND PLANNING EXCELLENT = PRICING AND . PROCESSING CHANGESNA a SHOP " DRAWINGS NA 7. LABOR RELATIONS 8 ADEQUACY OF " equipment 9. cooperation - cEvXrCcEi LtLcEmNtT EXCELLENT 10- OF work excellent 338 GARRARD 00000641 r\ BECHTEL INCORPORATED REFINERY & CHEMICAL DIVISION SUBCONTRACT ANALYSIS JOB NO. CLIENT 14053_______________ _____________ MARATHON (IT 1 COMPANY __________ LOCATION ROBINSON. ILLINOIS PROJECT ROBINSON REFINERY MODERNIZATION CONSTR. DATES 02/82-03/82PR0JECT SUBCONTRACT NO. & TYPE 14053-FSC-47 T&M________________ NAME &ADORESS OF SUBCONTRACTOR NELSON - KEATING MECHANICAL, INC. P.0. BOX 809 LAFAYETTE. INDIANA, 47902 COMP lete description of contract Pipefitter labor for instumentation loop checks. REMA RKS ACCT. NO. J82 DESCRIPTION & SPECIFICATION DATA OFFPLOT LOOP CHECKING UNIT 1.000's QUANTITY TOTAL DOLLARS 33.6 S/UNIT MANUAL MANHOURS MH/UNIT 1173 NONE TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED AVERAGE FORCE RCSC 5.17 PEAK FORCE 33.6 1173 RATINGS . HOME OFFICE ' SUPERVISION 21 SfUiePlEdRVISION ROOD EL AXCCnE.LLLLCE.INNT1 , MATERIAL * PROCUREMENT m/> * SCHEDULING AND PLANNING ryrn , cmt t ALtLLtlN 1 = PRICING AND M/\ PROCESSING CHANGES NA s. SHOP " DRAWINGS .N.A. 7. LABOR RELATIONS EXCELLENT ,, ADEQUACY OF EQUIPMENT . NA 9. COOPERATION EXCF1 ! FNT 10- OF wkjrk EXCELLENT GARRARD 00000642 BECHTEL INC ORPO RATED REFINERY & CHE MICAL.DIVISION SUBCONTRAC:t an>ALYSIS JOB MO. 14053 CLIE NT MARATHON OIL COMPANY LOC4mON ROBINSON. ILLINOIS PR OJECT ROBINSON REFINERY MODERNIZATION CC)NSTR. DATES 05/82 - 07/82 PRUJtCT SUBCCintrap.t no. a TYPF 14053-FSC-48 TIME & MATERIAL NAME & ADDRESS OF SUBCONTRACTOR SHEEHAN PIPELINE CONSTRUCTION, CO. P.C). BOX 352 ROBINSON, ILLINOIS 62454 COMP LETE DESCRIPTION OF contract Provide labor to assist in Project Demobilization. REMA RKS Bechtel provided all field supervision. ACCT. NO. 70110 DESCRIPTION & SPECIFICATION OATA DEMOBILIZATION UNIT <51 ,000's QUANTITY TOTAL DOLLARS so.n S/UNIT MANUAL MANHOURS MH/UNIT 2200 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED WELDING MACHINES AVERAGE FORCE RCSC S.17 PEAK FORCE 50.0 2200 RATINGS . HOME OFFICE 1* SUPERVISION 2*. field SUPERVISION , MATERIAL PROCUREMENT . SCHEDULING * AND PLANNING rypri i rwr tAUcLLLIM 1 ... NA .N.A. NA c PRICING AND PROCESSING CHANGES SHOP " DRAWINGS ... NA NA 7. LA80R RELATIONS EXCELLENT B ADEQUACY OF 8` equipment EXCELLENT 9. COOPERATION EXCELLENT ,n QUALITY 10- OF WORK EXCELLENT GARRARD 00000643 ' L ,wr BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION SUBCONTRA(;t an>i\LYSIS JOB NO. 14053 CUE NT MARATHON OIL COMPANY LOCAkTION ROBINSON, ILLINOIS PR OJECT ROBINSON REFINERY M0DERNIZATI0 CCINSTR. DATFS 03/82-04/82 PROJECT SUBCCINTRACT NO. & TYPE 1 4053-FSC-49 . 50 & 51 T&M NAME a address OF subcontractor SHEEHAN PIPELINE CONSTRUCTION COMPANY P.0. BOX 352 ROBINSON. ILLINOIS 62454 COMP lete description of contract Boilermaker labor for completion of Plant 16 heaters and punchlist work. REMA RKS ACCT. NO. DESCRIPTION & SPECIFICATION DATA 16F40 BOILERMAKER LABOR UNIT 1 ,000's TOTAL quantity DOLLARS lofi.s S/UNIT MANUAL MANHOURS MH/UNIT 3617 TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED NONE AVERAGE FORCE RCSC 5.17 PEAK FORCE 106.8 3617 - HOME OFFICE 1a SUPERVISION RATINGS rLvApCrUi L1 LFtNmT z supervision EXCELLENT * MATERIAL PROCUREMENT NA . SCHEDULING AND PLANNING EXCELLENT C PRICING AND PROCESSING CHANGES NA a. SHP DRAWINGS MNAfl 7. LABOR RELATIONS EXCELLENT ,, ADEQUACY OF EQUIPMENT NA,, 9. cooperation EXCELLENT 10- ofwrk EXCELLENT GARRARD 00000644 1.7 homg office GARRARD 00000645 JOB NO. \4o53 DESCRIPTION KftHp CLIENT OU-- CO LOCATION Rpe,lt05QKU)E- H0ME OFFICE COSTS SUMMARY CONST. DATES \/8o TO VflS: PREPARED BY D> u , uE_ DEPARTMENT BREAKDOWN Division Technical Services Engineering Procurement Construction Project Management Other Divisional Controller Personnel Labor Relations Legal & Insurance Data Processing Other Corporate Services Field Assignment (Function 10) tUTEfcOPFlC-E Bu-ULl&S MANHOURS Tech. Non-Tech. SALARIES Tech. Non-Tech. Payroll Additives COSTS IN $1000 Repro duction and Supplies Travel 25,1 364* 6 37. e. 3.3 5.6 *3 -- -- - 3. .1 .1 1,6 13.2 lO.*7 1.6 A >0 .5 U. 3 2-4 <4 ,z -- -5 35R.I 5275.1 525.1 203,4 115. 1 ll.fi - - - 3S,8> (.3 U.4 U3.4 67.3 U.P, 26.7 -1.1 U2.fi 31.5 6,3 3.2 -- 120.0 1116.3 210 .3 16-2 71.3 2. ft 37.3 -- 13.7 2.3 - (4,0 ,4 -- 40.2 616,3 407 2.S \7.6 1,6 4-1 ,4 (.3 12.2 35-6 36),8 Ufi,.3 lo4<2 28.0 a 5,3 IZ.S ,5 S>5 ), 6 * Tel., Tel., and Postage s/cOutside 3.3 334 35-0 6*4 1 v*7 28.6 3,2 1.4 .1 -- )s.4 1*2 - 7-5 72,2 6.3 -- 1,1 ____ *2. 1.3 - 4 2.0 -- -- - Other Total 26*3 S 06.8 -- .( -- -- 1*4 -- -- - \3< 2 26,0 6o3.0 fi7o6,0 \ 003,0 404,6 2327 43,4 ni.o 66, \ 11,2 84,7 23,4 26,0 TOTAL COSTS (Reimb. (Excludes AFI) ) OFFICE BREAKDOWN Sponsor - HoOtaTOlO Other- SPrtO Other- ALiio PvRfcOR Other- G,MTHR42oR> Other- EDHot^TOt^ TOTAL COSTS - ALL OFFICES (Excluding AFI) * EXCLUDES A6EtviCY Hl-veS -2.0 T 2.3 KiT 446-3 *5 2,7 6*588.1 4oo*5 2265.2 742,7 673-4 145.5 4l,3 574*7 U48T.O 4-2-to >7 13.5- - -1 46.S 5.7 *4 .1 63043 2g3.fi - - - 334-6 2(37,6 1.27. 6 --- 721,0 21 >7 - - - 550-8 122-6 - - U8.0 27,5 - - - ftfi.O 3,3 - - 485.3 \ol4o.2 <68,4 720.6 157 )5 7 2,6 26 ___77 ____ 7J_ 446-3 5-2 ."7 6*588 ,7 400.5 2265,2. 742,7 673-4 145. S 3 (.3 514-7 U487,0 HOME OFFICE COSTS SUMMARY PHR 1.7-1 PAGE GARRARD 00000646 & JOB NO. 140 53 DESCRIPTION R RHP CLIENT HftRftfl-tofO oil, co. LOCATION ftofet^QK) j IL HOME OFFICE COSTS BY OFFICE HOUSTON OFFICE CONST DATES lo/gp Jt) 3i/fi2. PREPARED BY T>. u . L.ELE. DEPARTMENT Division Technical Services Engineering Procurement Construction Project Management Other Divisional Controller Personnel Labor Relations Legal & Insurance Data Processing Other Corporate Services Field Assignment (Function 10) MANHOURS Tech. Non-Tech. SALARIES Tech. Non-Tech. COSTS IN $1000 (U.S.) Payroll Additives Repro duction and Supplies Travel Tel., Tel., and Postage s/cOutside Other Total 2.5,1 56>3,,l 20.0 5.6 .3 -- -- -- 2.2. - 1* 19. 1 lOi 1 ' 11 (a 4.0 8.9 -- <b .1 -- __ "358.1 5247> 266-5 139 .A i75> 1 11.ft -- -- -- -- 31.2- 11.9 119.0 617 11.ft 2W 9.0 88.0 -- 9.7 19 .4 120.0 1700 1 fZO- 1 73.0 71.9 27 24. 1 -- n 10.5 4o,Z 6 IS .0 34,0, 2.5 17. 1.7 4 -- -- 1.-4 * 34.0 354.0 3-2.7 40,2 28.0 *1 4.5 4 ij "2.7 3.4 37,1 Zo>S 0.4 It,7 28.0 17 1.0 _ -- 7, <4 -1 7,S 72, 1 5.S 1. ( "2. 1. 6> -- -- - "Z4p. 1 444 .O -- >1 -- -- 1,4 -- -- -- 1.9 II ,P> 6,01.2. 8S95/3 SO 11 370.4 332 * l 46,S 132,7' -- 18.4 2-Cb -- 55,7 12,4 TOTAL COSTS (Reimb. (Excluding AFI) ) 420,7 -4 Co S <>309.9 334 <6> 2137. G> 721 .O 55o ,8 118.0 66-0 4 as,3 10746,"2. PAGE GARRARD 00000647 HOME OFFICE COSTS BY OFFICE PHR 1.7-2 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ; nFsrRi'pTinlTgftMP-------- HOME OFFICE COSTS CLIENT HftftftTHQM otL-co. LOCATION R6ftlMSQ<M,|L. BY OFFICE iBam^oOFFICE CONST. DATES PREPARED BY TO ^fSjLs ______ DEPARTMENT Division Technical Services Engineering Procurement Construction Project Management Other Divisional Controller Personnel Labor Relations Leqal & Insurance Data Processing Other Corporate Services Field Assignment (Function 10) MANHOURS Tech. Non-Tech. SALARIES Tech. Non-Tech. COSTS IN $1000 (U.S.) Payroll Additives Repro duction and Supplies Travel l.S n.o .3 -- --' -- -- - - (0 .\ .1 > (a -- 3.0 i.5" .2 2.7.3 3B.fe <H.O -- -- -- -- -- -- 7`to 1.3 -- Rid. -- . -1 2-A.8 -- 2.7. e -1.-1 2.0 to*2 AO>2 3.2. - fl 0.2 -- to.2 t. 0 -- 0.5 -' .5" -- 1 2.7 .3 -- i5 wn l *6? 7.e 85,6. H.o -- 8 7-7 .S - 2,0 11 Cp Tel., Tel., and Postage S/COutside -- \ .O -- * Cp l.s .8 <1 7.8 1*1 - .0 ~ -- - .1 2. 0 -- --. Other Total . 262.8 -- -- -- ~ - ^ .O 1 .A l'6 )to. 1 4AI.2 `2-- 383_ -7 7-2. &`(o__ 27,6 n. s_ TOTAL COSTS (Reimb. (Excluding AFI) ) 1 q.5 5.7 2-03.8 (bS.^ 12.7.0? 2.1.7 122. ds 2.7. S' 3.3 68-i 7 20.0 PAGE GARRARD 00000648 ltTT&*OFFlCE_ PAULI RaeoR --7x __________-QAlTHERSBofte - 3* - 6X-T7X - 5x EBHcrUTCW - <=,x TOTAL -- -- -- 1 .7 .\ HOME OFFICE COSTS BY OFFICE .1 I5.fr V.. .8 \ .7 .-1 8 1 7.7 7.7 2fr.O *>hr 1.7-2 '1. ? SCHEDULE data GARRARD 00000649 GARRARD 00000650 GARRARD 00000651 | REPORT DATE LINE-INDICATES PROGRESS * AS OF FRIDAY CUTOFF FOR LINE TAPED -- WORK ACTIVITY -- FLOAT/RESTRAINT cT- SCHEO ISSUE FOR APPROVAL T ISSUED COMPLETE drc- SCHEO. ISSUE TO CONSTRUCTION dK ISSUEO COMPLETE SCHEO. WORK ITEM START OR END WORK ITEM STARTED - IF NO WORK ITEM FOLLOWS IT CAN ALSO INDICATE COMPLE - TION. BECHTEL APPVD VEN( o- FIELD NEEO OATE V- DELIVERY DATE GENERAL NOTES A A A m 11. A A uoa JN SalteCAVr^+)''.AH>wft^ A Btvsec> on weAs-r'9> iaaa*co.s n>\ A a6,^e& ou forecast *1 mahhour^ W A ivu, r*e a?pcj^a^ if CSL HIM* BECHTEt MARATHON OIL COMPANY ROBINSON REFINER l' MODERNIZATION PROJECT AREA A-PLANT 16 CONSTRUCTION aRcA SUMMARY SCHEDULE mmm*. 14053 Hp-M- lOfl'tW * Cfc MOTE mwm mi 'Cft aau.v momcm Mor TKMHMMixIKCWKTOUU. MVWM ' ntvSwCoHwMmUkl RuCV*mW>MtuRrUnNtatOmTvKcDtWmAuHtElRi 1 hJC * T* UtU*L MM>. *1E* JOB NO. 3 DESCRIPTION ______________ mFiyTMx^ATUo^ c>\{_ <c-Q. LOCATION oamsoKi , ILUMOI -5 GENERAL DATA SCOPE PF WIIRK EP'fS . STANDARD WORK WEEK 40 MHI7S /vuK. DATE OF AWARD 5/80 FINAL MECHANICAL COMPLETION 4/3o/g2 ENGINEERING PERIOD 3/l/eO Til 3/12/52 ,-1. MONTHS TO 90% ENGINEERING COMPLETION `'5 r*M 2-MC7 5HIFT" POf? FFACT /l^eSETJ 5Tf?UCTU??: lO/lU/gl PiriMG UIGMT- SHIFT- _ 12/ll/gl-*- 4/30/82 TMOONFTINHfSll FMROFfM.HSATNAIRf. TAlOPFOFMOPU.NFDTA.DTNIONS ,, H^MTH5 C Wf* 80 TO APR. '8Z7\) MANUAL MANHOURS: _____ 1 "3 ft ft . loo Z4o ,ooo MANUAL PEAK: bechtel *2-41 SUBCONTRACT v//er z/z^lBz. w/d 4 //G /8 2 MAXIMUM SUSTAINED PHYSICAL % COMPLETION PER MONTH &% LOST TIME (DAYS) DUE TO: STRIKES 7 Z't* MAM7AVS WEATHER M/A OTHER ACTIVITY ST. RUN PIPE SPOOLED PIPE STRESS RELIEVING STRUCTURAL STEEL LOOP CHECK INo 1 ALLA 1 IUN HM 1 to ANU AU IIVII V UUKAIIUNU SUSTAINED CONSTR. INST. RATE DURATION 4941 L.F. '"'mo 4/81 - Z/fo ACTIVITY PILING 1<cA2 LF ^MO V'-3/0e FOUNDATIONS SUSTAINED CONSTR. INST. RATE DURATION ' 886 CV no a/si -10/01 U/A. - 3/^2. A/G CONDUIT Mo. 9/91-4/02 A.15 ThL, ^M>. V8l'3/8i WIRE & CABLE <'P'3I'> 63 352 uF 8/91 -4/82 HO INITIAL CONSTR. ACTIVITY ys?- s/fet TO START OF FOUNDATIONS M/A 8/80 -Z/8I SCHEDULE SUMMARY JOB OVERALL EPC MILESTONES PAGE_______ CONST. DATES 'o/gO TO 4l82TOTAL DURATIONWEEKS ACTIVITY QUANTITY START COMPLETE HOME OFFICE PROCESS FLOW DIAGRAMS 35 P&ID'S MfinFi 133 f'L'T^ 1b,Z3 28. P9<XfrS5 FATA SUS^TS -4 l 4/8o 4/go 5/8o 4/gO TREND BASE ESTIMATE DEFINITIVE ESTIMATE ISOMETRICS SPOOL FABRICATION STEEL FABRICATION B.E.C. MAJOR EQUIPMENT CONTROL VALVES (PURCH.) 1 SX. 4/80 1EA- 9/go I&4I >/8l 274o spools 12/80 S-rOKis 10/00 CMilafiSifrs s/eo Z47 7/8o FIELD CEKAL TPC) SITEPREP^'I^^okO 1 LOT 9/80 TEMPORARY OFFICE/WHSE TEMPORARY ELECTRICAL TEMPORARY WATER/SEWER FOUNDATIONS UNOERGROUND PIPF A 9800 HHRS "3000 HHft5 \3ooMHff6 <^19 5<SY, 1 FIELD ERECTED VESSELS 09 EN. FIELD ERECTED TANKS EA, ERECT STRUCTURAL STEElO" io> 318-rn. 8/80 8/80 0/ao u/go '/8i 5/8! M/A 4/81 ST. RUN PIPE AZ 470L.F. 49941 LF. 6/81 1/Bi PIPE TESTING A/G CONOUIT ELECTRICAL CHECKOUT LOOP CHECK 193153 LF. 133^2.0 LFT 419 EA. 957 CA. I2ft>2 3ft Ei_F >/6l 9/81 2/82 1/82 11/81 'z/8o 4/81 0/81 8/80 5/80 10/00 6/81 lo/gl 7/81 i/8l '0/01 "/Bo 9/80 9/8o 9/&o 5/8' 3/81 Z/0Z M/4 'i/8' 7/81 Z/82 3/82 Z/82 4/0Z 4/62 5/02 START COMPLETE 4/Bo 4/80 5/8 o 4/8o 4/&o 9/80 2/81 12/81 10/80 5/8o 7 /8o iz/Ba 5/8/ 7/8' &/&o 5/8 0 l/8o 9/61 l /02 i/82 1/8 1 4/82 lo/go 0/8o 8/go 8/8o i2/8o z/ei 4 /81 7/81 7/81 (p/e/ 7/81 9/01 9/01 9/81 3/8 Z ic/fti 2/81 ]2/80 |2/8o 12/80 io/8i 4/gi Z/0 2. 4/02 3/62 Z/Bt 3/82 4/8 2 4/0>2. 4/BZ 6/028/0Z COMMENTS SCHEDULE SUMMARY PHR 1.8-1 WJ02F 0S/27/BI CB/HY M GARRARD 00000655 e * KOM3H oe/H-'Sl 4i' 16 The following examples of schedules illustrate the types and detail of schedules used on the project. GARRARD 00000656 PERFORMANCE PROGRESS BECHTEL Job No. 14053 PROGRESS & PERFORMANCE CURVES PROJECT FORECAST # 4 TOTAL PROJECT CATEGORY. 100 90 80 70 60 50 40 30 20 10 0 PERIOD ENDING GARRARD 00000658 BECHTEL Job No. 14053 PROGRESS & PERFORMANCE CURVES PROJECT FORECAST # 4 CATEGORY. TOTAL DIRECTS (iMCL S/c) 100 90 80 70 60 50 40 CO CO LLI 30 OOCC CC CL 20 10 0 PERIOD ENDING BECHTEL Job No. 14053 PROGRESS & PERFORMANCE CURVES PROGRESS GARRARD 00000659 1981--------- --------------- | 1982 PERFORMANCE PROGRESS BECHTEL PERIOD ENDING Job No. 14053 PROGRESS & PERFORMANCE CURVES PROJECT FORECAST # 4 AREA B SATURATES GAS PLANT category _an_p ofp-_plots 100 90 80 70 60 50 40 30 20 10 0 PERIOD ENDING PERFORMANCE PROGRESS BECHTEL Job Ho. 14053 PROGRESS & PERFORMANCE CURVES PERIOD ENDING 00 90 80 70 60 50 40 30 20 10 0 PERIOD ENDING PERFORMANCE PROGRESS BECHTEL Job No. 14053 PROGRESS & PERFORMANCE CURVES PROJECT FORECAST # 4 CATEGORY INSTRUMENTATION J* 100 90 80 70 60 i i\ 50 40 30 20 10 0 1981" 1982 PERIOD ENDING rI PERFORMANCE PROGRESS BECHTEL Job Ho. 14053 PROGRESS & PERFORMANCE CURVES PROJECT FORECAST # 4 category 100 90 80 70 60 50 40 30 20 10 0 PERIOD ENDING BECHTEL Job No. 14053 PROGRESS & PERFORMANCE CURVES PROJECT FORECAST # 4 category PERFORMANCE PROGRESS o > 73 73 > 73 D o o 1981 f 1982 o o o FOCUS RE PORT" GARRARD 00000665 GARRARD 0000' O c Ic o c ( (. c c G G G C G G G G G G o (3) 03 RECEIVED J. A. Oakland 30 JUN1982 BECHTEL FORECAST CONTROL AND UPDATING SYSTEM-FOCUS 7 JOB NUMBER 19053-000 RUN M0. 72 PROJECT TITLE CUT-OFF DATE ROBINSON RfFJNRY MODERNZTN PROJ-MOC . , ' . >'/ ; ,, -\t v M ft-- *.},,, , 5/21/82 PROJECT START DATE 10/06/80 USERS MANUAL OATE-JANUARY .1982 JOB NO. 14053-000 ROBINSON REFINRY MODEKNZTN PROJ-MOC REPORT NO. C38022-40 FOCUS MASTER FILE LISTING RUN DATE PAGE 5/24/82 1 -******J^^'pt'r r r *rir rtv vr TTrifTfV v t -r t*r 1 00 $ $ 3 $ $3:$ 4$ ********** CUT -OFF DATE 5/21/82 ***** ****** .......... ..... ....... UNITS CURRENT OF BUDGET TO-DATE PROGRESS . PROJECT FORECAST TRENO FCST PHYS TRENO PCT PCT ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT QUANT MANHOURS QUANT MANHOURS QUANT MANHOURS MANHOURS METHOD COMP COMP ********* ************************** *******$*** ******** ********** ********** ********** *********** 44444444444444444 *********** ao6lio AO6LHL1 AQ6L12L2 A06L80LL A06L81 A11LI0 AI1L11L1 AIILI2L2 AI1L80LL AllL81 A12L10 AI2L11LI AI2L12L2 A12L22L4 A12L80LL A12L81 A13L10 A13L11L1 S/8 6 STM.TRACE SUBHDRS. SPALL BORE CS PIPE S/A 6 LARGE BORE CS PIPE S/A 6 STEAM TRACE TUBING S/A fa S/B fa DEKATRACE S/3 I.SIM.TRACE SUBHDRS. SMALL BORE CS PIPE S/A I LARGE BORE CS PIPE S/A I STEAM TRACE TUBING S/A 1 S/B l DEKATRACE S/B 2 STM.TRACE SUBHORS. SMALL BORE CS PIPE S/A 2 LARGE BORE CS PIPE S/A 2 LARGE BORE AL PIPE S/A 2 STEAM TRACE TUBING S/A 2 S/B 2 DEKATRACE S/B 3 STM.TRACE SUBHDRS. SB CS PIPE-RACK S/A 3 LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF 10 689 343 20 20 10 2031 1652 20 20 10 5395 24 36 357 20 20 10 3100 ------- IT 524 721 Tl 11 11 2267 3918 11 11 11 5867 5116 1591 11 11 11 8302 402 794 505 844 1148 357 2169 3070 632 1456 1432 5267 4623 505 2785 4200 44 9 3189 589" 1375 1175 491 368 739 6726 9299 431 794 2811 19608 17811 2377 1519 754 1115 6785 4(52 794 505 844' 1148 357 "2155 3070 632 1456 1432 5267 4623 505 2785 4200 449 3189 505 1375 1175 ~491 368 739 5726 9299 431 794 2811 19410 17803 2377 1519 7 54 1115 6785 589 CURVE-0 1375 CURVE-L 1175 CURVE-L 491 CURVE-L 368 CURVE-0 739 CURVE-0 5726 curve-t: 9299 CURVE-L 431 CURVE-L 794 CURVE-0 2811 CURVE-0 19608 CURVE-L 1T8II CURVE-L 2377 CURVE-L 1519 CURVE-L 754 CURVE-0 1115 CURVE-0 6785 CURVE-L 100 100 100 100 100 100 loo 100 100 100 100 100 loo 100 100 100 100 100 100 10c 100 loo 100 100 IOC 100 ICO 100 ICO 100 100 Ido loo 100 100 100 A13L12L2 AI3L1TL2 AI3L21LI AI3L80LL AI3L81 A14LI0 AI4LIIL1 A14L12L2 A14L80LL A14L81 A15L10 AISL1IL1 A15L12L2 A15L21LI A15L22L4 A15L80LL A15L81 A16E10EE AI6EIIEE A16E12EE AI6E20EE AI6E30EE A16E40EE AI6E4IEE A16E50EE AI6E60EE A16E61EE A16E62EE A16E63EE A16E70EE LB CS SPOOLS S/A 3 LF Le CS PIPE-RACK S/A 3 LF SB ALLOY PIPE-RACK S/A 3 LF STEAM TRACE TUBING S/A 3 LF S/3 3 DEKATRACE LF S/B 467 STM.TRCE SUBHDRS LF SMALL BORE CS PIPE S/A 4 LF LARGE BURE CS PIPE S/A 4 LF STEAM TRACE TUBING S/A 4 LF S/B 467 DEKATRACE LF S/B 5 STM.TRACE SUBHDRS. LF SMALL BORE CS PIPE S/A 5 LF LARGE BORE CS PIPE S/A 5 LF SMALL BORE AL PIPE S/A 5 LF LARGE BORE AL PIPE S/A 5 LF STEAM TRACE TUBlNG S/A fa LF S/B 5 DEKATRACE LF ERECT COLUMNS 6 VESSELS UNITS ERECT PLATFORMNG REACTOR UNITS LOAD CATALYST CF ERECT STORAGE TANKS UNITS ERECT HEAT EXCHANGERS UNITS ERECT FIRED HEATERS UNITS ERECT PLTFRM HEATER 16FJ UNI TS INSTALL PUMPS 6 DRIVERS ....... UNITS BLOMERS AND SPARES INSTALL GAS BOOSTER COMP UNITS UNITS RECYCLE GAS CENTRIF COMP UNITS RECYCLE GAS COMPRESSORS INSTALL OTHER EQUIPMENT UNITS EA 463 13245 331 20 20 10 2555 2177 20 20 10 2852 1430 651 121 20 20 4200 100 0 400 4500 400 400 3600 500 200 100 200 3200 1115 11746 1041 11 11 11 2512 5270 11 11 11 2675 3132 751 574 ........ 11 11 5399 4500 0 168 7500 7181 21135 5223 1000 9900 6600 3300 1983 866 7677 866 7677 6676 5717 6676 5717 192 294 192 294 2408 966 2408 966 2520 1293 2520 1293 1155 1620 1155 1620 2496 9357 2496 9357 4003 16034 4003 16034 1257 816 1257 816 2100 856 2100 838 34 5 516 345 516 5248 17639 5248 18199 3503 21512 3503 21462 496 958 496 958 327 5052 327 5052 1847 ..... 875 ----------- 1B47~ 875" 1904 761 1904 741 3900 10904 3900 10878 100 6536 loo "5536 0000 200 54 200 54 4600 11194 4600 11162 400 29809 400 29809 400 49480 400 49354 2 800 .......... 5824 2800 "....5825...... 500 1771 500 1771 200 7573 200 7573 100 4669 100................. .......................... 4669 200 2341 200 2341 5900 1075 5900 1075 7677 CURVE-L 5717 CURVE-L 294 CURVE-L 966 CURVE-L 1293 CURVE-0 1620 CURVE-0 9357 CURVE-L 16034 CURVE-L 816 CURVE-L 856 CURVE-0 516 CURVE-0 17639 CURVE-L 21512 CURVE-L 958 CURVE-L 5052 CURVE-L B75 CURVE-L 761 CURVE-0 10904 CURVE-E 6536 CURVE-E 0 BLOCK-E 54 CURVE-E i 1194 CURVE-E 29809 CURVE-E 49480 CURVE-E 5022, CURVE-E 1771 CURVE-E 7573 CURVE-E ........ 4669 CURVE-E 2341 CURVE-E 1075 CURVE-E too 100 100 100 100 100 100 100 100 100 100 100 IDO 100 100 TOO 100 100 TOO 0 100 loo 100 100 100 100 100 100 100 100 100 100 too 100 100 100 100 100 ICO 100 100 100 100 100 ICC TOO 100 1 GO 100 0 ICO ICO 100 ICO TOO 100 100 ICO 100 100 O 8 1 *o * s fo 8 t9r. o ,7 '4 o H ,f 9 ?! 9 2, ? :< 9 ?c 9 1? 13 9I'l :p 17 '9 lr " 9 44 * 9 4" -,r, s/ r,r Cl ff- f JOB NO. 19053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38022-90 F 0CuS MASTER FILE LISTING RUN OATE PAGE Ft/ 82 2 - -..... . -^^1 ------------------- ........ -- " ~ 00 ' ~ ...... ..... -... # 4f $$ # $ $ $ $ # %$4: *4:& 4:4f$ $ $ " $ 4:$$ $ 4: $4:4^ -------------- CTT! -OFFDATE 4: $4: 5/21/8? 4s&$4:4t4 UNITS OF .CURREN--T--- -- BUDGET ....... ........... ---T--O-----D--A--T--E--- P. R. OG-- RESS PROJECT FORECAST TRENO .... . ------ FCST PHYS TRENO PCT ...PCT .... ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT QUANT MANHOURS QUANT MANHOURS QUANT MANHOURS MANHOURS METHOD COMP CCMP $4:4:4:4:4; 4: * 444444444 ... Ai6J01J9 FAB INSTRUMENT SUPPORTS EA .... 102 1995 3?3 35 35 373 3T1 CURVE-J 100 100 A16J11J9 F1EL0 MOUNTED INSTRUMNTS EA 177 8179 203 9109 203 9109 9109 CURVE-J 100 100 A16J15J9 INSTALL MINOR INSTRUMNTS AI6J22J IDC I/O RACK EA UNITS 779 2 7626 3 900 2817 300 276 900 2850 300 ~ 276 2817 CURVE-J 100 276 CURVE-J 100 100 too A16J31JJ LOCAL CONTROL PANEL UNITS 100 190 1900 792 1900 768 792 CURVE-J 100 100 A16J50JJ INSTRUMENT SHELTERS EA 197 2627 32 233 32 217 233 CURVE-J 100 100 AI6J60JJ ANALYZER CONTROL PCKGE EA 83 7266 15 695 15 627 69? CURVE-J 100 100 A16J7IJJ INSTR AIR TUBING LF 1579 670 3100 1923 3100 1361 1923 CURVE-J 100 100 A16J79JJ A16J81JJ A16J82JJ INSTR AIR SUB-HEAOERS LOOP CHECK CALIBRATION TESTING LF LOOPS EA 3383 169 1077 2365 1695 6515 7090 526 639 5375 3732 2709 7090 683 695 5229 3175 32 86 5375 CURVE-J 9B70 CURVE-J 2797 CURVE-J 100 77 98 100 77 99 A16J95JJ EMERGENCY SO REDUNDANCY UNITS 100 1177 100 953 100 953 . 953 CURVE-J 100 100 A16LI1L1 INST CS PIPE 2 IN UNOER LF 67 90 7609 0 0 0* 0 0 BLOCKS 0 0 A16L12 DELETE Hill 0 0 0 0 0 0 0 BUDGET 0 0 A16L29L9 INST AL RACK LARGE BORE LF 992 752 0 0 0 0 2068 BLOCK-9 0 0 A16L70LL INST L/G PIPING LF 2301 5083 2 30 3 6263 2303 6263 6263 CURVE-L 100 100 A16LB0LL INSTALL STM TRACE TUBING LF 6912 3932 0 0 0- 0 0 BLOCK-L 0 0 A16L 81 LF 0 0 0 0 0 0 0 BUDGET 0 0 A16L91LL ASSIST XR AY ST RELIEVE UNITS 200 1900 200 3971 200 3971 T9TI CURVE-L 100 TOD A16L98LL TESTING INSPECTION LF 63033 6698 90932 16579 90932 16597 16579 CURVE-L 100 100 A16M10MM STEEL STRUCTURES TONS 387 19530 300 17977 300 17977 17977 CURVE-M too loo A16M20MM LADDERS G PLATFORMS TONS 58 9575 190 13199 190 13199 13199 CURVE-M 100 100 A16M30MM PIPEWAY STEEL TONS 12 950 22 1029 22 1029 1029 CURVE-M 100 100 A16N30 0 FIREPROOFING LUGS A16P12PP POWER CONTROL EQUIP UNITS 1 1 EA 127 6218 82 7 899 209 5793 827 209 899 5664 " 899 CURVE-0 100 5745 CURVE-P 100 100 100 A16P13PP EMERGENCY STANOBY EQUP EA 17 800 16 529 16 529 529 CURVE-P 100 100 A16P19PP LIGHT FIXTURES RECEPTL A16PI6PP REDUNDANCY ALARMS EA EA..... 310 2 59 1998 320 ~ 593 9093 593 ....... 0 ............. 0 ................... 0* 9059 9093 CURVE-P ... --.......0 --------- - 0 BLOCK-P 100 0 100 0 A16P2IP6 INSTALL A/G RGS CONDUIT LF 52878 29106 79819 97120 79819 95960 97120 CURVE-P 100 1,00 A16P23P6 INSTALL NON-MET CONOUIT LF 25500 9117 17676 9183 17676 9183 9183 CURVE-P 100 100 .. A16P25PS INSTALL CABLE TRAY ... -.... ......LF Iff - 15 ..... 895 ..... 1272 895 1266 ----------- T2T2 CURVE-P 100 100 .. A16P31P7 PULL WIRE 600V 1KV LF 297010 8998 252905 6732 252905 6701 6732 CURVE-P 100 ICO A16P32P7 PULL CABLE 5KV ABOVE LF 19900 1110 18285 725 18285 725 725 CURVE-P 100 100 A16P3JP7 PULL ELECTRNIC TC WIRE ...... LF .... ...... 99200 9629 86150 ..... 9961 ... 86150 9961 ---------- 9961 CURVE-P 100 IOC A16P39PP TERMINATIONS 600V C IKV EA 9198 2353 5786 9092 5786 9029 9092 CURVE-P 100 100 A16P3SPP TERMINATIONS 5KV ABOVE EA 102 320 117 986 117 967 986 CURVE-P 100 100 A16P36PP TERM!NATIONS ELECTR 6 TC Ea ..... 696 7 3697 7259 7S99S ..... 7254 .... 4485 9495 CURVE-P 100 .... 100....... A16P91PP GROUNDING UNITS 10900 3987 21815 2580 21815 2495 2580 CURVE-P 100 100 A16P92PP INSTALL GROUND WELL EA 100 236 100 115 TOO 115 115 CURVE-P 100 100 A16P93PP ELECT HEAT TRACING LF 8600 8256 2500 16 SB 2500 2oiI 1888 CURVE-P loo loo A16P50P7 O/H POWER DISTRIBUTION LF 13 9 0 0 0* 0 0 BLOCK-7 0 0 A16P 81IPP ELECT TESTING E CHECKOUT UNITS 100 1280 100 1961 100 1999 1961 CURVE-P 100 100 A16P99 0 Secuno drop mat handling QMIIRS ............... 1 ............. . 1 2 000 ....... 2000 1799 -- ------- 1799 CURVE-0 100 .....100 ...... A1600100 FABRICATE REBAR TONS 95 715 95 1266 95 1266 1266 CURVE-Q 100 100 A16Q11QQ PLACE FOUNDATION CONC CY 2696 635U 9627 11098 9628 11098 11100 CURVE-Q 100 100 A160120U PLACE STRUCTURAL CONC CY 22 51 869 3 2275 9037 2275 9037 903 7 CURVE-Q loo 100 A16U15QQ PLACE OTHER CONCRETE CY 239 797 333 209 333 209 209 CURVE-Q 100 100 A16Q21QU PLACE FOUNDATION REBAR TONS 132 3130 901 11622 901 11622 11622 CURVE-Q 100 100 O 8 1 2o 5 6o 0 9 III o o w <1 21 9 9 A 23 3, 11 ,, 37 *' * 44 K ,, 4' ,, 0 JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MUC J[ REPORT NO. C38022-40 FOCUS MASTER FILE LISTING RUN OATE PAGE 5/24/02 3 o o /" --------------------------------- o , hm......-- --........ ........ .. ... * $ $$$ $$$ $ *******<: $ $ 00 ................. " . . ... - 2$ UNITS CURRENT BUDGET 70-DATE PROGRESS " PROJECT FORECAST CUT -OFF DATE 5/21/82 TREND PHYS TREND o OF FCST PCT PCT ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT QUANT MANHOURS QUANT MANHOURS QUANT MANHOURS MANHOURS METHOD COMP COMP C $$$$$$$ 4=* ** ^ * * ** * $ $ YTTXT 0 8 A16U22QU PLACE STRUCTURAL REBAR A16Q25QQ PLACE OTHER REBAR 9 A16Q31QQ PLACE E STRIP FDN FORMS TONS TONS SF 223 16 17973 2858 375 6458 340 0 31715 21953 0 28507 341 0* 31715, 21953 0 28507 22038 CURVE-Q 0 BLOCK-Q 28507 CURVE-Q 100 0 100 loo 0 100 9 H' 0 l? .0 A16U32QQ PLACE 6 STRIP STR FORMS SF 37906 16t>7 2 70113 54213 70113 54213 54213 CURVE-Q loo 100........... " n AI6Q35QQ PLACE E STRIP OTHER FORM SF 1640 735 0 0 0* 0 0 BLOCK-G 0 0 <J A16U6IQQ PLACE PRECAST CONCRETE CY 478 1147 410 1780 410 17B0 1T80 CURVE-Q 100 100 l( A16Q62QU PLACE PRECAST REBAR TONS 82 1312 139 4193 139 4193" "4193" CURVE-Q 100 100 Ai606300 PLACE PRECAST FORMS SF 17700 7222 13015 9871 13015 9871 98T 1 CURVE-Q 100 100 ,r 1 A16Q69Q0 SET PRECAST CONC ITEMS CY 478 3824 410 7226 410 7226 7226 CURVE-Q 100 100 h: AI6071QU PLACE CONRETE PAVING SF 70470 11275 36000 3894 36000 3894 3894 CURVE-Q 100 100 AI6Q73QU PLACE CONC ENVELOPES CY 690 3312 685 3443 68 5 3443 3443 CURVE-Q 100 100 3 IS AI6R03 ELECTRICAL SUBSTATION UNITS 100 560 100 1341 100 1345 1341 CURVE-0 100 100 10 A16R1U BOILER FEED WATER BLOG. UNITS" 100 270" TOO 619 ruo 650" 619 CURVE-0 100 108 ?n AI6R20 SATELLITE CONTROL ROOM UNITS 100 350 100 1298 100 1300 1298 CURVE-0 100 100 A16S03S0 DEWATERING BMHRS 2800 2800 4100 4673 4100 4673 4673 CURVE-S 100 100 21 ,, A16SUS5 excavation e disposal .M AI6S12S5 BACKFILL C COMPACTION CY CY 1702 9765 4953 7547 2900 5883 4804 5951 2900 5883 4804 5951 4004 CUftVE-5 TOO 5951 CURVE-S 100 ICO 100 v A16S31S5 SEWERS 6 DRAINAGE LF 3670 2466 3161 3415 3161 3415 3415 CURVE-S 100 100 Y. Al6S32S5 PRECAST MANHOLES UNITS.. 2000 2450 "2400 3030 2400 3038 3038 CURVE-S 100 100 fi A16S41S5 FINE GRADING t. LEVELING SF 70470 6146 46872 1781 46872 1900 1781 CURVE-S 100 100 .7 A16Y10 0 SCAFFOLDING AI 71 mi SMALL BORE CS PIPE S/A T 73 AI7L12L2 LARGE BORE CS PIPE S/A 7 BMHRS IF ...... LF 19186 1343 1027 19186 186T 2262 25390 1607 1908 77427 3371 6841 25390 ... ...1607 1909 77607 -------- 3371 6841 77427 CURVE-0 3371 CURVE-L 6846 CURVE-L 100 100 100 100 TOO....... 100 V ' <0 AI7L21L1 INST AL PIPE 2IN L UNDER LF 579 1101 336 445 336 445 44 5 CURVE-L 100 100 Tl AI7L80LL steam Trace Tubing s/a l M A18L10 S/B 8 STM.TRACE SUBHORS. LF LF 20 ..... 11 10 11 434 1488 168 3617 434 1489 168" 3617 160 CURVE-L loo 3619 CURVE-0 100 100 100 " a:- !3 A10L11L| SMALL BORE CS PIPE S/A 8 LF 6978 8722 6732 22072 6732 21226 22072 CURVE-L 100 100 J4 AI8L12L2 Large bore cs pipe s/a a A18L21L1 SMALL BORE AL PIPE S/A 8 LF LF 2001 304 4100 475 2832 121 22114 327 2832 121 22007 32 7 22114 CURVE-L 100 327 CURVE-L 100 loo 100 :( t A18L22L4 LARGE BORE AL PIPE S/A 8 LF 907 4017 1289 18764 1289 18764 18764 CURVE-L 100 too V AI8L80LL STEAM TRACE TUBING S/A 8 LF 20 11 ........ 37iO 3652 3712 3552 3654 CURVE-l loo 100 "......... 4'. A18L81 S/B 8 DEKATRACE IF 20 11 4284 311 4284 311 311 CURVE-0 100 100 10 AI9L10 S/B 9 STM.TRACE SUBHORS. LF 10 11 383 523 383 523 523 CURVE-0 100 100 A19LULI SMALL BORE CS PIPE S/A 9 4. A19L12L2 LARGE BORE CS PIPE S/A 9 LF LF 3036 1453 2604 3218 2108 2227 5355 11512 2l 1 3 2227 5355 11512 5369 CURVE-L loo 11512 CURVE-L loo 100 1U0 4? AI9L21L1 SMALL BORE AL PIPE S/A 9 LF 11 20 293 668 293 668 668 CURVE-L 100 100 ,, > AI9L22L2 LARGE BORE AL PIPE S/A 9 LF 7 31 48 1099 48 ......... 1099 ....... 1099 tURVE-L 100 100 ......... AI9L80LL STEAM TRACE TUBING S/A 9 LF 20 11 984 595 9e4 595 595 CURVE-L 100 100 4' A19L81 S/B 9 OEKATRACE LF 20 11 1428 359 1428 354 359 CURVE-0 100 100 r.,. 4f A21L11LL INST CS PIPE 2IN C UNDER LF 33 55 1636 2203 1636 2203 2203 CURVE-L 100 loti r. W A21L12L2 LARGE BORE CS SPLO PIPE LF 26 50 1053 6745 1053 6745 6 74 5 CURVE-L 100 100 .1.0 A21LI7L2 LARGE BORE CS RACK PIPE A21L80LL STEAM TRACE TUBING SIB2I LF LF 61 56 2982 4766 2982 4766 4766 CURVE-L 100 100 C1 20 11 191 444 .............191 191 CURVE-L 100 ....100 ......... A31E50EE INSTALL PUMPS E DRIVERS A31E70EE INSTALL OTHER EQUIPMENT EA ea 200 100 500 100 200 0 405 0 200 0- 405 0 405 CURVE-E 100 0 BLOCK-E 0 ICO a w A31J01J9 FAB INSTR SUPPORTS Ea 12 200 3 31 3 3i .................. 31 CURVE-J 1U0 100 ..... * A31J11J9 F1EL0 MOUNTED INSTRMENTS EA 20 524 5 101 5 101 101 CURVE-J 100 100 '' ... A31J15J9 INSTALL MINOR INSTRMENTS EA 21 105 4 13 4 13 13 CURVE-J 100 loq ' 0 o JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC r> REPORT NO. C38022-40 FOCUS MASTER FILE LISTING RUN OATE PAGE 5/24/82 4 O 9 r ----------------- mmrn ' Mi o? $$$$$??* $$$$$$$ UNITS A ........ OF o5 6 ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT #if$: & 4;$ $ $ $ s$ $ $$ ## $$ <! $$$# I oa A31J50JJ INSTRUMENT SHELTERS A3U70JJ INSTALL ins tr tubeepipe Ea LF . A31J81JJ LOOP CHECK CALIBRATE EA 10 A31J82JJ CALIBRATION E TESTING EA o A31L80LL STEAM TRACE TUBING LF A31M30MM PIPEWAY STEEL TONS n A3IP21P6 PLT 31 ELECT 1COMPOSITET LF oM A31G40QQ PLACE CONCR TECCOMPOSITE1 CY A31S11S5 EXCAVATION DISPOSAL CY 16 A31S12S5 BACKFILL COMPACTION CY C IT 18 A31Y10 SCAFFOLDING B09E10EE ERECT COLUMNS VESSELS BMHRS EA c ?i B09E30EE B09E50EE B09E60EE INSTALL HEAT EXCHANGERS INSTALL PUMPS DRIVERS INSTALL COIMPRESSORS EA EA EA B09E7OEE INSTALL OTHER EQUIPMENT EA ?.l B09J11J9 FIELD MOUNTED INSTRUMNTS ?4 B09J15J9 INSTALL MINOR INSTRUMNTS EA EA B09J31JJ LOCAL CONTROL PANELS ?: B09J50JJ INSTRUMENT SHELTERS UNITS EA 21 B09J70JJ INSTALL INST TUBE PIPE LF ?a B09J81JJ LOOP CHECK LOOPS B09J82JJ TEST STORE EA B09L10L1 STEAM TRACE PIPE-SUBHORS LF B09L11L1 INST CS SPLD 2IN UNDER LF c i? B09L12L2 INST CS SPLD 31N TO 6IN LF 13 B09L70LL INSTALL U/GROUND PIPE LF 14 B09L80LL STEAM TRACING LF c 15 B09L98LL TESTING INSPECTION LF 36 B09M10MM STEEL STRUCTURES TONS 37 V u* B09M20MM B09M30MM B09P12PP LADDERS E PLATFORMS PIPEWAY STEEL POWER CONTROL EQUIP TONS TONS EA * B09P14PP LIGHT FIXTURES RECEPIL EA ....... 4. B09P21P6 4? B09P31P7 43 " 809P33P7 INSTALL A/G RGS CONDUIT PULL WIRE 600V 1KV PULL ELECTRNIC ..IC WIRE LF LLFp 44 B09P34P7 TERMINATIONS bOOV 1KV EA 44 B09P36P7 TERMINATIONS ELECTR TC EA 46 B09P41P7 GROUNDING ............... LF B09P43PP ELECTRIC HEAT TRACING -<> B09P80PP ELECTRICAL TEST CHKOUT LF UNITS r. 80901100 PLACE FOUNDATION CONC CY >n B09021QQ PLACE FOUNDATION REBAR B09Q31QQ PLACE E STRIP FDN FORMS TONS SF 7 B0907100 PLACE CONCRETE PAVING SF o B09R90QQ BUILDING WORK UNITS ,4 B09S11S5 EXCAVATION DISPOSAL CY o ' 00 CURRENT "~ ' ' BUOGET TO-OATE PROGRESS PROJECT CUT-0 FF "UA TE 5/Z1782 $#$$SSSSS$S$SSSSSS$S:$S FORECAST TREND PHYS TREND 2 3 9 ' FCST....... ....... PCT PCT -------- b QUANT MANHOURS 2 T~ 200 44 1 20 1 9 57 355~ 185 105 6 11 38 5 400 QUAN7 MANHOURS - ? "---------------32 190 89 74 --r 4 00 5 1706 -- 209 7^3 12 438 QUANT MANHOURS 4 190 7 7 0- 5 17116 12 32 89 11 10 0 209 793 438 MANHOURS METHOD COMP CCMP $$$$$$$$$ vrvvr? 32^CURVE-J" too 100 89 CURVE-J 100 100 4 CURVE-J 100 6 CURVE-J IDO 100 100 0 BLQCK-L 0 0 209 CURVE-M 100 100 797TURVE-P 100 TOO 438 CURVE-Q loo 100 6# fl 9 ,n I? 13 4 16 .0 60 103 746 500 600 400 100 300 0 0 0 0 230 370 746 38 7 272 290 500 ` 120 0 0 0 0 60 50 0 600 900 300 100 300 0 0 0 0 243 34 0 733 213 10 252 0 41 5 0 23 60 50 0* 600 900 300 loo 300 0* 00* 0* 243 34 0 733 2l3 10 252 160 41 5 0 23 243 CURVE-S 34 CURVE-S 0 TARGET 733 CURVE-E 213 CORVE-E 10 CURVE-E 252 CURVE-E 190 BLOCK--E 41 TO-OATE 5 TO-OATE 0 BLOCK-J 23 TO-OATE 100 loo 0 100 100 loo loo 100 0 0 0 0 100 loo 0 100 1G0 ICO 100 0 100 100 0 100 X ?, j; ? ?r ?tt .11, 14 0 1 149 0 0 0 9 0 0 0 4 345 0 0 0 8 0 0 0 25 22 0 0 0 117 0 0 0 105 85 40 26 302 168 44 75 os 25 22 OS os os 117 os OS 0 105 85 40 26 302 168 44 75 0 BLQCK-J 105 CURVE-J 85 CURVE-J 40 TO-OATE 26 fO-OAfE 302 TO-OATE 168 CURVE-L 44 TO-OaTE 75 TO-OATE 0 100 100 0 0 0 100 0 0 0 ,6 100 100 -17 11 1G0 ioo 40 4, 100 1? 100 .....loo.............. 4- 100 4f, 13 466 8 210 8 210 210 CURVE-M 100 100 41 13 842 ~ -j T039 " " 7' 1039 1039 CURVE-M 100 "100 15 574 42 1458 42 1458 1458 CURVE-M 100 100 lb 755 13 174 13 174 174 CURVE-P 100 ioo 44 ........252 ............. ' 26 .... ... ..... 67 ........... .....26....~ ...............67 .........67 CURVE-P 100 100 ....... 3814 2259 5250 1840 5250 1840 1840 CURVE-P loo 100 S4 36200 805 17400 328 17400 328 328 CURVE-P loo 100 6250 305 ... "2265 ... " ' "77" 2265... 77 77 CURVE-P 100 IOC 315 201 100 54 100 54 54 CURVE-P 100 ICO 320 187 80 118 80 118 118 CURVE-P 100 100 950 800 100 302 2517 250 iOoo 50 100 227 50 158 looo 50 100 ............227 ....227 CURVE-P 50 50 CURVE-P 158 158 CURVE-P 100 100 100 100 ........ r.i 100 r 100 '' 122 .............. 317 133 ........391 ............... 133 " 391 ..391 CURVE-0 TOO ..... 100 5 126 7 715 7 715 715 CURVE-Q 100 100 4700 1965 2690 1024 2690 1024 1024 CURVE-Q 100 100 4080 660 4090 340 4080 340 .............. 340 CURVE-Q 100 100 ------- 100 240 0 0 OS 0 0 BLOCK-Q 0 0 BOO 1611 653 1324 653 1324 1324 CURVE-S 100 100 n ... GARRARD 00000670 e# # # 0 JOB NO. 14053-000 ROBINSON REFINRY MODERN2TN PROJ-MOC REPORT NO. C38022-40 FOCUS MASTER FILE LISTING RUN QATE PAGE 5/24/62 5 <5 9 r i 4* AaA. gk4g iAp 4.aA. Ag <4? 00 ********* ************ CUT-OFF DATE 5/21/82 ****** 1 79 3 UNITS CURRENT BUDGET TO-DATE PROGRESS PROJECT FORECAST TREND PHYS TREND 4 OF FCST PC? PCf 5 acct. no DESCRIPTION OF ACCOUNT RC QUANT QUANT MANHOURS . QUANT MANHOURS QUANT MANHOURS MANHOURS METHOO COMP CCMP 0 * *$ $*4: * * * * ** <:* 4= * *$ 4:*4: $ * ****************** *********** ******** *********** ********* *6$3$$S 3 3*3 ****** ***** 9 ; B09S12S5 BACKFILL 6 COMPACTION B09S31S5 SEWERS DRAINAGE 0 B09S32S5 PRECAST MANHOLES CY LF EA 650 300 348 . 171 499 287 310 1209 4W 287 3 to 1209 HO CURVE-5 100 1209 CURVE-S 100 TOO 100 9 10 9 1 136 1 4 1 4 4 CURVE-S 100 100 10 B09S41S5 FINE GRADING LEVELING SF 2200 215 2200 65 2200 65 65 CURVE-S loo 100 B09Y10 SCAFFOLDING 1? B20U40QU PLACE CONCRTEICOMPOSITEI 11 B20S11S5 EXCAVATION BACKFILL .4 B21E10EE ERECT COLUMNS VESSELS IS B21E50EE INSTALL PUMPS DRIVERS ,0 B21LUL1 INST CS PIPE 2IN UNDER MHRS CY CY EA EA LF 0 7 13 100 400 0 0 100 40 25 1005 0 0 0 .0 100 600 0 2052 0 0 59 314 0 0* 0$ 0* 100 600 0* 2052 0 0 59 314 0 2052 TO-DATE 0 BLOCK-Q "0 BLOCK-5 59 CURVE-E 314 CURVE-E 0 BLOCK-1 0 0 15 100 loo 0 100 0 0 100 100 0 9 ,, >< "3 1/ B21L12L2 LARGE BORE CS SPLD PIPE 16 B21L1TL2 LARGE BORE CS RACK PIPE LF LF 0 0 0 0 0 1 0 BLOCK-2 0 0 3 0 0 0 0 03 35 0 BLOCK-2 0 0 J. .0 B21L22L4 LARGE BORE AL SPLO PIPE LF 230 385 0 0 03 0 0 BLOCK-4 0 0 ? M B21L24L4 LARGE BORE AL RACK PIPE LF 360 596 0 0 03 0 0 BLOCK-4 0 0 21 B21L98LL TESTING INSPECTION LF 0 0 0 0 03 0 0 BLOCK-L 0 0 Jr n B21M30MM PIPEWAY STEEL '3 B21M40MM MISCELL STRUCT STEEL TUNS TONS 462 17380 59 4420 327 16443 5 108 327 16443 16443 CURVE-M loo 100 5 180 108 CURVE-M 100 100 ?? r t B21P12PP POWER CONTROL EQUIP BZ1P14PP LIGHT FIXTURES RECPTLE X B21P21P6 INSTALL A/G RGS CONDUIT EA Ea LF 10 640 a 97 8 97 97 CURVE-P 100 100 1; 9 2700 . 80 1696 0 600 0 291 03 600 80 291 O BLOCK^F 0 291 CURVE-P 100 0 100 V, !: n B21P31P7 PULL WIRE 600V 1KV LF 15100 560 1200 74 1200 74 74 CURVE-P 100 ICO /fl B21P32PB PULL CABLE 5KV ABOVE 74 B21P34PP TERMINATIONS TESTING LF ............... 1 ............. 81....... EA 20 157 0 50 0 ... 126 ~.. 03 50 -0 126 -- 0 FLOCK-8 ......0..... 0 ....... 1, 126 CURVE-P 100 ICO 1" 3 m B21P43PP ELECT HEAT TRACING 11 B21Q40QG PLACE CONCRTElCtMPOSITEI CLFy 3B002 ' 320 1362 2800 217 622 2698 2800 217 622 2698" 622 CURVE-P 100 ICO 269B"CURVE=Tr 100" 100 17 B21SUS5 EXCAVATION DISPOSAL CY 1305 3465 469 1107 469 1107 1107 CURVE-S 100 100 '1' 3 n B21S12S5 BACKFILL COMPACTION CY 1224 535 288 333 288 333 333 CURVE-S 100 100 14 B23E 10EE ERECT COLUMNS VESSELS 15 B23E30EE ERECT HEAT EXCHANGERS lb B23E 31Ec ERECT CONDENSER 23E-9 EA EA EA looo 1200 100 2000 520 1980 1400 ----------4525 1300 843 100 1100 1400 1300 100 4 525 .... 843 1100 4525 CURVE-E 843 CURVE-E 1100 CURVE-E 100 100 100 100 .... .. 100 4. 3 100 B23E40EE ERECT FIRED HEATERS ....... EA .... 100 2300 ...... ... 100 ----------4688 loo... 4688 46BB TURVE-E "100 100---------- 3" B23E50EE INSTALL PUMPS DRIVERS EA 2200 3900 2000 1443 2000 1443 1443 CURVE-E 100 100 3 39 B23E70 OTHER EQUIPMENT UNITS 300 150 ZOO 82 200 74 82 CURVE-0 loo ICO V. 4b B23J01J9 FAB INSTRUMENT SUPPORTS EA 24 ......... 405 15 91 ....... ' 15.... ... ....... 91 ........ 91 CURVE-3 loo 100 ......... 1 B23J11J9 FIELD MOUNTED INSTRUMNTS 47 323J15J9 INSTALL MINOR INSTRUMNTS EA EA 40 231 1282 1679 71 1016 186 1083 71 186 1016 1083 1016 CURVE-J 100 1083 CURVE-J 100 100 100 v Q:.4 ,3 B23J31JJ Local control panel UNITS 100 36 100 16 100 ------ 16 16 CURVE-J loo ICO 44 B23J50JJ INSTRUMENT SHELTERS EA 23 768 22 617 22 617 617 CURVE-J loo 100 <3 4S B23J50JJ ANALYSER CONTROL PCKGE EA 15 140 1 8 1 8 8 CURVE-J 100 100 "= B23J70JJ INSTALL INSTR TUBEEPIPE Lf 1180 730 1600 1643 1600 1627 1643 CURVE-J 100 100 B23J81JJ LOOP CHECK 41 B23J82JJ CALIBRATION TESTING EA EA 32 400 134 883 134 883 883 CURVE-J 100 100 Qc. 310 1748 80 639 80 639 639 CURVE-J 100 100 fi 41 B23J95JJ EMERGENCY SO REDUNDANCY UNITS ido 449 0 0 03 0 0 BldCK-J 0 0 H B23L10L1 STEAM TRACE PIPE-SUBHURS LF 5 7 1279 3147 1279 3147 3147 CURVE-L loo 100 O B23L11LI INST CS PIPE 2IN UNDER LF 5168 5665 3053 8711 3052 3711 8711 CURVE-L 100 100 B23L12L2 INST CS SPLD JIN 10 6IN LF 50 86 13915 3711 12583 3 711 12587 12583 CURVE-L loo 100 B23L21L1 INST AL PIPE 2IN UNDER LF 2 80 611 0 0 03 5800 0 BLOCK-1 0 0 o B23L70LL INSTALL U/G PIPE ; LF 490 581 990 1236 990 1236 1236 CURVE-L loo loq oo GARRARD 00000671 9 O JOB NO. 1`053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC FOCUS MASTER FILE LISTING RUN DATE PAGE 5/24/82 6 O 0 REPORT NO. C38022-40 o -. i ..... 00 CUT-OFF DAtE 5/21/82 1 7 3 S 6 , ACCT. NO B23L80LL DESCRIPTION OF ACCOUNT inst stm Trace tubing UNITS OF RC QUANT $$$$$$$$$ LF CURRENT QUANT 2 50 BUOGET MANHOURS 135 TO-DATE PROGRESS QUANT MANHOURS 4400 3055 PROJECT FORECAST QUANT MANHOURS TREND FCST MANHOURS METHOD PHYS PCT CCMP TREND PCT CCMP 4405" 1005 3005 CURVE-L 100 100 29 5 69 0 9 9 i0 1 2 ! ' C< B23L91LL B23L93LL B23L98LL B23M10MM B23M20MM B23M30MM 823N30 B23N40 ASSIST XRAY E ST RELIEVE FAB TIE-IN SPOOLS TESTING E INSPECTION STEEL STRUCTURES PLATFORMS E LAOOERS PIPEWAY 3TEET"" FIREPROOFING LUGS FIREPROOF STRUCT STEEL UNITS EA LF TUNS TONS TONS UNITS CF 100 L 17055 60 28 62 1 3537 225 13 1933 2385 2075 2540 1 12462 " 100 36 "2421T 7 34 17 725 0 483 901 4195' 650 4055 816 808 0 100 36 "24212" 7 34 17 725 09 483 901 - 4195 650 4055 BT5" 808 0 483 CURVE-L 901 CURVE-L ------ 4T95" CURVE-L 650 CURVE-M 4055 CURVE-M BPS "CURVE-M 808 CURVE-0 0 TARGET 100 100 TOO 100 100 100 100 0 100 100 100 ....... 100 100 "100 100 0 9.0 1 9 > 9 7 6 i ft 823P12PP B23P13PP B23P14PP B23P21P6 B23P23P6 B23P25P8 POWER E CONTROL EQUIP EMERGENCY E STANDBY EQUP LIGHT FIXTURES E RECEPTL INSTALL A/G RGS CONOUIT INSTALL NON-MET CONOUIT INSTALL CABLE TRAY EA EA EA LF LF LF 1 53 21915 3100 400 ..... 2400 400 480 12456 400 240 ..... 52 0 203 26500 3470 0 ---------- 1239..... 0 683 TO 460 563 0 --- -------52 09 203 26500" 3470 09 .....1239 ........... 1239 0 683 10476"-- 563 0 683 10460 563 00 CURVE-P BLOCK-P CURVE-P CURVE-P CURVE-P BLOCK-8 TOO 0 100 "TOO 100 0 ... 100........... 0 100 TOO 100 0 2, 2. 2 B23P3IP7 PULL WIRE 600V E 1KV LF ' 66360 ... i9l5 >3 B23P32P7 PULL 5KV E ABOVE CABLE LF 14 1 B23P33P7 pull electrnic e tc wire LF 40375 1792 T6Ij B23P34P,P terminations 6oov g ikv EA 1168 : , B23P35PP 5KV E ABOVE TERMINATIONS B23P36PP TERMINATIONS ELECT E TC EA EA 1 3087 a 1749 64000 1700 30000 850 36 2900 1259 25 1293 " 238 86 970 64000 1700 30000 BOO 36 2900 1259 25 1293 230 86 970 1259 CURVE-P 25 CURVE-P 1293 CURVE-P 230 CURVE-P 86 CURVE-P 970 CURVE-P 100 100 100 100 100 100 loo 100 100 100 100 100 2*1 3( 12 ' "8 29 30 31 B23P41PP B23P43PP B23P50P7 B23P80PP GROUNDING ELECTRIC HEAT TRACING 0/H POWER DISTRIBUTION ELECT TESTING E CHECKOUT LF LF LF UNITS 1500 3850 53 100 480 3775 10 385 2020 0 1725 100 445 0 240 364 2020 09 1725 loo 445 0 240 364 445 CURVE-P 0 BLOCK-P 240 CURVE-P 364 CURVE-P loo 0 100 100 100 0 100 "Too 3/ v: 7 B23P99 SECOND DROP MAT HANDLING BMHRS 1 1 0 0 09 0 0 TARGET 0 0 B23U01Q0 FABRICATE REBAR TUNS 1 16 10 1285 10 1285 1285 CURVE-Q 100 100 }4 35 36 - 3? B23QUUQ B2 3012 QQ 823U21QQ B23Q22QQ PLACE FOUNDATION CONC PLACE STRUCTURAL CONC PLACE FOUNDATION REBAR PLACE STRUCTURAL REBAR CY CY TONS ..... TONS 412 1059 10 38 16 359 T ........ ~ 13 410 114 27 10 2090 442 2016 no*!... - 4io 114 27 10 2090 442 2016 1199 2090 CURVE-Q 442 CURVE-Q 2C16 CURVE-Q 1199 CURVE-0 100 100 100 TOO 100 ICO 100 100...... ns M ' in jn B23Q31QQ PLACE E STRIP FON FORMS D23U32QQ PLACE E STRIP STR FORMS SF SF 8455 98 3611 44 7200 6326 4266 3919 7200 6326 4266 3919 4266 CURVE-Q 100 3919 CURVE-Q 100 100 100 40 B23Q61QQ PLACE PRECAST CONCRETE .......CY 10 .............. 24 .......... 171 557 .... m ........... 557 ..... 557 CURVE-Q TOO 100 B23Q62QQ PLACE PRECAST REBAR B23063QU PLACE PRECAST FORMS TONS 1 16 28 1531 28 1531 1531 CURVE-Q 100 100 SF 10 4 7541 5676 7541 5676 5676 CURVE-Q 100 100 43 B23Q69 SET PRECAST CONC ITEMS CY 10 80 17 3 3619 .... 17 J 3619 3619 CURVE-0 100 TOO B23Q71QQ PLACE CONCRETE PAVING B23Q73QU PLACE CONCRETE ENVELOPES 4f B23R01 BUILDINGS SF CY MHRS 2199U 93 0 5592 445 0 21990 108 0 2760 1258 0 21990 108 0 2760 1258 0 2 760 CURVE-Q 1258 CURVE-Q 0 BUDGET 100 100 0 100 100 0 B23R95 0 REVAMP EXISTING BLDGS B23S03S5 DEWATERING UNITS BMHRS 100 870 299 875 100 756 870 4306 100 870 756 4306 756 CURVE-U 100 4306 CURVE-S 100 100 100 49 B23S11S5 EXCAVATION E DISPOSAL CY 2664 3560 3745 4490 .... 374 5 ........ 4535 ... ...4490 CURVE-S TOO TOO ..... 50 ,1 B23S12S5 BACKFILL COMPACTION B23S31S5 SEWERS E DRAINAGE CY 2711 1060 3676 3671 3676 3671 3671 CURVE-S 100 100 " LF 1033 688 1537 3366 1537 3366 3366 CURVE-S 100 100 .2 .......B23S32S5 'il 823S41S5 B23S98 65 PRECAST MANHOLES F1NEGRA0ING E LEVELLING DEMOLITION , EA SF UNITS 7 21990 100 855 1925 449 6 8 21990 100 579 920 6613 ....... a 21990 100 579 ............579 CURVE-S 768 920 CURVE-S 6613 6613 CURVE-S 100 100 100 100 ..... " 100 " 100 oO o _! JOB NO. I<(053-000 ROBINSON REFINRY M00ERN2TN PRQJ-MOC REPORT NO. C38022--40 FOCUS MASTER FILE LISTING RUN DATE PAGE 5/24/82 7 o o --------------- --- 1 ---------- -------------- H ........... 7 *:*$*$$*******jJ: *Jj! $ $* * ** $ #$*$ $ $ % $ ****#** OC *********** ********** ********************* 3 UNITS CURRENT .......OF.... BUDGET --TO--D- ATE- - PROGRESS `' PROJECT FORECAST '-OFF TREND FCST...... 0ATE 5/21/87 ****** PHYS TRENO PCT ... PCT -- o S ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT QUANT MANHOURS QUANT MANHOURS 6 ************************** ***$#$* ********* ********* ********** QUANT MANHOURS MANHOURS METHOD COMP CCMP ********** * **** **$ ******* 3 ***** ****** o ? S2 3Y 10 0 SCAFFOLDING ..................... BMHRS 20978 20926 " "70928" "28735 70428 78735 " -------Z1735~CLfKVE-0 TOO 100..... 3 ft B24L1IL1 INST CS PIPE 2IN G UNOER a B24L12L2 INST CS SPLD 3IN TO 6IN LF LF 10 11 2031 4689 2031 4689 4689 CURVE-L 100 100 H 10 27 2531 7493 2531 7493 7493 CURVE-L 100 100 10 B24Y10 SCAFFOLDING MHRS 0 0 0 1585 d* 1585 1585 TO-DATE 0 100 1 -i B2 5L11L1 INST CS PIPE 2 IN G UNOER i? B25LI2L2 INST CS SPLD 3IN TO 6IN LF LF 10 11 1542 2053 1542 2053 2053 CURVE-L 100 100 10 27 168T 5281 1687 5281 5281 CURVE-L 100 100 B25Y10 SCAFFOLDING MHRS 0 0 0 1982 0* 1957 T982 70-0ATE a- 100 t 'I B28E10EE ERECT COLUMNS 6 VESSELS EA 1200 1050 TOO 771 TOO 771 771 CURVE-E 100 100 9 B28E30EE ERECT HEAT EXCHANGERS 16 B28E50EE INSTALL PUMPS 6 DRIVERS 1' B28E70EE INSTALL OTHER EQUIPMENT ie B28JOIJ9 FAB INSTR SUPPORTS EA EA EA EA 500 300 200 14 200 120 1200 235 200 0 200 4 34 0 231 18 200 a* 200 4 34 0 239 18 34 CURVE-E 0 BLOCK-E 231 CURVE-E 18 CURVE-J 100 0 100 100 100 0 100 100 ? ?t 19 B28JI1J9 FIELD MOUNTED INSTRUMNTS EA 17 516 12 144 12 144 144 CURVE-j 1U0 loo ?0 B28J15J9 INSTALL MINOR INSTRUMNTS 21 B28J50JJ INSTRUMENT SHELTERS 2? B28J60JJ ANALYSER G CONTROL PCKGE ?:) B28J70JJ INSTALL INSTR TUBEGPIPE EA EA EA LF B6 16 2 752 729 377 355 686 48 8 0 600 176 147 0 214 48 8 04 600 176 147 0 214 176 CURVE-J 147 CURVE-J 0 BLOCK--J 214 CURVE-J 100 100 0 100 100 100 0 100 .9 ? B28J8IJJ LOOP CHECK EA 22 194 29 92 29 92 92 CURVE-J 100 100 1 2f. B28J82JJ CALIBRATION G TESTING EA 128 737 12 30 12 30 30 CURVE-J 100 ICO 9B28J95JJ EMERGENCY SO REDUNDANCY UNITS 100 660 0 0 04 0 0 BLOCK-J 0 0 21 B28L10L1 STEAM TRACE PIPE-SUBHDRS 26 B28L11LI INST CS PIPE 2IN G UNDER 20 B28L12L2 INST CS SPLD 3IN TO 6IN 3C B28L21L1 INST AL PIPE 2IN 6 UNOER LF LF LF LF 2 4483 1705 10 3 5058 2933 44 412 308 3 1102 0 639 .... 6557 3475 0 412 3083 1102 04 639 6557 3475 0 639 CURVE-L 6557 CURVE-L 3475 CURVE-L 0 BLOCK-1 100 100 100 0 100 TOO.... 100 0 t, 7 ' 3 11 B28LT0LL INSTALL u/g PIPE 12 B28L80LL STEAM TRACING 33 B28M10MM STEEL STRUCTURES 1, B28M20MM PLATFORMS G LADDERS LF LF TONS TONS 10 22 50 27 32 I ------------1--7- 72S5-- 0 888 1 13 6 1327 65 1044 04 888 1 ..."""........ 13... 6 1327 65 ...... 1044 6 TO-DATE 1327 CURVE-L 65 CURVE-M 1044 CURVE-M 0 100 100 100 100 100 100 ....loo..... * 9 < 9Ji B28N40 FIREPROOF STRUCTURAL STL CF 891 3200 0 0 04 0 0 TARGET 0 c * B28P12PP POWER 6 CONTROL EQUIP EA 8 294 0 8 C4 8 8 TO-DATE 0 100 If B28P14PP LIGHT FIXTURES G RECEPtL ..... EA .... ... 26 160 39 "71 ................ 39 ........... 71 71 CURVE-P 100 .... 100...." < ifl B28P21P6 INSTALL A/G RGS CONDUIT LF 19 B28P31P7 PULL HIRE 600V G 1KV LF til B28P33P7 PULL ELECTRNIC G TC WIRE ..... LF 5150 15420 3670 2729 39 7 ... 222 5 000 12000 ...........3065 ...... 1872 5000 122 12000 130 -----------3065..... 1872 122 ......... 130 1872 CURVE-P -----------1132Q2 CURVE-P CURVE-P 100 100 100 100 100 100 9 ' B28P34PP TERMINATIONS 600V G 1KV B28P36PP TERMINATIONS ELECT G TC 43 B28P41PP GROUNDING 44 B28P43PP ELECT HEAT TRACING 4', B28Q1LQQ PLACE FOUNDATION CONC 46 B28U21QQ PLACE FOUNDATION REBAR ,, 828Q31QQ PLACE G STRIP FDN FORMS ie B28Y10 SCAFFOLDING EA EA LF LF CY Tons sf MHRS 88 418 700 2700 142 5 2923 0 139 229 225 2640 335 107 1150 0 100 400 480 5300 81 4 2191 0 29 7030 1930 250 435 1120 964 100 400 450 5300 81 4 2191 04 29 70 83 1930 250 435 1120 964 29 CURVE-P 70 CURVE-P 83 CURVE-P 1930 CURVE-P 250 CURVE-Q 435 CURVE-0 1120 CURVE-Q 964 TO-OATE 100 100 100 100 100 100 100 0 100 100 100 100 100 ... 100 ..... 100 100 *O V, s o DO 61 of,; B29E10EE ERECT COLUMNS 6 VESSELS B29E30EE ERECT HEAT EXCHANGERS BMHRS EA loo500 35 650 300 100 ....... 42 383 300 100 .... 42 383 4? CURVE-E .. 100 .. I CO...... 383 CURVE-E 100 100 55 ro o B29E50EE INSTALL PUMPS G DRIVERS * B29J01J9 FAB INSTRUMENT SUPPORTS B29JU J9 INSTRUMENTS B29JI5J9 INSTRUMENTS EA EA EA EA 400 0 0 0 800 500 0 ......... 0 00 a0 229 0 8 25 500 04 04 04 229 0 8 25 229 0 8 25 CURVE-E BLOCK-9 TO-DATE TO-OATE loo ...... 0 0 0 100 ....... 0 ICO 1001 CP W o n oo ___3 0 JOB NO. 14053-000 ROBINSON REF1NRY MODERNZTN PROJ- MOC e REPORT NO. C38022-40 FOCUS MASTER FILE LISTING RUN DATE PAGE 5/24/82 a a a --............... MM - ...........................- M ' c 1 A c 6 $ % $$$* j* $$ $ ACCT. NO #$$$$$$ J. DESCRIPTION B^B |A> .Ab OF ACCOUNT A. b4b b bA. *4. B^B B.B RC *A UNITS OF QUANT 00" * -- CURRENT BUDGET QUANT MANHOURS TO-DATE PROGRESS PROJECT FORECAST QUANT MANHOURS QUANT MANHOURS $ $ # TjS$ $$4S $$ $ $$ * $S * --CUT^UFFTWTF 577I7B2"~ $$$$$$ ** TREND PHYS TREND FCST PC 1 PCT MANHOURS METHOD COMP CCMP ***** 1 l9 4 > *3 * 7 I > n n 10 r 11 i,. 7 in ,0 ?? B29J50JJ B29J60JJ B29JT0JJ B29J81JJ B29J82JJ B29J95JJ B29LlOLl B29L11L1 B29L12L2 B29LT0LL B29L80LL B29L98LL B29M10MM B29N40 B29P12PP B29P14PP B29P21P6 INSTRUMENTS ANALYSER L CONTROL PCKGE INSTRUMENTS LOOP CHECK CALIBRATION E TESTING EMERGENCY SO REDUNDANCE STEAM TRACE PIPE-SUBHORS INST CS PIPE 2IN 6 UNOER INST CS SPED 3IN TO bINN INSTALL U/G PIPE STEAM TRACING TESTING E INSPECTION STEEL STRUCTURES FIREPROOF STRUCT STEEL POWER E CONTROL EQUIP LIGHT FIXTURES E RECEPTL INSTALL A/G RGS CONDUIT EA EA LF EA EA UNITS LF LF LF LF LF LF Tons CF EA EA LF 0 7 100 14 72 100 0 263 561 5 0 0 5 243 11 21 3685 0 155 86 140 459 75 0 241 1112 7 0 0 200 900 480 320 2285 0 0 379 29 18 0 0 83 534 180 0 0 1 0 17 38 7500 10 0 139 348 87 0 47 131 3156 468 121 65 20 0 289 174 2895 0* O'* 379 29 18 0* 0*" 83 534 180 0* 0* --j 0* 17 38 7500 10 10 TO-DATE 0 0 0 BLOCK-J 0 139 348 139 CURVE-J 100 348 CURVE-J 1150 87 87 CURVE-J 100 0 jjy- 0 BLOCK-J 47 TO-OATE 0 0 131 131 CURVE-L 100 3142 3156 CURVE-L 100 468 ~ ...... 468 CURVE-L ..loo 121 121 TO-OATE 0 65 65 TO-OATE 0 20 20 CURVE-fT TOO 0 0 TARGET 0 289 289 CURVE-P 100 174 174 CURVE-P 100 2895 2895 CURVE-P 100 TOO 0 100 100 100 0 ruo loo 100 loo... 100 100 100 0 100 100 ICO i"n .? 13 M <1 It If 3 ?r " 7. 77 M 2'i ?r 74 36 ?4 B29P23P6 INSTALL NON-MET CONDUIT 70 B29P25P8 INSTAlLTaBlE TRAY B29P31P7 PULL WIRE 600V E1KV LF LF LF 900 820 9200 160 T3SB 1037 0 0 12400 0 0 505 0* 0* 12400 0 0 505 0 BLOCK-6 0 BLOCK-B 505 CURVE-P 0 0 100 0 0 100 37 33 31 H B29P33P7 PULL ELECTRNIC E TC WIRE LF 17100 875 15700 346 15700 346 346 CURVE-P 100 100 If ,'fl ......B29P34PP TERMINATIONS 600V EKV........ 74 B29P36PP TERMINATIONS ELECT E TC EA EA 189 429 138 272 300 300 141 225 300 300 141 225 141 CURVE-P 100 22 5 CURVE-P 100 100 .......... 17 100 36 10 B29P41PP GROUNOING )l B29P43PP ELECTRIC HEAT TRACING V B29U40QQ PLACE CONCRTE(COMPOSITE! LF LE CY 300 1025 43 160 1025 810 400 0 29 81 0 581 400 d* 29 81 0 581 81 CURVE-P 0 BLOCK-P 581 CURVE-Q 100 0 100 100 0 100 10 1. .1? 1.1 B29QUQQ PLACE CONCRETE PAVING .4 B29U73QQ place concrete envelopes 15 B29S11S5 EXCAVATION E DISPOSAL SF CY........ .. CY 2534 ....... 18 440 585 500 25 .... 105 --------------- 0 .......-' 0 690 126 916 500 25 0* ..................0 126 916 25 CURVE-Q - o BLOCR-a 916 CURVE-S 100 .... 0 100 100 11 ".....0............ 1- 100 If 10 B29S12S5 BACKFILL E COMPACTION ,7 " B29S31S5 SEWERS C DRAINAGE ................ CtFY 437 ..... 174 215 88 170 .............179 261 400" 88 179 261 400 261 CURVE-S 100 100 400 CURVE-S 100 _ log... r 1. B29S41S5 FINEGRAOING E LEVELING SF 2534 225 500 66 500 66 66 CURVE-S 100 100 .10 B29Y10 SCAFFOLDING MHRS Q Q 0 98 0* 98 98 TO-OATE 0 100 40 B30PUPP POWER DISTRIBUTION EQUIP EA .................. 9 ............2590 " - ....... 8 ............... 359 .............. 8 ............ 359 ...........359 CURVE-P 100 100............. 11 B30P21P6 INSTALL A/G RGS CONDUIT LF 200 560 245 111 245 111 111 CURVE-P 100 ICO 47 830P23P6 INSTALL NON-MET CONDUIT LF 300 320 0 0 0* 0 0 BLOCK-6 0 0 .,1 ` ""B30P35PP TERMINATIONS 5KV E ABOVE 41 B30P50P7 O/H POWER DISTRIBUTION EA LF ... 35 ... 2386 312 ........... ' ' 36 ------- ----300 " 36.... 1279 13400 3248 13400 300 3248 ' 300 "CUR VE-P luo 3248 CURVE-P too TOO .. 100 " V. B30P80PP ELECT TESTING E CHECKOUT UNITS 100 160 100 87 100 87 87 CURVE-P 100 100 ,t ir, B30Q73QU PLACE CONCRETE ENVELOPES CY s 100 io 2 10 2 2 CURVE-Q 100 100 n B30S11S5 EXCAVATION E DISPOSAL CY 34 70 10 8 10 8 8 CURVE-S 100 100 m B30S12S5 BACKFILL E COMPACTION CY 25 30 8 0 8 0 12 BLOCK-5 100 0 44 B32E20EE ERECT STORAGE TANKS EA 200 100 300 57 300 ...............57 ' ` 57 CURVE-E 100 loo B32E50EE INSTALL PUMPS E ORIVERS EA 300 1250 300 1696 300 1696 1696 CURVE-E 100 100 > B32E70EE INSTALL OTHER EQUIPMENT ',7 B32JI1J9 FIELD MOUNTED INSTRUMNfS B32J15J9 INSTALL MINOR INSTRUMNTS B32J31JJ LOCAL CONTROL PANELS EA EA EA UNITS 600 0 0 100 917 0 0 35 800 0 0 100 390 4 44 0 BOO 0* 0* 100 390 4 44 35 390 CURVE-E 4 TO-OATE 44 TO-DATE 20 BLOCK-J 100 0 0 100 100 100 100 0 O' ' 'r GARRARD 00000674 JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C3802Z-40 FOCUS MASTER FILE LISTING RUN DATE PAGE 5/24/82 9 oo UNITS CURRENT ... OF ~ BUDGET H#Xf 4s TO-DATE 4=*4! $4:4: $$$4:$4:4:$$ 4=4=4:4:$4:4:4:4:$4: PROGRESS PROJECT FORECAST ------------ CQT^BFF DATE 57217 82 TREND PCS? ... ... PHYS TREND PCT PCT o o , 9 .0 >1 n |4 ir i/ >8 19 ?> ?2 24 ?5 T 2b n 42 V. . t" J`i " 4? f 44 16 r * Q o o B32J60JJ B32J70JJ B32J81JJ B32J82JJ B32L10L1 B32L11L1 B32LI2C2 B32L70LL B32L80LL B32L91LL B32L98LL B32M40MM B32P12PP B32P14PP B3ZP21P6 B32P22P6 B32P31P7 B32P32P7 B32P33P7 B32P34PP B32P35PP B32P36PP B32P41PP B32P43PP B32P50P B32QUQQ B32Q21QQ B32Q310Q B32Q73QQ B32R10 B32S11S5 B32S12S5 B32S31S5 B32S32S5 B32S41S5 B32Y10 B33L70LL B33L98LL B35L11L1 B41L11L1 B41L12L2 B41L17L2 B41L9BLL B41Y10 B42L11L1 B42H2L2 B42L17L2 B42Y10 ANALYZER PACKAGES ....... INSTRUMENT AIR TUBEEPIPE LOOP CHECK TLST-CALlBRAlE-STORE STEAM TRACE PIPE-SUBHDRS INST CS PIPE 2IN UNDER INST CS SPED 3IN TO 6IN INSTALL U/G PIPE STEAM TRACING ASSIST XRAY 6 ST RELIEVE TESTING E INSPECTION MISC. STEEL POWER E CONTROL EQUIP LIGHT FIXTURES E RECEPTL INST A/G RGS CONOUIT INST U/G CONDUIT PULL WIRE 600V E IKV PULL CABLE 5KN E ABOVE PULL ELECTRNIC E TC WIRE TERMINATIONS 600V E IKV TERMINATIONS 5KV E ABOVE TERMINATIONS EL EC TR E TC GROUNOING ELECT HEAT TRACING 0/H POWER DISTRIBUTION PLACE FOUNDATION CONC PLACE FOUNDATION REBAR PLACE E STRIP FDN FORMS PLACE CONCRETE ENVELOPES CHEMICAL INJECTION BLDG. EXCAVATION E DISPOSAL BACKFILL E COMPACTION SEWERS DRAINAGE PRECAST MANHOLES FINE GRADING E LEVELING SCAFFOLDING INSTALL U/G PIPING TESTING E INSPECTION INST CS PIPE 2IN E UNDER SMALL BURE PIPE LARGE BORE SPOOLED PIPE LARGE BORE RACK PIPE TESTING E INSPECTION SCAFFOLOING SMALL BORE PIPE LARGE BORE SPOOLED PIPE LARGE BORE RACK PIPE SCAFFOLOING EA ~ 0 0 LF 0 0 EA 9 84 EA 43 ~ 271 LF 0 0 LF 0 0 LF " 0 ............. IT LF 95 164 LF 0 0 .. UNITS loo 400 LF 253 18 TONS IT 411 EA a 480 EA 41 400 LF 5650 4536 LF 1000 160 LF 13500 358 LF 3000 240 LF 3800 190 EA L58 204 EA 24 145 EA 180 235 LF 1340 488 LF 650 640 LF 2500 960 CY 335 642 TONS 38 575 SF 6457 1689 CY 30 105 UNITS LOO 145 CY 1268 1459 CY 1840 450 LF 1000 4262 EA 4 280 SF 10 1 MHRS 0 0 LF 1155 2119 LF 1455 255 LF 170 180 LF 0 b LF 719 1189 LF 8357 5677 LF 7 27 32 5158 MHRS 0 0 LF 0 0 LF 439 b40 LF 10219 7934 MHRS 0 0 0 0 29 10 0 0 0 2091 0 0 544 22 15 69 7000 320 23870 4400 3800 150 24 180 1825 1600 0 68 5 32 12072 16 100 3088 2958 976 6 3400 0 0 0 0 0 1812 4442 58869 0 0 1093 05593 0 0 124 25 0 81 361 4257 0 0 11 1630 602 247 2955 46 728 128 52 143 73 67 425 383 0 3100 2935 8345 338 1302 3368 3267 ..... 33832?9 413 1740 0 0 0 305 4956 4293 2594 1479 32 2999 4627 920 ...0* 0* 29 10 0* 00* 2091 0$ ~ ...... 0$ 544 22 T5 69 7000 320 23870 4400 3800 150 24 180 1825 1600 0* 68 5 32 12072 16 100 3088 2958 976 6 3400 0* ~~ o4 0* 0* 0* 1812 4442 58869 0* 0* 1093 5593 0* TT 0 BLOCK--T 0 0 0 0 124 0 BLOCK-J 0 124 CURVE-J 100 0 100 25 25 CURVfc-J IDO 100 1 0 BLOCK-1 0 0 3 81 81 TO-OATE 0 100 361 361 TO-DATE a 100 4257 0 ....... 0 4257 CURVE-L 100 100 0 8L0CK-L 0 .............. 0 BtflCK-L ....... 0...... 00 ------- 11 1630 11 CURVE-L 100 1630 CURVE-M 100 100 100 3 60? 602 CURVE-F loir 100 24 7 2955 247 CURVE-P 100 2955 CURVE-P 100 100 100 3 46 728 126 52 46 CURVE-P 728 CURVE-P 128 CURVE-P 52 CURVE-P 100 100 100 100 100 loa ICO 100 K3 :i? 1- 3143 143 CURVE-P 100 100 73 73 CURVE-P 100 loa V 67 425 67 CURVE-P 100 425 CURVE-P 100 100 100 1! 3 383 2 383 CURVE-P 100 0 TARGET 0 100 0 .49 4 3100 2935 8345 338 1302 3100 CURVE-Q 2935 CURVE-Q 8345 CURVE-Q 338 CURVE-Q 1302 CURVE-0 100 100 100 100 loo 100 100 loo 100 100 3 14 Itff 9 1< 3368 5368 tURYE-S 100 100 ..... 3267 3267 CURVE-S 3329 3329 CURVE-S ........ 817 --------- --- 837 CURVE-S 100 100 100 100 100...... 100............ 9 413 1740Q 413 CURVE-S 1740 TO-DATE 0 0LOCK-L 100 0 0 100 100 0..... 9 5? 0 0 BLOCK-L 0 0 " 0 0 305 0 BLOCK-l 305 TO-DATE 00 60 0 100 ........ 4956 4293 4956 CURVE-L 100 4293 CURVE-L 100 100 100 O ... 2 504 1479 32 2999 462 7 920 2504 CURVE-L 1479 TO-OATE 32 TO-OATE 2999 CURVE-L 4627 CURVE-L 920 TO-OATE 100 0 0 100 loo 0 100 ..... ` o100 .100 100 ........ o100 ' 100 o o JOB NO. 14053-000 ROBINSON REFINRY H0DERN7TN PROJ-MOC a REPORT NO. C38022--40 FOCUS MASTER FILE LISTING RUN DATE 5/24/82 PAGE 10 o 9 c> ? 3 r *4= $$ 4= 4= S99 * 9S 00 units CURRENT BUOGET TO-DATE PROGRESS .......................................... ~~............. ........ .. OF " ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT WW44 44 44 44 l( 44 4* 44 4r.vA* 4v4 w4444T44T44i4r4T44 4Y4 4V4 r4'*w44 4w4 44Y44W44 44w44 4v4 4-4T44 4i4r4r4 QUANT MANHOURS QUANT MANHOURS $7S $ $ $ *^ * $ ** PROJECT FORECAST QUANT 1ANH0URS CUT-OFFTIAT E-------572X7*2 ^vv**t***r TRENO FCST MANHOURS METHOD PHYS TREND PCT...... PCT...... COMP CCMP 39 9 j ..... B43L11L1 8 4 B43L12L2 B43L17L2 SMALL BORE PIPE LARGE BORE SPOOLED PIPE LARGE BORE RACK PIPE LF LF LF rra ----------- 1759 327 632 9991 3733 2066 718 2306 1222 2512 2986 2066 718 2306 1222 2512 2986 1222 CURVE-L 2512 CURVE-L 2986 CURVE-L 1UU 100 100 IUU 100 100 9 , 2 B43Y10 B44L11L1 B44L12L2 B4 4 L 17 L 2 SCAFF0L0ING SMALL BORE PIPE LARGE BORE SPOOLED PIPE Large bore rack pipe MHRS LF LLFT 0 9029 1581 29251" 0 6269 3086 25596 0 8391 3879 17998" 895 9032 13036 TZZ59 0* 8391 3879 15998 896 9032 13036 12299 895 TO-DATE 9032 CURVE-L 13036 CURVE-L 12299 CURVE-L 0 100 100 TOO 100 100 100 100 13 9 .7 r c B44Y10 B45L11L1 B45L12L2 SCAFFOLDING SMALL BORE PIPE LARGE BORE SPOOLED PIPE MHRS LF LF 0 990 25 0 762 59 0 1930 ............ 56 9753 0* 9753 930 1930 930 ............909..... ..... 56 ........... 909....... 9753 TO-DATE 930 CURVE-L .....909 CURVE-L 0 100 too 100 100 100 9 c; a 4 B45L1TL2 B45Y10 B90L70LL B99J11J9 B99J15J9 LARGE BORE RACK PIPE SCAFFOLDING Install u/g pipe install xmitters install minor instrument LF MHRS LF EA EA 5011 0 75 3 9 8361 0 130 102 70 2851 0 0 10 21 5972 2368 0 80 95 2851 0* 0* 10 21 5972 2368 0 80 95 5972 CURVE-L 2368 TO-DATE 0 BLOCR-L 80 CURVE-J 95 CURVE-J 100 0 0 100 100 100 100 0 100 100 24 2 c3 c B99J31JJ B99J50JJ B99J70JJ B99J81JJ B99JB2JJ B99L10L1 LOCAL CONTROL PANELS INSTRUMENT SHELTERS INST AIR TUBE G PIPE LOOP CHECK TEST-STORE-CALIBRATE STEAM TRACE PIPE-SUBHDRS UMTS ........... loo EA 1 LF 90 ~ LOOPS ' ~~~5~ EA 9 LF 33 135 0 0 0* 0 0 BLOCK-J 0 0 28 2 8 2 8 8 CURVE-J 100 100 99 650 199 650 199 199 CURVE-J 100 100 17 759 zr IT 21 17 17 CURVE-J 100 100 23 8 11 8 11 ii CURVE-J 100 100 M 55 1093 2678 1093 2678 2678 CURVE-L 100 100 >G 9 c9 0 B99L11L1 B99L12L2 B99L80LL INST CS PIPE 21N UNDER.... INST CS PIPE GTR THAN 2" STEAM TRACING LF LF LF ......... 39 2 39 50 ...... 66 395 27 906 ..."....... 803....... 882 2205 8359 3759 906 ........... 903 882 2205 8359 3759 803 CURVE-L 2205 CURVE-L 3759 CURVE-L TOO 100 100 ICO............. .1/ 100 100 40 , B99L98LL TESTING E INSPECTION............. LF 99 7 ".. 06 6 TB6 6 6 CURVE-L 100 ICO e? B99S31S5 SEWERS 6 DRAINS B99Y10 SCAFFOLDING LF MHRS 90 . 25 00 90 189 0 109 90 0* 189 109 189 CURVE-S 100 109 TO-OATE 0 100 100 H 4 .......C50J21JJ c C50J26JJ V. C50M40MM ......C50P11PP MAIN CONTROL ROOM PANEL PROCESS CONTROL COMPUTER MISCELL STRUCTURAL STEEL DISIRBT HGH VLTG PWR EQ EA-------- UNITS TONS EA..... . ' ......6 100 IB ....."" 3 .... 626 100 1220 360 ~~ ........ 6 70 22 .... ...........3 ..... ...... 555....... ....'.... 6 283 70 1391 22 ....... .......956...... ....... " 3 .............555 ... 555 283 283 1391 1391 ............. 956 .... .. *56-------------- CURVE-J CURVE-J CURVE-M CURVE-- P' 100 100 100 100 .. 100 ........ 100 4' 100 100----- -t Y c C50P12PP POWER G CONTROL EQUIP C50P13PP EMERGENCY 6 UPS EQUIP UNITS 108 1020 EA 9 2086 100 9 962 1557 100 9 962 1557 962 CURVE-P 100 1557 CURVE-P 100 100 100 ,, C50P14PP LIGHTING FIXTURES/RECPTL EA 19 ........70 10 ............. 120 ....... ..... 10 ............. 120 ... ..... 120 CURVE-P 100 100 C50P15P0 OTHER ELECTRICAL EQUIP EA C50P16PP PROGRAMABEL CONTR MASTER EA 131 3 9755 1580 209 9 3912 91 209 9 3912 91 3912 CURVE-P 100 91 CURVE-P 100 100 100 C50P20P6 INST A/GRGS COND MAINS LF....... 1900 ~..... 1090 .....2561 -----------3296....... 2561 3296 ~ ~3296 CURVE-P 100 100 ....... C C50P21P6 INST A/G RGS COND BRANCH LF C50P22P6 INST U/G CONDUIT LF 3550 3990 1917 1115 3965 5390 2611 1528 3965 5390 2611 1528 2611 CURVE-P 100 1528 CURVE-P 100 100 100 C50P25P8 INST CABLE TRAY LF 11220 16952 10920 15638 10920 15638..... 15638 CURVE-P 100 100 IC 4H C50P30P7 PULL DATA HIGHWAY CABLE C50P31P7 PULL WIRE 600V G 1KV LF LF 50620 7260 1619 218 108950 19200 6965 759 108950 19200 6965 759 6965 CURVE-P 100 759 CURVE-P 100 100 100 C50P32P7 PULL CABLE 5KV G ABOVE LF 12200 1223 10000 1621 1C000 1621..... ... 1621 CURVE-P 100 100............. , C50P33P7 PULL ELECTRNIC G TC WIRE C50P34PP TERMINATIONS 600 G 1KV LF EA 79B00 600 3393 386 11101 652 1199 378 11101 652 1199 378 1199 CURVE-P 100 378 CURVE-P 100 100 100 cr, J ....C50P36PP TERMINATIONS ELECT L TC C C50P41PP GROUNDING C50P42PP GROUNO WELL INSTALLATION EA LF EA 5961 58380 100 3612 9170 356 5167 17306 101 2315 3019 535 5167 17306 101 2315 3019 535 ..... 2 315 CURVE-P 3019 CURVE-P 535 CURVE-P TOO 100 100 100............. 100 n 100 cO e0 c _ri j B ; 9 12 n M l 17 20 21 72 23 75 2C 77 28 79 30 M 1? 13 J< 35 W 3' w 30 <0 3, 47 4,1 47 48 e 'f il o o JOB NO. 16053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38022--40 FOCUS MASTER FILE LTSTING .... TV?V T T 4 ACCT. NO C50P80PP C50P95PP C50U60QQ CSOQ73QQ C50R01 0 C50S11S5 C50SX2S5 C50Y10 0 C51J01JJ C51J10JJ C51J11J9 C51J15J9 C51J17J9 C51J19J9 C51J22JJ C51J50JJ C51J70JJ C51J81JJ C51J82JJ C51L11L1 C51L80LL C51P12PP C51P16PP C51P20P6 C51P21P6 C51P25P8 C51P31P7 C51P33P7 C51P36PP C51P36PP C51P37P7 C51P61PP C51P62PP C51P90PP C52J01JJ C52J10JJ C52JU JS C52J22JJ C52J82JJ C52L11L1 C52P12PP C52P16PP C52P20P6 C52P21P6 C52P25P8 C52P31P7 C52P33P7 C52P36PP 00 $$$$$$$$$ UNITS CURRENT BUOGET OF DESCRIPTION OF ACCOUNT RC QUANT $ $ $$$$$$$ QUANT MANHOURS ELECT TESTING CHECKOUT OSPOSLERMOVL OF EXSTG EL UNITS UNITS 100 l 1919 1 PLACE CONCRTE(COMPOSITEI CY n 220 PLACE CONCRETE ENVELOPES CY 81 380 CONTROL ROOM ARCHITECT UNITS 100 1751 EXCAVATION E DISPOSAL CY 350 601 , BACKFILL E COMPACTION CY 2 60 216 SCAFFOLOING BMHRS 1608 160 8 INSTRUMENT SUPPORTS EA 29 368 PRE ASMB TRANSMETRANSDUC EA 333 1303 FIELD MOUNTED INSTRUMNTS EA 192 7806 INSTALL MINOR INSTRUMNTS EA 110 227 INSTALL P/I TRANSDUCERS EA 30 750 INSTALL I/P TRANSDUCERS EA 138 966 CONTRL CONSL SATLITE RKS INSTRUMENT SHELTERS UNITS EA 100 173 168 366U . INST INSTR TUBE E PIPE LF 6177 1810 LOOP CHECK EA 369 2559 TESTESTOREECALIB INST EA 627 TT806 INST CS PIPE 2IN E UNDER LF 1660 1760 INST STM TRACE TUBING LF 8693 6926 POWER E CONTROL EQUIP EA 22 772 PROGRAM CONTR SATELLITE EA 36 517 INST A/G RGS COND MAINS LF 6300 3370 INSf A/G RGS COND BRANCH LF 16583 9099 INST CABLE TRAY LF 100 160 PULL WIRE 600V E 1KV LF 581 31 PULL ELECT E TC WIRE LF 99000 3168 TERMINATIONS 600V E 1KV EA 53 TERMINATIONS ELECT E TC EA 5098 3896 PULL ELECTRONIC MAINS LF 5000 660 GROUNDING LF 2200 866 GROUND WELL INSTALLATION EA 100 237 ELECTRONIC DISCONNECTS EA 233 ... ....639 INSTRUMENT SUPPORTS EA 26 288 PRE ASMB TRANSMETRANSOUC EA 232 902 FIELD MOUNTED INSTRUMNTS EA 132 5370 CONSOLE SATELLITE RACKS UNITS 100 168 TESTESTOREECALIB INST EA 282 1160 INST CS PIPE 2IN E UNDER LF 1015 1225 POWER E CONTROL EQUIP EA 9 160 PROGRAM CONTR SATELLITE EA 17 258 INSTALL A/G RGS COT MAIN LF 150U 1175 INST A/G KGS COND BRANCH LF 3626 164b INSTALL CABLE TRAY 600 V E 1KV WIRE PULL ELECT TC WIRE LF LF 200 180 3209 LF 63300 1818 600 V E 1KV TERMINATIONS EA 15 a TO-DATE PROGRESS QUANT MANHOURS 19 369 100 37 2 36 902 113 683 100 1806 165 837 107 266 1386 1636 55 196 352 ............... 775 98 1560 37 160 32 235 . 57 160 100 179 69 378 670 256 630 1232 603 ' 729" 0 11 876 695 19 593 32 55 3685 3255 13653 7300 8U 907 8290 369 32303 838 230 329 6987 6958 ' 3180 <,06 1000 263 100 659 .... ..... 13 .... ""...... 27 00 266 631 0 136 100 256 302 536 0 26 31 633 6365 250 6606 8 760 320 0 660 69 688 1901 328 111 176 73 RUN DATE 5/2A/82 PAGE 11 0 9 PROJECT FORECAST CUT-OFF DATE~~ 5/21/82 3 <:2$Jjs & *$ ' TREND FCST PHYS TRENO PCT PCT ?9 QUANT MANHOURS MANHOURS METHOD COMP CCMP ***$$ 9 19 369 369 CURVE--P 100 loo 100 36 372 902 372 CURVE-P 100 902 CURVE-Q 100 100 100 9 113 683 683 CURVE-Q 100 100 100 165 1806 83 7 1806 CURVE-0 100 83 7 CURVE-S 100 100 100 9 ,, 107 266 266 CURVE-S loo 100 1386 55 1636 196 1636 CURVE-0 100 196 CURVE-J 100 100 100 9 352 775 775 CURVE-J loo loo 98 1560 1560 CURVE-J 100 100 9 37 32 160 235 ^13650-tCuUkRvVeE--Jr 100 TOO 100 lor 57 160 160 CURVE-J 100 100 loo 179 179 CURVE-J 100 100 69 378 378 CURVE-J [00 loo 670 630 603~ 0* 256 1232 729 11 256 CURVE-J 1232 CURVE-J 729 CURVE-J 11 TO-OATE 100 100 loo 0 100 100 100 100 C 3. 876 695 695 CURVE-L 100 100 19 32 3685 13653 80 8290 32303 230 6987 6958 1000 100 593 55 3255 T300 907 369 838 329 3180 606 263 659 593 CURVE-P 55 CURVE-P 3255 CURVE-P 7300 CURVE-P 907 CURVE-P 369 CURVE-P 838 CURVE-P 329 CURVE-P 3180 CURVE-P 606 CURVE-P 263 CURVE-P 659 CURVE-P 100 100 100 loo 100 100 100 luo 100 ISO 100 100 100 100 3 100 -:j loo 100 4;' i 100 loo 100 < 100 100............ 4 1 100 100 v ....... ..... 13... ....... 27 27 CURVfc-P 100 100 0* 266 0 631 0 BLOCK-J 0 631 CURVE-J 100 0 100 9 06 136 136 TO-BATE 0 100 100 302 0* 26 31 633 256 536 0 660 69 688 256 CURVE-J 536 CURVE-J 0 BLOCK-1 660 CURVE-P 69 CURVE-P 68 8 CURVE-P 100 100 0 100 100 loo ICO 100 0 100 100 100 9 r.( 61 r.; 9 6365 250 1901 328 1901 CURVE-P 100 328 CURVE-P 100 100 ICO Q 6606 111 ...... Ill CURVE-P 100 100 8760 320 1 76 73 176 CURVE-P 100 73 CURVE-P 100 100 100 Q 0 o r ft 3 j 1 Gs 6 J' "$ 18 * 10 c> n M r. i 6 JOB NO. 14053-000 ROBINSON REF1NRY M0DERN2TN PROJ-MOC REPORT NO. C38022-40 FOCUS MASTER FILE LISTING RUN DATE 5/24/82 PAGE 12 o ......... ....................... A A; ^ ' VT TTV 00 ---------CUTr-OFF DATE-------------5/21/82------------------ ACCT. NO DESCRIPTION OF ACCOUNT UNITS OF........... ........ RC QUANT CURRENT QUANT BUDGET MANHOURS TO-DATE PROGRESS QUANT MANHOURS PROJECT FORECAST QUANT MANHOURS TREND nS I MANHOURS METHOD PHYS PCT COMP TREND PCT COMP $ & j{i $ $ $ * $ ^ $ $ $ $ 4:$ $ ^ C52P36PP TERMINATIONS ELECT E TC C52P37P7 PULL ELECTRONIC MAINS C52P41PP GROUNDING C52P42PP GROUNCWELL INSTALLATION C52P43PP ELECT HEAT TRACING C53J01JJ INSTRUMENT SUPPORTS C53J10JJ TRE ASMB TRANSHETRANSUUC C53J11J9 FIELD MOUNTED INSTRUMNTS C53J15J9 INSTALL MINOR INSTRUMNTS C53J1/J9 INSTALL P/I TRANSDUCERS C53J19J9 INSTALL I/P TRANSDUCERS C53J22JJ CONSOLE SATELLITE RACKS C53J50JJ C53J70JJ INST INSTR TUBE PIPE C53J74L1 INST AIR SUBHEADER C53J82JJ TESTGSTOREECALiB INST .. C53L11L1 INST CS PIPE 2IN E UNDER C53P12PP POWER E CONTROL EQUIP C5IP16PP "Program conIr satellite C53P20P6 INST A/G RGS CONO MAINS C53P21P6 INST A/G RGS CONO BRANCH C53P25P8 INSTALL CABLE TRAY..... ..... " C53P31P7 PULL HIRE 600V E 1KV C53P33P7 PULL ELECT E TC HIRE C53P34PP TERMINATIONS 600V E~lKV C53P36PP TERMINATIONS ELECT E TC C53P37P7 PULL ELECTRONIC MAINS C53P41PP GROUNDING .............................. C53P42PP GROUNO HELL INSTALLATION C53P90PP ELECTRONIC DISCONNECTS C54J01JJ INSTRUMENT SUPPORTS ............ C54J10JJ PRE ASMB TRANSMETRANSDUC C54J11J9 FIELD MOUNTED INSTRUMNTS C54J15 J9 INSTALL MINOR INSTRUMNTS C54J17 J9 INSTALL P/I TRANSDUCERS C54J19J9 INSTALL I/P TRANSDUCERS C54J22Jj CONSOLE SATELLITE..RACKS C54J50JJ INSTRUMENT SHELTERS C54J70JJ INST INSTR TUBE PIPE C54J82JJ TesTeSToreecalib Inst C54L11L1 INST CS PIPE 2IN E UNDER C54P12PP POHER E CONTROL EQUIP C54P14 C54P16PP PROGRAM CON TR SATELLITE C54P20P6 INST A/G RGS CONO MAINS C54P21P6 INST A/G RGS CONO BRANCH C54P25P8 INSTALL CABLE TRAY C54P31P7 PULL WIRE 600V E lKV EA LF LF EA " ~ LF EA EA EA EEAA - EA UNITS EA LF LF EA LF EA EA LF LF LF LF LF EA EA LF LF EA EA EA " ~ EA EA EA....... .... EA EA UNITS EA LF EA LF EA ea ...... EA LF LF LF LF 2131 12 39 1964 746 1964 746 100 13 2239 92 2239 92 2200 864 860 177 860 177 100 237 100 ...... 130 ~ 100 "TBO 3125 2000 0 15 0* 15 24 129 ...... 288 419 ~ 28 249 ------------- 299 2 249 8 299 48 2081 37 83 18 450 1 250 1 ----------- 0,-0 0 --------------------------------ff- 0* 0 250 0 o.. 70 490 0 0 0* 0 100 148 200 127 200 127 50 1000 0 0 0* 0 1598 690 16 0 16 0 2 1 1505 414 1505 414 356 1552 391 652 391 652 435 525 0 0 o 0 23 480 41 915 41 915 20 262 0 122 0* T22 3295 2582 6112 5165 6112 5165 11850 6189 12284 7555 12284 7555 5 8 440 879 440 879 25 1 12180 616 12180 616 44975 1855 42090 1147 42090 1147 20 n 274 46 278 46 2243 1248 4047 2188 4047 2188 4000 2200 544 864 7452 540 539 7452 539 220 540 .. 220.... 100 23 7 117 367 117 367 2V1 4 ........ 288 ...... 0 .....6" 220l 0* 0 6 221 304 1209 210 224 210 224 113 106 4508 ... 214 0 492 0* 492 ' .......6 .... ......... 18..... ............. 6........... 18..... 24 600 0 0 0- 0 74 TOO .. 479 283 5 ----- llo .... 1lfe039 . 5 109 no .. .. 163 102 2040 0 8 0* 8 4200 313 1747 1318 0 352 137 473..... 0* 352 137 473..... 1370 1650 0 0 0* 0 22 810 00 49 1099 49 1099 0 o... ........... o ... ..... 0 20 262 2 185 2 185 52 30 4382 14774 6161 14774 6161 18318 9399 16641 9718 16641 9718 10G 160 97 335 97 335 1175 47 8804 200 e804 200 7S6 LUKVt-P 1UU IOO 92 CURVE-P 100 100 177 CURVE-P 100 100 130 CURVE-P 100 IOO 15 TO-DATE 0 100 8 CURVE-J 100 100 ^ 299" CURVfc--J IOO IOO 250 CURVE-J 100 100 0 BLOCK-9 0 0 " - 0 BLOCK-9 ..... 0 ...... 0 ......... .. 0 BLOCK-9 0 0 127 CURVE-J 100 -------- jj- BLOCK-J 0 100 (J 4 BLOCK-J 100 0 414 CURVE-L 100 100 652 CURVE-J loo loo 0 BLOCK-1 0 0 915 CURVE-P 100 100 1 ?2 TD-DATE 0 IOO 5165 CURVE-P 100 100 7555 CURVE-P 100 100 879 CURVE-P loo loo 616 CURVE-P 100 100 1147 CURVE-P 100 100 46 tURVE-P loO IOO 2188 CURVE-P IOO 100 539 CURVE-P 100 100 .. 220 CURVE-P 100 IOO .... 367 CURVE-P 100 100 0 BLQCK-P 0 0 2 21 CURVE-J IOO 100 224 CURVE-J 100 100 492 TO-DATE 0 100 ..........13 CURVE-J 100 ICO 0 BLOCK-9 0 0 109 CURVE-J 100 100 "163"CURVE-J 100..... 100 ...... a TO-OATE 0 IOO 137 TO-DATE 0 100 ..... 473 CURVE-J IOO 100 0 BLOCK-1 0 0 1G99 CURVE-P 100 1U0 ............0 BUDGET... 0.... ... a 185 CURVE-P 100 100 6161 CURVE-P 100 100 9718 CURVE-P 100 100 335 CURVE-P 100 ICO 200 CURVE-P 100 100 9 9 9 9 9 O e e '' ? 1 4 S 6 1 9 .0 .3 -4 IS 6 >' 18 K n t, 29 11 I.1 31 >4 IS ie u v. 4.) -7 .1 # 44 4' c 4, ,! c o JOB NO. 15053-000 ROBINSON REFINRY MODERNZTN PROJ- HOC REPORT NO. C38022-50 FOCUS MASTER FILE LISTING RUN OATE 5/24/82 PAGE 13 ACCT. NO 4rrrri*rirr y C55P33 P7 C55P35PP C55P36PP C55P37P7 C55P51PP C55P52PP C55P90PP C55R01 0 C55J01JJ C55J10JJ C55J1IJ9 C55J15J9 C55J17 J9 C55J19J9 C55J22JJ C55J50JJ C55J70JJ C55J82JJ C55L1IL1 C55P12PP C55P16PP C55P20P6 C55P21P6 C55P25P8 C55P31P7 C55P33P7 C55P35PP C55P36PP C55P37P7 C55P51PP C55P92PP C55P90PP C56J01JJ .. C56J10JJ C56J11J9 C56J15J9 C56J17J9 C56J19J9 C56J3IJJ C56J50Jj C56J82JJ C56L1IL1 C56P16PP C56P21P6 C56P31P7 C56P33P7 C56P35PP C56P36PP DESCRIPTION OF ACCOUNT PULL ELECT TC WIRE TERMINATE WIRE 600V/1KV TERMINATIONS ELECT TC PULL ELECTRONIC MAINS GROUNOING GROUNO WELL INSTALLATION ELECTRONIC DISCONNECTS COKER CR STRUCTURAL MOOS INSTRUMENT SUPPORTS PRE ASMB TRAN5MCTRANSDUC FIELD MOUNTEO INSTRUMNTS INSTALL MINOR INSTRUMNTS INSTALL P/I TRANSDUCERS INSTALL I/P TRANSDUCERS CONSOLE SATELLITE RACKS INSTRUMENT SHELTERS INST INSTR TUBE PIPE TESTSSTOREECALIB INST INST CS PIPE 2IN UNOER POWER CONTROL EQUIP PROGRAM CONTR SATELLITE INSTALL A/G RGS COT MAIN INST A/G RGS COND BRANCH INSTALL CABLE TRAY PULL WIRE 600V 1KV PULL ELECT TC WIRE TERMINATIONS 600V IKV TERMINATIONS ELECT TC PULL ELECTRONIC MAINS GROUNDING GROUNO WELL INSTALLATION ELECTRONIC DISCONNECTS INSTRUMENT SUPPORTS PRE ASMB IRANSMETRANSOUC FIELD MOUNTED INSTRUMNTS INSTALL MINOR INSTRUMNTS install p/i Transducers INSTALL I/P TRANSDUCERS LOCAL CONTROL PANEL INSTRUMENT SHELTERS TESTEST0RE6CALIB INST INST CS PIPE 2IN UNDER PROGRAM CONTR SATELLITE INST A/G RGS CONDUIT PULL WIRE 600V IKV PULL ELECT TC WIRE TERMINATIONS oOOV IKV TERMINATIONS ELECT TC 00 FFFF$$4=FFF CUT-OFF DATE FFFFFFFFSFFFFFFFFF 5/21/832$ UNITS CURRENT BUOGET TO-DATE PROGRESS PROJECT FORECAST OF RC $Q$$UA$N$T$ QUANT MANHOURS $it QUANT MANHOURS QUANT MANHOURS $ it$ 4=$ *F FF F FFFF 4=F FFF F * FF F FF TREND FCST MANHOURS METHOD PHYS TREN0 PCT PCT CCMP CCMP LF 100932 3263 38562 1357 38562 1357 1357 CURVE-P 100 100 EA 15 a 155 113 155 113 113 CURVE-P 100 100 EA 3157 1827 898 1950 898 1950 1950 CURVE-P 100 100 LF LF EA EA UNITS EA EA EA EA EA EA UNITS EA LF EA LF EA EA LF LF LF LP LF EA EA LF LF EA...... ' - 7318 2000 100 66 0 29 157 90 69 6 69 300 82 1975 208 7 00 20 38 ITiou 9350 900 500 83000 5 6099 2000 3000 100 936 800 23 7 218 0 398 617 3656 199 150 998 999 1690 859 852 890 320 522 7 8U 22 36 690 31 2512 3 ....... 1516 256 1120 ........ 237 12308 1030 12388 1000 365 1000 100 350 100 0 15 0* 0 0 0* 3 58 3 172 150 172 3 265 3 8 50 a 0 0 OF 0 0 0* 300 225 300 3 127 3 0 0 0* 201 353 201 0 0 0* 60 821 60 36 151 36 1709 739 .... 1789 5 301 2251 5301 552 537 39632 ............ trr 552 39612 2678 88 2678 751 .... 3191 258 751 .. Tllo.. .......3191... 5750 206 5750 2000 195 2000 101 .........201 ..... 101 1030 365 . 350 19 0 58 150 265 50 0 0 225 127 0 353 0 821 151 739 2251 537 611 88 ln25o8 206 195 2DI- 1030 CURVE-P 365 CURVE-P 350 CURVE-P 15 To-oaTE 0 BLOCK-O 58 CURVE-J 150 CURVE-J 265 CURVE-J 50 CURVE-J 0 BLOCK-9 0 BLOCK-9 225 CURVE-J 127 CURVE-J 0 BLOCK-J 353 CURVE-J (T BLOCK-1 821 CURVE-P 151 CURVE-P 739 CURVE-P 2251 CURVE-P 537 CURVE-P sir CURVE-P 88 CURVE-P 258 CURVE-P 1110 CURVE-P 206 CURVE-P 195 CURVE-P 201'CURVE-P 100 100 100 100 100 100 0 loo 00 100 100 loo loo 100 100 100 1 GO 00 00 100 100 100 100 00 100 100 00 100 100 100 100 100 100 100 ICO 100 100 itjct 100 100 100 100 100 100 ....100 100 100 100 100 100^ ICO EA 159 397 0 7 0* 7 7 TO-DATE 0 100 EA 29 EA....... ......... 257 280 .... 1062 00 ....... 185 ..... ...... 175.... 0* 0 185 ...... 175 0 BLOCK-J 0 0 175 CURVE-J 100 .. 100 EA 171 6525 0 318 OF 318 318 TO-OATE 0 100 EA 109 258 21 65 21 65 65 CURVE-J 100 100 EA ..... 6 150 ...'..... 7 ..... 1 ? 3.. ".............. 7 121" 123 CURVE-J 100 100 EA 95 665 2 5 2 5 5 CURVE-J 100 100 UNITS 100 100 100 88 100 88 88 CURVE-J 100 ICO EA..... 126 2520 19 310 19 310 310 CURVE-j loo 100 EA 272 1152 253 716 253 716 716 CURVE-J 100 100 LF 1070 1290 0 0 OF 0 0 BLOCK-1 0 0 EA 28 272 0 0 OF 0 ...... .... 0 BLOCK-P 0 ......... 0 LF 22 80 2105 5875 1968 5875 1968 I960 CURVE-P 100 100 LF 75 3 5815 158 5815 158 158 CURVE-P 100 100 LF 67000 226 3 5520 181 5520 lei 181 CURVE-P loo loo EA 5 3 335 151 335 151 151 CURVE-P 100 100 EA 3327 1972 2063 892 2063 e92 092 CURVE-P 100 100. c e <3 G 1 *r ` p 5 1( 1, ,, ?-l ?' 1, 1i;! 4440.; 44 4f 41 .4 SI r; r., R e r JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC FOCUS MASTER FILE LISTING RUN DATE 5/24/82 PAGE 14 3 Cl REPORT NO. C38022--40 ^ ^_ 1 ---------------------- ..... ---------------- ? ,1 $ $# $ $ # $ $:$ $ $ $ $ 4 6 ACCT. NO DESCRIPTION OF ACCOUNT ft OC UNITS CURRENT OF ..... BUDGET ' RC QUANT QUANT MANHOURS TO-DATE PROGRESS QUANT MANHOURS PROJECT QUANT FORECAST MANHOURS ^r*vr*T* ' CUT-OFF DA IE 5/21/82" ***$ TREND ~FCS1 MANHOURS METHOO PHYS TREND PCT.... ....PCT COMP CCMP $$ \ ? 3 s * ' , B I? n i r. ./ IB 14 11 ?i ?<> TO 1. )1 K YC V 10 " M 10 C56P37P7 C56P41PP C56P90PP C61J01JJ C61JU J9 C61J15J9 C61J1Tj9 C61J19J9 C61J5UJJ C61J70JJ C61J8IJJ C61L80LL C61P2IP6 C61P3IP7 C61P34PP C61P36PP C61P90PP C62J01JJ C62JI1J9 C62J15J9 C62J17J9 C62J19J9 C62J50JJ C62J70JJ C62J9IJJ C62L80LL CbZPZlP6 C62P31P7 C62P34PP C62P36PP C62P90PP C63J0IJJ C63JIIJ9 C63J15J9 C63J17J9 C63J19J9 C63J50JJ C63J70JJ C63J74JJ C63J81JJ C63LBOLL C63P21P6 C63P3IP7 C63P34PP C63P36PP C63P90PP C64J01JJ C64J11J9 PULL ELECTRONIC MAINS LF TOO 13 GROUNDING LF 1000 480 ELECTRONIC DISCONNECTS EA 119 276 PREFAB INSTR SUPPTS-CQNV EA 1 12 INSTALL XMITTERS -CONV EA 2 79 INSTALL MINOR INSTR-CONV EA 20 41 install p/i transor-conv EA ...... 1 25 INSTALL I/P TRANSDR-CONV EA 17 MOUNT INSTR SHELTER-CONV EA 1 20 PNUEMATIC TUBING -CONV LF 23 .... 10 LOOP CHECK -CONV EA 3 22 INSTALL STEAM TRACE-CONV LF 74 Replace flex coNdit-ConV .. ... LF 37 20 PULL 600V/1KV WIRE -CONV LF 19 1 TERMINATI0NS-600V -CONV EA 53 TERMINATIONS ELE/TC-CONV " EA ..... " 4 .... ........... 3 REMOVE EXIST INSTR -CONV EA 20 41 PREFAB INSTR SUPPTS-CONV EA 1 12 INSTALL XMITTERS -CONV EA 2 79 INSTALL MINOR INSTR-CONV EA 87 190 INSTALL P/I TRANSOR-CONV EA INSTALL I/P TRANSOR-CONV ..... EA......... 19 9tr ....... 475 686 MOUNT INSTR SHELTER-CONV EA 121 2420 PNUEMATIC TUBING -CONV LF 3000 1300 LOOP CHECK -CONV LOOPS 248 ~l8l9 INSTALL STEAM TRACE-CONV LF 6050 3430 REPLACE FLEX CONDIT-CONV LF 100 45 PULL 600V/1KV WIRE -CONV LF 20 1 TERMINATIONS-600V -CONV EA 10 6 TERMINATIONS ELE/TC-CONV EA 100 58 REMOVE EXIST INSTR-CONV EA ..... "...160 "... ... ...320 PREFAB INSTR SUPPTS-CONV EA 1 12 INSTALL XMITTERS -CONV EA 10 395 INSTALL MINOR INSTR-CONV EA 49 INSTALL P/I TRANSOR-CONV EA 1 25 INSTALL i/p transor-conv EA 17 MOUNT INSTR SHELTER-CONV EA 2 40 PNUEMATIC TUBING -CONV LF 598 258 INST AIR SUBHEADER LF 21 LOOP CHECK -CONV EA 106 .........778 INSTALL STEAM TRACE-CONV LF 2600 1475 REPLACE FLEX CONOIT-CONV LF 1010 557 PULL 600V/1 KV WIRE Lf 375 19 TERMINATIONS-600V -CONV EA 11 7 TERMINATIONS ELE/TC-CONV EA 100 56 REMOVE EXIST INSTR -CONV Ea 39 156 PREFAB INSTR SUPPTS-CONV EA 1 12 INSTALL XMITTERS -CONV EA 1 33 4065 275 4065" 775 " 7T5"CURVE-P "100 - ICO T .0 j 0 2 0 0* 0 0* 83 ........... 12 ... 0 0 83 0 BLOCK-P 0 BLOCK-P 83 CURVE-J 0 0 100 0 0 100 o 109 893 109 093 893 CURVE-J 100 100 9 8 9 8 8 CURVE-J 100 100 o~ 69 0 155 0Sf 69 0 155 0 BtUCK-9 0 155 CURVE-J loo u 100 i: 'r 3 ............. 50 221 0 ------------------------42 1720 3 50---------------------- 221 ..... 0 42 1720 34 BLOCK-J .. A2 CURVE-J 1720 CURVE-J 100 0 100 .... 100 ........... 2. 100 100 r. 800 --9I5- 1200 411 ------ 489 37 800 915 1200 411 48 9" 37 411 CURVE-L 100 484 CURVE-P TOO 37 CURVE-P loo 100 TOO 100 2r 258 164 6 380 83 90S 384 258 l646 380 83 905 384 83 CURVE-P 905 CURVE-P 384 CURVE-P 100 100 100 100 100 100 V H174 56 1246 51 54 14 147 51 56 T244 54 56 CURVE-J 1746" CURVE-J 54 CURVE-J 100 100" 100 100 100 100 3? n u 21 ........ 105 lb 467 21 ............. 176... ............ 105 ... 216 18 467 467 CURVE-J 176 -------------176 CURVE-J 216 216 CURVE-J 100 loo 100 100 100.......... 100 nr 549 84 549 84 84 CURVE-J 100 100 395 " T350 390 T350" 1350 CURVE-J TOO 100 11 870 200 870 200 200 CURVE-L 100 100 3689 1137 3689 1137 1137 CURVE-P 100 100 ....6972 ............... 301 155 11 .... 6972 .......... 381 ............. 381 CURVE-P 100 155 11 11 CURVE-P 100 100 100 <s IT 2355 296 947 ........ 351 2211 296 947 ... 351" 947 CURVE-P 107 35 X CURVE-P 100 100 TOO " 18 101 18 101 101 CURVE-J 100 100 184 1673 184 1673 1673 CURVE-J 100 100 44 .............. 109 44 ............. 109 ... ~... . 109 CURVE-J 100 100........... 32 308 32 308 308 CURVE-J 100 100 111 644 111 644 644 CURVE-J 100 100 ;; 15 820 94 ------ ---- 15... 163 820 94 163 94 CURVE-J 100 16 3 CURVE-J 100 100 100 P 645 86 645 86 86 CURVE-J 100 100 ........ 444 2007 444 200? 200 7 CURVE-J loo ICO 888 130 888 130 130 CURVE--L 100 100 1789 1358 72 627 41 7 1790 ... 1357 72 6A27r 7 627 CURVE-P ..... ........ 41 CURVE-P 7 CURVE-P 100 100 100 100 100 100 s. ...... rf :r 1997 576 1997 576 576 CURVE-P 100 100 7 B 244 78 244 244 CURVE-P 100 100 .... fi-i 21 96 21 96 96 CURVE-J 100 100 139 1333 139 1333 1333 CURVE-J 100 100 GARRARD 00000680 o JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MUC I REPORT NO. C38022--40 FOCUS MASTER FILE LISTING RUN DATE 5/24/82 PAGE 15 o 9 $*$$$ UNITS OF ACC I. NO DESCRIPTION OF ACCOUNT RC QUANT =**$*=$*$ C64J15J9 INSTALL MINOR INSTR-CuNV EA C64J17J9 INSTALL P/I TRANSOR--CONV EA C64J19J9 INSTALL I/P TRANSOR-CONV EA C64J50JJ MOUNT INSTR SHE LTER-CONV EA C64J70JJ PNUEMATIC TUBING -CONV LF C64JB1JJ LOOP CHECK -CONV LCOPS C64L80LL INSTALL STEAM TRACE-CUNV LF C64P21P6 REPLACE FLEX CONOIT-CONV LF C64P31P7 PULL 600V/1KV WIRE -CONV LF C64P34PP TERPINATI0NS-600V -CONV EA C64P36PP TERMINATIONS ELE/TC-CONV EA C64P90PP REMOVE EXIST INSTR -CONV EA C65J01JJ PREFAB INSTR SUPPTS-CONV EA C65J11JJ INSTALL XMITTERS -CONV EA C65J15J9 INSTALL MINOR INSTR-CONV EA C65J17J9 INSTALL P/I TRANSDR-CONV EA C65J19J9 INSTALL I/P TRANSOR-CONV EA C65J50JJ MOUNT INSTR SHELTER--CONV EA C65J70JJ PNUEMATIC TUBING -CONV LF C65J81JJ LOOP CHECK -CONV LCOPS C65L80LL INSTALL STEAM TRACE-CONV LF C65P21P6 REPLACE FLEX CONDIT-CONV LF C65P31P7 PULL 600V/1KV WIRE -CONV LF C6.5P34PP TERMINATI0NS-600V -CONV EA C65P36PP TERMINATIONS ELE/TC-CONV EA C65P90PP REMOVE EXIST INSTR -CONV EA C66J01JJ PREFAB INSTR SUPPTS-CONV EA C66J11J9 INSTALL XMITTERS -CONV EA C66J15J9 INSTALL MINOR INSTR-CONV EA C66J17J9 INSTALL P/I TRANSOR--CONV EA C66J19J9 INSTALL I/P TRANSOft-CONV EA C66J50JJ MOUNT INSTR SHELTER-CQNV EA C66J70JJ PNUEMATIC TUBING -CONV LF .... C66J81JJ LOOP CHECK ......... -CONV LOOPS C66LBOLL INSTALL STEAM TRACE-CONV LF C66P21P6 REPLACE FLEX CONOIT-CONV LF C66P31P7 PULL 600V/IkV WIRE -CONV LF C66P34PP TERM INA TI0NS-60GV -CONV EA C66P36PP TERMINATIONS ELE/TC-CONV Ea C66P43PP ELECTRIC HEAT TRACING LF C66P90PP REMOVE EXIST INSTR -CONV EA SOON 18 OA AREA C INSULATION FSC 18 LF SOON21 A EQUIP INSLN PlT16 FSC 21 SF SOON22 A PIPE INSLTN PLT16 FSC 21 SF S00N23 A EQUIP INSLN OFF PL FSC 24 SF S00N24 A PIPE INSLTN OFFPL FSC 24 ELF S00N25 A FIREPRF VSSL SKRT OFF PL T SF SOON 26 A FIREPRF STR STEEL OFFPLI CF 00 CURRENT BUOGET QUANT MANHOURS T- 1 6 1 20 331 48 00 1000 2 25 38 20 9 2427 2811 516 25 10 1000 10 1 2 3 1 1 1 25 1 6 577 33 12 79 7 25 7 20 .......ii 168 4150 100 20 5 18 1232 2355 49 T() 32 1 2 4 1 1.... 1 - 83 12 79 10 25 7 20 2940 .... 297 62 50 50 25 5 69 100 19 17830 1280 2178 3502 51 I 3 40 98 44 10219 3 3000 71670 12830 73914 2200 11220 25951 3977 1995 7 260 1323 4661 -------------------------- ~TUt=OFF D'ATF 5/21/82 TO-OATE PROGRESS PROJECT FORECAST ------------ TRENO FCST PHYS TREND .............PCI ...... PCI 9 QUANT MANHOURS QUANT MANHOURS MANHOURS METHOD COMP CCMP 9 117 - -12B- 1TT 128 128 CURVE-J 100 100 19 115 29 1957 461 691 2326 6017 193 3009 92 25 94 31 a 63 17 215 468 925 1348 ' 5980 120 0 102 22 0 ------ 8 3 18 42 6 486 721 1094 0 66 2095 40 241 133 19 320 115 221 29 219 1957 2353 442 112 691 1170 2326 443 6017 32 193 1024 3009 37 86 ------------ 9225- 513 94 30 31 123 8 172 63 59 17 53 215 1563 468 197 925 2 74 04 8 0* 0* T540 5980 185 120 0 0* 1144 102 32 22 0 0- ... 245..... 83 113 18 52 426 1405 ... .. ..... 486 122 721 767 14 1094 0* 10 66 80 3 2095 32 40 259 241 133 320 221 219 2353 112 1170 44 3 32 1024 37 86 513 30 123 172 59 53 1563 197 274 185 0 1144 32 0 25S 113 52 1405 122 767 15 10 803 32 259 133 CURVE-J 320 CURVE-J 221 CURVE-J 219 CURVE-J 2353 CURVE-J 112 CURVE-L 1170 CURVE-P 443 CURVE-P 32 CURVE-P 1024 CURVE-P 37 CURVE-P 86 CURVE-- j~ 513 CURVE-J 30 CURVE-J 123 CURVE-J 172 CURVE-J 59 CURVE-J 53 TTURVE-3 1563 CURVE-J 197 CURVE-L 274 CURVE-P BLOCK-7 BLOCK-P CURVE-P 185 CURVE-P 0 BLOCK-J 1144 CURVE-J 32 CURVE-J 0 BLOCK-9 255 CURVE--J 113 CURVE-J 52 CURVE-J " 140 5 CURVE-J 122 CURVE-L 76 7 CURVE-P 15 10--DA 1 b 1U CURVE-P 803 CURVE-P ".... 32 CURVE-P 259 CURVE-P 100 100 loo 100 104 loo loo 100 100 100 100 100 100 100 100 100 IU0 100 100 100 100 100 100 0 100 100 0 100 100 100 100 100 100 0 100 100 100 100 100 100 loo 100 100 100 100 100 100 ICO 100 loo 100 100 100 100 100 100 100 100 100 TOO 100 0 100 100 0 100 100 100 100 100 100 100 100 100 100 100 9 9 8786 6263 8786 6263 6263 CURVt-0 100 100 23973 20970 12288 24767 9746 2793 9814 10270 6047 8414 1032 1993 29712 50000 12288 4400C 9 74 7 2893 9233 18878 1800 14750 ....... 2 500 2000 I2I63_CURVE--0 24487 CURVE-0 6C47 CURVE-0 14948 CURVE-C 1032 CURVE-0 2064 CURVE-0 ... 81 42 100 56 100 97 81 42 0 100 56 ..... . 100 Q ____ oO GARRARD 00000681 JOB NO. 1 <i053-000 ROBINSON REEINRY MOOERNZTN PROJ-MOC REPORT NO. C38022-40 F 0C0 S MASTER FILE LISTING ............ "fll ...... -................. .... TWYTr TV W YYVYYVirWir''PVV*WVYY'TY'Yl*Y*-YV -- 00 UNITS CURRENT OF BUDGET ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT QUANT MANHOURS TO-DATE PROGRESS ... " QUANT MANHOURS PROJECT FORECAST QUANT MANHOURS SOON2T FIREPRF VSSL SKRT-PLT 16 SOON28 FIREPRF STR.STEEL-PLT 16 SU0N30 INSTR INSULATION OFFPLOT S00XI0 PAINTING FSC S00X40 A LARK PAINTING FSC 40 S00Z01 A LE00 CONSTRCTION FSC 1 SOOZ02 A POTTER ELECTRIC FSC 2 S00Z03 A SHEEHAN PIPELINE FSC 3 S00Z05 OA MORRIS CONSTRCT FSC 5 soozoa a CENTRAL IL POWER FSC 8 S00Z09 A CONNOR CONNOR FSC 9 S00Z13 OA MAECO CONSTRCT FSC 13 S00Z16 OA MAECO CONSTRCT FSC 16 S00Z19 A STURM HEATING FSC 19 S00Z22 A FIELD X-RAY FSC 22 S00Z23 A MISCELL BUILDINGS FSC 23 SOOZ26 A REACTOR INTERNALS FSC 26 S00Z27 A MAECO PL16 ROAD FSC 27 S00Z28 A STRESS RELIEVING FSC 28 S00Z29 A HEATER REFACTORY FSC 29 S00Z30 A ERECT COOLIN TOWR PO E30 S00Z32 A STURM-WATER CHILL.. FSC 32... S00Z34 A MARTINSVL ROOFING FSC 34 S00Z36 A CLEAN COMPR PIPE FSC 36 S00Z38 A REWORK EXIST 29C-1FSC 38 S00Z91 A ACOUSTIC EMISSIONS TEST S00Z99 A MAINTENANCE ROADS S05Z60 A COMP AREA REWORK FSC........... S09J11J9 MORRIS-INSTALL XMITTERS S09JI5J9 MORRIS-INSTALL MIN INST S09J3Ijj MORRIS LOCAL CONTROL PL S09J50JJ MORRIS MOUNT INST SHELTR S09J70JJ MORRIS--INST AIR TUBCPIPE S09H0L1 MORRIS-STEAM TRACE PIPE S09L11L1 MORRIS - 2" UNDER RCS S09L12L2 MORRIS - 3" OVER SPOOLS S09L17L2 MORRIS - 3M6 OVER RACK S09L2IL1 MORRIS-ALLOY PIPE S09L70LL MORRIS-UNDERGROUND PIPE S09L8QLL MORRIS-STEAM TRACING S09L98LL MORRIS-HYDROTESTING S09M30MM PIPEWAY STEEL S09XXX MORRIS DISTRIBUTABLES S29J01J9 ALLEN-MODIFY INSTR SUPPT S29J11J9 ALLEN--INST ALL TRANSMTTRS S29J15J9 ALLEN-INST ALL MINUR INST S29J50JJ ALLEN-MOUNT INSTR SHELTR S29J60JJ ALLEN-ANALYZER SF 57 50 690 6641 1898 7850 0 SF 27 95 213 168 1022 0 EA 1 5 10 32 188 0 SF 75800 8340 37885 1730 5T760 2750 SF 15000 750 19425 899 19425 899 UNITS 200 9430 200 10148 200 10148 UNITS 100 2400 100 2648 loo- 2648 UNITS 100 6500 100 6528 100 6528 UNITS 100 9980 100 11948 100 11948 UNITS 100 376 50 188 100 376 UMTS 100 200 200 464 200 572 CY 22193 9823 27662 11317 27662 11317 EA 7 840 7 1024 7 1024 UNITS 100 200 100 165 100 165 UNITS 100 578 300 1663 300 1663 UNITS 5 00 1169 800 If To 800 1770 UNITS 1100 4705 1100 5927 1100 4616 UNITS D-INS _ 1-00g- 1820 100 24ir 80 161" " 100 2417 80 361 UNITS 100 1550 100 7531 100 5680 UNITS 100 3000 100 2502 100 2500 units 100 100 100 64 100 ............ .....64 UNITS 100 80 300 168 300 160 UNITS 1 12 100 2444 100 500 UN ns 100 191$ 100 riU6 150 1700 UNITS 1 2 100 338 100 192 BMHRS 688 688 688 183 688 183 UNITS .... 100 ...... 2000 ' .......... 0 ........... 0 ..... ..... ...... 09 0 EA 12 361 27 207 27 628 EA UNITS'" ~ 117 loo 805 ..... . 35 66 100 ... 53 ...... 0 66 ........ 105" 35325 EA 1 20 13 34 13 130 LF 1000 766 1200 546 1200 689 LF ...... ................ 3 ... ;............ 5 ..... 1461 ..... 1290.... .......... 1461 "........1142 LF 3366 4337 2039 3553 2039 2906 LF 1409 2973 2261 6664 2261 6891 LF 2815 2633 14t 4 1474 1297 LF 275 630 623 1171 623 1109 LF 1 1 10 118 10 20 LF 50 27 3981 1447 3981 1728 LF 4615 503 9292 1027 9292 959 TONS 1 38 1 39 1 65 BMHRS 1 1 ...............0 ..........1091 ............. 0$ ............. 425 EA 13 215 3 12 3 50 EA IS 608' 18 243 18 544 EA 35 136 58 137 se 169 EA 21 375 3 30 3 80 EA 0 0 0 0 09 0 RUN OATE 5/24/82 PAGE 16 CUT-OFF DATE 5/ZF/82 TREND FCST MANHOURS METHOD PHYS PCT... COMP TREND PCT COMP 2244 CURVE-CT 806 CURVE-0 940 TARGET - "2638 CURVE-0 899 CURVE-0 10148 CURVE-0 2F4TT CURVE-0 6528 CURVE-0 11948 CURVE-0 376 CURVE-0 464 CURVE-0 11317 CURVE-0 1024" CURVE-0 165 CURVE-0 1663 CURVE-0 1770 CURVE-0 5927 CURVE-0 80 CURVE-0 36T curve 7531 CURVE-0 2502 CURVE-0 64 CURVt-0 168 CURVE-0 2444 CURVE-0 TT56" CURVF-0 338 CURVE-0 183 CURVE-0 0 TARGET 20 7 CURVE-J 53 CURVE-J 20 BLOCK-J 34 CURVE-J 546 CURVE-J 1290 CURVE-L 3553 CURVE-L 6664 CURVE-L *54 CURVE-L 1171 CURVE-L 118 CURVE-L 1447 CURVE-L 1027 CURVE-L 39 CURVE-M .... 1091 TO-OATE 12 CURVE-J 24 3 CURVE-J 137 CURVE-J 30 CURVE-J 0 BLOCK-J 85 .. 85 21 21 53 66 66... 100 IOC 100 100 TOO IOO 100 100 100 100 50 50 100 ICO 100 100 io<r 1W 100 100 100 100 loo ioo 100 ICO 100 100 iutr 100 100 100 100 100 loo '... loo 100 100 100 IOC 100 TOO 100 100 100 100 0 ..... 0 100 100 100 100 TOO .........0 100 100 100 100 loo 100 100 100 loo 100 100 .... 100 100 100 100 100 ioo loo 100 100 100 100 0 TOO 100 100 100 100 loo lod too 100 00 o 9 ; 9 s ' 9 fl ir> 9 17 9 . IP >, 21 21 75 it 29 .2 V, .13 ir. V Id M If 4- ' ,1 r.n M r.' '* O e0 * JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC _#] REPORT NO. C38022-40 FOCUS MASTER FILE LISTING RUN OATE 5/24/82 PAGE 17 0 c 7 T 4 ACCT. NO 6 $$$$$$$$$ , S29J70JJ ,, S29L10L1 S29L1IL1 10 .... S29L12L2 H S29L17L2 17 S29L70LL n S29LBOLL 14 S29L9BLL S29XXX >0 S31L11L1 ,7 S3IL12L2 19 S31L98LL 14 S32J1IJ9 S32J15J9 S32J31JJ S32J50JJ ;'j S32J60JJ ?* S32J70JJ S32L10L1 /f S32L11L1 ?; S32L12L2 7H S32L70LL ?y S32L80LL TO S32L98LL U S32XXX V S45L11LI S45L12L2 S45L17L2 S99L11LI S99L 12L2 37 X70110 0 X70120 0 34 X70130 0 4, X70160 0 ,1 X70170 0 X70190 0 f 44 4.. c> 47 m 4' c '< o I X70210 0 X70224 X70231 0 X70232 0 X70250 0 X70260 0 X70270 0 X70510 0 X70520 X70530 0 X70540 X7I110 DESCRIPTION OF ACCOUNT ******* UNITS .. OF RC QUANT ALLEN-INST AIR TUBE PIP...... ALLENSTEAM TRACE PIPE ALLEN2" 6 UNDER RK SP ALLEN3" OVER SPOOLS ALLEN-3" OVER RACK PIPE ALLENUNDERGROUNO PIPE ALLENSTEAM TRACING ALLENHYOROTESTING ALLEN-OISTRIBUT ABLES INST SC PIPE 2IN UNDER INST CS SPED 3IN TO 6IN TESTING INSPECTION hoke-install TRANSMITTER HOKE-INSTALL MINOR INST HOKE-LOCAL CONTROL PANEL moke-mount Inst shelter .... HOKE--ANAL YZ ERS HOKE-INST AIR TUBE EPIPE HOKE--STEAM TRACE PIPE HOKE--2" t UNDER RK SP HOKE--3" OVER SPOOLS HOKE--UNDERGROUND PIPE HOKE--STEAM TRACING HOKE--HYDROTESTING HOKE-OISTRIBUTABLES INST CS PIPE 2IN UNOER LARGE BORE CS SPLO PIPE LARGE BORE CS RACK PIPE HOKE-2" UNOER RK SP HUKE-3" OVER SPOOLS TEMPORARY BUILDINGS TEMP WORK AREA BAYS TEMP ROADS PRKG FENCES TEMP WATER AIR SEWAGE MINOR TEMP CONSTRUCTION WEATHER PROTECTION GENERAL E FINAL CLEAN-UP RUBBER SAFETY BLANKETS FIRST OROP MAT HANDLING WAREHOUSING UNALLOCATED LABOR ON E OFF EXPENSES SURVEYING WELOER TESTING WELDER UPGRADING SHOW-UP TIME BOILRMKR HOLIDAY HOURS TEMPORARY BUILDINGS LF LF LF IF..... LF LF LF LF BMHRS LF LF LF EA EA UNITS EA EA LF LF LF LF LF LF LF BMHRS LF LF LF LF LF BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS MHRS BMHRS 00 $SS******* #$***$#* $#$***:$*:*:$ Cut-off date $$*************** 5/21/82 ***** , 7 CURRENT BUOGET .. .................. TO-OATE PROGRESS PROJECT FORECAST TREND ......... ........... ................ ... FCST PHYS TREND PCT.... PCT..... QUANT MANHOURS M* 710 52 2541 g74 401 505 4570 0 3822 1125 4915 4 29 0 2 3 110 32 703 609 69 2700 ... 2210 670 6 .......... 27 433 0 4914 2047 367 114 251 0 42 280 98 41 676 " ' QUANT MANHOURS QUANT MANHOURS MANHOURS ME THOO COMP ****# TVYYVVY*VTY$**$** 776 313 ` 775" 70(7 31 ff CURVE-J" 300 211 1486 1266' 217 1643 4137 - 211 1486 1266 434 2 592 3768" " 217 CURVE-L 1643 CURVE-L 4137 CURVE-L 100 100 100 224 0 224 334 621 BLOCK-2 100 34 478 77 416 34 478 74 ..685" 77 CURVE-L 100 *ij. 6 CURVk-L 100 4481 664 4481 435 664 CURVE-L 100 0 556 759 696 ... 0* 556 230 693 .... 759 TO-DATE 0 696 CURVE-L 100 586 842 "5 2549 24 122 586 1142y 2549 40 101 ' 2549 CURVE-L 34 CURVE-L ITT CURVE-J 100 74 100 50 55 50 493 55 CURVE-J 100 0 0 0# 0 0 BLOCK-J 0 2 33 2 42 33 CURVE-J loo 3 560 347 98 459 "26 3 560 347 280 445 439 98 CURVE-J 459 CURVE-J 26 TURVE-L 100 100 100 1395 3490 1395 2045 3490 CURVE-L 100 CCMP 100 R 1* loo 100 i 100-- --------- 0 100 100 ,, 100 100 100 100 7. 71 100 100 0 100 100 r TO 100 100 IV 100 1957 5 50 2454 0 185 116 1419 4 6 4663 3951 5211 9 27 179 0 320 266 2367 5 11 4663. 3551 1120 To 9 350 1796 0 600 269 793 46 199 4663 3951 ... 5241 89 417 33 205 508 2086 2330 147 202 7103 3493 1120 109 350 1796 0* 600 269 793 46 199 4663 3951 5521 216 459 249 203" 1213 447 1179 101 507 6941 3493 5241 CURVE-L " m curve-1 417 CURVE-L 33 CURVE-L 205 "TO-DATE 508 CURVE-L 2086 CURVE-L 2330 CURVE-L 147 CURVE-L 202 CURVE-L 7103 CURVE-0 3493 CURVE-0 100 loo 100 100 u 100 100 100 loo 100 lod 100 100 loo 100 100 TOO 100 100 loo 100 100 100.......... 100 n 4b 44 " 3820 25 30 728 1388 2768 3820 25 30 728 1388 2768 3320 2530 72 8 1388 2768 3208 761 710 1490 3413 3820 2850 "........ 2530.... ........... 761 728 646 1388 1385 2768 1339 3208 CURVE-0 761 CURVE-0 710 CURVE-0 1490 CURVE-0 3413 CURVE-0 100 100 100 100 100 100 TOO............ 100 100 " TOO V 8644 1392 6 5390b 6073 8000 8644 1392 6 53806 6073 8000 8644 13926 53470 6073 8000 6308 13926 72262 8461 9601 8644 13926 53806 6073 8000 5400 14200 64000 6488 6000 6308 CURVE-0 13926 CURVE-0 ....72716 CURVE-0 8461 CURVE-0 9601 CURVE-0 100 100 99 100 100 100 100 99 100 100 4 1.1 6. r a 15 ODD 8272 1602 15039 15000 8272 1602 15039 15000 8272 1602 15039 13384 7438 146*! 17462 15000 8272 1602 15039 13900 5986 1120 2 0000 ... 13384 CURVE-0 7438 CURVE-0 1464 CURVE-0 17462 CURVE-0 100 100 100 100 100 100 100 100 cG 0 2318 0 2318 0 2318 224 2692 0* 2318 0 2575 224 TO-DATE 0 2682 CURVE-0 100 100 100 c ic GARRARD 00000684 JOB NO. 14053-000 ROBINSON REFINRY MOOERN2TN PROJ-MOC FOCUS MASTER FILE LISTING RUN DATE 5/24/82 PAGE 18 REPORT NO. C38022-40 -------------- .. ? 3 4 B------------ -------------- f ~..... ....... DO 4T.14T.AT A.A A.A *** &*:$* 4: $4:4:4:4:: #4: UNITS CURRENT BUOGET OF - TO-DATE PROGRESS PROJECT cu r=OFF DATE " 5721/82 $*$$***** * $$<## $ * * * * * ** * ****** FORECAST TREND FCST PHYS TREND PCX PCT r. ACCT. NO **** ** ** DESCRIPTION OF ACCOUNT RC QUANT QUANT MANHOURS ******** QUANT MANHOURS QUANT MANHOURS MANHOURS METHOO COMP COMP ***** , X71120 a X71I30 0 X7I150 TEMPORARY WORK AREAS TEMPORARY ROADS TEMPORARY POWER BMHRS BMHRS BMHRS 1899 418 13866 1899 418 13866 1899 416 13866 1133 310 19080 1899 418 13866 1296 288 15556 1133 CURVE-0 310 CURVE-0 19080 CURVE-0 loo 100 100 100 100 100 IQ X7116U X71I70 TEMPORARY SEWERS MINOR TEMPORARY CONSTCTN BMHRS BMHRS 4792 2704 4792 2704 4792 2 704 787 2267 4792 2704 2090 2759 787 CURVE-0 loo 2267 CURVE-0 100 lod 100 ,, X71190 WEATHER PROTECTION BMHRS 3959 3959 3959 7395 3959 2903 7395 CURVE-0 100 100 13 X712IO M X71220 X71250 l<". X71270 X72I10 ie X72120 CLEAN UP MAINT TOOLS 6 EQUIPMENT UNALLOCATED LABGR SURVEYING TEMPORARY BUILDINGS TEMPORARY WORK AREAS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS 13605 20200 6505 0 1588 1755 13605 20200 6505 0 1508 1755 13605 20100 6505 0 1588 1755 24639 16248 9742 0 2692 1480 T3603 20200 650 5 0 1588 1755 10965 15268 7325 0 2875 1666 24689 CURVE-<r 16329 CURVE-0 9742 CURVE-0 0 BUCGET 2692 CURVE-0 1480 CURVE-0 ICO 100 100 0 100 100 100 100 loo c 100 100 V, X72130 TEMPORARY ROADS BMHRS 502 502 502 443 502 414 443 CURVE-0 loo IOC X72160 X72170 TEMPORARY SEWERS MINOR TEMPORARY CONSTCTN BMHRS BMHRS 3119 590 3119 598 3119 598 957 418 3119 598 1079 727 957 CURVE-0 100 418 CURVE-0 100 100 100 X72190 'J1 X72210 WEATHER PROTECTION CLEAN UP BMHRS BMHRS 1126 7869 1126 7869 1126 7 06 9 2291 12881 1126 7869 799 8505 2291 CURVE-0 loo 12881 CURVE-0 100 100 100 X72250 UNALLOCATED LABOR BMHRS 5652 5652 5652 5959 5652 7737 5959 CURVE-0 100 100 X72270 SURVEYING BMHRS 0 0 0 15 0 0 35 TO-DATE 0" TOO ,f X 73110 TEMPORARY BUILDINGS BMHRS 931 931 931 1697 931 1609 1697 CURVE-0 100 100 3/ X73120 TEMPORARY WORK AREAS BMHRS 65 65 65 82 65 82 82 CURVE-0 100 100 ro X73130 TEMPORARY ROADS BMHRS 39 39 39 48 39 48 48 CURVE-0 100 100 ?9 X73160 TEMPORARY SEWERS BMHRS 0 0 0 0 0* 0 0 BUOGET 0 0 30 X 7 3170 MINOR TEMPORARY CONSTCTN BMHRS 70 70 TO 60 70 60 60 CURVE-0 100 100 x73i90 WEATHER PROTECTION BMHRS 27 27 ............. 27 90" 77 18 90" CURVE-0 "TOD 100 X73210 CLEAN UP BMHRS 2137 2137 2137 2527 2137 2441 2527 CURVE-0 100 100 X73250 UNALLOCATED LABOR BMHRS 807084 B CM KEMP-CHNG TO Fl X GSKT...... Hill 2690 2690 .... 0 ................ 0 2690 3295 2690 3196 0 ............ 176 - ........... 0 ......' 0 32r7965 CURVE-0 TO-DATE 100 0 IOC 100 IS 816005C B REPLACE DAMAGED BLADES mu 0 0 0 56 0$ 0 56 TO-DATE 0 100 36 816011 8 ITT-GRINNEL mu 0 0 0 829 a* 0 829 TO-DATE 0 100 37 816012 B BRAND INSULATION ...................... Hill ............0 0 0 ..... ~ 0 ..... 0" U 0 BUCGET 0 0 816013 B INGER-RAND;16G-1A MHRS 0 0 0 30 0* 0 30 TO-DATE 0 100 31 816014 B GKN-B 5REPAIR F2 SECTION MHRS 0 0 0 24 0$ 0 24 TO-OATE 0 100 816016 B Ml SC BCS FOR RELNC TRUCK Hill 0 0 0 409 ` .......... 0 - 0 ------ --- 409 TO-DATE 0 .... ICO 816018 B IR RET PULS TANKS TO IR mu u 0 0 254 0* 0 254 TO-DATE 0 100 816019 B HAPPY-16E- A/8 COILS MHRS 0 0 0 0 0* 0 0 BUCGET 0 0 U 816020 B GKN-B j16F-3 SIR. STL. mu 0 a 0 ... 100 ..... .....0* 0 100 TO-DATE 15 100 4 4. 816021 B GKN-B;I6F-l*2.4 STACK 816023 B GKN-B; REWORK 16F-5 MHRS MHRS 0 0 0 0 0a 0 83 0* a 0 BU CGET 0 0 0* a 83 TO-OATE 0 100 -C 816024 B GKN-B;F3 CONV.BOX #4 MHRS 0 0 0 0 0* 0 0 BUCGET 0 0 7 816025 B GKN-B;F5 0UCT.F3 STACK MHRS 0 0 0 0 0* 0 0 BUOGET 0 0 *a 816026 B GKN BIRW/RWK PLTFMR F124 nm 0 0 0 761 o* 0 761 TO-DATE 0 100 i- 816027 B 6KN BIRW/F5 FLNG AT 12MI mu 0 0 0 7 0* ....... 0 --------------- 7 TO-DATE 0 100 S1602B B GKN-B;REWORK F3 MANIFOLD mu 0 0 0 80 0 0 80 TO-DATE 0 100 816029 B GKN-B;16F-1 CUIL BEVEL mu 0 0 0 0 0* 0 0 BUCGET 0 0 >' 816030 B GKN--B;VC HTR.RWRK PIPING am 0 a 0 0 0$ 0 0 BUOGET 0 ........e 816032 8 GKN-B!REPAIR F3 BURNERS MHRS 0 U 0 101 0* 0 101 TO-OATE 0 100 816033 B GKN-B;REBVEL MK16F3C mu 0 0 0 1253 0- 0 1253 TO-OATE 0 100 f 0 <3 9 "1 ?9 4 * 9 If 9 .2 15 11 9 71 n *' .? V. ,, V! ' /r r.1 r. 1 ? JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC FOCUS MASTER FILE LISTING RUN DATE 5/24/82 PAGE 19 REPORT NO. C3B022-40 %$$ $# j*s $ $ 00 CUT -OFF DATE 5/21/82 a } ACCT. NO DESCRIPTION OF ACCOUNT UNITS CURRENT BUOGET ......... OF RC QUANT QUANT MANHOURS jjr# $$sj: # # 4? TO-DATE . '............ QUANT PROGRESS PROJECT ............... . ........ " MANHOURS $***::$ $**; QUANT FORECAST MANHOURS TREND FCST MANHOURS METHOD PHYS PCT COMP TREND PCT CCMP .......816034 B GKN-B;REPR.PNLS.MKIA29R 816035 B GKN B; FI.2 RwK RAO TUBS 816036 B GKN-9;PROVIDE ACCESS DRS 81603T B GKN-B;FLAP DAMPERS 816038 B GKN-B;REPK.COLD AIR OUCT 816039 B GKN-9; F3.FLANGE MK5A13 816040 B gkn-b;spring Hanger rods 816041 B GKN-B;RAD.MALL RESTRAINT 816042 B gkn-b;compens.to damper 816043 B GKN-B F5 GUILLOTIN DMPR 816045 B GKN-B;REWK ASST 16F3 osg 816046 B F12.4 RAOIANT ROOF PANEL 816047 B GKN-B;F3-STRWYS/PLtFORMS 816048 B gkn-b;pltfrm.at elev.ioi 816049 B GKN-B;PLTFMS.l1,12.13614 816050 B INGERSOL-RANO;COMPRESSOR 816051 B LECTRODRYER 816053 B GKN--B;VC HTR-REV.CO PIPE 816055 B GKN-B;REF AB.16HS-1208 816056 B ECKO;CUT/REWELD 11/4CHRM 816057B B REPLC DMGOEMISNG REF 16--3 816058 B GKN- B; F1 - R E V R S E F L ANGE S 816062 B RELCT E REWLD BEAMS--F3 816064 B INGERSOLL RAND 816065 8 ECKO;RWRK.SPL.16P-208-1D 816066 B ECK0;RWRK.SPL.16P-203-lB 816067 B ECKO;RWRK.SPL.16P-204-1B 816068 B ECKO;RWRK.S PL16P--205--IQ 816071 B GKN-B;WIND BRACING-VCHTR 816072 B JOHNSON SCRN16C--25 MOUIF 816075 B GKN-B INSTL RING SF-16F4 816076 B GKN-B;CONV.RESTRAINTS F3 816077 B ELLIOTT MTRL ONLY THRMW 816080 B SAUOER INO. 16C-25 MODIF 816089 B TIE-DOWN STORAGE SHED 816090 B I.R.--UNLOADER VALVES 816091 B ECKO;REFAB.SPL.16P--1401A 816093 B GKN-B;RELOC.DAMPER CNTRL 816094 B GKN--B;HOR.BOX REV.16F-3 816095 B REVISING BRACKETS 816108 B BRAND INS. CLEAN-UP 818035 B GKN-B;RWRK.RAO.SECT.TUBE 821004 B STR STEEL REPAIRS 823010 B SMITHCO ENG. RECOMB FINS 823052 B B UNIV. LOCKPORT TGTN BOLT 823055 B REFAB 16-HS-1208 823070 B INDIRECT L WORK TO ACM 823085 B STEEL MESH ON VSL SKIRTS j mil ...-..... 0 urn 0 mu 0 mu 0 mu 0 mu 0 iiiir 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu 0 urn 0 mu 0 mu 0 mu 0 mu 0 iiiir 0 mu Q mu 0 ...... mil ...... 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu ....... 0 mu 0 mu 0 mu 0 mu 0 mu 0 mu 0 um 0 mu J mu 0 um 0 um 0 0 0 0 0 0 0 0 0 0 0 u 0 0 0 0 0 0 0 0 0 u ..... 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .....................0 0 0 0 0 0 .................0 0 0 0 0 0 0 92~ ' -... 0* 10 ... 0 20 0$ 0 0 0 0* 0 0 0 0* 0 0 0 0* 0 0 125 0* 0 --D~ 0 XT .................0* 0 0* 0 0 00 0 ...... ......116 .... o* 0 0* ................. 0 .... 0 2637 0 0 0 48 o* . 0 0 0 0* IT 0 0 0* 0 0 0 0* 0 0 127 0* 0 0 49 0 0 0 0 0$ 0 0 0 0* 0 0 204 0 675 0* 0 0* . 0 ...0 207 ...... ......0* ..... .... 0 0 8 o* 0 0 242 0 0 a 0 ------- 122 0 0 37 0 0 0 12 0 0 0 64 0 0 0 26 0 0 0 56 0 0 0 ............. 23 0 0 0 55 0 0 000 0 0 118 0 0 0 17 0 0 0 46 0 0 ......... 0 74 0 0~ 0 615 0 0 0 140 0 0 0 48 0 0 0 48 0 0 0 0 0* 0 0 173 os 0 ------- 0 140 0 0 0 82 os 0 00 0 0 0 13 0 0 0 38 0 0 .... 92 TO-DATE 0 20 TO-DATE 0 0 BUDGET 0 0 BUCGET 0 0 BUDGET 0 125 TO-OATE 0 0 BUDGET u 0 BUOGET 0 0 BUDGET 0 116 TO-DATE 0 2637 TO-OATE 0 48 TO-DATE 0 0 "BUDGET 0 0 BUCGET 0 0 BUDGET 0 127 TO-DATE 0 49 TO-OATE 0 0 BUDGET 0 0 "BUDGET 0 204 TO-DATE 0 675 TO-DATE 0 207 TO-OATE " n a TO-DATE 0 242 TO-OATE 0 122 TO-OATE 0 37 TO-DATE 0 12 TO-OATE 0 64 TO-OATE 0 26 TO-DATE 0 56 TO-DATE 0 23 TO-DATE 0 55 TO-DATE 0 0 BUOGET 0 118 TO-DATE 0 17 TO-DATE 0 46 TO-DATE 0 M "TO-DATE " 0 615 TO-OATE 0 140 TO-OATE 0 48 TO-DATE 0 48 TO-OATE 0 0 BUOGET 0 I73 TO-DATE .... 0 140 TO-OATE 0 82 TO-DATE 0 0 BUCGET 0 13 TO-DATE 0 38 TO-DATE 0 100 ....... 4 100 " 0 0 0 IOC 0 ,r 0 0 100 100 100 0 M ?' 0 0 ICO..... " " 100 0 3. IT 100 100 IOC......... 100 1U0 100 ... 100 100 100 ICO r. 4', ' 100 100 ...... n 100 G 100......... 100 100 ,e loo 100 100 100 8. 100 0 100 ICO P- 100 0............... . ICO loq 0 e JOB NO. 14053-000 ROBINSON REFINRY MQDERNZTN PROJ- MOC # REPORT NO. C38022-40 FOCUS MASTER FILE LISTING RUN DATE 5/24/82 PAGE 20 0 o OO c **************** UNITS CURRENT BUOGET ..... Of .......... ...... r ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT 6 QUANT MANHOURS ; 826031 r e 826036 828022 .0 ....B30U17 r 832009 .2 870008 900044 l4 900097 B NO DESCRIPTION B GKN-B PROVIOE ACCESS ORS B ELECTRODRYER 280-1 SKID B HESTlNGHOUSE VENDOR REP B BCKCHRG FOR TOWR SBCNTRT B REPAIRS ON 4100 CRANE C23E-14 MONORAIL E "TROEE? C FUEL GAS BYPASS iim mu mu inn mu imi IZUT mu " ~xr 0 0 0 0 0 0 0 ' _ a 0 00 0 0 0 0 900217 C ROAC REPAIR 00 M 900218 C DRAIN VLV IN O'BRIEN BOX 900219 C INVERT XMITTER FLANGES .A 900220 C INSTALL BLOWDOWN VALVES 00 0a 00 14 900221 C ASSISTANCE TO HONEYWELL 00 900222 C INST BOX PWR FEED BY PLT 00 71 900223 C COKER QUENCH PANEL mil 0 0 72 ^ 900226 C RELOCATE LIGHT FIXTS-CCR 73 900228 C RELOCATE TEMP A/C UNIT BMHRS 0 0 0 a 900229C C CIPS RAILROAD CROSSING mu 0 a 900234 C RECEPTACLES IN CONTR RM 76 900235 C DISTRIB FIREPROOF mil mu 0 0 0 0 900236 C INSTALL NDZ2LES ON TANKS ?e 900238 C DRAINS ON O'BRIEN BOXES 79 900244 C BECHTEL--TIE--INS TO 900245 C SMALL BURE ADDS 23-28 imi mu mu mu 0 0 0 0 0 0 0 0 II 900248 C DELETION OF FUEL OIL PIP J? 900249C C REV. TO FUEL GAS LINES 13 900252C C ADD SPLASH BAFFLES H 900257 C PLANT 7 PSV BYPASSES 15 900265 C SEAL WELD INSTRUMENTS lli 900268 C NAPTHA STRUCTURE SI 900300 C COKER CNTRL RM MODIFICTN mil mil mil ILILI mu mu 0 0 0 0 0 0 ....a 0 0 0 0 0 0 -0 >8 900306C C CORRECT HEAT PROBLEMS mil 19 900313 C NEW T/C TAGS mu 10 9003I6C C ARTF MOD CAT CRACKER .............. mu 1. 900318 C HONEYWELL GROUNDING mu 1.' 900323 B MOD.SECURITY SYSTEM mu 0 0 0" a 0 0 0 0 a 0 .....900535 C LOST TIME ............... .c 901244 C ALLEN-PLANT 29 TIE-INS BMHRS mu ... 0 .... 0 0 0 TO-DATE PROGRESS QUANT MANHOURS IT ~ 648 06 0 132 0...................113 0 70 00 0T 00 00 00 00 00 00 00 00 00 .0 0 00 00 0 25 00 0 28 00 00 00 00 00 "" "------- o....... -......... 0 0 120 0 82 0 .................0 00 00 ................. 0..... ....... 263 00 00 '........ 0.............. 0 .0 0 PROJECT FORECAST CUT-OFF OAT E 57217BT $$$* TREND PHYS TREND o FCST PCT PCT QUANT MANHOURS MANHOURS METHOD COMP CCMP 0 0* 0 0* - - 0?r 8 0 649 TO-DA 1t 0 100 9 0 6 TO-DATE 0 100 K. 0 0 0" 132 TO-OATE I13T0-DAT E ------ 0Q 100 .....ioo.... ..." 13 0* 0 70 TO-DATE 0 100 14 0 0# 0 0 BUCGET 0 0 1( a 0 ' 0 BUDGET 0 u 0 0 0 BUCGET 0 0 IP 3000 3000 0 BUCGET 0 a *. 0 0 0 BUCGET 0 0 71 0 0 0 BUDGET 0 0 ?; 0 0 0 BUDGET 0 0 0 0 CTBUMET 0 0 ? 0 0 0 BUOGET 0 0 0 0 0 BUCGET 0 0 0 0 0 BUCGET 0 0 n 0 0 0 BUDGET 0 c 0 0 0 BUDGET 0 0 17 IT 0 0 0 "STODGE! 25 TO-OATE 00 0 100 13 14 0 a 0 BUCGET 0 0 3f 0 0 28 TO-OATE 0 loo 17 0 0 0 BUOGET 0 0 10 0 0 0 BUDGET 0 a 4fl 0 0 T BUDGET 00 4. 0 0 0 BUOGET 0 0 47 .." ".. 00 0... ---------- ---- 0 _ 00 0 BUOGET 0 0 BUCGET ..... 0 120 TO-OATE 0 0 44 0 '...."" 4' 100 ir, 0 0 82 TO-OATE 0 100 li 0 0 0"BUDGET 0 0 .17 0 0 0 BUCGET 0 0 0 0 0 BUCGET 0 0 .....0 " ....."......0 ...... 263 TO-DATE ....... 0 ICO 0 0 0 BUOGET 0 0 0 0 0 BUDGET 0 0 2000 2000" 0 "BUDGET... 0 .... ..0 a 0 0 BUCGET 0 0 I END OF MASTER FILE LIST 950 RECORDS ON FILE -.1 .............. - o 1 ' 4 L R 10 .? 13 18 ?C ?1 ?4 n 21 2!i JOB NO1405 3-000 ROBINSON REFINRY M00ERNZTN PR0J-M0C REPORT NO. C38022--40 X LIMIT 20 "PCT CURVE CODE -0- E 4= J4 L* M* P$ U* S* .CO .00 .00 .00 CO .00 .00 -10- .00 .00 .00 .00 .00 .00 .00 FOCUS FORECAST LIMITS AND CURVES -20- 1.17 .97 1.18 1.23 1.11 1.03 1.19 -30- 1.15 1.14 1.22 1.25 1.22 1.08 1.32 -40- 1.13 1.25 1.23 1.23 1.28 1.15 1.30 -50- 1.11 1.19 1.19 1.20 1.25 1.18 1.21 -60- 1.09 1.11 l.ll 1.15 1.19 1.15 1.14 -70- 1 .07 1.04 1.05 1.10 1.14 1.12 1.08 V LIMIT 15 PCT -80- -90- -100- 1.05 .99 i.o2 1.04 1.08 1.07 1.04 1.03 .98 rai 1.01 1.03 I.01 1.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 END OF REPORT C38022- 40 DATE PAGE 5/24/82 1 13 1$ ir V. 0 a o 2o o R 111? a If "3 ?; } y> 31 V 3; )!! " 40 ............................. ......................................... - ----- . ............ ............................................................................. GARRARD ooooo s. ...... --....................... - - . CD 00 ' GARRARD 00000688 c _<rf o c c c c r c r c " C c c c c c G JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MQC REPORT NO. C38040-35 FOCUS ***P ERFORMANCE REPOR T *** SUMMARY OF TOTAL PROJECT RUN DATE PAGE 5/24/82 I C ALCJJL AT igNS _HASEQ_ ON_BUDGE_T_ LINE ITEM AREA PROJECT FCS.T DATE 11/20/81* FCST 004 CUT-OFF DATE 5/21/82 ........ CURRENT BUDGET ..... .... _ MANHOURS PROJECT..........TRENC FORECAST FORECAST MANHOURS MANHOURS ....... THIS WEEK TG-OATE PERFORMANCE FACTOR PERCENT CALC ACTUAL CALC ACTUAL THIS TO TRND COMPLETE MANHOURS MANHOURS___ MANHOURS MANHOURS____..W..E.E..K._.._._._..O- A T'E__' _*_$F<C=*S*<TTRNOPHYS HYDRTRETR/PLATFRMR OFF-PLOTS TOC CONVERSION SUBCONTRACTS DISTRIBUTABLES TOTAL PROJECT 445993 ..... 660945 331899 39703T 263844 181295 130293168959 248644 246790 1470673 1855026 866557 391191 181333 189094 290531 1918706 1193 0 0 3069 960 5222 JOlt 0 .544542, 335016 863203 390969 1.69____ 1.59 .00 1.17 1.58 100 100 1.17 100 100 0 255682 181295 .00 .71 .71 100 100 .2967_____ 147114______162284______ .97____ l.JO_____ 1.10___ *<>....... 86 686 248208 289996 .71 1.17 1.17 100 100 5661 1810 7747 _1.23_ 98 1530562 1.09 1.23 98 ol O o o o o 9 9 9 9 9 9 9 9 9 9 O o :o o o % s & JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC 0 REPORT NO. C38040-35 FOCUS ^PERFORMANCE REPOR T SUMMARY OF TOTAL PROJECT RUN DATE PAGE CALCULATIONS BASEO ON BUDGET 5/24/82 1 c PROJECT FCST DATE 11/20/81, FCST 004 CUT-OFF DATE 5/21/82 c " r c ............................. ................... CURRENT LINE BUDGET ITEM CATEGORY MANHOURS $ '$: $ <s # :$ $ $ tJ: <r * ^ 4 PROJECT " TREND FORECAST FORECAST MANHOURS MANHOURS $E $J $L $M w~ N *P T c$ $R S #X Y 2 *1 2 5 EQUIPMENT INSTRUMENTATION PIPING STRUCTURAL STEEL INSULAT K FlREPRF ELECTRICAL CONCRETE BUILDINGS SITEWORK PAINTING SCAFFOLOING MISCEL SUBCONTRCTS TEMP FACILITIES TEMP SERVICE OTHER OPERATIONS 94260 148277 2795C1 53744 93599 288399 97909 3615 55436 9091 42468 55730 56856 166875 24913 149706 12687 506719 60870 57081 269198 223047 7159 66403 4504 126667 64195 52920 166764 27106 149920 717 36 505121 60772 72651 270483 223134 7122 66403 5592 126486 68755 60677 203266 26588 THIS ifE EK CALC ACTUAL MANHOURS MANHOURS TO-DATE CALC ACTUAL MANHOURS MANHOURS PERFORFSNCEFACTOR PERCENT THIS TO TRND COMPLETE WEEK DATE FCST TRND PHYS 0 1193 0 0 2654 0 0 0 0 415 0 0 58 902 0 0 730 180 0 2T4T~ 1091 0 0 0 224 13 0 0 686 0 94880 146690 314656 44915 4 5416 330944 132592 3375 55877 5139 47702 6U168 56856 166439 24913 149730 70482 502399 60772 4T588 270483 223047 7122 66391 4684 126486 68567 60677 202731 26588 .00 .61 .00 .00 "Tien.00 .00 .00 .00 .54 00 .00 .00 .76 .00 1.58 .48 1.60 1.35 1.05 .82 1.68 2.11 1.19 .91 2.65 1.14 1.07 1.22 1.07 1.58 .48 1.60 1.35 r.os.. .82 1.68 2.11 1.19 .76 2.65 1.14 1.07 1.22 1.0 7 100 98 99 100 66 100 100 100 100 84 100 100 100 100 100 100 <59 100 100 iT 100 100 100 100 70 100 100 100 100 100 TOTAL PROJECT 1470673 1855026 1918706 5222 5667 1887747 1.23 98 1530562 1.09 1.23 98 ar o O 17 13 M9 1C 9 ?c r1 9 7. V 9 9 13 O 3 9 9 '0 GARRARD 00000689 e JOB NC. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MUC REPORT NO. 038040-35 FOCUS --P ERFORMANCE REPOR T _____ DETAIL OF HYORTRETR/PLATFRMR A RUN DATE PAGE CALCULATIONS 8ASE0 ON BUDGET 5/24/e2 1 o Q PROJECT FCST OATE 11/20/81, FCST S 004 CUT-OFF OATE 5/21/82 O LINE ITEM. CATEGORY CURRENT PROJECT TRENO THIS WEEK TO-DATE BUDGET FORECAST FORECAST CALC ACTUAL CALC ACTUAL MANHOURS__MANHOURS___ MANHOURS___ MANHOURS__ MANHOURS___ MANHOURS MANHOURS PERFORMANCE FACTOR PERCENT THIS TO TRNO COMPLETE WEEK DATE FCST TRND PHYS 9 . .......... E ..... EQUIPMENT._______ ,, J INSTRUMENTATION L ___ M PIPING STRUCTURAL STEEL _ N INSULAT FIREPRF P ELECTRICAL ......... a ... CUNCREIE ........... .... R BUILDINGS s SITEUORK - _V_ _ .SCAFFOLDING. . 74489 41688 110971 ....... 19593 1 75900 ............ 7 5275 1180 26964 .. 19932 131451 23006 307897 31854 849 92183 468745) 24058 77607 131635 24387 310812 31854 849 93564 168832 3258 23939 77427 1193 0 0 0 0 0 0 0 0 14596 730 40890 180 156631 0 23322 0 827 91 96210 0..... .. 98844 0 1180 0 26650 13 25390 131635 23211 308721 31854 849 93564 168745 3258 23939 77427 oq .61 .00 .00 .00 .00 .00 .00 .00 .00 1.76___ 1.76 .57 .57 1.97 1.97 1.37 1.37 1.03 1.03 .97 .97 1.71 1.71 2.76 2.76 .90 .90 3.05 3.05 100......100. 95 96 :;o 99 100 100 100 ::o` 100 ioo......... " ' 100 100 100 100 100 100 100 100 100 100 9 -A HYORTRETR/PLATFRMR 445993 860945 866557 1193 14 544542 863203 1.69 1.59 1.58 100 100 19 9 9 9 9 9 9 O O o o GARRARD 00000690 o fV e /1 ? 3 4 6 ' 9 10 2 1.1 H If, 7 ie ,r. 22 JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C3B040-35 FOCUS ^PERFORMANCE REPORTS DETATL OF OFF-PLOTS B RUN OATE PAGE CALCULATIONS BASEO ON BUDGET 5/24/82 2 *************VAVATATA-.V.AP-tfAVRAOTVVJ. EAVC*T**F*C*S*T***D*A*TE* 11/20/81 $v $$F$C$S$T$$$ i0r0V4TVvriv *********** CURRENT PROJECT TREND this week TO- OATE LINE $$$IT$E$M$$$ CATEGORY ******************** BUDGET MANHOURS FORECAST FORECAST CALC MANHOURS **m*a*n*h*o*u*r*s***manhours ACTUAL MANHOURS CALC ACTUAL MANHOURS $$$M$ANH$O:U$R$S$ CUT-OFF OATE ******* vv5v/2v1/82 PERFORMANCE THIS TO WEEK OATE factor PERCENT TRND COMPLETE FCST TRND $$$$ phys ***** E EQUIPMENT J INSTRUMENTATION 19771 18255 18285 0 0 20282 18095 .00 .89 .90 99 100 14131 8219 8220 0 0 12334 8200 .00 .66 6? 100 100 L PIPING 109073 157111 151284 0 0 122243 151284 .00 1.24 1.24 100 100 M STRUCTURAL STEEL 32893 27610 27538 0 0 20064 27538 .00 1.37 1.37 100 100 N INSULAT G FlREPRF 16563 808 803 0 0 775" "TRJB .00 1*11 1*11 100 100 P ELECTRICAL 67965 41189 41093 0 0 76548 41093 .00 .54 .54 1U0 100 Q CONCRETE 22034 52917 52917 0 0 32498 52917 .00 1.63 1.63 100 100 R BUILDINGS 684 2058 2053 0 0 444 2058 .00 4.64 100 100 S SITEkORK 27857 41244 41363 0 0 28950 41351 .00 1.43 1.43 100 100 Y SCAFFOLDING 20928 47626 47625 0 0 20928 47625 .00 2.28 2.28 100 100 OFF-PLOTS 331899 397037 391191 0 0 335016 390969 .00 1*17 1.17 100 100 " ;e 29 30 19 14 r, ]6 17 10 9 79 A Q5 9 8 9 9 "9 " ?. r. 7' ?n ?9 3f: 11 37 * ............. -- -................ ............ - i2 ,1 GARRARD 00000691 O O 3 w M IF >8 >0 ?? JUB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38040-35 FOCUS PERFORMANCE REPORT* DETAIL OF TOC CONVERSION___ C ______ RUN OATE PAGE CALCULATIONS 3ASED ON BUDGET 5/24/82 3 Tri-TXTTl-V-i-V-iTTTVT LINE ITEM CATEGORY PROJECT FCST OATE 11/20/81. FCST 004 CUT-OFF OATE 5/21/82 CURRENT PROJECT TREND THIS WEEK .... TO-OATE ............ ..... PERFORMANCE FACTOR PERCENT BUDGET FORECAST FORECAST CALC ACTUAL CALC ACTUAL THIS TO TRNO COMPLETE MANHOURS MANHOURS MANHOURS MANHOURS MANHOURS **************************************** **M*A*N*H*O*U*RS****M*A*N*H*O*UR*S****W**EE*K*_*__*_*O*A*T*E****F*C*S*T*J*T*R*N*O**P*H*Y*S* J INSTRUMENTATION 87723 36724 36762 0 0 88060 36724 .00 .42 .42 100 100 L PIPING 25793 1678 1678 0 0 3283 1678 .00 .51 .51 100 100 M STRUCTURAL STEEL 1220 1341 1341 0 0 1491 1341 .00 .90 .90 100 100 P ELECTRICAL 144534 135826 135826 0 0 158186 135826 .00 .86 .86 100 ICO Q CONCRETE 600 1385 1385 0 0 1250 1385 .00 1.11 1.11 100 100 R BUILOINGS 1751 1806 1806 0 0 1751 1806 .00 1.03 1.03 100 100 S SITEWORK 615 1101 1101 0 0 277 1101 .00 3.97 3.97 100 100 Y SCAFFOLDING 1608 1434 1434 0 0 1384 1434 .00 1.04 1.04 100 100 rC TOC CONVERSION 263844 181295 181333 0 0 255682 181295 .00 .71 .71 100 100 GARRARD O; >" ooooo CD CD J A 6 ' 10 " 1? M 10 JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38040-35 F o c y .S P E R F 0 R M A N C E R E P 0 R T$$* DETAIL OF SUBCONTRACTS S RUN OATE PAGE CALCULATIONS BASEO ON BUDGET 5/24/82 4 LINE ITEM CATEGORY CURRENT BUDGET MANHOURS PROJECT FCST DATE 11/20/81. FCST S * $ $ 4? $ $ *$41 <: PROJECT TRENO THIS WEEK FORECAST FORECAST CALC ACTUAL MANHOURS MANHOURS MANHOURS MANHOURS 004 CUT-OFF DATE ***< TO- DATE PERFORMANCE FACTOR CALC ACTUAL MANHOURS MANHOURS THIS WEEK TO DATE TRND FCST 5/21/82 PERCENT COMPLETE TRND PHYS J L M N X Z *S INSTRUMENTATION PIPING STRUCTURAL STEEL INSULAT E FIREPRF PAINTING MISCEL SUBCONTRCTS SUBCONTRACTS 4735 33664 38 77035 9091 55730 1B0293 4738 40033 65 55424 4504 64195 168959 2367 41347 39 70994 5592 68755 189094 0 0 0 2654 415 0 3069 0 0 0 2743 224 0 2967 5406 32499 38 43864 5139 60168 147114 2347 40716 39 45931 4684 68567 162284 .00 .00 .00 1.03 .54 .00 .97 .43 1.25 1.03 1.05 *91 1.14 1.10 .44 1.2 7 1.03 l.OB .76 1.14 99 98 100 65 84 100 100 100 100 67 70 100 1.10 86 86 0 9 >9 9 0 9>0 1? 13 M9 16 IE IS 21 ?: ?< 7< n 00 Jl GARRARD 00000693 r a GARRARD 00000694 V e > <* ? 3 A < ' " 12 T 18 .4 20 2. 22 23 4 28 21) 3Q 3? )) >1 U jb * H P ,2 < n > JQ3 NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38040-35 FOCUS **P ERFORMANCE REPOR T DETAIL OF HYDRTRETR/PLATFRMR A RUN DATE PAGE CALCULATIONS BASEO ON BUDGET 5/24/82 1 3$* 333# 333$$3$3$3$3$$ PROJECT FCST DATE 11/20/81 FCST 004 CUT-OFF OATE 5/21/82 3333333333 33333333333 33333333 333$$$$$3$$$$$33333$$$ 3333333333333 333333 3333333333 CURRENT PROJECT TREND THIS WEEK TC- DATE PERFORMANCE FACTOR PERCENT LINE BUOGET FORECAST FORECAST CALC ACTUAL CALC ACTUAL THIS TO TRNO COMPLETE ITEM COMMODITY manhours MANHOURS manhours MANHOURS MANHOURS MANHOURS MANHOURS WEEK OATE FCST TRND PHYS 333$$ 33333333#$*###$#*$## 333#3#33333333 333333333# 33333333 $3# 333$##$3 A iA( >A* A. <A* A 3$3#3333$$33 A. <A A <Ai A 33333$ 3333333 33$ E10 Ell E12 E20 E30 E40 E41 E50 E60 E61 E62 E63 ETO J01 Jll J15 J22 J31 J50 J60 J70 J71 J74 J81 J82 J95 L10 HI L12 L17 L21 L22 L24 L70 LBO L81 L91 L98 Ml 0 M20 M30 N30 PI 2 PI 3 P14 PI 6 ERECT COLUMNSGVSLS PLATFORMING REACTR LOAD CATALYST ERECT STORAGE TANK HEAT EXCHANGERS FIREC HEATER PLATFORMG HEATERS PUMPS G DRIVER C0MPRESS0RS60RIVER GAS BOOSTER COMP RECYCLE GAS C/COMP RECYCLE GAS COMPRS OTHER EQUIPMENT PREFAB INST SUPTS INSTALL XMITTERS REMOVCINST ALL INST SATELLITE RACKS LOCAL CONTROL PANL INSTRUMENT SHELTER ANALYZERGPACKAGE INSTR TUBE GPI PE INSTL INTRU TBGPIP INST AIR SUBHEADER LOOP CHECK CALIURATIONGTESTNG OISPUSAL EXIST INS STEAM TRACE PIPGSH SPL 2 INGSM PIPE SPL 2.5-6 IN PIPE INST CS RACK3IN-6I SPL AL 2INGSM PIPE SPL AL 2.5--61NPI PE RCK AL 2.5-6IN PIP OU/G CS PIPE STM Trace tbg COMMODITY X-RAY6STR RELIEVNG tesTinggInspect ion STEEL STRUCTURE LADDERSGPLAT,6HRL PIPEWAY STEEL INSULATE INSTRUMTS POwERGCONTROL tQUP JPS EQUIPGSTCBY LIGHT FIXTURES6RCT PROGRAM CONTROLLER 5399 4500 0 168 7500 7181 21135 5723 1000 9900 6600 3300 2083 2195 8703 7731 3 140 2982 7266 185 . 670 2365 1750 6521 1177 88 43004 28902 11802 3388 6213 752 5083 3553 88 1400 6698 14530 4575 488 1 6218 800 1498 320 10878 6536 0 54 11162 29809 49354 6229 1771 7573 4669 2341 1075 404 4210 2863 276 768 249 627 89 1361 5224 3186 3296 453 11530 94007 120555 10483 2692 27292 0 6263 9604 5453 3471 16547 17477 13144 1233 849 5664 524 4054 0 10904 6536 0 54 11194 29809 49480 6229 1771 7573 4669 2341 1075 404 4210 2830 276 792 265 645 tJ9 1423 5375 4874 2751 453 11532 94505 ...120725 10483 2692 27292 2069 6263 9706 5496 3471 16579 17477 13144 1233 849 5745 524 4093 0 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 0 10 00 0 24 0 16 00 00 00 00 830 566 363 114 00 00 0 180 ......- .... 0 ...--0 00 00 ................ 0... ...............0 00 0 ~.............. 0 0 o 00 00 00 00 00 00 00 0 48 00 0 39 00 5013 10904 4500 6536 00 84 54 7667 11194 7181 29809 21135 49480 4562 6229 1000 1771 9900 7573 6600 4669 3300 2341 36 56 1075 735 404 9511 4210 8831 2830 450 276 2660 792 625 265 1313 176 645 89 1320 1423 4922 5375 5293 3736 3877 2713 ......... 1177 453 6613 39853 11530 94491 54239 I20T20 8658 10483 2537 2692 ..........9724 .........27292.... 00 5087 6263 8440 .............9 704 10471 5496 1400 3471 9609 1657 9 11264 17477 11043 13144 1015 827 1233 849 9988 5745 753 524 2866 4093 00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .68 .31 .00 .00 .ou DO" .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .ou .00 00 ! oi O! i 2.18 1.45 .00 .64 1.46 4.15 2.34 1.37 1.77 .76 .71 .71 .29 .55 .44 .32 .61 .30 .42 .49 .51 1.08 1.09 .71 .70 .38 1.74 2.37 2.23 1.21 1.06 2.81 .00 1.23 I.I5 .52 2.48 1.73 1.55 1.19 1.21 1.03 .58 .70 1.43 .00 2.18 1.45 .00 .64 1.46 4.15 2.34 1.37 1.77 .76 .71 .71 .29 .55 .44 .32 .61 .30 .42 .49 .51 1.08 1.09 .71 .70 .38 1.74 2.37 2.23 1.21 1.06 2.81 2.75 1.23 I.T5 .52 2.48 1.73 1.55 1.19 1.21 1.03 .58 .70 1.43 .00 100 100 0 100 100 loo 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 77 99 ICO 100 100 100 100 100 100 0 100 100 100 100 loo 100 100 100 100 100 100 100 0 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 ICO 100 100 100 77 98 100 100 100 100 1 00 100 100........ 0 100 100 100 100 loo 100 100 loo 100 100 loo 100 0 ? ,, G a l 13 M ig 2. 7> 21 rn 70 34 77 33 11 70 )7 )? 30 3- 12 11 IS K 'V ,f . 01 0/ i- c %) C Ld ; c* i < ' " , ' m , " " . > > 3n n ' > > > ' " > >< ' 'r " I" ' J " " " t , JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38040-35 FOCUS ***P ERFORMANCE REP OR TSS* ' DETAILJJF HYDRTRETR/PLATFRMR A__________ RUN DATE PAGE CALCUtATIONS BASED ON BUDGET 5/24/82 2 ******** ********************** LINE ITEM COMMODITY CURRENT BUDGET MANHOURS PROJECT FCST OATE 11/20/81 t FCST a 004 *********** TV ********* PROJECT TREND THIS WEEK FORECAST FORECAST CALC ACTUAL MANHOURS MANHOURS MANHOURS MANHOURS *********** ********* *********** TO- OATE CALC ACTUAL MANHOURS MANHOURS ********* CUT-OFF OATE 5/21/82 $$$$$$$ ssssss ***** PERFORMANCE FACTOR THIS TO TRNO WEEK OATE FCST ******************** PERCENT COMPLETE TRNO PHYS ***** P21 P2 3 P25 P31 P32 P33 P34 P35 P36 P41 P4 2 P43 P50 P80 P99 QO1 oil QI2 Q15 Q21 Q22 02 5 031 Q32 Q35 040 Qb 1 Q62 063 069 Q71 Q73 R0 3 RIO R20 S03 SI 1 SI 2 S31 S32 S41 Y10 RGS BRANCH CONDUIT NON-METALLIC COND CABLE TRAY 600VC1KV CABLE 5KV6 LARGER CABLE ELECTCTC WIRE TERMNTN 600VG1KV TERMNTN 5KVGAB0CE TERMNTN ELECTRGTC GROUNDING GROUNDUELLS ELECT HEAT TRACING 0/H POLE LINE OIST TESTING MATERIAL HANDLING FABRICATE REBAR \ FOUNOATN CONCRETE* STRUCT CONCRETE OTHER CONCRETE FOUNC REBAR STRUCT REBAR OTHER REBAR FOUNO FORMS STRUCT FORMS OTHER FORMS MISC CONC ICOMP 1 PRECAST CONCRETE PRECAST REBAR PRECAST FORMWORK SET PRECST ITEMS CONCRETE PAVING CONDUIT ENVELOPES ELECTRICAL SUBSTAT BUILDING SATELLITE CONT.RM. DEWATERING E XC AVA TIQNGOISPOSL BACKFILLGCOMPACTIN SEWERS ORA INAGE PRECAST MANHOLES FINE GRADINGCLEVIG SCAFFOLDING 29111 4117 15 8448 1110 4624 2353 320 3697 3487 236 8256 9 1280 1 715 6350 8643 797 3180 2858 375 6458 16672 735 4C0 1147 1312 7222 3824 11275 3312 560 270 3 50 28C0 5183 7917 2468 2450 6146 19932 46753 4183 1268 6701 725 4961 4029 467 4485 2495 115 2011 0 1949 1799 1266 1098 90 37 204 11622 21953 0 28507 54213 0 438 1780 4193 9871 7226 3894 3443 1345 650 1300 4673 5047 5905 3415 3038 1900 77607 47913 4183 1272 6732 725 4961 4092 486 4495 2580 115 1888 0 1961 1799 1266 11100 9037 204 11622 22038 0 28507 54213 0 438 1780 4193 9871 7226 3894 3443 1341 619 1298 4673 5047 5985 3415 30 38 1781 77427 0 0 0 0 0 0 0. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 T) 0 0 0 o 0 0 0 0 764 0 0 10 0 0 58 0 0 48 0 112 0 12 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 13 44884 2854 1343 7193 1409 4229 3282 367 4147 6979 236 2400 0 12 80 2000 715 TTI04 8735 1110 9660 4357 0 11396 30837 0 84 984 2224 5310 3280 5760 3288 560 2 70 350 4100 8669 4727 2126 2940 4088 25390 47913 4183 1272 6732 725 4961 4092 486 4495 2580 115 1888 0 1961 1799 1266 11098 9037 204 11622 21953 0 28507 54213 0 438 1780 4193 9871 7226 3894 3443 1341 619 1293 4673 5047 5985 3415 3038 1781 77427 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00" .00 .00 .00 .00 .00 00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 1.07 1.47 .95 .94 .51 1.17 1.25 1.32 1.08 .37 .49 .79 .00 1.53 .90 1.77 nr. o0 1.03 .18 1.20 5.04 .00 2.50 1.76 .00 5.21 1.81 1.89 1.86 2.20 .68 1.05 2.39 2.29 3.71 1.14 .58 1.27 1.61 1.03 44 3.05 1 .07 1.4 7 .95 .94 .51 1.17 1.25 1.32 1.08 .37 .49 .79 .00 1.53 .90 1.77 1.00 1.03 .18 1.20 5.04 .00 2.50 1.76 .00 5.21 1.31 1.89 1.36 2.20 .68 1.05 2.39 2.29 3.71 1.14 .58 1.27 1.61 1.0 3 .44 3.05 100 100 100 100 loo 100 100 100 100 100 roo loo 0 100 100 100 loo 100 100 100 100 0 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 loo 100 100 100 100 100 reo 100 100 100 100 100 TOO 100 0 100 100 100 10O ICO 100 100 100 0 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 a a ln n' u a 1? 13 Ma If, "i r. - r . 1,,n A, " A, A. 1r Af 33 s; ,f M cr *A HYDRTRETR/PLATFRMR 445993 860945 866557 1193 2014 544542 863203 1.69 1.59 1.58 loo 100......... ..... ir Q C V e 0> /" A 0 ' JOB NO. 14053-000 ROBINSON REFINRY M00ERN27N PROJ-MCC REPORT NO. C3804Q-35 FOCUS P E R F 0 R M A N C R E P 0 R T*** DETAIL OF OFF-PLOTS B. RUN DATE PAGE CALCULATIONS BASED ON BUDGET 5/24/82 3 LINE ITEM COMMODITY $ CURRENT BUDGET MANHOURS PROJECT FCST DATE 11/20/81 FCST 8 $$ PROJECT TRENO THIS WEEK FORECAST FORECAST CALC ACTUAL MANHOURS MANHOURS MANHOURS MANHOURS 004 TO- DATE CALC ACTUAL MANHOURS MANHOURS CUT-OFF OATE 5/21/82 PERFORMANCE FACTOR PERCENT THIS TO TRND COMPLETE WEEK date FCST TRNO PHYS 1 2 4 5 f' B ' 10 *' ,'j 4 ?? \\ ?7 j ?9 30 )l " lr 37 r* *> n V. 'h ,, 51 * E10 E20 E30 E31 E40 E50 E60 E70 J01 Jll J15 J31 J50 J60 J70 J81 J82 J95 L10 LI 1 LI 2 LI 7 L21 L22 L24 L70 L80 L91 L93 L98 Ml 0 M20 M30 M40 N30 N40 Pll P12 PI 3 P14 P21 P2 2 P2 3 P25 P31 P32 ERECT COLUMNSEVSLS ERECT STORAGE TANK HEAT EXCHANGERS CONDENSOR 23E-9 FIRED HEATER PUMPS ORIVER COMPRESSORS*! DRIVER OTHER EQUIPMENT PREFAB INST SUPTS INSTALL XMITTERS REMOVEINSTALL INST LOCAL CONTROL PANL INSTRUMENT SHELTER ANALVZEREPACKAGE INSTR TUBEEPIPE LOOP CHECK C ALIBRATIONETESTNG OISPOSAL EXIST INS STEAM TRACE PIPESH SPL 2 INESM PIPE SPL 2.5-6 IN PIPE INST CS RACK3IN-6I SPL AL 2INESM PIPE SPL AL 2.5-6INPIPE RCK AL 2.5-6IN PIP UU/G CS PIPE STM TRACE TBG X-RAYESTR RELIEVNG TIE-IN WORK TESTINGE INSPECTION STEEL STRUCTURE LADOERSEPLAT ,EHRL PIPEWAY STEEL MISCELL STRCT STEL INSULATE INSTRUMTS FIREPROOF STRUT SL POWER DISTRB EQP POWERECONTROL EQUP UPS EUUIPESTDBY LIGHT FIXTURESERCT RGS BRANCH CONDUIT U/G CONDUIT NON-HETALLIC COND CABLE TRAY 600VE1KV CABLE 5KVE LARGER CABLE 3497 ICO 1642 1980 2 300 7365 500 2387 640 1900 2478 106 1173 650 1546 871 3583 1184 65 20017 24165 51301 655 385 596 3691 189 625 13 7371 4 776 2992 20294 4831 1 16562 2590 5049 400 1692 26521 160 880 1600 5072 322 6130 57 1473 1100 466 8 3692 252 863 109 1293 1378 51 805 8 2129 1569 877 0 6552 34072 58759 29207 5800 0 0 6135 8256 483 901 6946 945 6138 18717 1810 .....808.... 0 359 2409 0 1322 20440 46 563 0 3016 151 6130 57 1473 1100 4688 3692 252 893 109 1293 1378 36 805 8 2145 1569 877 0 6551 34072 58768 29172 0 0 0 6135 8256 483 901 6946 945 6138 18717 1738 808.... 0 359 2409 0 1242 20424 46 563 0 3016 15 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .... .... 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ...... ..... 0 0 0 0 0 0 ..............0 0 0 0 0 0 4007 150 1181 1980 2300 7521 500 2643 320 2980 1922 71 980 9 2459 2798 795 0 4231 30328 39938 27572 0 0 0 5140 7370 225 468 6971 659 3948 14550 - 970275 0 2302 5603 0 3479 ......... 32156 51 448 0 4619 473 6130 57 1473 1100 4688 3692 252 703 109 1293 1378 16 805 8 2145 1569 877 0 6551 3407 2 58768 29172 0 0 0 6135 8256 483 901 6946 945 ........ 6138.... 18717 1738 ........ BOB 0 359 2409 0 1242 20424....... 46 563 0 3016 153 .00 .00 1.53 .38 1.53 .38 .00 1.25 1.25 .00 .56 .56 .00 2.04 2.04 .00 .49 .49 .00 ^ 50 .50 .00 .27 .34 .00 .34 .34 .00 .43 .43 .00 .72 .72 .00 .23 .51 .00 .00 .82 .89 .82 .89 .00 .87 .87 .00 .56 .56 .00 1.10 1.10 .00 .00 .00 .00 1.55 1.55 .00 1.12 1.12 .00 1.47 1.47 .00 1.06 1.06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 1.19 1.19 .00 1.12 1.12 .00 2.15 2.15 fio 1.93 1.93 .00 1.00 1.00 .00 1.43 1.43 .00 1.55 1.55 .00 1.29 1.29 .00 1.92 1.92 .00 l.II 1.11 .00 .00 .00 .00 .16 .16 .00... .43 .....43 .00 .00 .00 .00 .36 36 .00 ` .64..... .... .64 .00 .90 .90 .00 1.26 1.26 .00 .00 .00 .00 .65 .65 .00 .32 .32 100 100 100 100 loo 100 100 79 100 100 100 44 100 100 100 100 100 0 100 100 100 100 0 0 0 100 100 100 loo 100 100 loo 100 100 100 0 100 100 0 100 100 100 100 0 100 100 100 100 100 13 M 100 loo 100 it IP 100 100 ?1 100 100 f4 100 100 loo r :(. 7fl 100 100 100 100 0 100 100 100 K 3.' 1" 100 0 40 4, 0 0 100 ICO If 100 loo 41 100 100 100 ........... 100 100 100 ...... 0 100 100............ f,l 0 100 100 ....... 100 100 0........ " 100 ' 100 < GARRARD 00000698 1 #f 6 ? 3 4 0 s J 3 S jo >3 A ' 29 JO 11 )? J3 y y V t 11 10 4' c: ( A JOB NO . 14053-000 ROBIMSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38040-35 F 0C U S SS*P E R F 0 R M A N C E R E P 0 R T*3 DETAIL OF OFF -PLOTS 6 RUN DATE PAGE CALCULATIONS BASED ON BUDGET 5/24/82 4 PROJECT FCST DATE 11/20/81, FCST 3 004 CUT-OFF OATE 5/21/82 LINE ITEM COMMODITY CURRENT BUDGET MANHOURS PROJECT FORECAST MANHOURS TREND FORECAST MANHOURS THIS WEEK CALC ACTUAL MANHOURS MANHOURS TO- DATE PERFORMANCE FACTOR PERCENT CALC ACTUAL THIS TO TRND COMPLETE MANHOURS MANHOURS WEEK DATE FCST TRND PHYS $ $ $$ $$ sjt4s $$ $ 4s * Jfr 4= 4=4=*$ P3 3 ELECTETC WIRE 3384 1898 1898 0 0 2620 1898 .00 .72 .72 100 100 P34 TERMNTN 600VE1KV 1541 731 731 0 0 1509 731 .00 .48 .48 100 100 P3 5 TERMNTN 5KVEABUCE 465 459 459 0 0 754 459 .00 .61 .61 100 100 P36 TERMNTN ELECTRETC 2672 1450 1450 0 0 23 34 1450 .00 .62 .62 100 100 P41 GROUNDING 1655 1261 1261 0 0 1996 1261 .00 .63 .63 100 100 P4 3 ELECT HEAT TRACING 10917 2985 2985 0 0 9901 2985 .00 .30 .30 100 100 P50 0/H POLE LINE DIST 2249 3490 3488 0 0 7508 3488 .00 46 46 100 100 P80 TESTING 795 609 609 0 0 795 609 .OU .77 .77 100 100 P99 MATERIAL HANDLING 1 0 0 0 0 0 0 .00 .00 .00 0 0 QOl FABRICATE REBAR 16 1285 1285 0 0 160 1285 .00 8.03 8.03 100 100 QIl FOUNDATN CONCRETE 2353 5831 5831 0 0 2904 5831 .00 2.01 2.01 100 100 Q12 STRUCT CONCRETE 38 442 442 0 0 433 442 .00 1.02 1.02 100 100 021 FOUNO REBAR 1167 6101 6101 0 0 1352 6101 .00 4.51 4.51 100 100 Q22 STRUCT REBAR Q31 FOUNO FORMS 13 1199 1199 0 0 130 1199 .00 9.22 9.22 100 100 8415 14755 14755 0 0 82 20 14755 .00 1.80 1.80 100 100 Q32 STRUCT FORMS 44 3919 3919 0 0 2840 3919 .00 1.38 1.38 100 100 Q40 MISC CONC (COMP) 2272 3279 3279 0 0 4150 3279 .00 .79 .79 100 100 Q61 PRECAST CONCRETE 24 557 557 0 0 410 557 .OU 1.36 1.36 100 100 Q6 2 PRECAST REBAR 16 1531 1531 0 0 448 1531 .00 3.42 3.42 100 100 Q63 PRECAST FORMWORK 4 5676 5676 0 0 3016 5676 .00 1.88 1.38 100 100 Q69 SET PRECST ITEMS 80 3619 3619 0 0 1384 3619 .00 2.61 2.61 100 100 Q71 CONCRETE PAVING 6837 3125 3125 0 0 63 67 3125 .00 .49 .49 100 ICO Q7 3 CONDUIT ENVELOPES 755 1598 1598 0 0 684 1598 .00 2.34 2.34 100 100 ROI MISCELL ARCHITECT 0 0 0 0 0 0 0 .00 .00 .00 0 0 RIO BUILDING 145 1302 1302 0 0 145 1302 .OU 8.98 8.98 100 100 R90 PACKAGED BLDGS 240 0 0 0 0 0 0 .00 .00 .00 0 0 R95 REVAMP EXIST BLDGS 299 756 756 0 0 299 756 .00 2.53 2.53 100 100 S03 DEWATERING 875 4306 4306 0 0 875 4306 .00 4.92 4.92 100 100 Sll EXCAVAT IONEDISPOSL 10895 11258 11213 0 0 113 37 11213 .00 .99 .99 loo 100 S12 BACKFILLECOMPAC TIN 2638 7842 7854 0 0 2606 7842 .00 3.01 3.01 too 100 S31 SEWERS DRAINAGE 5316 8493 8493 0 0 5579 8493 .00 1.52 1.52 100 100 S32 PRECAST MANHOLES 1271 1420 1420 0 0 1533 1420 .00 .93 .93 100 100 S41 FINE GRAOINGELEVIG 2366 1312 1464 0 0 2524 1464 .00 .58 .53 100 100 S98 DEMOLITION 4496 6613 6613 0 0 4496 6613 .00 1 .47 1 .47 100 100 YIO SCAFFOLDING 20928 47626 47625 0 0 20928 47625 .00 2.28 2.28 100 100 SB OFF-PLOTS 331899 397037 391191 0 0 335016 390969 .00 1.17 1.17 100 100 c V A 6 i 4 ' 3 H 11 * 2. 2: r- i: 1( )/ 111 ,0 1. '1, AA *' At 46 St ;; {' " JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN 0 REPORT NO. C38040-35 """............. ' e> < s c ' LINE ITEM COMMODITY g J01 .0 j 10 Jll 17 J15 Jlf J19 J21 ... J22 J26 IB J31 n J50 J70 ?| J74 77 "................jai n J82 7, LI 1 LBO M40 n Pll :-3 P12 PI 3 P14 P15 PI 6 P2 0 W P21 T, P22 r> P25 v P30 n A ......... P31 P32 P33 U P34 P36 P37 .M P41 P42 P43 1* P80 P90 P95 r Q40 Q7 3 R01 Sll SI 2 PREFAB INST SUPTS PREASSEMBLE XMITRS INSTALL XMITTERS REM0V6INSTALL INST INSTALL P/1 trnors INSTALL I/P TRNORS MAIN CONTROL PANEL SATELLITE RACKS PROCESS COMPUTER LOCAL CONTROL PANL INSTRUMENT SHELTER INSTR TUBEEPIPE INST AIR SUBHEADER LOOP CHECK CALIBRATIONETESTNG SPL 2 INtSM PIPE STm Trace tbg MISCELL STRCT STEL POWER DISTKB EQP POWERECONTROL EQUP UPS EQUIPESTD3Y LIGHT FIXTURESERCT OTHER ELECT EQUIP PROGRAM CONTROLLER RGS CONDUIT MAINS RGS BRANCH CONDUIT U/G CONDUIT CABLE TRAY DATA HGHWY CABLE 600V61KV CABLE 5KVE LARGER CABLE LLLC1ETC WIRE TERMNTN 600VEIKV TERMNTN ELECTRETC ELECT/TC WIRE MAIN grounding GROUNDWELLS ELECT HEAT TRACING TESTING ELECT DISCONNECTS ELECT DEMOLITION MISC CONC (COMP) CONDUIT ENVELOPES MISCELL ARCHITECT EXCAVATIONED ISPOSL BACKFILLECOMPACTIN PROJ-MOC ....... ... CURRENT BUDGET MANHOURS $ $* $* ** * $ 1920 5512 30593 1180 2700 3800 626 1171 100 100 13200 7974 2 11015 7830 7290 18503 1220 360 3562 2086 70 4755 3673 13379 33830 1115 17740 1619 364 1223 18222 450 17952 2402 14162 1541 2098 1919 2011 1 220 380 1751 401 214 FOCUS PERFORMANCE REPORT DETAIL OF TOC CONVERSION C. RUN OATE PAGE CALCULATIONS BASED ON BUDGET 5/24/02 5 0 9 \ PROJECT FCST OATE 11/20/81, FCST S 004 CUT-OFF DATE * $$ * * <t# * sjc *# 5/21/82 79 PROJECT TREND FORECAST FORECAST MANHOURS MANHOURS ***$$$* THIS WEEK CALC ACTUAL MANHOURS MANHOURS TO- DATE CALC ACTUAL MANHOURS MANHOURS PERFORMANCE THIS TO WEEK DATE FACTOR PERCENT TRNO COMPLETE FCST TRNO PHYS 9 n 3 903 2044 9802 624 1389 1965 555 950 283 88 1526 1006 500 11630 " 3459 11 1667 1341 456 4330 1557 120 ........ 3912 663 19104 377o8 1528 18624 6465 3740 1621 4919 1481 18166 2546 4238 2292 47 369 1508 372 902 483 1806 837 264 903 2044 9802 624 1389 1965 555 950 283 08 1560 1010 500 11630 3459 11 1667 1341 456 4330 1557 120 3912 663 19104 37768 1528 18624 ..... 6465....... 3740 1621 4919 1481 18166 2546 42 38 2292 47 369 1509 3 72 902 483 1806 837 264 0 0 1872 903 0 0 5413 2044 0 0 34553 9802 0 0 744 624 0 0 2975 1389 0 0 4190 1965 0 0 626 555 "..... 0 .....--.... a ......... ri4? ------------ 950.... 0 0 70 283 0 0 100 88 0 0 3820 1526 0 0 1986 1006 0 0 1076 500 o 0 212 70 11630 0r 0 8018 3459 0 0 0 11 0 0 3283 T667 0 0 1491 1341 0 0 360 456 0 0 5650 4330 0 0 2086 1557 0 0 50 120 0 0 7405 3912 0 0 3585 663 0 0 23627 19104 6 0 39796 37768 0 0 1747 1528 0 0 18266 18624 ...... (1 ........ .........a"~ 34 84 .... 6465 0 0 5100 3740 0 0 1003 1621 ...........0 0 4990 ............4919..... 0 0 2064 1481 0 0 24143 18166 0 ..................a 5043 2546 0 0 4808 4238 0 0 1507 2292 0 0 39 47 0 0 365 369 0 0 2880 1508 0 0 100 372 0 0 720 902 0 0 5 30 483 o 0 it 5 i 1806 0 0 189 837 0 0 88 264 .00 .00 .00 .00 00 .00 .00 .Ou .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 00 .00 .48 .38 .28 .84 .47 .47 .89 ........71 4.04 8B .40 .51 .46 .55 .43 .00 .51 .90 1.27 .77 .75 2.40 .53 .18 .81 .95 .87 1.C2 ~~I.B6 .73 1.62 ...99 .72 .75 " .50... .88 1.44 1.21 1.01 .52 ..3.72 1.25 .91 1.03 4.43 3.00 .48 .38 .28 .84 47 .47 .89 .71.. 4.04 .88 .41 .51 .46 .55 .43 .00 .51 .90 1.27 .77 .75 2.40 .53 .13 .81 .95 .87 1.02 1.86 .73 1.62 .....99 .72 .75 .50 .88 1.44 1.21 1.01 .52 3.72 1.25 .91 1.03 4.43 3.00 100 loo 100 100 IDO 100 100 100 100 100 98 100 100 100 100 100 loo 100 100 100 100 100 100 100 100 100 100 100 roo 100 100 100 100 100 loo 100 100 loo 100 100 100 100 100 loo 100 100 100 9 100 100 100 n M9 roo 100 100 '' 1 100..... ....... 100 4 100 7, IOO 100 100 100 100 4 71! 79 -K 0 100 100 loo 100 >r, 100 100 >f) ICO 100 1? 100 ioo V, 100 V 100 100 100 100 100 100 100 IOO 100 100 ICO 6. 100 100 100............... 100 r.r 100 ,h 100 100 100 r GARRARD 00000700 GARRARD 00000701 t) 0 ' !. ! 4 i6 ' y ,0 n .3 .4 !., 1/ IB IR ?l ?? M M ?S .'I a ?o 30 1. 37 34 33 .37 )') in 4, >7 13 *r 47 '.3 JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38040-35 FOCUS ***P ERFORHANCE REPOR T**< DETAIL OF SUBCONTRACTS RUN OATE PAGE CALCULATIONS BASEO ON BUDGET 5/24/82 T PROJECT FCST DATE 11/20/81 , FCST tf 004 CUT-OFF DATE 5/21/82 $44444444444444444444 4444 44444444 4444444 44444 44 4=44 CURRENT PROJECT TREND IHIS WEEK TC- OATE PERFORMANCE FACTOR PERCENT LINE BUDGET FORECAST FORECAST CALC ACTUAL CALC ACTUAL THIS TO TRNO COMPLETE ITEM COMMODITY MANHOURS MANHOURS MANHOURS MANHOURS MANHOURS MANHOURS MANHOURS WEEK DATE FCST TRND PHYS ******** ******************** 4=4=4= *********** ****,= *4:*$ *********** ********** ************* $4444 J01 JII J15 J31 J50 J60 J70 L10 LIT LI2 LI 7 L2I L70 LBO L98 M3 0 NIB N2I N22 N2 3 N24 N25 N26 N27 N28 N30 XXX XIO X40 701 702 703 705 70B 709 713 716 719 722 723 726 72 7 728 729 730 732 PREFAB INST SUPTS INSTALL XMITTEKS REMOVEINSTALL INST LOCAL CONTROL PANL INSTRUMENT SHELTER ANALYZERGPACKAGE INSTR TUBEGPIPE STEAM TRACE PIPESH SPL 2 INESM PIPE SPL 2.5-6 IN PIPE INST CS RACK3IN-6I SPL AL 2INESM PIPE OU/G CS PIPE STM TRACE TBG TESTINGEINSPECTION PIPEWAY STEEL AREA C INSUL FSCIB BRAND EOP IN FSC21 AREAA PIP IN FSC21 ARE AB EQP IN FSC24 AREAB PIP IN FSC24 FRPF VSL SKT OFF PL FRPF SIR' STL OFFPL FRPF VSL SKT PL 16 FRPF STR STL PL 16 INSULATE INSTRUMTS S/C SUPPLIED DISTR PAINTING FSC35 LARK PAINT FSC40 LEDO CONSTR FSC 01 POTTER ELEC FSC 02 SHEEHAN FSC 03 MORRIS FSC 05 IL POWER FSC 08 CONNOR FSC 09 MAECO SITEWK FSC13 MAECO GRNDML FSC 16 STURM STM HO FSC19 FIELD XRAY FSC 22 STURM HVAC FSC23 REACTOR INTERNALS MAECU FSC27 STRESS RELVE FSC28 HEATER REFRACTORY ERECT COOLING TWR STURM CHILLR FSC32 215 1103 1192 35 437 280 1473 115 12952 12718 5670 630 16 81 1402 38 "10219 11220 25951 397r 19957 260 4661 690 95 5 1 8340 750 9430 2400 6500 9980 3 76 200 9823 840 200 578 1169 4705 180 2 1550 30C0 ICO 50 1273 1014 35 252 2 80 1834 2015 9550 19683 2810 1109 310 2873 1683 65 6263 9233 1B878 1800 14750 2500 2500 0 0 0 855 2750 - gW- 10148 2648 6528 11948 376 572 11317 1024 165 1663 1770 4616 80 361 5680 2500 64 12 572 245 20 97 98 1323 1533 10037 20879 3405 1171 284 22 80 1758 39 6263 12163 24487 6047 14948 1032 2064 2244 806 940 2055 2638 899 10148 2648 6528 11948 3 76 464 11317 1024 165 1663 1770 5927 80 361 7531 2502 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 140 1066 25 359 42 694 328 0 0 0 415 Q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 331 912 0 832 135 ----------- 6?- 436 0 32 0 ------2- 24Q 0 0 0 0 0 .... "5...... 0 0 0 0 0 0 0 0 0 0 0 0 0 ......... 0 0 0 -------- 0 0 0 0 0 0 0 0 0 0 0 0 50 14 89 1112 35 356 200 2084 3160 7358 13002 3076 1427 247 2597 1632 38 50 36 8151 7593 3809 6687 1152 9040 797 749 50 0 4168 - g7I 9430 2400 6500 9980 188 400 12244 840 200 1734 18 70 47 05 180 604 1550 3000 100 12 572 245 0 97 98 1323 1533 10037 20879 2784 1171 284 2280 1748 39 6263 9814 10270 6047 8414 1032 R9T 1898 168 32 2055 1730 899 10148 2648 6528 11948 188 464 11317 1024 165 1663 17 70 ....... 5927.... 80 361 7531 2502 6^ .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 2.36 .86 .00 2.32 3.21 .09 1.33 .00 .00 .00 .54 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .24 .38 .22 .00 .27 .35 .63 .49 1.36 1.61 *91 .82 1.15 .88 1.07 1.U3 1.24 1.20 1.35 1.59 1.26 .90 .20 2.38 .22 64 .00 .42 .93 1.08 1.10 1.00 1.20 1.00 1*16 .92 1.22 .83 .96 .95 1.26 .44 .60 4.86 .83 .64 .24 .38 .22 .57 .2 7 .35 .63 .49 1.36 1.61 1.11 .82 1.15 .88 1.06 1.03 1*24 1.20 1.35 1.59 1.26 9Q .20 2.38 .22 1.00 .00 .42 .93 1.03 1.10 r.oo 1.20 1.00 1*16 .92 1.22 .87 .96 .95 I .26 .44 .60 4.86 .83 .64 100 loo 100 0 100 loo 100 100 100 100 82 100 100 100 99 100 loo 81 42 100 56 100 97 85 21 3 100 66 100 100 100 100 100 50 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 99 100 IflO 81 42 100 56 100 97 85 21 5 0 66 180 100 100 100 100 50 100 100 100 100 100 100 100 100 100 100 100 100 0 9 2n , S *n S ' 9 13 9 If IH M r> i 12 n if 17 V! 10 11 1? 11 *' r.i " . J e 4 c ' y 10 < 1? M 16 JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-NOC REPORT NO. C38040-35 FOCUS =S=**P ERFORHANCE REPOR T-* DETAIL OF SUBCONTRACTS S RUN DATE PAGE CALCULATIONS BASED ON BUDGET 5/24/82 B LINE ITEM COMMODITY CURRENT BUDGET MANHOURS PROJECT FCST DATE 11/20/81, FCST S 4= *4=4=* 4= $4=44=4= PROJECT FORECAST MANHOURS TREND FORECAST MANHOURS THIS WEEK CALC ACTUAL MANHOURS MANHOURS 9V^ Y.T8.'T'Jllf. *W4. 48. WVW 004 $$=* **$$ 4**4=*:4=4=4 TO- DATE CALC ACTUAL MANHOURS MANHOURS CUT-OFF OATE 5/21/82 ** *4=4=4=4:4:4:4=S*4=4:*4:4:4=*4: PERFORMANCE FACTOR PERCENT THIS WEEK TO DATE TRND COMPLETE FCST TRND PHYS Z34 Z36 Z38 Z60 Z91 199 ROOFING FSC34 CLEAN COMPR PIPE REWORK 29C-1 FSC38 COMP AREA REWORK ACOUSTIC EMISSIONS MAINTENANCE ROADS *S SUBCONTRACTS 80 12 1915 2000 2 688 180293 160 500 1700 0 192 183 168959 168 2444 1106 0 338 183 189094 0 0 0 0 0 0 3069 0 0 0 0 0 0 2967 240 1200 1915 0 200 688 147114 168 2444 1106 0 338 183 162284 .00 .00 .00 .00 .00 .00 .97 .70 2.04 .58 .00 1.69 .27 1.10 .70 2.04 .58 .00 1.69 .27 100 100 100 0 loo 100 100 100 100 0 100 100 1.10 86 86 f 8 '' K * 17 ,, 1/ : GARRARD 00000702 " fU n f) ? 3 < ' C .n 12 < 73 /' - JOB NO. 14053-000 ROBINSON REFINRY MODEKNZTN PROJ-MOC REPORT NO. C38040-35 FOCUS S-SSP ERFORMANCE REPOR T$< DETAIL OF DISTRIBUTARLES X. RUN DATE PAGE CALCULATIONS 0ASEO ON BUOGET 5/24/82 9 LINE ITEM no 120 130 150 160 170 190 210 220 224 231 232 250 260 270 510 520 530 540 *X COMMODITY TEMP BUILDINGS TEMP WURK AREAS TEMP ROADS G PRKG TEMP POWER TEMP WATER.A1R.SWR MINOR TEMP CONSTR WINTERIZATION GENERAL CLEAN-UP MAIN! TOOLS G EQUP RUBBER SFTY ULANKT FIRST DROP WAREHOUSING UNALLOCATED LABOR ON-OFF EXPENSES SURVEYING WELOER TESTING WELDER TRAINING SHOW-UP TIME B.M. HOLIDAY HOURS OISTRIBUTABLES $ PROJECT FCST DATE 11/20/81. FCST S 004 $$ <s*= fc <c $ $ $ $ $4s $$ $$ * $ $ $ CUT-OFF DATE 5/21/82 $< CURRENT project BUDGET FORECAST MANHOURS MANHOURS TRENO FORECAST MANHOURS This WEEK calc ACTUAL manhours MANHOURS TO-OATE PERFORMANCE FACTOR CALC ACTUAL THIS TO TRNO MANHOURS MANHOURS WEEK DATE FCST $ PERCENT.... COMPLETE TRND PHYS ? "" 5 69 R 9 9500 7670 4779 13866 10441 4100 6500 26379 20200 8644 13926 53806 20920 8000 15000 82 72 1602 15039 0 246644 14000 6537 3600 15556 3930 4192 5105 23250 15268 5400 14200 64000 24746 6000 13900 5986 1120 2U0U0 0 246790 14174 6188 4009 19080 2505 3455 11266 43510 16329 6308 13926 72716 27457 9601 13419 7438 1464 17462 224 290531 58 0 0 0 0 0 0 192 160 0 0 470 80 0 0 0 0 0 0 960 0 0 0 0 0 0 0 116 0 0 0 376 65 89 40 0 0 0 0 686 9500 7670 4779 138 66 10441 4100 6500 26379 20100 8644 13926 53470 20920 8000 15000 82 7 2 1602 150 39 0 248208 14174 6188 4009 19080 2505 3455 11266 43510 16248 6308 13926 72262 27457 9601 13419 7438 1464 17462 224 289996 .00 .00 .00 .00 .00 .00 00 .60 .00 .00 .00 .80 .81 .00 .00 .00 .00 .00 .00 .71 1.49 .81 .84 1.38 .24 .84 1.73 1.65 .81 .73 1.00 1.35 1.31 1.20 .89 .90 .91 1.16 .00 1.17 1.49 .81 .84 1.38 .24 .84 1.73 1.65 *81 .73 1.00 1.35 1.31 1.20 .89 .90 .91 1.16 .00 100 100 loo.. loo....... 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 99 99 100 100 100 100 100 100 100 100 100 100 100 100 100 0 1.17 100 100 9 1' M9 IF 1 1 7, Jf ?' *1 37 J 3. V V ' ------- ------ - - - -...- -............... i. .......................... - ........................... . :: -- -.. -........ - -- ......... ----------- --------- GARRARD 00000703 GARRARD 00000704 oo GARRARD 00000705 i , 0! 6 JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-S8 _____ ________ ______ _ _ FOCUS QUANTITY AND UNIT RATE REPORT PLATFORMING RE AC TR Ell PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 2 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT---------------------------- QUANTITY-------------------------- ------------------------ MANHOURS--------------------------- --------------------UNIT MANHOURS----------------- OF BUDGET FCSTTO JTHIS^ BUDGET ___ FCST_TO THIS BUDGET____ J^CST TO JHIS ........ ACCT 8 QUANT #004 DATE WEEK ...... . 8004 OATE WEEK 8004 DATE WEEK $********** t**^**t*it**4:*****it***s*#*s***i**i*i:^*4;*^^t*t*********-^i-**-*----**^*---*-*^ ERECT PLATFORMNG REA A16E11 UNITS . **J0TA L__ PL ATFORMING,RE ACTS 100 100 100 100 100 100 0 4500 0 4500 6536 6536 6536 6536 0 45.00 65.36 65.36 0 45.00 65.36 65.36 .00 TREND FORECAST MH 6536 TREND FORECAST PERF 1.45 PERFORMANCE RATIOS ** 1.00 1.45 1.45 .00 o 9 GARRARD 00000706 JOB NO. 14053-000 ROBINSON REFINRV MOOERNZTN PROJ-MOC 0 REPORT NO. C30090-58 FOCUS QUANTITY ANO UNIT RATE REPORT LOAD CATALYST E12 0 DATE 5//24/82 PAGE 3 PERFORMANCE BASED DN BUCGET WEEK ENDING 5/21/82 WEEK 116 OF 121 0 ACCOUNT DESCRIPTION UNIT - -- QUANTITY---------- --MANHOURS---------- -Unit manhours----------------- OF BUCGET FCST TO THIS BUDGET FCST TO THIS BUDGET FCST TO THIS ............... ..................... ACCTff QUANT #004' DATE WEEK".......... #004 QATE WEEK........... #C04 DATE...... WEEK L0AO CATALYST ......... A16E12 CF C *PT0TAL LOAD CATALYST ___ _____ o .00 .00 .00 .00 o c TREND FORECAST MH 0 TREND FORECAST PERF .00 *# PERFORMANCE RATIOS .00 .00 .00 .00 o 9 9 9 9 9 c JOB NO. 14053-000 ROBINSON REFINRV MODERNZTN PROJ-MOC REPORT NO. C 38090--58 FOCUS QUANTITY AND UNIT RATE REPORT ERECT STORAGE TANK E20 DATE 5/24/82 PAGE 4 PERFORMANCE BASED ON BUDGET WEEK ENDING 5/21/82 WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCTS UNIT OF BUDGET QUANT --QUANT ITY---------- FCST JTO S004 DATE THIS___ BUDGET WEEK --MANHOURS---------- FCSITO "004 DATE THIS WEEK BUOGEL -UNIT MANHOURS- FCST TO 0004 DATE THIS WEEK ' ERECT STORAGE TANKS B32E20 EA.......... 200........ e ....**T0TAL ERECT STORAGE TANK . - -... -- ..... 200 300 300 300 300 TREND FORECAST MH 57 TREND FORECAST PERF ERECT STORAGE TANKS A16E20 UNITS 400 200 200 **TOTAL ERECT STORAGE TANK 400.. ... 200...... 200 - TRENO FORECAST MH 54 TREND FORECAST PERF 0 100 57 57 0 0 100 57 57 0 .38 PERFORMANCE RATIOS 0 168 54 54 0 0 ... 168....................54______ 54 ...... 0 .64 PERFORMANCE RATIOS ** .50 .19 .50 _____ .19.... 1.00 .38 .42 .27 ..... .42 .........27... 1.00 .64 .19......... .00 .19 ....00 .38 .00 .27 .00 .27 .64 .00 a 9 9 oo GARRARD 00000707 9 9 9 fQ cO co o o jQ 6 e o JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT heat exchangers E 30 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 5 BUCGET WEEK 116 OF 121 ACCOONT DESCRIPTION UNIT -----------------OF BUCGET .............. ACCTS QUANT .......... vr'rV'rxTrvr'rTi'if'Tr'rTrvr-rvYWv^-r'T'rvxYV -QUANTITY-------------------------- FCST TO THIS ;;ooa oaTe week -------------BUDGET -MANHOURS-------------------------- FCST TO THIS *004 DATE WEEK --------------------UNIT MANHOURS---------------- BUOGET FCST TO THIS "004 DATE ....... BEER INSTALL HEAT EXCHANG B09E30 EA ERECT HEAT EXCHANGER 823E30 EA ERECT HEAT EXCHANGER 828E30 EA ERECT HEAT EXCHANGER B29E30 EA 600 1200 500 500 900 1300 200 100 900 1300 200 100 $*TOTAL HEAT EXCHANGERS 2800 2500 2500 TREND FORECAST MH 1473 TREND FORECAST PERF ERECT HEAT EXCHANGER A16E30 UNITS 4500 4600 4600 $$TOTAL HEAT EXCHANGERS 4500 4600 4600 TREND FORECAST MH 11194 TREND FORECAST PERF 0 0 0 0 0 1.25 0 0 1.46 2 72 520 200 650 213 843 34 383 213 843 34 383 0 0 0 0 1642 1473 1473 0 PERFORMANCE RATIOS 7500 11162 11194 0 7500 11162 11194 0 ** PERFORMANCE RATIOS ** .45 .43 .40 1.30 .59 1.00 1.67 1.67 1*00 .24 .65 .17 3.83 .59 1.25 2.43 2.43 1.46 .24 .65 .17 3.83 .59 1.25 2.43 2.43 1.46 .00 .00 .00 .00 .00 .00 .00 .00 .00 C 8 6 <3 4 c 12 13 15 <1 If 1 20 in i )i i c: C r GARRARD 00000708 JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C3B090--58 FOCUS QUANTITY AND UNIT RATE REPORT CONDENSQR 23E-9 E31 DATE 5/24/82 PAGE 6 PERFORMANCE BASEO ON BUCGET WEEK ENDING 5/21/82 WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT# UNIT------------------OF BUCGET QUANT --QUANTITY---------- fcst ____ TO #004 DDAATTEE THIS BUOGET WEEK --FCMSATNHOURS- TO #004 DATE TH?S WEEK BUOGET -UNIT MANHOURS----------------- JFCST TO THIS #004 DATE WEEK ERECT CONDENSER 23E- B23E31 EA **TOTAL... CONDENSOR 23E-9_____ __ TREND FORECAST MH 100 100 100 100 100 100 TRENO FORECAST PERF 0 1980 1100 1100 0 19.80 11.00 11.00 0 1980 1100 1100 0 19.80 11.00 11.00 .56 PERFORMANCE RATIOS 1.00 .56 .56 .00 .00 .00 < i c c% c* ci r9 1 CQ cQ o ::o Go o o GARRARD 00000709 c r ' g l? tfl JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-HOC REPORT NO. C38090-58 ACCOUNT DESCRIPTION ACC t H UNIT OF BUCGET QUANT FOCUS QUANTITY ANO UNIT RATE REPORT FIREO HEATER E40 DATE 5/24/82 PAGE 7 PERFORMANCE BASEO ON BUDGET WEEK ENOING 5/21/82 WEEK 116 OF 121 --QUANTITY-------- FCST TO !004 DATE THIS BUDGET WEEK ............. --MANHOURS------------ FCST TO #004 DATE THIS BUDGET W^EEK .^...... . -UNIT MANHOURS----------------- FCST TO THIS M0^4 ^ DATE..........WEEK ERECT FIRED HEATERS B23E40 EA 100 100 100 s*TOTAL FIRED HEATER 100 100 100 TREND FORECAST MH 6688 treno FORECAST PERF ERECT FIREO HEATERS A16E40 UNITS 400 400 400 **TOTAL FIRED HEATER ____ 400......... 400........ 400 TREND FORECAST MH 29809 TRENO FORECAST PERF 0 2300 4688 4688 0 0 2300 4688 4688 0 2.04 $*= PERFORMANCE RATIOS ** 0 7181 29809 29809 0 0_ 4.15 7181 29 809 29809 .......... 0 PERFORMANCE RATIOS 23.00 23.00 1.00 17.95 1T.95 1.00 46.88 46.88 46.88 46.88 2.04 2.04 74*52 74.52 74.52 74.52 4.15 4.15 .00 .00 .00 OTT .00 .00 17 * o 9 9 9 1 9 17 n 9 ir. 9r- l 78 l jr. GARRARD 00000710 ii 9 \ *o JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-58 ACCOUNT DESCRIPTION ACCTJ UNIT OF BUDGET QUANT FOCUS QUANTITY AND UNIT RATE REPORT PLATFORMG HEATERS E41 DATE 5/24/82 PAGE 8 PERFORMANCE BASED ON BUDGET WEEK ENDING 5/21/82 WEEK 116 OF 121 --QUANTITY--------- FCST TO #004 DATE THIS BUOGET WEEK ~............. -MANHOURS-------------------------- FCST TO THIS #004 DATE........ WEEK BUOGET -UNIT KANHOURS- FCST TO #004 DATE THIS WEEK ERECT PL TERM HEATER A16E41 UNITS 400 400 400 **T0TAL PLATFORMG HEATERS !0 TREND FORECAST MH 400 400 400 49480 TREND FORECAST PERF 0 21135 49354 49480 0 0 21135 49354 49480 0 2.34 PERFORMANCE RATIOS -- 52.84 123.39 123.70 52.84 123.39 123.70 1.00 2.34 2.34 .00 .00 .00 1? 13 ]! ?! ?? ;; o o o o :,d d d :q 01 ::Q i-' ::a ::o n n c !S c GARRARD O' c * 3 A 6 * 9 10 1? n 19 2. 2 25 21 30 )> 12 n Jh JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MCJC REPORT NO. C38090--5b FOCUS QUANTITY AND UNIT RATE REPORT PUMPS & DRIVER E50 DATE 5/24/82 PAGE 9 PERFORMANCE BASED ON BUCGET WEEK ENDING 5/21/82 MEEK 116 OF 121 ACCT# 3$ $ $ $ $ * # $ <: * :$ $: OF QUANT $5 * $ $ BUCGET INSTALL PUMPS G ORIV A31E50 EA INSTALL PUMPS G DRIV B09E50 EA INSTALL PUMPS G DRIV B21E50 EA INSTALL PUMPS G DRIV B23E50 EA INSTALL PUMPS G DRIV B28E50 EA INSTALL PUMPS G DRIV B29E50 EA INSTALL PUMPS G DRIV B32E50 EA 200 400 400 2200 300 400 300 FCST #004 20U 300 600 2000 0 500 300 TO OATE THIS WEEK ******* BUDGET 200 300 600 2000 0 500 300 0 500 0 290 0 1005 0 3900 0 120 0 800 0 1250 FCST #004 405 10 314 144 3 0 229 1696 TO DATE THIS BUDGET WEEK $$$: FCST #004 TO OATE THIS WEEK 405 10 314 1443 0 229 1696 0 2.50 2.03 2.03 .00 0 .73 .01 .03 00 0 2.51 .52 .52 .00 0 1.77 .72 .72 .00 0 .40 .00 .00 .00 0 2.00 .46 46 .00 0 4.17 5.65 5.65~ .00 SSTOTAL PUMPS G DRIVER_____ 42 00 3900 ..._ 3900 ....... 0 ... 7865 ..... 4097_______ 4097 ........ 0 ........ 1.87 _____ 1.05... 1.05 ........00 TRENC FORECAST MH 4097 TREND FORECAST PERF .51 PERFORMANCE RATIOS $$ 1.00 .51 .51 .00 INSTALL PUMPS 6 ORIV A16E50 UNITS 3600 2000 2800 0 5223 5824 5824 0 1.45 2.08 2.08 .00 --TOTAL PUMPS G DRIVER 3600 2800 2 800 0 5223 5824 5824 0 1.45 2.08 2.08 00 TRENO FORECAST MH 5824 TRENC FORECAST PERF 1.43 ** PERFORMANCE RATIOS ** 1.00 1.43 1.43 .00 a 1 4 5 9 10 1? 13 'r 16 Ifl 'P ___ i:i }' 2' ?n 31 3? 1.3 V *0 l l to ....................... -................. ..................... -.............. - -------- --------------- ................. ................ ................. ..............-.......... - .....-...... -..........~~ .................. ............... ............................ 41 -...................... -....... -......... *.................. r GARRARD 00000712 -....................................... - ............................. - - - .......................... " -......................-........-- c JOB NO. 14053--COO ROBINSON REFINRY MODERN/TN PROJ-MOC REPORT NO. C380V0-58 FOCUS QUANTITY ANO UNIT RATE REPORT COMPRESSORSGORIVER E60 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 10 BUCGET MEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT OF BUDGET ..................................................ACCTS QUANT --QUANTITY-------------------------- FCST TO THIS 1004 DATE WEEK ------------------------ MANHOURS------------ BUDGET FCST TO 5004 DATE ---------THIS WEEK --------------------UNIT MANHOURS----------------- BUDGET FCST TO THIS ~ 5 C04 DATE WEEK INSTALL COIMPRESSCRS U0SE60 EA... fflOTAL COMPRESSORS^DRIVER................ TRENO FORECAST MH BLOW CRT AND SPA RES aI6F60 UNITS sSTOTAL.... COMPRESSORSCDRIVER TREND FORECAST MH 1 100 10U 100 0 500 252 252 0 100 100 100 0 500 252 252 0 TREND FORECAST PERF .50 ** PERFORMANCE RATIOS 500 500 500 0 1000 1771 1771 0 500 .... .... 500________ 500 _____ 0 ____1000 1771.......... 1771______ 0 TREND FORECAST PERF 1.T7 $$ PERFORMANCE RATIOS 5.00 5.00 1.00 2.00 2.00 1.00 2.52 2.5F .00 2.52 2.52 .00 .50 .50 .00 3.54 3.54 .00 3.54..... 3.54 _____ .00 1.77 1.77 .00 GARRARD 00000713 * O eo c- o o &o e JOB NO. 14053-000 ROBINSCN REFINRY MODERNZTN PROJ-MOC d REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT GAS BOOSTER COMP E61 PERFORMANCE WEEK ENDING BASEO ON 5/21/82 DATE 5/24/82 PAGE 11 BUOGET WEEK 116 OF 121 o ACCOUNT DESCRIPTION UNIT---------------------------- QUANTITY---------------------- --------------- ------- MANHOURS-------------------------- --------------- --UNIT MANHOURS----------------- OF EUCGET FCST TO THIS BUDGET FCST TO THIS BUOGET FCST TO THIS ACCTC QUANT .... ............ 0004 DATE WEEK......... " 0004 DATE WEEK......... 0004 DATE WEEK c f\ l ttoo j i i Install gas booster Ai6E6i units 200 200 200 0 9900 **TO.TAL GAS BOOSTER COMP___ ___ 200___ ___ 200_____ 200.. _______ 0___ 9900 7573 7573 7573 7573 0 37.87 37.87 0 49.50 37.87 37.87 _____ .00 ___ TREND FORECAST MH 1` TREND FORECAST PERF .76 PERFORMANCE RATIOS 1.00 .76 .76 .00 14 c O JOB NO. 16053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--58 FOCUS QUANTITY AND UNIT RATE REPORT RECYCLE GAS C/COMP E6Z DATE 5/26/82 PAGE 12 PERFORMANCE BASED ON BUCGET WEEK ENDING 5/21/B2 WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCTS UNIT ------------------OF BUCGET QUANT -- QUANTITY-------------------------- ------------------------ MANHOURS------------- FCST TO THIS BUDGET FCSTTO SJ006..... DATE WEEK.. ............. #006 DATE THIS BUDGET WEEK .......... -UNIT MANHOURS- FCST TO #006.........DATE THIS WEEK RECYCLE GAS CENTRIF A16E62 UNITS TOTAL RECYCLE GAS C/COMP ........... TRENO FORECAST MH 6< 100 100 100 100 100 100 TREND FORECAST PERF 0 0 .71 6600 6669 6669 6600 6669 6669 ** PERFORMANCE RATI! 0 66.00 66.69 66.69 0 66.00 66.69 66.69 1.00 .71 71 .00 .00 .00 GARRARD 00000715 19 Q Q ::c c. JOB NO. 14053-000 ROBINSON REFINRY MQDERNZTN PROJ-MUC REPORT NO. C38090-5B FOCUS QUANTITY AND UNIT RATE REPORT RECYCLE GAS COMPRS E63 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 13 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT U UNIT---------------------------- QUANTITY--------------------------- OF BUCGET FCST TO THIS QUANT <,'004 " DATE WEEK ******* RECYCLE GAS COMPRESS A16E63 UNITS 200 200 200 0 ------------------------ MANHOURS--------------------------- --------------------UNIT MANHOURS BUDGET FCST TO THIS BUDGET FCST TO THIS #004 ********* DATE WEEK ****** $004 DATE ...HEEk xr***vv 2*. r*?*?xx-rr 3300 2341 2341 0 16.50 ii.7i .oo STOTAL RECYCLE GAS COMPRS 200 200 200 0 3300 2341 2341 0 16.50 11.71 11.71 .00 TRENO FORECAST MH 2341 TRENO FORECAST PERF .71 PERFORMANCE RATIOS ** 1.00 71 .71 00 o 39 s 9 fl 9 1C ?: 24 ?Q ?! 31 33 2? 36 V 23 33 30 41 I? 1C 43 GARRARD 00000716 9 o 6 JOB NO. 1 <*053--000 ROBINSON REFINRY MOOERNZTN PRQJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY ANO UNIT RATE REPORT OTHER EQUIPMENT E 70 PERFORMANCE MEEK ENDING BASED ON 5/21/82 OATE 5/24/82 PAGE 14 BUDGET WEEK 116 OF 121 * ACCOUNT DESCRIPTION i OF BUCGET < ACC T# QUANT **** 4=4= 4=4= 4=4= ** ****** 4= *4= 4= 4== 6 INSTALL OTHER EQUIPM A16ET0 EA s INSTALL OTHER EQUIPM A31E70 EA 9 INSTALL OTHER EQUIPM B09E70 EA 10 INSTALL OTHER EQUIPM B28E70 EA INSTALL OTHER EQUIPM B32E70 EA 3200 100 300 200 600 FCST #004 5900 0 300 200 800 TO OATE 5900 0 300 200 800 THIS WEEK BUDGET $***$** FCST #004 0 1983 0 100 0 120 0 1200 p 917 1075 0 160 239 390 TO OATE 1075 0 0 231 390 THIS WEEK UNIT BUDGET FCST #004 TrTTrrrrr MAN HOURSTO DATE THIS WEEK 0 .62 .18 .18 .00 0 1.00 .00 .00 .00 0 .40 .53 .00 .00 0 6.00 1.20 1.16 .00 0 1.53 .49 .49 .00 n 4ST0TAL OTHER EQUIPMENT 4400 72 00 7200 0 4320 1864 1696 0 .98 .26 .24 .00 ..... ............... TREND FORECAST MH... .............1886 TRENO FORECAST PERF ______. 30 ............... PERFORMANCE RATIOS $$ ... 1.00.... . ... .30 .. .27 ............00 a 8 J ' 3 M ;; u _____ 21 OTHER EQUIPMENT ie B23E70 UNITS SSTOTAL OTHER EQUIPMENT 300 300 2 00 200 200 200 TRENO FORECAST MH 82 TRENO FORECAST PERF /? 0 150 74 82 0 .50 0 150 74 82 0 50 .82 PERFORMANCE RATIOS 1.00 .37 .37 .74 .41 .41 .82 .00 00 .00 ?: ?4 7( 71 .12 a ll ?r> JO :: ,, 44 9 e o ..... ....................... 9 Q - -- - --... -....... ----------------------- . . 9 aV. a a o ' o { _ ______ c 5 C GARRARD 00000717 JUB NO. 19053-000 ROBINSON KEFINRY MOOERNZTN PROJ -MOC REPORT NO. C3B09O--58 6 F0CU s QUANTITY AND UNIT RATE REPORT PREFAB INST SUPTS JOl PERFORMANCE WEEK ENDING BASED on 5/21/82 DATE 5/29/82 PAGE 15 budget WEEK 116 OF 121 8 ACCOUNT DESCRIPTION UNIT .1 OF EUCGET ACCT # QUANT $$$$$$ 6 / FAB INSTRUMENT SUPPO A16J01 EA FAB INSTR SUPPORTS A3UUI EA FAB INSTRUMENT SUPPU B23J01 EA .0 FAB INSTR SUPPORTS B28J01 EA M FAB INSTRUMENT SUPPO 829JOI EA INSTRUMENT SUPPORTS C51J01 EA . 1 Instrument supports C52J01 EA INSTRUMENT SUPPORTS C53J01 EA INSTRUMENT SUPPORTS C59JU1 EA INSTRUMENT SUPPORTS C55J01 EA 1/ INSTRUMENT SUPPORTS C56J01 EA IB PREFAB INSTR SUPPTS- CblJOl EA IB PREFAB INSTR SUPPTS- C62J0I EA PREFAB INSTR SUPPTS- C63J0I EA PREFAB INSTR SUPPTS- C69J01 EA PREFAB INSTR SUPPTS- C65J01 EA PREFAB INSTR SUPPTS- C66J01 EA ALLEN-MUDIFY INSTR S S29J01 EA 102 12 29 19 0 29 29 29 29 29 29 l 1 1 1 1 1 13 FCST #009 35 3 15 9 0 55 0 2 6 3 0 12 19 18 21 25 0 3 TO DATE 35 3 15 9 0 55 0 2 6 3 0 12 19 IB 21 25 0 3 THIS WEEK BUDGET *r* 0 1995 0 ZOO 0 905 0 235 00 0 398 0 288 0 288 0 288 0 398 0 288 0 12 0 12 0 12 0 12 0 12 0 12 0 215 FCST #009 37 3 31 91 18 0 199 0 8 221 58 0 83 56 101 96 86 0 50 ..... TO DATE THIS WEEK 373 31 91 18 0 199 ~0 8 221 58.... 0 83 56 101 96 86 0 12 0 0 0 0 0 0 0 0 0 ....... 0 0 0 0 0 0 0 0 0 BUOGET FCST ~#609 $***** umiQC-- TO DATE THIS WEEK $$$$#$$ 19.56 10.66 16.67 10.33 16.88 6.07 16.79 .00 9.50 .00 12.00 3.53 12.00 .00 12.00 9.0C 12.00 36.83 ...12.00 .....19.33 12.00 12.00 .00 6.92 ~ 12.00 9.0IT 12.00 5.61 12.00 9.57 12.00 3.99 12.00 .00 16.59 16.67 10.66 .00 10.33 .00 6*0 / .00 A 50 .00 .00 .00 3.53 .00 .00" .00 9.00 .00 36.83 .00 19.33.. .........00 ........ .00 .00 6.92 .00 ~~9700 .00 5.61 .00 9.57 .00 3.99 .00 .00 .00 9.00 .00 4 5 G 7 9 10 u 13 M I-. 7, ?/ ?! ?r TP 3; SSTOTAL PREFAB INST SUPTS ?U TRENO FORECAST MH ?1 li> 325 216 216 1928 TRENO FORECAST PERF 0 9970 1966 192 8 0 15.29 6.79 6.61 . .98 PERFORMANCE RATIOS 1.00 .99 00!^ .00 .00 - 11 1 l i I )( ) ......................................... ....................................... 3S 11 ....-- ------------- -......--....... . -- -- -------------------------- ---.... --......... - ------------------------------ -................... --.. ........ - ................- 5 ,, i ; GARRARD 00000718 1' JOB NO. 14C53-000 ROBINSON REFINRY MODERNZTN PRQJ-MUC REPORT NO. C38090--58 FOCUS QUANTITY AND UNIT RATE REPORT PREASSEMBLE XM1TRS J10 DATE 5/24/82 PAGE 16 PERFORMANCE BASED ON BUDGET WEEK ENDING 5/21/82 WEEK 116 OF 121 **** ACCOUNT DESCRIPTION ACCTS UNIT OF BUDGET FCST QUANT #004 trTVVTYiviTi PRE PRE PRE PRE PRE PRE A SMB AS MB ASMB ASMS ASMB ASMB TRANSMGTRAN C51J10 TRANSMGTRAN C52J10 TRANSMGTRAN C53J10 TRANSMGTRAN C54J10 TRANSMGTRAN C55J10 TRANSMGTRAN C56J10 EA EA EA EA EA EA 333 232 129 304 1 57 257 352 246 249 210 172 184 TO OATE 352 246 249 210 172 184 **TOTAL PREASSEMBLE XMITRS 1412 1413 1413 TRENO FORECAST MH 2044 TRENO FORECAST PERF THIS week BUDGET FCST 45 * #004 4: 4: # TO THIS DATE WEEK # * *4* * $ 4 BUDGET ~MNfT MA FCST TO #004 DATE 0 0 0 0 0 0 0 .38 1303 902 419 1209 617 1062 77 5 431 299 224 140 175 77 5 431 299 224 140 175 0 0 0 0 0 0 5512 2044 2044 0 WAT PERFORMANCE RATIOS ** 3.91 3.89 3.25 3.98 3.93 4.13 3.90 1.00 2.20 1.75 1.20 1.07 .81 .95 1.45 .38 2.20 1.75 1.20 1.07 .81 .95 1.45 .38 THIS WEEK .00 .00 .00 .00 .00 .00 .00 .00 1 . * n Y " ?s GARRARD 00000719 O o o o o & # u GARRARD 00000720 * ' 3 A 6 ' 0 10 .2 n ,4 18 ?2 2' ?4 28 30 " JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT INSTALL XMITTERS Jll PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE IT BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT# Ar A A* A* jAj A* Av Ap Aa A* Ap*Aa ^ Aa Aa Aa Aa Aa A* Aa aj UNIT OF EUCGET FCST QUANT #004 Aa A> Aa lA A A> Aa a^ ^Aa aAa A FIEL0 MOUNTED INSTRU FIELD MOUNTED INSTRM FIELD MOUNTED INSTRU FIELD MOUNTEO INSTRU FIELD MOUNTEO INSTRU INSTRUMENTS FIELD MOUNTED INSTRU INSTALL XMITTERS FIELD MOUNTED INSTRU FIELD MOUNTED INSTRU FIELD MOUNTEO INSTRU FIELO MOUNTED INSTRU FIELD MOUNTED INSTRU FIELD MOUNTEO INSTRU INSTALL XMITTERS INSTALL XMITTERS INSTALL XMITTERS INSTALL XMITTERS INSTALL XMITTERS INSTALL XMITTERS MORRIS-INSTALL XMITT aLlen-instaLL transm HOKE-INSTALL TRANSMI A16J11 A 31J11 B09J11 B23J11 B28J11 B29J11 B32J11 B99J11 C51J11 C52J11 C53J11 C54J11 C55J11 C56J11 C61J11 C62J1I C63J11 C64J11 C65J11 C66J11 S09J11 S29J1I S32J11 EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA 177 20 0 40 17 0 0 3 192 132 48 113 90 171 2 2 10 1 2 2 12 19 4 203 5 0 71 12 0 0 10 98 0 1 0 3 0 109 147 184 139 94 102 27 18 3 TO THIS BUDGET FCST TO DATE WEEK ******* S : #004 DATE ************ 203 5 0 71 12 0 0 10 98 0 1 0 3 0 109 147 184 139 94 102 27 18 3 0 8179 0 524 00 0 1282 0 516 00 00 0 102 0 7804 0 5370 0 2031 0 4508 0 3656 0 6425 0 79 0 79 0 395 0 38 0 79 0 79 0 361 0 608 0 134 4109 101 41 1016 144 8 4 60 1540 136 250 492 264 318 893 1246 1673 1333 "513 1144 628 544 101 4109 101 41 1016 144 8 4 80 1540 136 250 492 264 318 893 1246 1673 1333 513 1144 207 243 122 THIS BUDGET WEEK $$$$$ -.iikirr MAKiuntQC-- FCST #C04 TO DATE THIS WEEK 0 0 . .0. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 46.21 26.20 .00 32.05 30.35 .00 .00 34.00 40.65 40.68 43.35 39.89 40.62 37.57 39.50 39.50 39.50 38.00 39.50 39.50 30.08 32.00 33.50 20.24 20.20 .00 20.24 20.20 .00 14.31 12.00 .00 14.31 12.00 .00 .00 8.00 15.71 .00 8.00 15.71 .00 .00 250.00 250.00 .00 .00 88.00 88.00 .00 .00 8.19 a. 19 8.4 8 8.48 9.09 9.09 9.59 5.46 9.59 11.22 11.22 23.26 7.67 30.22 13.50 33.67 40.67 .00 .00 .00 .00 .00 .00 00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 00 .00 .00 *00 .00 **TOTAL INSTALL XMITTERS 1057 1226 1226 0 42299 16578 15877 0 40.02 13.52 12.95 n ...................... TREND FORECAST MH 15877 TREND FORECAST PERF..... ..... .33 PERFORMANCE RATIOS $$ 1.00... .... .33 .00 - ,, j| ! I*s, oo ? 4 s 7 i-r> ,7 13 M 16 2T ?1 7-1 ? .1* If V T. -................. ................ - -................................................................... ........ -.... ....... -........................... -- ; C JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN HRUJ-MOC REPORT NO. C38090-58 6 '' ACCOUNT DESCRIPTION UNIT 3 OF BUCGET 4 ACCTit QUANT s **************************** 8 INSTALL PINOR INSTRU A16J15 EA INSTALL PINOR INSTRM A31J15 EA INSTALL PINOR INSTRU B09J15 EA 10 INSTALL P1NUR INSTRU B23J15 EA INSTALL MINOR INSTRU B28J15 EA 12 INSTRUMENTS B29J15 EA n INSTALL MINOR INSTRU B32J15 EA .4 INSTALL MINOR INSTRU B99J15 EA INSTALL PINOR INSTRU C51J15 EA -0 INSTALL MINOR INSTRU C53J15 EA -7 INSTALL MINOR INSTRU C54J15 EA 18 INSTALL MINOR INSTRU C55JI5 EA in INSTALL MINOR INSTRU C56J15 EA INSTALL MINOR INSTR- C61J15 EA INSTALL MINOR INSTR- C62J15 EA 22 INSTALL MINOR INSTR- C63J15 EA 23 INSTALL MINOR INSTR- C64J15 EA ?4 INSTALL PINOR INSTR- C65J15 EA INSTALL PINOR INSTR- C66J15 EA * MORRIS-INSTALL MIN I S09J15 EA ALLEN-INSTALL MINOR S29J15 EA HOKE-INSTALL MINOR I S32J15 EA 779 21 0 231 86 0 0 9 110 37 106 66 109 20 87 6 1 3 4 117 35 29 * *$TOTAL REMOVE INSTALL INST 1852 FOCUS QUANTITY AND UNIT RATE REPORT RE MOVEINST AL L INST J15 PERFORPANCE MEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 18 BUCGET WEEK 116 OF 121 FCST #004 TO DATE THIS BUDGET FCST TO THIS WEEK #004 DATE WEEK $$$$ ********* ********$** $$$$$ BUDGET FCST #CC4 NUflilR^-- TO THIS DATE WEEK 900 900 0 7626 2850 2817 10 9.79 3.17 3.13 .00 4 4 0 105 13 13 0 5.00 3.25 3.25 .00 0 00 0 5 50 .00 .00 .00 .00 186 186 0 1679 1083 1083 0 7.27 5.82 5.82 .00 48 48 0 729 176 176 0 8.48 3.67 3.67 .00 0 00 0 25 25 0 .00 .00 .00 .00 0 00 0 44 44 0 .00 .00 .00 .00 21 21 0 70 45 45 0 7.78 2.14 2.14 .00 37 37 0 ` 227 140 140 0 2.06 3.78 3.78 .00 o....... ' ......0 ~o 83 0 0 0 2.24 .00 .00 .00 6 6 0 214 18 18 0 2.02 3.00 3.00 .00 8 8 0 149 40 40 0 2.33 5.00 5.00 .00 21 21 0 248 65 65 0 2.28 3.10 3.10 .00 9 9 0 41 8 a 0 2.05 .89 .89 .00 51 51 0 190 54 54 0 2.18 1.06 1.06 .00 44 44 0 9 109 109 0 2.25 2.48 2.48 .00 117 117 0 2 128 128 0 2.00 1.09 1.09 .00 31 31 0 7 30 30 0 2.33 .97 .97 .00 22 22 0 10 32 32 0 2*50 1.45 1.45 .00 66 66 u 805 352 53 0 6.86 5.33 .80 .00 58 58 0 136 169 137 0 3.89 2.91 2.36 .00 50 50 0 251 493 55 0 8.66 9.86 1.10 .00 1679 1679 0 12581 5879 5077 10 6.79 3.50 3.02 .00 TREND FORECAST MH 5077 TREND FORECAST PERF .40 PERFORMANCE RATIOS T * 1*00 .47 .40 .00 8 2 * H >r 21 w. t; 3! V :: 16 18 37 1! : GARRARD 00000721 - --..........- -------- -------------........ ............................................... -- - - - ......... - ......... - - ---- -------- ......... -......... ..................... ----- 60 i J *iiiiiiittttttt GARRARD 00000722 e 6 1 4 0 " 12 >8 ,, 3, ?? 33 24 JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PRQJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT INSTALL P/I TRNORS J17 ACCOUNT DESCRIPTION UNIT OF ACCTS QUANT ******** ******************** BUCGET FCST #004 TO THIS BUDGET DATE MEEK ******* ******* FCST #004 t PERFORMANCE MEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 19 BUDGET MEEK 116 OF 121 TO DATE THIS WEEK 8UDGET .IIMIT M AklUnilQC-- FCST #004 TO DATE THIS WEEK $$$$$$ INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL P/I P/I P/I P/I P/I P/I P/I P/I P/I P/I P/I TRANSUUC TRANSOUC TRANSOUC TRANSOUC TRANSOUC TRANSORTRANSORTRANSORTRANSORTRANSORTRANSOR- C51J1T C53J17 C54J1T C55J17 C56J17 C61J17 C62J17 C63J17 C64J17 C65J17 C66J17 EA EA EA EA EA EA EA EA EA EA EA <=*TOTAL INSTALL P/I TRNDRS 30 18 24 6 6 1. 19 1 1 1 1 108 32 0 0 0 7 0 21 32 19 8 0 119 32 0 0 0 7 0 21 32 19 8 0 119 0 750 0 450 0 600 0 150 0 150 0 25 0 475 0 25 0 25 0 25 0 25 0 2700 235 0 0 0 123 0 467 308 133 123 0 1389 235 0 0 0 123 0 467 308 133 123 0 1389 0 25.00 7.34 7.34 0 25.00 .00 .00 0 25.00 .00 .00 0 25.00 .00 .00 0 25.00 17.57 17.57 0 25.00 .00 .00 0 25.00 22.24 22.24 0 25.00 9.63 9.63 0 25.00 7.00 7.00 0 25.00 15.38 15.38 0 25.00 .00 .00 0 25.00 11.67 11.67 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 oo TREND FORECAST MH 1389 TREND FORECAST PERF .47 $$ PERFORMANCE RATIOS 1.00 .47 .47 00 0 9 a ?9 4 5 6n 8 9 Ur 9 9 ir, 9 1 2' 29 32 1,1 IF 10 : ........... -.............................. ............................. -.......... - .......... - -................. ---------------------- ------------------- , : ii - O ......................- .................................................... ..........-- -....... ------------------- -..... - ..................................... .............. .................. ..........-.................... -.............-.......... - 6l < C JOB NO. 14053-000 FOCUS DATE 5/24/82 ROBINSON REFINRY MOOERNZTN PROJ-MOC QUANTITY AND UNIT RATE REPORT PAGE 20 REPORT NO. C38090--58 INSTALL I/P TRNORS J19 PERFORMANCE BASED ON BUDGET WEEK ENOING 5/21/82 WEEK 116 OF 121 ii ACCOUNT DESCRIPTION UNIT ------------------ -QUANTITY--------- --------- ------------------------ manhours--------------------------- --------------------UNIT MANHOURS------------------ OF BUDGET FCSL _ TO THIS BUDGET FCST TO THIS BUDGET FCST TO THIS ACC T 8 QUANT 8004 date WEEK ..........................#004 OATE WEEK ......... 0004....... DATE WEEK 7 INSTALL I/P TRANSDUC C51J19 EA INSTALL I/P TRANSOUC C53J19 EA i * INSTALL I/P TRANSDUC C54J19 EA INSTALL I/P TRANSDUC C55J19 EA " INSTALL I/P TRANSOUC C56J19 EA INSTALL I/P TRANSOR- C61J19 EA n INSTALL I/P TRANSDR- C62J19 EA INSTALL I/P TRANSDR- C63J19 EA INSTALL I/P TRANSOR- C64J19 EA .6 INSTALL I/P TRANSDR- C65J19 EA 17 INSTALL I/P TRANSOR- C66J19 EA 18 SSTOTAL INSTALL I/P TRNDRS 138 70 74 64 95 1 98 1 6 1 1 549 57 0 5 0 2 69 105 111 115 63 83 610 57 0 5 0 2 69 105 111 115 ... 63 83 610 0 0 0 0 0 0 0 0 0 "0 0 0 966 490 479 448 665 7 6 86 7 38 7 7 3800 140 0 109 0 4 155 176 644 320 172 245 F965 140 0 109 0 4 155 176 644 320 172 245 1965 0 7.00 2.46 2.46 .00 0 7.00 .00 .00 .00 0 6.47 21.80 21.80 .00 0 7.00 .00 .00 .00 0 7.00 2.00 2.00 .00 0 7.00 2.2 5 2.25 .00 0 T.00 1.68 1.66 .00 0 7.00 5.80 5.80 .00 0 6.33 2.78 2.78 GO 0 7.00 2.73 2.73 .00 0 7.00 2.95 2.95 .00 0 6.92 3.22 3.22 .00 a-i 21 TREND FORECAST MH 1965 TREND FORECAST PERF .47 $$ PERFORMANCE RATIOS 1.00 .47 .47 .00 s I : < 4 a 4 4 4 I? n M4 ,( " "1 r 21 ?X 21 ? 7' 14 4 4 :4 :;4 :i i GARRARD 00000723 :a 61 :q ::c Cl ::c ;:c '5 e> c JOB NO. 14053-000 ROBINSON REFINRY MODERNZ TN PROJ-MOC REPORT NO. C38090--58 FOCUS QUANTITY AND UNIT RATE REPORT MAIN CONTROL PANEL J21 PERFORMANCE WEEK ENOING BASEO ON 5/21/82 DATE 5/24/82 PAGE 21 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION .......................................... ACCf # UNIT - ------- QUANTITY---------- OF BUCGET FCST TO QUANT .... #004 ... DATE THIS BUDGET WEEK " -MANHOURS-------- ----------------- ------------- FCST TO THIS BUDGET #004 DATE WEEK.............. -UNIT MANHOURS- FCST TO #004 DATE i=$4 $=**=*<=**$$ THIS WEEK rvyty*t MAIN CONTROL ROOM PA C50J21 EA ..TOTAL MAIN CONTROL PANEL _ TREND FORECAST MH 666 666 D FORECAST PERF 0 0 .39 626 555 555 0 626 555 555 0 ** PERFORMANCE RATIOS ** 104*33 104*33 1.00 92.50 92.50 92*50 92.50 .89 .89 .00 .00 .00 ' 1? 13 1C GARRARD 00000724 t V c .1 A 5 * 8 .0 12 .6 18 JOB NO. 14053--COO ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C3B090-58 FOCUS QUANTITY AND UNIT RATE REPORT SATELLITE RACKS J2Z PERFORMANCE WEEK ENDING BASED ON 5/21/82 OATE 5/24/82 PAGE 22 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION OF EUCGET FCST ACCT # QUANT #004 sss-z-t.s^st^ss*********** *********** IOC I/O RACK A16J22 UNITS CONTRL CONSL SATLITE C51J22 UNITS CONSOLE SATELLITE RA C52J22 UNITS CONSOLE SATELLITE RA C5JJ22 UNITS CONSOLE SATELLITE RA C54J22 UNITS CONSOLE SATELLITE RA C55J22 UNITS 2 100 100 100 100 300 300 100 100 200 110 300 TO DATE 300 100 100 200 110 300 THIS WEEK 0 0 0 0 0 0 rJIJU T MAJUUnifOC BUOGET FCST TO THIS BUDGET FCST #004 DATE WEEK #004 ******** **$********* ******* ***********^** TO OATE 3 148 148 148 283 444 276 179 256 127 163 225 276 179 256 127 163 225 0 1.50 .92 .92 0 1.48 1.79 1.79 0 1.48 2.56 2.56 0 1.48 .64 .64 0 2.83 1.48 1.48 0 1.48 .75 .75 THIS WEEK .00 .00 .00 .00 .00 .00 S4T0TAL SATELLITE RACKS 702 1110 1110 0 1174 1226 1226 0 1.67 1.10 1.10 .00 TREND FORECAST MH 1226 TREND FORECAST PERF .68 PERFORMANCE RATIOS ** 1.00 .68 .68 .00 73 24 77 a a 7^ 4 1 1^ 7 It 1 4 >g 11 14 K 17 4G " i i T L 7 4* 0 Q r 0t r. 0 ['<______ ____ o C GARRARD 00000725 e JOB NO. 14053-000 ROBINSON REFINRY MODERNZ TN PROJ-MOC 4 REPORT NO. C3B090-58 FOCUS GUANTITY AND UNIT RATE REPORT PROCESS COMPUTER J26 DATE 5/24/82 PAGE 23 PERFORMANCE BASED ON BUCGET WEEK ENDING 5/21/82 WEEK 116 OF 121 o 8 ACCOUNT DESCRIPTION ACCT# UN I T OF BUCGET FCST QUANT #004 ********** TO DATE THIS BUDGET WEEK FCST 2004 TO OATE THIS BUDGET WEEK FCST #004 TO DATE 2$ ? THIS t WEEK... ............ ******* 6 PROCESS CONTROL COMP C50J26 UNITS 100 70 70 **TOTAL PROCESS COMPUTER 100 70 70 TREND FORECAST MH 283 TREND FORECAST PERF 0 0 4.04 100 283 283 0 100 283 283 0 S* PERFORMANCE RATIOS ** 1.00 i.oo 1.00 4.04 4.04 4.04 4.04 4*04 4.04 .00 .00 .00 10 IT IF 9 9 9 9 : :9 :: 9' GARRARD 00 :: # i JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ- MOC REPQRT NO. C38090-56 FOCUS QUANTITY AND UNIT RATE REPORT LOCAL CONTROL PANL J31 PERFORMANCE WEEK ENDING BASED ON 5/21/82 OATE 5/24/82 PAGE 24 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACC T It UNIT -- OF BUDGET QUANT --QUANTITY-------------------------- FCST __ TO THIS 004 DATE WEEK BUOGET --MANHOURS-------------------------- FCST TO THIS 004 DATE........ WEEK BUOGET -UNIT MANHOURS----------------- FCST TO THIS a004 OATE WEEK <3 i ; i \' 0 1 : ' 1? 3 ' !' LOCAL CONTROL PANEL LOCAL CONTROL PANELS LOCAL CONTROL PANEL LOCAL CONTROL PANELS LOCAL CONTROL PANELS LOCAL CONTROL PANEL MORRIS LOCAL CONTROL HOKE-LOCAL CONTROL P A16J31 B09J31 B23J31 B32J31 B99J31 C56J31 S09J31 S32J31 UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS 100 0 100 100 100 100 100 0 1900 0 100 100 0 100 100 0 1900 0 ICO 100 0 100 100 0 3-TUTAL LOCAL CONTROL PANL 600.... " 2300 2 300 TREND FORECAST MH 936 TREND FORECAST PERF 0 0 0 0 0 0 0 0 0 .33 140 0 36 35 35 100 35 0 768 0 16 35 0 88 35 0 792 0 16 0 0 88 0 0 3 81 942 896 PERFORMANCE RATIOS 24 1.40 0 .00 0 .36 0 .35 0 .35 0 1.00 0 .35 0 *00 24 ......... .64 -* oo .40 .00 .16 .35 .00 .88 .35 .00 ...... .41 .33 .42 .00 .16 .00 .00 .88 .00 .00 .39.... .31 .00 .00 .00 .00 .00 .00 .00 .00 1. " .00............. ? .00 ? } GARRARD 00000727 a t? :;Q Ml :;c ::c ::c c 0 6 ' 0 i < 0b 10 " n ,4 l> " n -i. 78 30 31 \! 13 JOB NU. 19053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-- 58 FOCUS QUANTITY ANO UNIT RATE REPORT INSTRUMENT SHELTER J50 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/29/82 PAGE 25 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT it *****i=*********C*:*** UNIT OF BUCGET FCST TO THIS QUANT 3009 OATE WEEK ****************-**** ******* ****** BUDGET FCST 3009 TO DATE THIS BUDGET WEEK FCST 3009 TO OATE THIS WEEK INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENTS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS MOUNT INSTR SHELTERMOUNT INSTR SHELTERMOUNT INSTR SHELTER- MOUNT INSTR SHELTERMOUNT INSTR SHELTERMOUNT INSTR SHELTERMORRIS MOUNT INST SH ALLEN-MOUNT INSTR SH HOKE-MOUNT INST SHEL A16J50 A31J50 B09J50 B23J50 B28J50 B29J50 B99J50 C5IJ50 C53J50 C 59J 50 C55J50 C 56J 50 C61J50 C62J50 C63J50 C69J50 C65J50 C66J50 S09J50 S29J50 S32J50 EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA 197 32 32 0 2627 217 233 16 17.87 6.78 7.28 .00 27 9 9 0 355 32 32 0 13.15 8.00 8.00 .00 0 0 00 0 23 23 0 .00 .00 .00 .00 23 22 22 0 768 617 617 0 33.39 28.05 28.05 .00 16 8 8 0 377 197 19 7 0 23.56 18.38 18.38 .00 0 0 00 0 10 10 0 .00 .00 .00 .00 1 2 2 0 28 8 8 0 28.00 5700 5700 .00 173 69 69 0 3960 378 378 0 20.00 5.98 5.98 .00 50 0 0 0 1000 0 0 0 20.00 .00 .00 .00 102 0 0 0 2090 8 8 0 20.00 .00 .00 .00 82 3 3 0 1690 127 127 0 20.00 92.33 92.33 .00 126 19 19 0 2520 310 310 0 20.00 16.32 16.32 .00 1 3 3 0 20 0 0 0 20700 .00 .er .00 121 18 18 0 2920 216 216 0 20.00 12.00 12.00 .00 2 15 15 0 90 99 99 0 20.00 6.27 6.27 .00 1 29 29 0 20 221 221 0 20iOO 7.62 7.62 .00 1 17 17 0 20 59 59 0 20.00 3.97 3.97 .00 l 1 18 13 1l38 0 20 0 ........ 20" 113 113 rio-- 19 0 20.00 6.28 6.28 0 20700 ..10.00 2.52 .00 .00 21 3 3 0 37 5 80 30 0 17.86 26.67 10.00 .00 2 2 2 0 92 92 33 0 21.00 21.00 16.50 .00 $*=T(JTAL INSTRUMENT SHELTER 898 277 277 0 17792 2832 2693 16 19.81 10.22 9.72 .00 TRENO FORECAST MH 2727 TREND FORECAST PERF .97 PERFORMANCE RATIOS 1*00 .99 .97 .00 o 8 9 * J9 -0 9 l? .3 ,4 It 7 H' X 21 ?4 ;( x 79 30 37 r. ' V w 40 l : I if ............ - ... ------ ------- .......-.......... ........ *..... Ifl GARRARD 00000728 - v' -------- ----- 7 ................. O o JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090--58 - -- FOCUS QUANTITY AND UNIT RATE REPORT ANAL YZERCPACKAGE JfcO Account description 3 OF BUCGET 4 ACCT # QUANT S **************************** $ c 7 ANALYZER CONTROL P A16J60 EA 8 ANALYSER CONTROL P B23J60 EA tt ANALYSER CONTROL P B28J60 EA 10 ANALYSER CONTROL P B29J60 EA ANALYZER PACKAGES 12 ALLEN-ANALYZER B32J60 EA S29J60 EA U MOKE-ANALYZERS S32J60 EA 83 15 2 7 0 0 3 FCST #004 15 1 0 0 0 0 3 TO DATE 15 1 0 0 0 0 3 THIS MEEK BUOGET ******** 0 7266 0 140 0 355 0 155 00 00 0 280 FCST #004 627 8 0 0 0 0 280 DATE PAGE PERFORMANCE BASED ON BUDGET 5/24/82 26 TO THIS BUOGET DATE WEEK *4=4s4=$4=4=4=4:4t$ _tlklTT MANUnilQC- FCST TO #004 DATE ?T?TTVT? THIS WEEK 645 8 0 0 0 0 98 0 87.54 41*80 43.00 0 9.33 8.00 8.00 0 177.50 .00 .00 0 22.14 .00 .00 0 .00 .00 .00 0 .00 .00 .00 0 93*33 93.33 32.6F" .00 .00 00 .00 .00 .00 .00 CD 4-TOTAL ANALYZERSPACKAGE 16 TREND FORECAST MH 110 19 19 751 TRENO FORECAST PERF 0 .47 8196 915 751 0 PERFORMANCE RATIOS 4=4= 74.51 1.00 39.53 .57 .47 .00 .00 7 A p " .7 .3 ..I ,6 e ?f 77 7: >> 77 24 z 30 z. 13 4< 36 3? 9 3H 40 4? Q =C ... ---- ---------- -......... -.... - ...... -....- O GARRARD 00000729 S3 - ................................................ -- .......... o -- o o --- - y 1 e JOB NO. 1 <,053-000 ROBINSON REFINRY MOQERNZTN PROJ -MOC REPORT NO. C38090-58 F 0CUS QUANTITY AND UNIT RATE REPORT INSTR TUBEEP IPE J70 . ACCOUNT DESCRIPTION ACCTff UNIT OF EUCGET FCST TO THIS BUDGET QUANT S005 DATE MEEK *********** ********** ****** *:**$*$*=$:* FCST 1*005 PERFORMANCE MEEK ENOING BASEO ON 5/21/82 DATE 5/25/82 PAGE 27 BUDGET MEEK 116 OF 121 TO DATE THIS BUDGET MEEK FCST TO 3005 OATE $$$$$$$$ THIS MEEK INSTALL INSTR TUBE6P A3IJ70 LF INSTALL INST TUBE E B09J70 LF INSTALL INSTR TUBEEP B23J70 LF INSTALL INSTR TUBEEP B28J70 LF ii INSTRUMENTS B29J70 LF u INSTRUMENT AIR TUBEE B32J70 LF INST AIR TUBE E PIPE B99J70 LF INST INSTR TUBE E PI C51J70 LF INST INSTR TUBE E PI C53J70 LF INST INSTR TUBE E PI C5<|J70 LF INST INSTR TUBE E PI C55J70 LF IS PNUEMATIC TUBING - C6IJ70 LF PNUEMATIC TUBING - C62J70 LF 1= PNUEMATIC TUBING - C63J70 LF PNUEMATIC TUBING - C65J70 LF PNUEMATIC TUBING - C65J70 LF PNUEMATIC TUBING - C66J70 LF MURRIS-INST AIR TUBE S09J70 LF ALLEN-INST AIR TUBE S29J70 LF HOKE-INST AIR TUBE E S32J70 LF 200 190 190 0 185 89 89 0 .93 .57 .57 .00 0 0 00 0 0 0 0 .00 .00 .00 .00 1180 1600 1600 0 7 30 1627 1653 0 *62 1.02 1.03 .00 752 600 600 0 686 215 215 0 .91 .36 .36 .00 100 379 3 79 0 86 139 139 0 .86 .37 .37 .00 0 0 00 0 0 0 0 .00 .00 .00 .00 <,8 650 650 0 55 159 159 0 .92 .23 .23 .00 5177 570 570 0 1810 256 256 0 .53 .55 .55 .00 1598 16 16 0 690 0 0 0 .53 .00 .00 .00 <,2 00 0 0 0 1757 137 137 0 .52 .00 .00 .00 1975 0 0 0 859 0 0 0 .53 .00 .00 .00 23 50 50 0 10 52 52 0 .53 .85 .85 .00 3000 559 559 0 1300 85 85 0 .53 .15 ~7T5 ;oo 598 820 820 0 258 163 163 0 .53 .20 .20 .00 20 1957 1957 0 9 219 219 0 .55 .11 .11 .00 25 215 215 0 11 53 53 0 .55 .25 .25 .00 2950 526 526 0 1280 52 52 0 .55 .12 .12 .00 1000 1200 1200 0 766 689 556 0 .77 .57 .56 .00 710 776 ... f 76 0 609 700 " 315 0 *06 .90 .51 .011 110 560 560 0 98 555 559 0 .89 .79 .82 .00 CD "0 **TOTAL INSTR TUBEEPIPE 22656 10558 10558 0 11178 5058 5563 0 .59 .55 .00 TRENO FORECAST MH 5567 TRENO FORECAST PERF .68 PERFORMANCE RATIOS 1.00 .75 .68 .00 V }5 ,, 4 5 6 9 10 13 M If, ?. 2" 7' 7" 3(' 3? .Vi yi <10 < GARRARD 00000730 .........................-................................ .................................. ........... o -- ............--............... ......---------------- --------------------------------------------- c e JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MQC REPORT NO. C38090--58 FOCUS QUANTITY AND UNIT RATE REPORT INSTL INTRU T86PIP J71 DATE 5/24/82 PAGE 28 PERFORMANCE BASED ON BUDGET WEEK ENDING 5/21/82 WEEK 116 OF 121 ACCOUNT DESCRIPTION .................................. "yf* y A. jA> <A> ACCfs A* A* A* jAj UNIT -------------------------- QUANTITY-------------------------- OF BUCGET FCST TO THIS QUANT 004... DATE WEEK ------------BUOGET -MANHOURS----------- FCSJ TO S004....... DATE -------- THIS WEEK ------------ ------- UNIT MANHOURS------------------ BUDGET^ fCST TO .......... SCO A......... DATE JHIS WEEK INSTR AIR TUBING A16J71 LF **TOTAL INSTL INTRU TB6PIP TREND FORECAST MH 1574 3100 3100 1574 3100 3100 1423 TREND FORECAST PERF 0 0 1.08 670 1361 1423 0 670 1361 1423 0 PERFORMANCE RATIOS =*= *43 .43 1.00 .44 .44 1.0 3 .46 .46 1*08 .00 .00 .00 1? n GARRARD 00' \- f 10 c> o- ooo CO 3 a :;a o :;o c JOB NO. 1 <053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC ty REPORT NO. C38090-58 FOCUS QUANTITY ANO UNIT RATE REPORT INST AIR SUBHEADER J78 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/28/82 PAGE 29 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT - OF BUCGET FCST TO THIS BUDGET FCST ACCTff QUANT 8009 DATE WEEK jm*r o INSTR AIR SUB-HEADER A16J78LF INST AIR SUBHEADER C53J78 LF INST AIR SUBHEAOER C63J78 LF 3383 2 2 70<r0 1505 685 7080 1505 685 0 2365 01 01 5228 818 86 TO date 5375 818 86 THIS BUDGET WEEK UNIT FCST *r 0.0 S MA Nuniioc-^. TO THIS DATE ... BEER $$**** 0 .70 .78 .76 .00 0 .50 .28 .28 .00 0 .50 .13 .13 .00 $$T0TAL INST AIR SUBHEADER ..... .... TREND FORECAST MH " 5875 TREND FORECAST PERF .98 2367 5 72 A 5875 PERFORMANCE RATIOS 1.00 T95 .98 .00 2 3 5 9 9 9 9 9 9 9 G>) 73 73 > 73 D 9 O oOooo 00 1 .m\ 6 w - m (. ' -- y 10 " i? n JOB DO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-58 nvTt)tJI| 1 UL j 11 1 1 U<v OF ACCT # QUANT v4*TYVV'r4*^v4'XTTT"VVTVVT^'VT *4 eUCGET LOOP CHECK C CALIBRA A31J81 EA LOOP CHECK B23J81 EA LOOP CHECK B28J81 EA LOOP CHECK B29J81 EA LOOP CHECK B32J81 EA LOOP CHECK LOOP CHECK LOOP CHECK C51J81 EA - C61J81 EA - C63J81 EA 44 32 22 14 9 349 3 106 F 0C U S UUANTITY and unit RATE REPORT LOOP CHECK J81 -QUANTITY FCST TO S 004 DATE * THIS WEEK BUDGET *$*$**$$ FCST S004 7 134 29 29 29 4 30 221 444 7 134 29 29 29 4 30 221 444 3 105 0 400 0 194 0 140 0 84 0 2559 0 22 0 778 11 88 3 92 348 124 1232 1720 2007 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 30 BUDGET WEEK 116 OF 121 TO DATE 4 883 92 348 124 1232 1720 2007 THIS BUDGET FCST TO WEEK #004 DATE ***** YTY-r-rY-YY-Y 0 2.39 1.57 .57 0 12.50 6.59 6.59 0 8.62 3.17 3.17 0 10.00 12.00 12.00 0 9.33 4.28 4.28 0 7.33 2.87 2.87 0 7.33 7.78 7.78 0 7.34 4.52 4.52 THIS WEEK .00 .00 .00 .00 .00 .00 .00 .00 * ..... SSTOTAL ' u LOOP CHECK ............... TREND FORECAST MH 9 2, 22 LOOP CHECK LOOP CHECK LOOP CHECK A16J81 B09J81 B99J81 LOOP CHECK 2-1 LOOP CHECK - C62J81 - C64J81 ,, LOOP CHECK LOOP CHECK - C65J81 - C66J81 6410 LOOPS LOOPS LOOPS LOOPS LOOPS LOOPS LOOPS 5/9 TRENO 164 1 5 248 331 168 297 1323 FORECAST 683 25 21 390 442 468 466 1323 PERF 526 25 21 390 461 468 486 - .... 42 82 6417 6410 6 .61 PERFORMANCE RATIOS 82 1645 04 0 49 0 1819 0 2427 0 1232 0 2178 3175 105 17 1350 2353 T563 1405 3732 105 17 1350 2353 ~1563 1405 566 0 0 0 .o 0 0 7.40 1.00 10.03 4.00 9.80 7.33 7.33 T.H 7.33 4.85 .61 4.65 A.20 .81 3.46 5.32 3.34 2.89 4 85 ~..... .00 *....... .61 .00 7.10 4.20 .81 3.46 5.10 3.34 2.89 6.90 .00 .00 .00 .00 .00 .00 29 10 *'PTOTAL LOOP CHECK TREND FORECAST MH 1214 2515 2377 11663 TRENO FORECAST PERF 82 .57 9354 9968 10525 566 PERFORMANCE RATIOS 7.71 1.00 3.96 .49 4.43 .56 6.90 .69 -........... ---...... -..................---...... ..-...... -.-- ----.... -.. --- -..-... -- 1........ .....-------.. -... --- -........... ----------- ----------- 9 3 9 1 ;9 7 1 f 1 9 i : :t ,1 ; ;* p \% - <n i i ; 0- .... --.... -....... --.. ----- ..- -- ....------------- ------ - V ------------ --------- i -...----- -.......... ......... 9 ..... -.... - ....-.......... Q 0 <j 0 6G 0 -o o . _ ... .... J C GARRARD 00000733 l 9 in JOB NO. 1*053--COO ROBINSON REFINRY HOOEKNZTN PROJ-#OC REPORT NO. C38090--58 FOCUS QUANTITY AND UNIT RATE REPORT CALIBRATIONETE STNG J82 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/2*/82 PAGE 31 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT # UNIT-----------------------------QUANTITY--------------------------- OF BUCGET FCST TO THIS QUANT SOO* DATE WEEK ------------------------ MANHOURS--------------------------- --------------------UNIT MANHOURS BUDGET FCST TO THIS BUDGET FCST TO THIS SOO* OATE WEEK SOO* DATE MEEK 4* 4-4-4-44-4- ****** 444$444444444 4-4-4-4-4 4*4- *,:**, CALIBRATION E TESTIN CAL I BRAT ION TESTIN TEST E STORE CALIBRATION E TESTIN CALIBRATION G TESTIN CALIBRATION E TESTIN TEST-CAL IBRATE-STORE TEST-STORE-CALIBRATE TESTESTOREECALIB INS TESTESTOREECALIB INS TESTESTOREECALIB INS TESTESTOREECALIB INS TESTESTOREECALIB INS TESTESTOREECALIB INS A 16J 82 A31J82 B09J82 B23J82 B28J82 B29J82 852182 B99J82 C51J82 C52J82 C53J82 C54J82 C55J82 C56J82 EA EA EA EA EA EA EA EA EA EA EA EA EA EA **T0TAL CALIBRATIONETESTNG TREND FORECAST MH 1077 1 1*9 310 128 72 *3 * *27 282 356 313 208 272 6*5 7 22 80 12 18 10 6 *03 302 391 352 201 253 63* 7 22 80 12 18 10 8 *03 302 391 352 201 253 36*2 270* 2693 7087 TREND FORECAST PERF 59 6515 16 0 3*5 0 1 7*8 0 737 0 *59 0 2 71 0 23 0 1806 u 1160 0 1552 0 1318 0 852 0 11*2 3286 10 85 639 30 37 25 11 729 536 652 *73 353 716 2709 * 85 639 30 87 25 11 729 536 652 *73 353 716 11* 0 0 0 0 0 0 0 0 0 0 0 0 0 60 1793* 7632 70*9 11* .56 $$ PERFORMANCE RATIOS ** 6.05 6.00 2.32 5.6* 5.76 6.38 6.30" 5.75 *.23 *.Il *.36 *.21 *.10 *.20 *.92 1.00 5.09 1.43 3.86 7.99 2.50 *.83 2.50 1.38 1.81 1.77 1.67 1.3* 1.7 6 2.83 2.82 .60 *.27 .57 3.86 7.99 2.50 *.83 2.50 1.38 1.81 1.77 1.67 1.3* 1.76 2.83 2.62 .56 1.93 .00 . .00 .00 .00 00 00~ .00 .00 .00 .00 *00 .00 .00 1.90 .31 o 9 8 9 9 9 9 9 9 ?n .>9 10 GARRARD 00000734 :9 9o ') O' ft f t ' i f R 9 I> 1 f. JUB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT DISPOSAL EXIST INS J95 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/29/82 PAGE 32 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT it OF BUCGET FCST QUANT 0009 $$ **********4 TO THIS OATE WEEK ******* BUDGET FCST TO 0009 DATE ******** ************ ****** THIS WEEK BUDGET FCST SG09 TO THIS DATE WEEK irvvrvr'rir rvvr vv EMERGENCY SO REUUN0A A16J95 UNITS EMERGENCY SO REDUNDA B23J95 UNITS EMERGENCY SO REDUNDA B28J95 UNITS EMERGENCY SO RE0UN0A B29J95 UNITS 100 100 100 100 100 0 0 0 100 0 0 0 0 1177 0 999 0 660 0 75 95 3 0 0 0 953 0 0 0 0 11.77 9.53 9.53 0 9.99 .00 .00 0 6.60 00 .00 0 .75 .00 .00 .00 .00 .00 .00 **TUTAL DISPOSAL EXIST INS 900 100 100 0 2361 953 953 0 5.90 9.53 9.53 .00 TREND FORECAST MH 953 TRENO FORECAST PERF .38 PERFORMANCE RATIOS 1.00 .38 .38 .00 ?<: 21 21 >3 a ' 4 <9 ; 9 13 If. r ?i ? r 1H =' " .................. -................................................ -............................................................ 41 I" ' -.......... -..........- -- ----------------------- - -........-.......... ------------------ --- ....... -.................- ............................ .......................... ........ -........ .... -- -........ ----- -........... -.......-- -....... -...............- - - - - 5 5/ 9 --............. 9 O ,3 .................-................. - -..... .. ............ .....-- O' O 7 o o GARRARD 00000735 fil e r 19 ?? ?3 2` ; JOB NO. 14053-000 ROBINSON REFINRY MQDERNZTN PROJ- MOC RtPQRT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT STEAM TRACE PIPESH L10 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 33 BUDGET WEEK 116 CF 121 --"-- OF 8UCGET ACCT ii QUANT S/B 6 STM.TRACE SUBH A06L10 LF S/B 1. STM.TRACE SUBH A11L10 LF S/B 2 STM.TRACE SUBH A12L10 LF S/B 3 STM.TRACE SUBH A13L 10 LF S/B 4E7 STM.TRCE SUB A14L10 LF S/B 5 STM.TRACE SUBH A15L10 LF S/B 8 STM.TRACE SUBH A1BL10 LF S/B 9 STM.TRACE SUBH A19L10 LF STEAM TRACE PIPE-SUB B09L10 LF STEAM TRACE PIPE-SUB B23Lio LF STEAM TRACE PIPE-SUB B2BL10 LF STEAM TRACE PIPE-SUB B29LI0 LF STEAM TRACE PIPE-SUB B32L10 LF STEAM TRACE PIPE-SUB B99L10 IF MORRIS-STEAM TRACE P S09L10 LF ALLENSTEAM TRACE PIP S29L10 LF HOKE --STEAM TRACE PI S32L10 LF 10 10 10 10 10 10 10 10 0 5 2 0 0 33 3 52 32 FCST #004 402 357 1432 449 1155 345 1489 383 0 1279 412 0 0 1093 1461 211 34 7 TO DATE THIS BUDGET WEEK 402 357 1432 449 1155 345 1488 383 0 1279 412 0 0 1093 1461 211 347 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 11 11 11 11 11 11 11 0 7 3 0 0 55 5 69 41 FCST SO 04 589 739 2811 1115 1620 516 3617 523 40 3147 639 47 1 267 8 1142 434 439 TO DATE THIS BUDGET WEEK IIMtT MAf FCST TO #004 OATE THIS WEEK 589 739 2811 1115 1620 516 3617 523 40 3147 639 47 0 2678 1290 217 26 0 1.10 1.47 1.47 .00 0 1.10 2.07 2.07 .00 0 1.10 1.96 1.96 .00 0 1.10 2.48 2.48 `.00 0 1.10 1.40 1.40 .00 0 1.10 1.50 1.50 .00 0 1.10 2.43 2.43 .09 0 1.10 1.37 1.37 .00 0 .00 .00 .00 .00 0 1.40 2.46 2.46 .00 0 1.50 1.55 1.55 .00 0 .00 .00 .00 .00 0 .00 .00 .00 .00 0 1.67 2.45 2.45 .00 0 1*67 .78 .88 .00 0 1.33 2.06 1.03 .00 0 1.28 1.27 .07 .00 S3TOTAL STEAM TRACE PIPESH TREND FORECAST MH 19616 TRENO FORECAST PERF 1.40 268 20097 19614 PERFORMANCE RATIOS 0 1.44 1.40 .00 o 9 9 oO GARRARD 00000736 O C: O JOB NO. 14053--000 FOCUS ROBINSON REFINRY MOOERNZTN PROJ-MOC QUANTITY AND UNIT RATE REPORT REPORT NO. C38090-58 SPL 2 INESM PIPE Lll 6 1 H1^ vU Uli 1 1 A U11 3 OF BUDGET FCST TO THIS BUDGET 4 ACCT # QUANT #004 DATE WEEK 6 ********************************** $* $ ************** FCST #004 PERFORMANCE WEEK ENDING BASEO ON 5/21/82 DATE 5/244/82 PAGE 34 BUDGET WEEK 116 OF 121 TO DATE THIS BUDGET FCST TO WEEK #004 OATE ******* ********* ******* THIS WEEK ******* e 1 ; : ' SMALL BORE CS PIPE S AOfaLll LF 8 SMALL BORE CS PIPE S AULI1 LF '> small bore cs pipe s Ai2Lii LF 10 SB CS PIPE-RACK S A13LI1 LF " SMALL BORE CS PIPE S A14L11 LF SMALL BORE CS PIPE S A15L11 LF 13 INST CS PIPE 21N U A16LI1 LF M SMALL BORE CS PIPE S A17L11 LF SMALL BORE CS PIPE S A18L11 LF '8 SMALL BORE CS PIPE S AI9L11 LF INST CS PIPE 2IN U A21LU LF R INST CS SPLD 2IN U B09L11 LF IP INST CS PIPE 2IN U B21L11 LF z.; INST CS PIPE 2IN U B23L1I LF 2. INST CS PIPE 2IN U B24L11 LF n INST CS PIPE 2IN U B25L11 LF INST CS PIPE 2IN U B28L11 LF INST CS PIPE 21N U B29L11 IF > INST CS PIPE 2IN U B32L11 LF INST CS PIPE 2IN E U B35L11 LF 71 SMALL BORE PIPE B41L11 LF 79 SMALL BORE PIPE B42L11 LF SMALL BORE PIPE 30 SMALL BORE PIPE B43H1 LF B44LI1 LF SMALL BORE PIPE B45L11 LF 3? INST CS PIPE 2IN U B99L11 LF )3 INST CS PIPE 2IN U C51L11 LF H INST CS PIPE 2IN U C52L11 LF 33 INST CS PIPE 21N U C53L11 LF 3C INST CS PIPE 2IN U C54LI1 LF 3? INST CS PIPE 21N E U C55L11 LF INST CS PIPE 21N U C56L11 LF 30 MORRIS - 2"E UNOER R S09L11 LF 30 ALLEN2" UNDER RK S29LII LF 1, INST SC PIPE 2IN E U S31L11 LF HOKE--2" UNOER RK S32L11 LF 13 INST CS PIPE 2IN U S45L11 LF 4., HOKE-2" E UNDER RK S99L11 LF SSTOTAL SPL 2 INSM PIPE 689 2031 5395 3100 2555 2852 6790 1343 6978 3036 33 0 0 5168 10 10 4483 263 0 170 0 0 1111 4024 440 39 1460 1015 435 1370 700 1070 3366 2541 3822 703 185 4 794 2169 5267 3189 2496 5248 0 1607 6732 2113 1636 0 0 3052 2031 1542 3083 83 0 0 0 0 2066 8391 1430 406 0 0 0 0 0 0 2039 1486 556 1395 600 46 794 2169 5267 3189 2496 5248 0 1607 6732 2108 1636 0 0 3053 2031 1542 3083 83 0 0 0 0 2066 8391 1430 406 0 0 0 0 0 0 2039 1486 556 1395 600 46 67191........ 59457...... 59453 0 524 1375 1375 0 0 2267 6726 6726 0 0 5867 19410 19608 151 0 8302 6785 6785 0 0 2512 9357 9357 0 0 26 7 5 18199 17639 29 0 7609 0 0 0 0 1867 33 71 3371 0 0 8722 21226 22072 0 0 2604 5355 5355 0 0 55 22U3 2203 0 0 0 26 26 0 0 0 0 00 0 5665 8711 8711 0 0 11 4689 4689 0 0 11 2053 2053 0 0 5058 6557 6557 0 0 241 131 131 0 0 0 81 81 0 0 180 0 0 0 0 0 305 305 0 0 0 32 32 0 0 1759 1222 1222 0 0 6264 9032 9032 0 0 762 430 430 0 .76 1.12 1.09 2.68 .98 .94 1.12 1.39 1.25 .86 1.67 .00 *00 1.10 1.10 1.10 1.13 .92 .00 1.06 .00 .00 1.58 1.56 1.73 1.73 3.10 3.69 2.13 3.75 3.47 .00 2.10 3.15 2.53 1.35 .00 .00 2.85 2.31 1.33 2.13 1.58 .00 .00 .00 .00 .59 1.08 .30 1.73 3.10 3.72 2.13 3.75 3.36 .00 2.10 3.28 2.54 1.35 .00 .00 2.85 2.31 1.33 2.13 1.58 .00 .00 .00 .00 .59 1.08 .30 .00 .00 .00 .00 .00 oo .00 .00 .00 .00 .00 .oo .00 .00 .00 .00 oo 00 .00 .00 00 .00 .00 00 .00 " ,, M w " ,, ? ^ ?r ,, . ; ,? >1 " ,, " ,0 " 0 66 0 1760 0 1225 0 525 0 1650 0 840 0 1290 0 4337 0 2 700 0 4914 0 676 803 11 0 0 0 0 0 2906 2592 693 2045 803 11 0 0 0 0 0 3553 1643 696 3490 0 1.69 1.93 1.98 .00 ' 0 1.21 .00 .00 00 ,, 0 1.21 .00 .00 .00 v 0 1.21 .00 .00 .00 " 0 1.20 .00 .00 .00 ,, 0 1.20 .00 .00 .00 v> 0 1.21 .00 .00 .00 0 1.29 1.43 1.74 .oo 0 1.06 1.74 1.11 .00 0 1.29 1.25 1.25 .00 '' 0 .96 1.4 7 2.50 oo ; 0 320 1213 0 5 101 508 147 0 1.73 2.02 .85 .00 W 0 1.25 2.20 3.20 .00 ; o 83263 137640........138611 ... 180.... Cl 1.24 .....2.31 ....2.33... ... .00....'......... o, ______ ____ _____ TREND FORECAST MH 138625 TREND FORECAST PERF 1.79 - --........... PERFORMANCE RATIOS.................. 1.00 1.78 1.79.... 00 GARRARD 00000737 --.................................' -................ V. -................... o o m JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC 9 REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT SPL 2.5-6 IN PIPE L12 ' c< ACCOUNT 3 .......................... DESCRIPTION ACCt# t OF BUDGET FCST TO QUANT #004 ~ DATE ************* THIS BUDGET MEEK FCST #004 PERFORMANCE WEEK ENDING BASED ON 5/21/B2 DATE 5/24/82 PAGE 35 BUDGET WEEK 116 OF 121 TO DATE THIS BUDGET MEEK *$***$*= *$$**** IIKlTT FCST #004 MANUntiDC--. TO DATE THIS WEEK -r vr tt* r r o II 17 ,r Ifl .3 * i2 .`0 n ,4 ic LARGE BORE CS PIPE S A06L12 LF LARGE BORE CS PIPE S A11L12 LF LARGE BORE CS PIPE S A12L12 LF LB CS SPOOLS S A13L12 LF LARGE BURE CS PIPE S A14L12 LF LARGE BORE CS PIPE S A15L12 LF LARGE BORE CS PIPE S A17LI2 LF LARGE BORE CS PIPE S A18L1Z LF LARGE BORE CS PIPE S A19L12 LF LARGE BURE CS SPLO P A21L12 LF INST CS SPLD JIN TO B09L12 LF LARGE BORE CS SPLO P B21L12 LF INST CS SPLO 3IN TO B23L12 LF INST CS SPLD JIN TO B24L12 LF INST CS SPLD 3IN TO B25H2 LF INST CS SPLO 3IN TO B28LI2 LF INST CS SPLO JIN TO B29L12 LF INST CS SPLO 3IN TO B32L12 LF LARGE BORE SPOOLEO P B41H2 LF LARGE BORE SPOOLEO P B42H2 LF LARGE BORE SPOOLED P B43L12 LF LARGE BORE SPOOLEO P B44L12 LF LARGE BORE SPOOLED P B45L12 LF INST CS PIPE GTR THA B99L12 LF MORRIS - 3"E OVER SP S09L12 LF ALLEN3" 6 OVER SPOOL S29L12 LF INST CS SPLO JIN TO S31L12 LF HOKE--3" C OVER SPOO S32L12 LF LARGE BORE CS SPLD P S45L12 LF HOKE-3" 6 OVER SPOOL S99L12 LF 343 1652 2436 463 2177 1430 1027 2081 1453 26 0 0 5086 10 10 1705 561 0 719 439 327 1581 25 239 1409 874 1125 1957 116 6 505 3070 4623 866 4003 3503 1909 2832 2227 1053 0 0 3711 2531 1687 1102 534 0 1812 1093 718 3B74 56 882 2261 1266 586 1120 269 199 505 3070 4623 866 4003 3503 1908 2832 2227 1053 0 0 3711 2531 1687 1 102 534 0 1812 1093 718 3874 56 882 2261 1266 586 1120 269 199 0 721 0 3918 0 5116 0 1115 0 5270 0 3132 0 2262 0 4100 0 3218 0 50 00 00 0 13915 0 27 0 27 0 2933 0 1112 00 0 1189 0 840 0 632 0 3086 0 59 0 345 0 2973 0 2210 0 2047 0 5211 0 266 0 11 1175 9299 17803 7677 16034 21462 6841 22007 11512 674 5 302 l 12587 749 3 5281 3475 3142 361 4956 2999 2512 13036 409 2205 6891 3763 2549 5521 447 507 1175 9299 17811 767 7 16034 21512 6841 22114 11512 6745 302 0 12583 7493 5281 3475 3156 361 4956 2999 . 2512 13036 409 2205 6664 4137 2549 5241 2086 202 0 2.10 2.33 2.33 .00 0 2.37 3.03 3.03 .00 0 2.10 3.85 3.85 .00 0 2.41 8.86 8.86 .00 0 2.42 4.01 4.01 .00 0 2.19 6.13 6.14 .00 0 272 0 3.58 3.59 .00 0 1.97 7.77 7.81 .00 0 2.21 5.17 5.17 .00 0 1.92 6.41 6.41 .00 0 .00 .00 .00 .00 0 .00 .00 .00 .00 0 2.74 3.39 3.39 .00 0 2.70 2.96 2.96 .00 0 2.70 3.13 3.13 .00 0 1.72 3.15 3.15 .00 0 1.98 5 .88 5.91 .00 0 .00 .00 .00 .00 0 1.65 2.74 2.74 .00 0 1.91 2.74 2.74 .00 0 1.93 3.50 3.50 .00 0 1.95 3.37 3.37 .00 0 2.36 7.30 7.30 .00 0 1.44 2.50 2.50 .00 0 2.11 3.05 2.95 .00 0 2.53 2.98 3.27 .00 0 1.82 4.35 4.35 .00 0 2.66 ....... 4.93 4.68 od 0 2.29 1.66 7.75 .00 0 1.83 2.55 1.02 .00 <1 8 ?9 S "9 > 910 1? 1.1 M9 ,e 9 9 ,0 n r. 17 IP AO -If $*TOTAL SPL 2.5-6 IN PIPE TREND FORECAST MH 29277 4 8292 48291 2003 72.... TREND FORECAST PERF 0 65785 198997 200367 0 1.87 .......... ' AX ~ PERFORMANCE RATIOS --X3C.... 2.25 4.12 4.15 .00 ... 1.00 .... 1.86 .....1.87.... .........00 ..... OELETE A16L12 Hill 0 0 0 SSTOTAL SPL 2.5-6 IN PIPE 000 TREND FORECAST MH 0 TREND FORECAST PERF 0 0 .00 0 0 0 0 .00 0 0 0 0 .00 PERFORMANCE RATIOS **......... ... .00 .00 .00 .. .00 .00 .00 .00 .00 .00 f .00 ....... - i GARRARD 00000738 -............. -............................... v. .......... -....... ..........-...... -- o GARRARD 00000739 > ' ;a ,n 12 M ' 18 ,, n >3 JOB NO. 14053-000 ROBINSON REF 1NRY MODERNZTN PROJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT INST CS RACK 31N-61 LIT i PERFORMANCE WEEK ENDING' BASED ON 5/21/82 DATE 5/24/82 PAGE 36 BUDGET MEEK 116 OF 121 ACCOUNT DESCRIPTION OF BUCGET ACCTU QUANT TA'. TAG 'ABG A't.TvrTAG ^rA'GrAiArvAGTAGWpAp A'GrJTG --TG AWlp JGVApVAGVApTAG 'ArGirApTAGrTAG MAp aGr ********** UUWlT 1 11 5--------------" FCST TO S004 DATE THIS WEEK BUDGET FCST TO THIS BUDGET S004 DATE WEEK $$$$$$$$$$$ ************* FCST SC04 TO DATE ------- THIS WEEK Lb CS PIPE-RACK S A13L17 LF LARGE BORE CS RACK P A21L17 LF LARGE BORE CS RACK P B21L1T LF LARGE BORE RACK PIPE B41L17 LF LARGE BORE RACK PIPE B42L17 LF LARGE BORE RACK PIPE B43L17 LF LARGE BORE RACK PIPE B44L17 LF LARGE BORE RACK PIPE B45L17 LF MORRIS - 3"E OVER RA S09L1T LF ALLEN- 3"6 OVER RACK S29H7 LF LARGE BORE CS RACK P S45L17 LF 13245 61 0 8357 10219 4441 29251 5011 2815 401 1419 6676 2982 0 4442 5593 2306 15448 2851 1474 224 793 6676 2982 0 4442 5593 2306 15448 2851 1474 224 793 **TOTAL INST CS RACK3IN-6I 75220 42789 42789 TREND FORECAST MH 43060 TREND FORECAST PERF 0 11746 0. 56 00 0 . 5677 0 7934 0 3733 0 2 5596 0 8361 0 2633 0 670 0 2367 5717 4766 35 4293 462 7 2486 12294 54 72 1297 334 1179 5717 4766 0 4293 4627 2486 12294 5472 454 0 2330 0 68773 42500 42439 1.10 PERFORMANCE RATIOS 0 0 0 0 0 0 0 0 0 0 0 0 .89 .92 .00 .68 .78 .84 .88 1.67 .94 1.67 1.67 .91 1.00 .86 1.60 .00 .97 .83 1.08 BO 1.92 .88 1.49 1.49 .99 1.03 .86 1.60 .00 .97 .83 1.08 .80 1.92 .31 .00 2.94 .99 1.08 .00 .00 . .00 .00 .00 .00 .00 .00 00 .00 .00 .00 .00 19 >0 )1 12 n 36 V : 40 ,t - *T ............... ................... -............ - 0 ? ,, 8 9 * 1.3 i ,, "a m m t ; n f 04 :: 9 0 ? i0 a JUB NO. 14053-000 ROBINSON REFINRY MODERN2TN PROJ -MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT SPL AL 2INESM PIPE L21 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 37 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT# > ^v^,Taw** ^'Ti.r^a*arAa**a'aif`c *,rAavWWwV. T<AWa ^aTi>r>afiirv^aV.9.i^r* OF QUANT BUCGET FCST S004 TO THIS BUDGET OATE WEEK $$ ******** FCST TO THIS #004 DATE WEEK *********** ******* .(INIT MAN BUOGET FCST TO ~S004 DATE ******** ********* THIS WEEK SB ALLOY PIPE-RACK S A13L21 LF SMALL BORE AL PIPE S A15L21 LF INST AL PIPE 2IN E U A17L21 LF SMALL BORE AL PIPE S AI8L21 LF SMALL BORE AL PIPE S A19L21 LF INST AL PIPE 21N 6 U B23L2I LF INST AL PIPE 2IN E U B28L21 LF MORRIS-ALLOY PIPE S09L21 LF 331 651 5/9 304 11 280 10 275 192 496 336 121 293 U 0 623 192 496 336 121 293 0 0 623 0 1041 0 751 0 1101 0 475 0 20 0 611 0 44 0 630 294 958 445 327 668 5800 0 1109 294 958 445 32 7 668 0 0 1171 0 3*15 1.53 1.53 0 1.15 1.93 1.93 0 1.90 1.32 1.32 0 1.56 2.70 2.70 0 1.82 2.28 2.28 0 2.18 .00 .00 0 4.40 .00 .00 0 2.29 1.78 1.88 .00 .00 .00 .00 .00 .00 .00 .00 **TOTAL SPL AL 2INESM PIPE 2441 2061 2061 0 4673 9601 3863 0 1.91 4.66 1.87 .00 TREND FORECAST MH 3863 TREND FORECAST PERF .97 PERFORMANCE RATIOS 1.00 2.42 .97 .00 9 9 GARRARD 00000740 1 i!! C o JOB NO. 14053-000 ROBINSON REFINRY H0DERN2TN PROJ-MGC I REPORT NO. C38090--53 FOCUS QUANTITY AND UNIT RATE REPORT SPL AL 2.5-61NPIPE L22 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 38 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT# UNIT ------------------OF BUCGET QUANT --QUANTITY-------------------------- FCST TO THIS #004 DATE WEEK' ------------------------ MANHGUHS ------------------------- BUDGET FCST _ TO THIS #004 DATE WEEK --------------------UNIT MANHOURS------------------ BUOGEf ^CST TO THIS ................ #004......... DATE WE EK LARGE BORE AL PIPE S A12L22 LF LARGE BORE AL PIPE S A15L22 LF LARGE BORE AL PIPE S A18L22 LF LARGE BORE AL PIPE S A19L22 LF LARGE BORE AL SPLO P U21L22 LF -- SSIUIAL SPL AL 2. 5-61NPIPE 357 121 907 7 230 1622 505 327 1289 48 0 2169 505 327 1289 48 0 2169 TREND FORECAST MH 27292 TREND FORECAST PERF 0 0 0 0 0 0 2.81 1591 574 4017 31 385 2377 5052 18764 1099 0 2377 5052 10764 1099 0 6598 27292 27292 PERFORMANCE RATIOS 4.46 4.74 4.43 4.43 1.67 4.71 15.45 14.56 22.90 .00 4.71 15.45 14.56 22.90 .00 4.07 12.58 12.58 L.OO___ .. 2.81 .....2.81 .00 .00 .00 .00 .00 .00 .......00 GARRARD 00000741 a o 0 IO I;O GARRARD 00000742 e JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090--58 FOCUS QUANTITY ANO UNIT RATE REPORT RCK AL 2.5-6IM PIP LZ4 PERFORMANCE WEEK ENOING BASEO ON 5/21/82 OATE 5/24/82 PAGE 39 BUDGET WEEK 116 OF 121 > ACCOUNT DESCRIPTION UNIT - ------------------------- QUANTITY--------------------------- ------------------------ MANHOURS- -UNIT MANHOURS OF 8UCGET FCST TO THIS BUDGET FCST TO THIS BUDGET FCST TO THIS ACCT3 QUANT ........ ..... 3004 DATE WEEK 3004 OATE WEEK ' MO 4 DATE WEEK C pvvr*^*^***^ INST AL RACK LARGE B A16L24 LF 992 0 0 0 752 0 00 .76 .00 .00 .00 LARGE BORE AL RACK P B21L24 LF 360 0 0 0 . 596 0 0 0 1.66 .00 .00 .00 **T0TAL RCK AL 2.5-6IN PIP 1352 0 0 0. 1348 0 0 0 1.00 .00 .00 TRENO FORECAST MH 2068 TRENO FORECAST PERF 2.75 PERFORMANCE RATIOS ** 1.00 oo .00 .00 9 9 1? 9 9 9 11 $ o o 0 6 ' - c * ' * > ?3 JOB NO. 14053-000 ROBINSON REFINRY M0DERN2TN PROJ-MOC REPORT NO. C38090--58 FOCUS QUANTITY AND UNIT RATE REPORT OU/G CS PIPE L 70 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE AO BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCTS OF QUANT BUDGET *********************************** FCST TO 2004 DATE ********* -A* A. A A THIS BUDGET FCST TO THIS WEEK 2004 DATE WEEK ******************** $:$$$$# BUOGET FCST SC 04 TO DATE ******* this WEEK INST U/G PIPING A 16L70 LF INSTALL U/GROUNU PIP B09L70 LF INSTALL U/G PIPE B23L70 LF INSTALL U/G PIPE B28L70 LF INSTALL U/G PIPE B29L70 LF INSTALL U/G PIPE B32L70 LF INSTALL U/G PIPING 833L70 LF INSTALL U/G PIPE B90L70 LF MORRIS-UNDERGROUND P S09L70 LF ALLENUNDERGROUNO PIP S29L70 LF HOKE--UNDERGROUND PI S32L70 LF 2301 9 490 10 5 95 1155 75 1 5 5 2303 117 990 0 180 2091 0 u 10 34 109 2303 117 990 0 180 2091 0 0 10 34 109 **T0TAL OU/G CS PIPE 4151 5834 5834 TREND FORECAST MH 12682 TREND FORECAST PERF 0 0 0 0 0 0 0 0 0 0 0 0 1.21 5083 8 581 22 7 164 2779 130 1 6 9 6263 168 1236 6 468 4257 0 0 20 74 216 6263 168 1236 6 468 4257 0 0 118 77 89 0 0 0 0 0 0 0 0 0 0 0 8790 12708 12682 0 PERFORMANCE RATIOS ** 2.21 .89 1.19 2.20 1.40 1.73 2.41 1.73 1.00 1.20 1.80 2.12 1.00 2.72 1.44 1.25 .00 2.60 2.04 .00 .00 2.00 2.18 1.98 2.72 1.44 1.25 .00 2.60 2.04 .00 .00 11.80 2.26 .82 2.18 2.17 1.21 1.21 .00 .00 .00 .00 .00 00 .00 .oo .00 .00 . 00 .00 .00 ?e 30 w 33 ---------------------- -...................................................... - ------------------- ---------- ............... ................. ------------------ ------ - -........ -...........- ................ - ....................-- -- -.............................................. --..... -..... -- - -- - -........ ................ ---------------------------- . ; ' e < ,r ,, >3 1 ,r. ; .3 ' 1!' 1 - J? .! 1.2 o S3 o ............................. - y. S' - -............. .................... ---- - ------------------- 6. 64 CS 66 cn "o o __________ ______ ___ _____.___ 5 o GARRARD 00000743 it * <> GARRARD 00000744 c st 7 ,, 9 .0 - ,2 r 16 ?? 34 25 75 n *> n " JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--58 FOCUS QUANTITY AND UNIT RATE REPORT STM TRACE TBG 180 OF BUDGET FCST TO THIS BUDGET ACCt QUANT 004........... DATE 'week *********************************** ********* $ ****** ******** FCST 004 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE PAGE 5/24/82 41 BUDGET WEEK 116 OF 121 TO THIS BUDGET FCST TO DATE WEEK 004 DATE ******* rriY**TT r- v-VT4*Tirr THIS WEEK o ' 9 5 79 STEAM TRACE TUBING S AObL80 IF STEAM TRACE TUBING S A11L80 LF STEAM TRACE TUBING S A12L80 LF STEAM TRACE TUBING S A13L80 LF STEAM TRACE TUBING S A14L80 LF STEAM TRACE TUBING S A15L80 LF INSTALL STM TRACE TU A16L80 LF STEAM TRACE TUBING S A17L80 LF STEAM TRACE TUBING S A18L80 LF STEAM TRACE TUBING S A19L80 LF STEAM TRACE TUBING S A21L80 LF STEAM TRACE TUBING A31L80 LF STEAM TRACING B09L80 LF INST STM TRACE TUBIN B23L80 LF STEAM TRACING B28L80 LF StEAM TRACING 829L80 LF STEAM TRACING B32L80 LF STEAM TRACING b99LB0 LF INST stm Trace Tuuin c5iLeo lf INSTALL STEAM TRACE- C61L80 LF INSTALL STEAM TRACE- C62L80 LF INSTALL STEAM TRACE- C63L80 LF INSTALL STEAM TRACE- C64L80 LF INSTALL STEAM TRACE- C65L80 LF INSTALL STEAM TRACE- C66L80 LF MORRIS-STEAM TRACING S09L80 LF ALLENSTEAM TRACING S29L80 LF HOKE--STEAM TRACING S32L80 LF .... 20 20 20 20 20 20 6412 20 20 20 20 20 0 250 50 0 0 50 8893 7 6050 2600 4800 4150 6250 50 50 50 844 844 632 632 2785 2408 2785 2408 1257 1257 1847 1847 00 434 3712 434 3710 984 .... 9 84 444 444 00 00 4400 4400 888 888 00 0 8359 0 8359 874 8 74 800 800 870 870 888 691 808 691 925 925 721 721 3981 3931 478 478 ....350 ...... ~ 350 0 0 0 0 0 0 0 0 0_. 0 0 0 c 0 0 0 0 0 0 0 ,0 0 0 0 0 0 ......... 0 11 491 11 431 11 1519 11 966 11 816 11 875 3432 0 11 168 11 3552 , i 59 5 11 191 11 0 0 44 135 3005 27 1327 0 121 00 27 3759 4926 495 4 411 3430 200 1475 130 2811 112 2 355 197 3502~ 27 1728 27 686 27" ..... ...... ............... " 491 431 1519 966 816 875 0 163 3652 595 191 0 44 3005 132 7 121 0 3759 495 411 200 130 112 197 122 1447 U4176 0 .55 0 .55 0 .55 0 `55 0 .55 0 .55 0 .54 0 .55 0 .55 0 .55 0 .55 0 .55 0 ;ocr 0 .54 0 S4 0 .00 0 .00 0 .54 0 .57 0 .57 0 .5 7 0 .57" 0 .59 0 .57 0 56 0 .54 0 .54 g" ---------- .54" .58 .68 .55 .40 .65 .47 .(TO .39 .96 .60 .43 .00 H30 .68 1.49 .00 .00 .45 .57 .51 .23 .15 .16 .21 .17 .43 1.44 1.31 .58 .68 .55 .40 .65 .47 CO .39 .98 ...... .60... .43 .00 .00 .68 1.49 .00 .00 .45 .57 .51 .23 .15 .16 .21 .17 .36 .87 1.19 .00 it .00 in 9 .00 1? .00 n 9.00 M .00 .00 17 .00 16 9 .00 .GO .00 .00 2: 9 700 .00 .00 .00 .00 7-1 30 .00 .00 3.- :n .00 .00 .00 .00 .11 in .00 .00 AO A. .00 -17 .00 AA ......00...... ....... -STOTAL STM TRACE TBG TREND FORECAST MH 39682 39572 395 70 21909 TREND FORECAST PERF 0 1.01 22326 22400 21907 0 PERFORMANCE RATIOS A.A .56 1.00 .57 1.03 .55 1.01 .00 .00 A6 M -.... -...... -......... .......------------- " -................ - O --.......-.... ...... -........- - ..................................- o _! 6 w c ?. ft ,u U M , , 2? 23 JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PRQJ -MOC REPORT NO. C3809O-58 F 0CU s CUANTTTY AND UNIT RATE REPORT DETAIL . L81 DATE 5/24/82 PAGE 42 PERFORMANCE BASED ON BUDGET WEEK ENOING 5/21/82 WEEK 116 OF 121 OF BUCGET FCST WTti *TAp TwTl. TwT*. ^Wp V. -TA.TAp'PVTAp'^Yp Y<Ap YAp *"Ap3<Ap^*ATpTAp1Jp* AiTAp C^Yp^CTp*TMTpSATT^P YQTpUATp ^ArpTNApTT>Ap ************ S004 ------ MANHOURS TO THIS BUDGET FCST TO THIS DATE MEEK SO 04 OATE WEEK ****** ******** ******* ************$$$#*$ S/0 6 DEKATRACE S/B 1 DEKATRACE S/B 2 DEKATRACE S/B 3 OEKATRACE S/B ACT OEKATRACE S/B 5 DEKATRACE S/B 8 DEKATRACE S/B 9 DEKATRACE A06L81 LF A11L81 LF A12L81 LF A13L81 LF A14L81 LF A15L81 LF A i 6L 61 If A18L81 LF A19L81 LF 20 20 20 20 20 20 0 20 ..... ...20___ 1148 1456 4200 2520 2100 1904 0 4284 1428____ 1148 1456 4200 2520 2100 1904 0 4284 1428 0 0 0 0 0 0 0 0 ..... 0 11 368 368 11 794 794 11 754 754 11 1293 1293 11 838 856 11 741 761 000 11 311 311 ....11 _____ 354 ___ ..359 0 0 0 0 0 0 0 0 ...... 0 BUDGET .55 .55 .55 .55 .55 .55 .00 .55 .55 FCST SG04 .32 .55 .18 .51 .40 .39 *00 .07 .25 TO THIS DATE WEEK *rx?^v .32 .55 .18 .51 ' .41 .40 .00 .07 *25 .00 .00 .00 .00 .00 .00 .00 .00 .00 9 a ,A , '? A "1 1A , __ $$TOTAL DETAIL 88 5453 5496 0 TRENO FORECAST MH 5496 TREND FORECAST PERF .52 PERFORMANCE RATIOS 1.00 .52 .52 .00 V 10 U rj i j 1 f > ^ " . u c9 C O >o o Ori GARRARD 00000745 JOB NO. J4053-000 ROBINSON REFINRY MOOERNZTN PRQJ-MOC >' REPORT NO. C38090--58 FOCUS QUANTITY AND UNIT RATE REPORT X-RAYESTR RELIEVNG L91 DATE 5/24/82 PAGE 43 PERFORMANCE BASED ON BUDGET 1 WEEK ENDING 5/21/82 WEEK 116 OF 121 o 9 6 UNIT t)U A is 1 Ilf OF BUCGET FCST TO THIS BUOGET FCST ................... ACCTS QUANT #004 DATE WEEK ` "" ......... . #004 C * ******* TO THIS BUDGET FCST TO THIS DATE WEEK 1004 oaTe WEEK...... ******* ********* ******* * ASSIST XRAY 6 ST KEL A16L91 UNITS c ASSIST XRAY ST REL B23L91 UNITS ASSIST XRAY ST REL B3ZL91 UNITS 200 100 100 200 100 0 200 loo 0 0 1400 0 225 0 400 3471 483 0 3471 483 0 0 7.00 17.36 17.36 .00 0 2.25 4.83 4.83 .00 0 4.00 .00 .00 .00 9 9 9 c $*TOTAL X-RAYSTR RELIEVNG 400 300 300 0 2025 3954 3954 0 5.06 13.18 13.18 .00 9 TREND FORECAST MH 3954 TRENO FORECAST PERF 2.43 PERFORMANCE RATIOS 1.00 2.43 2.43 .00 c9 9 9 v 19 -'0 :;3 GARRARD 00000746 O JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-5B FOCUS QUANTITY AND UNIT RATE REPORT TIE-IN WORK L93 ' ACCOUNT DESCRIPTION , OF EUCGET FCST TO THIS BUDGET FCST ACCTIf QUANT S 004 DATE WEEK if 004 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 44 BUDGET WEEK 116 OF 121 TO DATE THIS BUDGET WEEK FCST #CC4 kiuntif?*:-- TO DATE THIS WEEK ' FAB TIE-IN SPOOLS B23L93 EA .1 SSTOTAL TIE-IN WORK 10 TREND FORECAST MH 1 36 36 1 36 36 901 TREND FORECAST PERF 0 0 1.93 13 901 901 0 13 901 901 0 ** PERFORMANCE RATIOS ** 13.00 13.00 1.00 25.03 25.03 25.03 25.03 1.93 1.93 .00 .00 .0 0 " 13 ;; 21 IS 19 K ?1 /8 l V) 13 53 1 ' GARRARD 00000747 > * ---------- ------- ..........--.... 6? 9 64 CC o :: o o o JOB NO. 14053-000 ROBINSON REFINRY MODERN!TN PROJ -HOC * REPORT NO. C3B090-5B 6 ' W) ACCOUNT DESCRIPTION OF EUCGET .............. ACCTff QUANT c6 TESTING 6 INSPECTION A16L98 LF TESTING E INSPECTION B09L98 LF TESTING INSPECTION B2IL98 LF to TESTING 6 INSPECTION B23L98 LF TESTING 6 INSPECTION B29L98 LF 12 TESTING E INSPECTION B32L98 LF testing e Inspection U33L98 LF M TESTING INSPECTION B41L98 LF TESTING INSPECTION B99L98 LF H, MORRIS-HYOROTESTING S09L98 LF ' ALLENHYDROTESTING S29L98 LF .0 TESTING INSPECTION S31L98 LF HOKE--HYOROTESTING S32L98 LF 63033 0 0 17055 0 253 1455 72732 99 4615 4570 4915 2454 FOCUS QUANTITY AND UNIT RATE REPORT TE ST INGINSPECTION L98 FCST TO #004 DATE ******* ********* 90432 0 0 24212 0 544 0 58869 18b 9292 4481 1142 1796 90432 0 0 24212 0 544 0 58869 186 9292 4481 842 1796 THIS WEEK 0 0 0 0 0 0 0 .0 0 0 0 0 0 BUDGET ******** 6698 0 0 19-33 0 18 255 5158 7 503 4 33 367 179 FCST #004 16547 75 0 4195 65 11 0 2594 6 959 435 40 249 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 45 BUDGET WEEK 116 OF 121 TO DATE $$ $$ THIS BUDGET WEEK $$$ * FCST #004 TO THIS DATE WEEK ... ******* ******* 16579 0 .11 .18 .18 .00 75 0 .00 .00 .00 .00 0 0 .00 .00 .00 .00 4195 0 .11 .17 .17 .00 65 0 .00 .00 .00 .00 11 0 .07 .02 .02 .00 0 0 .18 .00 .00 .00 2594 0 .07 .04 .04 .00 6 0 *07 .03 .03 .00 1027 0 .11 .10 .11 .00 664 0 .09 .10 .15 .00 24 0 .07 .04 .03 .00 33 0 .07 *14 .02 .00 2, TOTAL TEST INGE INSPECTION 171181 190954 190654 0 15551 25176 25273 0 .09 *13 .13 .00 oo " TRENO FORECAST MH 25283 TRENO FORECAST PERF 1.39 PERFORMANCE RATIOS ** 1.38 1.39 30 > n : o 9 8 9 5 6 } 9 9 10 9 17 13 M9 If, U is 9 20 21 24 ?e 3` 3t " w 39 40 43 4C. ......... -..... ............ -..... ....................... - ................ .....-........ - -- --------- -- -...... --....-..... ------------- ----- j o i GARRARD 00000748 - --.................... -..................... -......................... .............. - ..........- - - .... -............. ................. ------------- -------- -- ------------------------------- ....... ........... --- -............. -...........- r, 0 Jj 6 3 tc 12 n ,5 JOB NO. 14053-000 ROBINSON KEFINRY MOOERNZTN PROJ-MGC REPORT NO. C38O9O-50 FOCUS QUANTITY AND UNIT RATE REPORT STEEL STRUCTURE M10 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 46 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT2 ******************** OF QUANT BUCGET ********** UUAN I l IY FCST TO oo4 DATE THIS MEEK BUDGET ******** FCST SQ04 TO OATE THIS BUDGET WEEK FCST "004 TO OATE THIS WEEK STEEL STEEL STEEL STEEL STEEL STRUCTURES STRUCTURES STRUCTURES STRUCTURES STRUCTURES A16M10 TONS B09M10 TONS B23M10 TONS 112 BM10 TONS B29M10 TONS 387 13 60 32 5 300 8 7 1 I 300 8 7 l 1 "STOTAL STEEL STRUCTURE 497 317 317 TREND FORECAST MH 18422 TREND FORECAST PERF 0 14530 0 466 0 2385 0 1725 0 200 1747 7 210 650 65 20 17477 210 650 65 20 0 0 0 0 0 0 19306 18422 18422 0 1.55 PERFORMANCE RATIOS $$ 37.55 35.85 39.75 53.91 40.00 38.85 1.00 58.26 26.25 92.86 65.00 20.00 58.26 26.25 92.86 65.00 20.00 58.11 58.11 1.55 1.55 .00 .00 .00 .00 .00 .00 .00 a 3 ? 8 1C 12 IE r. ? GARRARD 00000749 9 Q o o o JOB NO. 14053-COO ROBINSON REFINRY MOOERNZTN PROJ-MGC ft' REPORT NO. C30O9O-58 FOCUS QUANTITY AND UNIT RATE REPORT LADDER'SEPLAT HRL H20 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/02 PAGE 47 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT# OF QUANT LAOUERS 6 PLATFORMS LAOOERS 6 PLATFORMS PLATFORMS LADDERS PLATFORMS LAOOERS A16M20 B09M20 B23M20 B2BM20 TONS TONS TONS TONS BUCGET 58 13 28 1 FCST TO THIS BUDGET FCST TO THIS BUOGET #004 DATE WEEK #004 OATE WEEK *********** ********** ********** ***** ******** ******** 140 7 34 13 140 7 34 13 0 4575 13144 13144 0 842 1039 1039 0 2075 405 5 4055 0 75 1044 1044 0 78.88 0 64.7 7 0 74.11 0 75.00 UNIT FCST #004 HA fcunniK-'-- TO THIS OATE WEEK T'rn-r'rrvY- V-*TTTr 93.89 148.43 119.26 60.31 93.89 148.43 119.26 80.31 .00 .00 .00 .00 3ST0TAL LADDERSEPLAT HRL 100 194 194 0 7567 19282 19282 0 75.67 99.39 99.39 .00 TREND FORECAST MH 19202 TREND FORECAST PERF 1.29 4* PERFORMANCE RATIOS 1.00 1.29 1.29 .00 <1 9 9 9 9 GARRARD 00000750 o JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-58 6 '' ACCOUNT DESCRIPTION OF BUCGET ACCT3 QUANT 6 PIPEWAY STEEL PIPEWAY STEEL PIPEWAY STEEL K. PIPEWAY STEEL PIPEWAY STEEL PIPEWAY STEEL A16M30 A31M30 B09M30 B2IM30 B23M30 S09M30 TONS TONS TONS TONS TONS TONS 12 1 15 462 62 1 FOCUS (JUANTITY AND UNIT RATE REPORT PIPEWAY STEEL M30 FCST 3004 22 5 42 327 17 1 TO DATE $$$*$$ THIS WEEK BUOGET ******** FCST 3004 22 5 42 327 17 1 0 450 0 3B 0 5 74 0 17380 0 2340 0 38 1024 209 1458 16443 816 65 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 48 BUCGET WEEK 116 OF 121 TO THIS DATE WEEK $ BUDGET FCST 3004 TO DATE vrv**r* THIS WEEK 1024 209 1458 16443 816 39 0 37.50 46.55 46.55 0 38.00 41.80 41.80 0 38.27 34.71 34.71 0 37.62 50.28 50.28 0 37.74 48.00 48.00 0 38.00 65.00 39.00 .00 . 00 .00 .00 .00 00 **TOTAL PIPEWAY STEEL 553 414 414 0 20820 20015 19989 0 37.65 48.35 48.28 .00 TREND FORECAST MH 19989 TRENO FORECAST PERF 1.28 PERFORMANCE RATIOS 1.00 1.28 1.28 .00 16 70 . 71 22 ?i 2/ 28 8 ; e " ", " " ,t " : 7*1 ?' " * 33 3* 3? ,, A3 c c o c ......... -................-.......... -............................. -..................... .......... -............. -............. -.....-............... - - l 61 f.: o GARRARD 00000751 JOB NO. 14053--COO RUBINSON REFINRY MOOERNZTN PROJ-HOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT MISCELL STRCT STEL M40 PERFORMANCE WEEK ENDING BASEO ON 5/21/82 DATE 5/24/82 PAGE 49 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT---------------------------- QUANTITY--------------------------- OF BUCGET FCST TO THIS ACCT3 QUANT 3004 DATE WEEK r*rirTTVT^*'rvTW'rY`T'`*rv'r ******* MISCELL STRUCT STEEL B21M40 TONS 59 5 50 MISC. STEEL B32M40 TONS 17 22 22 0 MISCELL STRUCTURAL S C50M40 TONS 18 22 22 0 ------------------------ MANHOURS--------------------------- BUDGET FCST TO THIS 3004 DATE WEEK 4420 411 1220 180 1630 1341 108 1630 1341 0 0 0 --------------------UNIT MANHOURS---------------- BUDGET____FCSTTO ........... JH TS 3004 DATE WEEK 74.92 24.18 67.78 36.00 74.09 60.95 21.60 74.09 60.95 .00 .00 .00 **TOTAL MISCELL STRCT STEL 94 49 49 0 6051 3151 3079 0 64.37 64.31 62.84 .00 TREND FORECAST MH 3079 TRENO FORECAST PERF 1.2B PERFORMANCE RATIOS ** 1.00 1.31 1.28 .00 5 6 9 10 17 13 15 JOB NO. 14053-000 RUBINSCN REFINRY MODERN/TN PROJ-MOC REPORT NO. C38090-5B FOCUS QUANTITY AND UNIT RATE REPORT AREA C INSUL FSC18 NIB PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 50 BUDGET WEEK life OF 121 ACCOUNT DESCRIPTION ACCT # UNIT---------------------------- QUANTITY--------------------------- ------------------------ MANHOURS--------------------------------------------------- UNIT MANHOURS OF BUCGET FCST TO THIS BUDGET FCST TO THIS BUDGET FCSt TO QUANT #004 DATE WEEK #004 DATE WEEK #004 DATE = *********** ********* ****** ********* ******* AREA C INSULATION FS S00N18 LF 17B30 8786 8786 0 10219 6263 6263 0 .57 .71 .71 **TQTAL AREA C INSUL FSC18 17830 8786 8786 0 10219 6263 6263 0 .57 .71 .71 TREND FORECAST MH 62fe3 TREND FORECAST PERF 1.24 ** PERFORMANCE RATIOS ** 1.00 1.24 1.24 THIS WEEK .00 .00 If i* oO ' 1 9 1 5 C> ` !1 n 3 1 d o G ::o' ::o o GARRARD 00000753 o CD GARRARD 00000754 JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-HOC f? REPORT NO. C3 8090--58 FOCUS QUANTITY AND UNIT RATE REPORT BRANO EQP IN FSC21 N21 DATE 5/24/82 PAGE 51 PERFORMANCE BASEO ON BUCGET WEEK ENDING 5/21/82 WEEK 116 OF 121 e ACCOUNT DESCRIPTION UNIT -QUANTITY-------------------------- ------------------------ MANHOURS-- -UNIT MANHOURS- OF EUCGET FCST TO THIS BUOGET FCST TO THIS BUDGET FCST TO THIS ACCTtf QUANT S004 DATE WEEK ?;oo4 DATE WEEK S004 DATE WEEK A. iA. A. A. A. .A. tA. *A <A EQUIP INSLN PLT16 FS SOON21 SF 33000 29712 23973 412 11220 9233 9814 331 .34 .31 .41 <=*TOTAL BRANO EQP IN FSC21 33000 29712 23973 412 11220 9233 9814 331 .34 .31 .41 .80 TREND FORECAST MH 12163 TRENO FORECAST PERF 1.20 PERFORMANCE RATIOS 4= 1.00 .91 1.20 2.36 o 9 9 9 9 9 9 9 9 9 9 9 o Oo JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090--58 FOCUS QUANTITY ANO UNIT RATE REPORT AREAA PIP IN FSC21 N2? PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 52 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT -QUANTITY- -MANHOURS- -UNIT MANHOURS- OF EUCGET FCST TO THIS BUDGET FCST TO THIS BUOGET FCST TO THIS - ACCT 0 QUANT 0004 DATE WEEK 0004 DATE WEEK 0004 DATE WEEK ********* ************ ********* $$$***$* ' PIPE INSLTN PLT16 FS S00N22 SF 71670 50000 20970 2944 25951 18878 10270 912 3 10 s*T0TAL ARE AA PIP IN FSC21 TREND FORECAST MH 71670 50000 20970 24487 TREND FORECAST PERF 2944 1.35 25951 18878 10270 912 ** PERFORMANCE RATIOS ** .36 .36 1.00 .38 .38 1.04 49 .49 1.35 .31 .31 .86 9 9 <1* & # to GARRARD 00000755 9 O o Co O JOB NO. 1*1053-000 ROBINSON REFINRY MODERN!TN PROJ-MOC 9 REPORT NO. C30O9O-5B F 0C0 S QUANTITY AND UNIT RATE REPORT AREAB EQP IN FSC29 N23 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/29/82 PAGE 53 BUCGET WEEK 116 OF 121 s 9 ACCOUNT DESCRIPTION UNIT UNIT MAN OF EUCGET FCST TO THIS BUDGET FCST TO THIS BUDGET FCST TO THIS .......................ACCT# QUANT #009 DATE MEEK #009 DATE WEEK TRTOTf..... DATE..... SEEK ... ~ e9 SF 12B30 12288 12288 80 3977 1800 609 7 0 .31 P*TOTAL.... AREAB EQP IN FSC29 12830 12288 12288 80 3977 1800 6097 0 .31 TREND FORECAST MH 6097 TREND FORECAST PERF 1.59 PERFORMANCE RATIOS 1.00 .15 .15 .97 .99 .99 1.59 .00 .00 .00 9 3 19 9 9 9 9 O o o'. o o; 9 9 9 GARRARD 00000756 9 9 O n ft JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MCC REPURT NO. C38090-50 FOCUS QUANTITY AND UNIT RATE REPORT AREAS PIP IN FSC24 N24 OATE 5/24/82 PAGE 54 PERFORMANCE BASED ON BUOGET WEEK ENDING 5/21/82 WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCTJf UNIT OF eUCGET QUANT ---QUANTITY---------- FCST TO #004 DATE THIS BUDGET WEEK -MANHOURS-------------------------- FCSJ TO THIS #004 ~ OATE WEEK ------------BUOGET -UNIT MANHOURS- _F_C__S_T____ tO #004 DATE THIS WEEK PIPE INSLTN OFFPL FS S00N24 ELF 73914 44000 24767 T^TOTAL.....AREAB PIP IN FSC24 73914 44000 24767 TRENO FORECAST MH 14948 TRENO FORECAST PERF 1330 19957 14750 0414 832 1330 19957 14750 8414 032 1.26 PERFORMANCE RATIOS *4= .27 .27 1.00 434 *34 1.24 .34 .34 1.26 63 .63 2.32 <1 GARRARD 00000757 t > ;;o oO CO m O O GARRARD O* c 3 c JOB NO. 14053-000 ROBINSON REF I NRY MOOERNZTN PROJ-MOC REPORT NO. C38090r58 FOCUS QUANTI TV AND UNIT RATE REPORT FRPF VSL SKT OFFPL N25 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 55 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT UNIT---------------------------- QUANTITY------------- OF BUDGET FCST TO QUANT #004 DATE THIS WEEK BUDGET ------ MANHOU RS-------------- FCST TO THIS 0ATE WEEK BUDGET MANHOURS-- FCSf TO THIS S0C4 DATE WEEK FIREPRF VSSL SKRT OF S0CN25 SF 60TOTAL FRPF VSL SKT OFFPL TREND FORECAST MH 2200 9747 9746 1032 TREND FORECAST PERF 352 .90 260 2500 1032 135 260 2500 1032 135 ** PERFORMANCE RATIOS .12 1.00 .26 2.17 .11 .90 3.25 IQ , 9 9 9 " >1 n 3? 9 36 3 1C 31 o*7 A3 :: o. :; 3 9 57 :i ooooo O cn : r.Fi ; ::: :: o o 1 6 ' " JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ- MOC REPORT NO. C38090--58 ACCOUNT DESCRIPTION **$$*** ACCTS UNIT OF EUCGET QUANT FOCUS QUANTITY AND UNIT RATE REPORT FRPF STR STL OFFPL N26 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 56 BUCGET WEEK 116 OF 121 -QUANTITY- FCST TO #004 DAT THIS WEEK BUDGET jA. V. .A. A --MANHOURS- FCST TO #004 jA. jA. .fc A. . DATE THIS BUDGET WEEK -UNIT MANHOURS- FCST TO #004 DATE THIS WEEK FIREPRF STR STEEL OF S00N26 CF S*T0TAL FRPF STR STL OFFPL TRENO FORECAST MH 1323 2893 2793 2064 TREND FORECAST PERF 197 .20 4661 2000 1993 65 4661 2000 1993 65 ** PERFORMANCE RATIOS ** 3.52 1.00 .69 .71 .20 .20 .33 .09 in V 30 GARRARD 00000759 9 O oo o O e ' 4 : I' 5* 1? i:, JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PRUJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY ANO UNIT RATE REPORT FRPF VSL SKT PL 16 N27 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 57 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT it UNIT OF QUANT BUCGET ----- QUANT ITY-------------- FCST TO 0004 DATE THIS WEEK -----------------MANHOURS----------------- BUDGET FCST TO THIS #004 DATE WEEK --UNIT MANHOURS- BUDGET FCST TO #004 DATE THIS WEEK FIREPRF VSSL SKRT-PL SOOM27 SF **T0TAL FRPF VSL SKT PL 16 TREND FORECAST MH 5750 7850 6641 2244 TREND FORECAST PERF 2736 2.38 690 0 1898 436 690 0 1898 436 PERFORMANCE RATIOS .12 1.00 O O .00 .29 .16 2.38 1.33 o 3 O o o 3 3 3 GARRARD 00000760 9 O o . A . JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PRGJ-MCC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT FRPF STR STL PL 16 N28 PERFORMANCE MEEK ENDING BASED ON 5/21/82 OATE 5/26/82 PAGE 58 BUCGET KEEK 116 OF 121 ACCOUNT DESCRIPTION ............. ............ ACCTS A A Ar .A. Ar A. A. A. A. .W A A. A' A. A. A. A. A* A. A. A. UNIT---------------------------- QUANTITY--------- OF BUCGET FCST TO QUANT ..................... #004 .....DATE A A A A A AAA A. <A A. A. jV ^ AA AAA A AA^ A. A. A A A A A --------- ------------------------ MANHOURS--------- THIS BUDGET FCST TO WEEK #004 ... DATE A'r. rA'.KMW A'vAr. -Ar. Av. irATAWXA. 'Ar.nA*'AT. AV AbYvA.rAr.vMbYA. T*^b TA. AT. ATAi.rAir. ArT^W A'i.'Ar. --------- --------------------UNlt MANHOURS-----------------THIS BUDGET FCST TO THIS WEEK ............ " ..... ' #004....... DATE........ WEEK FIREPRF SfR.STEEL-PL S00N28 SF........ ..... 27 .. 1022 213 0 95 0 168" 0 " 3752 700 .73 .00 `TOTAL FRPF STR STL PL 16 TRENO FORECAST MH 806 TREND FORECAST PERF .22 95 0 168 0 -= PERFORMANCE RATIOS ** 1.00 .00 .22 .00 ?< 4? ooo 03 IT -10 <16 5? 60 fS CR 10 GARRARD 00' c r ' .i A 6 / c0 * " - JOB NO. 14053-000 ROBINSON REFINRY M00ERN2TN PROJ-MCC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT INSULATE INSTRUMTS N30 PERFORMANCE WEEK ENDING BASEO ON 5/21/82 DATE 5/24/82 PAGE 59 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION :$ A* ACCT Hr *A, <A. # UNIT OF QUANT fc:*:**** BUDGET INSTR INSULATION OFF S00N30 EA FIREPROOFING LUGS AlbN30 UMTS FIREPROOFING LUGS B23N30 UNITS 1 1 1 FCST TO THIS BUDGET FCST #004 DATE WEEK #004 ********** ******* ******* ******** *********** TO OATE 188 827 725 10 827 725 0 0 0 5 0 32 l 849 849 1 808 808 THIS BUDGET FCST WEEK #004 $$$$$ ********* ******** TO DATE 32 5,00 .00 3.20 0 1.00 1.03 1.03 . .0 1.00 l.ll 1 11 THIS WEEK ******* .00 .00 .00 $TUTAL INSULATE INSTRUMTS 7 1657 168 9 32 TREND FORECAST MH 2597 TREND FORECAST PERF 1.04 PERFORMANCE RATIOS 1.00 .66 1.05 .00 o ; 4 6 8 <> 10 ,, IF y. ? 2 7f o 28 31 o 13 o 3/ o A? 1 ............ -........ 41 - .........-....................................... ........................* ............... ...................-............. -- -................... - - -.......... -............ -- '......... .......................... .....-..... ------------------ ------- ....................... -........- GARRARD 00000762 IB 3 ......... -............................... ............................-- ................................ - ......------- --------------- --------- r,' - -......................... ------------------------- 6/ .................. -.............- .................................................. o o oo GARRARD 00000763 0 7 (i ' t) M 16 10 19 ?1 a JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PRQJ-MOC REPORT NO. C30090--5B FOCUS GUANTITY ANO UNIT RATE REPORT FIREPROOF STRUT SL N40 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/02 PAGE 60 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT it OF QUANT eUCGET FIREPROOF STRUCT STE B23N40 CF FIREPROOF STRUCTURAL B28N40 CF FIREPROOF STRUCT STE B29N40 CF 3537 891 243 FCST 3004 0 0 0 TO DATE THIS BUDGET FCST TO WEEK 3004 DATE ******* ********************* 0 0 12462 0 0 0 0 3200 0 0 0 0 900 0 0 THIS WEEK BUDGET FCST TO THIS 3004 DATE WEEK ******** TTVn-TT-r-rvr-r'rT 0 3.52 .00 .00 .00 0 3.59 .00 .00 .00 0 3.70 .00 .00 .00 SSTQTAL FIREPROOF STRUT SL 4671 0 0 0 16562 0 0 0 3.55 .00 .00 .00 TRENO FORECAST MH 0 TREND FORECAST PERF ** PERFORMANCE RATIOS 1.00 .00 .00 .00 zs 'I? ? 3 ' l? ' 70 ?; 7fc ' " 39 V <12 44 o ........ -.......................... - 51 J; 9 s: a .............. -..............- --..........-.....-- ........................... * O'"' ............----------- --------------------- 6i 6FT t' C o C! .......--....... ........ _____________ o f o o JOB NO. 1 <(053-000 ROBINSON REFINRY MODERN/TN PROJ-MQC REPORT NO. C38090-58 ACCOUNT DESCRIPTION UNIT------------------OF BUCGET Af.CT m..... QUANT................. " FOCUS UUANTITY AND UNIT RATE REPORT POWER DISTRB EQP Pll PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 61 BUCGET WEEK 116 OF 121 --QUANTITY------ FCST TO S004..... ~ DATE THIS WEEK -MANHOURS------------ BUDGET FCST TO ...... "SQOT " DATE THIS WEEK BUDGET ..... ' -UNIT MANHOURSFCST TO THIS .1004 DATE .......WEEK POWER DISTRIBUTION E B30P11 EA D1STRBT HGH VLTG PWR C50P11 EA TOTAL' POWER DIS TRB EQP......... . TRENO FORECAST MH 12 11 11 815 TRENO FORECAST PERF 2590 360 359 456 359 456 287.78.. ...44.88 44.88 120.00 152*00 152.00 0 2950 815 815 0 245.83 74.09 74.09 .31 PERFORMANCE RATIOS 1.00 .31 .31 *00 .00 .00 .00 GARRARD 00000764 ? 8 13 14 If. " K ?t r\ .'8 ii 14 JOB NO. 14053-000 ROBINSON REFINRY MODERNZTA PROJ-MOC REPORT NO. C38090-58 ACCOUNT DESCRIPTION UNIT---------OF EUCGET . ACCT # QUANT FOCUS QUANTITY AND UNIT RATE REPORT POWERECONTROL EQUP P12 PERFORMANCE WEEK ENOING DATE 5/24/82 PAGE 62 BASED ON BUOGET 5/21/82 WEEK 116 OF 121 --QUANTITY FCST TO #004 DATE THIS WEEK ------- MANHOURS BUDGET FCST TO #004 DATE THIS WEEK . .. -UNIT MANHOURS-- BUDGET FCST TO THIS #004 DATE WEEK 0 a s POWER CONTROL EOUI A16P12 EA POWER CONTROL EOUI B09P12 EA POWER E CONTROL EGUI B21P12 EA POWER CONTROL EQUI B23P12 EA POWER CONTROL EOUI B28P12 EA POWER CONTROL EGUI U29P12 EA POWER CONTROL EOUI B32P12 EA POWER CONTROL EOUI C51P12 EA POWER CONTROL EGUI C52P12 EA POWER CONTROL EOUI C53P12 EA POWER CONTROL EQUI C54P12 EA POWER CONTROL EOUI C55P12 EA 127 16 10 44 8 11 8 22 9 23 22 20 204 13 a 52 0 17 15 19 24 41 49 60 204 13 8 52 0 17 15 19 24 41 49 60 SSTGTAL POWERECONTROL EQUP 320 502 5 02 TREND FORECAST MH 12022 TREND FORECAST PERF POWER E CONTROL EQUI C50P12 UNITS 108 100 100 0 6218 0 755 0 640 0 2 400 0 294 0 480 0 480 0 7 72 0 160 0 480 0 810 0 320 5664 174 97 1239 8 289 602 593 440 915 1099 821 5745 174 97 1239 8 289 602 593 440 915 1099 821 0 .59 13809 11941 12022 ** PERFORMANCE RATIOS 0 1U20 462 462 48 0. 0 0 0 0 0 0 0 0 0 48 0 48.96 47.19 64.00 54.55 36.75 43.64 60.00 35.09 17.78 20*8 7 36.82 16.00 43.15 1.00 9.44 27.76 13.38 12.13 23.83 .00 17.00 40.13 31.21 18.33 22.32 22.43 13.68 23.79 .59 4.62 28.16 13.38 12.13 23.83 .00 17.00 40.13 31.21 18.33 22.32 22.43 13.68 23*95 .59 4.62 .00 .00 .00 9; .00 .00 .00 .Off""" " .00 .00 .......00 .00 .00 : ?! ' ... ...... . ?' A : .00 : .00 .00 ; **TOTAL POWERECONTROL EQUP TREND FORECAST MH 108 100 100 462 TRENO FORECAST PERF 0 .49 1020 462 462 0 PERFORMANCE RATIOS ** 9.44 1.00 4*62 .49 4.62 .49 .00 .00 : .\ . :> r ii r r r * :7 G) > 73 73 > .i ------- 73 D M O v ........................................... O Ooo O (c3n1 . r 6 C r ................................... ------------------- ------------ ............................ ..........................*. . /o :...if it oj .............................................. "> ` O' JOB NO. 14053--000 ROBINSON REFINRY MOOERNZTN PROJ-MUC REPORT NO. C36090-58 ......... ............... - FOCUS QUANTITY AND UNIT RATE REPORT UPS EQUIP&STOBY P13 -- ACCOUNT DESCRIPTION .............. ..................ACCT 0 A* A jJ. X X X XX X X ^A. X X X X X X X X X X jJj UNIT OF QUANf BUCGET FCST 0004 TO DATE THIS BUDGET WEEK FCST 0004 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 63 BUCGET WEEK 116 OF 121 TO THIS DATE WEEK $$$$$$$ BUDGET VIVA 9 1 1 ni|M UU U J FCST TO 0004 DATE THIS WEEK EMERGENCY E STANDBY A16P13 EA EMERGENCY E STANDBY B23P13 EA EMERGENCY E UPS EQUI C50P13 EA 17 16 16 1 00 444 <=*TOTAL .... UPS EQUIPESTDBY ----- ------ TRENO FORECAST MH 2081 22 2U 20 TREND "FORECAST" PERF ` 0 0 0 0 -73 800 400 2086 524 0 1557 524 0 1557 3286 2081 2081 $$ PERFORMANCE RATIOS 0 47.06 32.75 32.75 0 400.00 .00 .00 0 521.50 389.25 389.25 0 149.36 104.05 104.05 1.00 .7 3 .73 00 .00 .00 .00 .00 o 9 8 79 9 9 to 9 1? 9 ,, 9 GARRARD 00000766 9 o e JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC r REPORT NO. C38090--58 FOCUS QUANTITY AND UNIT RATE REPORT OTHER ELECT EQUIP P15 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 65 BUCGET WEEK 116 OF 121 o ACCOUNT DESCRIPTION UNIT OF BUCGET FCST t *$$4=4^4=:* 4=4= *4=4:4: ACC T # QUANT #004 TO DATE THIS WEEK BUDGET *** FCST #004 TO DATE THIS BUOGET WEEK FCST #004 TO DATE THIS WEEK Aj AA OTHER ELECTRICAL EQU C50P15 EA **TOTAL OTHER ELECT EQUIP 131 131 204 204 204 204 0 , 4755 0 4755 3912 3912 3912 3912 0 36*30 19*18 19.18 0 36.30 19.18 19.18 .00 .oo TREND FORECAST MH 3912 TREND FORECAST PERF .53 4=4= PERFORMANCE RATIOS 4=4= 1.00 .53 .53 .00 9 ; 5 g9 8 9 " 15 9 16 9IB ?C 21 9?: ?: 74 ?r 77 9 9 9 9 9 GARRARD 00000768 9 o JOB NG. 14053-000 ROBINSON REFINRY MOOERNZTN PRQJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT PROGRAM CONTROLLER P16 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 66 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT# UNIT OF quant ****** BUDGET --QUANTITY FCST TO if 004 DATE ------MANHOURS THIS BUDGET FCST WEEK #004 ****** ****** *********** TO DATE THIS WEEK -UNIT MANHOURS- BUDGET FCST TO #004 DATE .**:*.* $* $ $ *$ * $ $# THIS WEEK REDUNDANCY ALARMS A16P16 EA........ PROGRAMABEL CONTR MA C50P16 EA PROGRAM CONTR SATELL C51P16 EA PROGRAM CONTR SATELL C52P16 EA PROGRAM CONTR SATELL C53P16 EA PROGRAM CONTR SATELL C54P16 EA PROGRAM CONTR SATELL C55P16 EA PROGRAM CONTR SATELL C56P16 EA 259 3 34 17 ... 20 20 38 28 0 4 32 31 0 2 36 0 0 4 32 31 0 2 36 0 ......**TQTAL PROGRAM CONTROLLER ......... 419 ..... 105 ~....... 105 TREND FORECAST MH 663 TREND FORECAST PERF 0 0 0 0 0 0 0 0 --- .18 320 1580 517 258 262 262 522 272 0 91 55 69 122 185 141 0 0 91 55 69 122 185 141 0 0 0 0 0 0 0 0 0 3993 663.."... 663.... 0 PERFORMANCE RATIOS ** 1.24 526.67 15.21 15.18 13.10 13.10 13.74 9.71 9.53 1.00 .00 22.75 1.72 2.23 .00 92.50 3.92 .00 .GO 22.75 1.72 2.23 .00 92.50 3.92 .00 .00 .00 *00 .00 .00 .00 .00 .00 6.31... 6.31 ....... .00...... .18 .18 .00 6 1 4 f 9 Ip 17 * JOB NO. 14053-COO ROBINSON REFINRY MQDERN2TN PROJ-MOC REPORT NO. C 38090- 58 FOCUS GUANTITY AND UNIT RATE REPORT RGS CONDUIT MAINS P20 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 6T BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCTS ************ ******** OF BUCGET QUANT ******** INST A/G RGS COND MA INST A/G RGS CONO MA INSTALL A/G RGS COT INST A/G RGS COND MA INST A/G RGS CONO MA INSTALL A/G RGS COT C50P20 C51P20 C52P20 C53P20 C54P20 C55P20 LF LF LF LF LF LF 1400 4300 1500 3295 5230 1000 WU 1 J. * V FCST TO 004 DATE 2561 3485 433 6112 14774 1789 2561 3485 433 6112 14774 1789 THIS BUDGET WEEK 0 1090 0 3370 0 1175 0 2582 0 4382 0 7 80 FCST 004 3296 3255 488 5165 6161 739 TO OATE THIS BUDGET FCST MEEK ~1?C04 ****$*** TO DATE *** THIS WEEK 3296 0 .78 1.29 1.29 .00 3255 0 .78 .93 .93 .00 488 0 .78 1.13 1.13 .00 5165 0 .78 .85 .85 .00 6161 0 .84 .42 .42 .00 739 0 .78 .41 .41 .00 **TOTAL RGS CONDUIT MAINS 16725 29154 29154 u 13379 19104 19104 0 .80 .66 .66 .00 TREND FORECAST MH.............19104.... TRENO FORECAST PERF .81 ** PERFORMANCE RATIOS ..... 1.00 ............ .81 .81.... ..... .00 8 IP 17 13 .f. 'B JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PRO J- MOC REPORT NO. C 3 6090-58 FOCUS QUANTITY AND UNIT RATE REPORT RGS BRANCH CONOUIT P21 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 68 BUOGET WEEK 116 OF 121 ` ACCOUNT DESCRIPTION 3 OF BUCGET FCST TO ******** f, A C C T if QUANT #004 Afc# * i#. JG .A. .j. .Aj WC *A ********** ******* DATE THIS WEEK BUDGET FCST S004 ******** *********** TO DATE THIS WEEK BUOGET .HMfT FCST #004 UAMlimiDC. TO DATE ****** THIS WEEK INSTALL A/G RGS CONO A16P21 LF " PLT 31 ELECT ICOMPOS A31P21 LF 9 INSTALL A/G RGS CONO B09P21 LF INSTALL A/G RGS CONO B21P21 LF 11 INSTALL A/G RGS CONO B23P21 LF INSTALL A/G RGS CONO B28P21 LF " INSTALL A/G RGS CONO B29P21 LF INSTALL A/G RGS COND B30P21 LF INST A/G RGS CONOUIT B32P21 LF ,r, INST A/G RGS CONO BR C50P21 LF INST A/G RGS COND BR C51P21 LF INST A/G RGS COND BR C52P21 LF ,4 INST A/G RGS COND BR C53P21 LF .C INST A/G RGS COND BR C54P21 LF ?! INST A/G RGS COND BR C55P21 LF ?? INST A/G RGS CONOUIT C56P21 LF M REPLACE FLEX CONDIT~ C61P21 LF REPLACE FLEX CONDIT- C62P21 LF REPLACE FLEX CONDIT- C63P21 LF -v, REPLACE FLEX CONOIT- C64P21 LF REPLACE FLEX CONDIT- C65P21 LF REPLACE FLEX CONOIT- C66P21 LF 52878 9 3814 2700 21915 5150 3685 200 5650 3550 16583 3624 11850 18318 4350 2280 37 100 1010 1000 100 50 79819 1706 5250 600 26500 5000 7500 245 7000 3965 13453 4345 12284 16641 5301 4875 915 36 89 1790 2326 1348 1094 79819 1706 5250 600 26500 5000 7500 245 7000 3965 13453 4345 12284 16641 5301 4875 915 3689 1789 2326 1348 1094 0 29106 05 0 2259 0 1696 0 12456 0 2729 0 2285 0 560 0 ' 4536 0 1917 0 9099 0 1648 0 6189 0 9399 0 2236 0 2104 0 20 0 45 0 557 0 516 0 49 0 51 45960 793 1840 291 10476 1872 2895 111 2955 2611 7300 1901 7555 9718 2251 1968 489 1137 627 1170 274 767 47120 793 1840 291 10460 1872 2895 111 2955 2611 7300 1901 7555 9718 2251 1968 489 1137 627 1170 274 767 764 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .55 .56 .59 .63 .57 .53 .62 2.80 .80 .54 .55 .45 .52 .51 .51 .92 .54 .45 .55 .52 .49 1.02 .58 .46 .35 .49 .40 .37 .39 .45 .42 .66 .54 .44 .62 .58 .42 .40 .53 .31 .35 .50 .20 .70 .59 .46 .35 .49 .39 .37 .39 .45 .42 .66 .54 .44 .62 .58 .42 .40 .53 .31 .35 .50 .20 .70 .00 .00 .00 .00 GO .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00" .00 .00 .00 **TOTAL RGS BRANCH CONOUIT 158853 205646 205645 0 89462 104961 106105 764 .56 .51 .52 .00 " TREND FORECAST MH 106105 TREND FORECAST PERF .91 ' ** PERFORMANCE RATIOS ** 1.00 .90 .91 .00 a a ? 13 l>. ?: z* ?' !.! * V 4( l SI 5- GARRARD 00000771 o- -........... ............. - ------------------------------...................... ...................... ................. 6 6* 6/ o 0 o 7 o S o C 1 '? ,, JU3 NO. 14053-000 ROBINSON REF INRY MOUERNZTN PROJ-MOC REPURT NO. C 38090-5 8 FOCUS QUANT I TV AND UNIT RATE REPORT U/G CONDUIT P22 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 69 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCTii UNIT - --QUANTITY---------- --------- ------------------------ MANHOURS--------------------------- --------------------UNIT MANHOURS------------------ OF BUCGET FCST TO THIS BUDGET FCST TO THIS BUDGET FCST TO THIS QUANT #004 DATE WEEK J!004~"... DATE WEEK 5004 OATE...... WEEK " rwir4*vrT`<i`*AAwAwvt wtxwA AwVI*.*rirvAwwwwwwwA wrirvwi* wn* irJ*brATAAAJbTJ>TiMrTirv*virv*TTTA^*ATArAVAwA. vAWvkvAAT> AVXVit>'rA`r*AAAvAJTk AT INST U/G CONOUIT INST U/G CONDUIT B32P22 LF C50P22 LF SSTOTAL U/G CONDUIT 1000 320 320 0 160 46 46 0 .16 14 .14 .00 3440 5390 5390 0 1115 152 8 1528 0 .32 .28 .28 .00 4440 5710 5710 0 1275 1574 1574 0 .29 .28 .26 .00 TREND FORECAST MH 1574 TREN0 FORECAST PERF .88 4* PERFORMANCE RATIOS 1.00 .88 .88 .00 18 ?| ?? 9 9 / GARRARD 00000772 9 d JOB NO . 14C53-000 ROBINSON REFINRY MQDERNZTN PRO J -MOC REPORT NO. C38090-58 F 0CU s QUANTITY AND UNIT RATE REPORT NON -METALLIC COND P23 PERFORMANCE WEEK ENOING BASED ON 5/21/82 OATE 5/24/82 PAGE 70 BUDGET WEEK 116 OF 121 rYYTTirr-r ACCTtf UNIT OF BUDGET QUANT $ *********** FCST #004 TO THIS BUDGET DATE WEEK ****** ********* FCST #004 TO THIS DATE WEEK ******* BUDGET FC St #004 $******$ TO DATE This WEEK INSTALL INSTALL INSTALL INSTALL NON-MET NON-MET NON-MET NON-MET CONCI CONO COMB COND A16P23 B23P23 B29P23 B30P23 LF LF LF LF 25500 3100 900 300 17676 3470 0 0 17676 3470 0 0 0 4117 0 400 0 160 0 320 4183 563 0 0 4183 563 0 0 0 16 .24 .24 .00 0 .13 .16 .16 .00 0 18 .00 .00 .00 0 1.07 .00 "TOTAL NON-METALLIC COND 298U0 21146 21146 0 4997 ^746 4746 0 .17 .22 .22 .00 TREND FORECAST MH 4746 TREND FORECAST PERF 1.44 PERFORMANCE RATIOS ** 1.00 1.44 1.44 .00 O O 9 9 9 9 9 9 io IO GARRARD 00000773 e ' ft f 6 f " ,7 13 10 JOB NO 14053-000 ROBINSON REFINRY MODERN2TN PROJ-MOC REPORT NO. C3B090-58 FOCUS QUANTITY AND UNIT RATE REPORT CABLE TRAY P25 PERFORMANCE WEEK ENDING . BASEO ON 5/21/82 OATE 5/24/82 PAGE 71 BUDGET WEEK 116 OF 121 o 9 w*i*v ACCTff mrTVTrT UNIT OF QUANT BUCGET FCST .004 TO THIS DATE WEEK ******** BUDGET FCST TO r004 DATE ******* ************ THIS BUDGET WEEK *:$$$ ** uit i i rtMiwiuurj FCST TO SC04 DATE 1 1 ! INSTALL CABLE TRAY INSTALL CABLE TRAY INSTALL CABLE TRAY INST CABLE TRAY INST CABLE TRAY INSTALL CABLE TRAY INSTALL CABLE TRAY INSTALL CABLE TRAY INSTALL CABLE TRAY A16P25 LF B23P25 LF B29P25 LF C50P25 LF C51P25 LF C52P25 LF C53P25 Lf C54P25 LF C55P25 LF 10 400 820 11220 100 200 5 100 .......... 400 895 0 0 10920 80 250 440 9r ..... 542 895 0 0 10920 80 2 50 440 97 _ 542 0 15 0 240 0 1360 0 16452 0 160 0 320 08 0 160 0 _ 640 1268 0 0 15638 907 32 8 879 335 537 1272 0 0 15638 907 328 879 335 537 0 1.50 1.42 1.42 0 .60 .00 .00 0 1.66 .00 .00 0 1.4 7 1.43 .. 1.43 0 1.60 11.34 11.34 0 1.60 1.31 1.31 0 1750 Z.00 ~2 00 0 1.60 3.45 3.45 0 1.60 .99 .99 SPTOTAL CABLE TRAY 13255 13224 13224 0 19355 19892 19896 0 1.46 1 .50 1.50 TREND FORECAST MH 19896 TRENO FORECAST PERF 1.01 s# PERFORMANCE RATIOS ** 1.01 1.01 N* oo o O THIS WEEK 9 9 .00 .00 .00 .00 .00 .00 .00.......... ' .00 .00 9 so 35 to 43 oo GARRARD 00000774 ;; o o GARRARD 00000775 GARRARD 00000776 cn 6 f) 3 c c 17 < 1/ 71 7? 7.1 ? ?K 7) ;e ?<i 17 JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090--58 ACCOUNT DESCRIPTION ACC T # UNIT UF QUANT BUDGET FOCUS QUANTITY AND UNIT RATE REPORT 600V81KV CABLE P31 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 73 BUDGET WEEK 116 OF 121 --QUANTITY--------------- FCST TO THIS #004 DATE WEEK BUDGET ------- MANHOURS FCST #004 . TO DATE __. THIS WEEK ---- BUOGET UNIT MANHOURS-- FCST TO THIS #004 DATE WEEK PULL WIRE 600V & IKV PULL WIRE 600V 8 IKV PULL WIRE 600V t 1KV PULL WIRE 600V 8 IKV PULL WIRE 600V 8 1KV PULL WIRE 600V 8lKV PULL WIRE 600V 8 IKV PULL WIRE 600V 6 IKV PULL WIRE 600V 8 1KV 600 V 6 IKV WIRE PULL WIRE 600V 6 1KV PULL WIRE 600V 8 IKV PULL WIRE 600V 8 IKV PULL WIRE 600V 8 1KV PULL 600V/1KV WIRE PULL 600V/1KV WIRE PULL 600V/I KV WIRE PULL 600V/1KV WIRE - 600V/1KV WIRE PULL 600V/1KV WIRE - A16P31 H09P31 B21P31 B23P31 B28P31 B29P31 B32P31 C50P31 C51P31 C52P31 C53P31 C54P31 C55P31 C56P31 C61P31 C62P31 C63P31 C64P31 C65P31 C66P31 LF LF LF LF LF LF LF LF LF...... LF LF LF LF LF LF LF LF LF LF LF 297010 36200 15100 66360 15420 9200 13500 7260 581 180 25 1175 580 75 19 20 375 25 20 25 252905 17400 1200 64000 12 000 12400 23870 14200 8290 6 404 12180 8804 39632 5815 1200 6972 1357 6017 ~0 0 252905 17400 1200 64000 12000 124C0 23870 14200 8290 6 404 12180 8804 39632 5815 1200 6972 1358 6017 '0 0 S3T0TAL 600VS1KV CABLE 463150 494646 494647 TRENO FORECAST MH 13488 TRENO FORECAST PERF 0 8448 6701 6732 10 .028 0 805 328 328 0 .02 2 0 560 0 1915 74 1259 74 1259 0 .037 0 .029 0 397 122 122 0 .026 0 1037 505 50 5 0 .113 0 358 728 728 0 .027 0 218 759 759 0 .030 0 31 369 369 0 .053 0 9 111 111 0 .050 0 1 616 616 0 .040 0 47 200 200 0 .040 0 31 611 611 0 *053 0 3 158 158 0 .040 0 1 37 37 0 .053 0 j-- 381 381 0 .050 0 19 41 41 0 .051 0 1 443 443 0 .040 "0 1 0' 0 0 .050 0 1 14 14 0 .040 0 13884 13457 13488 10 .030 * .798 $$ PERFORMANCE RATIOS 1 .000 *027 .019 .062 .020 .010 .041 031 .053 .045 .017 .051 .023 .015 .027 C31 053 .030 .074 000 .000 .027 .019 .062 .020 .010 .041 031 .053 .045 .0 17 .051 .023 .015 .027 .031 .055 .030 .074 .000 .000 .027 " .027 .796 .798 000 .000 .000 .000 .000 .000 .cob .000 .000 .000 .000 .000 GOO 000 .000 .000 .000 .000 .000 .000 .000 .000 >5 30 17 .................. '' .......................................... .......... ....... -......... .......... .......... ' ............. " -......... ......-.......... ---- ------ ----- ------ ------------- ----- --------- <r -1' n ;o .? S' - o 9 } 4 5 8 10 t? 13 16 " 70 ?! ?; 74 2 ?f 79 30 37 33 31 16 1? 43 46 r.1 V S' !>7 r.n 60 6 o06 C-'I ; n Q o m 1 'i 8 0 ? \-- J08 NO. 14053-000 ROBINSON REFINRY MOOEKNZTN PROJ- MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT 5KVE LARGER CABLE P32 PERFORMANCE WEEK ENDING BASED ON 5/21/82 OATE 5/24/82 PAGE 74 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT - --QUANTITY---------- ---------- ------------------------ manhours------------- ------------ --------------------UNIT MANHOURS------------------ OF EUCGET FCST TO THIS BUDGET FCST TO THIS BUDGET fCST______TO THIS ACCT it QUANT I!004 DATE WEEK " .......... ~~ 3004 DATE ...WEEK 3004 DATE WEEK 4 rr*v*r*TTTV:rv'**Y;r'rr:rrT*4`r:!:v**'!:TTi::rT?ri PULL PULL PULL PULL PULL CABLE CABLE 5KV E CABLE CABLE 5KV E 5KV E ABOVE 5KN E 5KV E ABU ABO CAB ABO ABO A16P32 B21P32 B23P32 B32P32 C50P32 LF LF LF LF LF SSTOTAL 5K V E LARGER CABLE TRENO FORECAST MH 14400 1 14 3000 12200 18285 0 1700 4400 10000 18285 0 1700 4400 10000 29615 34385 34385 2499 TREND FORECAST PERF 0 0 0 0 0 0 .866 1110 81 1 240 1223 725 0 25 126 1621 725 0 25 128 1621 2655 2497 2499 PERFORMANCE RATIOS 0 .077 0 81.000 0 .071 0 .080 0 .100 0 .090 1.000 .040 .000 .015 .029 .162 OTT .865 .040 .000 .015 .029 .162 .^73 .866 .000 .000 .000 .000 .000 .000 .000 GARRARD 00000777 o co O 0 ti > * 3 4 > 6 > 10 n 4 IB " JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ- HOC REPORT NOi C38090-58 F 0CUS QUANTITY AND UNIT RATE REPORT ELECTETC WIRE P33 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 75 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT# UNIT OF eUCGET QUANT PULL PULL PULL PULL PULL PULL PULL PULL PULL PULL PULL PULL PULL ELECTRNIC TC ELECTRNIC TC ELECTRNIC 6 TC ELECTRNIC TC ELECTRNIC TC ELECTRNIC TC ELECTRNIC TC ELECT TC MIRE ELECT TC WIRE ELECT TC WIRE ELECT E TC WIRE ELECT TC WIRE ELECT TC WIRE A16P33 B09P33 B23P33 B28P33 B29P33 B32P33 C50P33 C51P33 C52P33 C53P33 C54P33 C55P33 C56P33 LF LF LF LF LF LF LF LF LF LF LF LF LF 942 00 250 40375 3670 17100 3800 74800 99000 63300 44975 100932 83000 67000 FCST #004 *$**$ 86150 2265 30000 3065 15700 3800 11101 32303 8740 42090 38462 2678 4420 TO DATE THIS BUDGET FCST TO THIS BUDGET WEEK #004 DATE WEEK r-ri TT'VTT ******** <=*=**:!:***$*: $$$*$$$ $$$$$ 86150 2265 30000 3065 15700 3800 11101 32303 8740 42090 38462 2678 4420 0 4624 0 305 0 1792 0 222 0 875 0 190 0 3343 0 3168 0 1818 0 1855 0 3263 0 2512 0 2263 4961 77 1293 130 346 52 1144 838 174 1147 1347 88 181 4961 77 1293 130 346 52 1144 838 174 1147 1347 88 181 0 .049 0 .049 0 .044 0 .060 0 .051 0 .050 0 .045 0 .032 0 .029 0 .041 0 .032 0 .030 0 .034 FCST #004 .058 .034 .043 .042 .022 .014 .103 .026 .020 .027 .035 .033 041 TO DATE .058 .034 .043 .042 .022 .014 .103 .026 .020 .027 .035 .033 .041 THIS WEEK .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 SSTOTAL ELECTETC WIRE 698402 280774 280774 0 26230 11778 11778 0 a 038 042 .042 000 TREND FORECAST MH 11778 TREND FORECAST PERF .995 PERFORMANCE RATIOS ** 1 .000 .99 5 .995 .000 .'8 10 11 o 8 4 5 G fl * 1C 17 n M ?l ?r ? ?II 30 3' 3f :n *0 'll Jfi .... -.... -....... -- -----.......-...-... ------------------ -................ GARRARD 00000778 " " 53 fi( 01 o; " ...... ----- -- ...... ..... - ............. .......-- c oo iiittt iiiiiiittttttt GARRARD 00000779 JOB NO. 14053-000 ROBINSON REFINRY MODERN/TN PROJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT TERMNTN 600VE1KV P34 PERFORMANCE WEEK ENDING BASED ON 5/21/82 OATE 5/24/82 PAGE 76 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT OF EUCGET FCST TO THIS BUDGET ACCT # QUANT #004 OATE WEEK VT-rT'rvY'rTVTVViri-r-rrTvrTr-rTTVA **************** ********** rTYvvrv Trvvrv ********* FCST #004 TO OATE THIS BUOGET WEEK ****** NuniiR*:- FCST TO #004 DATE ******** THIS WEEK ' TERMINATIONS 600V 6 A16P34 EA n TERMINATIONS 6O0V 6 B09P34 EA 9 TERMINATIONS TESTI B21P34 EA .0 TERMINATIONS 600V U23P34 EA " TERMINATIONS 600V E B28P34 EA ,P TERMINATIONS 600V EK B29P34 EA TERMINATIONS 600V E B32P34 EA M TERMINATIONS 600 1 C50P34 EA TERMINATIONS 600V E C51P34 EA ,0 600 V E IKV TERMINAT C52P34 EA TERMINATIONS 600V E C53P34 EA IB TERMINATE WIRE 600V/ C54P34 EA 19 TERMINATIONS 600V E C55P34 EA TERMINATIONS 600V C56P34 EA 21 TERMINAT IONS-600V - C61P34 EA TERMINATI0NS-600V - C62P34 EA TERMINAT IONS-600V - C63P34 EA TERMINAT IONS-600V - C64P34 EA r, TERMINAT IONS--600V - C65P34 EA rf TERMINATIONS-600V - C66P34 EA 4148 315 20 1168 88 189 158 600 5 15 20 15 5 5 5 10 11 10 5 5 5786 100 50 800 100 300 150 652 230 " 320 274 155 751 335 258 155 72 193 0 66 5786 100 50 800 100 300 150 652 2 30 320 274 155 751 335 258 155 72 193 0 66 0 2353 0 201 4029 54 4092 54 58 0 .57 *64 .70 .54 .71 .54 .00 .00 0 157 126 126 0 7.85 2.52 2.52 .00 0 702 0 139 238 29 238 29 0 .60 .30 .30 .00 0 1.58 .29 .29 .00 0 138 0 204 0 386 141 143 378 141 143 378 0 .73 .47 .47 .00 0 1.29 .9 5 .95 *00 0 *64 .58 .58 .00 0 _ _ Q3 0 329 73 329 73 0 0 .60 .53 1.43 .23 1.43 .23 .00 .00 0 11 46 46 0 .55 .17 .17 .00 0 8 113 113 0 .53 .73 .73 .00 0 3 248 248 0 60 .33 A 33 .00 0 3 151 151 0 .60 .45 .45 .00 0 3 83 83 0 .60 .32 .32 .00 0 6 11 11 0 .60 .07 .07 .00 07 7 7 0 .64 .10 .10 .00 0 6 32 32 0 .60 .17 .17 .00 03 0 .600 0 .00 .00 .00 0 3 10 10 0 .60 .15 .15 .00 28 **TOTAL TERMNTN 600VEIKV 6797 10747 10747 0 4344 6241 6304 58 .64 .58 .59 .00 TREND FORECAST MH 6304 TREND FORECAST PERF .92 $$ PERFORMANCE RATIOS $$ .91 .92 .00 >6 ,, 9 ' . '* M ,'l ?: 'I' ,, -1. 3r ' ", 5 5-; 47 * L .....-.......... .......... -.... - ..--...... ....- ........... .............. -.... ..... fil rr, o .... -- o -o b O . ; A i| 12 '< JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-5B F 0C0S QOANTITY ANO ONIT RATE REPORT TERMNTN 5KVKABOCE P35 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 7T BOCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCTi? UNIT OF QUANT --------- QUANTITY-------------------------- ------------------------ MANHOURS----------------------1-- ------------- UNIT MANHOURS----------------- BUDGET FCST TO THIS BUDGET FCST TO THIS BUDGET FCST TO THIS 1/004......... DATE ...... WEEK ......... SC04.... DATE......WEEK...... ...... . --------- SOW-- DAT E WE EK TERMINATIONS 5KV 6 A 5KV ABOVE TERMINAT TERMINATIONS 5KV 6 A TERMINATIONS 5KV G A AI6P35 B23P35 B30P35 B32P35 EA EA EA EA SSTOTAL TERMNTN 5KVGABOCE TREND FORECAST MH 102 1 35 24 117 36 36 24 117 36 36 24 162 213 213 945 TREND FORECAST PERF 0 320 08 0 312 0 145 467 86 300 73 486 86 300 73 0 3.14 3.99 4.15 0 8.00 2.39 2.39 0 8.91 8.33 8.33 0 6.04 3.04 3.04 0 785 926 945 0 4.85 4.35 4.44 .84 PERFORMANCE RATIOS 1.00 .83 .84 .00 .00 .00 .00 .00 .00 o 9 9 9 GARRARD 00000780 O o JOB NO. 14053-000 ROBINSON REFINRY MODERN2TN PRO J-- MQC REPORT NO. C 38090--50 FOCUS QUANTITY AND UNIT RATE REPORT TERMNTN ELECTRDTC P36 6 '* ACCOUNT DESCRIPTION j OF BUDGET FCST TO THIS BUDGET FCST - ACCT If QUANT #004 DATE WEEK 5 A.A A A A A A AArA A A A A -A A A AJ ******* ***************** #004 > TERMINATIONS ELECTR A16P36 EA TERMINATIONS ELECTR B09P36 EA 9 TERMINATIONS ELECT B23P36 EA 0 TERMINATIONS ELECT B28P36 EA TERMINATIONS ELECT B29P36 EA TERMINATIONS ELECTR B32P36 EA TERM INAT IONS ELECT C50P36 EA K TERMINATIONS ELECT C51P36 EA TERMINATIONS ELECT C52P36 EA .6 TERMINATIONS ELECT C53P36 EA TERMINATIONS ELECT C54P36 EA a TERMINATIONS ELECT C55P36 EA to TERMINATIONS ELECT C56P36 EA .o TERMINATIONS ELE/TC- C61P36 EA ?l TERMINATIONS ELE/TC- C62P36 EA ** TERMINATIONS ELE/TC- C63P36 EA ri TERMINATIONS ELE/TC- C64P36 EA ?4 TERMINATIONS ELE/IC- C65P36 EA TERMINATIONS ELE/TC- C66P36 EA 6467 320 3087 418 429 180 5461 5098 2131 2243 3147 6099 3327 4 100 100 1000 18 69 7254 80 2900 400 300 180 5167 4987 1964 4047 898 3191 2063 1646 2211 1997 3009 5980 2095 7254 80 2900 400 300 180 5167 4987 1964 4047 B98 3191 2063 1646 2355 1997 3 009 5980 2095 0 3697 0 187 0 1749 0 229 0 2 72 0 235 0 3612 0 3894 0 1239 0 1248 0 1827 0 3416 0 1972 03 0 58 0 56 0 577 0 10 0 40 4485 118 970 70 225 67 2315 3180 746 2188 1940 1110 892 905 947 576 1024 1540 803 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 78 BUDGET WEEK 116 OF 121 TO THIS BUDGET FCST **D*A*TE*****W*E*E*K********** #004 TO DATE 4495 118 970 70 225 67 2315 3180 746 2188 1940 1110 892 905 947 576 1024 1540 803 0 .57 .62 .62 0 .58 1 .48 1.48 0 .57 .33 .33 0 .55 .18 .18 0 .63 .75 .75 0 1.31 .37 .37 0 .66 .4 5 .45 0 .76 .64 64 0 .58 .38 .38 0 .56 .54 .54 0 .58 2.16 2.16 0 .56 .35 .35 0 .59 .43 .43 0 *75 .55 .55 0 .58 .43 .40 0 .56 .29 .29 0 .58 .34 .34 0 .56 .26 .26 0 .58 .38 .38 THIS WEEK .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 8 ? 4 ' * I? ... 11 2* 2-1 If II IV 'n $#T0TAL TERMNTN ELEC TRTC .'9 TREND FORECAST MH 10 39698 50369 50513 24111 TREND FORECAST PERF 0 .79 24321 24101 24111 0 $$ PERFORMANCE RATIOS ** .61 1.00 .48 .79 .48 .79 .00 311 40 1? .............. -.............. -..................... - ...... -......... ---- ------------- --------- ------......... - -..... -- -........-........... ........-...... -- - ---------------- ----------- --------------- ....-....-.... -- ---- --------- --- - -------- ---- --------- -------- --------- -- -- 44 .r oo GARRARD 00000781 41 O 9 V Q G<1 /( O ............. _*________ 11 o 0 o e c> / 10 " 1? M >8 JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-58 ACCOUNT DESCRIPTION ACCT# UNIT------------------- OF BUDGET QUANT ...... FOCUS QUANTITY AND UNIT RATE REPORT ELECT/TC WIRE MAIN P37 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 79 BUDGET WEEK 116 OF 121 --QUANTITY-------------------------- FCST TO THIS 004 DATE WEEK ------------------------ MANHOURS- BUDGET____ FCST TO THIS 004 " DAT E...... WWEEEEKK BUDGET -UNIT MANHOURS- FCST TO 3004 DATE THtS WEEK PULL PULL PULL PULL PULL PULL ELECTRONIC ELECTRONIC ELECTRONIC ELECTRONIC ELECTRONIC ELECTRONIC MAIN C51P37 MAIN C52P37 MAIN C53P37 MAIN C54P37 MAIN C55P3T MAIN C56P37 LF LF LF LF LF LF $TOTAL ELECT/TC WIRE MAIN TREND FORECAST MH 5000 100 4000 7318 2000 100 6958 2239 7452 12388 5750 4065 6958 2239 7452 12388 5750 4065 18518 38852 38852 2546 TRENO FORECAST PERF 0 640 404 404 0 .13 U 13 92 92 0 .13 0 544 539 539 0 .14 0 936 1030 1030 0 .13 0 256 206 206 0 .13 0 13 275 275 0 .13 0 2402 2546 2546 0 .13 .50 PERFORMANCE RATIOS 1.00 .06 .04 .07 .08 .04 .07 .07 .50 .06 .04 .07 .58 .04 .07 .07 .55 .00 .00 .00 "05 .00 .00 .00 .50 2? o 9 o o 9 9 9 9 *e V GARRARD 00000782 co J' Co e '' 1 3 K. " 1? H, Ifl 15 21 22 ft n JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-HOC REPORT NO. C38090-58 FOCUS CUANTITY AND UNIT RATE REPORT GROUNDING P4I PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 80 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION T T TV $$ V V ACCT it UNIT OF QUANT BUCGET FCST <,`004 TO OATE THIS BUDGET WEEK FCST 3004 TO OATE THIS BUDGET FCST TO WEEK 004 DATE $$ *$$$$*$* THIS WEEK GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING B09P41 B23P41 B28P41 B29P41 B32P41 C5QP41 C51P41 C52P41 C53P41 C54P41 C55P41 C56P41 LF LF LF LF LF LF LF LF LF LF LF LF 950 1500 700 300 1340 58380 2200 2200 2200 2000 3000 1000 1000 2020 480 400 1825 17306 1000 860 540 1000 2000 0 1000 2020 480 400 1825 17306 1000 860 540 1000 2000 0 44TOTAL GROUNDING TRENO FORECAST MH 75770 28431 28431 5499 TREND FORECAST PERF GROUNDING A16P41 UNITS 10900 21815 21815 **TOTAL GROUNDING 10900 21815 21815 TRENO FORECAST MH 2580 TRENO FORECAST PERF 0 302 0 480 0 225 0 160 0 488 0 9170 0 864 0 864 0 864 0 800 0 1120 0 480 227 44 5 83 81 42 5 3019 263 177 220 365 194 0 227 445 83 81 425 3019 263 177 220 365 194 0 0 318 0 320 0 .321 0 533 0 364 0 .157 0 .393 0 .393 0 393 0 .400 0 .373 0 .480 0 15817 5499 5499 0 .209 .808 PERFORMANCE RATIOS 1 .000 0 3487 2495 2580 48 .320 0 3487 2495 2580 48 320 .370 W T PERFORMANCE RATIOS 1 .000 .227 .220 .173 .203 .233 .174 .263 .206 .407 .365 .097 .000 .193 .808 .114 .114 .358 .227 .220 .173 .203 .233 .174 .263 .206 .407 .365 .097 .000 .193 .808 1 IB .118 .370 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 . 8 ' , 1 1 , ' ' , , ; 2 ; ; ' 3 n< it ?(! GARRARD 00000783 ...................... ......................- ......... A2 -................................ ' * : C- ....................- --- -........... ........-- ........................- --------------------- ............................ -- ---------------------- -- .................. -....................... ............. -...........-........ ........ --............ ......-........--- 6' D? C 9 OS QGfi 6? fj'J Q in O O 0 6 e 3 4 6 / t .0 9" 1? JUB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PRO J -MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT GROUNOWELLS P42 PERFORMANCE WEEK ENDING BASED ON 5/21/82 OATE 5/24/82 PAGE 81 BUOGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCTS UNIT OF QUANT At tUCGET A A Atr Ai A -QUANTITY FCST TO THIS BUDGET FCST TO #004 DATE WEEK #004 DATE J ********* vttvr^ $****** ******** ************ THIS BUOGET WEEK $$*$$$$ FCST #004 TO DATE INSTALL GROUND WELL A16P42 EA 100 GROUND WELL INSTALLA C50P42 EA 100 GROUND WELL INSTALLA C51P42 EA 100 GROUNOWELL INSTALLAT C52P42 EA 100 GROUND WELL INSTALLA C53P42 EA 100 GROUNO WELL INSTALLA C54P42 EA 1U0 GROUND WELL INSTALLA C55P42 EA 100 100 101 100 100 117 100 101 100 101 100 100 117 100 101 0 236 0 356 0 237 0 237 0 237 0 237 0 237 115 535 659 180 367 350 201 115 535 659 180 367 350 201 0 2.36 1.15 1.15 0 3.56 5.30 5.30 0 2.37 6.59 6.59 0 2.37 1.80 1.80 0 2.37 3.14 3.14 0 2.37 3.50 3.50 0 2.37 1*99 1.99 **TOTAL GROUNOWELLS TOO 719 719 0 1777 2407 2407 0 2.54 3.35 3.35 TREND FORECAST MH 240T TREND FORECAST PERF 1.32 PERFORMANCE RATIOS =8=* 1.00 1.32 1.32 THIS WEEK .00 .00 .00 .00 00 .00 .00 .00 .00 ?1 ?} 24 V 21 " ,, : " - a 9 a 1 9 4 5 6 7 9 A a m9 i? 3 9 ie '?l n a n ?n 30 31 J3 }K 39 43 tf, 48 -.................... ................ ------ t. 6 r ff GARRARD 00000784 n -0 $ 0 ' 3 1 c 7 B '0 n H ill JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090--58 FOCUS OUANTITY ANO UNIT RATE REPORT ELECT HEAT TRACING P43 PERFORMANCE WEEK ENDING BASEO ON 5/21/82 DATE 5/24/82 PAGE 82 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT# UNIT OF QUANT EUCGET FCST #004 ELECT HEAT TRACING A16P43 LF ELECTRIC HEAT TRACIN U09P43 LF ELECT HEAT TRACING B21P43 LF ELECTRIC HEAT TRACIN U23P43 LF ELECT HEAT TRACING B28P43 LF ELECTRIC HEAT TRACIN B29P43 LF ELECT HEAT TRACING B32P43 LF ELECT HEAT TRACING C52P43 LF ELECTRIC HEAT TRACIN C66P43 LF 8600 800 300 3850 2700 1025 650 3125 100 2500 50 2800 0 5300 0 1600 0 ..... 40 TO DATE THIS BUDGET WEEK $$$$$*$ 2500 50 2B00 0 5300 0 1600 0 40 0 8256 0 2517 0 320 0 3775 0 2640 0 1025 0 640 0 2000 u 90 FCST #004 2011 50 622 0 1930 0 383 15 32 TO THIS BUDGET DATE WEEK *A ****** FCST #004 TO DATE 1888 50 622 0 1930 0 383 15 32 112 0 0 0 0 0 0 0 0 .960 3.146 1.067 .981 .978 1.000 98?r .640 .980 .804 .755 1.000 1.000 .222 .222 .000 .000 .364 .364 .000 .000 .259" .239 .000 .000 .800 .800 **TOTAL ELECT HEAT TRACING 21150 12290 12290 0 21271 5043 4920 112 1.006 .410 .400 TREND FORECAST MH 4920 TREND FORECAST PERF .399 PERFORMANCE RATIOS ** 1.000 .409 .399 THIS WEEK .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 ?7 n * ?!> * 57 3-< " ,, 2 9 ' 12 :4 H r. r 71 T! )i : V 11! 11 AS 48 42 y GARRARD 00000785 : :o n O- c .......... ..................... E' G5 67 ..... - -...-...... -- ; rj 0 c 6 7 4 6 / " 17 JOB NO. 14053-000 ROBINSCN REFINRY MOUERNZTN PROJ- MOC REPORT NO. C 38090--58 FOCUS QUANTITY AND UNIT RATE REPORT 0/H POLE LINE DIST P50 PERFORMANCE WEEK ENDING BASEO ON 5/21/82 DATE 5/24/82 PAGE 83 BUDGET WEEK 115 OF 121 ACCOUNT DESCRIPTION ACCTS UNIT OF QUANT BUDGET ii*tt 0/H 0/H 0/H 0/H POWER POWER POWER POWER 01 SIRIBUTI 01STRIBUTI OISTRIBUTI 01STRIBUT I A16P50 B23P50 B30P50 B32P50 LF LF LF LF 13 53 2386 2500 FCST #004 0 1725 13400 0 TO OATE THIS WEEK ******* 0 1725 13400 0 0 0 0 0 BUOGET ******** 9 10 1279 960 FCST #004 0 240 3248 2 TO THIS OATE wlEk ****** BUOGET FCST #004 TO OATE 0 0 .69 .00 .00 240 0 .19 *14 .14 3248 0 .54 .24 .24 0 0 .38 .00 .00 *TOTAL 0/H POLE LINE OIST TRENO FORECAST HH 49 52 15125 15125 3488 TRENO FORECAST PERF 0 46 2258 349 0 3488 0 ** PERFORMANCE RATIOS ** .46 1.00 .23 .46 .23 .46 THIS WEEK .00 .00 00 .00 .00 .00 o e 1 9 s 69 A * to 9 1? n 9 ,, 9 l * 2'< ?8 3P M V. ' -- -............. - - TO 30 31 9 IS 9 * ... - ............... - ..... -...... - ....... ..... ....... ........... --..... 17 O AS -If 9 46 9 SI 9 S.' O -........ ....... -............-..... f.7 6 9 .......-...... ........... 9 -................. ------------------------ 9 O d GARRARD 00000786 JOB NO. 14053-000 ROBINSON REFINRY MQDERN2TN PROJ-MOC REPORT NO. C38090-58 6 '* FOCUS QUANTITY AND UNIT RATE REPORT TESTING P80 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATEPAGE 5/24/82 84 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT OF BUCGET FCST A ACCT # QUANT #004 k 4Tk44k1 WV 4k 4k iaitvap t4krw4. 4k ^k 4. ^4 Ar v v<4. t w ***** l.4.4.A.AA.4.;4A4;A 6 > ELECT TESTING CHEC A16P80 UNITS " ELECTRICAL TEST CH B09P80 UNITS ELECT TESTING CHEC B2JP80 UNITS .r. ELECT TESTING CHEC B30P80 UNITS ELECT TESTING E CHEC C50P80 UNITS ,7 100 100 luo 100 100 100 100 100 100 19 n TOTAL TESTING 500 419 TO DATE 100 100 100 100 19 419 THIS WEEK BUOGET FCST TO THIS BUDGET #004 DATE WEEK ******** ************ ******* ******* UNIT MAN uniiac-- FCST TO #004 DATE THIS WEEK 0 1280 0 250 0 385 0 160 0 1919 0 3994 1949 158 364 8T 369 2927 1961 158 364 87 369 2939 12 0 0 0 0 12 12.80 2.50 3.85 1.60 19.19 7.99 19.49 1.58 3.64 .87 19.42 19.61 1.58 3.64 .87 19.42 6.99 7.01 .00 .00 .00 .00 .00 .00 TREN0 FORECAST MH 2939 TREN0 FORECAST PERF 1.20 PERFORMANCE RATIOS ..... 1.00..... .......1.20....... .... 1.20 00 14 15 " :3 0 9 8 79 A 9 s 9 9It' u 9 IF 9 __ 20 71 " ?; 315 3.1 3S rJ'' <' a; GARRARD - as e c -O O O O O 00 ............................................. - -........ -............................ ...... -...... -------- ---------------- -------------------------------- -------- -------------------- -..... -............... ......... - -................................ 9 'fi ....... -......... -.......-...... ............. -............ 9 ........................................... ---51 O o s? 6`J ID o 7 o 5 d 0 0 , I n 9 10 II ,6 IG IH 71 24 ?!> :f a JUB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT ELECT DISCONNECTS P90 DATE 5/24/82 PAGE 85 PERFORMANCE BASED ON BUDGET WEEK ENDING 5/21/82 WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCTw UNI T OF QUANT BUCGET ELECTRONIC OISCONNEC C51P90 EA ELECTRONIC OISCONNEC C53P90 EA ELECTRONIC OISCONNEC C54P90 EA ELECTRONIC OISCONNEC C55P90 EA ELECTRONIC OISCONNEC C56P90 EA REMOVE REMOVE EXIST EXIST INSTR - C61P90 INSTR - C62P90 EA EA REMOVE EXIST INSTR - C63P90 EA REMOVE EXIST INSTR - C64P90 EA REMOVE EXIST INSTR - C65P90 EA REMOVE EXIST INSTR - C66P90 EA 233 1 66 154 119 20 160 39 10 32 19 FC ST S004 13 0 0 0 0 3 80 296 78 92 120 241 TO OATE ******* THIS WEEK BUDGET 13 0 0 0 0 380 296 78 92 120 241 0 439 04 0 218 0 397 0 2 76 0 41 0 320 0 156 0 33 0 83 0 44 FCST 3604 27 0 14 ? 0 384 351 244 37 185 259 # TO DATE 27 0 14 - 7 0 384 351 244 37 185 259 THIS WEEK BUDGET FCST S00'4 Nuni ioc -- TO BATE THIS BEER # $ ^ <: <: <: # $ $ $ $ $ $ ' 0 "1788 2.0TT 2.68 0 4.00 .00 .00 0 3.30 .00 .00 0 2.88 00 .00 0 2.32 .00 .00 0 2.05 1.01 1.01 2.060 1.19 1.19 0 4.00 3*13 3.13 0 3.30 .40 .40 0 2.59 1.54 1.54 0 2.32 1.07 1.07 .00 .00 .00 .06 .00 .00 .00 .00 .00 .00 .00 *4>T0TAL ELECT DISCONNECTS 8 53 1220 1220 0 2011 1508 1508 0 2.36 1.24 1.24 .00 TREND FORECAST MH 1508 TREND FORECAST PERF .52 PERFORMANCE RATIOS 1.00 .52 .52 .00 o m ' 9 i 69 6 m9 ? (3 M9 IE If ?C ?. j: !! 57 71 Jfl 31 32 Jf 10 ii l in .................- - -.........-- ------------------- ------- - -- .. ...................... --......-............ -- -,4 57 GARRARD 00000788 ii. e; L- 9 n JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-58 f 7 ACCOUNT DESCRIPTION .................................. ...................................... ................... acc! # OF QUANT BUDGET FCST .................. ............... ~ S004 FOCUS QUANTITY AND UNIT RATE REPORT ELECT DEMOLITION P95 PERFORMANCE WEEK ENDING BASEO ON 5/21/82 DATE PAGE 5/Z9/82 86 BUDGET WEEK 116 OF 121 TO DATE THIS WEEK BUDGET nANHLUHj FCST SO09 TO OATE THIS WEEK BUDGET -MUTT UAMUnilOC- FCST 3004 TO OATE THIS WEEK 1 DSPOSLGRMOVL OF EXST C50P95 UNITS 1 100 100 $TOTAL ELECT DEMOLITION 1 100 100 TREND FORECAST MH 372 TREND FORECAST PERF t? 0 0 3.72 1 372 372 1 372 372 ** PERFORMANCE RATIOS 0 0 1.00 1.00 1.00 3.72 3.72 3.72 3.72 3.72 3.72 .00 .00 .00 a f 1C -- ------------------- ------ ---........................ - ------------------------------------ --------- ---------......----------------------------- .............. -- -----------------:----------------- -............ -- - -......................... -..........-...........--- -- IU in GARRARD 00000789 9 O Q O eo C) 0 JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-HOC REPORT NO. C38090--58 F 0 CO S QUANTITY ANO UNIT RATE REPORT MATERIAL HAMOLING P99 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE PAGE 5/24/82 87 EUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT UNIT--------------------------------- OF QUANT EUCGET ............................ --QUANTITY---------------------- --MANHOURS---------------------- FCSJ #004 TO DATE THIS BUOGET ........ WEEK......... `....... ................ FCST #004 TO DATE THIS `WEEK BUOGET --UNIT MANHOURS- FCST TO #004 DATE THIS WEEK SECOND OROP MAT HAND A16P99 BMHRS SECOND DROP MAT HAND B23P99 BMHRS --TOTAL MATERIAL HANOLING 2000 0 2000 0 _________________ ____ TRENO FORECAST MH 1799 TREND FORECAST PERF .90 1799 0 1799 0 2 1799 1799 0 PERFORMANCE RATIOS ** uoo 1.00 1.00 .90 .00 .90 .00 .90 .90 .00 .00 .00 ix s GARRARD 00000790 0 (o 'V *> JOB NO. 14053-000 ROBINSON REFINRY MODERN2TN PROJ-HOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT FABRICATE REBAR QOl DATE 5/24/82 PAGE 88 PERFORMANCE BASED ON BUDGET WEEK ENDING 5/21/82 WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCf# UNIT-----------------------------QUANTITY-------------------------- OF BUCGET FCST TO THIS QUANT #004 DATE WEEK *<=*****$ ------------------------ MANHOURS--------------------------- BUDGET FCST TO THIS #004 DATE WEEK --------------------UNIT BUOGET FCST #004 MANHOURS TO DATE THIS WEEK 'rxvTTT-r rvrvtvyt FABRICATE REBAR A16QU1 TONS 45 45 45 0 715 1266 1266 0 15.89 28.13 28.13 FABRICATE REBAR B23Q01 TONS 1 10 10 0 16 12B 5 1285 0 16.00 128.50 128.50 =*$TOTAL FABRICATE REBAR 46 55 55 0 731 2551 2551 0 15.89 46. 3B 46.38 TRENO FORECAST MH 2551 TREND FORECAST PERF 2.92 PERFORMANCE RATIOS 1.00 2.92 2.92 .00 .00 .00 .00 a i f> 1? 13 1 m 1 ?n i t f 'i 18 GARRARD 00000791 Cl ::a "O o "o c 6 JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MGC REPORT NO. C38090--50 FOCUS QUANTITY AND UNIT RATE REPORT FOUNOATN CONCRETE Qll PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 89 BUCGET WEEK 116 OF 121 6 ACCUUNT DESCRIPTION 3 OF BUCGET FCST A ACCT 8 QUANT 8004 .bTT^Yb TVT.bTJbArT T JTb Vrfk ,Tb .b *Ar V^b .rb ^4'TA*V^0 JTbYb *Ap ^b Wb J r^TYT-rTTVTn b > PLACE FOUNDATION CON A16QU CY H PLACE FOUNDATION CON B09QI1 CY a PLACE FOUNDATION CON B23Q11 CY ,0 PLACE FOUNDATION CON B28Q11 CY PLACE FOUNDATION CON B32011 CY ? 2646 122 412 142 335 4628 133 410 81 685 n SFTOTAL FOUNOATN CONCRETE 3657 5937 TO DATE 4627 133 410 81 685 5936 ....... TREND FORECAST MH ....... ... . - - -- 16931 ...TREND FORECAST PERF___ 8 THIS WEEK BUDGET FCST TO THIS BUDGET 8004 DATE WEEK 4: $* $$ 4s $$4 # $ 41 $ $$$$$$ FCST TO THIS 8004 DATE WEEK #$$ $$$ $$ $ 29 3 5 ]9 0 6350 0 317 0 1059 0 335 0 642 11098 391 2090 250 3100 11098 391 2090 250 3100 0 8703 16929 16929 1.21 ________ performance RATIOS 0 2.40 2.40 0 2.60 2.94 0 2.57 5.10 0 2.36 3.09 0 1.92 4.53 0 2.38 2.85 ..... 1,00 _______1.21 2.40 2.94 5.10 3.09 4.53 2.85 1.21... .00 .00 .00 .00 .00 .00 * 9 12 14 9 15 ie 9 .00_______ 9 920 /I 22 \ i3 ?0 9 25 31 ?. T 9 28 17 29 9 12 9 II * 9 3? 9 S' S' 9" 57 9Sf r>o Cl c9 GARRARD 00000792 9 1: 9 12 O- V ....... .. ____ ........................... o JOB NO. 14053-000 ROBINSON REFINRY MODERN2TN PROJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT STRUCT CONCfcETE Q12 PERFORMANCE WEEK ENDING BASED ON 5/21/82 OATE 5/24/82 PAGE 90 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ................... ACCTS UNIT OF EUCGET QUANT --QUANTITY-------- FCST TO ;;0o0o4 DATE this budget WEEK --MANHOURS- FCST TO 0004 OATE THIS BUDGET WEEK -UNIT MANHOURS- FCST TO 0004 DATE THIS WEEK PLACE STRUCTURAL CON A16Q12 CY PLACE STRUCTURAL CON B23Q12 CY 2251 10 2275 114 2275 114 8643 38 9037 442 9037 442 0 3.84 3.97 3.97 0 3.80 3.88 3.88 TOTAL STRUCT CONCRETE... 2261 2389 2389 0 8681 9479 9479 3.84 3.97 3.97 TREND FORECAST MH 9479 TREND FORECAST PERF 1.03 PERFORMANCE RATIOS 1.00 1.03 1.03 .00 .00 .00 .00 GARRARD 00000793 m a o o co C 1 s i i l GARRARD 00000794 C r e< 1 ' 9 " JOB NO. 14U53-OOU ROBINSON REUNRY MOOERNZTN PROJ-MOC REPORT NO. C3B090-58 FOCUS QUANTITY AND UNIT RATE REPORT OTHER CONCRETE Q15 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 91 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT 8 UNIT OF QUANT BUDGET -QUANTITY- FCST TO ....SJ004 ... DATE THIS WEEK BUDGET -MANHOURS- FCST TO 3004 DATE THIS WEEK BUDGET -UNIT MANHOURS- FCST TO DATE tr$ $ $ $* * #^* *$ THIS WEEK PLACE OTHER CONCRETE A16Q15 CY 3ST0TAL OTHER CONCRETE TREND FORECAST MH 239 333 333 239 333 333 204 TREND FORECAST PERF 0 0 . 18 ? 97 204 204 0 797 204 204 0 ** PERFORMANCE RATIOS ** 3.33 3.33 1.00 .61 .61 .18 .61 .61 .18 .00 00 .00 ---.......... -.... -- ------------------ -- -.... -...... -.......-....-....-- JOB NO. 14053-000 ROBINSON REFINRY MODERN2TN PROJ-MOC REPOR1 NO. C38090-58 6 FOCUS QUANTITY AND UNIT RATE FOUNO REBAR ' REPORT Q21 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 92 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT 3 OF BUDGET 4 ACCT# QUANT $*$$$$ rTTV-rTT'fTTTTrVT'r'VTTVV $$$ ' PLACE FOUNDATION REB A16Q21 TONS PLACE FOUNDATION REB B09021 TONS !> PLACE FOUNDATION REB B23Q21 TONS 1" PLACE FOUNDATION REB B28Q21 TONS PLACE FOUNDATION REB B32Q21 TONS 1? $*TOTAL FOUND REBAR 132 5 16 5 38 196 FCST #004 401 T 27 4 32 471 TO DATE 401 7 27 4 32 471 THIS BUDGET FCST TO THIS WEEK #004 DATE WEEK ****** 3:$$3:$$$$$$ ******* 0 3180 11622 11622 0 126 715 715 0 359 2016 2016 0 107 435 435 0 575 2935 2935 0 0 0 0 0 BUDGET 24.09 25.20 22.44 21.40 15.13 UNIT FCST #C04 MA hiumiQC- TO THIS DATE WEEK ******* $$ 28.98 102.14 74.67 108.75 91.72 28.98 102.14 74.67 108.75 91.72 .00 00 .00 .00 .00 0 4347 17723 17723 0 22.18 37.63 37.63 .00 TREND FORECAST MH 17723 TREND FORECAST PERF 1.61 PERFORMANCE RATIOS 1.00 1.61 1.61 .00 6 Jl n <3 9 e 92 1 A 9 9 910 n 9 tr 9 ?t ?A * ?; ?3 3C ji 12 v -At - -....................... ,< y V > if 4R S-: -------- ------------------------- ------------------------ ............... -................... - 9 ......-......................... C'J ------------------------------------ 61 96; 6` G5 M 6/ O M 42 o 5 n GARRARD 00000795 JOB NO. 14053-000 ROBINSON REFINRY MODERN/TN PROJ-MOC REPORT NO. C38090--58 FOCUS QUANTITY AND UNIT RATE REPORT STRUCT REBAR Q22 PERFORMANCE WEEK ENDING BASEO ON 5/21/82 DATE 5/24/B2 PAGE 93 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ****** ACCT # UNIT---------------------------- QUANTITY--------------------------- ------------------------ MANHOURS-------------------------- OF EUCGET FCST TO THIS BUOGET FCST TO THIS QUANT #004...... Bate "... Week .... `............ 7Td04 ~ BATE........WEER --------------------UNIT MANHOURS BUOGET FCST TO HrC'04 DATE THIS WEEK ******** PLACE STRUCTURAL REB A16Q22 TONS PLACE STRUCTURAL REB B23Q22 TONS S3T0TAL STRUCT P.EBAR ' 223 1 224 341 10 351 340 10 3 50 0 2858 21953 21953 0 13 1199 1199 0 2871 23152 23152 0 12.82 64.38 64.57 0 13.00 119.90 119.90 0 12.82 65.96 66.15 .00 .00 .00 TREND FORECAST MH 23237 TRENO FORECAST PERF 5.16 PERFORMANCE RATIOS 1.00 5.14 5.16 .00 6 9 10 12 13 15 16 o; 64 1( fl GARRARD 00000797 0 6 JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PRO J- MOC REPORT NO. C38090- 58 FOCUS QUANTITY AND UNIT RATE REPORT FOUND FORMS Q31 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/25/82 PAGE 95 BUCGET WEEK 116 OF 121 ******** OF ACCT a QUANT $$$ EUCGET FCST #009 TO DATE PLACE 6 STRIP FON FO A16Q3I SF PLACE 6 STRIP FON FG B09Q31 SF PLACE G STRIP FON FO B23031 SF PLACE G STRIP FON FO U2UQ31 SF PLACE G STRIP FON FO B32Q31 SF TOTAL FOUND FORMS ........... ...........- ..... -................ . 179T3 5700 8555 2923 6957 90508 31715 2690 7200 2191..... 12072 31715 2690 7200 2191 12072 55868 ~ 55 868 TREND FORECAST MH 53262 TREND FORECAST PERF THIS WEEK 0 0 0 0 0 0 BUDGET FCST TO #009 DATE ******* ******** 6958 1965 3611 1150 1689 28507 1029 9266 1120 8395 28507 1029 9266 1120 8395 19873 93262 93262 THIS BUOGET FCST WEEK SC05 ****$** $$$$$$$$ 0 .36 .90 0 .52 .38 0 .53 .59 0 .39 .51 0 .26 .69 0 .37 7T TO DATE THIS WEEK .90 .38 .59 .51 .69 .00 .00 .00 ... .00 .00 .tr ~ .00 2.21 PERFORMANCE RATIOS 1.00 2.21 2.21 .00 8 5 ; 9 10 13 14 n ?3 Mi 31 IT 0 GARRARD 00000798 JOB NO. 16053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090--58 FOCUS QUANTITY ANQ UNIT RATE REPORT STRUCT FORMS Q32 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/26/82 PAGE 96 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ******** ACCTtf UNIT OF QUANT --QUANTITY------- EUCGET FCST TO THIS BUDGET *006 ..........DATE ..... WEEK ********* ******* 6 PLACE 6 STRIP SIR FO A16Q32 SF 37906 70113 70113 0 16672 PLACE 6 STRIP STR FO B23Q32 SF 98 6326 6326 0 66 -- MANHOURS------------ FCST TO 8006 .......OATE THIS BUDGET WEEK... . ' " -UNIT MANHOURS----------------- FCST TO THIS 900A OATE WEEK " 56213 3919 56213 3919 .66 .65 .77 .62 .77 .62 .00 .00 **TOTAL STRUCT FORMS 38006 76639 76639 0 16716 58132 58132 .66 .76 76 .00 > TREND FORECAST MH 58132 TREND FORECAST PERF 1.73 ,00 1.73 1.73 .00 a a a a a a a GARRARD 00000799 a o o O V1 r ' 9 1? JOB NO. 14Q53-C00 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY ANO UNIT RATE REPORT OTHER FORMS Q35 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 97 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT--------------------OF BUCGET ACCT 0 QUANT...................... ATW ATb ATW ATW <fAV( A.TAWIAr. YA. BT^ lAYW ATW ATW AYW AWTWTbJTW AY* AWTAWb AW ATW 'AAb B^TB AWYA'.VAW mbAW bAAW *ATb bATW bArb 'AY. bAWb (A* rbAY. bAb'TbAb AbA. 'AYb bArW'rbAbYA --QUANTITY-------------------------- FCST^ TO THIS BUDGET 004........... DATE WEEK WAArbTbIWriAAb b'Arb-avW *AbTAW'rATW AlbMAWrATW A`rWrbJiWrAWTbAWb AW. bATb AW AYb AW"bA. AwW AWTAW4bA --MANHOURS--------------- FCST T0 THIS S004 ~ DATE WEEK BUDGET -UNIT MANHOURS---------------- FCST TO THIS 0004....... DATE WEEK PLACE STRIP OTHER A16Q35 SF 1640 0 0 0 735 0 0 0 45 .00 .00 **T0TAL OTHER FORMS 1640 O 0 0 735 0 .450 0 .00 .00 .00 TREND FORECAST MH 0 TREN0 FORECAST PERF .00 PERFORMANCE RATIOS ** 1.00 .00 .00 .00 IS 0 9 9 9 9 9 oo GARRARD 00000800 O O 0 6 ' 3 S , H j .0 l3 JOB NO. 15053-000 ROBINSON REFINRY M00ERNZTN PR0J -MOC REPORT NO. C38090--58 F 0C U s QUANTITY AND UNIT RATE REPORT MISC C0NC I COMP I Q50 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/25/82 PAGE 98 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT OF Y bAb AL..A. bAb A- iAp bA. ACCTS QUANT .A.bAb bAb A* Ab Ab <Ab .Ab bAb bA ***** PLACE PLACE PLACE PLACE PLACE CONCRTEICOMPOS CONCRTEICOMPOS C0NCRTEICCMP0S CONCRTEICCMPOS CONCRTEICOMPOS A31Q50 B20Q50 B21Q50 B29Q50 C50Q50 CY CY CY CY CY EUCGET 57 7 82 53 11 FCST #005 12 0 217 29 36 TO THIS BUDGET FCST TO THIS DATE ****** WEEK **************** XAA#A0A0A5.AAA.AA.AbOAJAI.bTI.Ea aa WEEK IKiTT MAMUnilDC. BUDGET FCST #005 TiA-r-riprY-r'Y TO DATE THIS WEEK 12 0 217 29 36 0 500 0 100 0 1362 0 810 0 220 538 0 2698 581 902 538 0 2698 581 902 0 7 ."02 36.50 36.50 0 15.29 .00 .00 0 16.61 12.53 12.53 0 18.85 20.03 20.03 0 20.00 25.06 25.06 *00 .00 .00 .00 .00 <=*T0TAL MISC C0NC IC0MP) 200 295 295 0 2892 5619 5619 0 15.56 15. T1 .00 TREN0 FORECAST MH 5619 TREND FORECAST PERF PERFORMANCE RATIOS _ ...... 1.00..... .... .93 53 .00 t 8 ? 8 9 in .? " in ?. ? ?< ? 4 P IP ^4 GARRARD 00' JS ' ooo 0o0 r>: 67 C c (pi ! JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--58 ACCOUNT DESCRIPTION ACCT UNIT----------------OF BUDGET QUANT .............. FOCUS QUANTITY AND UNIT RATE REPORT PRECAST CONCRETE Q61 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 99 BUDGET WEEK 116 OF 121 -QUANTITY---------- FCST TO ,',*ou4 ........oate -------- ------------------------ MANHOURS--------------------------- THIS BUDGET FCST TO THIS WEEK ........................#004 DATE WEEK ------------------- UNIT MANHOURS---------------- BUDGET FCST TO THIS #004 .... OATE... ... WEEK PLACE PRECAST CONCRE A16Q61 CY PLACE PRECAST CONCRE B23Q61 CY SSTOTAL PRECAST CONCRETE TREND FORECAST MH 47B 10 410 171 410 171 488 581 581 2337 TREND FORECAST PERF 0 0 0 1.68 1147 z<* 1171 1780 557 2337 1780 557 2337 PERFORMANCE RATIOS 0 0 0 2.40 2.40 2.40 1.00 4.34 3.26 4.02 1.68 4.34 3.26 4.02 1.68 .00 .00 .00 .00 < 4 <3 a 8 9 10 l? t3 H. 2*1 2! 29 3*1 30 31 >? GARRARD 00000802 f.o n V r JUB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--50 FOCUS QUANT IT Y ANO UNIT RATE REPORT PRECAST REBAR 062 PERFORMANCE WEEK ENDING BASEO ON 5/21/82 OATE 5/24/82 PAGE 100 BUCGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCT f UNIT OF BUCGET QUANT --QUANTITY-------------------------- ------------------------ MANHOURS------------- FCST TO THIS BUDGET FCST_______ TO f 004 DATE WEEK if004 DATE --------- THIS WEEK -------- ---------- umjt MANHOURS----------------- BUDGET FCST TO THIS ... S004 DATE WEEK PLACE PRECAST REBAR A16Q62 TONS PLACE PRECAST REBAR B23Q62 TONS 82 139 139 1 28 28 TOTAL""' PRECAST REBAR ................ TREND FORECAST MH 5 724 __TRENO FORECAST PERF 2.14 1312 16 4193 1531 4193 1531 1328 5724 5724 PERFORMANCE RATIOS < 16.00 16.00 30.17 30.17 54.68 54.68 .00 .00 1.00 2.14 2.14 .00 t 6 8 <3 <3 a a a a 4 4 4 1 GARRARD 00000803 e JOB NO. 14053-000 ROBINSON REFINRY MQDERNZTN PROJ-MOC o REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT PRECAST FORMWORK Q63 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 101 BUCGET WEEK 116 OF 121 c ACCOUNT DESCRIPTION UNIT - -- QUANTITY-------------------------- ------------------------ MANHOURS------------- -UNIT MANHOUPS- OF BUCGET FCST TO THIS BUDGET FCST TO THIS BUDGET FCST TO THIS A C C T ii QUANT 0004 DATE WEEK '004 .... oaTe WEEK 0CC4 DATE WEEK o ^f-jr.Tj.Ta.-TTVlrTjT. l PLACE PRECAST FORMS A16063 SF r PLACE PRECAST FORMS B23Q63 SF 17700 ID 13015 7541 13015 7541 7222 4 9871 5676 1871" 5676 ,41 .40 .76 .75 76 .75 .00 .00 --TOTAL PRECAST FORMWORK 17710 20556 20556 0 7226 15547 15547 .41 .76 .76 .00 TREND FORECAST MH 15547 TRENO FORECAST PERF 1.87 ** PERFORMANCE RATIOS 1.00 1.87 .00 00 GARRARD 00000804 e JUB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--58 FOCUS QUANTITY ANO UNIT RATE REPORT SET PRECST ITEMS Q69 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 102 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCf S UNIT---------------------------- QUANTITY---------- OF EUCGET FCST TO QUANT S004 DATE THIS BUDGET WEEK ~ --MANHOURS---------- FCST TO ?004 DATE --------THIS WEEK --------------------UNIX MANHOURS----------------- BUDGET FCST TO THIS S004 DATE ..........WEEK SET PRECAST CQNC ITE A16Q69 CY SET PRECAST CONC ITE B23Q69 CY 478 10 410 173 410 173 'TOTAL..... SET PRECST ITEMS 488 583 583 _______ ______TRENO FORECAST_MH___ 10845__ TRE ND FOREC A ST _P E RF 0 2.33 3824 80 7226 3619 7226 3619 3904 10845 1C845 PERFORMANCE RATIOS 8.00 8.0U 8.00 1.00 17.62 17.62 20.92 20.92 18.60 18.60 2.33 2.33 .00 .00 .00 .00 <3 GARRARD 00000805 j i > :q M "Q ::q ii? ::c c e JOB NO. I4053-000 ROBINSON REFINRY MODERNZTN PROJ-HOC REPORT NO. C38090--58 FOCUS QUANTITY and UNIT RATE REPORT CONCRETE PAVING Q71 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 103 BUDGET WEEK 116 OF 121 e ACCOUNT DESCRIPTION UNIT OF eUCGET FCST TO THIS BUOGET FCST TO THIS BUOGET FCST TO THIS ACCT it QUANT 5004 OATE WEEK #004 DATE WEEK o * 4 44 4:4= 4= *4 4 *4 = 4 4 4 4 4=4= 4= 44 $^vrirrvvvrr iiiiiiiitttttttt it **** 444=44**44444 4444444 5C04 DATE WE Ek 44444444 : ! ! \ PLACE CONRETE PAVING A16Q71 SF 70470 36000 36000 0 11275 3894 3894 0 16 .11 .11 oo PLACE CONCRETE PAVIN B09Q71 SF 4080 4080 4080 0 660 340 340 0 ^16 .08 .08 .00 PLACE CONCRETE PAVIN B23Q71 SF 21990 21990 21990 0 5592 2760 2760 0 .25 .13 .13 .00 PLALfc CONCRETE PAVIN B29Q71 SF 2534 500 500 0 585 25 25 0 .2 3 .05 .05... .00 44T0TAL CONCRETE PAVING TREND FORECAST MH 99074 62570 62570 7019 TRENO FORECAST PERF ------------ - - - -... - ... - - ' . . . . . . _ 0 18112 7019 7019 0 .18 .58 44 PERFORMANCE RATIOS 44 1.00 ___ ________ __ .... .... ...................... ...... ... ... ......... .. __ _____ .. .11 .11 .00 .58 .58 .00 .. ............ .... ________________ GARRARD 00000806 > 4 l( " " .1 JOB NO. 14053-000 ROBINSON REFINRV MOOEKNZTN PROJ-MQC REPORT NO. C3809Q--58 FOCUS UUANTITY AND UNIT RATE REPORT CONDUIT ENVELOPES QT3 PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 104 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION YTTr r->rr vv rr ty Accf # UNIT OF QUANT BUDGET -QUANT IT Y- FCST TO #004 DATE $: THIS WEEK BUDGET -MANHOURS- FCST TO #004 OATE THIS WEEK BUDGET -UNIT FCST #004 MANHOURSTO DATE THIS HEEK $$$$$$ PLACE CONC ENVELOPES A16Q73 CY PLACE CONCRETE ENVEL B23Q73 CY PLACE CONCRETE ENVEL B29Q73 CY PLACE CONCREfE ENVEL B30073 CY PLACE CONCRETE ENVEL B32Q73 CY PLACE CONCRETE ENVEL C50Q73 CY --TOTAL CONDUIT ENVELOPES TREND FORECAST MH 690 93 18 9 30 81 685 108 0 10 16 113 685 lua 0 10 16 113 921 932 932 5524 TRENO FORECAST PERF 0 0 0 0 0 0 0 1.23 3312 445 105 100 105 380 3443 1258 0 2 338 483 3443 1258 0 2 338 483 0 0 0 0 0 0 4447 5524 5524 0 -- PERFORMANCE RATIOS 4c 4t 4.80 4.78 5.03 11.11 3.50 4.69 4.B3 1.00 5.03 11.65 .00 .20 21.13 4.27 5.03 11.65 .00 .20 21.13 4.27 5.93 5.93 1.23 1.23 .00 .00 .00 .00 .00 .00 .00 .00 1 GARRARD 00000807 o0 JOB NO. 14053-000 ROBINSON REFINRY MODERN/TN PROJ-MOC 0 REPORT NO. C38090--58 FOCUS QUANTITY AND UNIT RATE REPORT MISCELL ARCHITECT R01 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 105 BUCGET WEEK 116 OF 121 O ACCOUNT DESCRIPTION UNIT - ------------------------- QUANTITY-------------------------- ------------------------ MANHOURS--------------------------- ----------------- -UNIT MANHOURS----------------- _ OF BUCGET FCST TO THIS BUDGET FCST TO THIS BUDGET FCST TO THIS ACCT # QUANT #004....... DATE WEEK ...........3004 ~ .....DATE WEEK ' ~ " #004 DATE "WEEK ' * 10 BUILDINGS B23R01 MHRS SSTUTAL MISCELL ARCHITECT TREND FORECAST MH 000 000 0 TREND FORECAST PERF 0 0 .00 00 0 00 0 S* PERFORMANCE RATIOS 0 0 .00 .00 .00 oo ! i .00 .00 .00 .00 .00 CONTROL ROOM ARCHITt C50R01 UNITS : COKER CR STRUCTURAL C54R01 UNITS ;; s*TOTAL MISCELL ARCHITECT 100 0 100 100 0 100 100 0 100 10 TREND FORECAST MH 1806 TREND FORECAST PERF 0 0 0 1.03 1751 0 1806 0 1806 0 1751 1806 1806 $$ PERFORMANCE RATIOS 0 0 0 17.51 .00 17.51 1.00 18^56 18.06 .00 .00 1io*0 CD 18.06 1.03 1.03 .00 .00 .00 .00 .00 .00 .00 71 27 GARRARD 00000808 Q O JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-58 ACCUUNT DESCRIPTION ACCT It UNIT------------------- OF BUOGET QUANT ...... FOCUS QUANTITY AND UNIT RATE REPORT ELECTRICAL SUBSTAT R03 PERFORMANCE MEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE ICfe BUDGET MEEK 116 OF 121 --QUANTITY---------- FCST TO if 00 4 "......DATE THIS BUOGET MEEK .............. --MANHOURS---------- FCST TO 004 DATE THIS BUOGET MEEK "......... . -UNIT MANHOURS- FCST TO if004 DATE THIS WEEK ELECTRICAL SUBSTATIO A16R03 UNITS 100 100 100 SSTOTAL ELECTRICAL SUBSTAT___________ ______________________________ __ TREND FORECAST MH 1341 TREND FORECAST PERF 2.39 560 1345 1341 0 560 1345 1341 0 PERFORMANCE RATIOS ** 5.60 13.45 13.4T 1.00 2.40 2.39 .00 .00 i i i i i c c c c r GARRARD 00000809 JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-5B ACCOUNT OESCRIPTIUN ACCTS UNIT------------------OF BUCGET QUANT FOCUS UUANTITY AND UNIT RATE REPORT BUILDING RIO PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 107 BUCGET MEEK 116 CF 121 -- QUANTITY-------------------------- FCST TO THIS 0004 DATE WEEK ------------------------ MANHOURS------------- BUDGET FCST TO ........ 0004 DATE THIS BUDGET WEEK UNIT MANHOURS----------------- FCST TO THIS 0004 DATE WEEK BOILER FEED WATER 9L A16R10 UNITS 100 100 100 CHEMICAL INJECTION b B32R10 UNITS 100 100 100 **TOTAL.... BU1L0ING ...... .......... TREND FORECAST MH 1921 TREND FORECAST PERF 4.63 2 TO 145 650 1302 619 1302 415 1952 1921 ** PERFORMANCE RATIOS ** 2.70 1.45 6.50 6.19 13.02 13.02 .00 .00 1.00 4.70 4.63 .00 GARRARD 00000810 JOB NO. 14053-000 FOCUS DATE 5/24/82 I I Oooo00 GARRARD O' & JOB NO. 14053-000 ROBINSON REFINRY MODERN!TN PROJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY AND UNIT RATE REPORT REVAMP EXIST BLDGS R95 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 110 BUOGET WEEK 116 OF 121 I ACCOUNT DESCRIPTION ACCT it UNIT OF QUANT BUDGET ****** BLDG B23R95 UNITS 100 -QUANT IT Y- FCST TO #004 OATE $$$$$$$ THIS WEEK BUOGET 100 100 0 299 -MANHCURS- FCST TO THIS "004 DATE WEEK VTT*VT'C:`*^fT*T BUDGET -UNIT MANHOURS- FCST TO THIS #004 OATE WEEK ****** 756 756 0 2.99 7.56 7.56 .00 EXIST BLDGS 100 100 100 0 299 756 756 0 2.99 7.56 7.56 .00 ORECAST MH 756 TREND FORECAST PERF 2.53 $*= PERFORMANCE RATIOS 1.00 2.53 2.53 .00 I A 4 B 41C 17 '* 4 4 4 4 4 4 1 1 4 4 4 4 G GARRARD 00000813 C c c C e JQ9 NCJ. 14053--000 ROBINSON REFINRY MODERNZTN PROJ-MOC 0 REPORT NO. C38090--58 FOCUS QUANTITY ANO UNIT RATE REPORT DEWATERING S03 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 111 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACCTtf UNIT---------------------------- QUANTITY--------------------------- ------------------------ MANHOURS--------------------------- OF EUCGET FCST TO THIS__ BUOGET_____ FCSTTO_____ THIS QUANT ................. ........ S604 ..DATE WEEK. ......................#004 DATE WEEK ------------------- UNIT MANHOURS------------------ BUDGET_____FCSTTO__ THIS___ ' #004 DATE WEEK DEWATERING DEWATERING A16S03 BMHRS B23S03 BMHRS SSTOTAL DEWATERING TREND FORECAST MH 2800 870 4100 870 4100 870 3670 4970 4970 TRENC FORECAST PERF 0 2800 0 875 ---- 3675 467 3 4306 8979 4673 4306 8979 1.80 <=* PERFORMANCE RATIOS 1.00 1.01 T.uu 1.00 1.14 4.95 r.ai 1.80 1.14 4.95 1.81 1.80 .00 .00 .00 .00 \ f 16 37 ]' ] :\ 0 c 1 I :: < 38 :: * :< SJ i i * on i; c c GARRARD 00000814 ft 1 6 1 f> 10 IS PC 21 ?? 21 ft - ft ft JOB NO. 10053-000 ROBINSON REFINRY MOOERNZTF PRO J- MOC REPORT NO. C38090-58 F 0CU s QUANTITY ANO UNIT RATE REPORT EXCAVATIONEDISPOSL Sll PERFORMANCE WEEK ENOING BASED ON 5/21/82 DATE 5/24/82 PAGE 112 BUDGET WEEK 116 CF 121 ACCOUNT DESCRIPTION ACCT5 OF BUDGET QUANT $ FCST 5004 TO OATE THIS WEEK BUDGET FCST TO 5004 DATE' ******* $$ THIS BUDGET WEEK ***TTTT uniioc.. FCST TO THIS 5004 DATE WEEK *# $$ EXCAVATION DISPOSA A16S11 CY EXCAVATION DISPOSA A31S11 CY EXCAVATION DISPOSA B09S11 CY EXCAVATION BACKFIL B2CS11 CY EXCAVATION DISPOSA B21S11 CY EXCAVATION OISPOSA B23S11 CY EXCAVATION OISPOSA B29S11 CY EXCAVATION OISPOSA B30S1I CY EXCAVATION E DISPOSA B32S11 CY EXCAVATION DISPOSA C50S11 CY 1702 60 800 13 1305 2664 440 34 1268 350 2900 60 653 0 469 3745 126 ID 3080 165 2900 60 653 0 469 3745 126 10 3083 165 0 4953 0 230 0 1611 0 40 0 3465 0 3560 0 690 0 70 0 1459 0 401 4804 243 1324 0 1107 4535 916 8 3368 837 4804 243 1324 0 1107 4490 916 a 3368 83? 0 2.91 1*66 1.66 .00 0 3.83 4.05 4.05 .00 0 2.01 2.03 2.03 .00 0 3.08 .00 .GO .00 0 2.66 2.36 2.36 .00 0 1.34 1.21 1.20 .00 0 1.57 ~T.27 7.27 00 0 2.06 .80 .80 .00 0 1.15 1.09 1.09 .00 0 1.15 5.07 5.07 .00 TOTAL EXCAVATIONEDISPOSL 8636 11216 11216 0 16479 17142 17097 0 1.91 1.53 1.52 TREND FORECAST MH 1709T TRENO FORECAST PERF .85 ** PERFORMANCE RATIOS 1.00 .85 .85 .00 ao 26 Pi 30 31 33 3f 37 IP " IT) ......... V 5 6 f 6 6 r 6 6 A _____ 7 GARRARD 00000815 GARRARD 00000816 a 3 - 6 7 10 - JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-58 FOCUS QUANTITY ANO UNIT RATE REPORT B ACK FT LLCOMPAC TIN S12 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 113 BUDGET WEEK 116 OF 121 A C vU Uri V AJ 1 l U I. UUAi ! 11 V OF BUCGET FCST TO * ACCT # QUANT #004 OATE ********* ***********rA4,<VA TTAH. A". 4`A.T'F4>*4A-*--4TA.'*rA4. 4M4 JF4 Air'FA*TA14l4`44 V4. l4r4 THIS BUDGET FCST WEEK #004 ********** TO THIS DATE WEEK $$$ BUDGET FCST #004 TO OATE THIS WEEK BACKFILL COKPACTIO A16S12 CY BACKFILL COMPACTIO A31S12 CY BACKFILL COMPACTIO B09S12 CY BACKFILL COMPACTIO B21S12 CY BACKFILL COMPACTION B23S12 CY BACKFILL COMPACTIO B29S12 CY BACKFILL COMPACTIO B30S12 CY BACKFILL COMPACTIO B32S12 CY BACKFILL COMPACTIO C50S12 CY 9765 103 650 1224 2711 437 25 1840 260 5883 50 499 288 3676 88 8 2958 107 5883 50 499 288 3676 88 8 2958 107 PPTOTAL UACKFILLECCMPACT IN 17015 13557 13557 TRENO FORECAST MH 14103 TRENO FORECAST PERF 0 7547 0 370 0 348 0 535 0 1060 0 215 0 30 0 450 0 214 5951 34 310 333 3671 261 0 3267 264 5951 34 310 333 3671 261 0 3267 264 0 0 0 0 0 0 0 0 0 0 10 769 14091 14091 0 1.90 ** PERFORMANCE RATIOS ** .77 3.59 .54 .44 .39 .49 1720 24 .82 .63 1*00 1.01 .68 .62 1.16 1.00 2.97 .00 1.10 2.47 1.04 1.90 1.01 .68 .62 1.16 1.00 2.97 Off 1.10 2.47 1.04 1.90 .00 .00 .00 .00 .00 .00 00 00 .00 .00 .00 JOB NO. 14053-000 ROBINSON REFINRY MODERNSTN PROJ-MOC REPORT NO. C38090--58 $$$$$*:**:** OF BUCGET ACCTff QUANT SEWERS DRAINAGE SEWERS DRAINAGE SEWERS ORA INAGE SEWERS ORAINAGE SEWERS DRAINAGE SEWERS DRAINS AI6S31 LF B09S31 LF B23S31 LF B29S31 LF B32S31 LF B99S31 LF 36T0 300 1033 174 1000 ______ 40 **TOTAL SEWERS ORAINAGE 6217 TREND FORECAST MH......il908 TREND FOCUS QUANTITY AND UNIT RATE REPORT SEWERS ORAINAGE S31 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 114 BUCGET MEEK 116 OF 121 FCST TO S004 DATE #$**$*$*? ****** THIS WEEK n >u u Htj BUDGET FCST TO S004 DATE ******** ******************* THIS WEEK BUDGET FCST SO04 ********* TO This DATE WEEK ******* 3161 287 1537 179 976 90 3161 287 1537 179 976 90 .0 2468 0 171 0 688 0 170 0 4262 0 25 3415 1209 3366 400 3329 189 3415 1209 3366 400 3329 189 0 .67 1.08 1.08 .00 0 .57 4.21 4.21 .00 0 .67 2.19 2.19 .00 0 .98 2.23 2.23 "".Off" 0 4.26 3.41 3.41 .00 0 .63 2.10 2.10 .00 6230 6230 FORECAST PERF 0 1.55 7784 11908 11908 "PERFORMANCE "RATIOS ~ 0 1.25 ........ 1.00 i i Oil o il 1.91 1.91 .00 1.55..... ..... .00 ... i 8 10 4 4 * !' ?0 c 0 6 b f, 10 18 o ?l JOB NO . 14053-000 ROBINSGN REFINRY MOOERNZTN PRO J -MOC REPORT NO. C 38090--58 F 0CUS QUANTITY ANO UNIT RATE REPORT PRECAST MANHOLES S32 PERFORMANCE WEEK ENDING BASEO ON 5/21/82 OATE 5/24/82 PAGE 115 BUDGET HEEK 116 OF 121 RCXU Uli 1 UL 4 ^ 1 1 UH OF ACCT# QUANT 33****** $$$$WTW JVA *I8T. YV.WX"A.W<^k J^W V* IrVTWafVc A*ir*AY* V*AY. ' BUDGET FCST 5004 TO DATE rYYYYYYYYYrrYk'1 PRECAST MANHOLES PRECAST RANHOLES PRECAST RANHOLES BOSS 32 EA B23S32 EA B32S32 EA lIl 78 8 466 **TOTAL PRECAST MANHOLES 12 15 15 TREND FORECAST MH 1420 TREND FORECAST PERF PRECAST RANHOLES ......A16S32 UNITS 2000 2400 2400 SSTGTAL PRECAST MANHOLES 2000 2400 2400 TREND FORECAST MH 3038 TREND FORECAST PERF THIS WEEK 0 0 0 BUOGET FCST TO THIS BUDGET FCST TO THIS $004 OATE WEEK "$cor DATE week ******* *$*****$#*$* 333333 333333* YTYYYYYY 333333333 ****** *3****** 136 855 2 80 4 579 837 4 579 837 0 136.00 4.00 4.00 0 122.14 72.38 72.38 0 70.00 139.50 139.50 .00 .00 .00 0 1271 1420 1420 0 105.92 94.67 94.67 .00 .93 ** PERFORMANCE RATIOS ** 1.00 .93 .93 .00 0 2450 3038 3038 ..........0... 1.23 ... 1.27 ..1.27 .00 0 2450 3038 3038 0 1.23 1.27 1.27 .00 1.03 3* PERFORMANCE RATIOS ** 1.00 1.03 1.03 .00 GARRARD 00000818 Ik ' fl '' 3 '3 JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--58 ACCOUNT DESCRIPTION Accra UNIT OF QUANT BUDGET FOCUS QUANTITY AND UNIT RATE REPORT FINE GRAOINGELEVIG S41 FCST #004 TO DATE THIS BUOGET WEEK FCST #004 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 116 BUDGET WEEK 116 OF 121 TO DATE THIS BUOGET WEEK FCST 0004 TO DATE THIS WEEK $$$$**$ FINE GRAOING 6 LEVEL FINE GRADING 6. LEVEL FINEGRAOING 6 LEVELL FINEGRAQING LEVELI FINE GRADING 6 LEVEL A16S41 B09S41 B2JS41 B29S41 B32S41 SF SF SF SF SF *$TOTAL FINE GRADINGELEVIG TREND FORECAST MH 70470 2200 21990 2534 10 46872 2200 21990 500 3400 46872 2200 21990 500 3400 97204 74962 74962 3245 TRENO FORECAST PERF 0 6146 1900 1781 0 .09 0 215 65 65 0 .10 0 1925 768 920 0 .09 0 225 66 66 0 .09 0 1 413 413 0 .10 0 8512 3212 3245 0 .09 .49 ** PERFORMANCE RATIOS 1.00 .04 .03 .03 .13 .12 .04 .49 .04 .03 .04 .13 .12 .04 .49 00 .00 .00 .00 .00 .00 .00 ?0 2' 23 5 F 9 13 '' 20 30 37 1? -- 0 <1 3! * V- - -..................... ............... ............ .................. .............. ......................... 61 6'. Cl 6- fA rr .0 6 ?( ......... ..........l_______ ______ fs GARRARD 00000819 flU JOB MO. 19053-000 ROBINSON REF INRY MQDERNZTN PROJ-MOC REPORT NO. C38090-5B FOCUS QUANTITY ANO UNIT RATE REPORT DEMOLITION S98 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/29/82 PAGE 117 BUDGET WEEK 116 OF 121 ACCOUNT DESCRIPTION ACC T UNIT - OF QUANT CGET DEMOLITION B23S98 UNITS SSTOTAL DEMOLITION ...... 100 100 -QUANTITY- FCST TO THIS BUOGET aoo9 date WEEK ******** ******** ****** 100 loo 0 9996 100 100 0 9996 MANHCURS- FCST TO -UNIT THIS BUDGET FCST *009 ~ DATE" WEEK" aoo9 ******** ******** MANHOURSTO DATE $$$$$$ 65 n 5613 0 99.96 66*1 3 66 *13 6613 6613 0 99.96 66.13 66.13 THIS WEEK .00 .00 3 ......- * ? 9 IP 12 TREND FORECAST MH 6613 TREND FORECAST PERF 1.97 PERFORMANCE RATIOS 1.00 1.97 1.97 .00 GARRARD 00000820 * JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PRQJ-MGC REPORT NO. C3B090--58 FOCUS QUANTITY AND UNIT RATE REPORT S/C SUPPLIED DISTR XXX PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 11B BUOGET WEEK 116 OF 121 ACCOUNT DESCRIPTION UNIT-----------------------------QUANTITY--------------------------- ------------------------ MANHOURS--------------------------- ------------ ------- -UNIT MANHOURS OF EUCGET FCST TO THIS BUOGET FCST TO THIS BUDGET FCST TO ACCT QUANT ********************* $$$$$ $3* ******** 004 OATE WEEK $ 004 OATE WEEK 004 OATE ********* ********* ******** v,rv TY"r MORRIS DISTRIBUTABLE S09XXX BMHRS 1 0 00 i 42 5 1091 0 1.00 .00 .00 ALLEN-DISTRIBUTABLES SZ9XXX BMHRS 0 0 00 0 230 759 0 .00 . .00 .CO HOKE-DISTRIBUTABLES S32XXX BMHRS 0 0 00 0 200 205 0 .00 .00 .00 THIS WEEK .00 .00 .00 oi : O **TOTAL S/C SUPPLIED OISTR 1 0 0o 1 855 2055 0 1.00 .00 .00 TREND FORECAST MH 2055 TREND FORECAST 'PERF.00 ^PERFORMANCE RATIOS ** 1.00 .00 .00 .00 ' in u 13 e JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC > REPORT NO. C38090--58 FOCUS QUANTITY ANO UNIT RATE REPORT PAINTING FSC35 X10 PERFORMANCE WEEK ENDING BASED ON 5/21/B2 DATE 5/24/82 PAGE 119 BUCGET WEEK 116 OF 121 0 e ACCOUNT DESCRIPTION UNIT------------------- -QUANTITY--------------- ------------------------ MANHOURS -UNIT MA NHOURS-- o OF BUCGET FCST TO THIS BUDGET FCST TO THIS BUDGET FCST TO THIS ........... ACCT if QUANT 3004 DATE WEEK 3004 DATE WEEK 3004 DATE KEEK.... " ***$*$*< ******* ******************** JrW-WrfeTV^1.-WrW .tAriWpW $ tTVTVTTT - V-*- T TTT o PAINTING FSC S00X10 SF **TOTAL PAINTING......... FSC35 75800 75800 57760 57760 37885 37885 3775 3775 8340 8340 2750 2750 030 1730 224 224 li .11 .05 .05 .05 .05 06 06 o ) TREND FORECAST MH FORECAST PERF .42 PERFORMANCE RATIOS 1.00 .43 .42 .54 o ro co c0 ca t9 c c c GARRARD 00000822 o ! im lo i '* GARRARD 00000823 f ' # JOB NO. 1 <(053-000 ROBINSON RF.FINRY HOOERNZTN PROJ-MOC REPORT NO. C38090-58 ACCOUNT DESCRIPTION ACCffi UNIT-----------------OF EUCGET QUANT .................. FOCUS QUANTITY AND UNIT RATE REPORT LARK PAINT FSC<tO X40 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 120 BUOGET WEEK 116 OF 121 -QUANTity--------- FCST TO #004 ..........DATE VVVrVXTvrTTTT THIS WEEK ------------------------ MANHOURS-------------- BUDGET FCST______ TO ....... #004 Bate THIS WEEK ------------ .------ unit manhours------------------ BUDGET FCST TO THIS ...# C 04.......... DATE WEEK LARK PAINTING FS S00X40 SF 15000 19425 19425 0 750 899 899 0 .05 .05 .00 I --*TOTAL LARK PAINT FSC40 15000 19425 19425 0 750 899 899 0 .05 .05 .05 .00 TRENO FORECAST MH 899 TREND FORECAST PERF .93 PERFORMANCE RATIOS ** 1.00 .93 .93 .00 9 2<: y A c........... ......... JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC jpl REPORT NO. C38090-5B o' J OF BUCGET ACCT# QUANT ** JritrJ* JY* **,,JptvJ4tJMr Jit`JrtYJr-Jvr JrAVJ* JrrrATJrTJrvrfc t*'-J*r^-rJrrJ-WrJTr JrTJrVJrx*vJWrJ^rJvr rrV . FOCUS QUANTITY AND UNIT RATE REPORT SCAFFOLDING Y10 UIT - FCST TO #004 DATE THIS BUDGET WEEK ****** $4* $ FCST #004 PERFORMANCE WEEK ENDING BASED ON 5/21/82 DATE 5/24/82 PAGE 121 BUCGET WEEK 116 OF 121 TO THIS BUDGET DATE WEEK ******* $$**** FCST #004 TO OATE THIS WEEK to to to to to to i to 1 to SCAFFOLDING n SCAFFOLDING SCAFFOLDING SCAFFOLDING A16Y10 BMHRS A31Y10 BMHRS B23Y10 BMHRS C50Y10 BMHRS 19186 746 20928 1608 25390 0 20928 1384 25390 0 20928 1384 0 19186 77607 7 742 7 13 1.00 3.06 3.05 .00 0 746 0 0 0 1.00 .00 .00 .00 0 20928 28735 28735 0 1.00 ! 1.37 1.37 .00 0 1608 1434 1434 ,0 1.00 ' 1.04 1.04 .00 *STOTAL SCAFFOLDING 42468 47702 47702 0 42468 107776 107596 13 1.00 2.26 2.26 .00 TREND FORECAST MH 107596 TRENO FORECAST PERF 2.26 $ PERFORMANCE RATIOS ** 1.00 2.26 2.26 .00 SCAFFOLDING SCAFFOLDING SCAFFOLDING SCAFFOLDING SCAFFOLDING SCAFFOLDING SCAFFOLOING SCAFFOLDING SCAFFOLDING SCAFFOLDING SCAFFOLDING SCAFFOLOING B09Y10 MHRS 0 0 00 0 2052 2052 0 .00 .00 .00 .00 B24Y10 MHRS 0 0 0a 0 1585 1585 0 .00 .00 .00 .00 B25Y10 MHRS 0 0 00 0 198 2 1982 0 .00 .00 CO .00 B28Y10 MHRS 0 0 00 0 964 964 0 .00 .00 ocT .00 B29Y10 MHRS 0 0 00 0 98 98 0 .00 .00 .00 .00 B32Y10 MHRS 0 0 00 0 1740 1740 0 .00 .00 .00 .00 B41Y10 MHRS 0 a 00 0 1479 1479 0 .00 .00 .00 .00 B42Y10 MHRS 0 0 00 0 920 920 0 .00 .00 .00 .00 B43Y10 MHRS 0 0 00 0 846 845 0 .00 .00 .00 .00 B44Y10 MHRS 0 0 00 0 4753 4753 0 00 iOO~ TO .00 B45Y10 MHRS 0 0 00 0 2368 2368 0 .00 .00 .00 .00 B99Y10 MHRS 0 0 00 U 104 104 0 .00 .00 .00 .00 $*T0TAL SCAFFOLDING 0 0 00 0 18891 18890 0 .00 .00 .00 .00 TREND FORECAST MH 18890 TREND FORECAST PERF .00 * PERFORMANCE RATIOS ** .00 *00 .00 *00 8 . 40 43 y. 48 42 GARRARD 00000824 65 .'Ci