Document NGMORVp6EkpQaz7YmRDV4YzGy
ROBINSON REFINERY MODERNIZATION PROJECT
MARATHON OIL COMPANY ROBINSON, ILLINOIS
PROJECT HISTORICAL REPORT
BECHTEL JOB NO. 14053
BECHTEL PETROLEUM INC.
1980 - 1982
GARRARD 00000489
PROJECT STATISTICS
GARRARD 00000490
10 PROJECT SUM M A, Y
GARRARD 00000491
PROJECT SUMMARY
PAGE
job no_____ 14Q53______________,_________
JOB TITLE RRMP____________________ JOB LOCATION ROBINSON. ILLINOIS CLIENT MARATHON OIL COMPANY CLIENT HOME OFFICE LIMA. OHIO
EPC
CONTRACT
CPB
LIST FACILITIES CONSTRUCTED:
PLANT
DESCRIPTION
9 AMINE TREATING
16 HYDROTREATER/PLATFORMER
23 SATURATES GAS
28 LPG TREATING
29 REFORMER FEED SPLITTER
20,21,30-99 OTHER OFFPLOTS
50 TDC CONSTRUCTION
60 TDC CONVERSION
BECHTEL SPONSORING DIVISION____il.ff._-l
SUBASSIGNMENTS
R&E
SPONSORING OFFICE HOUSTON PARTICIPATING OFFICES SAN FRANCISCO , LOUISVILLE. EDMONTON. ANN ARBOR. GAITHERSBURG
CAMP SIZE ~
CAPACITY
30,000 BPSD 20 mm SCFD
11200 BPSD
ENGINEERED BY
BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL
CONSTRUCTED BY
BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL BECHTEL
FINAL JOB COSTS MAJOR EQUIPMENT OTHER DIRECTS DISTRIBUTABLES HOME OFFICE TOTAL BECHTEL
SETTLEMENTS
TOTAL
$ MM
20.3 58.7 19.6 14.2 112.8
( -3) 112.5
SCHEDULE AWARD START DESIGN ENGR'G. ENGR'G. 90% START CONSTRUCTION START FOUNDATIONS START A/G PIPING FINAL MECH. COMPL.
DATE
03/80
03/80 09/81 10/80 12/80 06/81 04/82
MANHOURS
M
RPCHTFI OIRFCT MANUAL 1 383.1
BECHTEL DISTRIB. MANUAL 293.3
SUBCONTRACT
258.3
NON-MANUAL
350.6
HOME OFFICE
499.0
FINAL PRODUCTIVITY (DIRECTS)
1 .63
MANPOWER (PEAK) BECHTEL MANUAL SUBCONTRACT NON-MANUAL HOME OFFICE
DURATION
18.5
82
1241 266 121 169
PHR 1.0-1
GARRARD 00000492
Page 2
RATIO ANALYSIS
Normal Historical Range
Your Project
.1 Non-Manual Manhours as a % of Manual Manhours
20.9%
Domestic Projects
15-20%
Remote/Camp Projects
22%-28%
2. Distributable Costs as a % of Direct Labor Costs
72.9%
68%-85%
N/A
3. Home Office Costs as a % of Total Field Costs
11.7%
8%-12%
.5%-12%
4. Distributable Manual Manhours as a % of Direct Manual Manhours
21.2%
18*-23%
N/A
5. Engineering Tech Manhours Per Piece of Major Equipment
1,180 950-1150
1000-1200
6. Peak Construction % Complete Per Month
8% 7%-9%
6%-8%
Comments:
.1 The non-manual manhours for the project (350,600) includes 53,500
manhours of design engineering work performed at the jobsite for the TDC-2000 conversion. If these hours are excluded, item 1 above is 17.7%. 2. One factor that caused item 5 above to be high is the large revamp content in the project scope.
GARRARD 00000493
11 SUMMAg-V COST DATA
GARRARD 00000494
JOB NO.
{JOB DESCRIPTION CLIENT LOCATION
14053 ROBINSON REFINERY MODERNIZATION
MARATHON OIL COMPANY ROBINSON, ILLINOIS
PROJECT COST SUMMARY BY CATEGORY Dollars & Manhours In Thousands
COLUMNS & VESSELS TANKS EXCHANGERS FIRED HEATERS PUMPS COMPRESSORS SPECIAL EQUIPMENT
SUBTOTAL MAJOR EQUIPMENT
INSTRUMENTS PIPING STRUCTURAL STEEL INSULATION ELECTRICAL CONCRETE WORK BUILDINGS SITE WORK PAINTING
SUBTOTAL OTHER DIRECTS
SCAFFOLDING
TOTAL DIRECT FIELD COSTS
TEMPORARY CONSTRUCTION MISC. CONSTRUCTION SERVICES CONSTRN. EQUIP., TOOLS, SUPPLIES FIELD OFFICE COSTS (NONMANUAL MHRS OTHER OPERATIONS REMOTE AND OFFSHORE ASSOC. COSTS
MANHOURS
Bechtel
13.5 0.3
11 .1 30.6 13.1 21 .3
4.9 94.8
S/C
6.6 -
3.0 1 .6
2.0
13.2
152.6 288.9
53.4 16.6 288.7 97.9
3.6 60.6
962.3
_
0.6
77.1 0.8
10.0 6.4 9.3 9.1
113.3
43.4
-
1100.5
126.5
57.2 168.2
274.9 24.9
14.4 1 ?
. _
FINAL BUDGET
BECHTEL COSTS
Material
Labor
4958.1 98.8
4969.2 4972.7 1417.5 4088.5 1013.6 21518.4
298.0 11.5
230.3 675.8 261 .8 418.7
77.3 1 973.4
9383.2 6194.9 1680.9
19.6 4269.8 1010.6
74.6 229.0
3206.1 6279.9 1111.5
355.4 5940.4 1615.3
74.2 1019.7
22862.6 1 9602.5
787.6
44381.0 22363.5
631 .2 244.2 4281 .6 1416.3
_
1209.3 3185.8
11.0 6093.3
_
S/C COSTS
494.7
389.1 42.7
116.0
1042.5
TOTAL COSTS
5750.8 110.3
5588.6 5691.2 1 679.3 4623.2 1090.9 24534.3
-
62.8
_
3196.4 42.4
556.8 557.7 565.3 658.5 5539.9
12589.3 12537.6
2792.4 3571 .4
10252.6
3182.7 706.5
1814.0 558.5
48005.n
787.6
5582.4 73326.9
689.1 10.3
_
2529.6 3440.3 4292.6 7509.6
MANHOURS
Bechtel
S/C
24.2
.1 13.4 82.3
8.6 15.3
1.6 145.5
7.1 -
2.8 12.2
1 .3 1.3 0.3 25.0
65.7 416.5
60.7 2.1
269.1 223.1
7.2 66.5
1110.9
4.5 100.5
1.9 81 .8
1 .1
1 .4 7.9 12.5 3.4 215.0
126.7
1383.1
240.0
60.6 206.?
350.6 26.5
16.2 2.0 _
.1
PAGE _.
CONST. nflTFS 10/80 TO 04/82 PREPARED BY____________________
ACTUAL COSTS
BECHTEL COSTS
Material
4873.0 36.5
4430.1 5028.6 1192.2 4066.1
703.5 20330.0
Labor
515.6 2.0
281 .4 1760.3
162.7 287.9
31.7 3041.6
S/C COSTS
606.8 0.3
224.6 433.6
38.0 38.R
8.8 1350.9
TOTAL COSTS
5995.4 38.8
4936.1 7222.5 1392.9 4392.8
744.0 24722.5
7400.3 7843.4 1 677.5
5.7 3783.0 1795.9
57.1 431 .8
1 .3 22996.0
_
1368.4 8731.6 1181.6
48.3 5241.0 3861.6
122.2 1084.9
.3 216.39.9
2155.9
131 .4 2999.3
83.4 2811.6
45.9 74.9 574.1 682.6 111.9 7616.1
8900.1
19574.3 2942.5 2865.6 9069.9
5732.4 753.4
2199.3 113.5
62161 .0
2155.9
43326.0 26837.4
8866.0 79029.4
788.0 153.9
4974.8 1570.4
106.9
1071 .9 3647.0
_
6125.0 468.7
612.8 38.0
1 .0
12.2 _
2472.7 3838.9
4975.8 7707.6
575.6
TOTAL DISTRIBUTABLE FIELD COSTS
TOTAL FIELD COSTS (Reim. )
DIVISION TECHNICAL SERVICES ENGINEERING PROCUREMENT OTHER DIVISIONAL SERVICE DEPARTMENTS
TOTAL,H.O. fReim.i
BURDEN CONTINGENCY NEGOTIATED SETTLEMENTS TOTAL PROJECT COSTS (Reim.)
{Excludes Gross Margin)
525.2 1 62?.?
22.0 273.6
40.6 13.0
7.5 356.7
1 982.4
15.6 T727T
6573.3 50954.3
10499.4 32862.9
82.9 631 .5 127.9
98.5 24.3
405.3 5143.3
695.2 314.8 129.2
_
965.1
6687.8
1908.7 7641.4
142.1 61469.5 39550.7
699.4 7281.8
17772.1 91099.C
488.2 5774.f
823.1 413.: 153.E
_ 7652.5
1 908.7 7641 .4
7281.8 108302.r
2027.0 26.7
383.8 48.5 22.1 17.9
499.0
2526.0
PROJECT COST SUMMARY BY CATEGORY
Tfi.S
258.3 _ _ _ _ _ _
258.3
7550' 11312.6
50920.0 38150.0
113.5 1596.0
200.4 238.3
84.4
489.5 7110.8
802.7 585.5 265.9
2232.6
9254.4
2763.0
(310.0 55605.6
47404.4
664.0 1 9570.6
9530.0 98600.C
603.0 _ 8706.8
1003.1 82.3.8 360.3
_ 11487.0
2763.C
(310.0 9530.0 112540.C
PHR 1.1-1
JOB NO.
14053
JOB DESCRIPTION . ROBINSON MODERNIZATION PROJECT
CLIENT
MARATHON OIL COMPANY
LOCATION
ROBINSON, ILLINOIS
PROJECT COST SUMMARY BY PLANT Dollars & Manhours In Thousands
PLANT NUMBER & DESCRIPTION 5 HYDROGEN COMPRESSOR
MANHOURS
Bechtel -
S/C 2.0
FINAL BUDGET
BECHTEL COSTS
Material -
Labor -
S/C COSTS
116.0
TOTAL COSTS
116.0
9 AMINE TREATING
30.6
1 .8 1114.1
559.6
84.0
1757.7
16 HYDROTREATER/PLATFORMER
448.3
73.4 26688.4
8909.1
3539.3
39136.8
20/21 INTERCONNECTING PIPELINE
108.1
13.0
1234.2
2573.4
343.5
4151.1
23 SATURATES GAS
135.7
8,0 4 0 98.1
2475.8
340.6
6914.5
50/60 TDC-2000 CONVERSION
266.9
16.3
6962.3
5573.4
1097.7
13633.4
28 LPG TREATING
28.8
1 ,5 1527.4
638.3
167.0
2332.7
29 REFORMER FEED SPLITTER 30 ELECTRICAL DISTRIBUTION 31 IITII 1TY GENERATION
23.8 5.4
11.5
5.6 732.8
- 375.5
_ 451 .8
486.8 110.2 240,4
160.6 -
290.7
1380.2 485.7 982.9
32 COOLING TOWER 99 MISC. OFFPLOT PLANTS
40.5 0.9
3.9 1194.7 1.0 1 .7
794.4 2.1
443.0 -
2432.1 3.8
CONST. OATFS PREPARED BY
PAGE 10/80 TO 04/82
MANHOURS
Bechtel
S/C
_
15.1 812.5 109.9 180.5 181 .3
20.8 11.8
4.1 2.7 43.1 1.3
18.8 131 .2
26.6 14.3 13.2
3.0 12.3
-
3.3 13.8
3.5
ACTUAL COSTS
BECHTEL COSTS
Material
Labor
4.0
1151 .8
276.9
25688.8 15800.4
3535.1
2244.7
3543.1
3372.4
6784.0 3568.4
856.0
415.9
529.6
229.6
4.5 80.1
114.3
50.7
865.6
772.3
249.2
26.0
S/C COSTS
_
TOTAL COSTS
4.0
545.7
1974.4
5229.7 46718.9
769.5
6549.3
398.3
7313.8
704.9 11057.3
85.6 1357.5
383.3
1142.5
. 84.6
96.9
261 .9
555.7
2193.6
96.4
371 .6
TOTAL DIRECT FIELD COSTS
1100.5
126.5
44381.0 22363.5
6582.4
73326.9
PROJECT COST SUMMARY BY PLANT
1383.1
240.0 43326.0 26837.4
8866.0
79029.4 PHR 1.1-2
l4o5'3
JOB DESCRIPTION KKHP____________________
CLIENT MAKATIPLI <3>l i_ COHPAW
LOCATION TtoBR'LSoiJ.
-1MOI -b
QUANTITY & UNIT RATE SUMMARY TOTAL PROJECT
PAGE
CONST. DATES IofbQ TO___ 4/81-____ PREPARED BY C.'jRCKSou /p- LEE
UNIT RATES AND RATIO ANALYSIS
HOME OFFICE 1. ENGINEERING TECH MHRS 2. ISOMETRIC DRAWINGS 3 ENGINEERING TECH MHRS 4. NO. OF H.O. ISSUED PO'S 5. PROCUREMENT MANHOURS 6. TOTAL H.O. COSTS 7. FIELD NON-MANUAL MANHOURS 8. ENGINEERING TECH MHRS
COLUMN
NO. PIECES OF EQUIPMENT
18"U NO. PIECES OF EQUIPMENT
llrAteCO TOTAL NO. OF DRAWINGS
277 NO. PIECES OF EQUIPMENT
4fi,Soo NO. H.O. ISSUED P.O.'S
ST TOTAL FIELD COSTS
350
TOTAL H. 0. MHRS
ZCrfjteOO TOTAL H.O. MANHOURS
COLUMN A4B B
n>oi
\\80 5.^6
'Z0^0 H7. e>
3
27.3 m.i *18600 .iz ^M.000 .70
4^430
FIELD MANPOWER & MANHOURS 9. MON-MANUAL MANHOURS
10. NON MANUAL MANHOURS 11. DISTRIBUTABLE MANUAL MHRS 12. NM MANPOWER PEAK 13. MANUAL MANPOWER PEAK 14. NM MANPOWER PEAK 15. BECHTEL DIRECT MANUAL MHRS
35 0,(pOO DIRECT + DISTRIB MANUAL MHRS
1G76100 .21
350, (cOO DIRECT + DISTRIB + S/C MAN. MHRS
m-47CO . 1
\7.\
DIRECT MANUAL MANHOURS MANUAL MANPOWER PEAK
1383100 .21
[2A\
.10
MANUAL MANPOWER AVERAGE
5\0
l-Z-l
NM MANPOWER AVERAGE
so
1,51
1363.1OO FINAL PRODUCTIVITY FACTOR (DIRECTSI L.63 81(^528
FIELD COSTS
16. OTHER DIRECT MATL & S/C COSTS 30SU.I
17. OFFPLOT MATL & S/C COSTS
L2IS.U?
18. OFFPLOT MANUAL MHRsG*^1--^ -48
19. TOTAL DIRECT MATL & S/C COSTS
20 DISTRIBUTABLE COSTS
135 TO (t>
MAJ. EQUIPT MATL & S/C COSTS PROCESS UNITS MATL & S/C COSTS PROCESS UNITS MANUAL MHRS COST INDEX TO CONVERT TO 1970 $ DIRECT LABOR COSTS
16111.1 l.fel 30116.5 ."15
,s\ 'in \R330
^T3_
BULK MATERIAL RATIOS
21. INSTRUMENT MtACTKLcu& .St/Cc>CeOjfSTS 22. LINEAL FEET OF PIPE
NO. OF CONTROL LOOPS na653 NO. PIECES OF EQUIPT
23. TOTAL PIPING MANHOIIRR(loa4) 5H.OOO LINEAL FEET OF PIPE
24. TOTAL PIPING COSTS
1157-1.3 LINEAL FEET OF PIPE
25. TOTAL PIPING MATL & S/C COSTS I05V42.T MAJ. EQUIPT MATL & S/C COSTS
LIN FT SMALL PIPE
73156 LIN FT LARGE PIPE
27. LIN FT SHOP SPOOLED PIPE 28. NUMBER OF SPOOLS
W-ll 27-10
LINEAL FEET OF PIPE NO. PIECES OF EQUIPT
29. LIN FT OF WIRE (P31 & P32)
CONNECTED HORSEPOWER
30. LIN FT OF WWE (P31, P32 & P33) ^57^07 LIN FT OF CONDUIT
31. PWR & CONTROL EQUIPT COSTS
TOTAL ELECT ACCT MATERIAL COSTS
32. CUBIC YARDS CONCRETE 33. TONS OF STRUCTURAL STEEL 34. EQUIV L.F. INSULATION
5127 517, 1
\3VM3
NO. PIECES OF EQUIPT NO. PIECES OF EQUIPT LIN FT A/G PIPE
35. CUBIC YDS EXCAVATION + B.F.
CUBIC YDS CONCRETE
216 lo.^l
301 578
H66S3> z-ai 116633 .11
lerm 157
isn 1 \78653
?>o<\
*17 -zg 8-07
<1116 15.1
2M/p5S 3183 . 22
3 0*1 7.01
ii 1.87
MJM 63
1.5L
QUANTITY AND MANHOUR DETAIL
Item MAJOR EQUIPMENT
Columns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt.
Quantity
&Bechtel S/C
Unit
Manhours
Manhours
IZi&70A
EA TON
5 EA
BBL
76. EA
4*>e5,
EA BTU
6*7 EA BHP
&(,<II,!
EA BHP
75EA
3o1EA
31315 4473%4M 120 24.00
l9f Z 0 6= z 13.24 <14386 19877/ . ^
99 2 1
146.01
1 CeCpOlp 1*50?-0-4/
182.9 25,4 6
Item STEEL
Quantity
Bechtel & S/C Manhours
Structural Steel
383.8 t
20360
Platforms, Ladders
193.3 T
19281
Other Steel Total Steel
464.1 7 1041,5 T
23067
INSULATION
Pipe Ins.
9Ft Avg.*$ 13994Self 56'S6 7
Equipment Insul. Fireproofing
4167? sf 17236 SF
18121
5QOZ>
INSTRUMENTS Field Mounted Instr. Panel Instruments
"i6>44EA
3644ea
- EA
1022 1
Zt, 435
-
Control Valves Package Control Syst.
- EA
\3 EA
733
PIPING
2" & Under CS 214"-6" St. Run CS ^
5 lf LF
I50ZI8
8"-12" St. Run CS
LF
14"-24" St. Run CS '45230 lf
26" & Over St. Run ds
Vti` - 6" Spools CS^)
LF
LF
44313
8" - 12" Spools CS 4-77 79LF
14" - 24" Spoofs CS
LF
26" & Over Spools CS
LF
2*3640
Total A/G CS
10.4704 LF
Underground Pipe
4719 lf
SP<K,.lityPin^;^, 1904 OLF
4Dfol7l 13390 545 3
19 27 725
3858
Z.Z]
,48
4ZU
l 47
1.60 .29
ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Tray
CONCRETE WORK Formwork Rebar Concrete Total Q Acct
BUILDINGS SITE WORK
Excavation Backfill Sewers/Drains
1927 ea
Z34799LF 26856-lf
LF 6I5Z9ea 12790 lf I3Z24LF
25273 1232.68
6.320 4B2Z1 -31266
50 34 19&9Z
I52662SF
116941
9887 t
49149
9251 CY ZS947
II6Z4cy ZZ2 659
272/ sf l5o8l:
21I83cy Z3Z5Zcy 6230 LF
21592
20 243 119 17
Unit Manhours
52,7699.75 49 70
60 IO
.40 43
34
13.12
. 55
24 OS 51 39
I.60
.77 49 7 l
3- 13. 19.1.5 5.64
.94
.87
1.9 1
Alloy Pipe Steam Tracing Hangers/Supports Test/Inspect Material Handling
-4Z30LF 4D6.IOLF
EA 19 31 53 LF
31155 Z.IB49
1. 37
.54
With Pi PI JJCr z63oz-
. 13
Al/A
NOTES:
GARRARD 00000497
QUANTITY & UNIT RATE SUMMARY
PREPARED RY
PHR 1.1-3
1 COST BREAKDOWN
gy categ-orv
GARRARD
4-
PHR 1.1-4
PAGE
GARRARD 00000499
&
JOB NO. HQ5S
DESCRIPTION CLIENT MARftTVVQto 0(0 CO.
LOCATION (?Q&'uSc^ , H_
COSTS AND COMMITMENT HISTORY
CONST. DATES l of SO m 4/s2^ PREPARED BY 5. l. LEE
YEAR CUTOFF DATE
19-i
19 42.
19____
March 31 June 30 Sept. 30 Dec. 31 March 31 APR 30 Sept. 30 Dec. 31 March 31 June 30 Sept. 30 Dec. 31
PROJECT COSTS (CASH FLOW)
Major Equipment
2.4 04 6244 1244^ !4l3o 14784 2oo24
Other Direct Material
3853 J?472 14524 1444?. 224(2 22442.
rl
l__
Direct Labor AuCl, Disyrib.LfM3cl 1 6.5
U4ocj 14 345" 24287 3l4o
Subcontracts
_--
U 7b
2540 2o48p 4507 6no3
Subtotal Directs
8244 2069 42467 60665 75445 80427
Distributables (Exd. Non-Manual) Non-Manual Labor
144 O
4247 6185 7523 78 77
1310 3184 3457
6446 5803
Subtotal Field Costs
l 544 bl4 4 50 17 i 71376 83464 44107
Home Office
5S6G 8128 467 / 13745 t i '224 1(330
TOTAL PROJECT
Il54 34272 54842 82\2\ 100(88. 105437
PROJECT COMMITMENTS
Direct Material
Major Equipment Instruments Piping Structural Steel Electrical Concrete Work All Other Direct Material . TOTAL DIRECT MATERIAL Direct Subcontracts
18720 14438 20128 20177 20235 -20274 5030 644 7017 7471 7564 7514
3458 4431 5228 6374 7573 7874 (733 1716) 1444 1640 1646 1645
1474 soon 3328 35,85 3886 3434 )4'33 1217 1843 1428 1445 i 82 1 (pOO 3i3 444 478 440 443
32353 3b 631 344 F77 41653 4 338A 4361.0
PIP HOC:-Insulation
Buildings
Other (List Major S/C) ',STPLOORK
RfcftCToR
ILiTERWfllf
________ dlklELB___________________________ TOTAL DIRECT SUBCONTRACTS
-- 557
-
620 'ZicS 'Zi u> 1 658>
--
537 4W 630 205 (66, <205(3
-
2673 447 628 478 S\8 4744
400 3773 570
628 5oZ 414 674 2.
2480 2450 9640 3640
67n 570 601 60 1
544 548 154 3 1557 4378 486b
Distributable Material & S/C
3123. 4737 5604 6884 744.3 82 (
PAGE
Oi
GARRARD 00000500
COSTS AND COMMITMENT HISTORY
PHR 1.1-5
)
JOB WO. & TITLE IHO^ Rofolt^Oti RlffrlttefcN WflhflLlJ. CONSTR. DATES
TO ,4l&L.
CLIENT___________ MA^jKT\Ao4 Oil CjD .________________ PREPARED BY WY GmJJDvAfN____
"C"- COLUMNS & VESSELS
JOB LOCATION ft Qfo U^60t4 Xl^I t-4a\5
SUMMARY OF COLUMNS & VESSELS
INSTALLED QUANTITIES
FINAL MANHOURS
Bechtel
S/C
DIRECT COST $1000
Bechtel Matl.
S/C L&M
CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR
1.2. V- '2_-^2_ 2-2. 1-2-2
PAGE 2-
VL-ft'fcST
PAGEl 3/4/fT
^
PAGE 2_
p L AhiT 1.1
PAGE ^
WfsvAX 2/h
CARRY FORWARD FROM PHR \-2-Z. CARRY FORWARD FROM PHR 1 2-2-
PAGE PAGE
^ ^
VLCWjfV "LS pt Akj-p 2 [
CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR
PAGE
PAGE
^ EA 731
4*0 EA \av*>(0
-
\4t-\
-
3&lld 44a ^
1 EA
-- \\ <4- -
\<h EA 447S 6o
\ 1 - 6
EA Hi
-
zo^n
--
| EA 4t
//oC
16 - h LjL'S,
EA
EA
PAGE -------- 777
- 03
GARRARD
"IS rv/
TOTAL COLUMNS & VESSELS
/ S / 10 EA v\z^ 12m 4arrvc
oocoooon
"C" ACCOUNT - COLUMNS & VESSELS
PHR 1.2-1
1,S
COST CEAKD0\WN CY PLANT
GARRARD
JOB wn 140*53
CONST. DATES >/60 TO A /&2
JOB DESCRIPTION RRHP CLIENT MARACTHOkJ. C>IL eoHPAUV LOCATION RQBhUson) , ILLiMOia
PLANT SUMMARY Dollars & Manhours In Thousands
PLANT NUMBER_2 DESCRIPTION AMIklE ~reeATIM6
CAPACITY
OVERALL SUMMARY
MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E- Exchangers F--Fired Heaters G--Pumps K- Compressors T-- Special Equipt. SUBTOTAL
Material |
COSTS
Labor |
S/C
| Total
MANHOURS
Bechtel |
S/C
I4Z.I -
Z45.7 --
Z 3.3
77.9
3.0
492.0
i5.6 --
4 .5 -
4 .5
2A .6
-
--
--
_
0,2
0.3
-
0.5
157 .7 -
250.2 -
23.5 82.7
3 .0
517,1
,7 --
.2 --
.3 -
1 .2
__
-- -
--
QUANTITY AND MANHOUR DETAIL
Item MAJOR EQUIPMENT
Columns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt.
11 Qauuaanntt,ittVy 1| Mahntehl o&urSs/C 11 ManUhnoiut rs
Cf EA
34."5 TON
TfT ~ BBL
9 ea , EA
BTU 3 BE,,AP
ivr bhp 3 ea
7 33 i22/ZI4 --
213
24
--
1o 3
252 Z*2/ ,8
w/.c
w
22 EA
--
1
|BeMtnL&u,S./C| M.ffinr,
STEEL
Structural Steel Platforms, Ladders
7.6 T 7.1 T
Other Steel Total Steel
43-Ot 57. 7t
INSULATION
PPiipne. IInns*. ------ FtflA- vFga,c<*p 337 7 elf
Equipment Insul.
l 530SF
Fireproofing (CQVl fT) 1602 SF
210 1039 1496 2745
1 520 753 176
27.6 1463 34 & 47.6
0 45 0.49 O. 11
OTHER DIRECTS J--Instruments L--Piping M--Steel N--Insulation P- Electrical Q--Concrete Work R--Buildings S-Site Work X--Painting SUBTOTAL
134.9 304.2
100,0
-
79.7
2 5.0
-
16 ,0 --
65 9.8
2& II .6 52 .7 -
OO. \
42 .7 --
47 .5
217 4
2 8 .0
4464 1 .1
0.7 .7 --.
_ 545.2
165.7 764.2 153.&
67.7 I39.&
67 .7 -
63.5 --
I4ZZ.4
.1 .5 2.7 -- 3.1 2.5 -- 2 .9 -- II .&
1 .0
154 24 --
_ 1&.8
| TOTAL DIRECT COSTS | MSI .&| 242.o\ S45.7|l939 -5| 13.o|
\&~S\
INSTRUMENTS
93 EA
Field Mounted Instr. Panel Instruments
93 ea - EA
Control Valves
EA
Package Control Syst.
- EA
PIPING
2" & Under CS
214"-6" St. Run CS '
35oOLf LF
8"-12" St. Run CS , 14"-24" St. Run CS f
LF LF
26" & Over St. Run CS
2W - 6" Spools CS^
LF LF
8" - 12" Spools CS 14" - 24" Spools CS 26" & Over Spool* CS
226ILF LF LF
106 2 306 -
4909
6947
114 3-29 -
1 4o
3 07
ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Tray
CONCRETE WORK Formwork Rebar Concrete Total Q Acct
BUILDINGS SITE WORK
39 ea 5250LF
- LF
Z0665-f l&OEA
30 LF
-- LF
241 1&40
632
172 42 -
6.18 0.35
-
0.031
.96
.84 -
269O F
6.7 T 133 cy
208 cy
- SF
1024 715 390
246& --
-36
106.7 2.93 11-87
H.O. ENGINEERING
I
Total A/G CS
5761 LF U&56
2.06
Excavation
653 CY 1324
2.03
Other Direct Material 8t S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire IP31 & P32) Total Piping Manhours Peak Manual Manpower
Col A UNIT RATES AND RATIO ANALYSIS
Col B Af B
1205 --
5688 136 133
IT-4 OO I 5 881 U/A
492.5 2.45 Major Equipment Material & S/C $
No. Pieces of Equipment No. Pieces of Equipment No. Pieces of Equipment Connected Horsepower
22 26,8
22 (o.2
22 (q.o
53 497.14
Lineal Feet of Pipe
5&B8 2 7O
Area in Battery Limits (SF)
>4080 _
Underground Pipe Speciality Pipe
CS Valves [2%" 8c Larger)
127 LF - LF - EA
Alloy Pipe Steam Tracing Hangers/Supports
623 LF 3981 LF W/ L" EA
Test/Inspect
9292 lf
Material Handling
286 -
117 1 1499
1074 YY/.-u"
2 25
-
1.88 0.38
12
BackfiH Sewers/Drains PAINTING
49 9 CY 287 <-F
- SF
310 1209
-
. 62 4.21
--
Job Overall Labor Productivity
16 3
PLANT SUMMARY
PREPARED by S - ^ AP^C^AvUAV
PHR 1.3-1
JOB WO 4063
CONST. DATES `/gO TO -4 /&2
JOB DESCRIPTION RRHP CLIENT HMTA.-TXQM <PU- tSPFlFAUV LOCATION RoBIMoOlJ ILi-ugOI-S
PLANT SUMMARY Dollars & Manhours In Thousands
PLANT NUMBEH_lk DESCRIPTION 004 PLATFORHgK
HAPTHA HV<70-r~Re-ATE~f;
CAPACITY 30.000 BP6C
OVERALL SUMMARY
Materiel |
COSTS
Labor |
S/C
| Total
MANHOURS
Bechtel |
S/C
Item
QUANTITY AND MANHOUR DETAIL
| Quantity |B*S,,&urS/C| Mlffiur,
^
1
|B,M.nhn&urS/C| M.^ur,
MAJOR EQUIPMENT C--Columns & Vessels D-Tanks E-Exchangers F--Fired Heaters G--Pumps K-- Compressors T-- Special Equipt. SUBTOTAL
3899.1 5.7
3492 .9 4769.7
745.2
3964.2 ZZ4.5
17121 .3
384>. 4
1. *
227.3 1660. 1
91 .5
283.4 22 A
2072 .2
540.5 4&34_o - tp '8> 8.6. 3728.8
417.5 6847.3 28.0 865.3 38.5 4306. 1 - 246 .9
lo4! .7 20835.2
l&.l
0.1 io .9 77 .6 4 .9
i5 .0
1 .1 127 .7
(2? o --
o,3 n .7 i .0 i .3
--
20.3
MAJOR EQUIPMENT Columns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt.
-40 EA Soy. <* TON
2 EA - BBL
46 EA
. -4 EA 40l.4HrtBTU
2 EA 1990. 8HP
O EA 0524 BHP
59 EA
169 EA
toOZ/tr*-
2407 9 ZX*>/TOKl
54 27/<?A.
III 31 Z4Z/&A89 257 Z2*Af/&A.
5 824 16354
107 5
18/fey.
STEEL Structural Steel Platforms, Ladders Other Steel Total Steel
INSULATION
Pip. In.'
Equipment Insul. Fireproofing
366T 14 Ot
22 T 52 8 T
19 305 13144
1024 33473
52-75/ran 9 3-8B/TOM AIp ^5/rotS (*3Ao/roti
7 2 671 elf 293^1 SF 7489 sf
30564 11957
371S
O-^it/eL F 0.407/sr
0.496/5F
OTHER DIRECTS J-- Instruments L-Piping M-Steel N--Insulation P--Electrical 0--Concrete Work R--Buildings S-Site Work X--Painting SUBTOTAL
1608.5 455.5 24 .3 2038.3 3282.4 5573.9 1339.4 10195.7
795.4
6.3
go .4 1492.1
3 .7
23. 1 1800.3 1627. 1
12197 1780. 1
6 .O 3005.8
1440.2 2913 .9
74.9 4429.0
28 .9
56.3
73.0 I5S 2
188 .3 .4
387.9 .3
632.4 1258 -6 107.3 log.o
8567.5 II6o7.3 4188.0 24562.8
21.8 265.9
31.7
i .O 91 4 168.3
3-3 2 3 .8
--
607.2
43.5 l .8
46.3 o.Z 1 .4 1 .2
12 .5 3 .2 uo.9
TOTAL DIRECT COSTS |z 5688. fc| 144 7 9 ,S| 5229.7145398 ,Q | 734.91
131 H
INSTRUMENTS
II03EA 22719
206^,
Field Mounted Instr. Panel Instruments
1103 EA -- EA
6959
6.3/fey.
Control Valves
-- EA
Package Control Syst.
15 EA
PIPING
2" & Under CS
37050 LF
2tf"-6" St. Run CS \
LF
627 10 3617
4\V<ta.
2.8' o/zf
8" 12" St. Run CS ^
LF
14" 24" St. Run CS f 9436 LF
7 592 O.81/2/=
26" & Over St. Run CS 2W - 6" Spool* /
LF LF
8" - 12" Spools CS
14" - 24" Spools CS 26" & Over Spools
23538 lf LF LF
in 395
499/iF
ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Trey
CONCRETE WORK Formwork Rebar Concrete Total Q Acct
BUILDINGS SITE WORK
8I3EA 10242 1260 7ea
-79819 LF 4*=>96pO 0.59 /|_F
176*74, LF
4 183 0-24 /lf
379I55LF 14882 0.04 /lf
J3I57EA 2 5O0LF
8981
2011
^^ O.BO /|_f
895lf
1268 1 42/lf
II4843sf 92591 0.8f
881 t
39034 4A-3 fe=foa
7645 CY 22 119 2.9062; y
8997 cy 168 307 18.71 xfcY 1841 sf 4500 244
H.O. ENGINEERING
Other Direct Material & S/C $ Lineal F Bet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity
Total A/G CS
7002-4 LF 228804 3. 2 7/fer
Excavation
020867 cv 92 99
45
Col A UNIT RATES AND RATIO ANALYSIS
AfB
Underground Pipe
6IB8 LF
9177
1.48,^
BackfiH
415578 CY 12103 0-78 /y
i -15934 UR 1319
Major Equipment Material & S/C S !,&'63
No. Pieces of Equipment
IB9
No. Pieces of Equipment
169
.70 402
Sp^ilityPip
19040 lf
CS Valves (2fc" & Larger} -- EA
Alloy Pipe
3607 lf
5453
29 9 84
0.29,///
Sewers/Drains
PAINTING ( 3/C~)
3161 lf
iS)HO SF
3415 1.08 3262 0.047
8 3I/f NOTES: 2QL5 /VC55EL5 --* VUT - A5 LIFTEP
764 5 Cy 271 190 lf 3o94 OO
No. Pieces of Equipment Connected Horsepower Lineal Feet of Pipe
i69 404 IQ5I9.5 2578 75934 4-08
Steam Tracing Hangers/Supports Ten/Inspect
15901 lf (itJCL.) EA
92989 lf
9413
(iMCt,.)
16 547
0.59//T 0.18 /n"
RETSA^-y MHR<. IKJCt- FAB. RETSAR CQTV
UOT IklOL . >.
_____________
6lTfc WO KX- ~
exCAVATlOhi
-t i A Meu
Area in Battery Limits (SF)
Toooo 0.0102 Material Handling
(PlM-fllSS)
cockier sv :5/<c .
1 6?^)
PUNT SUMMARY
PREPAREQ BY M- Mltl-gR
PHR 1.3-1
JOB WO 14Q57> CONST. DATES tO/feo TO 4/82-
JOnBn nDrEoSoCnRiInP-TrIiOnNii OF^CRut-tCfT7
1
CLIENT MAsKA't-HokA Q\l COMP^MV
LOCATION
MSOil h-IikIqi-s
PLANT SUMMARY Dollars & Manhours In Thousands
paoe ' PLANT NUMBER 2 1 / 20 DESCRIPTION IMTRt:i;mici:Tln&
g>\ pgyyAV & TA.KXVS FYS-gC M
CAPACITY. ZM~~
SUMMARY MAJOR EQUIPMENT
Material
Labor
S/C
Total
Bechtel
S/C
Item MAJOR EQUIPMENT
QUANTITY AND MANHOUR DETAIL
Quantity
Bechtel & S/C
Unit
Manhours
l..m STEEL
| Quantity | ^ioVa* 1 Manhour,
C--Columns & Vessels D--Tanks E--Exchangers F-Fired Heaters G--Pumps K- Compressors T-- Special Equipt. SUBTOTAL
11.4 44. 8 562
i-3 -
1.0 23
-- 7.7 1.1
12.7 -
53-5
-
.1 -
.i
-
-
_ o. 3
-
0.3
Columns/VesseU Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt.
* /Z3 TON
EA BBL
EA
EA BTU
(j> EA BHP EA BHP
EA
7 ea
69
59/2.5 T
314
52
Structural Steel Platforms, Ladders Other Steel
T T 332.5 T
16551
Total Steel
332.5 T
16551
INSULATION Pip. In,. --FavF.*5 31762ELF
Equipment Insul.
SF
10991
Fireproofing
145 sf
18
49.8 49.8
.346 0.125
OTHER DIRECTS J-- Instruments L--Piping M-Steel N--Insulation P- Electrical Q--Concrete Work R-Buildings S-Site Work X-Painting SUBTOTAL
-
ZMu>.\
572.4
1624-8
322 4
-
10.1
4U
25.2 23.4 46.7
-
9.1 23.5 --
34789 z 006-0
446-2
-
4917.1 2-94. &
3'5.6 -
340.5 33.6
- 57. a
--
- 32.6
--
761 8 63007
77.5
1.2 2.7 14 99.4
15.3> II O -
26.3
I TOTAL DIRECT COSTS I 3 535.11 2068.3 | 769.5 | <* 372 .*? | 99 5 | 26-6 I
INSTRUMENTS Field Mounted Instr. X
EA EA
Panel Instruments Control Valves Package Control Syst.
>________ 2.WITH PtAW T 99
EA
EA
PIPING
2" & Under CS
^ I526Z LF
2W-&" St. Run CS
8"-12" St. Run CS
l
LF
16556
1.08
14"-24" St. Run CS
35T94LF
26" & Oeer St. Run CS
LF
LF2W - 6" Spools CS *
8" - 12" Spools CS \,906l lf
f14" - 24" Spools CS
26" & Over Spools CS I
lf
367 2 1 32944
1-03 3-64
H.O. ENGINEERING
Col A
II
UNIT RATES AND RATIO ANALYSIS
I
Total A/G CS Underground Pipe
' 60IITLF
- LF
86221 -
143
-
Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity
4240.7
6011 7
A2A Z IT
1200
1180&
n/a Tc3"
Major Equipment Material & S/C $ ^3-9
^
No. Pieces of Equipment No. Pieces of Equipment No. Pieces of Equipment Connected Horsepower Lineal Feet of Pipe Area in Battery Limits (SF)
_____7
_____ 7 CoO.b
51
16-5 T.2T
60117 1.54
m/a.
Speciality Pips
- LF
-
-
CS Valves |2%"& Larger)
EA
Alloy Pipe
- LF
-
-
Steam Tracing Hangers/Supports
8&03LF
3984
45
EA WITH F'if ?lMi
Test/I nspect Material Handling
59055LF
2 567 M/a
043
PLANT SUMMARY
ELECTRICAL
Equipment
A/G Conduit
U/G Conduit
Wire & Cable
Connections
Elect. Ht. Tracing
Cable Tray
CONCRETE WORK
Formwork
\
Rebar
^
Concrete Total QAcct
| ^
BUILDINGS SITE WORK
Excavation Backfill Sewers/Drains PAINTING
8 EA 600 LF
LF
1 ZOO LF
50 EA 28oolf
-- LF
97 291
74 1 26 621
-
12.13 49
062 Z 52
22 -
SF
T COHPOt.lt e Accrr
CY
ZI7 CY 2698
12.43
- SF
-
-
469 CY 288 CY
- LF - SF
H07 333
-
2.36
1.16
-
PREPARED BY
1 r KM7(7AWAV
PHR 1.3-1
JOB MO 14055
CONST. DATES lo/SO TO 4/bz
JOB DESCRIPTION <7 FK Mg CLIENT HMTATPOU. CnL- eCoMPAFlV LOCATION RPSIM5QU , u-6,FAQig
PLANT SUMMARY Dollars Er Manhours In Thousands
PI AMT NUMBER ^
PAGE.
DESCRIPTION SAtu^AtE'5 RLKHT
CAPACITY _
OVERALL SUMMARY
MAJOR EQUIPMENT C--Columns & Vessels D-Tanks E-Exchangers F-- F ired Heaters G-Pump$ K- Compressors T--Special Equipt. SUBTOTAL
Material |
COSTS
Labor |
S/C
| Total
MANHOURS
Bechtel |
S/C
595.1 -
6 18.7 255.9 198-1
-4
16,71 2
95.3
40.5 ioo2
26,. 3 l.fc
264.2
1.5 -
i -1
1-5 19.1
6.919
4.5
--
-.
-
-
659-5
19 -
375.2 225.9
47 14
0.5
-
--
2.0 ...... -1
1959.5
12-6,
-
-
0.5
MAJOR EQUIPMENT Columns/Vassets Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt.
QUANTITY AND MANHOUR DETAIL
Quantity
I Bechtel & S/C I Manhours
14- EA 3Z57T0N
EA BBL
17 ea
vwr-B%
"^5 BHP EA BHP
2. ea
55 ea
* ^
5
25
3Z3,/l39
19-43
H4
jis o 5110 / 140 -O /MAX.
14 43
72
a2
-li
--
I Duiniity ]'\
STEEL
Structural Steel
74'
6 50
67.6
Platforms, Ladders Other Steel
33 6 T 17-3 r
4054 816
1 20 6, 47. 2
Total Steel
58.3 t
5520
94 .7
INSULATION
Pip. In,. ------ F,"a^.0
& M l elf
3651
0 45
Equipment Insut.
8712SF
Fi reproofing(E'Qo1P] 574ZSF
4407 1642
O . -506 O.Z86
OTHER DIRECTS J--Instruments L--Piping M-Steel N--Insulation F^-- Electrical Q--Concrete Work R--Buildings S-Site Work X--Painting SUBTOTAL
375A
nil
725.1
1059. 5
100.1
106.3
1,3 4404.
1 3o.6>
17.0
3479
530.1 (2 9
1177
390 6
* (f -
187/ .9 2 5524
18.9 943
1.9
252.2 -
7-1 O. 2
-4-4>
379.2
505.1 1&789
206-3 253.5 752 3
37 O 508 5
5.2 4609-5
5 3 5o.5
5-5 1.1
17.g -30.7
8 23 9
I 35 6
on
3-3
O. I
94
-
-
0.1 -
0.2
1-3-6
INSTRUMENTS Field Mounted Instr. Panel Instruments Control Valves Package Control Syst.
257 ea
257 ea - EA EA
1 ea
59 79 zo 99
6
2" & Under CS
790 4 EE
2V4"-6" St. Run CS S
LF
8"-12" St. Run CS
LF
14"-24" St. Run CS /
LF
26" & Over St. Run CS
LF
2%" -- 6" Spools CS >
\ LF8" - 12" Spools CS 1/429 ef
1 &60 0 Rack pi
Flt z\
25356
23 3 <5.1/ 6
2.35 iid
3 41
ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracinq Cable Tray
CONCRETE WORK Formwork Rebar Concrete Total Q Acct
2 55 ea 2<^5o0Lf
3470lf 99445LF
3>736ea - LF - LF
1913 10472
563 3257 1293
-
750 40 16 033 . 35 -
21067 sf 65 t
13861 6030
695 CY
3088
l Z 11 CY 3061 5
.66 92.6
4.44
2L*5Z&
| total direct COSTS I 3543 I | 2822.6| 398-31 6764 Q|
H.O. ENGINEERING
I LZZZE 1
Col A UNIT RATES AND RATIO ANALYSIS
148 2 1 143 1
1I
Col B A -f- B
114" - 24" Spools CS
26" & Over Spools CS /
L^F
Total A/G CS Underground Pipe
15333EF
9 90 LF
43956 1236
287 1-25
BUILDINGS SITE WORK
Excavation Backfill
196 sf
866
3745 CY 3676 CY
44 9 0 367 1
4.43
1 2o 1.00
Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity
2251-1 16.323
AT o
6,9 5 6 5 700 53776.
M/A 1.03
Ko9a3 Major Equipment Material & S/C $
No. Pieces of Equipment
54
1 33 3o2
No. Pieces of Equipment
51
8.7
No. Pieces of Equipment
54 12.87
Connected Horsepower Lineal Feet of Pipe
2&l8z Z33.I3 16.323 3-29
Area in Battery Limits (SF)
21990 -
Speciality Pipe CS Valves (2%" & Larger)
- LF EA
-
Alloy Pipe
- LF
-
Steam Tracing
4440EF 300 5
Hangers/Supports
EA WITH plf
Test/Impact
24212 lf
4195
Material Handling
M/A
PLANT SUMMARY
-
.68
. 17
Sewers/Drains PAINTING
1 537 ef
4900SF
3366 1 50
Z 19 0031
NOTES: REBAR MHR5 ILlOLlJiPe: M-<Sire:
FA&RlCAT-loig___ c H
" Q-OI ' AS
WELL A5 *Q- 21, 22. 6.2"
"F?revafaP fxi-st BuilpiMCi - MO. 5>-Ff
PREPARED BY SRfc
HAC^IPAWAY
JOB MQ I4Q`53
CONST. OATES lo/6 TO 4/82-
JOB DESCRIPTION KTMP CLIENT MKRA-rHOtd C^l_ <=c>LOCATION ROBIU50K1 , ' l_v_ 1VAO1 *S
PLANT SUMMARY Dollars & Manhours In Thousands
PLANT NUMBER 26 DESCRIPTION kggj rREWIM^
CAPACITY _
OVERALL SUMMARY
MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E- Exchangers F--Fired Heaters G--Pumps
K-- Compressors
T-- Special Equipt. SUBTOTAL
Material
COSTS
Labor
s/c
Total
MANHOUR'
Bechtel |
Tj-u
209.7
ie.3
-
2037
4317
16.4 7
-
3.2
20 3
-
_
1.1 1.1
2261
-
IS.O -
207.4 452.5
8 -- .... -
2 IO
-
_
-
Item MAJOR EQUIPMENT
Columns/VesseIs Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt.
QUANTITY AND MANHOUR DETAIL
Quantity
Bechtel & S/C
Unit
Manhours
T EA 1 2(eTON
EA " BBL
EA - BTU
EA - BHP - EA
BHP ) EA
IO EA
>m
77 1 -
34-
2.21
uo/W 17 -
221
STEEL Structural Steel Platforms, Ladders Other Steel Total Steel
INSULATION Rip. In, Equipment Insul. Fireproofing
1 Quantity
1.4 T
1 2.6 T T
14.07
65 1044
1109
Z.432 elf <S>49 SF
i^n sf
1094 235 167
Manhour*
46-4 82-9
74 2
o 45 O. 36
O. II
OTHER DIRECTS J-- Instruments L --Piping
Q-Concrata Work R--Building!
S&.3 2t3. 3
24- 6
15. 6
zz&.a
216.
7 7.' 16. i
83.? 31.3
21 346'
47.S
106.. O 479 7
46 2 478
161 5 47.4
.8 lo. 8
I. I
4.3 1-8
0.1
1.2
1.7
INSTRUMENTS Field Mounted Instr. Panel Instruments
(pO E* 60 ea
_ EA
82! 370
-
137
6. 17 -
Control Valves
EA
Package Control Syst.
- EA
-
-
PIPING
2" & Under CS
3495 LF
7195
2.06
2V4"-6" St- Run CS N \
8" 12" St. Run CS
1
LF LF With PLj mjt 2i
ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Trecinq Cable Tray
CONCRETE WORK
39 ea 5 OCLF
- LF 15445LF
5ooEA 5 300LF
- LF
Tl 1672
334
99 19 30
-
1.82
11
-
021
Zo 3(p -
X--Painting
424.9 37 9.2
84-5 6&8.C,
IS.&
3-0
14"-24" St. Run CS / 26" & Over St. Run CS I Th" -- 6" Spools CS ^
LF LF LF
Formwork Rebar Concrete
ZI9I sf 3-7 T 81 cv
1120 435
250
51
117-6 309
[ TOTAL DIRECT COSTS | BSla.O | 39 9. 5 j 86-fi. ] ' 34 1 - 1 |
l9.8| 3-0 ]
8" - 12" Spools CS V llOZLf
14" - 24" Spools CS /
LF
26" & Over Spools CS .
LF
3475
375
Total Q Acct BUILDINGS SITE WORK
81 CY - SF
1606 -
2 2. 3 -
I 11.0. ENGINEERING | j [
I
I
V I Total A/G CS
4597 ef 10670
2-32
Excavation
----------- --
"" , --'
Col A UNIT RATES AND RATIO ANALYSIS
Col B A v B
Underground Pipe
LF< VUirH
UT 2 3~)
BackfiH
Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity
5(79.4
4597
61 I 2ooo
4997 U/A
1-6.3
432.2 1.18 Major Equipment Material & S/C $
No. Pieces of Equipment
IO 460
No. Pieces of Equipment
IO 6 -4
No. Pieces of Equipment
IO 87
Connected Horsepower
4/a
Lineal Feet of Pipe
4597 2.6,1
Area in Battery Limits (SF)
Speciality Pipe CS Valves [2%" & Larger)
- LF EA
-
-
Alloy Pipe Steam Tracing Hangers/Supports
- LF
333 lf
EA
1327 With Pk
149
Test/Inspect Material Handling
LF YJitH m/a
Kir- z "3
Sewers/Drains PAINTING
NOTES: 6lTWOC^K PLAMT 23
... _________ "" INCLUPI? WITH
PLANT SUMMARY
PREPARED BY
JOB no '4053
CONST. DATES lo/flo TO 4/g3-
JOB DESCRIPTION
_____________________________
CLIENT MM^A-r-HCJU- OM-- COMPMslV
LOCATION RoG'^iSoM
I L-LI N_1 Q 1 S___________
PLANT SUMMARY Dollars & Manhours In Thousands
PLANT NUMBER 2 9_________________ DESCRIPTION REFORm&R,
^Fa>L.\ 1 >fc-F=^
CAPACITY jJ7
4r
0
OVERALL SUMMARY
MAJOR EQUIPMENT C-Columns & Vessels D--Tanks E-Exchangers F--Fired Heaters G--Pumps K-- Compressors T-- Special Equipt. SUBTOTAL
Matarial
COSTS
Labor |
S/C
| Total
MANHOURS Bechtel 1 S/C
166. -
53.7 -
54.1 -
123.4
& 1
' 4.3
_ 2 13.2
56. 5 _ -
56.-8
T3-0 -
6.1 8 -
58.4 -- o. 2
193-4
-- --
.4
~ 2 -
U
i.i _ 1. 1
Item MAJOR EQUIPMENT
Columns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt.
| Quantity
2 , EA 2TON EA
' BBL l ea . EA
BTU 5 EA ^ BHP
EA " BHP
1 EA
> EA
QUANTITY AND MANHOUR DETAIL
m^R*,,,
1148
574/izt3,8
30 3 383
ZZ9
45.8
12 12
IMtem STEEL
11 Quanttittvy 11 BeMchatenlh&ouSrs/C 1l
Structural Steel Platforms. Ladders Other Steel
1.4 T -T -T
20 -
Total Steel
1-4 T
20
INSULATION Pip. In.. ------ F*a5S 1B94 elf
652
Equipment Insul.
514 SF
245
Fireproofi ng (Ed*01P) 742 sf
82
MaUnnhoiturs
14 3 -
14.3
0.45
O. II
OTHER DIRECTS J- Instruments L-Piping M-Steel N--Insulation ^-Electrical Q--Concrete Work R--Buildings S-- Site Work X--Painting SUBTOTAL
110.3 ni-5
16
114,4 6.4
3-0
-
40 <c>.2
Ce-Cp 79.7
4
90.1
10.5 -
Z&.& -
Z 14.7
30.1 2.14-0
82 4
326.-5
147.0 465.2
20 82.4 Z06-I
15.9 ~ 29.8 -- 947.4
3 3.8
-
4.7 Cp 1.7 -
ill
1-0 7.3
Z9
M2
INSTRUMENTS
76. EA
1356
17.84
Field Mounted Instr. Panel Instruments
36. ea
- EA
4 13 -
5.43
-
Control Valves
EA
Package Control Syst.
- EA
-
-
PIPING
2" & Under CS 2J4" 6" St. Run CS
8"*12" St. Run CS
1760 lf
' \ LF
''LL
14"-24" St. Run CS
i26" & Over St. Run CS
ef
2037
t-14
WITH PLP bKiT Zl7
2W -- 6" Spools cS\
LF
ELECTRICAL
Equipment
A/G Conduit
U/G Conduit
Wire 8t Cable
Connections
Elect. Ht. Tracing
Cable Tray CONCRETE WORK
Formwork Rebar
[ j
Concrete
)
55 EA 75C7XF
- LF
600 ea - LF - LF
463 2 895
932 365
-
8.42 39 -
033 61
-
SF T COHk'OSjTTj l ACiT. CY
TOTAL DIRECT COSTS [ 5
\ ZZ 7-9 [ 383.3[ U^Og>| ll.T
8"- 12" Spools CS \ 1600 lf
14"-24" Spools CS )
LF
26" 8i Over Spools CS
LF
7267
4.03
Total Q Acct BUILDINGS SITE WORK
30 CY - SF
606 -
. 15.95 -
H.O. ENGINEERING
Total A/G CS
' 3580lf 9304 . 2-6.0
Excavation
IZ0> CY
9 16
7. Z7
Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower
Col A UNIT RATES AND RATIO ANALYSIS
Col B A * B
732.7
*3794
_____ II9_
____ 29 12400 11115 M/A.
I&o ? 4.07 Major Equipment Material & S/C $
No. Pieces of Equipment No. Pieces of Equipment
& 474
a i4.9
No. Pieces of Equipment
& -3.6
Connected Horsepower
165 75.15
Lineal Feet of Pipe
3794 Z.93
Area in Battery Limits {SF)
nI/a*.
_
Underground Pipe Speciality Pipe
CS Valves (2%" & Larger)
214 lf - LF EA
54 5
-
2 55 -
Alloy Pipa
- LF
-
-
Steam Tracing Hangers/Supports Test/Inspect Material Handling
478 lf 537
1.12
EA WITH Pll =*INi<3
4481 lf
729
16
m/a
Backfill Sewers/Drains PAINTING
88 CY 179 lf
__ SF
261 39 9
-
2 97 2.23
--
NOTES: FLAUT 2*9 WORK E-MTAMl-j
HOi^CKUliCATIDIJ OF- EXI-ST-inJgr,
IJMir
Job Overall Labor Productivity
l.(3
PLANT SUMMARY
PREPARED BY 3- HARDAWAY
job noH1!!l5_ const, dates lg/go to alSiL
JOB DESCRIPTION ftRHP CLIENT HKKM-ILoM O'L- goMP'RyFAY LOCATION ROaiUSOU , )(_UMQIS
PLANT SUMMARY Dollars fr Manhours In Thousands
OVERALL SUMMARY
MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E-Exchangers F--Fired Heaters G--Pumps K-- Compressors T-- Special Equipt. SUBTOTAL
Material
COSTS
Labor S/C
~ -
-
-
-
MANHOURS Total Bechtel S/C
_
-
-- --
Item MAJOR EQUIPMENT
Columns/VesseU Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt.
OTHER DIRECTS J--lnstruments L--Piping M-Steel N--Insulation 9- Electrical Q--Concrete Work R--Buildings S--Site Work X--Painting SUBTOTAL
--
--
_
- ---
-
- --
-
--
4) 80. a _ 64 .1 -- _ -
4.1 -
- - --
-
4
A, *5
.J -
6o.l
- 05 -
--
-
84.u
4. 1
-
-
-
_
-
--
-
INSTRUMENTS Field Mounted Instr. Panel Instruments Control Valves Package Control Syst.
PIPING 2" fit Under CS 2K"-6" St. Run CS 8"-12" St. Run CS 14"-Z4" St. Run CS 26" & Over St. Run CS 2'A" - 6" Spools CS
8" - 12" Spools CS
TOTAL DIRECT COSTS 4 5
00.1
84.c.
4-1
14" - 24" Spools CS 26" & Over Spools CS
H.O. ENGINEERING
Total A/G CS
Col A
UNIT RATES AND RATIO ANALYSIS
Underground Pipe
Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity
45 -- -- ___ ___ --
M/a
1.6.3
Major Equipment Material & S/C $ .
No. Pieces of Equipment
.
No. Pieces of Equipment
_
No. Pieces of Equipment
_
Connected Horsepower
-
Lineal Feet of Pipe
..
Area in Battery Limits (SF)
_
Speciality Pipe CS Valves (2^" & Larger) Alloy Pipe Steam Tracing Hangers/Supports Test/Inspect Material Handling
PLANT SUMMARY
PLANT NUMBER. 3"0'
PAGE f
DESCRIPTION. ELECTRICAL.
C? I S~TF3 ' SUT IOU
QUANTITY AND MANHOUR DETAIL
CAPACITY__ !L
Quantity
Bechtel & S/C __ Manhours
EA TON
EA BBL EA
EA BTU EA BHP EA BHP
EA
EA
EA
EA
EA
EA
EA
LF LF LF LF LF LF LF LF LF LF LF LF EA LF LF EA LF
Unit Manhours
Item STEEL
Structural Steel
Quantity
Bechtel & S/C Manhours
T
Platforms, Ladders Other Steel Total Steel
T T T
INSULATION Pip# Ins. Equipment Insul.
ELF SF
Fireproofing
SF
ELECTRICAL
Equipment
& EA
A/G Conduit
Z45 LF
U/G Conduit
- LF
Wire & Cable CF 50) 1340O LF Connections (P- 35) 36. ea
Elect. Ht. Tracing
- LF
359 Ml _
3Z4 S 300 -
Cable Tray CONCRETE WORK
- LF
-
Formwork
SF
Rebar
T
Concrete
CY
Total Q Acct BUILDINGS
IO CY - SF
z-
SITE WORK
Excavation BackfiH Sewers/Drains PAINTING
IO CY 0 CY _ LF - SF
s
-
NOTES:
Unit Manhours
44.9 45 . 24
8.33 -
.2
. 8o
-
B. HKPC?aw.'aV PREPARED BY.
JORND l4ob2>
CONST. DATES lofco TO Al2
JOB DESCRIPTION R.2.MP
CLIENT MiXRKTWOrl OIL coN)P/v44 LOCATION fi.i>&lKl-bcisl XLL,
PLANT SUMMARY Dollars a Manhours In Thousands
PLANT NUMBER 31
PAGE__J__
DESCRIPTION UTIL. 6t4. A.KiC5 Cal^T-
CAPACITY (S>E. UolCb;
OVERALL SUMMARY
Material |
COSTS (ooas 4} Labor | S/C | Total
MANHOURS (ocg's)
Bechtel J
S/C
Item
| Quantity |
QUANTITY AND MANHOUR DETAIL 1 M.nSi'ur,
1 Qu*n,i,y
Manhour,
MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E--Exchangers F--Fired Heaters G--Pumps K- Compressors T-- Special Equipt. SUBTOTAL
-- -- -
-
_
it
--
7,6
_
-
life
1 Co . S
0.4-
\(p. 3
0,4-
MAJOR EQUIPMENT ColumnsA/esseIs Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt.
EA TON
EA BBL
EA
LA BTU
2.
EA BHP
EA
? EA
-- --
--
--
Ao5
--
--
-- -- -- -- 202/6A -- --
OTHER DIRECTS J--Instruments L--Piping M--Steel N-lnsulation P--Electrical Q--Concrete Work R--Buildings S-Site Work X--Painting SUBTOTAL
12.3
54. 6
32
--
TU-(e
1.8
1T
-
105,\
56 5.8 4.1
-
\5,.5
7-6
-
4.5
43.1
0.6
3~l 3>
-
90 -
96.9
18.5
147 X,,
12-3 90
42. 1 9.4
Op. 2
245.1
0.3 Oo 0.2
--
0.&
o.4
0,3 -- 2.3
----- 3,0
-
0.3
_
3.3
INSTRUMENTS (.TOY.')
^ EA
Field Mounted Instr. Panel Instruments
EA EA
Control Valves . Package Control Syst.
EA EA
PIPING
2" & Under CS
556 lf
2%"-6" St. Run CS
LF
8"-12" St. Run CS /
\ 14"-24" St. Run CS <
O
LF LF
26" & Over St. Run CS >__________LF
Th" - 6" Spools CS\
LF
281 114
--
--
M3
3 ,as/A
I2,fa/EA
--
--
I.2S /LF
8" - 12" Spools CS (
LF
| TOTAL DIRECT COSTS'
| H.O. ENGINEERING
Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity
114.3 | r'Xf | 96 9 1 Z6I 9 I 2,7 I 3.3 |
14" - 24" Spools CS 26" & Over Spools CS^
LF 2.S48
LF
4,35/lf
I Total A/G CS
Col A
UNIT RATES AND RATIO ANALYSIS
Col B
20 2__
Major Equipment Material & S/C $ 9Z
I \AZ LF 37
No. Pieces of Equipment No. Pieces of Equipment
2. 2
12. cv
No. Pieces of Equipment
2.
fa4oo> LF
Connected Horsepower
--
A -f B 21.96.
57/ \3,S 6
--
3,2&2
Lineal Feet of Pipe
1,142
Area in Battery Limits (SF)
Underground Pipe Speciality Pips CS Valves (2%"& Larger) Alloy Pipe Steam Tracing Hangers/Supports Test/Inspect Materiel Handling
I ,Ub
PLANT SUMMARY
1,142. LF
LF
3,242
2.64-/2F
LF
EA
LF
LF
IMCL. EA
--
--
1.(42 EF
4.0
O,0.'r-/CF
(DIS-TRUJi.)
STEEL
Structural Steel Platforms, Ladders
T T
Other Steel
5T
Total Steel
5T
INSULATION
Pip. In,. --1e\^ 491 elf
Equipment Insul.
- SF
J
Si
20 7 2 54
41, ft ho t4 4|,&hi=t4
O. 3Z
'-
Fireproofing
- SF
ELECTRICAL (cOYlPOi H E. /\CCT,)
1
Equipment A/G Conduit U/G Conduit
7 EA
1706 LF
---- LF
Wire & Cable Connections Elect Ht. Tracing
65,400 lf
Sfc> ea
BOO LF
Cable Trey
------ LF
CONCRETE WOHK (COpo5,1 Tt ACCY)
total
Formwork Rebar Concrete Total Q Acct BUILDINGS
IHlL. sf
WAO-- T
\Z CY
12 -------
CY SF
4i<6
36,5 /cV
SITE WORK
Excavation BackfiH Sawers/Drains PAINTING
(oO CY
.-0 =Y ____LF
SF
24-5
34---
4.,05/cy
0M%\CH
--.
NOTES:
UNllT LOcATE.T> Klo'R.TH cs4-
?(_T. \b Loire.(^TiMLr, OF 3. PoHP^, A sTLL
PVPe XAOL COMWLU TFoH T>LT, 16, \sbooPVtfc> vMTMrAfc*. f\WR,oX 4oo* 5o MHC
7A?? 1 U(a INTO x. &KLTH4C,
PREPARED BY (4. NAIL-LG.E-
PHR 1.3-1
JOB NO 140*5 3 _ CONST. DATES 1o/6Q TO ^/82>
JOB DESCRIPTION
krmp_________________________________
CLIENT HAtSA-Ti+oia PIL COMfAHV
LOCATION Rosmsou , illiMOI'S.
PLANT SUMMARY Dollars & Manhours In Thousands
PLANT NUMBER. 32
DESCRIPTION ^OOUIM-di i-OVsl E.
CAPACITY _
OVERALL SUMMARY
MAJOR EQUIPMENT C--Columns & Vessels D-Tanks E-Exchangers F-- Fired Heaters G-Pumps
K-- Compressors
T-- Special Equipt. SUBTOTAL
Material |
COSTS
Labor |
S/C
| Total
MANHOURS
Bechtel |
S/C
3 o.8 3
117.5
129.8 278.9
9
32.0 34
30.3
-
oz> -ZUe.O
-
0. (p
Z22 9
-
32 O
210-8 -
149.5
139.& 535.1
-
-
1.7 -
o.z
1-9
-
25 -
-
O. 2a 2.7
Item MAJOR EQUIPMENT
Coiumns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt.
QUANTITY AND MANHOUR DETAIL
Quantity
Bechtel & S/C
Unit Manhours
EA TON 3 EA BBL
1 EA
EA BTU 3 EA BHP EA BHP
& EA
1 5 EA
(p(a 2502
169 6
39 O
22 Z5o2
505
48.8
1,,m
1
|B*Ma"LSu,S/C| Manhoun
STEEL
Structural Steel
T
Platforms, Ladders
T
Other Steel
ZZ. 3T
Total Steel
22.3 t
INSULATION Pip. In., -- F,aK 1514 elf
Equipment Insul.
141 SF
Fireproofing
- SF
1030 1030
681 1 29 -
7 3-1 73 1
o.45 09Z
-
OTHER DIRECTS J-- Instruments L--Piping M-Steel N--Insulation P-Electricil Q--Concrete Work R-Buildings S-Site Work X--Painting SUBTOTAL
70 -5 132.5
3T.7
toio.3 I2&.8
0.1 94.8
-
S60-.7
ZO 98 .3 317
24-3 27 17
-
113.9 254-8
ZZ.Z
182.9 -
706-4
22.9 -
i3 9 -
332.8
105.4 54>2-5
M-4 22 9 2 20.2 383.6. 44. 2 277.7
10259
1 4.7
1.6 5.9 14.7 13 11.2 39- 5
0.6 9.3
0.8
_ 0.2 II.l
INSTRUMENTS
53 EA
Field Mounted Instr. Panel Instruments Control Valves Package Control Syst.
53 EA - EA
EA 3 EA
PIPING
2" & Under CS
\ 1742 LF
2%"-6" St. Run CS
LF
8"-12" St. Run CS 14"-24" St. Run CS
s /
26" fit Over St. Run CS 2'V - 6" Spoola CS
LF LF LF LF
903 225
-
98
3597
182 4 25
-
32 7
2.06
ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Tray
CONCRETE WORK Formwork Rebar Concrete
34 EA
7000 lf 3ZOLF
33595LF 354 ea
lipOO LF
- LF
849 2955
46 1333
283 383
-
10.1 -42 14
039 . 80 . 24
IZOTI SF 3Z.3 T 085 cy
8345 29 35 3100
69 90.9
4.53
8" - 12" Spools CS
U20LF 5502
4.91
Total Q Acct
TO 1 CY |4~T 1 8
zt.o
[ TOTAL DIRECT COSTS | Q>(p5.(p\ '"lAZ'l | 555.1 [ Z\(j,A -O |
| HO. ENGINEERING
[
I
I 7!
^4-i.4| '
13.6 | |
14" - 24" Spools CS
LF
26" & Over Spools CSy
LF
Total A/G CS
' 286Z lf
909 9
3.18
BUILDINGS SITE WORK
Excavation
084 sf
1545
3O&0CY 3365
2.20
1.09
Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire <P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity
Col A
UNIT RATES AND RATIO ANALYSIS
Col B Af B
Underground Pipe
919-5 600=2
54 6 85 Z82TO | 4006 4/a.
1 -0=3
Major Equipment Material & S/C $ ^^1
1
No. Pieces of Equipment
15 337
No. Pieces of Equipment
15 3-6
No. Pieces of Equipment Connected Horsepower
15 45-7 550 51.4
Lineal Feet of Pipe
5QQ2 2 77
Area in Battery Limits (SF)
Speciality Pipe CS Valves (214" & Larger) Alloy Pipe Steam Tracing Hangers/Supports Test/Inspect Material Handling
PLANT SUMMARY
2 20oLF - LF EA - LF
350 LF EA
1790 LF
4346 -
-
417 WITH fit
144 M/A
1.98
BackfiH
Z9 58cv
3207
1.1 O
-
Sewers/Drains
9 70LF 3339
3-42
PAINTING
-- SF
--
--
NOTES: E'YCRAU^ER 32E-4- COOL,lUp
1.19
TOWER ERECTED I3Y
IS. A.
PRiTtrHARC?
>08C0MTI?^CTOR
08 FOUMRATIONi, F3P7NJ6; . 6hiP 5>n~T-
yJoP?K IBV
PREPARED BY S HKPPAWAV
JOB NO ^0 3 ^ CONST. DATES lo/go TO A/fit
JOB DESCRIPTION RR MP* CLIENT HARKTtoU OIL OOf^F7,>M.V LOCATION ROfelU-^Oig . U-(-lfJCH<h,
PLANT SUMMARY Dollars & Manhours In Thousands
PLANT NUMBER. 99
DESCRIPTION Ml-SC OrrPLOT PLftUT-S
CAPACITY .
OVERALL SUMMARY
MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E --Exchangers F-- Fired Heaters G-Pumps K-- Compressors T~ Special Equipt. SUBTOTAL
Material |
COSTS
Labor
S/C
>4.0 I4Z t
14 (r-~\
--
4 1.1 9 M
Totai
| MANHOURS | Bechtel | S/C
4.0 144-7 I4B.7
-
-
-- -
-
-
o.t
O.)
QUANTITY AND MANHOUR DETAIL
Iltteemm
11 OQuiiaanmti,ttuy 11 BeMchatnahlo&urSs/C I1 ManUhnoiut rs
MAJOR EQUIPMENT
Columns/Vessels Tanks
EA TON
EA BBL
Exchangers
EA
Fired Heaters Pumps Compressors
EA BTU EA BHP EA BHP
Special Equipment
1 EA
49
49
Total Major Equipt.
| EA
lt.m STEEL
1 Quantity 1 Seehtalfii S/G |
Unit
1 1 Manhours 1 Manhours
Structural Steel
T
Platforms, Ladders
T
Other Steel
T
Total Steel
-T
-
-
INSULATION
Pip. In,--1 Equipment Insul.
Fireproofing (EQ y \ff)
6.81 elf 742 SF
-- SF
306.
4o6
o.45
0.55
OTHER DIRECTS J--Instrument* L--Piping M-Steel N-- Insulation P--Electrical Q--Concrete Work R--Buildings S--Site Work X--Painting SUBTOTAL
44,1 6Z.4
lot-, 6
4.2
1 Ce-O
-
-
-
31 23.3
3.1 03.4
2&.S
-
95-3
51.4 141-8
-
2B-& -
3-1 ZZ5.1
z
-8 -
2
1-2
0-1
zz 11
-
34
INSTRUMENTS
31 ea
Field Mounted Instr. Panel instruments
31 ea ^ EA
Control Valves
EA
Package Control Syst.
- EA
PIPING
2" & Under CS
\ 40U> lf
2V'-6" St. Run CS
1
LF
8"-12" St. Run CS If LF
.(HE14"-24" St. Run CS
;26" & Over St. Run CS
-
2%" - 6" Spools CS *
LF
^io 125 -
-
8 03
1 o.o
-4.03 -
'
1 98
ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Tray
CONCRETE WORK Formwork Rebar Concrete
EA LF LF LF EA LF LF
SF T CY
I |TOTAL DIRECT COSTS 253-Z.| 24.2 | 96.-41 3T3.6 |
I H.O. ENGINEERING [
j
Col A
I " ITM
1
UNIT RATES AND RATIO ANALYSIS
1-2 I 3-5 | II
8" - 12" Spools CS L B8Z LF
114" - 24" Spools CS
LF
26" & Over Spools CSV
LF
Total A/G CS
IZ&&LF
Underground Pipe
LF
2205 3008
2-50 2-34
Total Q Acct BUILDINGS SITE WORK
Excavation Backfill
CY SF
CY CY
Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower Job Overall Labor Productivity
ZOl.6 IZ88
36.
3oi4
M/A
16.3
Major Equipment Material & S/C $
^'
Speciality Pips
No. Pieces of Equipment No. Pieces of Equipment No. Pieces of Equipment Connected Horsepower Lineal Feet of Pipe Area in Battery Limits (SF)
i \zz>&
CS Valves (2'A" & Larger}
' 3(p Alloy Pipe
Steam Tracing
u/a
ize>& Z'34-
Hangers/Supports Test/Inspect Material Handling
LF
EA
LF
LF
EA WITH PlF
tace> LF
Ni/\
PLANT SUMMARY
03
Sewars/Drains PAINTING
9O LF
SF
1S9
210
NOTES: PL.AMT 99 cCoU f>l ST-S ORMl-sC. lU^TOHfASTATIOlJ AK1C? PlRlMCj
FROM PLWJT'b I.Z.T.S. ZO, U
PREPARED By S HAPRAWAV
GARRARD 00000512
JOB NO 140'
CONST. DATES 1 o/Q TO 4/g2-
JOB DESCRIPTION RRHP
CLIENT HLRutHpu Oil. Cohpauv
LOCATION HOE.lMS.OKJ, ILUUOia,
PLANT SUMMARY Dollars & Manhours In Thousands
PAGE il
PLANT NUMB5E0R^ DESCRIPTION ~TI?g - 2000
dOKJ^rrrRUd-r LQq
(\tr>
yy, ?
4^
CAPACITY _
OVERALL SUMMARY
MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E-Exchangers F--Fired Heaters G-Pumps K- Compressors T-- Special Equipt. SUBTOTAL
Material |
COSTS
Labor |
S/C
| Total
MANHOURS
Bechtel J
S/C
-
Item MAJOR EQUIPMENT
Columns,'Vets*Is Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment Total Major Equipt.
QUANTITY AND MANHOUR DETAIL
Quantity
Bechtel & S/C
Unit Manhours
EA TON
EA BBL
EA
EA BTU EA BHP EA BHP
EA
EA
Item STEEL
1 Quantity 1 Bacht.l & S/C 1 1 1 Manhours 1
Structural Steel
T
Platforms. Ladders Other Steel H-^O
T 22 T
\
Total Steel M -40
22 t
1 34 1
INSULATION Pipe Ins.
FtflAvn^ W/rnOELF
5944
Equipment Insul.
Fireproofing (EQO'f7/1
- SF - SF
--
OTHER DIR i CIS J-- Instruments l Piping M-Steel N- Insulation P- Electrical Q--Concrete Work R-Buildings S--Site Work X-Painting SUBTOTAL
4948.3 204.9
4fo 4
10-6
3 T. 5
26.1
7
1740 O
2396-0
<59 3.1
24.0
3o. 8
8
l&. O
.3 -
tT84.0 2710.4
-
5I53.Z
9-9
-
57.0
5
-
63 6
1-3
184.9
185.6
-
39.9 -
41759 30.9
12 3-0 1-4
480.1 -
514.0 18.8
1-8 1.1
-
0.3
-
704-9 10199-3
139.0
-
-
59
09 -
0>. 4
-
13.2
INSTRUMENTS Field Mounted Instr. Panel Instruments
2 87 EA 207 EA
EA
Control Valves
EA
Package Control Syst.
EA
PIPING 2" & Under CS 2K"-6" St. Run CS
- LF LF
8"-12" St. Run CS 14"-24" St. Run CS
LF LF
26" & Over St. Run CS
2W -- 6" Spools CS
LF LF
9 843 4 1 19
34.30 14.35
II
ELECTRICAL Equipment A/G Conduit U/G Conduit Wire & Cable Connections Elect. Ht. Tracing Cable Tray
CONCRETE WORK Formwork Rebar Concrete
ip 19 EA
900I8LF ^39>LF 4I66.2TLF
2 503 4* A - LF
IZ*3Z9LF
U038 52408
1528 22613 i3to9
15 1&624
SF T CY
8" - 12" Spools CS
LF
Total Q Acct
149 cy
902
TOTAL DIRECT COSTS | <6784-Q| Z7IO-41 70 4, 9 [ IQ I*? 9- 3 I 139.0 I 13.Z
h.o. engineering jjN, ;Ml-nLHM|o;: I j :y N--^ N; M, ; hi |l MOM; N; i; N N: .;[ni ': ;i;,; il!; N}m;|
|
Col A UNIT RATES AND RATIO ANALYSIS
Col B
Other Direct Materiel & S/C $
74&8.9
Major Equipment Material & S/C $ _
Lineal Feet of Pipe
No. Pieces of Equipment
-
Number of Spools Cubic Yards of Concrete Lin. Ft, Wire (P31 & P32) Total Piping Manhours
36 105325
________eoce
No. Pieces of Equipment No. Pieces of Equipment Connected Horsepower Lineal Feet of Pipe
_ _ .
Peak Manual Manpower
Area in Battery Limits (SF)
_
~
A{l
14" -24" Spools CS 26" & Over Spools CS Total A/G CS Underground Pipe Speciality Pipe CS Valves (214" & Larger) Alloy Pipe Steam Tracing Hangers/Supports Test/Inspact Material Handling
LF LF LF LF LF EA LF 874 LF EA LF
ll 595
BUILDINGS SITE WORK
Excavation BackfiH Sewers/Drains PAINTING
.57
revahp'sf
8168
165 cy 107 CY
- LF - SF
837 264
-
Job Overall Labor Productivity
1.03
PLANT SUMMARY
PREPARED BV B M
Unit Manhours
to .95 <60.95
.3ft, --
17-83 58
ZB
. 054 55 -
1.51
6-C>5
5 07 2.47 -
PHR 1.3-1
JOB NO 14053 CONST. DATES \oj%o TO -4/62-
JOB DESCRIPTION RRUP_________ ________________ CLIENT M^RftTHO^J <010 c^nl^Af^A UO LOCATION ftoaiUSOkl U-l.iuoi'5_________
PLANT SUMMARY
Dollars H Manhours In Thousands
PAGE.
PLANT NUMBER. GD
DESCRIPTION
2000
^QMvgrR-biDhl
CAPACITY
K !A
OVERALL SUMMARY
Material |
COSTS
Labor |
S/C
MAJOR EQUIPMENT C--Columns & Vessels D--Tanks E--Exchangers F-- Fired Heaters G--Pumps K-- Compressors T-- Special Equipt. SUBTOTAL
OTHER DIRECTS J--instruments L--Piping M-Steel N--Insulation P-- Electrical O--Concrete Work R--Buildings S--Site Work X--Painting SUBTOTAL
A........... 1
itdCLOpsi? ltd
5595 24-u>
-
-
PL A WT Z49.5
50
-
-
" - 8334>
-
_ -
-
j Total
MANHOURS
Bechtel j
S/C
_ _ _
_ -
559.5 Z4.&
249.5 -
-
833-&
Zd. 9 1.2 -
12.8
-
-
5o-9
-
-
-
QUANTITY AND MANHOUR DETAIL
item MAJOR EQUIPMENT
Columns/Vessels Tanks Exchangers Fired Heaters Pumps Compressors Special Equipment
Quantity | **<*,$/C
EA TON
EA BBL
EA
EA BTU EA BHP EA BHP
EA
Total Major Equipt. INSTRUMENTS
Field Mounted Instr. Panel Instruments
EA
ILpT5ea Z^BBI ILfT 5 EA ino5
EA
Control Valves
EA
Package Control Syst.
EA
PIPING 2" fie Under CS 2% " 6" St. Run CS 8"-12" St. Run CS 14"-24" St. Run CS 26" fit Over St. Run CS
LF LF LF LF LF
2- 6" Spools CS
LF
Unit Manhours
Up.05 &99
Item STEEL
Structural Steel Platforms, Ladders Other Steel Total Steel
Quantity
Bechtel fie S/C Manhours
T T T T
INSULATION
Pipe Ins.
FtfliL8rf
ELF
Equipment Insul.
SF
Fireproofing
SF
ELECTRICAL
Equipment
EA
A/G Conduit U/G Conduit Wire fie Cable Connections Elect. Ht. Tracing Cable Tray
UUpl LF
- LF
15547 lf
I7820>A
AO LF
- LF
44<j>4
-
9IU 5938
32
-
CONCRETE WORK
Formwork
SF
Rebar
T
Concrete
CY
8" - 12" Spools CS
LF
Total Q Acct
CY
I TOTAL DIRECT COSTS |
I H.O. ENGINEERING
j
| 833-(o| \1
| 8 5>3Cg | 4-0. 9
[........
i
14" - 24" Spools CS 26" & Over Spools CS Total A/G CS
LF LF LF
BUILDINGS SITE WORK
Excavation
SF CY
Other Direct Material & S/C $ Lineal Feet of Pipe Number of Spools Cubic Yards of Concrete Lin. Ft. Wire (P31 & P32) Total Piping Manhours Peak Manual Manpower
Col A
UNIT RATES AND RATIO ANALYSIS
L-O^TC^ ltd
p't*T'
______
Major Equipment Material & S/C $
Col B
----------------------------
No. Pieces ol Equipment
__________________
No. Pieces of Equipment
No. Pieces of Equipment
m/a
Connected Horsepower Lineal Feet of Pipe Area in Battery Limits (SF)
A -J- B
Underground Pipe
LF
Speciality Pips CS Valves (2J4" fie Larger)
LF
ea liBiii
Alloy Pipe
LF
Steam Tracing
4895 lf inz
Hangers/Supports
EA
Test/Inspect
LF
Material Handling
24
Backfill Sewers/Drains PAINTING NOTES:
CY LF SF
Job Overall Labor Productivity
l<
PLANT SUMMARY
PREPARED BY P.LJE.E./ <3 .
Unit Manhours
. 4o
-
059 33 So
-
PHR 1.3*1
"C" - COLUMNS & VESSELS
JOB NO. & TITLEROBiMSOM REmNertfV l4QpEmil2ATIOlJ
CLI ENT V\AS=^~rvAOr4 oil. ^OMpAtdy
* 14053
jo LOCATION RC>B.IKi>OM . ILL.\n103
CONSTR. Iiatfs 10ISo to A\ar PREPARE!) BY
PUT. EQUIP NO. NO
SERVICE
ASTM SPEC.
Diameter FT-IN
HEIGHT - FEET
Shell
Tangent
Thickness
to OVERALL Inches Tangent
WEIGHT-TONS
Bare -- Excluding Internals
AS LIFTED
9 6-9. ME-A AB50RB6R SA- 2850 5'0`'
c-10 FETf? 6A-S KO Pf?UM
54-2" 62 "-J"
W
10.5 1-5
14-*f
c-13 CARS 0EP ABSOR0
6 5
6/
C- \(fi WASH COLUHW
3-5
4-f
c-17 COMPR KO PRUM
/'5 /5
6-18 STWV
Pal
0*5
0 S
t-R Pf?O0 OOLTRAVS
tvSCJC .
FINAL MANHOURS
Bechtel
S/C
/s'S //3
33"
DIRECT COST S 1000
Bechtel Matl.
S/C L& M
48.9 2 3.6 2 7.8 2 1. 5
8- 1 5.3 4.3
C~ He Pf?C> COLTRA't'S 'rvcur^ VafcfcAMaeR
'
IFjLV S4--2,r 733
2. 1
0.5 -- \4z-y
-
i\ t-2
Zbr 3-?
--
l\ .4
PAGE 2 GARRARD 00000515
TOTALS
ALL OTHERS
( FA) C" <J1_EA>
"C" ACCOUNT - COLUIWIAIS & VESSELS
7?A --
--
phr 1.22
JOB NO. & TITLERQglMSOM Rt-F~lMtTR V LAQPtERMlZATIOhJ
CONSTR. OATES
TO 41&L
"C" - COLUMNS & VESSELS
CLIENT M^RatHOM c>)t- COMPM-iV job location R'os'msom ilhuois
PREPARED BY
PLT. EQUIP
NO. NO
SERVICE
ASTM SPEC.
Diameter FT-IN
HEIGHT - FEET
Shell
Tangent
Thickness
to OVERALL Inches
Tangent
WEIGHT - TONS
Bare -- Excluding Internals
AS LIFTED
1 (P c- 1 STRIPPER
SA-515-70 --- -
C-Z HYPRO FZCP 50R<& SK-5/5-70 12 '-or
C -4 HYPPO Pf?PT SEPR 5A-5/0-TO b'-Ce*
C-5
ttflM recycle oomp suer
96-0)" 35'-0" 25o"
121'-3"
51'-O" -
3/4"
2 Mu
~7I 31 44
2G
86 31 44 1
0-6 HYPRO FLASH PRR SK-5)5-70 9'- 0 '' 25'-0" 34- ll" 1 '/&* 23 23
C-7 STRPR OH RETOVR
9G
if - G
0-3 URPTHA REACTOR SK-38T- II 9 'O" 18'- Q" 24'-5/*" 2.29'
0-9
PLKTFRH
ROACTR
SA-3S7-II
fl'O"
lO'O"
8'6" iz'o"
-'
1-61 IBI 187 '-9" |.TI 2.08
O-IO ppops
0-11
\ST STACrtt ttaroP.
SOCJTVO*! llftlllft
SA-515-70 lO'-fe"
20-0" 43'-5" 3/4"
55 213
22 Llz
55 2>00 22
0-12 lUTE'RSTCt RCVR 0-/4 Hl<SH Pf?"S ROVR 0-15 PEe.UTAUIZE'R
5A-5P3-70 IO'- 0)"
5K-5I5-70 io'-o>"
SA-515'70
I0>'-0" 24'- 6" 1 Vfe" l5'-5fc* 24'- 5 36 5`/av 7(0-6" 97'- I" O'"! '/&
2-1 5T*.
63
713 5!
7G
'0- |(j> pesut pcciFve'R
' o-|9 iutcrmittakit
66 I-?? l'?7
FINAL MANHOURS
DIRECT COST
$ 1000
Bechtel
S/C
Bechtel
Matl.
s/c L&M
I64&
201-4
5*1 `G
94Z 4o
121.8
_> -Cs
492
loo
10. 9
IH7
27.0 1
127 + 697.1 1819.5 64a.-\
41 1
53 .1-
92 1 6. 3
5fi>4|o7B
1626
G2>. 1 117.6,
141.2,
|o7
4o
15.6
6-3 `,
PAGE
GARRARD 00000516
TOTALS
ALL OTHERS
UliS V^CiG.
( EA) < EA)
"C" ACCOUNT - COLUMNS & VESSELS
.,
\U>6ArCp ^7-1 2972-5 642>' l
PHR 1.2-2
UZJS
"C" - COLUMNS & VESSELS
JOB NO. & TITLEROBI^SOM RCFIMCRV MOPCRUIg-ATiOM
14053
CLIENT T'*A.VRaot\qn> CML- CotAPA^V PREPARED BY
job location . RQSlMSOKi , musAQlS
CONSTR OATES \o\e>c> TO A\.e/C
rv
PLT. EQUIP NO. NO
SERVICE
ASTM SPEC.
Diameter FT-IN
HEIGHT - FEET
Tangent to
Tangent
OVERALL
Shell Thickness
Inches
WEIGHT-TONS
Bare -- Excluding Internals
AS LIFTED
16 C-ZQ C/aACv*^UaCA> C-Z\ c/k-r collector
1 *'? 2.-I
\>7? 2.' 1
c-iz LOCK UOPPRtt
o-a O '*
C-Z 3 LOCK EM<3AOCR*l
c-z4
l\oP? 2_
C-Z5 CAT RCrSEM TOVUCR 0-16,8
Z><5'-6," -
53'-5" 3/4"
o *<s 3*4
23.6
O *9
v4
23.6
C-27 `SORCiC' HORP"IR
a-a
c-z a LOCK RoPPCR#2
C-29 LOCK CLJ6MSE:R*2.
c7^ CAT app>\l Pfomhcl Hoia>
I6P*- &>>:
vcc-T
i *i /' o
/*9 M
c-31 LOCK HOPPER -32 VCMT RROH ^ 1
-33 VCMT PROH *2
0 2.
0*21 0*2.
0*2. O * 7. O 2-
C-34 vcur ' -35 VlTMT PROM M
<>z 0*2
o* 2 O- 2.
FINAL MANHOURS
Bechtel
s/c
Ik 4-0
Z4 z4
4o
50 S
i&a 3Z. 24
-- Ik
16 Ik 16
DIRECT COST S ICOO
Bechtel Mail.
S/C L&M
6.7
6.2
(o . 3
16.5
609-4
36.2
6 .2
7 .5 -
3 -7
1 *8
EC l\-
1 .8 1 -8 1 .8
PAGE
GARRARD 00000517
TOTALS
ALL OTHERS
-TvV^ ?<XOu.
( EA) <J4_ea)
"C" ACCOUNT - COLUMNS ft VESSELS
161 Ik
,
,, ,
-R4-5 o -4
phri.2 2
COLUMNS & VESSELS
JOB NO. & TITLE POBlUSOKl REFWcRV KQP-t'RtOi\A~\OU
CLIENT MARfrTHQO CPlL COHPAUS*
4r o
JOB LOCATION RoB.lMSoM , ILUKiOVS
C0NSTR. DATES >o/go TO "t/g?. PREPARED BY_____________________
PLT. EQUIP NO. NO
SERVICE
ASTM SPEC.
Diameter FT-IN
HEIGHT - FEET
Tangent to OVERALL
Tangent
Shell
Thickness Inches
WEIGHT - TONS
Bare -- Excluding Internals
AS LIFTED
1 U> -36 EP. IMJCCT TAMK
C-37 MT GAS WASH TVJFJ
Z' u XIZ $ /z ?
C-41 PUST GC-LLCCTORS -42 PCGASSIMG PRUH
o-9 O'!
o?
0*7
C-43 FULL GAS KO PRM C-44 H compgst Pot -4 a Flash prom
h9 /* /?
M h-h
/*
c-49 0FW PETARATcpr
(j-1 ipl
C-50 ATTEMTR. STR\?f(
t'-h....
C-l If.nct .
C->6 TRAY'S
t f'T L .
c-a 13 ASK TS
Rc.c>cju2. Gas CL&At .escjg.iL
O 2_ > X
C.-4L foODStfulft. Gas, Ca* LllSCLlL
.'rVVJD VGftXAKbCL' ) (k_\ g-i xVkJG 'Gj 50\^W\ a.jr\
sir ~rA\B rt\Gc.
o.2 O Z.
FINAL MANHOURS
Bechtel
S/C
4o
2.71 l(o Ifc?
3Z 34
34
13o
32,
IG I4>
DIRECT COST SI000
Bechtel
Matl.
s/c
L&M
U.4
42,2 9.8
6,5
|3.5
9-4
9.4
26.9
-X
zvi
18.7
a.ft
Vft 7X
-
,
PAGE
GARRARD 00000518
'
TOTALS
ALL OTHERS
0
~TO-TA t_ VI A K>T \U C ^
( EA) t -M-EA)
'C" ACCOUNT - COLUMNS & VESSELS
l&t%
"bw. 1
PHR 1.2 2
JOB NO. & TITLE POBIU5om REFtWeRV MOPERKUCATIOM # \405"3
CLIENT MKRATnQU Oil COMPAMV
*C" - COLUMNS & VESSELS
job location ROg.lUSQM, ILUMQtS)
C0NSTR. DATES \o(eo TO 4/&Z PREPARED BY____________________
PLT. EQUIP NO. NO
SERVICE
23 6-1 FP 6'OMlUGLER
6-2 absorber 6-3 PC-CTHAUl'Z.ER
ASTM SPEC.
Diameter FT-IN
SA-515-70 |P- O" SA-5I5-7Q 5'-0" SA-515-70 7'- O"
HEIGHT - FEET
Tangent to
Tangent
OVERALL
Shell Thickness
Inches
33'-6)" 40'- 4" i M
ao'-o" 163'- 4" 9/W'
64'-9"
V4"
WEIGHT - TONS
Bare -- Excluding Internals
AS LIFTED
39-4 1 lo% a
J6o%
60 'b W -9
6-4 SEC ABSORBER
1G 1
6-5 PRC SATURATOR 6-6 P'CSOTAVJI^ER SA-515-70
92-9" III-II"
i 4-' Cp
43-i
iL) > 1
6-7 PCBOT OVHP f?EC
9%
9V
6-S PC PRO PAUPER
SA-515-70
89i a" 108-6*
40 4 46*G
6-9 PEPRR OVHP REC
la & G &.
6-10 PETHM2R SOUR C-l 1 T-T COKJPWS POT
O' t?
Z1)
69*5 f.%
6-12 FUEL 6AS KO PR
O 'la
O' 6
6-13 STM CortbtklS Sfc>T
O' $
0.
6-14 STm CX0\>C)S 'ftsT ' 1 6-41 STRP KO PROM
6>?v
T. OV 6T
Tn.Ri <b V. vo>te.o_^{^.a
0 > `C
O' 6 -
-
FitiL't* 'po(&ota<bc.*
--
FINAL MANHOURS
Bechtel
s/c
S'a/
102 736
.2/7
8>o /S'o
s?
7?
&/
77 77 77
a s S /<=>
&
DIRECT COST SI000
Bechtel
Matl.
s/c
L& M
71.0
6*, 2 O T61.2 o.%
25. e O 7-
25.8 0 1 %
1 20.4 O 23.1
97.8 O ~L^
20. t
3.a
9.0
7.5
5.2
5.4
4 .3
Si.*) Z .7.
PAGE
GARRARD 00000519
TOTALS
ALL OTHERS
~Tk-T*A l_
PL aoT "2?jC
( EA) < EA)
Z50r W7$ 5"o
'C" ACCOUNT - COLUMNS & VESSELS
,,
5^.\ \ 5
PHR 1.2-2
^ "C" - COLUMNS & VESSELS
JOE NO. & TITLE RO&IUSOU RCPlUERY MOPeRMIZATlotJ t* 140^=1 "A
CLI ENT M*>i?ATHOM Oil COKPAMY joe LOCATION R0BUJ6OKI lumM-Olb
CONSTR. IJATES lo/e>o TO 5/82. PREPARE!) BY
.
PLT. EQUIP
NO. NO
SERVICE
ASTM SPEC.
2g> 6-1 prop: coaler
.c-z PROP. MEA T<teAT:(
C-3 PRCtCAO.WA^H CL, c- 4 PROP, VUTFJ.VUS.COL 6-5 &OT, C AO %.VM6 H COL C-(j> BOTAHE EXTBCTR 6-7 SurALie s.Erri.e:K L-Z PROC col travS C-L> COL TRAS'6
\rttuYi *PiA (LjLA Rfsit CJ > ^|T
Diameter FT-IN
HEIGHT - FEET
Shell
Tangent
Thickness
to OVERALL Inches Tangent
WEIGHT - TONS
Bare -- Excluding
Internals
AS LIFTED
C> *> \b '1
6-4 4
c>' *3 1 b' k *5-$ 56
10 z
Zl 7 22. 2liy ,G> /9-0
/AJtC-.
FINAL MANHOURS
Bechtel
S/C
-26
/7JT
<rs~
ss~ /oS
/3/
~
72 V 77/
--
DIRECT COST $1000
Bechrel Mati.
S/C lam
5.4 40. &
ZZ. 1
23. 1
33. S
44. 7 3i . 2
1 .5 if. 3
0- 8 zo<n
--
2<* C-l
a
(L-2. o/^
4CC.VMlii^ -
_ _ _ _ _ k--! (AJ'*) rcve
/>/
1H(L
(
*
Gj&Wdfej tJDZiLt
6
exvert -Tir^T G&iJAc
k*34u n >
61
-
' fs* 2r
-
AV
WOlfl
16.u
SI#1 &
PAGE
GARRARD 00000520
TOTALS
ALL GTHERS
( EA)
w | k ,, ( A EA) \OTAl_ rL.AuVt 7& 1 24 C.
"C" ACCOUNT - COLUMNS & VESSELS
815 //oG ZZ.G'h
phr 1.2-2
*C" COLUMNS & VESSELS TRAYS
JOB NO. & TITLE
f?'fi:lM'RV HOpg'RkllgATlonJ.
CLIENT H> ARATR CAl QIC CQHpAhW * 140*5 3
JOB LOCATION RQQlU^Q*-1 It-LlMOl^___________ '
CONST. DATES \ <=>/&<=> TO 4/e2. PREPARED BY C- J^CKSQK
EQUIP. No.
TYPE OF TRAY
9C-9 SVlK^ULaVLe^r f*"A*5 9C-\0> SViAkiLGViLG PASS
\UO 1 two PASS VAvJ
1 i*C-8> d(SisAt'SrKibEuTtSor-
{(j>C-\6
5lM6cC PA65/ -y-vy o vAuve ^*S5
ASTM SPECS
Deck
Caps or Valves
01AM. FT-IN
No. TRAYS EACH DIAM.
AREA-SF
Per Tray
Per Vessel
cr 5 410 SS 5'-0" __2_ 15.9 33
1 3,-o" l o
\ 9'-6" 31
3lu> SS -
56
T4I0SS 7-0"^-' 't-rr
3.9 ! 33.9 43-5 1349
--
-""!3T-4 948
WEIGHT-TONS
Per Tray
Per Vessel
.11 2.25 .06 !0.55 .48 l4. 7
- 0.25 8.1
FINAL MAN HOURS
Bechtel
S/C
DIRECT COST
$1000
Bechtel
Mail.
S/C L&M
4.3
2.1
23.1
ia.7
14.9
Z3C-Z TWO PKSS VALV/S
Z3C-3 -rWO PASS VAlVO 230-4 SVIKAAL6VL.SC PASS
Z3C-6> two Pass valvs
23 C-&
TWO ^ SlKJ6Le PAS S^PASS VALVE
2&6-Z SIMSI6ELVCE PASS
232-6 PSlENVRGroLlHe APTASSISD
\1
41C.65 5'-d" 34 12.5 425.7 .14 4.75
T'tO" \lo 21.2 338.6 .29 4.6
3 -0" 24 4 97 119-3 .<944 1 .05
^flo" 'S-Tf -<31 4 1257.5
10.15
' ' V--'1VS''_-O_*
-^$3 721.4 l7-J--r-^-- 5.75
- A'-o'' 3 - 5'- 6* 7
75 228 .092 .275 20 140 16 1 . l&
(p6 9 .9 3.4 Zo. o H.4
l. 5
6. 3
PAGE
GARRARD
\L>C-8 ikhcrmAl basket's ( JlBToo)
TOTALS
o
o
o o o
"C" ACCOUNT -TRAYS
cn
IU
waupoi? WITH . CveOsUs-e/l.
00
PHR 1.2-3
UC" -- COLUMNS & VESSELS VESSEL PACKINGS
'
ROSiKlSoa
FuaeRV
JOB NO. & TITLE 140*5 3) MQC?'RkUr.ATtot4
CLIENT MARAVUOKt Q>L.
P/Vi I V
JOB LOCATION FvOG^SotJi , luuuvlQVS
EQUIP. NO.
DESCRIPTION OF PACKING (TYPE-MATERIAL-SIZE)
VOLUME CF
9<:-i5
iuc- a
i gc-8 \lffC - & \(aC-31
2&C- Z 286-3 Z8C-4 2&C-5
ACTIVA-reF CTHARCOAI. -PITTSBURGH TYP" 66L*8x30
PeMt)TOM IOO - Va" (rf rTAT/kLV6T SO^OKT
Peu5towe loo * 'A" <$ catalyst support
(7Mt.TOd IOO - 3A" (OATAUV
SUPPORT"
IKiTAV-OK (2") POKCTLA'Kj 6>APpL.S
imtauox (1 *9 poRcei-Auu -sapc?lets.
I1/?" PAUU. Ri>46tS
IKTPxUOX 1 Vz") PiOROCLAlkl 'oAPlpuc'S
'
ll/z" PAUL.
*
360
Cod
60
95
ZOO 335
65 65
i 25
WEIGHT TONS
5-4
CONST. DATES K>/eo TO 4/(32. PREPARED BY ^ OAK6oi4
FINAL MAN HOURS
Bechtel
S/C
DIRECT COST
$1000
Bechtel
Matl. suf"pf.ur<?
ev <aioMT
s/c
L&M
* '
i
PAGE
GARRARD 00000522
TOTALS
Includes Inert Packing, Catalysts and Chemicals When Furnished and/or Installed By Bechtel
C" ACCOUNT - VESSEL PACKINGS
^9
--
PHR 1.2 5
\
JOB NO. & TITLE
^?\sg<Cl U\a^ifi.AvU~feilcONSTR. DATES A&\jSSt_ TO &2L
TANKS
CLIENTKRfrfi.frTvLad Qu-- Clo.___________________________
JOB LOCATION 0-rih>N ~X1 ^_v_y
______________
prfparfr by H. <2,F\uL.ocjJifty
PLT. EQUIP. NO. NO.
SERVICE
ROOF TYPE
MATL IF NOT CARBON STEEL
DIAM. FT
HEIGHT CAPACITY FT BBLS
WEIGHT TONS '
FINAL MAN HOURS
Bechtel
S/C
DIRECT COST $ 1000
Bechtel Matl.
S/C L&M
'5'L Q-\U Ov^Pc&AfrvSr STdfii\GrE.TfrviL
\*>2. t>-va CAa&WsKfe
1^Csi_hi t)K TfrvOiic
*>Z. 0-r*> Cjq^C . *W**Oa ^rcsOA6t. Tf NYL
51
Jl________
q
V
B<\ *1^ l4- L
O . 'b
____ 4
Plant `b2_
?>0` &
b-T.
AytsfLaVsKvA VW.L'Xf^ M
\h Ch7<P->
APoavoM Funnel
O.Z
54
z&
...
1
PAGE
ALL OTHERS TOTALS
( .......... EA) IsTL ^H,/NOTE: Spheres and bullets should be listed on vessel sheet
111
*D" ACCOUNT - TANKS
1
5 O 'h o
PHR 1.2 7
&
"EM - EXCHANGERS
J01 1 NO. & TITLE
CL ENT
JOI S LOCATION
....
SUMMARY OF EXCHANGERS
............
CONSTR. D ATES I0(& TO PREPAREC BY
\
INSTALLED QUANTITIES
FINAL MANHOURS
Bechtel
S/C
DIRECT COST $1000
Bechtel Matl.
S/C
L& M
-*0
m>
CARRY FORWARD FROM PHR
CARRY FORWARD FROM PHR
CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR
CARRY FORWARD FROM PHR 1 r
CARRY FORWARD FROM PHR ll2~IZ
CARRY FORWARD FROM PHR
CARRY FORWARD FROM PHR
PAGE PAGE &JBr.
page PAGE
PAGE
-
'2.
M
PAGE
PAGE ........
PAGE
\=uAvit lli,
puhwyr 2L&
V\
*3%*-
4(b
17
JL 1 /
EA io,6>t EA /?V5
V ..&JLl
U& *!
EA -
EA -
EA --
^Sa^. O'B 'Ll 6 0
EA
EA
PAGE
GARRARD 00000524
TOTALS
"E" ACCOUNT - EXCHANGERS
1 G EA 13, 4-|o ZIW 4-U 30*1 r&'b
phr 1.2-8
^0
JOB NO. & TITLE
CONSTR. DATES
SHELL b TUBE "E" -- EXCHANGERS
CLIENT _____ ------------------------------------------------------------------job location _______________________________________________
PREPARED BY lY\ *
PLT. EQUIP. NO. NO.
SERVICE
S
H SHELL SIDE
E
L L Malarial S
Flange Rating
TUBE SIDE Flanga
Material Rating
MVBTU HR PER
SERVICE
SURFACE AREA SF
Per Shell
Par Service
WEIGHT (TONS)
PER SERVICE
FINAL MANHOURS
Bechtel
S/C
-.t (\UvkW. ^LtAt^Cnii ,1
*6
CthA Cbou.1 ./
\ZA kUM^t 'cTCAt\ViGE
-10 ktAtttE CjoousiA. /
/
-a
>&l JL<L
JterU'O'k
~
Glfte CbOl JB .. 1 *lr ?L^r 4
\6at5 VA LAS iSoV
P/ I6'6
<"<3
//
O. of
lUC,?,
/? /V
3V / eP-> /y ^2/3
TO
&Pa Lftto/Ov
DIRECT COST S 1000
Bechtel Matl.
S/C L& M
2V4 l4 ^
&& a 2/1 $ lVV l
11 <1 4-1
146'1
PRQPAvj P0Efc>
2& e-i
Z-tzaLxZA
/
i *2
/
T `blr
3? <3.&
// 3</
>4
10`S
PAGE
GARRARD 00000525
ALL OTHERS
I0TALS
1 FAl
-r-,
,,-
TT-U*b PfcCrl*
i H eai
"E" ACCOUNT - SHELL b TUBE EXCHANGERS
? 2(4 PHR 1.2 9
JOB NO. & TITLE
IATES ^\ao TO 4\&x CONSTR. t
SHELL & TUBE "E" - EXCHANGERS
CLIENT JOB LOCATION
PREPARE! BY U . Ctt\ AsCMh}
PLT. EQUIP. NO. NO.
IL
SERVICE
S
H SHELL SIDE
E
L L Material S
Flange Rating
TUBESIDE
Material
Flange Rating
MMBTU HR PER
SERVICE
SURFACE AREA SF
Per Shell
Per Service
WEIGHT (TONS)
PER SERVICE
fFuilf (o
t TF'bl.t ls< ifi C$
AoGO*Rjr
Wb C> 26lo sse4c
e-\fc
rPlVG teCoW
LocJ1 (U? J
e-i.
4
\\3tfin ?0ib0a3 Tg4tA CflOLg/l
1
^tkj. pPtiL o w TEiia faawitfe
l1
CJDtATLiiJsSrpefet* * FFU>evAT*
l^tA. -
z 1'LN\ol(-
3te*
IOL-
^CC>^2
%-<\h
wraift TdiiA Cjcs'oUJk.
z K\VMJ>
tiit a*
LMVAtS/ fcfcAMfl-
Sox fl'5
SoVU teOtn 4l\fc n%
iiiL
i'\b
4fotr-cPefLsfcMousfoti
.. utX
\
1
Kn-C.b
Ch
iJcJ'ejF AbtAtfiL
(cC^iF
\AvA\b AViM\IL
-i4
DtbuTftai (L<1
K^?WTfeT(Vlo5r P
U\s ffcm C-okJb,
4 \
Ch
IcO* U,f
dTcBtfmtmot"r re^>rw\f,<eL
1 \
i`ic POtL 6tf ClA ea
u^r CrAt auaut Li
6*21
id
T
t-2l
.KV\fvHi.t
X>a!KiiCA'rti.K, >.
V-e.GllAlUl OCtl.
l^o1 &&
2*64 wiv su<lv 3*34 4oeO U'Xt 2/3 &W2
FINAL MANHOURS
Bechtel
S/C
440
'L'OD 80 e>o
500
BO
80
zoo
11
10
70
32.
80
DIRECT COST $1000
Bechtel Matl.
S/C L&M
82.7^
U<6** s4.v
\6` \ aa^M
\2lV l4* *3 &v 4t*4 4i_i to- 6
4- - 4 1-4 60
<8 (3
PAGE
GARRARD 00000526
ALL OTHERS TOTALS
( EA)
____
TiW^
I 33 pal `
E" ACCOUNT - SHELL & TUBE EXCHANGERS
31 3.1 Z14 asn-t S-L.
PHR 1.2-9
JOB NO. & TITLE
Rt&uybfhA Rjl
CONSTR. DATES
TO 4r\|.t
AIR COOLED
CLIENTEAl\ft.ATl46i4 &U- Cb, JOB LOCATION (^Qfib^So4 , XuLl ikTCVS
PREPARED BY ff\. Cl
___
PLT. EQUIP. NO. NO.
SERVICE
OVERALL
DIMENSIONS
Lw
FT FT
MOTORS No. HP/EA
MMBTU HR
SURFACE AREA WEIGHT
Bare Extended TONS SF ESF
FINAL MAN HOURS
Bechtel
s/c
DIRECT COST SIOOO
Bechtel Matl.
s/c
L&M
VVd iL-S Pn-Obocrs CotJfctfjW L \lo e-s ^TlLlPPeiLOM CDdb.
*>2
H* i ^CJtolL^OJbvXTS Ct o IU z-vs Gt&vyThtoA. dA C&tll .
40 4o
\U e-n
UL 4tO
lU> -21 ?&l*ikRATtOhl CjD0U<
lb
t:\0
VJ\fvcT
C*A*a VTAGiL
CDN^O^olZ, lOTUIUmuD!
4er I u -17 I'44* Mhtit CoouilL
S\t Pu^yT lb
"1
4o 4b
Z.& \1. Sb
z& i4
*S i4 i4
4-
z
a 4 7_
4
16 IS
2o IS IS --
to l
44-a 9ao& 211249
&b7 2.IES 4z\l\ G4* 3 mbs S74bS2
IS- 2- 6lSV \q74U
TVO 4&4R &A426
l-ZA <MU
WL
27Vh 4%70
Lo *3 6 2H9 99573
\&
7.1-S 7.0
2
4*0
4
soo
700
Ifcoo ftDO
ftco
5"OD 700
700
(J&O
\4\t ss-z
S4&-S \\1'4 Vo Vo *4
1ZI 4-7 l <47-V
Moi
2Z 4A|ft uib issmas Z4 52.
&
VO 27>S sn4 njoo *7 (a
//oc>
--
209 -6
zr la-4 EaoTYorA^ Cto t ii.
bz_
II
z. lo
II * 152? wza s
383 --
6V1
PAGE
3 $
1
(3
GARRARD 00000527
ALL OTHERS TOTALS
T\\\ cj
1--------------
1
i
1
(.......... A>
' . Note: Under Each Item. Define Extent
V^kClCL (vAUA )
Of Field Assembly Required.
"E" ACCOUNT - AIR COOLED TUBULAR EXCHANGERS
VWVft
P
duo i o.in
SHELL & TUBE
JOB NO. & TITLE. CLIENT________
CONSTR. DATES
TO
PREPARED BY ttV (iMABVl
PLT. EQUIP.
NO. NO.
SERVICE
S
H SHELL SIDE
E
L L Malarial S
Flange Rating
zs e-i ll
y ML* /
-**
T)foorf\Wi.etC pjrfcj LtuOLO.iL ?tnijAroft-KTo(iL l-L s-t.b Coqu(L
/ / i
-1
&Cil.
\_o.tJ 1 2jlcpLe'-e Oil-- CJDOUTCXil,
*io TXvia tJOOUtllX
i / /
l-l|
i
tb0TA^_WJ^cT i
Qfcfftja'P 6/pI t*|* CjdOV3H*3A.
i
1 ^P^,(bC>tL-l.(L i
TUBE SIDE Flanga
Material Rating
MMBTU HR PER
SERVICE
//6t
/o3J
S ? S/8
J./S
26/
p.a?
uJFtnsr KcJW PltsvUd
IVC
SURFACE AREA SF
Per Shell
Per Service
Mt <41^
WEIGHT (TONS)
PER SERVICE
FINAL MANHOURS
Bechtel
S/C
//a 7S'
7S S~3 3Z 3^ <cT 3i"
yo //?
DIRECT COST $1000
Bechtel
Matl.
S/C L&M
94`Q
2.1' l
?.& *0
Co * (o
lE-'V
>(* "VlT TV'S TV-6
PAGE
GARRARD 00000528
Al l OTHERS TOTALS
( EAl
TV, PA<V
i |B EA)
E" ACCOUNT - SHELL & TUBE EXCHANGERS
<FV3
-
Mora
<J\
PHR 1.2-9
JOB NO. & TITLE
frA<i>WLlh4, CONSTR. DATES
*E" -- SURFACE CONDENSER
CLIENTtA^(LKTlA<SK> OiU CJC>. PREPARED BY KV fefrUJ*.^
job location
XuLihtoif?
PLANT NO. EQUIPMENT NO Wfi'i.- \*\
WEIGHT TONS
FINAL MAN HOURS
Bechtel
s/c
BARE CONDENSER (ATTACH 814" x 11" SKETCH NEXT PAGE}
GPM Wifi ; C.W. IN fo F, OUT H 6 F;
ASTM SPEC: SHELL .? . TUBESHEETS SIZE: l2.\-2-V, W 4`-4-M.H
;
\\ \oo
Ttl 4l&:L
DIRECT COST $1000
Bechtel Matl.
s/c L&M
\\S`\
TUBES - INSTALLED IN SH0P/R6fe> (CROSS OUT ONE).
NUMBER feti'b EA; O.D.
IN; LENGTH 1& FT;
GAGE *V1`5 ; ASTM SPEC
TOTAL AREA 'fe'SLtD S.F.
SEC \loG-U TOTALS
ACCESSORY EQUIPMENT INCLUDED WITH CONDENSER PRICE:
MAIN EJECTOR
1 EACH
HOGGING EJECTOR TYPE t4af
EACH
C.W. PUMPS GPM/EACH
. TDH
.
EACH
MOTORS FOR C.W. PUMPS HP/EA
. RPM
COND. PUMPS GPM/EACH
TDH
.
EACH
MOTORS FOR COND. PUMPS
HP/EA
, RPM
,
___ . _
"E" ACCOUNT - SURFACE CONDENSER
>L
\\
i -A <_4
10>0
"\
\\6 A | i
PAGE
GARRARD 00000529
1
OTHER
JOB NO. & TITLE. CLIENT_________
*E"-HEAT EXCHANGERS job location
PLT. EQUIP. NO. NO.
SERVICE
DESCRIPTION AND DIMENSIONS
lU
CH\#A^fT\Ot4
ULATliL
u2.tTIUC ^"o.b V
PlG UlZAriL ^ O VCW t
yvkadAti. lood
L.jkrtv\r
CONSTR. DATES 10 So jq 41 St-
PREPARED BY ^ CiALUa^tO/
DRIVER WEIGHT HP TONS
FINAL MAN HOURS
Bechtel
S/C
go
DIRECT COST $1000
Bechtel Matl.
s/c
L&M
\U iluscrtuc. ----- Vjgfyr&K-________
i6&Vp e^,\
FLG V-WATC& ?>6>WL\AJ Mrk?vJ ^ PtU*j
\ Ac
L loQA
- U-Taftil A.
or
lli -16 k\(L \\k<<L
~ \(3&y(Ur fc>Uv$t>
-r\P. y^Taoobut ic^knJ
\UUA>ioe1 '
MrTo1 tsiA Vv^COLdV U2lMoe>oT^ .
fto
Ar>
ft-o
*
PAGE
GARRARD 00000530
TOTALS
. ALL OTHERS
___ _
.
( EAl
too
E" ACCOUNT - OTHER HEAT EXCHANGERS
\?CH-
PHR 1.2-27
jfi'Ltfl
^ MECHANICAL DRAFT "E" -- COOLING TOWER
JOB NO. & TITLE \4rtfab
fcgjFvt^lfcN
CLIENT_>U- Oa. PBFPARFD BY MV C*KVXfi>v4^
j0B location
o t ~X tuk^v*>______________
PLANT NO........ 'Kl? DUTY IN MM8TU/HR. l^ WATER TEMP. IN F lO~),
EQUIP. NO.'SGPM^jLop DESIGN WET BULB F "J& L WATER TEMP. OUT F tfc*
lift ^
CONSTR. DATES 16 1
TQ U-i&l.
FINAL MAN HOURS
Bechtel
s/c
DIRECT COST $1000
Bechtel Matl
s/c
L&M
O & Xi La
OUTSIDE DIMENSIONS:
width
:
HEIGHT LENGTH
FOR 1 CELL TA^X ft
IS Z&
FT FT
TOTAL FOR
CELLS
ZQ'b ft
2.S, FT //X FT
:
FAN DRIVERS: . J
EACH/CELL
7' B
EACH/TOWER HP/EACH
MATERIALS OF CONSTRUCTION: frame 'Oe.tise kLi
SIDING fijOt. Cja.llCkCffi,M* Fl(l. ClTI\R.'ti(i^f
fill
^O'fshKTVc- CjALcfLlbe. Filta Vy P.
pwl
iiljjiiijjr
---------------- -
1
PAGE
GARRARD
TOTALS
TCiTfV L_ CJZZd L_v Cg
U.ft_
- Z*>0 2, O 'S *L\L'C
"E" ACCOUNT - MECHANICAL DRAFT COOLING TOWER
PHR 1.2-12
"F" - FIRED HEATERS
JOB NO. & TITLE CONSTR. OATES CLIENT PREPARED BY m. QAl.VJPWtt| JOB location
SUMMARY OF FIRED HEATERS
TO
INSTALLED QUANTITIES
FINAL MANHOURS
Bechtel
s/c
DIRECT COST $1000
Bechtel Matl.
S/C L&M
CARRY FORWARD FROM PHR l'2-7T
PAGE
CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR /2>|$'
PAGE PAGE
CARRY FORWARD FROM PHR h'2-IS' CARRY FORWARD FROM PHR 1.2-iC
PAGE PAGE
CARRY FORWARD FROM PHR
PAGE
CARRY FORWARD FROM PHR
PAGE
CARRY FORWARD FROM PHR
PAGE
2.0 Z-/
2 2-
/2J5 ^
UqF'V \Lf-2.
V
*4 7^f-[
\ EA ^(oCofe? 1^0 TlBfVL TIL'"L
\ ea
vib*4
1 EA 4&`$44 c|6r*4- 2>>54^
l EA
'UL' 7-
l ea
U,'\
EA
EA
EA
PAGE
TOTALS
"F" ACCOUNT - FIRED HEATERS
EA
&n$o
5o!fc?l< `V^vk
PHR 1.2-14
JOB NO. & TITLE
^QbeAfeK\bAcoNSTR. DATES
TO t AX-
FIELD ASSEMBLED "F" - PROCESS HEATER
clienttAMLivrUod
job location
chi-- C_*>.
prepared by
,
kMxbuA>_______________________________
equip.no. \lo'F-\
HEAT ABSORBED 2.B ") MMBTU/HR
ATUBE ASTM SPECS: RADIANT
*Vb6
SERVICE R. elkCfo <2 .Ak<\_66. \\Ckfis.<L
P\\
EFFICIENCY ^!*S % FUEL Oil- 1 GA& CONVECTION k *W3 Pll
FINAL MAN HOURS
Bechtel
S/C
FINAL DIRECT MATL. US SI.000
Bechtel S/C
FURNISH MATERIALS HEATER ASSEMBLY STEEL FRAME
QUANTITIES
METAL
WEIGHT
(TONS)
CASING
RADIANT TUBES
&*L INCH DIAMETER
CONVECTION TUBES 8> L> INCH DIAMETER
HEADERS & CROSSOVERS
TUBE SUPPORTS
W)*iSF
ZL EA
56 EA
za LF
STRESS RELIEVING ^ _,
EA
RADIOGRAPHS BURNERS
\OQ*L
EA
Or EA
BURNER PIPING
REFRACTORY - BRICK
- CONCRETE
\j Tv\v
block^' 0(2.Rn\\C_
2jC^\\<LJC
R(b(L.. (
\*jz. Y .
LF
STACK - DESCRIPTION: TJ'L.O 1
583-2
.feSIL
is* a
f
1
{ fb
/
30Vd
GARRARD 00000533
STACK LINING - DESCRIPTION: \^LATv^G BREECHING BREECHING LINING DESCRIPTION: (NOTE: ATTACH, AS NEXT SHEET. SIMPLE SKETCH SHOWING PREASSEMBLY)
loo a SF 5,6 SF "60 SF
\
'
T0TALS
\ cirrA v__ vWoceXL
t \<\d.
4,F" ACCOUNT - FIELD ASSEMBLED PROCESS HEATER
75o 58fl *2- 22. 2_
...........
PHR 1.2-15
JOB NO. & TITLE
^atogrt-^viATlicnJ
FIELD ASSEMBLED *F" - PROCESS HEATER
CLIENTKA&ftJVfiActnl QiL. Cfc>>
JOB LOCATION ^-fcfot ^*js>J t X
___________ .
EQUIP. NO. llfl F-L
SERVICE ^TL-vPPtKL ^(VCi. QjLP.iOVUgiL
HEAT ABSORBED
MMBTU/HR
EFFICIENCY
% FUEL O\L-iCxA^
TUBE ASTM SPECS: RADIANT C& A-loL Cr!L B
CONVECTION C& Alob Alt Ha
CONSTR. DATESTO PREPAREO BY ^
FINAL MAN HOURS
Bechtel
S/C
FINAL DIRECT MATL. US SI.000
Bechtel S/C
FURNISH MATERIALS
HEATER ASSEMBLY STEEL FRAME
CASING
RADIANT TUBES
INCH DIAMETER
CONVECTION TUBES
INCH DIAMETER
HEADERS & CROSSOVERS
TUBE SUPPORTS
STRESS RELIEVING RADIOGRAPHS
7oo%
BURNERS
BURNER PIPING
REFRACTORY BRICK (V,-rrn C
7.V*.
XL
CONCRETE
Xa\.c ^
BLOCK 4gRM. A v c
STACK DESCRIDPTTIIHOMN<: fClt?Q\ tKf\ATs3na(, . \ AA-TTTla_ _sIi iV.alil l\ll>rF-\\ ji * i
QUANTITIES
METAL WEIGHT
(TONS)
\2.b
\U-OD SF
dr it, EA
IcO EA
too LF
EA EA EA LF
VfrT- SF
M>U (obi Sth.
&
STACK LINING DESCRIPTION: ^^LAYUoG Cj&*JULT. BREECHING BREECHING LINING DESCRIPTION: (NOTE: ATTACH, AS NEXT SHEET, SIMPLE SKETCH SHOWING PREASSEMBLY)
*>i AifC*a\ SF bO SF bO SF
\
TOTALS
"YoTf\L_ Ue kTui <L \lfl Vr-'L. \z.s
Tbo yj84
PAGE
GARRARD 00000534
*F" ACCOUNT - FIELD ASSEMBLED PROCESS HEATER
PHR 1.2-15
JOB NO. & TITLE uj-iy/*)
9-tt.PvwfcCy MatoHUlhi,
EONSTR DATES \&i&0 TO 4 i
FIELD ASSEMBLED "F" -- PROCESS HEATER
client__________ MAa.KTA<atV Ow Ct>- prepared by Wv
job location
T.ia_u^>v*>,
equip.no. \t*'?:-`33{4Sb\Q.\Ts
HEAT ABSORBED '^Yq^Jf'lSiW^TU/HR
service 'pL-KT'FOft-IAu-'Xjr CjAkftJtiv* vW&ft (L
EFFICIENCY
% FUEL
_
TUBE ASTM SPECS: RADIANT K?)V5 <30-9^
CONVECTION K'Vb'o CtIL P4
FINAL MAN HOURS
Bechtel
s/c
____
FINAL DIRECT MATL. US$1,000
Bechtel s/c
FURNISH MATERIALS
HEATER ASSEMBLY STEEL FRAME
CASING
RADIANT TUBES
U*V' INCH DIAMETER
CONVECTION TUBES^^iiNCH DIAMETER 1<J2* <?(,+ lL>
QUANTITIES --
METAL WEIGHT (TONS)
ZZoo
ZLOOG sf ll& EA
4&,0T?
bo 4 EA
*>S'Vv`2>
HEADERS & CROSSOVERS TUBE SUPPORTS STRESS RELIEVING RADIOGRAPHS
*>7(5 tOG^l*
aV^TU
LF
EA EA
?)\n
0
BURNERS
BURNER PIPING
REFRACTORY BRICK
foU C- n l6oO ^
*4* ^^ONCRETE LOMhifTC 1 ^KY lilt^/\JafLUUtj^uT. ILV
U-C,
EA LF
4w>8S
-BLOCK Cji^mc V^VWLlL ^'-To"lW STACK - DESCRIPTION: STACK LINING - DESCRIPTION: LvitVvAl CtL - fAWblHi \k*
SF
SF
/ 4 t^v
\/
L
i\ _Co&_W
z44^.
BREECHING
600 SF
BREECHING LINING DESCRIPTION: (^oCAt^C, CMUltfe. 6oO SF
(NOTE: ATTACH, AS NEXT SHEET, SIMPLE SKETCH SHOWING PREASSEMBLY)
>'
T0TALS
Udkrc-A- tU-'^Alfcldb
*2..Z*D
1
f
PAGE
GARRARD 00000535
**F" ACCOUNT - FIELD ASSEMBLED PROCESS HEATER
PHR 1.2 15
JOB WO. & TITLE XA&'ob
WVSt^.CLLh nflMSTR DATES \qWot11
FIELD ASSEMBLED
"F" - PROCESS HEATER
clientUvMUon-V6^ Oil Cb................................... ......... prepared by ^ H4
job location RO&\C&aiV XiL.iAaA
__
EQUIP.NO. Uo'F-U-
SERVICE
HEAT ABSORBED #V4 lO MMBTU/HR
TUBE ASTM SPECS: RADIANT t\ AIOL Ctth
RFa<LAAC<L AlifvtcLft. EFFICIENCY %$% FUEL 01
CONVECTION C4# A/OC>
l CrA$ fi/lS
FINAL MANHOURS
Bechtel
S/C
FINAL DIRECT MATL. US$1,000
Bechtel S/C
FURNISH MATERIALS
HEATER ASSEMBLY STEEL FRAME
CASING RADIANT TUBES 4'46 INCH DIAMETER CONVECTION TUBES 4 *56# INCH DIAMETER
HEADERS & CROSSOVERS
TUBE SUPPORTS
STRESS RELIEVING RADIOGRAPHS
lOO *h
QUANTITIES
METAL WEIGHT (TONS) \A**4
ILoqo sf m-& EA Uo EA
loo LF
EA EA
.Cg^ZL
>m
BURNERS
BURNER PIPING REFRACTORY - BRICK
CA^ zV' TWti
-CONCRETE yA* ^V\.
Spj -l
LF -6A
-BLOCK 41' CvTCtvAvr \AV ,V V: ta/.vA Y*?'U SF
STACK -DESCRIPTION: STACK LINING DESCRIPTION: BREECHING BREECHING LINING DESCRIPTION: (NOTE: ATTACH, AS NEXT SHEET, SIMPLE SKETCH SHOWING PREASSEMBLYI
*0
--------- \--------
SF
--------
ii
--
SF r
t
'
\
I
TOTALS
.
vW.kTVYL
\vl0
T^i
'Ziz. ~c
PAGE
GARRARD 00000536
"F" ACCOUNT - FIELD ASSEMBLED PROCESS HEATER
PHR 1.2-15
FIELD ASSEMBLED "F" - PROCESS HEATER
JOB NO. & TITLE VAo1^ P QPjufoOti
CLIENTVvAKR_(\TAq<4 Q>L
.
JOB LOCATION Rafov^OtA Xlu
MftbuitU
EQUIP. NO. 'SL'bV^- \
SERVICE
HEAT ABSORBED
MMBTU/HR
TUBE ASTM SPECS: RADIANT
G2.Tb ____
EFPICIENCY Bft-U %
CONVECTION A
.llfo<3U-- kL.0--
FUEL
C.(L fo
FURNISH MATERIALS
HEATER ASSEMBLY STEEL FRAME
CASING RADIANT TUBES
Ia^B INCH DIAMETER
CONVECTION TUBES La*fa INCH DIAMETER
QUANTITIES
METAL
WEIGHT
(TONS)
Uoo
\aeoSF
+> EA
o4 EA
HEADERS & CROSSOVERS TUBE SUPPORTS
loo LF
STRESS RELIEVING RADIOGRAPHS BURNERS
lOD4T
EA EA 4- EA
BURNER PIPING
LF
REFRACTORY - BRICK ^.AAr\ C
CONCRETE
47% -ftKY..
- BLOCK STACK - DESCRIPTION:
At Cv^AA'X o \~-\V. am :. 6j4* 1 Y, ^'b1' D.b,
EA *J?CF
sr-
STACK LINING DESCRIPTION:
IZEuD sf
BREECHING
IOC??
BREECHING LINING DESCRIPTION:
iOOSF
INOTE: ATTACH, AS NEXT SHEET, SIMPLE SKETCH SHOWING PREASSEMBLY)
CONSTR. DATES!
Yq 4 i&Z.
PREPAREO BY ^ CrftUJaOP^
FINAL MAN HOURS
Bechtel
S/C
FINAL DIRECT MATL. USS1.000
Bechtel S/C
L \u\
TOTALS
"TS-tal-
iW.ftft.r'L
zHi
-
\(i)0
+/&S- 2> 4-4-0 2^4
PAGE
GARRARD 00000537
T- ACCOUNT - FIELD ASSEMBLED PROCESS HEATER
PHR 1.2-15
(&$
JOB NO. & TITL E
CLIENT
"G" - PUMPS & DRIVERS job location
SUMMARY OF EXCHANGERS
C0NSTR. EIATES^/a^> TO PREPARECIRY H. (SA(_l_C5boAV
INSTALLED QUANTITIES
FINAL MANHOURS
Bechtel
S/C
DIRECT COST $1000
Bechtel Matl.
S/C L& M
CARRY FORWARD FROM PHR CARRY FORWARD FROM PHR
PAGE 2-(r>
PAGE ^
CARRY FORWARD FROM PHR
PAGE 2-
CARRY FORWARD FROM PHR 1.2-22. PAGE
2--
CARRY FORWARD FROM PHR i >2-2.3 PAGE ?>2-
CARRY FORWARD FROM PHR L2z23> PAGE 33>
CARRY FORWARD FROM PHR LPAGE ^3>
CARRY FORWARD FROM PHR
PAGE
T'L.AkJiT 9 Pu.A*^~r 1 La
, -r |, , Z.**3 2.S
(j
ZC>
0
"52 Pu A kj f* 9 O
*j Z
EA -- /a
EA 4a4k
EA *5T -
EA
EA J22-9'
EA
--
-
EA 4o5 * EA
--
2V6 O 7.
146*2 t&u
44* a
mi 64-1 m-5
1*7 -
...
PAGE
GARRARD 00000538
TOTALS
EA
"G" ACCOUNNT - PUMPS & DRIVERS
13oZ
phri2*
JOB NO. & TITLE Z4053 ,
CONSTR. OATES Ql6a.T0 ^^2-
G** - PUMPS
chfiit MARATHOA/ OtL- CO, JOB LOCATION ROFZiA/SQA//A L
PREPARED BY
PIT. EOUIP. NO. NO.
SERVICE
PUMP: DRIVER:
pump impsu&s PUMP
(toil/
75( tlacuL. urntt DRIVER
PUbpiMPSUJS, PUMP
Refill*. PL/MW) DRIVER
GPM
TDH DISCH. PSIG
F
CASE MAT'L
RPM
TYPE M ST - ENGINE
DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT
o
BHP HP
FINAL MAN HOURS
Bechtel
S/C
B y/Yioc.
By tfJoc:
DIRECT COST $1000
Bechtel Matl.
S/C L&M
3i5L
2,$
&-/2
Z0K/ PRSSS.
AHth'lS PUMP
5ou& h/ATSfL
LecYCLC
PUMPfse,
PUMP DRIVER PUMP DRIVER
I
1 /S' \22S | jft# | too | . | 3too
MOTOfZ-
1
fej U, c> \
s to., d? \
TcsTal
PUMP
PM/Jr f DRIVER
PUMP
DRIVER
ot> itfiiPhlTilA PUMP
IA
t_4A<2Sifc
Zo G-qai'll 1/2? POAAP*, DRIVER
2^ Cr
ShjflCTp/AftJr^ PUMP
/j C+lAtiCtlL
/. pUM^
DRIVER
I
LosUtel
AAOTEppJ/2.
uoAl^fa^l
M.ofbiia,
no I \4oJ g..huip
iTfcpf _ .| lVLp \J
J2*.
ufr
hu-o c,7. h(poa U0`4
rfeyc. | *4-6 o n/
")5
c2V
<2/
,ZQ_
//S
Z*>-+9 O "L--
tS< $ n^
"2-1 6 * 9/r.i Te-AtA^e:.
PUMP DRIVER
ALL OTHERS
IV\OTbl^_
~Tdrrfc*L- PiAof Z^l 2-1
irV 3
io
i 4. .EA)
ro
?<=>Y iVvi a
PAGE
GARRARD 00000539
TOTALS
'T'cArui
"TTAv 5
Pf\tG.
"04 b&> I
N
On
"G" ACCOUNT - PUMPS
PHR 1.2-23
m
"G" - PUMPS
JOB NO. & TITLE
PRMfF_____________
CLIENT MAtUTtfO/U O/c. CIO, ______________
JOB LOCATION gOB/fi/SOM, iL(_ ,
CONSTR. DATES I0|&QTO ^ 1
PREPARED BY A.T- / M-MiLUEfc-
PLT. EQUIP.
NO. NO.
SERVICE
PUMP: DRIVER:
GPM
TDH DISCH. PSIG p
^$5* MAT L
RPM
TYPE
M -ST ENGINE
DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT
BHP HP
FINAL MAN HOURS
Bechtel
s/c
DIRECT COST $1000
Bechtel Mail.
s/c
L8.M
HYDRO <?-tM
PUMP lii. 'Ms
'PUmPLi spm DRIVER
hOTOfL
W-i IVo C.S. 3m 636
| W Pi/ 2$OO UPLTS TOO
5*3 IK1 J_ (&_
U/ATGfi-
to
5-2
//y7W2?A.'
PUMP
PUMP DRIVER
'll iss7 Motor.
67/ | IZD | STEBL | teoo V&fc /too volts
13 ts~
2>6
3*3
%U 1 1 0
Zrnipps-g. PUMP /37 2$"Y I
G-3$
'
%
hGFLUX. PUMP.
DRIVER
Motor.
| too | STtXL | 3600 I repc/ p&o volts
iDWl 3^6.... 33 is
10,7
I* 6
STRtpPGfL ' Borrows
PUMP
777/? 70 1 772-
41$0 \etgol /goo 276 34-6
35 88.1
1 (
ib
5 PUHPC*smt) DRIVER
MOTOR - U/P- / Thoo VOLK.
Boo
CHEMICAL- PUMP
lA/j&rr/oP
v.
Sr-5. PUMp
DRIVER
s'=ert fvccT. =^t IH
4.i
HepcTofL
PUMP
ProD, SBVAPaT.
1SG Hz
i(a 5-6 PUMP
ORIVER
motor.
BOO | TOO S7ESL $600 67
. UP-l/ T$oo volts.
600
VU6 33
50.8 , I L>
DB&UTANlZR PUMP
!(,
5-7$ ' REFLUX . 3 Sflaef,
DRIVER
36Z- 2i7 | M07Z>g.
3/6 1 too . d'. s. $600 1 T&F^ /tfLO VOLTS
73
$C
2 4^
63
IjS
1 * Lp
bGbLCTAN(Z~GfL < /Le&oitstz--
PUMP
m& Hi 1 3*72.
5$o if-rttiL $600
3*44
35
1*1*3 1 ' Lp
It,
5, fW^VYs**.} DRIVER
Motor,
TBfcJ %o volts.
fsv
AS7 /4T
6AS
Ct$fAUfCP~,
PUMP
166
65
9*o 1 * La
/ 5-? bkim PUMP DRIVER
PAGE
GARRARD 00000540
ALL OTHERS TOTALS
1
TciT'hL.
TyU^ 'PLLrlL
"G" ACCOUNT - PUMPS
EA
Zo lo
L\ 03'C rd-a
PHR 1.2-23
JOB NO. & TITLE 74*63 3
R&.MF*
CLIENT MAfLJSTtfOAJ O/L, <SCK
CONSTR. DATES.
.TO.
PREPARED BY fcT> / h,M|Ug_
`G" - PUMPS
PLT. EQUIP. NO. NO.
SERVICE
PUMP: DRIVER:
GPM
TDH DISCH. PSIG
F
CASE MAT'L
RPM
TYPE M - ST ENGINE
DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT
BHP HP
FINAL MAN HOURS
Bechtel
S/C
<6 SHO*A/iP/UIH WMBfL
PUMP as-/ I 3 3f| iso I VI8
Hop
DRIVER le^Ti(KA/Ac/Horoc boo/fft pfigj7&ft -`iCOr.
*5^
ISO,
>*>
tUUffiCB
tome*i$iL
i_ is
STWJtP
CUBM/C. WJ-
y, PUMP,
OHm** tovb&rs
1t> S-/3 UfJ, PuHp.
PUMP DRIVER PUMP DRIVER PUMP DRIVER
% |/r<7 |
UA J^//&hMO. TOnfC
l
nzr
SV I nr 1 C.l 13600
Iso/t-i rv\> )/v'TE~rF^CCj~^ ~-Vtl/6/0*> k\*-
o
6.08
IS
3>lk 6*S
StJfc. sv^vc 1* 2- IM V Aco'
T
6ft$, NfLO^Oe
lH1BZTh>V PUNK
PUMP DRIVER
|MS# WAT&K- PUMP
it
S~/^5 CiRc. puMp ____ m*&
DRIVER
WA$t( TOW&& PUMP
ik OU&.S&
,
PUPP h SM') DRIVER
CAUSTIC /A/?, PUMP
JZ&16
PUMP i - WAke DRIVER
STAR l UP
16't-
CAUSTIC S-18 )//3 Pk'Mp.
PUMP DRIVER
Z3?P
5G
\*3>o>
SE5i:iD rt-4 ih
"T" ACCT.
Sfc-E. S\r\l< 44 s u-\
T" AjCCT.
~7
DIRECT COST $1000
Bechtel Matl.
S/C L&M
Ioi.u \ *
W.9
6?
Tfnf
/7 lik
\ Co
!%& 7*3 S-S
PAGE
GARRARD
ALL OTHERS TOTALS o o o o o cn 4^
Total.- TiUfe
'G" ACCOUNT - PUMPS
.EA)
1 176*3
\Z <& TLi>
PHR 1.2-23
& "G" - PUMPS
JOB NO. ft TITLE foOSQ
RsTiMF?
CLIENT MARj&TffO/J &/LJOB LOCATION &0&/AJ$OA/, ILL. -
PLT. EQUIP. NO. NO.
SERVICE
PUMP: DRIVER:
fLAUB * HBLIBT PUMP
K,0> oRMff
!(, zr~2?> Uor pum
DRIVER
DC
fa S-X> PUHfi.
su/[//AeP&HiTrH, A, (6 &0O\T&PAUMP-
toftp. lA/it/eiro/iW3. PUMP
PUMP DRIVER PUMP DRIVER PUMP DRIVER
dtWO&f4fiS TP&Aizr. fa S-~3? PUMP
PUMP DRIVER
fa \
ATTEHpBfVODP PUMP /peep pump d>. \ ^PAll % DRIVER
(U<EtM/T
/F0 (WP fa K j-v/; $_ * %PABjc '
fGi
SODjuM y $uLF/re p fe^dPuhp o, - seAm.
PUMP DRIVER PUMP DRIVER
BoiLe/L F&zjD PUMP \J U/AfEP PUMP tti r-W, g. y %?Ae' DRIVER
GPM
TDH DISCH. PSIG
F
RPM
TYPE M ST ENGINE
ZJD t*M *S,T
DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT
XT (00 CrJ. 2ttt> i&> /sv MS/&. 1
ir
i
i
i
i
Hi JL0OO Motor.
%'! 2X0 CJ- 3600 wp-l/tsoo foots-
BHP HP
6t o
fat
C0NSTR. 0 ATES M/8& TO PREPARED HV AT. /m.milled
FINAL MAN HOURS
Bechtel
s/c
z4& 66
DIRECT COST $1000
Bechtel Mali.
S/C L&M
It. 0 1* Lp
16*1
4e>
3.3 l 6
?-\e> 66
fl3_ l -U>
SEE. SIC
V
,LT" 7S ccT
\ 60
4-1 5;*
1 6>
*n
SE& V-Z. -X"N1CX-
l1_____
66
/&X
,
WJtLukJ 1 v/-olc>
' * ^5
<41 4~c>U
U0.o*=o'^ 66
i * Cj)
t
___ L*1
GARRARD 00000542
ALL OTHERS
totals
TaTw,<V3. 1
"To X A
*r
EA> V~>^66i> *>ia UflO-3 0/.L4&4fe> ^1% l45-2 T&L
"G" ACCOUNT - PUMPS
PHR 1.2-23
&
"0" - PUMPS
JOB NO. & TITLE tWSA/*/? CONSTR. DATESTO_____________________ CLIENT ftArfLATkD/J &tt- C. PREPARED BY AiT> /MILLER JOB LOCATION fcOS/A/tSOM fu--
PLT. EQUIP. NO. NO.
SERVICE
PUMP: DRIVER:
M'A/ LUBGdL.
PUHp FO^/iK-2.
PUMP
16 -45* &
DRIVER
PACKING H0TDII. PUMP
tOOQMSr WT.
iiL &% PUHP foe. l&K-f. DRIVER
GPM
TDH DISCH. PSIG F
CASE MAT'L
RPM
TYPE M-ST-ENGINE
DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT
$T- /noTt>tL
'1
wunjoen oaa&
tOOLiHB,
-
PUMP
....... 'l
16 S-17 pump foe- fox-i. DRIVER
HOTOiL
l
meeottrf'iHp PUMP
lb 5-VB fU U>K-$A- DRIVER
ttvrotL
1
LU&B OIL PUMP PUHP &>*
fclt-38 DRIVER
MA/AJ LMt&Oii-- PUMP PUHP ft)ft
&-SO
MK-3A DRIVER
ii
HotoR-
H&AsLU&e~ PUMP
s
Uo -5/
DRIVER
PUMP
16
5
-Sit
/ dOb'Us/vT PiiHf 5. fie m-3%
DRIVER
PAOtfUSCC>J^AfjT~ PUMP'
PUMP
16 5-53 R>e
DRIVER
ii
hcr&tc
11
HotoL-
BHP HP
FINAL MAN HOURS
Bechtel
S/C
DIRECT COST $1000
Bechtel Mail.
s/c
L&M
IkH l W. ..
ALL OTHERS totals ^|K\CLODEP !M
KCCTS.)
1 EAl
I
V c5
PAGE
GARRARD 00000543
"G" ACCOUNT - PUMPS
PHR 1.2 23
JOB MO ft TITLE
RfcMF*,____________ CONSTR. OATESTO
CIIEMT M.&PATROaJ OIL- CO, PREPARED BY
"G" -- PUMPS
________ JOB LOCATION kOtZ/AiSPAJ, !LQr,
PLT. EQUIP. NO. NO.
SERVICE
PUMP: DRIVER:
Dt-erHAMzep PUMP
n
<J"/^ ! FESD P////P 5. 4 sparg: .
ORIVER
, Absohpbr
323
Sri.) '
f&0 PUMP
* se*ae
pdM& OIL-
53
S-3$f 5
PUtHP 4 SPA&5
PUMP DRIVER PUMP DRIVER
GPM
TDH DISCH. PSIG
f
RPM
TYPE M ST ENGINE
DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT
MOTO/l
1
r
MOTOR,
1
Motor
1
1
BHP HP
FINAL MAN HOURS
Bechtel
S/C
5^
r
7~
/^O T
D66UtArhtiZSfL PUMP
n $-4
HBFLUtC PUMP
DRIVER
MCTOfL
I
1
</o
s.
D&U7kfi//Z&- PUMP
23 5-5^ ' kB>tU=:e~
---- .... / 5, PuNPn^n)
DRIVER
OSPROPAMZeg. PUMP
53 '5,FEG4DsPmUitMeP'
LAfiJ 0>i-
n
s-7^ 5.
PUMP -s smae
DRIVER PUMP DRIVER
bBPRDpmzetL PUMP
6L M PUMP
5 Y SPA^t'
DRIVER
t'll3 w | MOTOR.
I
motor
r
Motor,
horotL*
1
3#> I^.S. /#>
WP-l/
POLK
I
.
* i
2/3 .^ss-
2S> _I______
J-OCs
r
r
TX%~ L...-
r
/ PRebUCj
n 6-9/ 1,
PUMP DRIVER
Motor,
r
ALL OTHERS
Ml<bCtUl_ /j()k(?iv.' ( i <i/ T*4>
1 / / EAl
DIRECT COST $1000
Bechtel Mail.
s/c
L&M
4 Ct?' ^
ID-4
ii*3
G-S (olo* 3 P.i-T z/ o is
IO-1
l! 4
i on
9 o>
PAGE
GARRARD 00000544
TOTALS
' fcsf A. t__ *TA \ 4>
2.
/.272
Vl'Vl !
"G" ACCOUNT - PUMPS
PHR 1.2-23
*G" - PUMPS
JOB NO. & TITLE
n if mt mmWOAJ
JOB LOCATION
t
OIL, >,
{ ILL.
C0NSTR. DATES. PREPARED BY _
PLT. EQUIP. NO. NO.
SERVICE
tXteM. .
23 S-W
AWiTtlffs PUMP
13 Gr~ //
Aoomus
K.
PUMP:
DRIVER:
PUMP DRIVER PUMP DRIVER
GPM
TDH DISCH. PSIG
F
CASE MAT'L
RPM
TYPE M ST - ENGINE
DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT
Motor, nn
Motor .
t~~i r
BHP HP
MdRO&AR&C*/ PUMP
tO tSj | if
IQO rS. \3266 i
23 G-iZ Tk&HSF PUMP. DRIVER irmsf: tupb,
'TqTAI_____
PUMP
Itro/sro psfs
>`Z,
ArAT
DRIVER PUMP
I
DRIVER
FINAL MAN HOURS
Bechtel
S/C
PO (
50
Z3 6-1% 3UVvP t>PAei
PUMP DRIVER
Q'J&Lh b PUMP
29 6~2fo pLft"W DRIVER
txsiC.^oiic>fJ PUMP
29 fr-'b lOi^itb rrc/2. , DRIVER
12^9 1^90-1
Moro/t
I
/4-6 I
I C. 6.1 /^So /zz_
TEl^C / ^(oo
/ 5o
^7
jfO /O
TibTTvG
?l^T aA
PUMP DRIVER
.TO
DIRECT COST $1000
Bechtel Matl.
S/C L&M
&2_
'L 1i*o
\A&*i 1*4
%'/ //>& L *2_
50-'
ALL OTHERS TOTALS
.EA)
PAGE
GARRARD 00000545
*G" ACCOUNT - PUMPS
PHR 1.2-23
* JOB NO. & TITLE f^OS 3 r.MFNT fl&RATtiOAJ
RfZMF? CONSTR. OATES ______________________ TO
____________________ PREPARED BY
"G" - PUMPS
JOB LOCATION
IL-l~ .
PLT. EQUIP. NO. NO.
SERVICE
PUMP: DRIVER:
GPM
TDH DISCH. PSIG
F
CASE MAT'L
RPM
TYPE M ST - ENGINE
DESCRIPTION: ENCLOSURE/VOLTS OR PSIG IN/OUT
BHP HP
FINAL MAN HOURS
Bechtel
s/c
it
pH MPi'j j$Cs,
PUMP ORIVER
' DISPEkSAKfT wj. PUMP-
PUMP
~/5~ M3,
DRIVER
HiWfcJ PUMP
W-L n
J-/8
U IB ,
.PUMP * $PAM6
DRIVER
4 v-t.
HftnoMknsj kj tiNt ZOL,
PUMP
n <5-30 70. '"VA. DRIVER
/06&0 WO
6/ .
% DT.
.W
Nt(mp //d$'T hrp-2- Itoo vouk, Uookvp^ r- S'OO
n
i
//>? O
--
'XU"/
MOTO/ZL,
m
ii
Pu/77/ vi l(S-2
M-OTD/e .
11
/ 7W
i/-2
MctvZ r
T2b~mL_ 22_
PUMP DRIVER
1 O ;)l Cj
PUMP
1
DIRECT COST $1000
Bechtel Matl.
Ill,
S/C L& M
IV^CjuVil 'bl'T-l
uMJL Ui / `bz.'j-z
uS..c.ZlO..T1 l>z_v- 1
Ul-6
ORIVER
(sO 7>A&LATa/L , PUMP
9o
Or-/Si
fa u
FtstL Pom/?^ 'driver
PUMP
\
4o
9*2-
DRIVER
PUMP
DRIVER
PAGE
GARRARD 00000546
ALL OTHERS TOTALS
1 EAl
"G" ACCOUNT - PUMPS
Ziol
--
PHR 1.2 23
)
"K" -- COMPRESSORS
JOB NO. & TITLE CLIENT
job location
.
SUMMARY OF COMPRESSORS
C0NSTR. CIATES .lG> \fiQT0 PREPAREC RY H GPLCOloA^
INSTALLED QUANTITIES
IHP)
FINAL MANHOURS
Bechtel
S/C
DIRECT COST SI000
Bechtel Mail.
SIC
L& M
CARRY FORWARD FROM PHR /*2~2^" PA6E Z>*T
CARRY FORWARD FROM PHR
PAGE
CARRY FORWARD FROM PHR h1~2~ PAGE 3^
\,C- \ ^ l ^
iLVd- ^
CARRY FORWARD FROM PHR l<2'2-S" PAGE 3<3
\(J)lC'a> ^ Vb
' CARRY FORWARD FROM PHR j.?*:2r RAGE 31 .....
*? !l WuV
___________________ '_______________________ CrvtvKPQ . CffOVaS
ALL OTHER ' K"ACCOUNT
-- fa
,5 V/
2bl*
Ti<*7 1*154-
// O'7?
\C= &>2tQ o.
\o&c
20fc VPWW Co * ^ 17 VlO-L
Of. cj
0
PAGE
I Trr
GARRARD 00000547
TOTALS
"K" ACCOUNT - COMPRESSORS
ISZHp \320 4-oUlo- \
-a
phr 1.2 24
"K" - COMPRESSORS
JOB NO. & TITLE
RflfolLWQtA
nCiLPIEMNTT___________K__M__v_$_L__A_T__V_\_f_.i_d____O___i_l____f__i___. ___ JOB LOCATION fl6afoUOft.3J ^~XL.L- UO&l1!
tAfi>hi4.hL CONSTR. DATES ^X^SL TO
_ _ _ _ _ _ _ PBFPflRFnry VK:Gi{\
&.1
CYLINDER OR CASE
SERVICE
1 &QO(i. C}t\h Cjdw(?U554<L
2
3
4
5
6
7
8
9
CASE MAT'L.
CLX
ACFM
WEIGHT (TONS)
COMPRESSOR DRIVER: TYPEMI^OfO/L HP ?Q
RPM 1 &
CONDITIONS (2):
GEAR: BOTTLES: INTERCOOLERS:
HP RPM To
RPM
EACH
EACH With/Without Piping
OTHER ACCESSORIES TOTAL FOR I SET
Ck\&Xs&
GKS coufrfr. t^tuJkT\at\
TOTALS FOR IDENTICAL SETS
SUCTION
PSIG
F
\ot>
FINAL MAN HOURS
Bechtel
s/c
//
JL
K"ACCOUNT - COMPRESSORS
DISCHARGE
PSIG
F
\<*&
MOL. WT.
W
Cp/Cv
\'W
BHP I2)*l
FINAL DIRECT MATL. US$1,000
Bechtel s/c
o
DRIVER TYPES: STM TURB, INDUCT. MOTOR, SYNCH. MOTOR, GAS TURB, ETC.
(2)
DRIVER CONDITIONS: MOTOR VOLTAGE. STEAM PSIG/ F IN & OUT, ETC.
'LL a tv*! o 'h
|VaJ h
PHR 1.2-25
PAGE
GARRARD 00000548
*K" - COMPRESSORS
job no. & title CLIENT__________ Mf\C<L.ATyAc>*4
C-*>
JOB LOCATION
P. XCi2dU^60n^ .
LU
^
CONSTR. DATES!
jo 'A-l&.l.
PREPARED BY LA .
K.H\ LUeK-
CYLINOER OR CASE
1 2 3 4 5 6 7 8 9
SERVICE
CsK5
CASE MAT'L.
ACFM
C-.T . rjtf wnw\
WEIGHT (TONS)
COMPRESSOR
DRIVER: TYPE (lltAoiTcA- HP
RPM
CONDITIONS (2):
GEAR:
HP
RPM To
RPM
BOTTLES:
EACH
INTERCOOLERS:
EACH With/Without Piping
OTHER ACCESSORIES ^\KlG fc
NAV^Cjtxl>. PtuL'la
ViMLlAt\(
tiliui CP
TOTAL FOR 1 SET
TOTALS FOR
a!'
IDENTICAL SETS
T
SUCTION
PSIG
F
la*
DISCHARGE
PSIG
F
-HO l*VI
MOL. WT.
tb.\
Cp/Cv
BHP
\At> *u4
FINAL MAN HOURS
Bechtel
s/c
Z3Z5
I (o
FINAL DIRECT MATL. US$1,000
Bechtel s/c
(II
DRIVER TYPES: STM TURB, INDUCT. MOTOR, SYNCH. MOTOR, GAS TURB, ETC.
(2)
DRIVER CONDITIONS: MOTOR VOLTAGE, STEAM PSIG/ F IN & OUT, ETC.
i rvzG
-V
1 Z&O
ZZi-c 0"7
|UJ
'K"ACCOUNT - COMPRESSORS
PHR 1.2-25
PAGE
GARRARD 00000549
A
J
COMPRESSORS
JOB NO. & TITLE CLIENT... JOB LOCATION
RjcLFI^BlV
CDNSTR. OATES
TO 4-1 &Z.
PREPARED BY t<V GKUJauMsI
CYLINDER OR CASE
SERVICE
1 fci-.eiu_e.Gte (i\2.v\\e.N
2
3
4
5
6
7
8
9
CASE MAT'L.
*T(2\_
COMPRESSOR DRIVER: TYPE (1) &T
CONDITIONS (21: L>00
HP 4
RPM 1^*3 <L
Gr / 4" tU MLA .
GEAR:
HP
RPM To
RPM
BOTTLES:
EACH
INTERCOOLERS:
EACH With/Without Fiping
OTHER ACCESSORIES
FllLb
TOTAL FOR 1 SET
TOTALS FOR
1
(l-USL.'b <U-P )
IDENTICAL SETS
ACFM
SUCTION
PSIG
F
DISCHARGE
PSIG
F
MOL. WT.
03?^
Cp/Cv
BHP
WEIGHT
Vi
\
FINAL MAN HOURS
Bechtel
S/C
3S&4 10^0
1
FINAL DIRECT MATL. US$1,000
Bechtel S/C
V\W8>
(II
DRIVER TYPES: STM TUR8, INDUCT. MOTOR. SYNCH. MOTOR, GAS TURB, ETC.
(2)
DRIVER CONDITIONS: MOTOR VOLTAGE, STEAM PSIG/ F IN & OUT. ETC.
''
\o *5 [i
lO&o
1^5
"K" ACCOUNT - COMPRESSORS
PHR 1.2-25
PAGE
GARRARD 00000550
*K" - COMPRESSORS
JOB WO. & TITLE CLIENT_________ U.k(lJ\Tl-4s4
fcdy.ytiVSft-N Md:> C>\L- Cib ,
JOB LOCATION
ti^e.ti ~X*~UtiXj>4/
CONSTR. DATES \<>\^ TO ^t\ feV PREPARED BY W\ . (%hl l ^ ^
CYLINDER OR CASE
SERVICE
1 UlTT
2 Kldr 6a*>
&L
3
4
5
6
7
8
9
CASE ACFM
\ MAT'L.
cx. e%8\ t.x.
WEIGHT (TONS)
COMPRESSOR
5yqa\
DRIVER: TYPE 11) ftAeriV>fe- HP 6 SOO RPM boCi
CONDITIONS (2):
GEAR: BOTTLES:
HP EACH
RPM To
RPM
INTERCOOLERS:
EACH With/Without Piping
OTHER ACCESSORIES
t\A \
TOTAL FOR 1 SET ' TOTALS FOR *iU
lV.b. ? O. UCA Ai> *>
IDENTICAL SETS
\4v
SUCTION
PSIG
F
lo^
loo
loo
DISCHARGE
PSIG
F
^4-o
3
MOL. WT.
Cp/Cv
BHP
VivfeS!' 10^
FINAL MAN HOURS
Bechtel
s/c
1ZG1 bob
FINAL DIRECT MATL. US$1,000
Bechtel s/c
\23kJ
(1)
DRIVER TYPES: STM TURB, INDUCT. MOTOR, SYNCH. MOTOR, GAS TURB, ETC.
(2)
DRIVER CONDITIONS: MOTOR VOLTAGE, STEAM PSIG/ F IN & OUT, ETC.
v
02zk_l
%-Z
Z6U \<&A`Z b o
PAGE
00
K"ACCOUNT - COMPRESSORS
PUR 1 ?.?S
\
0
&
"K" - FANS
J0B NO. & TITLE
^DftuiSOli Hll<jl2Y
CLI E NT
t\A MlA rUi'i lT Oil C l> -
job LOCATION jQP.3 S t
t-J ~X UL_* kW) ($
TAob
PLT. EQUIP NO. NO.
SERVICE
Ufr Cak* TbL&uUX
FAN DRIVER FAN
ACFM
P,SCH PRESS.
TYPE M -ST ENGINE
TO *3 il *M-
IL lb V
Cj-IloRLi k) ATiorJ ?jLOUtfL
DRIVER MoTIML.
FAN Z&\c>c> 71'1 DRIVER
|L V
(lGtlv^GATvoKi IbuaOtt FAN
2LB4oo 2o
\ *cPA0
DRIVER MaTo (2.
FAN
i4vvo
fciVjaoviVtKSL. ^ AiPML*.
DRIVER
FiOkCb KjcIiaoJac
VOL L. will<1 ^ >P*<L
FAN DRIVER
FAN
CASE MAT'L
RPM RPM
DESCRIPTION
i3!ai*F ,,1^
------*41toy-- \J - &lT "OC-Vlu.
IS=o
vaP-l e.Mx. Z\cnai
"1Sa-
UlP-\ d-.t.
l&OO
BHP
HP
&*fe lO
2CiCS no Zoo 11 loo
\Z
\6
DRIVER
^rZpCj>^ OcjlaP.
FAN
3 ^T'tf'CsT C Ps<2. Xv*af ISOO*P^
DRIVER
FAN
DRIVER
FAN
DRIVER
ATES\b\e>=> TO ^\&V CONSTR. D PREPARED BY VA. G'KLLhVj-'i^T
FINAL MAN HOURS
Bechtel
S/C
323
DIRECT COST $1000
Bechtel s/c Matl L & M
ta-5
333
m-iJ
333
3Z3
_____ 1&S-5 243
322
2.
113
n 3lo Id G 2^ 4o
ALL OTHERS TOTALS
< EA)
--
THIS p/M^L CPLT- Mo)-----------------
ns 4-
n
i 1
_________ i_________
"K" ACCOUNT - FANS
PHR 1.2 26
PAGE
GARRARD 00000552
JOB NC1. & TITLE CLIEN1r
"T"-SPECIAL EQUIPMENTJOBLC CATION
SUMMARY OF FIRED HEATERS
C0NSTR. EIATES `MS TO M- &x PREPAREC1 RY H . 6ftLLOU)
INSTALLED QUANTITIES
FINAL MANHOURS
Bechtel
S/C
DIRECT COST $1000
Bechtel Matl.
S/C L& M
CARRY FORWARD FROMPHR I-2-^
CARRY FORWARD FROM PHR
------
CARRY FORWARD FROM PHR
CARRY FORWARD FROM PHR
CARRY FORWARD FROM PHR
CARRY FORWARD FROM PHR
CARRY FORWARD FROM PHR
'r
CARRY FORWARD FROM PHR
PAGE 41 pL-AvOTT
PAGE _4J-----
AV^T1
PAGE igzAk PL.AK1T
PAGE
page AL_
PAGE
pL Ar4T
A.page
.. Plant
PAGE
q iL>
/ ea V/
33
\
3 EA l^/T/1 / T/Z^S'-JCt
Vo
6^ EA \cn*S`
.tovkla
2 EA
- oA
/ ea /&4
Z 03'1 l . 1
& EA /6S'
/ EA
;2P-S" izq-s U La
---
EA
PAC
GARRARD 00000553
TOTALS
EA
"T" ACCOUNT - SPECIAL EQUIPMENT
Zoo
8>..
phri.214
w
|*T* - SPECIAL EQUIPMENT
JOB NO. & TITLE
CLIENT J0B L0CATmN
CONSTR.
DATES
Jol&OTO 1
Mrlax. ^
PREPARED BY
PLT. EQUIP.
NO. NO.
SERVICE
\l - \ ?ACJcAG
DESCRIPTION ANO DIMENSIONS
DRIVER WEIGHT HP TONS
. ^VtAb
v^Lv,
'U-'bQ^ltb GrMj
C-tovitoC^biLlL. "lE-bl.
'
' ~ -- -
? -- ,,..... . ................
C.JCa^L.e'aOlft-
t, Okh
A<ZkT(L ^|-V>
\&
FINAL MAN HOURS
Bechtel
S/C
V/
....
DIRECT COST $1000
Bechtel Mail.
s/c
L& M
I'Vz.-n
4 y~n /Wiks
CMUC<LK\*Ct
'l-Zt
F\LTL
vv
r-uXklL
^ A
Sb Cr*W\ V\
\n
/ / a/
/Ay a/cS~ I'O
Au> \ o.
2.V T- 1 ~XXis>\JUc^i Fo*. th .-va
AT vo-iiiu&p vc^ATste a^ L& bfc'AI >\
---------- =-------- T~---- ----- 1----- 1----
-- o4
Zh n/-\ PRoPMG bttcR ,
NvOtiwmats. OotT \vCvLX_ P&E&Avit
bCYv&tr
2fe*C-\bKlfe C*M>
' 1-----------------
CJb^L-e^CtTL ?al*\A
CtoAbeW ZL.
2.SssGl-`1 uaXuUvTt^ G VvW ^e>C*~4
V (----------------------- _
T
V<`ivO--?-or o,, T X?^vkP'.....i^L1 S .fi-'' a" ^ GrAa ' *faTA*A
UKTt2.tL 2.B.-6^ PJUtlCSVAfc. \ickXaL
ALL OTHERS
\io /<s4 ~ --
2oVl
,x_
1. \
--- --
--.-- --
1 EA)
TOTALS
.
~TLvtKu -n\\S PAGd
ZV? I1
pM-1- 2.2
"T" AnnnillUT _ $PFniAI FnillPMFNT
PHR 1 2 27
GARRARD 00000554
*T' - SPECIAL EQUIPMEN1^
JOB NO. & TITLE
CLIENT JOB LOCATION
CONSTB. 01\TES \&\&^T0 *\&Z.
PREPARED
PLT. EQUIP. NO. NO.
SERVICE
lU 'i- \ kuL ^92liL
DESCRIPTION AND DIMENSIONS
DRIVER WEIGHT HP TONS
lAdj^KiTii.^ i^U-Otii&fo TWia
'DO.'VfcK.b Pfej9\v_rtl. v.
lX\lL
KACil h>r&& IrtTslC-Atbfc. 9 oriteA lA*tfYUtaM X**
O
FINAL MAN HOURS
Bechtel
S/C
Kb
DIRECT COST $1000
Bechtel Mali.
S/C L&M
&*6
J- l OCAULfL F S.G.'t* SfcAvl fKculuiTr> V^tJLtitaCkG CiUlAiM' tjjw
vAkreft.'IteKT. TftKilC (lUb-ll^ f\iUPvfi t>K1 TKOW.
1 U/b-il.^ Ffc>
\L>M\ \ UM- 0. k
\UGrvvrtfcUlor-4l-K<fo
1
r-6 (jAivutio- mow F^lfc. l-ltAutaU3r 66 &AL.U?4 iilLOM^
tvl.t
(u"4 x V "\
r-n klft. M&Tbft, i^v^r
*1Ti*k) *'6<ao'u^l* - CAviC-LL(\TI6Ni
U\ /**fUj (L , (\\ Q\**T lAarMC (lilC6\vkb\
o* nT \Z
^o*l
\Sv5tmjce P t>eL,TP
1*0 cmcecLf t
*O
iL r-4 FfcWT -rcR9
ITT^kI * LdaJ uv* r
to PPM
--Ab--iht ,---------P--p--t-v-s=--'V=--<--i-c-->---u--u--- `i-i------- --
A|0? *^\ Q-1$-' roA\juM
VL
TOTALS
ALL OTHERS .
' ni
( (\cj i.
"T" ACCOUNT - SPECIAL EQUIPMENT
EA)
bl
B3lOJ
-------- -- 14-9:3 _J
PHR 1.2 27
&
"T" - SPECIAL EQUIPMEN'*"
JOB NO. & TITLE
CLIENT JOB LOCATION
CONSTR.
0/MES
IpISOTR ---
4-1 8.1----- \
PREPARED
PLT. EQUIP. NO. NO.
UflJ
SERVICE
DESCRIPTION ANO DIMENSIONS
DRIVER WEIGHT HP TONS
FINAL MAN nouns
Bechtel
s/c
El.ctic- oli-l \0 Ttawi V. SIa' U GT \ 51
h zi o.Ta
. ------ ;---------- 1----------------- =-i------- x--- =*--
^<UY>6t J1...._
UL{& Soft.
^xubCct. \5c> \5c> \-PtA 'T^jca_\_'/ 5c>\-VtA
l TdUV
--
VLl^-Z. LixtJNL. vA^v^sr 7.2. Ff>w\
15
Total- uitrT s
DIRECT COST $ 1000
Bechtel Mall.
s/c LSM
4^7,
--
--
4oi VAaobt * LCA-l4o*--'hltfJ`afi IriU.. iwrc>
Ao^fi. e3Th<L#vCj`G,
GUI Ur>*j
Pfti eS \-CU\LA KltiS-itUi lift ,
--
l- zr -CU6KT-
--
-- ------------
* lU
*
*
*
1
TtuaueV
Pofc
VUfe^
^tTvS.' ----
fcOoP
\
V4kuV
- --
&EMfc, -- '----.........
.-----
7X1 ,K\
*
- \\*<-& *
LV
*
- tL-2*5 * * td b>Rl>P , *
* "
t-^ v '
V *^
4 "
.-a-......*....\l. 1T T w1 Mbp *'
- * *
\ * VVo^-tp nS
^ v\
1%
1 rri
T- 2.1^ *
T-r? *
Xu
"2-
tioP PC^A T
,*
J1
" tii ' 1
* vVi-ZM * T \Ci *
v ,-
kl
*
T'2.5 K\fi ^.'aTiait^Aaivr vr< 86* ug-t
Cmmat* f X>eu i?E?X
\oo loo
\z YL |oO
lOO
VL__
p&_&TeP
----------- f o
* *
Q5
|.C) u
>
^ Cu!h.
2.>l --
TOTALS
ALL OTHERS
Moot^Tltv'ib
oMt- Z4-r3l R/VD To Be
L?LCieD t>Jfc To PaoC. D&\LU.
TT\V^ e'KCiC
(
..... ................. --
EA)
A-UD
Lpi n
PAGE
"T" APPniIMT
CDCPIAl CnillDAflCMT
* #41
*T* - SPECIAL EOUIPMEN1^
JOB NO. & TITLE
CLIENT JOB LOCATION
PLT. EQUIP. NO. NO.
SERVICE
DESCRIPTION ANO DIMENSIONS
\Vq "EzZ V-Z>
T-4-
T-"l
5L1L
CfvrACy^T C^L6AT=>\VCiCt
"To
CArtvJfc** To ssju-S
C#WvOf*X L&ttovv^C*
'X&we.a. vJ
CfiTfrO/ST LOih Tdin}&
C-ftd0*5 T `o^bes. UO)
:
. ' '*
CONSTR. DlUTES \p\fe.CiTO PREPARE0 RY M.6iftLLOWAW/M. MlUc
DRIVER HP
WEIGHT TONS
FINAL MAN HOURS
DIRECT COST $IOOO '
Bechtel
S/C
Bechtel Mall
S/C L& M
*>0?PUQc
\z --
cutm
CUE*JT
__i_____
--
--
& YL ... ----
--
~~r~
%
------------- -
PAGE
GARRARD 00000557
TOTALS
_ __ ALL OTHERS
.i
*T" ACCOUNT - SPECIAL EQUIPMENT
i -------- ---------
( EAI
?>G?
`b&Wutl PHR 1.2 27
-- SPECIAL EQUIPMENT
JOB NO. & TITLE t4oS?a -fc-HP CDNSTR DATES \0>ls>Q TO 4 In
CLIENT hAARATHoiq DtL,
____________________ PREPARED BY
J0B location
ILoBIHSpia tj_l.
MU-Ug,
PLT. EQUIP. NO. NO.
SERVICE
DESCRIPTION AND DIMENSIONS
\L> CUEM. ADD.SUD 1 IKidJUT^-S, ItoP-IO, u, fci-S AtAT>
|b6i - 30>
DRIVER WEIGHT HP TONS
FINAL MAN HOURS
Bechtel
s/c
qo
DIRECT COST $ 1000
Bechtel Matl.
s/c
L& M
VV/lGfc,-S 4
CAe/i. /W?omu6 mCLODeS \bu~2> } \lctn-12. 4
40
V*WZ 4 U.6-13A
CUGKFtt>T>mvJ6 iNl_ope. U^D-S, \bto-Unb\b
<;vuo
4
cu&rt, ADDlTHJB mcLoDes. \bD-4r
\ itlD
AO qo
> 4 fc,fa- ift
PAGE
GARRARD 00000558
TOTALS
ALL OTHERS
"T" APPOIINT _ SPFHIAI FfllllPMFNT
( EA) 3(^0
A
04
PHR 1.2-27
1 ii ["T" - SPECIAL EQUIPMENT
JOB NO. & TITLE
CLIENT J0B L0CAT10N
CONSTR. OiMES A9V&4T0 PREPARED BY NVAAU^wM /Vl,M\LUE.
PLT. EQUIP. NO. NO.
SERVICE
DESCRIPTION ANO DIMENSIONS
DRIVER WEIGHT HP TONS
VU_ T-M recjiLT ec>(L
r-Va K
M ll
4 To *4 *\lv'
t *
. "
4 \ttAAA
. "-
r-u "
V *1 N
'< H U
H
T-V? 4
1*
k\
<
ll l\
*t
r- Vi .i 1 r-v\ u
,, 11 > ..
S ,
M ** " M " M 1.
rvua;*Jk ^iCjIlc A,W CPRJTfcJt.^ *iL A vlbJhl uM*
^ to ulk
____*____ A_________H___ ---------------------"--------------- 1-------t---------------i-i-------- *>
*
** tl
7-1
CAfc-TiJ-ib6
' c,| \?A
7-a
* H
"
A
i\ lA
\-4
II
%
R ' . 1* t
v-4 cbTiAtA 'It-uiAT*
^`blL-Ol.-.
4*- (eoo^dP hbo>V
>5 SXcMA KTCeaPtaCK v>tt
laoc^ 6J? xfc
(a >5<&l 4 oooc> ^ M-
l
FINAL MAN HOURS
Bechtel
S/C
It It
YL YL
It
YL
DIRECT COST $ 1000
Bechtel Mail. *
s/c L&M
1^4
------------ ^ \0 '
\0 . r__ 1 *J
to
IO *
|o 0._L
\o
^a ------ ---
\o w
1 P\M
?u.OblL blKc p U-
--
4o
I-6L
PAGE
GARRARD 00000559
TOfALS
ALL OTHERS
.
'"ToTAU
__i 1 EA) t ~Z-
^. V L-AkAT i La
\oT5
"T" ACCOUNT - SPECIAL EQUIPMENT
i\i*J 1 zi4>6
PHR 1.2 27
00
JOB NO. & TITLE /Vc>S~^
/> HONSTR. OATES \offi,o TO "T/82^
A
)
t*LT. EQUIP. NO. NO.
SERVICE
si S6y j\
"T" - SPECIA*L/EQUIPMENT
DESCRIPTION ANO DIMENSIONS
Z s*<Z/Lu>s
^^ Y
CLIENT
/S/sJ -Xi */.w
J0B L0CATS^0SN G'/O
DRIVER WEIGHT HP TONS
^To,,,
f__________
FINAL MAN HOURS
DIRECT COST $ 1000
Bechtel
SIC
Bechtel
Matt.
S/C L&M
--
--
PREPARED BY ^/A'.VW^ ^
CslS/if --V33 X&/ *> -J~ 'V` S
--SZ) -- y ,
~J\j
5*7
-
l,,
vul G- W
2?
GcjR.&d s/ass/
Z"a'/\ / ~ss / <3'<? -&/
A/ }
V y z<s \r?
J2- ? (S" ~ 5
tiJ CU .
/zx.
-
PAGE
GARRARD 00000560
TOTALS
ALLOTHERS
( EA)
`7" ACCOUNT - SPECIAL EQUIPMENT
-f^ -- +J
PHR 1.2-27
;
SPECIAL EQUIPMENT
JOB NO. & TITLE. CLIENT_________ JOB LOCATION
CONSTR. OATES PREPARED BY_
PLT. EQUIP. NO. NO.
SERVICE
DESCRIPTION AND DIMENSIONS
DRIVER WEIGHT HP TONS
FINAL MANHOURS
Bechtel
S/C
bZ. Sib br(uiA Chfc&C)ti VT.L. TM < ^T.*4 * 'H 't'tVy
ti 1 CrAtib `bfv.vi'b ^ F^Tk\ftAssvL._
ba >yy
WL-I k\<L
VACAavk ^ \OVnO 69 Wv
"I *^0- ^-C- Pn \ cb...b...V...*..*.\.A,\--;------------------------
st :
/z
(C
.TO
DIRECT COST , $ 1000
Bechtel Mall.
s/c L&M
11 "5.e>
-5
*>Z T-l if TRouuy 'Poft. \T*\>1 'feltbP,
S IbS PM
T-Z2` vmujZy
cAtcxuvte. C/u^t &
A PviVi CitfMUlta kt* '8
Tcstav_ -tA\*3 VAC* gl
t
Pi
-
-
\ .o
//y . /*r
^3
PAGE
GARRARD
ALLOTHERS
1 EAJ
ooooocon> TOTALS
'~r^-r fs i- Vc. av^-t h i--
**T" ACCOUNT - SPECIAL EQUIPMENT
-fA O
u* /3~" zi^-sr 12^.8 t#'Cp
PHR 1.2 2?
.If! R NR.ft TITI F MOS3>
RRMP7
CONSTR. 0/1ltfs IO /g>o m 4/82.
"S' -- INS TRUMENTS
CLIENT MAf?A"TWOkl Oil-- job location RoBiklsoki ,
COMPAKiV
PREPARED BY H.HILLER
MATL. LABOR REQ. CODE
JUT J11 ri
J12
J14 J10' J16
INSTRUMENT ACCOUNT DESCRIPTION
rntrAU. INSIHUMcNr SUPPORTS
( lOOO) final
INSTALLED
MANIHOURS
QUANTITIE
Bechtel
S/C
::::::::
,
l
'*A1
DIRECT COST $1000
Bechtel Matl.
S/C L&M
TRANSMITTERS. RECEIVERS. AND CONTROLLERS FLOW INSTRUMENTS
1229 E A ............ 1
loo4.o
\ EA
telllii 84-1
LEVEL INSTRUMENTS J*lO = PKE.AS'&EHBLE' X-MlTTeRS (Z044HHfi5>
1668 e A ' 25-3 > II
162.2 32.6
PRESSURE INSTRUMENTS
E a i 300.1
J18 TEMPERATURE INSTRUMENTS
J19 , MISCELLANEOUS INSTRUMENTS J-IT - 119, J-19=610
J21 J21 MAIN CONTROL PANEL & RACK J22 J22 MAIN PANEL INSTRUMENTS MAMOkLC tATOR'a J26 J26 PROCESS CONTROL COMPUTER J31 J31 LOCAL CONTROL PANELS J32 J32 LOCAL PANEL MOUNTED INSTRUMENTS J41 "L"ACCT CONTROL VALVES
J Ea i
53.0
129 e A
1050
Cx> E:a
6
-- 32312
IIIO UNIT6
12
--
1
70 UKllTr5
3 -- 659.9
2300 UUITs
EA
9
169.0 -
EA j
5730
J43 J44 J50 J60 J65
J71 J72
J95
J74 J7S
-
-
"LT'ACCT
`L"ACCT
J50 J60 J60 J71 J72
J 95
J74
-
J81 J82
PRESSURE REGULATORS RELIEF VALVES INSTRUMENT SHELTERS ANALYZERS
PACKAGE CONTROL SYSTEMS SINGLE TUBING MULTITUBING
INSTRUMENT AIR SUBHEADERS INSTALLATION MATERIALS LOOP CHECK
CALIBRATE & TEST
TOTALS
EA
EA
x 277 E A \ l9 E A f * A ' 13558 i-f
- iF - iF 919 o i f
LCIT
a
"" t A -SURPLUS
Z.6 . Cf> \
A4 -
4
52
152 T-6
6.6.T
.1 .1 * 1.5 -- --
5
12
--
4.5
7 1460
!5o.&. 360- O
--
30 30
4-4.4 -
- 14.8
469.0
33.6
<too.o> 7400.3 131.4
8
PAGE
GARRARD 00000562
J" ACCOUNT - INSTRUMENTS
PHR 1.2-28
m
"M" - ST 3UCTURAL STEEL
JOB NO.R TITI f 14053 RRMR CLIENT MAKATV^Oki OIL- OOMPAM-V job location R&'kisoKi , \l_lim.oi45
MATL. LABOR REQ. CODE
CONSTR. Dj1TFS 0/00 TO 4/82 PREPARED RY H. MIL.LEIR
INSTALLED QUANTITIES
Clooo) FINAL
MAN HOURS
Bechtel
s/c
DIRECT COST $1000
Bechtel
s/c
Matl.
L&M
Ml* M10 STEEL STRUCTURES AND CLOSURES
M2* M20 PLATFORMS, STAIRS, LADDERS & HANDRAILS
M3* M30 STEEL PIPE STANCHIONS
M4* M40 ' MISCELLANEOUS STRUCTURAL STEEL M5* M50 OTHER STRUCTURES PlPfi'VU'AV RETLOCATlOkl
317 T 18.4
t94 t 19. 2
A14 t zo.o
49 t 3.1
(j>Lp T
-
-- 1428.0 .1 340 5-0
_ k7.9
-- 74.5 1.6 13.1 60 4
TOTALS
I040T &0.7 "M" ACCOUNT - STRUCTURAL STEEL
19
Up77.5 83.4
PHR 1.2-30
&1
JOB NO.8, TITLE MC>S"S> f?MP _____
CONSTR. D/4TES lo/ao TO
"U" liiCIII ATIOU
& FIREPROOFING
CLIENT
job location
MATL. LABOR
REQ. CODE
N1* N10
PIPE INSULATION
% CAL SJL 9& Vo
AVERAGE DIAMETER
^"
OIL. COHf'AkJV ( Illinois
AVERAGE THICKNESS
2 */z "
FITTING FACTOR
\A~l
PREPARED BY H- 6RLLDtoftV
INSTALLED QUANTITIES
FINAL MAN HOURS
Bechtel
S/C
DIRECT COST $1000
Bechtel Matl.
s/c
L&M
139942 elf
IB 55657 35 1850.3
% MINERAL FIBER 2/'o
30"
(? " | 2A
% OTHER
~
N1* N20
N30 N30 N40 N40 NSO N50
EQUIPMENT INSULATION
% CAL SIL
2%
% MiMe?AL WOOL
<>7.7%
2 S/g_ " -a, *
Vo lusoupcriaa c:oMC.f?ere' 2-1%
2s(xl
FIREPROOF EQUIPMENT SUPPORTS MAMPEPdeAt. P- 50
( PNEUMATICALLY appliep)
FIREPROOF STRUCTURAL STEEL HMAPEP5P A.L P 6 O
(fWETO HAT) CALLS' APPLIEP) MISCELLANEOUS FIREPROOFING
( Z" )
(2")
4lfrT9 SF
i7Z3fr sf 39 5 cf
LF
303
17829
3993 4l25
o.3 73l,o
- 1132 o. 1 116-6
N60 N60
SOUND PROOFING
SF
WerLpifJG FiRerPRooF'iMei LgdrS to veisS^'L. -skirts
17230 5F 1809
lO l.<3 o.3
PAGE
TOTALS
'
2130 B1814 57 Zflll.fr j-i
N"ACCOUNT - INSULATION ft FIREPROOFING
PHR 1.2-31
JQBNQ.& TITLE 140*5 3 RR.MF* CQMSTR DATES >0/go TO * /&Z
R BUILDINGS
CLIENT HARACT-HoKi OIL, CQHPAkJV______________ jqb location T?os>iNASokl , iccikictiib
PREPARED BY
MAIL. LABOR
REQ. CODE
II0> t?OIOO
AKKZpO
FOR ALL PERMANENT BUILDINGS DESCRIPTION AND USE PITT U* SATeLUTE- ^OUTROL KooH
INSTALLED QUANTITIES
FINAL MAN HOURS
Bechtel
S/C
i3oo
DIRECT COST $1000
Bechtel Matl.
S/C L& M
z-4
NO. STORIES \
SO. FOOTAGE 763 ST CU. FOOTAGE 86> 3 6
MATERIALS OF CONSTRUCTION " c:oiacRere BLOCt
lie#. BZ3
f4*n e IIu R4000 nu RlrOoc
iil
R*?ooo ill* ROIOO
TOTALS
HVAC DESCRIPTION AlK HauplikW* Upvr.TlSZS BTUH f44ZO CFH ROOF TYPE OTHER DETAILS Ml SC.. PAiid-rikl^
DESCRIPTION AND USE REVAMP OFFPLOT SWITCH 6FAK KM.
u'~4" x n'~4" x i-z'-o"
NO. STORIES l
SO. FOOTAGE 19G-SF CU. FOOTAGE Z 35t#
MATERIALS OF CONSTRUCTION 2 `tz. " BRlOK
S>/T
HVAC DESCRIPTION ROOF TYPE
'
other details RerpuAce: exisTiwie, poors wth uevu t)TEEL POORS . BREAK -thro LATER, REPAIR HOLE'S
For BUS root ^oilpufT *M~rRY
Carry Forward From Pages____ _
Through
3/T
5>/'T' fHI'S PAGE1
wx
6 3 0
i 3oo
"XS0>
31
4iB --
2-4
17.0
07
54-B ~
r
HZ 7. I
750
Zo'Sifi
HZ
1030
17.0 7.1 19-4 k 4
(.)
"R"ACCOUNT-BUILDINGS
PHR 1.2 34
PAGE
GARRARD 00000565
'R" - BUILDINGS
JOBNO.&TITLE l4o53 RKMT
CLIEMT
QH- CEOM.PA rT Y
JOB LOCATION ROBlMSOhi , ILClMOt>
MATL. LABOR REQ. CODE Ilk All* K03Q0 R tO
FOR ALL PERMANENT BUILDINGS
DESCRIPTION AND USE PLTT Up BOlLF'R FEEP' WATER K*'-4 X 13'- 4" X IZ'-O'
l_P'<it.
NO. STORIES l
SO. FOOTAGE 21ft 5F CU. FOOTAGE ZUiZ
MATERIALS OF CONSTRUCTION &*'
BL.OC.K
CONSTR. OATES IO/ __ TO 4 (SlPREPARED BY H-HIUME.rM GRU-OUJft)
INSTALLED QUANTITIES
FINAL MAN HOURS
Bechtel
S/C
65o
DIRECT COST $1000
Bechtel Matl.
S/C L& M
1.5
nv/Ar nccrmPTiOM
^ACTEER UH-T> I2-40OFM
HVAC DESCRIPTION g y~rRAFAkA-Y-A^B P KOTCaFt.
ROOF TYPE Sutler-up Roof ota l*/t" KETAL tP'ETC-K
OTHER DETAILS ROLL - OF7 POOR
94
24
I -3
I ILr 6 12 Ro3oo R IO III* Rotoo
DESCRIPTION AND USE dUgMlCAL D4 JeC'r'tOd BLCPGt.
23'- 4" A 29 '4" > 11-4*'
NO. STORIES I
SQ. FOOTAGE (&34 CU. FOOTAGE ~l 6Ep9
MATERIALS OF CONSTRUCTION
g>" 2:0 m Crete: !3,i_oe.U.
UMiT FEATeRb OH-I 0(4-2. RooF
HVAC DESCRIPTION gC*K(/t4I AI l\OI tI>~T
AI
T
ROOF TYPE trrg L F~RAHE~ , Q.IPETg.K IKlCt, BUICT-UP RqqF'
OTHER DETAILS Rout- UP POOTR
S/T
&5o 130 2
U6
1.5 8-1
*1-9
11 1
12.
9.8
4l
PAGE
TOTALS
Carry Forward From Pages.
Through.
S/-T
1302
Z43
S/T THIS PACET
'R" ACCOUNT -BUILDINGS
1952
&1
13.9
9^ 218 CP
PHR 1.2 34
m
**fl" - BUM .DINGS
JOB NO.& TITLE >40*33 R^KP CLIENT MKR>/VT'How1 oil_ COHPALIV JOB LOCATION RoSiMSoki * iLLudolSi
CQNSTR. D,ftJFS 1 / 60 TO -4 l2>t
PREPARED BY H-HILLER /n-6H*-1-C>WAf
MATL. LABOR REQ. CODE
FOR ALL PERMANENT BUILDINGS
\ZLf
fioipo
CoORol
DESCRIPTION AND USE ZLMTRAL. ^OKiTKOU -ROOM
KIZAOUoo
MOP'lMCA'TIOid ot^e'XlS'T-
FoRT^ LOkLf>OL.eS
INSTALLED QUANTITIES
FINAL MANHOURS
Bechtel
S/C
l &0(e 6773
DIRECT COST $1000
Bechtel Matl.
s/c
L& M
31 438-0
NO. STORIES
SO. FOOTAGE
CU. FOOTAGE
MATERIALS OF CONSTRUCTION
tM STALL. WATER CHIllcR,
PAIK1T|M^'
OTHER DETAILS piRFCr HURL MHRS LR^KtSiLS MMfU-V F-"ofR
Ke-F'o5i-rionmi of raised floor so5P'aji>:(?>- creiuMdi
III/ RPieo
A> u -
Re>-i
TILLS FOR ecECrRiOAL COuiPHERT ACCESS
DESCRIPTION AND USE ft ALT Up EUCTF?\CAL SOI2.-STATIOkl 35'-4"X 24/-4"A |2'>"
NO. STORIES 1
SO. FOOTAGE 80>O ST cu. FOOTAGE lo3ZO O F"
MATERIALS OF CONSTRUCTION 2 ^z. " BRICK
il Ip
Lo. A Z1
s/~r
1 &OCp 5953
1345
31 4*17.1
25-0
-
HVAC DESCRIPTION AlR HAMPLIMCj UUlT 32COCFH (-3 rtf Hotor\ ROOF TYPE BUILT-UP OtJ PPCTOvST COklC . UMIT^, OTHER DETAILS
97 Ce Cp 72 A. 1
TOTALS
Carry Forward From Pages--..... Through
Sly "THIS
"R" ACCOUNT -BUILDINGS
`S/T
1345 3161
li*9 6>22
Z5.D 10.7 \
.
Z&.l 457.8
\
JOB NQ.& TITLE 4PS3
_____________________ CONSTR. DATES IO/g TO ^
...
"R" " BUILDINGS
MATL. LABOR REQ. CODE
CL1EMT HUF^V-HQld c=>iLjQg tOCATION RQBiM&OiQ lULiMOib
FOR ALL PERMANENT BUILDINGS
________________ PREPARED BY H MH-t-&R/n-6f>U-Q^ny
INSTALLED QUANTITIES
FINAL MAN HOURS
Bechtel
S/C
DIRECTC OST $1000
Bechtel Matl.
S/C L&M
DESCRIPTION AND USE REVAMP HVAO |kl eMOSTHUdi
5ATeu,ire: comtrol Room^
NO. STORIES --
SQ. FOOTAGE --
CU. FOOTAGE --
MATERIALS OF CONSTRUCTION --
^OMTROL ROOM ^ 3 : ID TOM A.C.UUirO'aOoo btom)
^omtRol. Hooh*^ RtvUoRKEl7 p'OCTlMt*
^>Ke:R ^oUrftou Room : ~t */2. "TokI
utJrr {&o 300 E ,-rovO>
2Z5
148
Z3.D Z.3
7.8
DESCRIPTION AND USE
*/~T
-
-40?
-
33.I
NO. STORIES
SQ. FOOTAGE
MATERIALS OF CONSTRUCTION
CU. FOOTAGE
HVAC DESCRIPTION ROOF TYPE OTHER DETAILS
'
PAGE
GARRARD 00000568
TOTALS
Carry Forward From Pages........... Through...............
TTDTA >' p, *'
"R" ACCOUNT-BUILDINGS
79Z2
m
51-1 574-1 <s>
PHR 1.2-34
"S"- SITE WORK
MATL. LABOR REQ. CODE
JOBMO.& TITLE <4o5 3 P.^HP CONSTB. DATES `/TO AjJUL
CLIENT t\P\Kkrc\\C>t^ g?|L- CqhPAUY__________________ PRFPARFfl BY M- MU-Lg~K________
JOB LOCATION R6i^oM . U-t-IMQlS
INSTALLED QUANTITIES
FINAL MAN HOURS
Bechtel
S/C
DIRECT COST $1000
Bechtel Matl.
S/C L&M
SOI S02 S03 S11 S12 su ^IZ.
SOI CLEARING AND GRUBBING
S02 STRIPPING AND ROUGH GRADING
S03 DEWATERING
S11 EXCAVATION I Clarify Qty. Basis and Construction Methods :
S12 BACKFILL )
5>ll
MASS ex-^Av/AnnotJ AUP P'lSP^-a.AL-
5IZ HAS-s, 6ACKFH-L, dOMPA^TIOKJ <*T UK
AVlOiU
AC
CY
4970 0MHi? s
UZUp CY
136^7 CY 1796-7 90>96cy
9-0 17. 1 14-1
4.5 6.1
164-5
193.1 40(e.&
S20 S31 S32 S41 S42 S43 S51 S52 S59 500
S20 PILING
LF
S31 SEWERS AND DRAINS S32 PRECAST MANHOLES AND CATCHBASINS S41 FINE GRADING S42 PLACE & LEVEL SUB BASE
6,2 30 lf
39 EA 74962 sf
SF
S43 ASPHALT PAVING
SF
S51 DIKES
CY
S52 FENCING C M^TETF? I/M- OKU-Y )
LF
S59 LANDSCAPING
SF
59o MISCELLANEOUS SITEWORK S-98 P6TMOL. prioU
loo OMITS
PPMOt-rno/d OF^/5T|ia6 PlpfiTRACfc- \kici-.
<j/dt PI re 1
T*CAVAT"IOk1 FTOR ME W PoUUIPA~nOU k LJ/tS PlPET
/
TOTALS
"S" ACCOUNT-SITE WORK
n.9 4.5 53
2212 24.3 16.6
o. 2.
2.1
Ce. ip
1.9
I.I
8z-5
PAGE
cs\ (p(p*5 12.5 431 6 682.6 O
PHR 1.2-35
"X" - PAINTING
JOB RIO. & TITLE ^0 5 3
RRHP
CLIENT
OIL OOHPAUV
JOB LOCATION Roe>WvJ>OU ,
CONSTR. Ciates 10/80 rn -4/82 PREPARE!IRY H (SALLOtOftY
MATL. LABOR REQ. CODE
- - PAINTING SUBCONTRACT
INSTALLED QUANTITIES
Ciooo) final MANHOURS
Bechtel
S/C
DIRECT COST $1000
Bechtel Matl.
S/C L&M
Structural Steel Piping Major Equipment All Other
SF SF 7^010 SF SF
UklT
ay
MT" -*>4
III 9
X10 - FURNISH PAINTING MATERIALS
GAL
1.-5
- XII PAINT STRUCTURAL STEEL (Direct Labor) - X12 PAINT PIPING (Direct Labor) - X13 PAINT MAJOR EQUIPMENT (Direct Labor) - X14 PAINT ALL OTHER (Direct Labor)
SF SF SF SF
PAGE
GARRARD 00000570
TOTALS
-
"X" ACCOUNT - PAINTING
-
2> A
13 ill.9
PHR 1.2 36
GARRARD 00000571
"P" - ELECTRICAL
MATL. LABOR REQ. CODE
JOB NO. & TITLE
______________
CLIENT
MARATLVPkl OU_ ctomPAnJV
JOB LOCATION Ro&msokl , ILLIMO'5
INSTALLED QUANTITIES
( IOOO) FINAL
MAN HOURS
Bechtel S/C
DIRECT COST $1000
Bechtel Matl.
S/C L& M
P11 P11 DISTRIBUTION EQUIPMENT Substation
1 -- EA
II EA
.&
26,3.6
Power Transformers
ff -- EA
15 KV Switchgear
2 -- EA
BMT^RV ISOILI?IUt BATrE-RiEt, ^ CHARUCR
1 - EA 1 - Lot
PI 2 PI 2 POWER & CONTROL EQUIPMENT 5KV & 600V Switchgear
-- EA
63 EA 12-4
Motor Control Centers
-- EA
- EA
- EA
- EA
PUp
P13 P13
P14 P14
P15 R. TO
S'- <-\
P15 P21
Pro^RKhkk^le; cowtrolcr EMERGENCY AND STANDBY EQUIPMENT LIGHTING EQUIPMENT OTHER ELECTRICAL EQUIPMENT PURCHASE RIGID METALLIC CONDUIT
INSTALL RIGID A/a METALLIC CONDUITyzo 4
105 EA
.7
20 EA
978 ea
ZoA ea
2-1 6.6 39
LF
234,8oolf 124.(5
P22 INSTALL RIGID U/G METALLIC CONDUIT
6710 LF
l.6>
P23 P23 NON-METALLIC CONDUIT - UNDERGROUND
Zl, 1-4(0 LF 4 7
P24 P24 THINWALL METALLIC CONDUIT
P21-24
Subtotal Installed Conduit 0.49
/ i_F~
-- LF ZW,(56>lf
130.3
P25 P25 CABLE TRAYS AND CHANNELS P29 INSTALLATION MATERIALS
13,224 lf i?.9
LOT
P31 P31 600V & 1000V WIRE
49464 (a LF 13-5
P33 P33 ELECTRONIC AND THERMOCOUPLE WIRE ff30 e?3T 428.576.LF 20.8
P31 + P33
Subtotal Wire
0.0-5B MHRs/lf
923.223LF 34.3
P32 P32 5KV& OVER CABLE
343S5 lf Z-5
844.6
147.1 155.2 724.2 456.5
31.0 -
105.0 20-5 187.8 239.8
59.7
MATL. LABOR REQ. CODE
P34 CONNECTIONS - 600V & 1000V WIRE
P35 CONNECTIONS - 5KV & OVER CABLE P36 CONNECTIONS - ELECT. & THERM. WIRE
P39 WIRE & CABLE INSTALLATION MATL.
P41 P41 GROUNDING
P42
P42
6kouw(7vlIell5
g," gS x i5o/
P43 P43 ELECTRIC HEAT TRACING
P50 P50 OVERHEAD DISTRIBUTION
P80 TESTING
P90 MOTOR DRIVERS
P-90 etle:c:t OidiC Pi SCOUEJECTS
f- 95 ETLETCT PEMOLiriDlJ
P-99 MATERIAL HAEip-LllUG
ELECT. RELAY CAuBRATIOM
6lJR Plus
TOTALS P" ACCOUNT -ELECTRICAL
PAGE
C0NSTR. DATES ip/Bo to A 16 ZPREPARED BY M. Hiller.
INSTALLED QUANTITIES
( IOOO)
FINAL MAN HOURS
Bechtel S/C
DIRECT COST $1000
Bechtel Matl.
S/C L&M
IOT47 EA
213 EA
50513 ea
(6.2
9 24.1
LOT
56)246 LF
7 ea
8.0
2-4
>38.0
766
1-0 - 41.9
12290 lf 1 5125 lf
419 limits
5-0 3.5
29
166. 8 108.0
12Z0 ETA too UKirps ZOOO LIMITS
i5
4
1.8
o.[
4.0
izoo.o'? 269.1 14 3783.0 45.9
PHR 1.2-32
PAGE
1"- PIPING
MATL. LABOR REQ. CODE
JOB NO. & TITLE 1-4053
BRHP__________
CLIENT HAKA-t-HOKI OIL. COHPAMV JOB LOCATION RoRi^sokl , ILLikloi^
INSTALLED QUANTITIES
f IQOO')
FINAL MAN HOURS
Bechtel S/C
DIRECT COST $1000
Bechtel Matl.
S/C L&M
MATL. LABOR REQ. CODE
CONSTR. DATES lo/eo TO 4 > 8ZPREPARED BY H. H'tLgR___
INSTALLED QUANTITIES
/ looo >
FINAL MAN HOURS
Bechtel S/C
DIRECT COST $1000
Bechtel Matl.
S/C L&M
L01 FIELD FABRICATE CS PIPE-2 ' & UNDER L02 FIELD FABRICATE CS PIPE-2%' & OVER
LF O
LF
o
L21 INSTALL ALLOY PIPE-2" & UNDER L22 INSTALL ST. RUN ALLOYPIPE-2%"-6"
206 Z lf LF
1.0 28
81.5
L03 FIELD FABRICATE ALLOY PIPE-2" & UNDER
L04 FIELD FABRICATE ALLOY PIPE - T/2" & OVER
LF LF
L23 INSTALL ST. RUN ALLOY PIPE-8"-12" L24 INSTALL ST. RUN ALLOY PIPE-14"-24"
LF LF
L05 FIELD FABRICATE SPECIALITY PIPE
LF
L25 INSTALL ST. RUN ALLOY PIPE 26" & OVER
LF
L09 FIE LD FABRICATE PIPE HANGERS AND SUPPORTS
II4CL. EA
L21-25 L26
SUBTOTAL
N
INSTALL SPOOLED ALLOY PIPE-2^"-6" '
LF LF
L11
LI 3 L14 L15 L11-15 L16
L18 L19 L16-19 L70 L11-19 + L70
INSTALL A/G CS PIPE-2" & UNDER (L-IOi LMI) INSTALL A/G ST. RUN CS PIPE-2%" - 6 " "
-10 315 lf LF
INSTALL A/G ST. RUN CS PIPE-8"-12" INSTALL A/G ST. RUN CS PIPE-14"-24"
L - IT
( t-S. BORE
rack pi re
42470LF LF
INSTALL A/G ST. RUN CS PIPE-26" & OVER
LF
SUBTOTAL y LF
INSTALL A/G SPOOLED CS PIPE-2^"-6"^
LF
INSTALL A/G SPOOLED CS PIPE-8"-12" |
L.-IZ
4&280lf
INSTALL A/G SPOOLED CS PIPE-14"-24"f ^.s^tooTs
LF
INSTALL A/G SPOOLED CS PIPE-26"& OVER
SUBTOTAL
*
LF LF
INSTALL U/G CS PIPE TOTAL INSTALLED A/G & U/G CS PIPE
5834 lf
166899 lf
12 5.0 32.8 38.5 4.0
16.79 32.3
12.0
.7
343.4 6.9 8
956.-4 U U ./p
941.&
20-4 2035.2
L- U L- 12
L01
L11 + L01
PURCHASE CS rife SM. L.6. SOI?e FABRICATE CS SPOOLED PIPE
TOTAL PURCHASED CS PIPE L-OI.L-U, L- 12.
I98T9Z lf LF LF
U32.2
2(*(etOO
3792.2
L12 L151 L152 LI 7
PURCHASE CS FITTINGS & FLANGES L-|3tO$ L'1320 49 950 ea
PURCHASE CS VALVES-SCREWED & SW L~ 1600
7451 ea
PURCHASE CS VALVES FLANGED & BW L- UpOO
2372 ea
PURCHASE CS PIPE SPECIALITIES
J0OO
3536ea
392.9 26.4 5 126.0.0 Z45.0
L27
INSTALL SPOOLED ALLOY PIPE-8"-12"
\
L-*Z
LCa.&ORe
2169
LF
27.3
--
L28 INSTALL SPOOLED ALLOY PIPE-14--24" (
LF
L29 INSTALL SPOOLED ALLOY PIPE-26" 8t OV(ER
---------------------------------------------------------------------- 7-----------------------
L26-29
SUBTOTAL
LF LF
L-21 L - 22
L21-29
TOTAL INSTALLED ALLOY PIPE
CUETMICAL CLCAMIM6 O P*
coMPeresoR
PURCHASE ALLOY PIPE
k, LG. BO RE
L02 FABRICATE ALLOY SPOOLED PIPE
L21 + L02
TOTAL PURCHASED ALLOY PIPE
L-27
PUF1CHA-6E Alloy SPECIALTIES
4231 LF 283 2.8
81.5
24
46-7
4030 LF
54.0
LF 858.0
LF 912 o
23 EA.
156.0
L-23
PURCHASE ALLOY FITTINGS 8t FLANGES
84 EA
24.0
L-25
PURCHASE ALLOY VALVES-SCREWED & SW
6.39 EA
39.9.
L-34 L80 L80
SPECIALTY PIPING STEAM TRACING'^kA.^KAc'e *
34 ea
FOG L>5-*. 59
LF *-F
_
\5.5
_ 11.8
zoo
5.0 341.8
344.4
L91 L91 L92 L92
L93 L94 L94
STRESS RELIEF RADIOGRAPHY. DYE CHECK, MAGNAFLUX REVAMP & TIE-IN WORK HANGERS & SUPPORTS
2411 PX EA
50 EA EA
3.0 o.&
.8
o.4
1.7
.1
- 28.2 - 48-6
410.0
2 -9
L95 BOLTS 8i GASKETS
LOT
130.1
L98 TEST & INSPECT
193 153 LF
>9.0 6.2
l&o,8
L99 MATERIAL HANDLING IU6L. VJ/ WAREHOUSE
LOT
PiPey/ay Re-LccATioii-o/iSi f
os pipe:
U/A- 3866 LF A/Cl --4140 LF
5-3
232 O
TOTALS
BACKCHARSCS MISC. 5/c. accts.
SURPLUS
L" ACCOUNT - PIPE
St MOTE'-- PURCHASED 38,262 LF
OF FfKATRAce Kr
4 Z.6S/l_F
5.7 <l5C.O>
LF 416.5 \oo.5 7843.4 2999.3
PHR 1.2-29
CONCRETE WORK
MATL. LABOR REQ. CODE
JOB NO. & TITLE I4o'5~5 RRMP'__________
CLIENT HKT^ATUOVl Oil- gQI-IFTKVW JOB LOCATION ROBIk1sq>-1 , Ii-UKLOIS
INSTALLED QUANTITIES
( |000>
FINAL MAN HOURS
Bechtel S/C
Q01 002
FABRICATE REBAR FABRICATE FORMS
55 T SF
zu
Q10
PURCHASE CONCRETE 5>5Z.08/-Y
%%0-- I4IZ4 cv
Q11 PLACE FDN. CONC FOR EGUIPT., STRUCT & PIPEWAYS 593T CY
10.9
Q12 PLACE STRUCTURAL CONCRETE
2 389 CY
95
Q13 PLACE BUILDING SUBSTRUCTURE CONCRETE
CY
Q14
PLACE BUILDING SUPERSTRUCTURE CONCRETE
CY
Q61 Q71Hf Q72 Q73 Q74 Q75 Q11-75
PLACE PRECAST CONCRETE PLACE CONCRETE PAVING MISC. CAST IN PLACE CONCRETE PLACE U/G CONDUIT ENVELOPE
S61 CY
6*2*570 SF 11*59 CY EA CY
<?3Z CY
PLACE SEAL SLABS G} - 16
333 CY
PLACE ALL OTHER CONCRETE (?-40 COMPOS VTE
294 CY
SUBTOTAL CONCRETE INSTALLED URi5.11 MHRS/lF 11025 CY
ZA
TO
5-5 .2
A L& Ale- 1
DIRECT COST $1000
Bechtel Matl.
S/C L& M
741.4
Q2* PURCHASE FOUNDATION REBAR PlfR-- ^lZO$ T
Q21 Q22 Q23
PLACE FOUNDATION REBAR PLACE STRUCTURAL REBAR PLACE BUILDING SUBSTRUCTURE REBAR
4TI T 351 T
T
024
PLACE BUILDING SUPERSTRUCTURE REBAR
T
Q62
021-24 + Q62
PLACE REBAR FOR PRECAST CONCRETE SUBTOTAL >41.II MHF7S /tofI
ALL OTHER REBAR (PAVING, ENVELOPES, ETC.) TOTAL REBAR INSTALLED
107 T 989 T IMG 1-- T 989 t
* <}-T|-A6SUMe G>"
IMCLUPe-S
VUIRET He-5H
n.7
23.2
57
4fc5.2
PAGE _L
CONSTR. DATES lo-B TO 4-gZ. PREPAREO BY M. MilLER
MATL. LABOR REQ. CODE
Q3*
Q31
032
033 Q34
Q63 031-34 + Q63
PURCHASE FORMS & FORM MATERIAL PLACE & STRIP FOUNDATION FORMS PLACE & STRIP STRUCTURAL FORMS PLACE / STRIP BUILDING SUBSTR.FORMS PLACE & STRIP BUILDING SUPERSTR FORMS PLACE & STRIP PRECAST CONC.
SUBTOTAL O.T7 HHRS/5F ALL OTHER FORMWORK
TOTAL FORMWORK
04* Q64
090
Q69
FURNISH ANCHOR BOLTS/ EMBEDS PURCHASE PRECAST STRUCT COMPONENTS PLACE PRECAST STRUCT CONC. ITEMS FURNISH SHIMS & GROUT
INSTALLED QUANTITIES
/ IOOO) FINAL
MAN HOURS
Bechtel S/C
DIRECT COST $1000
Bechtel Matl.
S/C L&M
SF 55807 SF 70439 SF
SF
4 3.3 68.1
344.0
SF
20550 SF 152 602. SF
SF
15.6 --
Ul-O
I5Z802SF
LB EA
583 c V
LOT
--
Hf! IS 3.2 u.o
10.8
41-1
gouc^ste: e soii-s rrsrma
F'OUUFWTtOlJS FOR PlpTWAV f?eLOCAT\ OM
loo cy
f.Lf
14.4 CeO. *5
----
TOTALS 0" ACCOUNT - CONCRETE WORK
.........- - --
--
223.1 1-4 1795.9 74 9
PHR 1.2-33
MAnu M_ manpower Data
GARRARD 00000574
R1/C71E-37C
MANPOWER SCHEDULE lob Nn. 14053.
MAN MONTHS \(e^ M HRS.^V^)
AVERAGE FORCE
CRAFT BOILERMAKER BRICKLAYER CARPENTER CEMENT-FINISHER ELECTRICIAN IRON WORKER LABORER MILL WRIGHT OPERATING ENGR. PAINTER PIPEFITTER PIPE WELDER
0CmTfoN.OV
DfcC
il. ian FEB
MAR APR. /W
JON
0(1L
AU5- ser
i 6/. ocr NOV. DGC
1982.IAN Fes
BRIG. BUOGET
ACTUAL/TOGO
4 6 12 IS" ir 25 3 3
57 86 "83" 27
/TlHf" jv/y O
1 _ - - - 23 2 - - 4 t - - / O
4" 8
IS' If} sv 43 51 92- 106 104 64 69 SI 62 id 92 73 46 4
1 3 r 5 4 8 12 16 (0 9 6 4 5 4
7O
12/ 43 ~W ~w 10 69 112 84 'It Ii2 152 156 133 12/ no 104 178 /74 /A*y 24
5 lb 14 13 44 50 J9_ 92 94 70 64 64 60 33 ao zat /6 3
S jLL n
-
il27 JfL 60
10/
-- - I
117 149 85 JFL 72 82 89 110 /of //p. IT.
6 *4 II
7 8 (3 22 py 00 C?
1
_3_
18 22 29 i2_ 52 59 is- 62 JfL 11 76 6$ 2.5 S'5 4
-
1 3 4 14 18 24 3/ id 62 "57" 126 172 226 35o 392
l TW1 4, 3 5" 8 i'i /& 35 39 To- 88 97
jssv /3s" 5
tsz 70 3
TEAMSTER SURVEYOR, CHAINMAN
1 JL_ & | _a_. _!2_ 15"
10
/#23 13 21 23 22 IS 18
/ 3
_2_ --fe_ 6 6 JU S' 7 5 5 4 6 5 5" 4 A i
TOTAL MANUAL SUBCONTRACTORS TOTAL MANPOWER
% 0. B. EXP. ACTUAL TOGO
%0. B. EXP. ACTUAL TO GO
m m12/ 55 IlH
113 140" 346 m 632 Isd 68/ 113 788 913 1046 |l5f> s?/ 6Y0 64
40 % 46 bO $1 28 3 2 7 3 5" 15" 16 ir 27 |23 205 .zrp 27V 1/3
%0. B. EXP. ACTUAL
52, I0|
m 194 KH tsi 343 348 9% 635 963 646 929 sis
TOGO
TIW 1355
111
ihid 1
Month Ending Ry A-l'
Q3t^ f&2- , Q-Pn 5*-i6 >u)
Supt. ReviewDate
MAN MONTHS
ORIG. BUOGET
ACTUAL
TO GO
46.8
FORE CAST
14 ioo~r
lol Zo58
753 1349
134-
144
2304
89o
289
80
10197
tze.5
11482
Jtz* BSa7
.iDR ND \4os^>
description
CLIENT bAAe/\T HotA OVU
LOCATION
3LL .
LABOR DISTRIBUTION
AND FINAL PRODUCTIVITY
P4rB 2
CONST. DATES IoI&oto 4. PREPARED BY M. N\\ LLSZ/
C.u '
DISTRIBUTION
PRODUCTIVITY
ACCOUNT
DESCRIPTION
C Columns & Vessels 0 Tanks
E Exchangers
F Fired Heaters
G Pumps & Drivers K Compressors
T Special Equipment SUBTOTAL MAJOR EQUIPMENT
FINAL MANHOURS
2AZS> 2. 111
\VT2>S 8 (o S1 Lp
7.421
\53\o4
PERCENT
FINAL
BUDGET
FINAL
PERFORMANCE PRODUCTIVITY PRODUCTIVITY
14 7o --
0.55
rcr
Libs'
2.75 0.71
0,37o
1.27
2..IO
4.8To
2-82.
4,45
0 > (o/o
0.80
1.35
on
0.75
1.27
o.rk
5.30 1.41
' f_____ LbS
O.SO 2. 66>
J Instruments L Piping M Structural Steel
N Insulation
P Electrical
7OT 5C1,7.\ 5
6oT?2 oMLY ) t\AO
2(ae\\o'Z.
4,z>% 2JbSlo
\A% o-1%
\s\l=>
0.48 l.GI
I.3S
(, oo
0-51
1.41.3 1.5
--
\ i G=>
o.un 2.70 2.03
--
(.30
Q Concrete
ZZ%047
1.(42,
l.b
2.47
R Buildings S Site Improvements X Painting
7,(57
(p(aS\o (0
on
3.8%
--
Z,/4
!. 17
l-.oo
--
{.IS ---------
-- 2.0 6
SUBTOTAL OTHER DIRECTS 120^,2.43 (47, g%
/,/7
L(a2>
(.7/
Y c^Po<_t>lN<=r
7.1%
2,
O.ICL-*r) o.iurap)
SUBTOTAL DIRECTS
148(4,013 S3.s%
6X Offshore Related
--
71 Temporary Facilities 72 Miscellaneous Services
(40,432.
2.04 j (o0>3
3.7% iu%
73 Tools & Equipment
--
74 Field Office
--
75 Other Operations
2/,,,586
(,s%
SUBTOTAL DISTRIBUTABLES
|4.S%>
TOTAL PROJECT
117780(4 100%
1.27
1, <43
2.07
PHR 1.4-2
GARRARD 00000576
JOB NO.
11053
description _.saaE-----------
CLIENT
q\l CO.
LOCATION RoRIUSQU,. ((-
MANUAL LABOR CRAFT DISTRIBUTION BY LETTER GROUP
..
CONST. OATES 1Q/&Q TO 4/82. PREPARED BY >
"C" "D" "E" "F" "G" "K" "T" SUBTOTAL
8M CARP
cm45l ELECT
IW
LAB MW
OE
PF TEAM
X M HRS % M HRS X M HRS % M HRS X M HRS X M HRS X M HRS X M HRS X M HRS X M HRS m H223 >9 224 3.7 104 * tp ISG> 6 120 2.3 5S4 , 7 41 Z&i *4446 T.4 H41 .( (236
7/2- > -
---
- - - 27 3 0.1 4
- 3.6* 4 5T.1 64 12-6 14
li.3 3<pl3 5 14 1.9 20>0 - 3 9.1 12-43 6* 70 5.7 771 1.} \4a J*4 S277 5.1 6.11
42/HI 2 131 .7 S6b 1-0 654 10.9 4426 z.5 2(toO 3-0 2516 m LI 640 ID.9 1433 1.4 12.0.0
.1 6 2.7 2V? 5.9 68 8 -1 5 - - 3.0 217
5721 Z,4 243 (37 I3S1 13 131
- - 2.2 3oe Z.fc 458 10.0 UoSf .1 13 Z.3 313 54,0 89(63 7.5 1245 12.1 20(5 l.o (to 6
-
a S3 13 44 1 ,u> 3o Sj6 1(3 -7.4 4S
4to| 123 237 3^ 63 S .8 IS
)P* 6V713 .7 mi 1.9 2831 i,e 2702 77 (0414 7-3 3542 12*/ |e>5fc! 13.0 14931 13.4 20562 z-3 3S23
5V
*>IC TO &\6.CT
&
TOTAL
X M HRS X M HRS MANHOURS - 3 Co CjD 24283
-- 8.1 1 - 2.1 214
V V1 (373s
4-9 42B6
lc*3
- |3.I (3o2 112.) - 3,o (330 \<p(to6> 63
- is-5 3oo
H33
- 5,0 ISBl 1531OA
"J"
"L" "M" 'N" "P" Q"
R" "S"
-X"
SUBTOTAL
V
TOTAL DIRECT
DISTR.
TOTAL MANUAL
--
- H4 9.7 t?8TI & Hit --
-3
.1 85 .2 152. 31.1 21643 .1 4o .2 HO - - .1 47 fcl.7 43331
11
.1 2S>4 ,2 6e>7 A 2.027 ,2 714 .7 33o7 - 48 7,0 35T16 73^ 37ol4 .5~ 2685
J 44 .7 414 Up 487
37614 .8 SIS 4,1 2473 14.0 854-1 4.1 2480 73 (722
- - - - - -
12. -
~ - - 15.1 324 -
- .1
3
&744 ,/ 355
2to(71J .( 24 1 >9 -224u> - 36 A \to(e I .z 53Z ,5 *433
7152-1 3 11652 - 42.
54o45 /J 51806 ./ ISSO o,l 14 LIST A 72> z.u 5721
-- >,4 4S28 10-2.7 7
- (7.9 10688 SoZ 2.1
- 10 3 too 77Z
- 5 lO
-2(30
- --- - --
2.23047
-
-
il* (57to
19$ 1417 1.5 247
15.7
11/2.5 34.1 f-----
2440
-
-
1.0 15 5.3 -2.-5 <tJ * ip 43
- - ,L 142 1.5 447 17 1121 1 so
341to7
-
12/770 t'to 136.12 4-/ 2763
--
- --- -
- .0 Ift - -
78c-/ ipX- 743 in 1.3 1 to 07f
226*39 a* 9Jo4l 80 loilll
17.0 7 6.1 73350 y>P
1.2 144-^8
.7 126 u0r 75677 ' 1 .4 Slo 9 1168 3Z? 4H51 - - .1 nu> 4.0 5(05 14 1701
4.1
7o53o 142 15 ii a t
1.3
1692? (94 27/347 75
ill 14b
10.0 143*72
14
2fZ78 i>*3 97457
45749 1.3 19700
-- -
"T(S 1
--
&
--
l&
7*9 95337 (206243
--
- (26?toto6>
4>.9 102924 14^6-/" 3
1.4 42ol 5.9 VT3S2 -Z
CoSti
14-5 42507 50 HS87 rr.i 79725 .1
34S
10.0
21.4 214/S^ 62121
93
28826 4.4
(2824
.2
411
213&S3
47 H73\
9.6 I(e8 733 /I
14682 18^ 33382.- T.l
12.8
(2ST35 227837
11
21to23
>0
12.2672
52co7C 17 18S26 7 12624 5.8 10 i4 (S 1771870(0
CRAFT DISTRIBUTION
PHR 1.4-3
PAGE
JOB NO. I4QSS
DESCRIPTION CLIENT MMSAtHokI o'LCQ.
LOCATION EdBiHSoi^.TlI..
f/cSTtofei" .
CRAFT WAGE RATE DEVELOPMENT
CONST. DATES \/8o TO 4/g>7-
PREPAREDBY M,
___
CRAFT
BOILERMAKERS CARPENTERS CEMENT MASONS ELECTRICIANS IRONWORKERS LABORERS MILLWRIGHTS OPER. ENGINEERS
f SIZE OF FORCE
AVERAGE PEAK
24,6 52.8 5.6 ioG.e> 31.5 7o.4
T,l 3&.1
2>6 106 16 life
XL
141
&4r 76
FINAL MANHOURS
14.73 1 \6&,T53
17.153, 323.656 125,735 277,877 21,673 122872
X OF TOTAL
4.2/o
7.s%
l.O"/o
l&.8^ 7.1 % 12,8%
U%
6,7%
OVERTIME ASX OF
cm. 241% 3.2(o%
476% 2,15%
0.51 % 2,30% 2.16%
5.26%
ABSENT EEISM
I+V.
S7 IE. % lo ^ 11 9 7. w 8%
CRAFT AVERAGE WAGE RATE
BASE (A)
FRINGES PLUS T & 1
TRAVEL
TOTAL
17.67 471 Ml 2371
14.64 3.5b -- 1^,22
13.56 3.4-0
\S.27 4.26 13,21 5.64-
-- --
16.46 1%53> 17,53
11.36 2,55 -- 13.71
1574 3.5g>
18.72
13.22 3.21 -- 16.51
JOURNEYMAN
n.os 13.67 13,80 |6,oc> 14.15 11.20 (4.47 14.65
AfB
l,o41,06 0.78 0.75 0,7 fo
l ,o 1
l.OS o.lo
-PAINTERS
PIPE FITTE RS/WELDERS 167.7
SURVEYORS
4,2
TEAMSTERS
mcvi layers
\s.\
0.1
541
1 73
4
520010
\2,824
4&5Z3
274% 0.7% 2,7%
o. 1%
4,41%
--
1,67% OU%
--
17.2 s 4.22
-- 21,47 16.30
1,05
10.56 3.G& -- 14.74" lo.l^ o .77
13.55 4.14- -- 17,61
IMS.., l.o]
1536 26g> -- \&.o4- ISlo
1,02
PAGE
GARRARD 00000578
totals: t.Cl\ieL 533.4
5/c>ou
"TOT PlRcT-4i>t^Tie
\\5o
l 676.45 1 74.2 7o 3.14% 5.87o
1T77,66 IDO /o
u 1 IS. 05 4.oA-
CRAFT WAGE RATE DEVELOPMENT
0.00
11.01
1S.03
1,00
PHR 1.4-4
JOB NO.
140 5 3
JOB DESCRIPTION RRMP
GHENT MARNTHOlL 2>IL- COHrfc Ktv
LOCATION ROB-lUSOkJ . H-LlNlOIS
ACCOUNT
DESCRIPTION
71.XX 71.10
Rechtel Direct Manhours
Direct Labor Dollars
TEMPORARY CONSTRUCTION FACILITIES
TEMPORARY buildings
Field Offices
Fa. I4-.9 Total SF
Warehouses Change Houses All Other Total
l Ife 3 2.C*
Fa Ea. Ea. Ea.
13. Total SF \Z - & Total SF
-<r Total SF 31.3 Total SF
71.20 71.30 71.40 71.50 71.60 71.70 71.80 71.90
TEMPORARY WORK AREAS & BAYS TEMPORARY ROADS. WALKS. PARKING. FENCES TEMPORARY RAILROAD & BARGE UNLOADING TEMPORARY POWER. LIGHT & COMMUNICATION TEMPORARY AIR. WATER & SEWAGE MINOR TEMPORARY CONSTRUCTION SCAFFOLDING. CRIBBING. DUNNAGE WINTERIZATION & WEATHER PROTECTION
BECHTEL
14.2
(p 2 l9.o
Z.5 3. 5 IK 3
DISTRIBUTABLES Dofois In Thousands
MANHOURS
SUB CONTRACT
TOTAL
TOTAL AS A % OF BECHTEL DIRECT MHRS
MATERIAL
24.>
1 . U?
149 . O
DOLLARS
LABOR
SUBCONTRACT (Matl. & Labor)
TOTAL
231.2
410,9
811. 1.
1.4
3 .O 1.3 -4
.3
(o.Z. 5.3
Z.2 . O 3- s 3. 9
U . U>
4 4
i-4
3
.a
42. 3 49. 8
184.9 4o.o 18. T z5z>.o 533
te>9.7 69.0
384.0 44. Z
61.9
199-9
51 .9
7?.7 549.4
49.7
13.2
l5z, C> 170.7:
594. fc 140. 45 8T.3
250-0 266. 4.
PAGE 1
CONST. DATES lofeo
TO 4/8 7.
PREPARED BY <. J/SC.KSOM__________
%DF I)IRECT LABOR DOLLARS
MATERIAL AND SUB CONTRACT
TOTAL
Z- 1
3-0
REMARKS
PiRCT MUIRS S/2 t4m MHKS
14-89, 37
c>iKerco-r labor 4 . 3 20.837-4
-Z 6 .4 . 7
1.0 .3 .(
.9 .2
Z- 2 -5 3 -9
1.0
71.XX TOTAL TEMP. CONST. FACILITIES
72.XX 72.10 72.20 72.31 72.32 72.40 72.50 72.60 72.70 72.80
MISCELLANEOUS CONSTRUCTION SERVICES GENERAL & FINAL JOB CLEAN UP MAINTENANCE OF TOOLS & EQUIPMENT MATERIAL HANDLING WAREHOUSING SECURITY UNALLOCATED SERVICE l ABOR ON & OFF EXPENSES SURVEYING ON SITE TRANSPORTATION
UO.
44 -O ZZ 5 13. 9 ?4. S
27. 6 9. S
(3. 4
l(o(2
.3 -5
.5 .5"
76.6
44.5 ZZ. 5
14.4 74. 8
ze.3
9.8 13.9
^ . 2.
7&.0
1071. 9
3-0 1-5
.0 5.0
i-9 .7 -9
133.0
(1 .2 7.7
778.Z 393.0 2458 I3Z3.0
491. 7 J72. 3
237-0
612 . & Z41Z.7
14 <? 7.4
8- 1 8.5
T9Z. 2 5330 Z 53 . Z 1323.0
499. 8 184-5 253- 2
5.2.
.1 -5 .o .o
.o .0 -1
9- Z
3 .0 2-0 .9
4 .9
1.9 .7 .9
72.XX TOTAL MISC. CONST. SERVICES
Z.O<0. z
73.XX 73.10
73.21 73.22 73.30 73.40
73.50
CONSTRUCTION EQUIPMENT & TOOLS
CONSTRUCTION EQUIPMENT
Bechtel Equipment Rentals Third Party Rentals -- Bare
Third Party Rentals -- Operated & Maintained Job Owned Equipment CnitHB3.fc Resale To.O
Subtotal Const. Equipment
SMALL TOOLS PURCHASE Cost Z7T-3 Resale '112
RENTAL TOOLS PURCHASE Cost
Resale 3 0
FREIGHT ON CONST. EQUIP. & TOOLS
CONSUMABLE SUPPLIES - WELD ROD & GAS Aftt-e 6UPfUE5-UWT
e>HAUU TOOL6 - UUIT Pi
PURCHASED UTILITIES
73.XX TOTAL CONST EQUIPMENT & TOOLS
7- . O
208.-2.
14 . O
l4-S 9
364-7.0
3 6. O 9.838. 9
A 14-3
I 30. o 914.0 12. 3 03. 2
8-317. 5 170. 3 (,. 8 153.4.
330. o 958. 5 950.5
79 .
49T4- &
DISTRIBUTABLES
1.0 1.0
1300. O 914. O
18- 3 83- z Z 3>|8 . 5 170. 3
4,. 8 158.4. 830.0 968. 6 958-5
79.6
\.o 4973.a
4.9 3.4 .1 ,8> 6.7 .6 .O 6 I.Z 36 3.0, .8
ie>. t.
4.9 3.4
.1 -3 6 .7 -6 .o O 1 .z 3.6
3.O'
.3
I&.6
PHR 1.6-1
JOB NO. 140 53 JOB DESCRIPTION BHHP CIIENT HARyrHOlJ Oil- COHPAM.V LOCATION FfoaiMSQNl , IL.L.UJQ13
ACCOUNT
74.XX 74.1X 74.11 74.12 74.13 74.14 74.15 74.16 74.17 74.18 74.19
DESCRIPTION Bechtel Direct Manhours Direct Labor Dollars FIELD OFFICE NON-MANUAL
Supervision Engineering Project Control Administration Warehousing & Purchasing Computer Services
T PC. iOWSTROCTIOH
tpc SUBTOTAL NON-MANUAL
Paid Absences
|
Social & Retirement Benefits} Payroll
Taxes and Insurance
1 Additives
SUBTOTAL
-w
Completion Bonus Foreion Service Premium Hardship Allowance Cost Differential
Other Benefits and
Allowances
Education and Other
SUBTOTAL
'
74.30 74.40 74.51 74.52 74.53 74.61 74.62 74.63 74.64 74.71 74.72
MEDICAL & SAFETY SUPPLIES PERSONNELTRAINING AIDS COMPUTER EQUIPMENT & SOFTWARE COMPUTER OUTSIDE SERVICES COMPUTER SUPPLIES OFFICE SUPPLIES OFFICE EQUIPMENT REPRODUCTION SUPPLIES TELEPHONE, TELEGRAPH, POSTAGE RELOCATION EXPENSE TRAVEL & ENTERTAINMENT
74.XX TOTAL FIELD OFFICE
75. 75.10 75.20 75.30 75.40 75.50 75.60 75.70 75.80 75.90 75.XX 60.XX
OTHER OPERATIONS WELDERS TESTS CRAFTTRAINING SHOW UPTIME VOTING & OTHER TIME OFF MANUAL TRAVEL STATE & LOCAL TAXES PERMITS PROJECT INSURANCE PRELIMINARY STARTUP OPERATIONS t6ta'l 6ther opEftATifiWi
TOTAL REMOTE & OFFSHORE ASSOC. COSTS TOTAL DISTRIBUTABLES
BECHTEL 35.0 71.0 29.7 04.4 38. I 30.1 53. 5 *$50. (p
l .5 IT.4
.2
20. 5 6.43.9
DISTRIBUTABLE Dolars In Thousands
MANHOURS
SUB CONTRACT
TOTAL
TOTAL AS A % OF BECHTEL DIRECT MHRS
MATERIAL
DOLLARS
LABOR
SUBCONTRACT (Mad. & Labor)
TOTAL
35.0
Z.4
71.O
4. 0
z9. 7
z. o
i 04. 5 30. 1
5.7
z. 5
30. 1
Z. 5
53. 5
3.6.
.1 350, 7 2*3. 5
748.9 .2 990. 7
354.0 Z 765.7
305. 8
5IZ.7 5
.4 4504.3
1540.7
l*Z.2
748.9 9 90.9 354.0 77ft. i 385. &
12.7-
5IZ.7 010. 5 4596.9
1540. 7
.1 ia.3
*%*&. 7
-Z--3. 5
7-0
90. 4 S'. 4
I 3 .6 90. Z M2,5 46.7 I0Z .3 673. B
|
1 -4
OiZG. O
1*2.Z
7. O
90.4 5.4
1*5. 90.2 112. 5 40.7 102. 3 673. 0 346. |
7707. to
7.4 1.5
n .4 .z
.5 .1
1.2 .O
56.Z .3
.4
130.9 Z6. 5
307. &
3. 5
107.1 26. & ^07,0
3.5 4
50.0
\.&
106.. 9
Z 44. 5 7594.0
DISTRIBUTABLES
46 0.7 iisiz..6>
50. O
<664 .O
575. 6 19 57 O, is
PAGE_i2_
CONST. DATES \o[&Q
TO 4/g.Z
PREPARED BY
J\CK5Qkl
%0f [ IRECT LABOR DOLLARS
MATERIAL AND SUB CONTRACT
TOTAL
2. & . a 3.7
1.3 .a Z. 9
1.4
1.9 3. 1 17.1
5.7
REMARKS
.&
.4 .o 1 .3 .4 .Z .7 2. 5 1,3
5- 9
.o
.4 .0 .I .3 .4 -2 .7 2.5 1.3
26.7
.2 .7 . . 1 .0 l. 1
.o .0 -O
.2 .4 *30. &
.2 2. i 7Z. 9
PHR 1.5 2
JOB NO. & TITLE
CLIENT________
CONSTRUCTION EQUIPMENT SCHEDULE
JOB LOCATION _
Job Owned, Bechtel Rental & Third Party Rental
rmNrRY MO!Jf.'!?N!2,\TIOis' f-RO.iL'C7 --M>WfHON 'Jit CO.-----
roainson. m.
EQUIPMENT DESCRIPTION
EQUIPMENT COUNT BY PERIOD
1980
1981
1982
CHFV. V-8 4DR. SEDAN
A $ 0 N D J F M A M J J A s 9 N D J F M A M ,1 ,i 1 1 1 1i 1 1 i11 1 1 1 1 11 1 1 i1 11 1
PLYMOUTH HORIZON 2 DR.
1 1 1 1i
1/2 TON VR. VB PICK-UP TRUCKS -2_ 2 TON FLATBED TRUCKS
-5_ _6_ 8 in 13 JL8 1 fi JLZ. 18 18 18 20 ?n 2D 19 13 13 13 12 fi 2 1 2 3 3 444 5 5 7 888 7 7 7 43 3 1
DUMP TRUCKS 6, 10, 12 CY.
333344331 1 1
MECHANICS TOOL TRUCK FUEL TRUCK LUBE TRUCK "A" FRAME TRUCK
2222222222233321 1
1 111i1 1i1 1 1 11 1 i1 1
1111i
1i1 1 11 1 1 i1 11
2 2 2 22 2 2
HD 4X6 TRACTOR LD 2X4 TRACTOR SEMI TRACTOR FIFTH WHEEL TRACTOR
OFFICE TRAILERS 24X60 FIRST AID TRAILER 8X36 COMFORT TRAILERS TIMEKEEPER/GUARD TRAILER CHANGE ROOM TRAILERS SEA VANS 8X32 TOOL VAN TRAILER HI-TANDEM TRAILERS LO-BOY TRAILERS SEA VANS 8X20 WELDING DEPT. TRAILER EXPANDABLE
11i11i111i 1 431 1 1 1 11i1 1 22
3 3 3 3 3 3 3 3 3 3 3 3 .3 3 3 3 3 3 ? 2 2 11 1 11 1 i 1 1 111 1i i i iii i 2 22 2 2 2 22 222 2 2 22 2 2 2 2 2 2 2 2 22 2 2 2 2 22 2 22 2 2 2? 2 2 3 3 5 5 9 9 10 11 13 14 14 14 13 13 13 15 15 13 10 333333 4 677 7 5444 4455 5 443 333 1 2222222222222222 1 1 1 1 22222221 1 1 1 1 i
fi6 13 13 24 24 37 37 37 34 34 34 34 34 34
1111111 11111111
TOTALS THIS PAGE
CONSTRUCTION EQUIPMENT SCHEDULE
CONST R. DATES . PREPAREO BY
PURCHASED EQUIPMENT
Purchase Cost
Less Resale
RENTAL EQUIPMENT
Total Months
Average Rental $/Mo.
RENTAL COST
23 5
... 288 91
--- ---------- .
29 35 17 18_ 14
210 . 300
4,830 _ 1 ,500
24Q 69,120____ ROD 4fi 5nn
650 __ 18,850____
175 __ 6,15_0____
1650
28,050
800.
14,400____
700 q.ftfin
. TO 12 5 4
1450 700 700 700.
14,500 8,400____ 3,500___ 2,800
Inclu led w/Ts iperary ulldlngs
20 180
3.600
38 300 _ 11,400____
iperary 1 uildtngs 202 240 18 150
48.480 2,700
91 . 90, 8.190
6.200 (29001 500 I2.QQ1 18 500 ___ 6.500
3R3Rnn 11-7600).
_..... 7
._ 170 . ...
______8__ ___ 2Z5L .
1.190 2,200
45,200 (20700)
312,660
PHR 1.5 3
PAGE
JOB NO. & TITLE
CLIENT________
^^CONSTRUCTION EQUIPMENT SCHEDULE
JOB LOCATION _
Job Owned, Bechtel Rental & Third Party Rental
MU;VJ.UOJ KOBiMSO!'! REflWLRY -----MODERNIZATION I'RUJICI "
MARATHON Oil CO. ROBINSON* 11! .
EQUIPMENT DESCRIPTION
FLATBED TRAILERS BOX TRAILER OFFICE TRAILER (CIPSl MAECO FLATBED 40 ft. FLATBED TRAILERS COMPACTOR WACKER RAMP COMPACTOR VIBRO PLATE
EQUIPMENT COUNT BY PERIOD
1 980
1981
1982
A S 0 N DJ FMA M J j A S0 N D J FMAM j j
4 8 15 16 17 23 23 14 7 2
i 1 1i 1 i1 1 1
1 1 i 1 22 2 2
1i11i11
34 999999999993 3
444 68888844441 1 I
22222344641 1 1
CRAWLER DOZER FRONT END LOADER W/RUBBER TIRE.
BACKHQE FRONT END LOADER CRAWLER - 450B
CASE HYDRAULIC GRADALL CRAWLFR - 660 BACKHOE 50 TON STEERING TRAILER &BOOSTEF BOBCAT 6 TON DROTT PICKER 8 TON PICKER 10 TON CHERRY PICKER 12-14 TON PICKER 15. 18, 20 TON PICKER 50 TON PICKER 70-85 TON CRANES 140 TON HYDROLIC CRANE 200 TON CRAWLER
1 1i111 1 22244421 1 1 1 11 i
111i1 111 111
1 1 1 i 1 1 1 11
1
1111
11
111
11111 11i
1 1 1 1 i 1 1 1 1 1 1 ?22
34A55
3??
2 2 2 2 4 6 8 9 m 12 14 14 14 13 10 7 6 ?
1 i 4444332
1 1 38777774?ii
1 11 i1 1 i1 i 11 iii i
? 2 ?2 ? ? ? ? ? ? ? i
TOTALS THIS PAGE
CONSTRUCTION EQUIPMENT SCHEDULE
CONSTR. DATES OCTOBER. 19S0
TO APRIL. 1982
PREPARED BY______________________________________________
PURCHASED EQUIPMENT
Purchase Cost
Less Resale
RENTAL EQUIPMENT
Total Months
Average Rental $/Mo.
RENTAL COST
36*000 (164Q0)
129 9
12 7
77 34
270
Z5_ 115 250
34l,830 fi7fl
]_,38Q 1.750
60 M2Q 125 4,250
8 1230 28 1000
9,840 28,000
11 1370
15,070
3*200 ___(1500)
9 1 4 2 3 8 17 33 137 26 51 15 23.
2500
22,500
900 900
500 2,000
750 1,500
1250 1000
3*750 8.000
1300
22,100
1450
47,850
2250
308.250
5500
143.000
6001)
306.000
.6500 _ 97,500
10500 . 241,500
39,200 (17900)
1,305,260 PHR 1.5 3
PAGE
0B
^^CONSTRUCTION EQUIPMENT SCHEDULE Job Owned, Bechtel Rental & Third Party Rental
.inRNn RTITIF
14Q53-OuO ROBINSON REFINERY
' MODERNIZATION PROJECT
CLIENT______________
aa A l? ft i HQN r>;t rr>
JOB LOCATION________________ ROBINSON, III.__________
EQUIPMENT DESCRIPTION
CRANE MATS (200T) CRANE MATS (140T)
EQUIPMENT COUNT BY PERIOD
1980
1981
1982
A S 0 N DJ F MAMJ J A s0N D J FMAM0 J
24 24 24 24 24 24 24 24 24 24 24
10 25 25 25 25 25 25 25 25 10 10 10
CONCRETE MIXER 9CF CONCRFTF BUCKET 3/4 CY. C0N0RFTF RMOKFT 1-1/? f,Y. -CONCRETE PUMP TRUCK w/BOOM CONCRETE TROWEL 42" . ___________ CONCRETE VIBRATORS CONCRETE BUCKET 1 YD. CONCRETE MIXER 6 CF. HI-RANGER BUCKET TRUCK SCISSOR LIFT #2000
MANLIFTS & SNORKEL LIFTS 40' HGT.
MANLIFTS - 40' TELESCOPING MANLIFTS - 60' TELESCOPING JLG TELECSOPING LIFT FORKLIFT 2-1/2 TONS HYDROLIC PALLET-LIFT TRUCM4500 AIR TUGGERS #2000 & #5000
8 PAK WELDERS 200 AMP WELDERS 200 & 300 AMP PORTABLE GAS
WELDERS 300 A 400 AMP MOTOR GENERATOR
WELDERS
1ii
\1
11
ii1 1 1i1 1 1 1
i1 i ii1 1 1 i1 1
iii111i11
??222222
n2 4 6 8 8 8 n
77777
2 22
?22
1i11
11111
22222222222221 1 1 1 1 1
3222222222234441 1 1
4 6666666333443
11
1 1 1 i i 1 1 1 1 1 11
ii 111 1
1111ii11
11111ii111111 1111
2 2 222222 2 2 2 222 2 22
32222
1 i 3 5 5 10 18 17 17 14 7 2 10 22 39 41 58 82 83 89 94 128 124 124 39 44 3 2 5 11 15 15 11 6 6 4 4 4 2 2 2 2 2 1 1 1
2
TOTALS THIS PAGE
CONSTRUCTION EQUIPMENT SCHEDULE
CONSTR. DATES OCTOBER. 1980 to APRIL. 1982 PREPARED BY_____________________________________________
PURCHASED EQUIPMENT
Purchase Cost
Less Resale
RENTAL EQUIPMENT
Total Months
Average Rental $/Mo.
RENTAL COST
15,800 in qnn
172001 (50001
5 150
13 50
7.100 132001
11 10
LQO 6000
inr.luH
includ :d w/Sma 1 Tnnls
4 100 5 300
32 3100
41 5GO
66 non
16 1450 7 1200
10 1450
1.250
(600)
19
n
675 310
750 650 1 .100 .60,000
400 1 .500 99,200 2D_J)Q0 72,600 23,200 8.400 14T500 12,830
3.410
ion 325 3?.500
ifnn
70 72,100
96 ?40
2 840
1 .680
35,050 (16000)
448,360 PHR I S 3
JOB NO. & TITLE
CLIENT________
^^CONSTRUCTION EQUIPMENT SCHEDULE
JOB LOCATION.
Job Owned, Bechtel Rental 0 Third Party Rental
EQUIPMENT DESCRIPTION
EQUIPMENT COUNT BY PERIOD
1 980
1981
1981
A S 0N DJ FMAM J JAs0N DJ FMAMjj
1PO/4RO V. POWER DISTRIB. PANEI!
2 4 6 6 10 10 10 12 15 15 15 15 15 12 10 6 4 i
120/480 V. POWER DISTRIB. PANEL!
4 44 4 4 4 i
350 W. GAS GENERATORS
55 5443 1 1 1 1
3500 W. GAS GENERATORS
1 33333333333333 33
35 W. GAS GENERATOR
11 1 i
1-1/2" CENTRIF. GAS PUMP
3" CENTRIF. GAS PUMP
2" & 3" SUBMERSIBLE ELECTRIC
PUMPS
3" HOMFLITE DIAPHRAGM PUMPS
. SPRAGUE TEST PUMPS
____________
AIR COMPRESSOR - 175 CFM GAS
4444 4443 44 4 44 222222222233311 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22
2 2 ? ?22 22 2 ?
R88888888a8 88 888 3321 1 222221 1 1
RADIAL ARM-SAW 18" BAND SAW 36" ABRASIVE CIITTFRS PIPE THREADERS 1/2" - 2" REBAR BENDER/SHEAR SKYCLIMBERS__________________________ WFT RAND SAW PIPE BEVELER_________________________ HI-PRESSER WASHER ICE MACHINES CRANE WORK BASKETS f3 man)
1 1i1 11 111 1 1i1
? 2 6 6 65 6 6 6 7 7 7 7 33 i 5 5 9 9 9 8 a 13 13 15 15 15 15 15 15 15 2
1i1111i11 1 8 99977 22
2222222222 2 222
7 7 7 77 7 7 7 7 7 7 7 7 1777
11111 1 1 111
2 2 33 3444444444
2222 2444444444
OTHER MISCELL. EOUIPMENT & SHOR' Ti RM RFI TA s
RENTAI REPAIRS TOTALS THIS PAGE TOTAL EOUIPMENT
CONSTRUCTION EQUIPMENT SCHEDULE
CONSTR. OATES PREPARED BY
OCTOBER. 1980
TO APRIL, 1982
PURCHASED EQUIPMENT
Purchase Cost
Less Resale
RENTAL EQUIPMENT
Total Months
Average Rental $/Mo.
RENTAL COST
2.200 nooo) 750 (300)
16R 25 30
12R 325 678
21,nnn 8.130
20.340
51 __ ^ 38 3? 40 150 (100) ____ 32___
20 40 9.600 (4400)
23 . 340
i finn i 3nn i Ann
800
7,82L____
10 3
include d w/Smal 1 Tools include d w/Smal 1 Tools
9 54 include d w/Smal 1 Tools include d w/Smal 1 Tools 10 8.350 (38001 7,000 (32001
170 295
?nn 505
3.36
1 ,700 ____ 900
i ^nn 27.270
5.700 (2600)
33,750 (15400) 153.200 (70000)
30.200 40.000
168,020 2.234.300
PHR 1.5-3
PAGE
15 DiSTP-lS U T ft 6 L 5
GARRARD 00000585
CONSTRUCTION NONMANUAL MANPOWER AND MANHOURS
hr 14053description ROBINSON REFINERY MODERNIZATION PROJECT
LOCATION ROBINSON, ILLINOIS
CUTOFF DATE;
I. NONMANUAL MANHOUR SUMMARY
TO DATE ______________
TO GO
______________
FORECAST
II. NONMANUAL MANPOWER SUMMARY
LOCAL HIRE PERMANENT HIRE CONSTRUCTION PERMANENT HIRE SERVICES TOTAL
J
19 80
FM AM J J A S 0 N
0J
19 81 F M AM J J
AS
0N 0
2 4 11 14 17 21 27 28 29 30 32 34 34 32 32 32 32 33
6 7 13 20 21 23 28 41 42 56 65 68 70 67 66 66 62 62 65
1 5 6 14 14 14 15 15 15 16 17 17 16 16 18 17 18 18
6 10 22 37 49 54 63 83 85 100 111 117 121 117 114 116 111 112 116
LOCAL HIRE
PERMANENT HIRE CONSTRUCTION
PERMANENT HIRE SERVICES
o
o o
TOTAL
o
o FORM RCCF 1
cn
1982
J F M A M J J A S 0 N 0 J F M AM J J A S 0 N 0
34 34 32 29 24 13 5
62 65 60 50 36 8 3
17 17 18 14 8 8 5
113 116 no 93 68 29 13
V" +1
GARRARD
GARRARD 00000587
BECHTEL CORPORATION
** LOCAL HIRE * HOUSTON PAYROLL
CLASSIFICATION
i SITE MGR.
? FIELD SUPT. in AREA SUPT. ii AREA SUPT. i? PIPE SUPT. 13 PIPE SUPT. 14 ELEC. SUPT. 15 ELEC. SUPT.
(A)
(B)
(A)
(B)
(A)
(B)
17 CIVIL SUPT. 16 CIVIL SUPT. 18 RIG/BM. SUPT. 19 MECH. SUPT. 128 CIVIL SUPT.
(Al (Bl (A) (A) (A)
139 FIELD SUPT.
140 TNSTR. SUPT.
(A)
141 NIGHT SHIFT SUPT. (A)
142 NIGHT SHIFT SUPT. (B)
PIPE SUPT.
(A)
INSTR. SUPT.
(B)
NIGHT SHIFT SUPT. (A)
| r~ --r~
Total Account
_ SUPERVISION
Job Ho. 14053 NON-MANUAL LABOR SCHEDULE
MONTH ENDING________ BYDATE.
REVIEWED______ DATE . PAGE S' OF.
SCHEDULED PERIOD
| TO GO |
.. _
j
19*50
iyai
iyt
I$
M J J A s O N D J F M A M J j A s o N 1= J F M AM AM so N J F M M J J A s o N D J F M A M MO.
M HRS.
--
-
mm 1
"
~
"
==
"~
m--m
B
B
"
B
s ____ mm
24 18 17 15 13 15
-- i
15
wmm i
11
Ua :
- = mpm 3
13 9
- ---
iSB r
__ i
r i__
---
r
i 3 3 "_ _ _
m" mi m
13 pBi 11
4 6
4
__ 6 6 4
t----^
2 i...................
2 ........ ............
~
--
- ---ii
i _d_ j . (__ (__
"- --
I 2__ | T ~2 2 3 T T T 10 1113
13 12 n 13
2 17 T3 T '2 T
. .. . _i
~ _I = ;__
208
i___________
BECHTEL CORPORATION
** LOCAL HIRE * HOUSTON PAYROLL FIELD ENGINEERING
CLASSIFICATION
146 PIPE ENG. 147 PIPE ENG.
(B) * (A) *
148 PIPE ENG.
(A) *
144 TURN OVER COORDINATOR
INSTR. DESIGN INSTR. DESIGN
*
DRAFTSMAN DRAFTSMAN DRAFTSMAN
**
** **
DRAFTSMAN DRAFTSMAN PIPE ENG
** *
PIPE ENG.
PIPE ENG.
ELECT. ENG. INSTR. DESIGN
*
INSTR. ENG.
Tota 1 Account. FIELD ENGINEERING
Job No. 14053 NON-MANUAL LABOR SCHEDULE
MONTH ENDING_________ BYDATE_ CHECKEDDATE _ REVIEWED______ DATE _
PAGEjj2_OF_
M MO. @M HRS/MO
1 9BO
SCHEDULED PERIOD
------------
M j J A s o N D j F M A M J J A S o N D j F M A M J J A S o N Ld J Jf|m a!m J A s o N D J F M A
-j
-- i M _"
z3
"
_
m u
_i
h
rn u 1 n
i
J nc t:
_l
L\
L LLi
i
rt
11---- u i
L. LL_ [F
r
L
1
1
l\ _
L_
1
1
_"_ 1
1
3 L
__
r\L._ 1__
J
1__ r
[I
L 1
M MO. |
6 6
4
2
3 4 1 3 8 7 3 3 5 5 5 3 3
TO GO M HRS.
$
j \__
rr
| j
!__ L- i_
L_
r
__
!
T J 6 l 7 7 13 17 19 19 19 20 22 24 29 30 33 40 40 36 26 S_
L _ I__ _ _ _ .
433
BECHTEL CORPORATION
** LOCAL HIRE * HOUSTON PAYROLL
ACCOUNT ADMINISTRATION AND OTHER SUPPORT PERSONNEL
Job No.. 14053 NON-MANUAL LABOR SCHEDULE
MONTH ENDING_________ BYDATE_ CHECKEDDATE _ REVIEWED_______ DATE _
PAGE ' I OF
_M HRS/MO
BECHTEL CORPORATION
LOCAL HIRE HOUSTON PAYROLL
J0b NO. 14053 NON-MANUAL LABOR SCHEDULE
MONTH ENDING__________ BYDATE__ CHECKEDDATE__ REVIEWED______ DATE__
PAGE_i^OF.,,.
ArrniiNT
ADMINISTRATION AND OTHER SUPPORT PERSONNEL(contlnued)__________________________________
M M0 0________ M HRS/mo
CLASSIFICATION
CLERK CLERK
** **
SCHEDULED PERIOD
9130 1981
9E 2
M j j A S O N D j F M A M J J A s o N D J F M A M J J A s o N D J F M A M J J A s O N D j F j M| A
!
M MO. 3
5 -
TO GO M HRS. [|
$
-
....
-
GARRARD
Total A
ADMINISTRATIO
O
O
o o o cn
CD
-
- .... -
-
- ....... -- ---
4 7 12 14 6 9 21 22 23 25 26 26 28 28 27 27 29 30 31 31 27 18 12 6
ii -- 509
BECHTEL CORPORATION
** LOCAL HIRE * HOUSTON PAYROLL
account
PROCUREMENT
6 FIELD PROCUREM'T MGR. 62 PUR. SPEC.
63 SR. EXPEDITOR
64 MAT. SUPV/FMCS
65 PROCUREMENT SUPV.
L PUR. SPEC.
67 PROJECT EXPEDITER
95 FMCS CLERK
**
71 SECRETARY 72 CLERK/TYPIST
110 CLERK/TYPIST 115 CLERK/TYPIST
** ** ** **
136 MATRL. SPEC.
137 MATRL. SUPV.______________
I3 PUR. SPEC.
*
1_______________________________ Total Account PROCUREMENT
Job No. 14053 NON-MANUAL LABOR SCHEDULE
MONTH ENDING______________ BYDATE CHECKED________ DATE REVIEWED_______ DATE________
PAGE 13 OF______
M MO. _______ M HRS/MO
SCHEDULED PERIOD
1j
....
1981
______
IS 82
M j j A S o N D j F M A M J J A s o|n D j f|m|a(m|j| j|a|s|o N1D j F M A M J J A s O N D j F M A
M MO.
B
BB i i B 1
1 22
TTP p^pB
B BB B B B
p
--
p
i B BB
PttP p
-
i
BB
bb
-
up III s
PP m --i--t~~ r ---__
r
'
_
S
mm
_S
m u
-
m-m
p
mm
B B
B
B
1
tm
S "
mm
_
_
~
m
m m
"
mm
B
"
B
=== Si
"m
u
BB
uB BB
u
1 19
14 18 12 21 16 22 22 19 18 14 11
6 4
TO GO M HRS.
Ji ]
1
1
$
'
-
__i --i
-- ----
....
__ __ _ T T L[ T__ __ SSI
T = = __ = _ _ ___
3 8 9 io:ff rf n 12 12 12 n 11 13 13 14 If 12 12 12
6
238
i________________
BECHTEL CORPORATION
* HOUSTON PAYROLL
ACCO int
PROJECT CONTROLS
CLASSIFICATIOfv
5 PROJECT CONTROLS SUPV. 55 LEAD COST ENG.
56 COST/SCHD. ENG. PLTFRM 57 COST/SCHD. ENG. OFFPLT
59 60
.-61
70
DATA PROCESS K. P. 0.
LEAD SCHFD. ENG. COST TECHNICIAN
**
**
117 127 118
__"1|
DISTRB/MAT'L COST ENG.
K. P. 0.
AREA COST ENG. SUPV.
&FIELD P S ENG.
Total Account PROJECT CONTROLS
Job NO.
14053__
NON-MANUAL LABOR SCHEDULE
MONTH ENDING________ BYDATE. CHECKEDDATE.
REVIEWED_____ --DATE -
pageJ+lof.
M MO. @
M HRS/Mn
SCHEDULED PERIOD
1 TO GO 1
l 98 1981 1 382
M J J A s o N D j F M A M J J A s O N D jjF m|a[m|j| j
Q
Z
O
V)
J F m|a M J J A s o N D j F M A
--i --
--i= 1
_
s
_.__
MM
1 a
: mm --m S
s" B B
Si =-- S
m 1BS
"3
:B
B
==
_T B
t B
m
B
! F r Bi Bfi Pi B T " B BP B -- -- B B B B B B B ^B B PB B
BB
JM MO. M HRS. ||
$
10 20
17
16 18
17 11
20
17
12 j
jj
19
4 f-----------------1[- ------------i P ^jjT;f7ML
ui 1
c =A
J |_ r
l___
J-
:
--
--
-
-
n
-- r;
-
-
fo}n
T 3 ~6 If
3ll` n fl lTrr TT FiTo iof10 J 8" 4 y
JJ
-- -- _ j 181
j!
L.......
" --------- 1
BECHTEL CORPORATION
** LOCAL HIRE * HOUSTON PAYROLL arrm int TDC CONSTRUCTION
AREA SLJPT. 39 ASST. SUPT.
40 ASST. SUPT. 4L ASST. SUPT. 116 INSTR. SUPT. 120 CONVERSION SUPV.
42 AREA ENG. 43 ASST. ENG. 44 SR. ELECT. ENG.
96 ELECT. ENG. - miw. 97 ELECT. FNG. 98 INSTR. ENG. 99 ELECT. ENG. . CONV.
1QQ_ INSTR. ENG.
101 SR. INSTR. ENG.
102 INSTR. ENG.
121 CALIBRATION ENG.
58 FIELD COST/SCHED. ENG.
90 INSTR. ENG.. rONV.
53 INSTR. ENG. - CONV. *
104 INSTR. ENG. - CONV. *
130 CONV. DRAFTER
** ]
Total Account TDC CONSTRUCTION
Job No. _ 14053 NON-MANUAL LABOR SCHEDULE
MONTH ENDING______________ BY.DATE CHECKEDDATE REVIEWED______ DATE_______
PAGE I OF______
M MO. @_______M HRS/mo
SCHEDULED PERIOD
ib
i nr\ i 13
M j j A s o N D j F M A M J J A S o|n D J F M A MalaBaaiaaB D J F M A M j j A SO N D j F M A
--
a
__ _____
Haaaaiiiiii
Maanpap UbU
---- "TFT
M MO. |
18 14 16 16
9 10
TO GO M HRS. 11
$
ji______
H
j__ i 1 r i
...
--
aa s a 8 IIIH
B == a
m
~
1 1 ma --
B a
mmmmm
~~
"II
jj r
I-t
;
aa
a a _j
n
--
j
ri 1
a
r
*a
i
J Tn BBj
r
ra
au
---
r
T--- 1 j__
Sa MB
c
18 15 16 14 iSlitlPilil
Bjssssm
11 10
7 lllllli 1 12 6
13 7 4 5 i|lill 6
1J_--_-- i r
[j ji
WSSm
i
_ T J 5 7 7 8 TO ~9 14:16 17 Ts 17 18 16 17 13 12 IT Y
228 ______
BECHTEL CORPORATION
** LOCAL HIRE * HOUSTON PAYROLL
ACCOUNT.
TDC DESIGN ENGINEERING
4 TDC DESIGN SUPV. 45 SR. INSTR. DESGR. 46 ASST. DRAFTSMAN
47 INSTR. DESIGNER *
48 INSTR. DESIGNER *
49 SR. ELECT. DESGR. * 50 ELECT. DESIGNER 51 ASST. DRAFTSMAN ** 52 ASST. ELECT. DRAFT.**
53 DRAFTSMAN
*
130 ASST. DRAFTSMAN **
qn ASST. TNSTR. DFS. **
91 DRAFTSMAN 9? DRAFTSMAN
** **
93 DRAFTSMAN
**
103 INSTR. DESIGNER
104 INSTR. DESIGNER
*
105 FI FCT. DESIGNER 106 ELECT. DESIGNER J07 ELECT. DESIGNER
* * *
m DRAFTSMAN 89 CLERK TYPIST
* **
111 CONTROLS COORD. 54 SFCRFTARY 94 ELECT. DESIGNER
** **
Trt+.i
TDC DESIGN ENGINEERING
Job NO.14052
NON-MANUAL LABOR SCHEDULE
MONTH ENDING_________ BYDATE _ CHECKEDDATE __ REVIEWED______ DATE __
PAfiF 1^ OF
M MO. 4
_M HRS/MO
|
--
1 98 (
mmM j j A s o N D j F M A M11
--
SCHEDULED PERIOD ___ 1981
iO
mml nId j|f|m|a|m|j] j|a s 12 N D i F M A M
aa s _
=
B
r * *-------------- 1
m . __ U+WMm
j TO GO
A S 0 N D j F M A M MO.
M HRS. 1
21
20 ,,_________ i i
12 15 16
$
zzzzzmw
fftrL tt
13
7 18 12
a-
s
ytrtwr
mz*
14 7
n
13
3
MB! yyy
yy
11 18
y1
11
yyy
n ~i
y h
lL
rTTi yyyj
"
__1 L
_J
...J
1
yyy
-
wZZZZzzzwi__1__ L
1
1--
n [_
L--
rTrT1 yyy
-- --
w1 1
- 1L
u
1_
r
II" hirn
-
4_
P
-- M- i 1'"
1___
1i r
Lt.
ruuy
Lu l_
i_
1 9 11 9 12
_7
4
- 5 ------ --.--_ 13
10
1___
r
1[ .
'5 7 10 14 15 14 14 2422 2222 232120 u 30y 7 6 T
y = _ _ = __ __ _ _ 289
SUBCOfMTR-A CTS
GARRARD 00000596
n
SUBCONTRACTS SUMMARY
S/C NO.
SUBCONTRACTOR
JOB NO.& TITLE 14053-R0BINSON MODERNIZATION PROJECT CONSTR. 0 ATES 10/80 TO 04/82
niFNT
MARATHON OIL COMPANY
PREPAREE BY
JOB LOCATION ROBINSON, ILLINOIS
DESCRIPTION OF WORK
INSTALLED QUANTITIES
S/C
MAN HOURS
MATL.
S/C COSTS $1000
OTHER COSTS
TOTAL
1 Ledo Constr. Co.
Central Control Room & TemD. Field Office/We rehouse
2 Potter Electric
Temporary Electrical Power
3 Sheehan Pioeline Co. Mobilization & Temporary Facilities
5 Morris Constr. Co.
Relocate Pipewav incl. A/G & U/G pipe
6 Faqqetti & Associates Concrete and Soils testinq
8 Central 11. Public Sen .1500 KVA substation for temp, power
9 Connor & Connor Inc. Survey services
10 Reliance Truck Co.
Equipment for reactor erection
11 AAA Godfrey 13 MAECo
Septic Tank services Plant 16 mass excavation
.
14 Sheehan Pipeline
Temporary facilities and services
15 S & S Inspection 16 MAECo
Weld radioqraphy for FSC-5 Drill qroundwells
17 Potter Electric
Construction Equipment
18 Insulation & Materials Thermal insulation of TDC-2000 instrument p ping
19 Sturm Heatinq and A/C Temporary steam supply header
20 Fuller Truckinq
Trash removal services
21 Brand Insulation, Inc. Plant 16 Equipment and pipino insulation 22 S & S Inspection, Co. Weld Radiography
23 Sturm Heatinq and A/C HVAC for new buildings & control rooms
10148 400.2 349J_ .749.1
2648 14.1 ___4HJL ___ 54.9
3205 11948
376
___41Li_ ___
27.0 ..498,8 _ 525..B
___LL!_ ___ ILA.
11.3
7.5 18.8
464 ____ 8.8. 331 .8 331 .8
11317 142.5
3323
_
8.2 ________ ILiL 484.4 626.9
50.5 50.5
1024
_
____ LJl 41.9 41 .9
6263
________ (LfL ___ Q^fL 19.3 175.6 194.9
165 2.5
4.6 ____ UL
28.1 28.1
40656 646.0 --97.fl.IL JilflJl
1662
46.1 46.1
1770 67.6 49.2 116.8
PAGE
GARRARD 00000597
TOTALS
TOTAL THIS PAGE 94969 1330.5 3161.3 4491 .8
SUBCONTRACTS SUMMARY
SUBCONTRACTS SUMMARY
JOB NO.& TITLE 14053-R0BINS0N MODERNIZATION PROJECT
ciient
MARATHON OIL COMPANY
JOB LOCATION ROBINSON. ILLINOIS
CONSTR. C ATES 10/80Tfl 04/82 PREPARES BY
s/c SUBCONTRACTOR NO.
DESCRIPTION OF WORK
INSTALLED QUANTITIES
S/C MAN HOURS
MATL.
S/C COSTS $1000
OTHER COSTS
TOTAL
24 A & M Insulation, Co. Off Plot pipino & equipment insulation
26 Nooter Corporation
Install reactor internals
27 MAECo
Temp, construction road south of Plant 16
28 Western Stress. Co. Stress relievinq
29 Gillisoie & Powers. Inc Install heater refactorv
30 Bac-Pritchard
Furnish and erect Coolinq Tower
31 Quality Fenco, Co.
Install qate in existinq refinery fence
32 Sturm Heatinq & A/C Water chiller for Central Control Room
33 General Electric, Co. Electrical relay cali bration
34 Martinsville Roofinq Install built-uo composite roofinq
35 Lark Commercial Paintinq Equipment paintinq
36 Halliburton Services Chemical cleaninq of compressor pipinq
37 Lee Kinter & Sons 38 Brooks Erection
Asphalt spray of parkinq lot Rework existing 29C-1
39 MAECo
Snow removal
40 Lark CommerialPaintino Paint heater stacks
41 MAECo
Remove backfill for FSC-10
42 Morris Construction.Co. Pipefitter Labor
43 Hoke Construction. Co. Pipefitter Labor
44 J. L. Allen, Co.
Pipefitter Labor
25167 280.0 420.0 __ZQCLQ.
5927
212.8 212.8
80 3.4 . k.,0 ____ 1A
361 7531 2502
165.8
28.2 ___ 2&^ 275.6 ..275JI
50.2 216.0
16 0.7 0.3 1.0
64 ' 4.8 1 .6 6.4
40 4.0 4.0
1 68 2650 2443
5,2 ___ AA. ____ 9A 7.2 87.8 95.0 _ 45.7 45.7
16 1106
111
0.6 . Q.6 ____ LA 7.2 49.6 56.8 -- 6.1 6.1
899 4.6 15.7 20.3
28854 36725
3.5 ____ IAl 844.0 844.0 _ 1072.0 1072.0
33046
960.0 960.0
PAGE
GARRARD 00000598
TOTALS
TOTAL THIS PAGE 147706 479.5 4088.0 4567.5
SUBCONTRACTS SUMMARY
PHR 1.6-1
&
SUBCONTRACTS SUMMARY
S/C NO.
SUBCONTRACTOR
45 Busch & Latta 46 Duneqan/Endevco 47 Nelson & Keatinq 48 Sheehan Pipeline, Co. 49 Sheehan Pipeline, Co. 50 Sheehan Pipeline, Co. 51 Sheehan Pipeline, Co.
T5A-1 DR. PELLEY 52
JOB NO. & TITLE 14053-R0BINS0N MODERNIZATION PROJECT
miFNT
MARATHON OIL COMPANY
CONSTR. 0 ATES 10/80Tn 04/82
PREPARED BY
JOB LOCATION ROBINSON, ILLINOIS
DESCRIPTION OF WORK
INSTALLED QUANTITIES
S/C MAN HOURS
MATL.
S/C COSTS $1000
OTHER COSTS
TOTAL
Fireproofing steel & vessel supports Acoustic Emissions Testinq Pipefitters labor for loop checkinq Demo bilization
8118
338 1173 2200
114.5
-
115.5
31 .7 33.6 50.0
230.0
31 .7 33.6 50.0
Boilermaker Labor Boilermaker Labor Boilermaker Labor
1696 1699
222
-- -
49.9 49.9
7.0
49.9 49.9
7.0
Medical Services Road Repairs
'.
122 12.2 12.2 129 1 .1 5.3 6.4
SIIRTOTAI
15697 115.6 355.1 470.7
PAGE
GARRARD 00000599
TOTALS
TOTAL SUBCONTRACTS 258372 1925.6 7604.4 9530.0
SUBCONTRACTS SUMMARY
PHR 1.6-1
BECHTEL INCORPORATED REFINERY & CHEMICAL DIVISION
SUBCONTRACT ANALYSIS
JOB NO
14053
CLIENT Marathon Oil Company__________________ LOCATIONRobinson, Illinois
PROJECT Robinson Refinery Modernization CONSTR. DATES 10/80 - 3/81
SUBCONTRACT NO. & TYPE 14053-FSC-l Lump Sum
NAME &A00RESS OF SUBCONTRACTOR
LeDo Construction Company, Inc.___________________________
609 North Jackson Street
Robinson, Illinois 62454
COMP LETE DESCRIPTION OF CONTRACT Revamp of existing Cafeteria into Central Control
Root for TDC-2000 and construction of temporary field office facilities
REMA RKS Field Supervision verv poor due to lack of experience and home office
quidlance. Bechtel was required to virtually direct most phases of the work in
an effort to maintain schedule.
ACCT. NO.
26R01 7m in
DESCRIPTION & SPECIFICATION DATA
CENTRAL CONTROL ROOM TEMPORARY FIELD OFFICE/WAREHOUSE
UNIT
LOT LOT
<si.OOP'S
QUANTITY
TOTAL DOLLARS
1 438.0 1 311.3
S/UNIT
MANUAL MANHOURS
MH/UNIT
438.0 5773 311 .3 4375
5773 4375
None
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
1 AVERAGE .-
I FORCE
1
RCSC 5.17
PEAK . ,, FORCE 18
. HOME OFFICE ' supervision
749.3
10148
RATINGS
,, Average
SUPERVISION , MATERIAL * PROCUREMENT . SCHEDULING ** AND PLANNING
e PRICING AND
processing changes
fi. SHOP DRAWINGS
7. LABOR RELATIONS
a ADEQUACY OF EQUIPMENT
Poor gqqH <Joa _ Poor Average
,,.
Good
Good
NA
9. COOPERATION
1rt QUALITY 10* OF work
Averaae Average
GARRARD 00000600
BECHTEL INCORPO RATED REFINERY & CHE MICAL DIVISION
SUBCONTRAC:t an;\LYSIS
JOB P40. CL1EFSIT LOCkTION
14053 Marathon Oil Company
Robinson, Illinois
PR OJECT Robinson Refinery Modernization
CO NSTR. DATES
8/80 - 1/81
SUBCC NTRACT NO. & TYPE
14053-FSC-2
T &M
NAME R AnnRFSS OF SUBCONTRACTOR Potter Electrical Engineering and Construction Co, Inc
P. 0. Box 3188
Terre Haute, Indiana 47803
COMP LETE DESCRIPTION OF CONTRACT Provide labor and material for temoorarv electrical cons truction as directed by Bechtel
REMA RKS
ACCT. NO.
7015C
DESCRIPTION & SPECIFICATION DATA INSTALL TEMPORARY POWER FACILITIES
$1,000`s
UNIT
QUANTITY
TOTAL DOLLARS
LOT
1
54.9
S/UNIT 54.9
MANUAL MANHOURS
MH/UNIT
2648
2648
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED Boom Truck Hypot
AVERAGE ,,
FORCE
4
FtCSC 5.17
PEAK ,, FORCE 8
54.9
2648
RATINGS
, HOME OFFICE
supervision
,, ,, Excellent
2. SFUIEPLEDRVISION
MATERIAL A PROCUREMENT
. SCHEDULING AND PLANNING
Good _ -- . Excellent
NA
= PRICING AND PROCESSING CHANGES
NA
S. SHOP DRAWINGS
NA
7. LABOR RELATIONS
Excellent
,, ADEQUACY OF " EQUIPMENT
Excellent
9. COOPERATION
Excellent
of wkjrk
Excellent
GARRARD 00000601
BECHTEL INC ORPO RATED
REFINERY & CHEMICA!. DIVISION
SUBCONTRACrr an>^LYSIS
job r\JO. CLIEIMT LOC/kTION
14053 Marathon Oil Company Robinson, Illinois
PR OJECT Robinson Refinery Modernization CC NSTR. DATES 08-12-80 thru 09-30-80
SUBCC1NTRACT NO. A TYPE
14053-FSC-3&14 TIME & MATERIAL
NAME a ADDRESS OF SUBCONTRACTOR Sheehan Pipeline Construction Company, p. 0. Box 352,
1924 South Utica Avenue. Robinson, Illinois 62454
COMP LETE DESCRIPTION OF CONTRACT Construction of iobsite temporary facilities at the
__direction of Bechtel.____ _____________________ ____ _________________________________________________
REMA RKS All work as directed by Bechtel ~ Labor, Material & Rental Equipment __ at c ost plus 10%. __ _______ ________________ ___
ACCT. NO.
70110 70130 7016C 7017C 70231 7025C
DESCRIPTION & SPECIFICATION DATA
TEMPORARY BUILDINGS TEMPORARY ROADS AND PARKING TEMPORARY WATER. AIR & SEWERS MINOR TEMPORARY CONSTRUCTION FIRST DROP MATERIAL HANDLING UNALLOCATED LABOR (JANITORIAL)
UNIT
$1,000's
QUANTITY
TOTAL DOLLARS
49.6
7.3 20.1
6.7 7.4
8.1
S/UNIT
MANUAL MH/UNIT MANHOURS
3264 480
' 1320 440 489 535
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
12* Ton Mobile Crane Case 580 Backhoe Weldinq Machines Water Pump (3 inch)
AVERAGE FORCE
RCSC 5.17
6
PEAK FORCE 12
99.2
- HOME OFFICE ' supervision
RATINGS Excellent
1 supervision
o MATERIAL * PROCUREMENT
. SCHEDULING ** AND PLANNING
Excellent _ ., . Excellent
. N/A
ePRICINGAND PROCESSING CHANGES N/A
a SHOP DRAWINGS
, N/A
7. LABOR RELATIONS Excellent
a ADEQUACY OF
equipment
,, ,. ^ Excellent
9. cooperation
QUALITY
of work
Excellent Excellent
6528 -
GARRARD 00000602
BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION
SUBCONTRACrr an>M.YSIS
JOB sJO. CUE SIT LOCftmON
14053 MARATHON OIL COMPANY ROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION
ccINSTR. DATES 1 0/80-02/81
PKUdttJ 1
SUBCCintract no. a type
14053-FSC-5 LUMP SUM
NAME & address of subcontractor MORRIS CONSTRUCTION COMPANY, INC.
P.0. BOX 3. TUSCOLA, ILLINOIS 61953
COMP LETE DESCRIPTION OF CONTRACT R^lpcate Plant 16 underqround pipe; Relocate pipe
rack; TDC-2000 Data Highway Civil and Structural work.
REMA RKS
ACCT. NO.
mn 16L12 16L70
16M30 16N10 16011 16S95
DESCRIPTION & SPECIFICATION DATA
SMALL BORE RACK PIPING LARGE BORE RACK PIPING UNDERGROUND PIPING STRUCTURAL STEEL PIPERACK PIPE INSULATION FOUNDATIONS DEMOLITION AND EXCAVATION
1 .000's
UNIT
QUANTITY
TOTAL DOLLARS
S/UNIT
MANUAL MANHOURS
MH/UNIT
LF 1380 20.3 14.7 483
0.35
LF 2760 82.5 29.9 1875
0.68
LF 3885 129.2 33.3 2914
0.75
TN 66 80.4 1218.2 1828 27.70
ELF 7147 70.4 9.9 1600
0.22
CY 100 60.5 605.0 1376 13.76
LOT 1 82.5 - 1872
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
CHERRY PICKERS BACKH0E
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
--
. '
HOME OFFICE SUPERVISION
525.8
-
RATINGS
GOOD
11 948
supervision EXCELLENT
1 procurement EXCELLENT
. SCHEDULING
* AND PLANNING AVERAGE
s PRICING AND PROCESSING CHANGES
,,GO,,O,,D
,, SHOP "* DRAWINGS
NA
7. LABOR RELATIONS EXCELLENT
a ADEQUACY OF
8- equipment
EXCELLENT
9. cooperation EXCELLENT
10- ofwkSrk
EXCELLENT
-
GARRARD 00000603
BECHTEL INCORPO RATED REFINERY & CHE MICAL DIVISION
SUBCONTRAG:t an/\LYSIS
JOB 40. 14053 CLiEfMT MARATHON OIL COMPANY LOGAiTION ROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION
CO NSTR. DATES 11/80-02/82
PRJECT
SUBCC NTRACT NO. & TYPE 14053-FSC-6 UNIT PRICE
NAME aAnnRFSS of subcontractor
FAGGETTI AND ASSOCIATES
1700 E. MAIN STREET, OLNEY, ILLINOIS 62450
COMP lete description of contract
Perform soils and concrete testinq.
REMA RKS
ACCT. NO.
16099
DESCRIPTION & SPECIFICATION DATA CONCRETE AND SOILS TESTING
1 ,000's
UNIT
QUANTITY
TOTAL DOLLARS
- 14.4
S/UNIT
MANUAL MANHOURS
MH/UNIT
-
NONE
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
14.4
, HOME OFFICE 'SUPERVISION
RATINGS
FYCFI | FNT
tAUCLLLm
supervision EXCELLENT
1 procurement EXCELLENT
. SCHEDULING
_
* AND PLANNING EXCELLENT
k PRICING AND PROCESSING CHANGES
s. SHOP
DRAWINGS
.N.A.
EXCELLENT
7. LABOR RELATIONS ^
a ADEQUACY OF
8` equipment
EXCELLENT
9. cooperation EXCELLENT
10- OF WORK
EXCELLENT
-
GARRARD 00000604
JOB VJO. CLIE MT LOC/^TION
BECHTEL INC,ORPO RATED
REFINERY & CHE MICA!. DIVISION
SUBCONTRAt3T AN/ALYSIS
14053 Marathon Oil Company
Robinson, Illinois
PR OJECT Robinson Refinery Modernization
CC)NSTR. DATES
10/80 - 11/8d
SUBCCINTRACT NO. & TYPE
14053 -FSC-8 Lump Sum
NAME & ADDRESS OF SUBCONTRACTOR
Central Illinois Public Service Company (CIPS)
711 South Ninth Street Mattoon, Illinois 61938
COMP LETE DESCRIPTION OF CONTRACT Supply and install 1500 KVA Substation for tpmpnra-ry
__ consstruction power____________ _________ _____________________________________________________ ______ ___
REMA RKS
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
7015q Supply and install Substation
Sl.OOO's
UNIT
QUANTITY
TOTAL
dollars
Each
1
18.S
S/UNIT NA
MANUAL MANHOURS
MH/UNIT
376 NA
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
18.8
376
RATINGS
, HOME OFFICE ' supervision , FIELD
supervision
, MATERIAL * PROCUREMENT . SCHEDULING
and planning
s PRICING AND PROCESSING CHANGES
c SHOP ^ DRAWINGS
Excellent E,, xce. l.len.t ,, ,, ^ Excellent
Excellent
NA
NA
7. LABOR RELAT.ONS
Excellent
,, ADEQUACY OF
equipment
Excellent
9. COOPERATION
Good
10- of work
Excellent
GARRARD 00000605
BECHTEL INC ORPO RATED REFINERY & CHE Ml CAL. DIVISION
SUBCONTRAC:t AN>!\LYSIS
JOB sJO. 14053 CLIE \IT Marathon Oil Company LOC>flkTION Robinson, Illinois
PR OJECT Robinson Refinery Modernizatior ccINSTR. DATES
SUBCCJNTRACTNO. & TYPE
14053-FSC-9
Time & Material
NAME a ADDRESS OF SUBCONTRACTOR Connor & Connor, Inc.
Robiicison, Illinois 62454
209 North Cross Street
COMP LETE DESCRIPTION OF CONTRACT Perform professional survey services for installation of p ermanent monuments, boundaries and elevations and other survey services as directed by Bechtel.
REMA RKS None.
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
:$1, pop's___________________________________________
UNIT
QUANTITY
TOTAL DOLLARS
S/UNIT
MANUAL MH/UNIT MANHOURS
All survey oartv members on hourly
70270 rate - All material at cost plus 5% NA
NA
8.5
NA
464
NA
None
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
AVERAGE 0
FORCE
J
RCSC 5.17
PEAK r FORCE 5
8.5 464
RATINGS
, HOME OFFICE ' supervision , FIELD
supervision
, MATERIAL A PROCUREMENT
. SCHEDULING AND PLANNING
b PRICING AND PROCESSING CHANGES
.6 SHOP
" DRAWINGS
Excellent .
Excellent >,
yta
... NA
>T,
NA
7. LABOR RELATIONS
JJA
,, ADEQUACY OF " equipment
Excellent
9. cooperation
Excellent
of work
Excellent
GARRARD 00000606
BECHTEL INC ORPO RATED REFINERY & CHEMICAL. DIVISION
SUBCONTRA(rr an>ALYSIS
JOB MO. CUE MT LOG/!TION
14053 MARATHON OIL COMPANY ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION
cc NSTR. DATES 02/82-03/82
PKUJtU
SUBCCINTRACT NO. & TYPE 14053-FSC-T 0 LUMP SUM NAME & ADDRESS OF SUBCONTRACTOR RELIANCE TRUCK COMPANY
2500 N. 24th AVENUE. PHOENIX, ARIZONIA 85009
COMP lete description of contract
Provide EauiDment and Supervision to offload.
haul, riq and erect Platformer Reactor.
REMA RKS
ACCT. NO.
16C09 1 fiC09
DESCRIPTION & SPECIFICATION DATA
ERECT PLATFORMER REACTOR TEST WEIGHTS
(EXCLUDES BACKCHARGE FOR $28,600 CREDITED TO BECHTEL LABOR AND CONSTRUCTION EQUIPMENT1
UNIT
1,000's
QUANTITY
TOTAL DOLLARS
319.1
.. 13.7
S/UNIT
MANUAL MANHOURS
MH/UNIT
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
HEAVY LIFT CRANE
AVERAGE FORCE RCSC 5.17
PEAK FORCE
331 .8
RATINGS
1
HOME OFFICE SUPERVISION
nAUvtCKDAflCbCt
1 supervision EXCELLENT
> MATERIAL
____
* PROCUREMENT GOOD
. SCHEDULING
AND PLANNING GOOD
= PRICING ANO
PROCESSING CHANGES AVERAGE
a SHOP
* DRAWINGS
AVERAGE
7. LABOR RELATIONS
a ADEQUACY OF
" EQUIPMENT GOOD
9. COOPERATION AVERAGE
10- of wkJrk
EXCELLENT
GARRARD 00000607
't1'!
- BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION
SUBCONTRAC:t AN/\LYSIS
job r^0. 14053
CLIEiMT MARATHON OIL COMPANY LOCAkTION ROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION
CC NSTR. DATES 09/80-04/82
HKUJtU
SUBCCINTRACT NO. & TYPE
14053-FSC-11
UNIT PRICE
NAME a AnnRFSS df subcontractor AAA GODFREY SEPTIC TANK SERVICE
P.0. BOX 583. VINCENNES. INDIANA 47591
COMP lete description of contract
Seotic Tank Service
REMA RKS
.
_1 .OOP's
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
70160 SEPTIC TANK PUMPING
UNIT
QUANTITY
TOTAL DOLLARS
8.2
S/UNIT
MANUAL MANHOURS
MH/UNIT
NONE
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
FICSC 5.17
PEAK FORCE
8.2
, HOME OFFICE ' SUPERVISION
RATINGS
,, . iNA
Z supervision EXCELLENT
MATERIAL PROCUREMENT
NA
. SCHEDULING AND PLANNING FXf!FI 1 FNT
b PRICING AND
...
PROCESSING CHANGES NA
DRAWINGS
NA
7. LABOR RELATIONS
B ADEQUACY OF
8- equipment
EXCELLENT
9. COOPERATION pxf!Fl 1 FNT
10-of work
EXCELLENT
-
GARRARD 00000608
. BECHTEL INC ORPO RATED REFINERY & CHE MICA1. DIVISION
SUBCONTRAt:t an>4LYSIS
JOB NO. CLIE NT LOC/kTION
14053 Marathon Oil Company
Robinson, Illinois
PR OJECT Robinson Refinery Modernization
ccINSTR. DATES
11/80-3/81
SUBCCINTRACT NO. & TYPE NAME & address of subcontractor
14053-FSC- 13
T&M
MAECo P. 0. Box 504 Lawrencevil 1 e, Illinois 6243
COMP lete description of contract Mass excavation of Plant 16 Acid Soil, haulinq contami nated soil to offsites disposal area includinq qradinq and covering with lime. haulinq aDproved backfill from MAECo suopliers and compaction to minimum of 9M modified proctor.: REMA RKS Backfill operations included mixino hvdrated lime (supplied bv Bechtel) for neutralization of acidic soil.
Sl.OOO's
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
UNIT
QUANTITY
TOTAL DOLLARS
S/UNIT
MANUAL MANHOURS
MH/UNIT
70130 TEMPORARY ROADS AND PARKING
CY
16S11 EXCAVATION AND DISPOSAL (calculated CY
volume)
1263 17967
27.0 193.1
21.4 10.7
670 4495
0.25
16S12 BACKFILL MATERIAL-CLAY SAND
ROCK&GRAVEL (For buildino road to disposal area)
CY
CY CY
855(1 5234
3319
57.7 45.0 39.8
6.75 8.60
12.00
15S12 BACKFILL & COMPACTION (calculated CY 9695 264.3 ... 27.3 6152 0.64
volume)
NOTE: Approximately 2500 CY of newl v ola ed sa turated fill wa s remov id and r solaced. -- Remainino volume discreoencv resul .s fro m differ ence be tween c. il cul ate i com-
pacted volume and loose purchased ol ume
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
5 Dumptrucks, 4 End Loaders, 3 Dozers, 2 Backhoes, 1 Vibratory Roller, 1 Farm Tractor with disc.
AVERAGE FORCE
RCSC 5.17
,_
15
PEAK FORCE
,,,, ^
626.9
RATINGS
11317
1- supervision
supervision
1 procurement . SCHEDULING * AND PLANNING 5. PRICING AND
processing changes
a. SHOP DRAWINGS
7. LABOR RELATIONS 8a- AEDQEUQIPUMAECNYT OF
9. cooperation
Excellent Excellent Excellent
Nfl tFxycreeilli epnnct Mfl
Excel 1 ent Ftxxcreeililepnnct Excellent
10-OF WORK
Excellent
GARRARD 00000609
JOB MO. CLIE NY
LOC/kTION
BECHTEL INC:orpo RATED REFINERY & CHE MICAl. DIVISION
SUBCONTRAt:t an><\LYSIS
14053 Marathon Oil Company
Robinson. Illinois
PR OJECT Robinson Refinery Modernization
cc)NSTR. DATES
2/81 - 4/81
SUBCCJNTRACT NO. & TYPE
14053-FSC-15
T & M and UP
NAME & ADDRESS OF SUBCONTRACTOR S & S Inspection Company
P. 0 Rnx 671
Lawrenceville, Illinois 62439
COMP LETE DESCRIPTION OF CONTRACT Provide weld radiography for Subcontract 14053-FSC-5
pipe5rack relocation as directed by Bechtel.
REMA RKS
ACCT. NO.
16L92
DESCRIPTION & SPECIFICATION DATA Weld RadioaraDhy
UNIT
$1,000's
QUANTITY
TOTAL DOLLARS
S/UNIT
2.5
MANUAL MANHOURS
MH/UNIT
*
-
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
Radiographic Equipment
AVERAGE FORCE RCSC S.17
,,
2
PEAK
,,
FORCE 2
2.5
RATINGS
, HOME OFFICE
supervision
,, ,, ^
Excellent
2* supervision
Excellent
, MATERIAL
* PROCUREMENT
. SCHEDULING AND PLANNING
= PRICING AND PROCESSING CHANGES
a SHOP
DRAWINGS
NA
NA
NA ,,N,,A
7. LABOR RELATIONS
^
% - ADEQUACY OF
equipment
,,
Excellent
9. cooperation
Excellent
ln QUALITY
10- OF WORK
.
Good
GARRARD 00000610
BECHTEL INCORPORATED , REFINERY & CHEMICAL DIVISION
SUBCONTRACT ANALYSIS
JOB NO. 14053 CLIENT . Marathon Oil Company
LOCATION Robinson, Illinois
PROJECT Robinson Refinery Modernization CONSTR. DATES Jan. 81 - April 81
subcontract no. & type 14053-FSC-16 hump Sum w/Unit Price adds & deducts
NAME & ADDRESS OF SUBCONTRACTOR MAECo Lawrenceville, Illinois 62439
500 N. 15th Street P. 0. Box 504
complete description OF CONTRACT Drilling of Groundwells 120' to 180' deep and providing and installing casing in each well - total of seven (7) wells (8" 0)
REMARKS__ The overall abilities, desire for cooperation and performance of work to high standards of workmanship makes MAECo a desirable Subcontractor. They will rgnain on our Bidder's List for any work within their area of interest.
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
UNIT
QUANTITY
TOTAL DOLLARS
S/UNIT
MANUAL MANHOURS
MH/UNIT
Drilling 7 Wells 150' Deep Each Add/L.F. for Wells over 150' Deep
Deduct/L.F. for Wells Less Than 1507 Deep
Lot 42.000 NA.
LF 30 LF "TSO
1.200 $40 (1600) $20
1024
NA
NA
NA
Standby Time for BPI Testins of Well k hr 12
son $50
NA
Extra Mobilization to Clear Wall TS Tot 1 r534 NA
NA
TOTAL
41 ,934
1024
ALLOCATION 16P41 PLANT 16 fl welll 26P41 PLANT 50 (6 well si
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
1 Each Well Drilling Rig
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
6.0 35.9
146 878
41 .9
1024
RATINGS
. HOME OFFICE ' SUPERVISION
FIELD SUPERVISION
MATERIAL PROCUREMENT
SCHEDULING AND PLANNING
Excellent Excellent Excellent
Excellent
PRICING AND PROCESSING CHANGES
SHOP DRAWINGS
Excellent NA
7. LABOR RELATIONS
.8
ADEQUACY OF EQUIPMENT
Excellaat Excellent
9. COOPERATION
Excellent
.10
QUALITY OF WORK
Excellent
GARRARD 00000611
BECHTEL INC ORPO RATED .
REFINERY & CHE MICAL. DIVISION
SUBCONTRAC:t an>!\LYSIS
JOB MO. yj-j-
CLIE
14053 Marathon Oil Company
LOCfikTION Rt)inson, Illinois
PR OJECT Robinson Refinery Modernizatic
INSTR. DATES Pr0:]eCt 12/80 to 4/81 CC
SUBCCINTRACT NO. & TYPE
14053-FSC-17
Unit Price
NAME & ADDRESS OF SUBCONTRACTOR
Rotter Electrical Eng. a Construction Co. Inc.
COMP LETE DESCRIPTION QF CONTRACT
Ren tal Aareement.
Operated & Maintained Construction Equipment
REMA RKS
ACCT. NO.
700313
DESCRIPTION & SPECIFICATION DATA
Power Pole Earth Auqer Rental (Pole Cat) (Total of 14 hours)
tl .nnn'c
UNIT
QUANTITY
TOTAL DOLLARS
1 Lot NA
0.6
S/UNIT
NA
MANUAL MANHOURS
MH/UNIT
NA NA
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
1 Each Pole Cat
AVERAGE
FORCE
i
FtCSC 5.17
PEAK FORCE
1
0.6
RATINGS
, HOME OFFICE SUPERVISION
2. field
SUPERVISION
j woa
G__O__O_d.
, MATERIAL A PROCUREMENT
,,
NA
. SCHEDULING AND PLANNING
NA
5. PRICING AND PROCESSING CHANGES
"e
SHOP DRAWINGS
NA
Ml
7. LABOR RELATIONS
9*
ADEQUACY OF
equipment
Good
Excelilen+t
9. COOPERATION
Excellent
in QUALITY of work
_ .. .
Excellent
GARRARD 00000612
BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION
SUBCONTRACIT AN/\LYSIS
JOB PJO. 14053 CLIEIMT MARATHON OIL COMPANY LOCAkTION ROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION
CC NSTR. DATFS 04/81-01/82
PROJECT
SUBCCINTRACT NO. & TYPE
1 4053-FSC-1 8 T&M
NAME a address of subcontractor
INSULATING AND MATERIALS CORPORATION
1042 CENTRAL INDUSTRIAL DRIVE. ST. LOUIS. MISSOURI 63110
COMP lete description of contract
Provide labor and material for thermal insulation
of TDC-2000 Instrument Pi Dina.
REMA rks
Field Supervision made little effort in obtaining the desired level of Droductivitv from insulators.
ACCT. NO.
16N1 0
DESCRIPTION & SPECIFICATION DATA PI ANT 16 PIPE INSULATION
UNIT
FI F
1 ,000's
QUANTITY
TOTAL DOLLARS
2268 10.0
S/UNIT
MANUAL MANHOURS
MH/UNIT
4.41 . 319
o;t4
26N10 TDC-2000 INSTRUMENT PIPING
ELF 16709 184.9 11 .07 5944
INSULATION
0736
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
NONE
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
ELF 18977 194.9 10.27
RATINGS
. HOME OFFICE 1- supervision , FIELD
SUPERVISION
3^ MATERIAL A PROCUREMENT
. SCHEDULING
** AND PLANNING
AVERAGE
POOR pGnOnOnD
...
NA
b PRICING AND PROCESSING CHANGES
.N.A.
e. shop DRAWINGS
NA
7. LABOR RELATIONS
GOOD
ADEQUACY OF M.
EQUIPMENT
NA
9. COOPERATION pQQR
1100*
QUALITY OF WORK
nGnOnOD
6263
0.33
GARRARD 00000613
BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION
SUBCONTRAC:t AN;ALYSIS
JOB MO. 14053 CLIE NT Marathon Oil ComDanv LOCAkTION Robinson, Illinois
PR OJECT Robinson Refinery Modernization cc1NSTR. DATES 1/9/81 -8/31/81
SU8CCINTRACT NO. & TYPE
14053-FSC-19 T & M
NAME & address of subcontractor Sturm Heating and Air Conditioning
501 S outh Webster Robinson, Illinois 62454
COMP lete description of contract Furnish material, fabricate and erect temoorarv
stecim suddIv header for winter concrete Drotection.
REMA RKS Extremely well aualified and cooDerative Subcontractor. Oualitv of worknlanship and follow-up on warranty repairs excellent.'
ACCT. NO.
701 90
DESCRIPTION & SPECIFICATION DATA TEMPORARY STEAM HEADER
UNIT
SI,OOP's:
QUANTITY
TOTAL DOLLARS
7.1
S/UNIT
MANUAL MANHOURS
MH/UNIT
165
None
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
co
aCSC 5.17
PEAK FORCE
,,^
7.1
RATINGS
165
1- supervision
z supervision
x procurement
. SCHEDULING
and planning
5. PRICING AND PROCESSING CHANGES
S".
SHOP DRAWINGS
7. LABOR relations
3.
ADEQUACY OF EQUIPMENT
9. cooperation
Excellent Excellent
Excellent
Excel 1 ent
FycpIIPnt 1 1 ent
.N. /,A. Excellent
m/a 'v
Excellent
10-ofw)RK
Excellent
GARRARD 00000614
BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION
SUBCONTRAC:t an>^LYSIS
JOB MO. 14053 CUE MT ___ MARATHON OIL COMPANY LOCAmON ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION CCINSTR. DATES 01 /81 -04/82PROJECT
SUBCCINTRACT NO. & TYPE
14053-FSC-20 UNIT PRICE
NAME & ADDRESS OF SUBCONTRACTOR
FULLER TRUCKTNfi
P.0. BOX 201. ROBINSON. ILLINOIS 62454
COMP lete description of contract
Trash removal services.
REMA RKS
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
/ 0 1 60 HTOTKEHOVAL SERVICES---------------------
UNIT
1,000's
QUANTITY
TOTAL DOLLARS
28.1
S/UNIT
MANUAL MANHOURS
MH/UNIT
NONE
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
28.1
. HOME OFFICE SUPERVISION
RATINGS
AA\V/FtKPAflbrFt
2. FIELD
SUPERVISION
ma
NA
*,
MATERIAL PROCUREMENT
. SCHEDULING
** AND PLANNING
.N.A. NA
=
PRICING AND PROCESSING CHANGES
NA
a SHOP DRAWINGS
IMA
7. LABOR RELATIONS |y|A
,, ADEQUACY OF . EQUIPMENT
AVERAGE
9. COOPERATION AVERAGE
10"
QUALITY OF WORK
NA
GARRARD 00000615
BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION
SUBCONTRAC:T AN;ALYSIS
JOB MO. 14053 CLIE NIT MARATHON OIL COMPANY LOCfimON ROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY M0DERNT7ATT0N CCINSTR. DATFR 10/81 - 09/82 PROJECT
SUBCC3NTRACT NO. & TYPE 14053-FSC-21____LUMP SUM & UNIT PRICE_______________________________ NAME & ADDRESS OF SUBCONTRACTOR ____ BRAND INSULATIONS. INC'.___________________________________________
1420 RENAISSANCE DRIVE PARK RIDGE, ILLINOIS 60068
COMP letedescription of contract Thermal Insualtion of eauiDment and DiDina in Area "A".
REMA RKS
ACCT. NO.
16N10 16N20
DESCRIPTION & SPECIFICATION DATA
PIPE INSULATION EOUIPMENT INSULATION
$1,0001s
UNIT
ELF SF
QUANTITY
TOTAL DOLLARS
64047 1035.0 29391 581 .0
S/UNIT
MANUAL MH/UNIT MANHOURS
16.2 28899 0.45
19.8 11757 0.40
-
NONE
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
ft CSC 5.17
JO
PEAK FORCE
,J,o-
1616.0
40656
RATINGS
- HOME OFFICE 1* supervision
, FIELD
supervision
, MATERIAL PROCUREMENT
. SCHEDULING AND PLANNING
5 PRICING AND PROCESSING CHANGES
e SHOP DRAWINGS
cEXvCrcEiLLi EcNmTt
__ ___
GOOD ROOD AVERAGE
AVERAGE NA
7. LABOR RELATIONS
,
o ADEQUACY OF EQUIPMENT
9. COOPERATION
QUALITY 10- of work
IMfl
AVERAGE
EXCELLENT
GARRARD 00000616
BECHTEL INC ORPO RATED REFINERY & CHE M1CA1.DIVISION
SUBCONTRACrr an>ALYSIS
JOB MO. 14053 CLIE NT MARATHON OIL COMPANY LOCfimON ROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATIO!^
CCINSTR. DATES 06/81-05/82
PROJECT
SUBCCINTRACT NO. & TYPE
14053-FSC-22 UNIT PRICE
NAME & ADDRESS OF SUBCONTRACTOR S & S INSPECTION COMPANY
P.0. BOX 671, LAWRENCEVILLE, ILLINOIS 62439
COMP lete description of contract
Weld X-Ray Services
REMA RKS
ACCT. NO.
16L92
DESCRIPTION & SPECIFICATION DATA WELD RADIOGRAPHY
UNIT
LOT
1 .000's
QUANTITY
TOTAL DOLLARS
1 46.1
S/UNIT
MANUAL MANHOURS
MH/UNIT
46.1 1662 1662
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
X-RAY UNIT
AVERAGE FORCE
RCSC 5.17
o ^
PEAK FORCE
c 0
46.1
1662
.'
HOME OFFICE SUPERVISION
RATINGS AVFRAfiF AVtKAbt
z supervision
AVERAGE
X PROCUREMENT
EXCELLENT
. SCHEDULING
^ AND PLANNING
EXCELLENT
c
PRICING AND PROCESSING CHANGES
AVERAGE
15 SHOP DRAWINGS
...
NA
7. LABOR RELATIONS
8 ADEQUACY OF
equipment
9. cooperation
cv... , ....
EXCELLENT EXCELLENT
10- ofwrk
EXCELLENT
GARRARD 00000617
BECHTEL INC ORPO RATED REFINERY & CHE MICA1. DIVISION
SUBCONTRAt:t AN/ALYSIS
JOB NO. CUE NT LOCAkTION
14053 MARATHON OIL COMPANY ROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATIOP'
CC1NSTR. DATFR 10/81-04/82
TMJECT
SUBCCintract no. & type
14053-FSC-23 LUMP SUM
NAME & address OF subcontractor
STURM HEATING AND AIR CONDITIONING
Rm S WFRSTFR. ROBINSON. ILLINOIS 62454
COMP lete description of contract
Air conditioninq and pressurization units for
new Dermanent plant buildings and rework of Air Conditioning systems
in pviat.ing plant control rooms.
REMA RKS
_1 .OOP's
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
16R70 PLANT 16 CONTROL ROOM HVAC 16R70 PLANT 16 SUBSTATION BLDG. HVAC
16R70 PLANT 16 BOILER FEEDWATER BLDG. HVA
23R70 PLANT 23 SWITCHGEAR ROOM HVAC 32R70 PLANT 32 CHEM. INJECT. BLDG. HVAC
26R70 REVAMP CONTROL ROOM #3 HVAC 2fiR7n REVAMP CONTROL ROOM #4 HVAC 26R7C REVAMP COKER CONTROL ROOM HVAC
UNIT
LOT LOT LOT LQT LOT LQT
1 OT LOT
QUANTITY
TOTAL DOLLARS
1 53.6 1 6.6
1 6.6
1 7.1 1 9.8
1 23.0 1 2.3 1 7.8
S/UNIT
MANUAL MANHOURS
MH/UNIT
887 97
94
112 171
225
36 148
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
NONE
AVERAGE FORCE
aCSC 5.17
PEAK FORCE
> 116.8
i HOME OFFICE 1- supervision
RATINGS
EXCELLENTrYpci i pkit
z supervision
MATERIAL a PROCUREMENT
, SCHEDULING AND PLANNING
EXCELLENT EXCELLENT GOOD
=
PRICING AND PROCESSING CHANGES
G,,O,,,,O,,D
C SHOP
drawings
AVERAGE
7. LABOR RELATIONS EXCELLENT
ADEQUACY OF EQUIPMENT
...
NA
9. cooperation
EXCELLENT
10- ofwSk
excellent
1770
GARRARD 00000618
I _>
BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION
SUBCONTRAC:T AN;ALYSIS
JOB MO. 14053 CUE MT MARATHON OIL COMPANY
LOC/OTON RQBINSQN. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATIC
CCINSTR. DATES 12/81 - 07/82
PR0JEC
SUBCCintractnd rtypp 14053-FSC-24
LUMP SUM & UNIT PRICE
NAME & ADDRESS OF SUBCONTRACTOR
A. & M INSULATION CO. '
261 4 CLYBOURN AVENUE
CHICAGO. ILLINOIS 60614
COMP lete description of contract
Thermal Insulation of equipment and pipinq in Area "B*
REMA RKS
ACCT. NO.
Nin N?n
DESCRIPTION & SPECIFICATION DATA
PIPE INSULATION
FQIITPMFNT TN^Ill atton
'
UNIT
ELF SF
si.ooo's
QUANTITY
TOTAL DOLLARS
S/UNIT
49771 550.0 11 .1 12288 150.0 12.2
MANUAL MANHOURS
MH/UNIT
1 9095 0.38
6072 0.49
NONE
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
700.0
25167
u, HOME OFFICE SUPERVISION
RATINGS
GOOD
, supervision MATERIAL PROCUREMENT
. SCHEDULING
4- AND PLANNING
5 PRICING AND PROCESSING CHANGES
EXCELLENT AVERAGE ROOD ROOD
6 SH0P DRAWINGS
.N.A.
7. LABOR RELATIONS
ROOD
a ADEQUACY OF EQUIPMENT
NA
9. cooperation
EXCELLENT
10- of work
EXCELLENT
GARRARD 00000619
4-
BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION
SUBCONTRA(:t an>^LYSIS
JOB MO. CLIE \IT LQCfikTION
14053 MARATHON OIL COMPANY ROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATIOI
CCINSTR. DATES 10/81-04/82
PKUJtU
SUBCCJNTRACT NO. & TYPE
14053-FSC-26
LUMP SUM
NAME & ADDRESS OF SUBCONTRACTOR
NOOTER CORPORATION
1400 S. THIRD STREET. ST. LOUIS, MISSOURI
63166
COMP lete description of contract Weld skirt to Platforming Reactor and install
________ Reactor internals.______________ _____________________________________
REMA RKS
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
16C09 INSTALL REACTOR INTERNALS
UNIT
1,000's
QUANTITY
TOTAL DOLLARS
212.8
S/UNIT
MANUAL MANHOURS
MH/UNIT
5927
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
NONE
AVERAGE FORCE
RCSC 5.17
.
PEAK FORCE
21778
5927
, home office SUPERVISION
RATINGS
rUnUnUnU
z supervision
EXCELLENT
1 PROCUREMENT
. SCHEDULING
* AND PLANNING
K PRICING AND PROCESSING CHANGES
8".
SHOP DRAWINGS
EXCELLENT
______
GOOD
AVERAGE NA
7. LABOR RELATIONS
EXCELLENT
a ADEQUACY OF EQUIPMENT
NA
9. cooperation
EXCELLENT
,n QUALITY
** of work____________ EXCELLENT_______________
GARRARD 00000620
---
job rslO.
CLIETsjt LOCAiTlON
BECHTEL INCORPO RATED REFINERY & CHE MICAL DIVISION
SUBCONTRAC:t an;\LYSIS
14053 Marathon Oil Company
Robinson, Illinois
PR OJECT Robinson Refinery Modernization
CO NSTR. DATES
6/15/81 - 6/19/81
SUBCCINTRACT NO. & TYPE aNAME address of subcontractor
14053-FSC-27
LUMP SUM
MAECo P. 0. Box 504 Lawrencevi 11 e, Illinois 6243
COMP lete description of contract
PI arit 16
Construction of temporary road on south side of
REMA RKS
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA Cnnst.riiction of temporary road
$1,000's
UNIT
QUANTITY
TOTAL DOLLARS
S/UNIT
TONS 340
9.4 27.6
MANUAL MH/UNIT MANHOURS
80 0.24
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
2 Dumptrucks, 1 End Loader, 1 Grader, 1 Rol 1 er
; AVERAGE
FORCE
ftCSC 5.17
-
5
PEAK FORCE
c
P
TONS 340
9.4 27.6 80
RATINGS
,`HsuOpMeErOvFisFiIoCnE
FtxycrepUuepnntt
z supervision , MATERIAL
x procurement
*
SCHEDULING AND PLANNING
*C PRICING AND processing changes
S. SHOP drawings
7. labor relations
a ADEQUACY OF 8> equipment
9. cooperation
Excellent Excel 1 ent Fxrpl 1 pnt
tXCe 1 1
txceiient
NAM/I Excellent ctxycrPeni ipenmt; Excellent
10-of work
Excellent
0.24
GARRARD 00000621
BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION
SUBCONTRAC:t an>^LYSIS
JOB NO. 14053 CLIE \IT MARATHON OIL COMPANY LOCAkTIONROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION
ccINSTR. DATES 10/81-04/82
PROJECT
SUBCCINTRACT NO. & TYPE
14053-FSC-28
UNIT PRICE
NAME & ADDRESS OF SUBCONTRACTOR WESTERN STRESS, INC.
3215 W. 127th STREET. BLUE ISLAND. ILLINOIS 60406
COMP LETE DESCRIPTION OF CONTRACT StrgSS relieving of 1-1/4% Chrome Pipe weld-;.
REMA rks Western Stress provided the equipment and a technician. Bechtel provided the 1 abor (3000 mhrsl to run the cables and wrap the pipe.
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
16L91 STRESS RELIEVING
UNIT
Dl
1,000's
QUANTITY
TOTAL DOLLARS
2417 28.2
S/UNIT
n .7
MANUAL MH/UNIT MANHOURS
361 0.15
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
SELF CONTAINED STRESS RELIEVING UNIT.
AVERAGE FORCE
RCSC S.17
PEAK FORCE
Dl 2417 20" 'll .7 361 0.15
RATINGS
supervision
EXCELLENT
supervision
EXCELLENT
3_ MATERIAL
.
* PROCUREMENT NA
. SCHEDULING
'* AND PLANNING
EXCELLENT
5. PRICING AND PROCESSING CHANGES
NA
6. SHOP DRAWINGS
NA.
7. LABOR RELATIONS^^
9 ADEQUACY OF
3- equipment
EXCELLENT
9. cooperation
EXCELLENT
10* of w5k
EXCELLENT
GARRARD 00000622
BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION
SUBCONTRAC:t an>^LYSIS
JOB NO. 14053 CLIE NT MARATHON OIL COMPANY LOCfikTION ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATIOI'
ccINSTR. DATRS 02/82-04/82
PRWECT
SUBCCINTRACT NO. & TYPE
14053-FSC-29
LUMP SUM
NAME & ADDRESS OF SUBCONTRACTOR GILLESPIE AND POWERS, INC.
9550 TRUE DRIVE, ST. LOUIS, MISSOURI 63132
COMP lete description of contract Install refractory In fired heaters.
REMA RKS
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
6F40 INSTALL REFACTORY 16F-1. 2. 4 16F40 INSTALL REFACTORY 16F-3
23F40 INSTALL REFACTORY 23F-1
UNIT
$F
SF
5F
1.000's
QUANTITY
TOTAL DOLLARS
1188 22068
1875
10.2 249.3
16.1
S/UNIT
MANUAL MANHOURS
MH/UNIT
8.60 11 .30
8.60
280 6811
440
0.24 0.31 0.24
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
NONE
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
SF 25131 275.6 10.97
.'*
HOME OFFICE SUPERVISION
RATINGS
rnnn
faUUU
supervision
, MATERIAL A PROCUREMENT
. SCHEDULING
** AND PLANNING
EXCELLENT .NA
AVERAGE
k PRICING AND PROCESSING CHANGES
6. SHOP DRAWINGS
.N.A.
AVERAGE
7. LABOR RELATIONS Q000
a ADEQUACY OF
EQUIPMENT
.
NA
9. cooperation
EXCELLENT
QUALITY
10-of work
EXCELLENT
7531
0.30
GARRARD 00000623
\
BECHTEL INC ORPO RATED REFINERY & CHE MICAL.DIVISION
SUBCONTRAC:t an;\LYSIS
JOB PJO. CLIEIMT L0C4kTION
14053 Marathon Oil Company
Robinson, Illinois
PR OJECT Robinson Refinery Modernization CO NSTR. DATES 8/18/81 - 11/27/81
SUBCCINTRACT NO. R TYPE
14053-E-30
Lump Sum
NAME & ADDRESS OF SUBCONTRACTOR BAC-Pritchard, Inc.
P. C). Box 7322 Baltimore, Maryland 21227
COMP LETE DESCRIPTION QF CONTRACT Furnish and erect Coolincr Tower
REMA RKS The ratines shown below are for after BAG chanqe in suoervision on Sept.ember 8, 1981. Field Supervision and Labor Relations poor prior to this date.
ACCT.
NO.
DESCRIPTION & SPECIFICATION DATA Lump Sum Price
51 ,000's
UNIT
QUANTITY
TOTAL DOLLARS
216.0
S/UNIT
MANUAL MANHOURS
MH/UNIT
2502
None
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
RCSC 5.17
,,,
12
PEAK FORCE
,,,
18
216.0
2502
. RATINGS
. HOME OFFICE 1- supervision 2. field
SUPERVISION
_ .,
Excellent Excellent
x PROCUREMENT
. SCHEDULING and planning
Excellent
_,
Excellent
5 PRICING AND PROCESSING CHANGES
a SHOP
" drawings
NA Excellent
7. LABOR RELATIONS
a ADEQUACY OF EQUIPMENT
Excellent
NA -
9. cooperation
Excellent
in QUALITY
10- of work
_ ...
Excellent
GARRARD 00000624
T\ ^ .
-"1
JOB MO. CLIE NT LOC/3kTION
BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION
SUBCONTRACIT AN>iVLYSIS
14053 Marathon Oil Company
Robinson, Illinois
PR OJECT Robinson Refinery Modernizatior
CCINSTR. DATES
8/1/81 - 9/1/81
SUBCCINTRACT NO. & TYPE
1405 3-FSC-31
Lump Sum
NAME & ADDRESS OF SUBCONTRACTOR 'Quality Fence Company
1515 Lafayette Avenue Terre Haute, Indiana 47804
COMP LETE DESCRIPTION OF CONTRACT Refinery perimeter fence.
Install one double leaf 32 foot crate in existincr
REMA RKS
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
1 Ea. 32' fiatfar Pahri rs-ha anH Install
UNIT
$1,000's
QUANTITY
TOTAL DOLLARS
1 .0
S/UNIT
MANUAL MANHOURS
MH/UNIT
16
None
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
3CSC 5.T7
3
PEAK FORCE
3
I .d RATINGS
16
supervision
^ supervision , MATERIAL A PROCUREMENT . SCHEDULING
and planning
e PRICING AND PROCESSING changes
B SHOP " DRAWINGS
7. LABOR RELATIONS
a ADEQUACY OF " EQUIPMENT
9. COOPERATION
Excellent Excellent _ .. , Excellent
n .. . Excellent
na
NA Good
NA Excellent
of work
Excellent
GARRARD 00000625
"N
JOB MO. CLIE MT LOC4kTIQN
BECHTEL INC ORPO RATED
REFINERY & CHE MICAL. DIVISION
SUBCONTRAC:t an>i\LYSIS
14053 Marathon Oil Company
Robinson, Illinois
PR OJECTRobinson Refinery Modernization CCINSTR. DATFS 7/15/81 - 8/15/81
SUBCC1NTRACTNO. R TYPE
14053-FSC-32
Lump Sum
NAME & ADDRESS OF SUBCONTRACTOR Sturm Heating and Air Conditionina
501 South Webster
Robinson, Illinois
COMP LETE DESCRIPTION OF CONTRACT Supolv and install one chilled water air conditioning
unit: in Central Control Room Battery Room
REMA RKS
ACCT. NO.
26R70
DESCRIPTION & SPECIFICATION DATA
Supply anH install nnp rhillf=d water unit
$1,000's
UNIT
QUANTITY
TOTAL DOLLARS
S/UNIT
1 LOT
6.4
-
MANUAL MANHOURS
64
MH/UNIT
*
None
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
AVERAGE .
FORCE
l
RCSC 5.17
PEAK FORCE
. 3
6.4 64
RATINGS
. HOME OFFICE
. supervision
2 FIELD
supervision
, MATERIAL * PROCUREMENT . SCHEDULING
and planning
e PRICING AND PROCESSING CHANGES
fi. SHOP DRAWINGS
,,
, ,Excellent
Excellent _ .. . Excellent ,, ,, ^ Excellent
NA ,, NA
7. LABOR RELATIONS
Excellent
ADEQUACY OF EQUIPMENT
NA
9. COOPERATION 1ft QUALITY
OF work
Excellent ,, Excellent
GARRARD 00000626
BECHTEL INC:orpo RATED REFINERY & CHE MICAl. DIVISION
SUBCONTRA(:T ANi4LYSIS
JOB MO. 14053 CLIE NT ___ MARATHON OIL COMPANY LOG/MION ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATIOf
CC)NSTR. DATES 1 2/81 -03/82
PR0JECT
SUBC(intract no. & type
14053-FSC-33 UNIT PRICE
NAME & ADDRESS OF SUBCONTRACTOR GENERAL ELECTRIC COMPANY
1811 EXECUTIVE DRIVE. SUITE A INDIANAPOLIS, INDIANA 46241
COMP lete description of contract Calibration and testing of electrical relays.
REMA RKS
ACCT. NO.
26P
DESCRIPTION & SPECIFICATION DATA ELECTRICAL RELAY CALIBRATION
UNIT
,000's
QUANTITY
TOTAL DOLLARS
4.0
S/UNIT
MANUAL MANHOURS
MH/UNIT
40
NONE
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
4.0 40
.'SHUOPMEERVOIFSFIOICNE
RATINGS
FLAYCCFLILL1 LEIN'I T1
1 supervision
EXCELLENT
*,
MATERIAL PROCUREMENT
.N.A.
. SCHEDULING
* AND PLANNING
NA
=
PRICING AND PROCESSING CHANGES
NA.
b SHOP
* drawings
EXCELLENT
7. LABOR RELATIONS
a"
ADEQUACY OF
equipment
EXCELL, E..N.T.
9. cooperation
EXCELLENT
,0- of work___________ EXCELLENT________________
GARRARD 00000627
BECHTEL INC ORPO RATED REFINERY & CHE MICAL.DIVISION
SUBCONTRAC:t an>ALYSIS
JOB MO. 14053 CUE MT MARATHON OIL COMPANY LOCAmON ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION'
CC NSTR. DATES 10/81-03/82
PROJECT
SUBCCintract no. ft type
14053-FSC-34 LUMP SUM
NAME &A0DRESS OF SUBCONTRACTOR MARTTNSVTI 1 F ROOFTNR COMPANY 26 S. WASHINGTON STREET, MARTINSVILLE, ILLINOIS 62442
COMP lete description of contract Install built-up composition roofing on new
Dermanent Diant buildinas.
REMA RKS
ACCT. NO.
16R30 1 RR30 32R30
DESCRIPTION & SPECIFICATION DATA
UNIT
PLANT 16 SUBSTATION ROOFING PI ANT Tfi RFW RIITI OTNR ROOFTNR PLANT 32 CHEMICAL INJ. BLDG. ROOFIN G
1.000's
quantity
total
DOLLARS
4.1 13 4.1
$/UNIT
MANUAL MANHOURS
MH/UNIT
72 24
72
NONE
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
9.5
.'
HOME OFFICE
supervision
RATINGS
rEvXrCcEiLLi EcNmTt
1 supervision
EXCELLENT
* PROCUREMENT
EXCELLENT
SCHEDULING AND PLANNING
rnnn bUUU
s PRICING AND
...
PROCESSING CHANGES NA
6".
SHOP DRAWINGS
.N.A.
7. LABOR RELATIONS
ADEQUACY OF
8` EQUIPMENT
9. cooperation ln QUALITY 10> of work
GOOD EXCELLENT
EXCELLENT
168
GARRARD 00000628
BECHTEL INC ORPO RATED REFINERY & CHE MICA!. DIVISION
SUBCONTRAC:t A!\I>o. LYSIS
JOB MO. CUE NT LOCFkTION
14053 ` MARATHON OIL COMPANY ROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION CC)NSTR. DATES 10/28/82 - 12/1 5/8?R0JEC
SUBCCINTRACT NO. & TYPE
1 4053-FSC-35 LUMP SUM
NAME a ADDRESS OF subcontractor LARK COMMERCIAL PAINTING AND BLASTING, INC.
P.0, BOX 2233. 2628 KUSSNER STREET. TERRE HAUTE. INDIANA 47808
COMP LETE description OP contract
Painting permanent plant equipment.
REMA RKS
ACCT. NO.
16X10 .23X1 .C
DESCRIPTION & SPECIFICATION DATA
PAINT EOUIPMENT - PLANT 16 PAINT EOUIPMENT - PLANT 23
UNIT
SF SF
SI .000's
QUANTITY
TOTAL DOLLARS
54110 91 .7 3650 3.3
S/UNIT
MANUAL MANHOURS
MH/UNIT
2558
92
*
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
SPRAY EQUIPMENT COMPRESSOR
AVERAGE FORCE
BCSC 5.17
PEAK FORCE
57760 95.0 1 .65 2650
1 HOME OFFICE 'SUPERVISION
RATINGS rypri 1 FNT tALC.LLt.tN 1
supervision
EXCELLENT
3- procurement
EXCELLENT
4* AND PLANNING
EXCELLENT
c PRICING AND PROCESSING CHANGES
tt SHOP DRAWINGS
rtXvrLtt-Li Li tnNiTT .N.A.
7. LABOR RELATIONS . EXCELLENT
8` equipment
9. cooperation
10- F WORK
EXCELLENT EXCELLENT EXCELLENT
0.05
GARRARD 00000629
BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION
SUBCONTRACrr an;ALYSIS
JOB MO. 14053 CLiE NT MARATHON OIL COMPANY LO CAmON ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION
ccINSTR. DATES 03/82-04/82
PROJECT
SUBCC)NTRACT NO. & TYPE 14053-FSC-36
T&M
NAME & ADDRESS OF SUBCONTRACTOR HALLIBURTON SERVICES
P.0. BOX 380. CROSSVILLE. ILLINOIS 62827
COMP lete description of contract Prpvide chemi cals and eauioment to chemically
cl pan carbon steel compressor piping.___________________________________
REMA RKS
ACCT. NO.
TO
DESCRIPTION & SPECIFICATION DATA
chEmical CLEANING
UNIT
1.000's
QUANTITY
TOTAL DOLLARS
45.1
S/UNIT
MANUAL MANHOURS
MH/UNIT
2443
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
CIRCULATING PUMP
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
45.7
HOME OFFICE
' supervision
RATINGS
EXCELLENT
^ supervision
EXCELLENT
3- procurement
EXCELLENT
. SCHEDULING AND PLANNING
GOOD
s PRICING AND
.
PROCESSING CHANGE^A
SHOP
^ DRAWINGS
NA
7. LABOR RELATIONS
a ADEQUACY OF EQUIPMENT
9. cooperation
Fym 1 FNT
EXCELLENT
OF WORK
EXCELLENT
2443
GARRARD 00000630
BECHTEL INC ORPO RATED REFINERY & CHE Ml CAL. DIVISION
SUBCONTRA(:t AN>4LYSIS
JOB MO. CUE NT LQCAvTION
14053 Marathon Oil Company
Robinson, Illinois
PR OJECT Robinson Refinery Modernization
CCINSTR. DATES
10/3/81
SUBCCINTRACT NO. & TYPE
14053-FSC-37 Unit Price
NAME a. address of subcontractor
Lee Kintner & Sons. Inc.
P. C). Box 128
Oblong, Illinois 62449
COMP LETE DESCRIPTION OF contract Apply MC-30 asphalt prime coat to roadways in
Mam.lal Parking Lot
REMA rks None
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
70130 AddIv prime coat
$1,000's
UNIT
QUANTITY
TOTAL DOLLARS
Gal 600
1 .2
S/UNIT
MANUAL MANHOURS
MH/UNIT
S2.10 16
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
1 each 5,000 Gallon Spray Truck
AVERAGE FORCE
RCSC 5.17
-I
x
PEAK FORCE
x
1 .2
RATINGS
16
supervision
supervision
1 procurement . SCHEDULING
AND PLANNING e PRICING AND
PROCESSING CHANGES S. SHOP
DRAWINGS
7. labor relations a ADEQUACY OF 8- equipment
9. cooperation
Excellent Excellent
Excellent
...
INA
...
NA
NA. Excellent 1E7Vxocoe1l1lent Excellent
10- OF work
Excellent
GARRARD 00000631
BECHTEL INC ORPO RATED REFINERY & CHE MICAt. DIVISION
SUBCONTRAC:t an LYSIS
JOB MO. 14053 CUE \1T MARATHON OIL COMPANY LOCfimON ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATIOf
cc)NSTR. DATES 10/81-12/81
PKUJEUT
SUBCCiNTRAirrNn a typf
14053-FSC-38 LUMPSUM
NAME a address OF subcontractor BROOKS ERECTION AND CONSTRUCTION COMPANY
1100 MACKLIND AVENUE, ST. LOUIS, MISSOURI 63110
COMP LETE description OF contract Rework existing vessel 29C-1.
REMA RKS
ACCT. NO.
29C01
.
DESCRIPTION & SPECIFICATION DATA
REPLACE VESSEL INTERNALS
UNIT
1.000's
QUANTITY
TOTAL DOLLARS
56.8
S/UNIT
MANUAL MANHOURS
MH/UNIT
1106 .
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
MOBILE CRANE
AVERAGE FORCE
RCSC5.17
PEAK FORCE
56.8
1106
t HOME OFFICE ' SUPERVISION
RATINGS GOOD
z supervision
MATERIAL
* PROCUREMENT
SCHEDULING AND PLANNING
EXCELLENT
EXCELLENT
rnnn
bUUU
5.
PRICING AND PROCESSING CHANGES
AflWVtCKDAfblrrt
c*
SHOP DRAWINGS
GOOD
7. LABOR RELATIONS GOOD
,, ADEQUACY OF EQUIPMENT
GODD
9. COOPERATION
.1_0-QofUAwLoITrYk
cEXvCrnELLi EcNuTt
GARRARD 00000632
a t
BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION
SUBCONTRAC:t an;\LYSIS
JOB vIO. 14053 CUE SIT MARATHON OIL COMPANY LOCATION ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION
CC NSTR. DATES 11/81-3/82
PKUJtU
SUBCCINTRACT NO. & TYPE
14053-FSC-39 T&M
NAME & ADDRESS OF SUBCONTRACTOR MAECO
500 N. 15th STREET LAWRENCEVILLE, ILLINOIS
62439
COMP lete description of contract Labor and equipment for snow removal services.
'
REMA RKS
ACCT. NO.
70190
. DESCRIPTION & SPECIFICATION DATA SNOW REMOVAL
1,000's
UNIT
QUANTITY
TOTAL DOLLARS
6.1
S/UNIT
MANUAL MANHOURS
MH/UNIT
111
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
END LOADER DUMP TRUCKS ROAD GRADER SAND SPREADER
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
6.1
, HOME OFFICE
' supervision
RATINGS
EXCELLENT
SUPERVISION
FXOFI 1 FNT
X PROCUREMENT
EXCELLENT
. SCHEDULING AND PLANNING
NA
= PRICING AND
...
PROCESSING CHANGES NA
"
SHOP DRAWINGS
,N.A
7. LABOR RELATIONS 000
*3. ADEQUACY OF equipment
9. cooperation
CEXYrCPE1LL, ErMNTT EXCELLENT
10- 2f wJr
EXCELLENT
111
GARRARD 00000633
' ! "*
BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION
SUBCONTRAC:T AIM;4LYSIS
JOB MO. CUE NIT LOC/TION
14053 MARATHON OIL COMPANY ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION CCINSTR. DATF.q 1 0/28/81-1 2/1 5/81 PR0JECT
SUBCCINTRACT NO. a TYPE
14053-FSC-40 LUMP SUM
NAME & address OF SUBCONTRACTOR
LARK COMMERCIAL PAINTING AND BLASTING, INC.
P .0. BOX 2233, 2628 KUSSNER STREET TERRE HAUTE, INDIANA 47808
COMP letedescription of contract Painting heater stacks and flue gas ducts (on ground).
REMA RKS
ACCT. NO.
16X10 23 XIC 26R50 16R50
DESCRIPTION & SPECIFICATION DATA
PAINT HEATER STACKS & DUCTS PAINT HEATER STACKS TOUCH UP PAINT IN CENTRAL CONTROL R* TOUCH UP PAINT IN SATELLITE CONT. Rf<
UNIT
SF SF SF SF
$1 .OOP's
QUANTITY
TOTAL DOLLARS
15000 15.6 1250 1.3
2500 675
2.7 0.7
S/UNIT
MANUAL MANHOURS
MH/UNIT
694
58
116 31
"
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
SPRAY EQUIPMENT COMPRESSOR
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
19425 20.3 1 .05 899
^i
HOME OFFICE SUPERVISION
RATINGS
CLXYPLCt.ILL1 tC.NMIT
^ supervision
EXCELLENT
3' PROCUREMENT
. SCHEDULING
4` AND PLANNING
e PRICING AND PROCESSING CHANGES
a SHOP
" DRAWINGS
7. LABOR RELATIONS
8`o ADEQUACY OF equipment
9. cooperation
EXCELLENT EXCELLENT
EXCELLENT NA FXCELLENT
PV.C, .
EXCELLENT EXCELLENT
10- of work
EXCELLENT
0.05
GARRARD 00000634
BECHTEL INCORPO RATED REFINERY & CHE MICAL DIVISION
SUBCONTRAC:T AN/iLYSIS
JOB PslO. CUE!\JT LOCA^TION
14053
Marathon Oil Company Robinson, Illinois
PR OJECT Robinson Refinery Modernization CC NSTR. DATES 11/16/81 - 11/30/81
SUBCCINTRACT NO. & TYPE
14053-FSC-41
Lump Sum
NAME & ADDRESS OF SUBCONTRACTOR
MAECo
P. C). Box 504
Lawrenceville, Illinois 62439
COMP LETE DESCRIPTION OF CONTRACT Removal of backfill placed by Reliance Truck Company (FSC>10) from Reactor off-loading area and restore Railroad right of way
REMA RKS
ACCT. NO.
16C09
DESCRIPTION & SPECIFICATION DATA
Lump Sum
UNIT
<n .ooo1 s
QUANTITY
TOTAL DOLLARS
3.5
S/UNIT
MANUAL MANHOURS
MH/UNIT
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
1 Front End Loader 2 Dump Trucks
AVERAGE
FORCE
RCSC 5.17
_ 5
PEAK ^ FORCE 5
3.5
. HOME OFFICE
' supervision
RATINGS
_ .. .
Excellent
supervision
, MATERIAL A PROCUREMENT . SCHEDULING
** AND PLANNING
k PRICING AND PROCESSING CHANGES
8. SHOP " DRAWINGS
7. labor relations
a ADEQUACY of 8> equipment
9. cooperation
Excellent
.,,
NA
NA
NA
....
NA Excellent Excelilent Excellent
10* of wfelRK
Excellent
GARRARD 00000635
J t_
BECHTEL INC ORPO RATED REFINERY & CHE MICAl. DIVISION
SUBCONTRAC:T AN/4>LYSIS
job rMO. 14053 CUE NT MARATHON OIL COMPANY LO CfimON ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION
CCINSTR. DATES 1102//0811-0n5c//8o2o
PROJECT
SUBCCINTRACT NO. & TYPE
14053-FSC-42 T&M
aNAME AnnRF.ss nF subcontractor
MORRIS CONSTRUCTION COMPANY
P.0. BOX 3 TUSCOLA. ILLINOIS 61593
COMP lete description of contract Pipefitter labor for pipe installation.
REMA RKS
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
PIPEFITTER LABOR
*
1 ,000's
UNIT
QUANTITY
TOTAL DOLLARS
844.0
S/UNIT
MANUAL MHAJNIT MANHOURS
28854
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
MOBILE CRANE WELDING MACHINES
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
844.0
28854
< HOME OFFICE supervision
RATINGS
CEXYCr'CEILL1 ECNMTT
supervision
EXCELLENT
O'
MATERIAL PROCUREMENT
.N.A.
SCHEDULING AND PLANNING
NA
s PRICING AND
.
PROCESSING CHANGESNA
,,'
SHOP DRAWINGS
NA
7. LABOR RELATIONS EXCELLENT
o ADEQUACY OF
8- equipment
EXCELLENT
3. COOPERATION
FXCFI.I.ENT
10- of work
EXCELLENT
GARRARD 00000636
BECHTEL INC:orpo RATED REFINERY & CHE MICAl. DIVISION
SUBCONTRAtrr AN;ALYSIS
JOB NO. 14053 CUE NT MARATHON OIL COMPANY LOG/mON ROBINSON. ILLINOIS
PF OJECT ROBINSON REFINERY MODERNIZATION
ccJNSTR. DATES 12/81-05/82
PROJECT
SUQCCINTRACT NO. ft TYPE
14053-FSC-43
T&M
NAME ft ADDRESS OF SUBCONTRACTOR HOKE CONSTRUCTION COMPANY
P.0. BOX 190 TUSCOLA. ILLINOIS 61953
COMP lete description of contract pip-fitter labor for Dioe installation.
REMA RKS
ACCT. NO.
DESCRIPTION a SPECIFICATION DATA
PIPEFITTER LABOR
UNIT
1.000's
QUANTITY
TOTAL DOLLARS
1072.0
S/UNIT
MANUAL MANHOURS
MH/.UNIT
36725
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
MOBILE CRANE WELDING MACHINES
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
1072.0
36725
RATINGS
. HOME OFFICE
supervision
EXCELLENT
supervision
EXCELLENT
MATERIAL PROCUREMENT
.N.A.
. SCHEDULING AND PLANNING
,,.
NA
c PRICING AND
....
PROCESSING CHANGESNA
G SHOP
DRAWINGS
.N.A.
7. LABOR RELATIONS EXCELLENT
a ADEQUACY OF
a- equipment
EXCELLENT
9. cooperation
EXCELLENT
10- ofwork
EXCELLENT
GARRARD 00000637
BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION
SUBCONTRAC:t AN;\LYSIS
job r40. 14053
CUE!NT MARATHON OIL COMPANY LOCAmON ROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATIO!^
CC NSTR. DATES 12/81-5/82
PROJECT
SUBCCINTRACT NO. & TYPE 14053-FSC-44 T&M NAME 8. ADDRESS OF SUBCONTRACTOR J.L. ALLEN COMPANY
P.0. BOX 341, TUSCOLA, ILLINOIS 61953
COMP lete description of contract Pipefitter labor for pipe installation.
REMA RKS
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
PIPEFITTER LABOR
1,000's
UNIT
QUANTITY
total dollars
960.0
S/UNIT
MANUAL MANHOURS
MH/UNIT
33046
TOTAL SUBCONTRACT CONSTRUCTION EQUIPMENT USED
MOBILE CRANE
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
960.0
33046
- HOME OFFICE SUPERVISION
RATINGS rypri 1 FNT LAUtLLtm
z supervision
EXCELLENT
, MATERIAL A PROCUREMENT
.N.A.
. SCHEDULING
* AND PLANNING
NA
e PRICING AND
PROCESSING CHANGES NA
a SHOP DRAWINGS
NA
7. LABOR RELATIONS 8 ADEQUACY OF
equipment
9. cooperation
pYPFl 1 FNT
FEYXFCFEILL1 EFNNTT EXCELLENT
10* of work
EXCELLENT
'
GARRARD 00000638
.3
.`i j
BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION
SUBCONTRAC:t an>ALYSIS
JOB vIO. 14053 CLIEIMT MARATHON OIL COMPANY LOCAkTION ROBINSON, ILLINOIS
PR OJECTR0BINS0N REFINERY MODERNIZATION
CC ISISTR. DATES 03/82-06/82
PR0JEeT
SUBCC1NTRACT Nfl. ft TYPE
14053-FSC-45 LUMP SUM
NAME aAnnnFSS of subcontractor BUSCH & LATTA PAINTING CORPORATION
1360 N. PRICE ROAD. ST. LOUIS. MISSOURI 63132
COMP lete description OF CONTRACT Labor and material to aDolv fireoroofinq to
structural steel and vessel suDDorts.
REMA RKS
ACCT. NO.
DESCRIPTION O SPECIFICATION DATA
23N30 FIREPROOF EOUIPMENT SUPPORTS-OFFPLOT 23N40 FIREPROOF STRUCTURAL STEEL-OFFPLOT 16N30 FIREPROOF EOUIPMENT SUPPORTS PLANT16
16N40 FIREPROOF STRUCTURAL STEEL PLANT 16
UNIT
SF CF SF CF
1 .000's
TOTAL QUANTITY DOLLARS
9747 2893 7489
1022
30.5 86.6
82.7 30.2
S/UNIT
3.13 29.93 11.04 29.55
MANUAL MANHOURS
MH/UNIT
1075 o.n
3057
1 .06
2918
0.39
1068
1.05
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
NONE
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
230.0
RATINGS
.'*
HOME OFFICE SUPERVISION
flVCDflPP HVCKHUC.
supervision
AVERAGE
3> procurement
EXCELLENT
. SCHEDULING AND PLANNING
POOR
c PPRROICCINESGSAINNGDCHANGES.rSnOnDnD
6"
SHOP DRAWINGS
.N.A.
7. LABOR RELATIONS pf)Qp
8118
8` EQUIPMENT
9. COOPERATION
AVERAGE AVERAGE
10- of work
AVERAGE
GARRARD 00000639
14053-FSC-45 FIREPROOFING BUSCH & LATTA PAINTING CORPORATION Planning and scheduling efforts were poor in that, of the three (3) schedules submitted, none were maintained. Un able to consistantly maintain the desired level of product ivity. Labor Relations were poor in that Busch & Latta initially assigned all work to the painters. Ironworkers claimed application of reinforcing mesh; labor's claimed vessel preparation, mixing materials and clean-up; cement masons claimed finishing of applied fireproofing material. In ternational representatives were required to resolve the disputes. Busch & Latta also initially refused to sign Union Agreements with the ironworker, laborers, cement masons and operating engineers.
GARRARD 00000640
BECHTEL INC ORPO rated REFINERY & CHE MICAl. DIVISION
SUBCONTRAtrr an/ALYSIS
JOB sjO. 14053 CUE \1T MARATHON OIL COMPANY LOCfikTION ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION
CC NSTR. DATES 03/82-04/82
PROJECT
SUBCCINTRACT NO. & TYPE
14053-FSC-46 T&M
NAME & ADDRESS OF SUBCONTRACTOR DUNEGAN/ENDEVCO
RANCHO VIEJO ROAD. SAN JUAN CAPISTRANO. CALIFORNIA
92675
COMP lete description of contract Acoustic Emissions testinq of Reactor transfer
pipinq under pnuematic testinq.
REMA RKS
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
T6F40 ACOUSTIC EMISSIONS TESTING
UNIT
1 .OOP's
QUANTITY
TOTAL DOLLARS
31 .7
S/unit
manual
MANHOURS
MH/UNIT
338
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
VAN WITH NECESSARY COMPUTER AND MONITORING EQUIPMENT
AVERAGE FORCE
RCSC 5.17
0 J
PEAK
0
FORCE -J
31 .7
. HOME OFFICE '* SUPERVISION
RATINGS FCY.AOLFtILLI LFIN'lT1
z supervision
EXCELLENT
, MATERIAL * PROCUREMENT
.N.A.
. SCHEDULING * AND PLANNING
EXCELLENT
= PRICING AND
.
PROCESSING CHANGESNA
a SHOP " DRAWINGS
NA
7. LABOR RELATIONS
8 ADEQUACY OF " equipment 9. cooperation
- cEvXrCcEi LtLcEmNtT EXCELLENT
10- OF work
excellent
338
GARRARD 00000641
r\
BECHTEL INCORPORATED REFINERY & CHEMICAL DIVISION
SUBCONTRACT ANALYSIS
JOB NO. CLIENT
14053_______________ _____________ MARATHON (IT 1 COMPANY __________
LOCATION ROBINSON. ILLINOIS
PROJECT ROBINSON REFINERY MODERNIZATION CONSTR. DATES 02/82-03/82PR0JECT
SUBCONTRACT NO. & TYPE
14053-FSC-47 T&M________________
NAME &ADORESS OF SUBCONTRACTOR NELSON - KEATING MECHANICAL, INC.
P.0. BOX 809 LAFAYETTE. INDIANA, 47902
COMP lete description of contract Pipefitter labor for instumentation loop checks.
REMA RKS
ACCT.
NO.
J82
DESCRIPTION & SPECIFICATION DATA
OFFPLOT LOOP CHECKING
UNIT
1.000's
QUANTITY
TOTAL DOLLARS
33.6
S/UNIT
MANUAL MANHOURS
MH/UNIT
1173
NONE
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
33.6
1173
RATINGS
. HOME OFFICE
' SUPERVISION
21 SfUiePlEdRVISION
ROOD EL AXCCnE.LLLLCE.INNT1
, MATERIAL
* PROCUREMENT
m/>
*
SCHEDULING AND PLANNING
ryrn , cmt
t ALtLLtlN 1
= PRICING AND
M/\
PROCESSING CHANGES NA
s. SHOP
" DRAWINGS
.N.A.
7. LABOR RELATIONS EXCELLENT
,, ADEQUACY OF EQUIPMENT
.
NA
9. COOPERATION
EXCF1 ! FNT
10- OF wkjrk
EXCELLENT
GARRARD 00000642
BECHTEL INC ORPO RATED REFINERY & CHE MICAL.DIVISION
SUBCONTRAC:t an>ALYSIS
JOB MO. 14053 CLIE NT MARATHON OIL COMPANY LOC4mON ROBINSON. ILLINOIS
PR OJECT ROBINSON REFINERY MODERNIZATION CC)NSTR. DATES 05/82 - 07/82 PRUJtCT
SUBCCintrap.t no. a TYPF 14053-FSC-48
TIME & MATERIAL
NAME & ADDRESS OF SUBCONTRACTOR SHEEHAN PIPELINE CONSTRUCTION, CO.
P.C). BOX 352 ROBINSON, ILLINOIS 62454
COMP LETE DESCRIPTION OF contract
Provide labor to assist in Project Demobilization.
REMA RKS Bechtel provided all field supervision.
ACCT. NO.
70110
DESCRIPTION & SPECIFICATION OATA
DEMOBILIZATION
UNIT
<51 ,000's
QUANTITY
TOTAL DOLLARS
so.n
S/UNIT
MANUAL MANHOURS
MH/UNIT
2200
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
WELDING MACHINES
AVERAGE FORCE
RCSC S.17
PEAK FORCE
50.0
2200
RATINGS
. HOME OFFICE
1* SUPERVISION
2*.
field SUPERVISION
, MATERIAL PROCUREMENT
. SCHEDULING
* AND PLANNING
rypri i rwr tAUcLLLIM 1
... NA
.N.A.
NA
c PRICING AND PROCESSING CHANGES
SHOP
" DRAWINGS
...
NA NA
7. LA80R RELATIONS
EXCELLENT
B ADEQUACY OF
8` equipment
EXCELLENT
9. COOPERATION
EXCELLENT
,n QUALITY
10- OF WORK
EXCELLENT
GARRARD 00000643
' L ,wr
BECHTEL INC ORPO RATED REFINERY & CHE MICAL. DIVISION
SUBCONTRA(;t an>i\LYSIS
JOB NO. 14053 CUE NT MARATHON OIL COMPANY LOCAkTION ROBINSON, ILLINOIS
PR OJECT ROBINSON REFINERY M0DERNIZATI0
CCINSTR. DATFS 03/82-04/82
PROJECT
SUBCCINTRACT NO. & TYPE 1 4053-FSC-49 . 50 & 51 T&M NAME a address OF subcontractor SHEEHAN PIPELINE CONSTRUCTION COMPANY
P.0. BOX 352 ROBINSON. ILLINOIS 62454 COMP lete description of contract Boilermaker labor for completion of Plant 16
heaters and punchlist work.
REMA RKS
ACCT. NO.
DESCRIPTION & SPECIFICATION DATA
16F40 BOILERMAKER LABOR
UNIT
1 ,000's
TOTAL quantity DOLLARS
lofi.s
S/UNIT
MANUAL MANHOURS
MH/UNIT
3617
TOTAL SUBCONTRACT
CONSTRUCTION EQUIPMENT USED
NONE
AVERAGE FORCE
RCSC 5.17
PEAK FORCE
106.8
3617
- HOME OFFICE 1a SUPERVISION
RATINGS
rLvApCrUi L1 LFtNmT
z supervision
EXCELLENT
*
MATERIAL PROCUREMENT
NA
. SCHEDULING AND PLANNING
EXCELLENT
C PRICING AND PROCESSING CHANGES
NA
a.
SHP DRAWINGS
MNAfl
7. LABOR RELATIONS
EXCELLENT
,, ADEQUACY OF EQUIPMENT
NA,,
9. cooperation
EXCELLENT
10- ofwrk
EXCELLENT
GARRARD 00000644
1.7 homg office
GARRARD 00000645
JOB NO. \4o53
DESCRIPTION KftHp
CLIENT
OU-- CO
LOCATION Rpe,lt05QKU)E-
H0ME OFFICE COSTS SUMMARY
CONST. DATES \/8o TO VflS:
PREPARED BY D> u , uE_
DEPARTMENT BREAKDOWN Division Technical Services Engineering Procurement Construction Project Management Other Divisional Controller
Personnel Labor Relations Legal & Insurance Data Processing Other Corporate Services Field Assignment (Function 10) tUTEfcOPFlC-E Bu-ULl&S
MANHOURS Tech. Non-Tech.
SALARIES Tech. Non-Tech.
Payroll Additives
COSTS IN $1000
Repro duction
and Supplies
Travel
25,1 364* 6
37. e. 3.3 5.6 *3
--
--
-
3. .1 .1
1,6 13.2 lO.*7
1.6
A >0
.5 U. 3
2-4 <4
,z --
-5
35R.I 5275.1
525.1 203,4 115. 1
ll.fi
-
-
-
3S,8> (.3
U.4 U3.4 67.3
U.P, 26.7
-1.1 U2.fi
31.5 6,3
3.2
--
120.0 1116.3
210 .3
16-2 71.3
2. ft 37.3
--
13.7 2.3
-
(4,0 ,4
--
40.2 616,3 407
2.S \7.6
1,6 4-1
,4
(.3 12.2
35-6 36),8 Ufi,.3 lo4<2
28.0
a
5,3
IZ.S ,5
S>5 ), 6
*
Tel., Tel., and
Postage
s/cOutside
3.3 334 35-0
6*4 1 v*7 28.6 3,2
1.4 .1
--
)s.4 1*2 -
7-5 72,2
6.3
--
1,1
____ *2. 1.3
-
4 2.0
-- --
-
Other
Total
26*3 S 06.8
--
.(
-- -- 1*4 -- --
-
\3< 2 26,0
6o3.0 fi7o6,0 \ 003,0 404,6 2327
43,4 ni.o
66, \ 11,2
84,7 23,4 26,0
TOTAL COSTS (Reimb. (Excludes AFI)
)
OFFICE BREAKDOWN Sponsor - HoOtaTOlO Other- SPrtO Other- ALiio PvRfcOR Other- G,MTHR42oR> Other- EDHot^TOt^
TOTAL COSTS - ALL OFFICES
(Excluding AFI)
* EXCLUDES A6EtviCY Hl-veS
-2.0 T
2.3 KiT
446-3 *5 2,7 6*588.1 4oo*5 2265.2 742,7 673-4 145.5 4l,3 574*7 U48T.O
4-2-to >7 13.5-
-
-1
46.S 5.7 *4
.1
63043 2g3.fi -
-
-
334-6 2(37,6 1.27. 6
---
721,0
21 >7 -
-
-
550-8
122-6 -
-
U8.0
27,5 -
-
-
ftfi.O
3,3
-
-
485.3 \ol4o.2
<68,4 720.6
157
)5 7
2,6
26
___77 ____ 7J_
446-3 5-2 ."7 6*588 ,7 400.5 2265,2. 742,7 673-4 145. S
3 (.3 514-7 U487,0
HOME OFFICE COSTS SUMMARY
PHR 1.7-1
PAGE
GARRARD 00000646
&
JOB NO. 140 53
DESCRIPTION R RHP CLIENT HftRftfl-tofO oil, co.
LOCATION ftofet^QK) j IL
HOME OFFICE COSTS BY OFFICE
HOUSTON OFFICE
CONST DATES lo/gp Jt) 3i/fi2.
PREPARED BY T>. u . L.ELE.
DEPARTMENT Division Technical Services Engineering Procurement Construction Project Management Other Divisional Controller
Personnel Labor Relations Legal & Insurance Data Processing Other Corporate Services Field Assignment (Function 10)
MANHOURS Tech. Non-Tech.
SALARIES Tech. Non-Tech.
COSTS IN $1000 (U.S.)
Payroll Additives
Repro
duction and
Supplies
Travel
Tel., Tel., and
Postage
s/cOutside
Other
Total
2.5,1 56>3,,l
20.0
5.6 .3
-- --
-- 2.2.
-
1* 19. 1 lOi 1 '
11 (a 4.0
8.9 --
<b
.1
--
__
"358.1 5247>
266-5 139 .A i75> 1
11.ft
-- --
--
--
31.2-
11.9 119.0 617
11.ft 2W
9.0 88.0
--
9.7 19
.4
120.0 1700 1
fZO- 1 73.0 71.9
27 24. 1
--
n
10.5
4o,Z 6 IS .0
34,0, 2.5 17. 1.7 4 --
-- 1.-4
*
34.0 354.0
3-2.7 40,2 28.0
*1 4.5
4 ij
"2.7
3.4 37,1 Zo>S
0.4 It,7 28.0
17
1.0 _ --
7, <4
-1
7,S 72, 1
5.S
1. ( "2.
1. 6>
-- -- -
"Z4p. 1 444 .O
--
>1 -- -- 1,4
-- --
--
1.9 II ,P>
6,01.2. 8S95/3
SO 11 370.4 332 * l
46,S 132,7'
--
18.4 2-Cb --
55,7 12,4
TOTAL COSTS (Reimb. (Excluding AFI)
)
420,7 -4 Co S <>309.9 334 <6> 2137. G> 721 .O 55o ,8 118.0 66-0 4 as,3 10746,"2.
PAGE
GARRARD 00000647
HOME OFFICE COSTS BY OFFICE
PHR 1.7-2
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ;
nFsrRi'pTinlTgftMP--------
HOME OFFICE COSTS
CLIENT HftftftTHQM otL-co. LOCATION R6ftlMSQ<M,|L.
BY OFFICE
iBam^oOFFICE
CONST. DATES PREPARED BY
TO ^fSjLs
______
DEPARTMENT Division Technical Services Engineering Procurement Construction Project Management Other Divisional Controller
Personnel Labor Relations Leqal & Insurance Data Processing Other Corporate Services Field Assignment (Function 10)
MANHOURS Tech. Non-Tech.
SALARIES Tech. Non-Tech.
COSTS IN $1000 (U.S.)
Payroll Additives
Repro duction
and
Supplies
Travel
l.S n.o
.3 -- --' -- -- -
-
(0 .\
.1 > (a
-- 3.0
i.5"
.2
2.7.3 3B.fe
<H.O -- -- -- --
-- --
7`to 1.3
--
Rid.
-- . -1 2-A.8 -- 2.7. e -1.-1
2.0
to*2
AO>2 3.2. -
fl 0.2
--
to.2 t. 0 --
0.5
-' .5"
-- 1 2.7
.3
-- i5 wn
l *6? 7.e 85,6. H.o
--
8
7-7 .S -
2,0 11 Cp
Tel., Tel., and
Postage
S/COutside
-- \ .O
-- * Cp
l.s
.8
<1 7.8
1*1
-
.0
~ -- -
.1 2. 0 -- --.
Other
Total
. 262.8
-- --
-- ~ -
^ .O 1 .A
l'6 )to. 1 4AI.2
`2--
383_
-7 7-2. &`(o__
27,6
n. s_
TOTAL COSTS (Reimb. (Excluding AFI)
)
1 q.5
5.7
2-03.8 (bS.^ 12.7.0? 2.1.7
122. ds 2.7. S' 3.3
68-i 7 20.0
PAGE
GARRARD 00000648
ltTT&*OFFlCE_ PAULI RaeoR --7x
__________-QAlTHERSBofte - 3* - 6X-T7X - 5x
EBHcrUTCW - <=,x TOTAL
-- --
--
1
.7 .\
HOME OFFICE COSTS BY OFFICE
.1
I5.fr
V..
.8
\ .7
.-1
8 1
7.7
7.7 2fr.O
*>hr 1.7-2
'1. ? SCHEDULE data
GARRARD 00000649
GARRARD 00000650
GARRARD 00000651
| REPORT DATE LINE-INDICATES PROGRESS * AS OF FRIDAY CUTOFF FOR LINE TAPED
-- WORK ACTIVITY -- FLOAT/RESTRAINT
cT- SCHEO ISSUE FOR APPROVAL T ISSUED COMPLETE drc- SCHEO. ISSUE TO CONSTRUCTION dK ISSUEO COMPLETE
SCHEO. WORK ITEM START OR END WORK ITEM STARTED - IF NO WORK ITEM FOLLOWS IT CAN ALSO INDICATE COMPLE
- TION. BECHTEL APPVD VEN(
o- FIELD NEEO OATE
V- DELIVERY DATE
GENERAL NOTES
A
A
A m 11. A
A uoa
JN SalteCAVr^+)''.AH>wft^
A Btvsec> on weAs-r'9> iaaa*co.s n>\
A a6,^e& ou forecast *1 mahhour^ W
A ivu, r*e a?pcj^a^
if CSL
HIM*
BECHTEt
MARATHON OIL COMPANY ROBINSON REFINER l'
MODERNIZATION PROJECT
AREA A-PLANT 16 CONSTRUCTION aRcA SUMMARY SCHEDULE
mmm*.
14053 Hp-M- lOfl'tW
* Cfc
MOTE mwm mi 'Cft aau.v momcm
Mor TKMHMMixIKCWKTOUU.
MVWM '
ntvSwCoHwMmUkl RuCV*mW>MtuRrUnNtatOmTvKcDtWmAuHtElRi 1 hJC * T* UtU*L MM>.
*1E*
JOB NO.
3
DESCRIPTION
______________
mFiyTMx^ATUo^ c>\{_ <c-Q.
LOCATION oamsoKi , ILUMOI -5
GENERAL DATA
SCOPE PF WIIRK EP'fS
. STANDARD WORK WEEK 40 MHI7S /vuK.
DATE OF AWARD 5/80
FINAL MECHANICAL COMPLETION 4/3o/g2
ENGINEERING PERIOD 3/l/eO Til 3/12/52 ,-1.
MONTHS TO 90% ENGINEERING COMPLETION `'5 r*M
2-MC7 5HIFT" POf? FFACT /l^eSETJ 5Tf?UCTU??:
lO/lU/gl PiriMG UIGMT-
SHIFT- _ 12/ll/gl-*- 4/30/82
TMOONFTINHfSll FMROFfM.HSATNAIRf. TAlOPFOFMOPU.NFDTA.DTNIONS ,, H^MTH5 C Wf* 80 TO APR. '8Z7\)
MANUAL MANHOURS:
_____ 1 "3 ft ft . loo Z4o ,ooo
MANUAL PEAK:
bechtel *2-41 SUBCONTRACT
v//er z/z^lBz. w/d 4 //G /8 2
MAXIMUM SUSTAINED PHYSICAL % COMPLETION PER MONTH
&%
LOST TIME (DAYS) DUE TO:
STRIKES 7 Z't* MAM7AVS
WEATHER M/A
OTHER
ACTIVITY ST. RUN PIPE SPOOLED PIPE STRESS RELIEVING STRUCTURAL STEEL LOOP CHECK
INo 1 ALLA 1 IUN HM 1 to ANU AU IIVII V UUKAIIUNU
SUSTAINED CONSTR. INST. RATE DURATION
4941 L.F. '"'mo 4/81 - Z/fo
ACTIVITY PILING
1<cA2 LF ^MO V'-3/0e
FOUNDATIONS
SUSTAINED CONSTR. INST. RATE DURATION
' 886 CV
no a/si -10/01
U/A.
- 3/^2. A/G CONDUIT
Mo. 9/91-4/02
A.15 ThL, ^M>. V8l'3/8i
WIRE & CABLE <'P'3I'>
63 352 uF 8/91 -4/82 HO
INITIAL CONSTR. ACTIVITY ys?- s/fet
TO START OF FOUNDATIONS
M/A
8/80 -Z/8I
SCHEDULE SUMMARY JOB OVERALL
EPC MILESTONES
PAGE_______
CONST. DATES 'o/gO TO 4l82TOTAL DURATIONWEEKS
ACTIVITY
QUANTITY
START
COMPLETE
HOME OFFICE PROCESS FLOW DIAGRAMS
35
P&ID'S MfinFi
133 f'L'T^ 1b,Z3 28.
P9<XfrS5 FATA SUS^TS
-4 l
4/8o
4/go 5/8o 4/gO
TREND BASE ESTIMATE DEFINITIVE ESTIMATE ISOMETRICS SPOOL FABRICATION STEEL FABRICATION B.E.C. MAJOR EQUIPMENT CONTROL VALVES (PURCH.)
1 SX. 4/80
1EA-
9/go
I&4I
>/8l
274o spools 12/80
S-rOKis 10/00 CMilafiSifrs s/eo
Z47
7/8o
FIELD CEKAL TPC) SITEPREP^'I^^okO
1 LOT
9/80
TEMPORARY OFFICE/WHSE TEMPORARY ELECTRICAL TEMPORARY WATER/SEWER FOUNDATIONS UNOERGROUND PIPF A
9800 HHRS "3000 HHft5 \3ooMHff6 <^19 5<SY,
1
FIELD ERECTED VESSELS
09 EN.
FIELD ERECTED TANKS
EA,
ERECT STRUCTURAL STEElO" io> 318-rn.
8/80 8/80 0/ao u/go '/8i 5/8!
M/A 4/81
ST. RUN PIPE
AZ 470L.F. 49941 LF.
6/81
1/Bi
PIPE TESTING A/G CONOUIT ELECTRICAL CHECKOUT LOOP CHECK
193153 LF. 133^2.0 LFT
419 EA. 957 CA. I2ft>2 3ft Ei_F
>/6l 9/81 2/82 1/82 11/81
'z/8o 4/81 0/81 8/80 5/80 10/00 6/81 lo/gl 7/81
i/8l '0/01
"/Bo 9/80 9/8o 9/&o 5/8' 3/81 Z/0Z
M/4
'i/8' 7/81 Z/82 3/82 Z/82 4/0Z 4/62 5/02
START COMPLETE
4/Bo
4/80 5/8 o 4/8o 4/&o 9/80 2/81 12/81 10/80
5/8o 7 /8o
iz/Ba 5/8/ 7/8' &/&o 5/8 0 l/8o 9/61 l /02 i/82 1/8 1 4/82
lo/go 0/8o 8/go
8/8o i2/8o z/ei
4 /81 7/81 7/81
(p/e/
7/81 9/01 9/01 9/81 3/8 Z ic/fti
2/81
]2/80 |2/8o 12/80 io/8i 4/gi
Z/0 2. 4/02 3/62 Z/Bt 3/82 4/8 2 4/0>2. 4/BZ 6/028/0Z
COMMENTS
SCHEDULE SUMMARY
PHR 1.8-1
WJ02F 0S/27/BI CB/HY
M
GARRARD 00000655
e
*
KOM3H oe/H-'Sl 4i'
16
The following examples of schedules illustrate the types and detail of schedules used on the project.
GARRARD 00000656
PERFORMANCE PROGRESS
BECHTEL
Job No. 14053
PROGRESS & PERFORMANCE CURVES
PROJECT FORECAST # 4
TOTAL PROJECT CATEGORY.
100 90 80 70 60 50 40 30 20 10 0
PERIOD ENDING
GARRARD 00000658
BECHTEL
Job No. 14053
PROGRESS & PERFORMANCE CURVES
PROJECT FORECAST # 4
CATEGORY. TOTAL DIRECTS (iMCL S/c)
100
90 80
70 60
50
40 CO CO
LLI
30
OOCC
CC CL
20
10
0
PERIOD ENDING
BECHTEL
Job No. 14053
PROGRESS & PERFORMANCE CURVES
PROGRESS
GARRARD 00000659
1981---------
---------------
|
1982
PERFORMANCE PROGRESS
BECHTEL
PERIOD
ENDING
Job No. 14053
PROGRESS & PERFORMANCE CURVES
PROJECT FORECAST # 4
AREA B
SATURATES GAS PLANT category _an_p ofp-_plots
100 90 80 70 60 50 40 30 20 10 0
PERIOD ENDING
PERFORMANCE PROGRESS
BECHTEL
Job Ho. 14053
PROGRESS & PERFORMANCE CURVES
PERIOD ENDING
00 90 80 70 60 50 40 30 20 10
0
PERIOD
ENDING
PERFORMANCE PROGRESS
BECHTEL
Job No. 14053
PROGRESS & PERFORMANCE CURVES
PROJECT FORECAST # 4
CATEGORY INSTRUMENTATION J*
100 90
80
70 60 i
i\ 50
40
30
20 10
0
1981"
1982
PERIOD ENDING
rI
PERFORMANCE PROGRESS
BECHTEL
Job Ho. 14053
PROGRESS & PERFORMANCE CURVES
PROJECT FORECAST # 4
category
100 90 80 70 60 50 40 30 20 10 0
PERIOD ENDING
BECHTEL
Job No. 14053
PROGRESS & PERFORMANCE CURVES
PROJECT FORECAST # 4
category
PERFORMANCE PROGRESS
o
>
73
73
>
73
D
o o
1981
f 1982
o
o
o
FOCUS RE PORT"
GARRARD 00000665
GARRARD 0000'
O c Ic o c ( (. c c G
G
G C G G
G G G
G
o
(3) 03
RECEIVED
J. A. Oakland 30 JUN1982
BECHTEL FORECAST CONTROL AND UPDATING SYSTEM-FOCUS 7
JOB NUMBER
19053-000
RUN M0. 72
PROJECT TITLE CUT-OFF DATE
ROBINSON RfFJNRY MODERNZTN PROJ-MOC
. , ' . >'/ ; ,,
-\t v M
ft-- *.},,, ,
5/21/82
PROJECT START DATE
10/06/80
USERS MANUAL OATE-JANUARY .1982
JOB NO. 14053-000 ROBINSON REFINRY MODEKNZTN PROJ-MOC REPORT NO. C38022-40
FOCUS MASTER FILE LISTING
RUN DATE PAGE
5/24/82 1
-******J^^'pt'r r r *rir rtv vr TTrifTfV v t -r t*r 1
00 $ $ 3 $ $3:$ 4$
**********
CUT -OFF DATE 5/21/82 ***** ******
.......... ..... .......
UNITS CURRENT OF
BUDGET TO-DATE PROGRESS
.
PROJECT FORECAST
TRENO FCST
PHYS TRENO
PCT
PCT
ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT
QUANT MANHOURS
QUANT MANHOURS
QUANT MANHOURS MANHOURS METHOD COMP COMP
********* **************************
*******$*** ******** ********** ********** ********** *********** 44444444444444444 ***********
ao6lio AO6LHL1 AQ6L12L2 A06L80LL A06L81 A11LI0 AI1L11L1 AIILI2L2 AI1L80LL AllL81 A12L10 AI2L11LI AI2L12L2
A12L22L4 A12L80LL A12L81 A13L10 A13L11L1
S/8 6 STM.TRACE SUBHDRS.
SPALL BORE CS PIPE S/A 6
LARGE BORE CS PIPE S/A 6
STEAM TRACE TUBING S/A fa
S/B fa DEKATRACE
S/3 I.SIM.TRACE SUBHDRS.
SMALL BORE CS PIPE S/A I
LARGE BORE CS PIPE S/A I
STEAM TRACE TUBING S/A 1
S/B l DEKATRACE
S/B 2 STM.TRACE SUBHORS.
SMALL BORE CS PIPE S/A 2
LARGE BORE CS PIPE S/A 2
LARGE BORE AL PIPE S/A 2
STEAM TRACE TUBING S/A 2
S/B 2 DEKATRACE
S/B 3 STM.TRACE SUBHDRS.
SB CS PIPE-RACK
S/A 3
LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF
10 689
343 20 20 10
2031 1652
20 20 10 5395 24 36 357 20 20 10 3100
------- IT
524 721
Tl 11 11 2267 3918
11 11 11 5867 5116 1591
11 11 11 8302
402 794 505 844 1148 357 2169 3070 632 1456 1432 5267 4623 505 2785 4200 44 9 3189
589"
1375 1175
491
368 739 6726 9299 431 794 2811 19608 17811 2377 1519 754 1115 6785
4(52
794 505 844' 1148 357 "2155 3070 632 1456 1432 5267 4623 505
2785 4200
449 3189
505 1375 1175 ~491
368 739 5726 9299
431 794 2811 19410 17803 2377 1519
7 54 1115 6785
589 CURVE-0 1375 CURVE-L 1175 CURVE-L
491 CURVE-L 368 CURVE-0 739 CURVE-0
5726 curve-t:
9299 CURVE-L 431 CURVE-L 794 CURVE-0
2811 CURVE-0
19608 CURVE-L 1T8II CURVE-L
2377 CURVE-L 1519 CURVE-L
754 CURVE-0 1115 CURVE-0 6785 CURVE-L
100 100 100 100 100 100 loo 100 100 100 100 100 loo 100 100 100 100 100
100 10c 100 loo 100 100 IOC 100 ICO 100 ICO 100 100 Ido loo 100 100 100
A13L12L2 AI3L1TL2 AI3L21LI AI3L80LL AI3L81 A14LI0 AI4LIIL1 A14L12L2 A14L80LL A14L81 A15L10 AISL1IL1 A15L12L2 A15L21LI A15L22L4 A15L80LL A15L81 A16E10EE AI6EIIEE A16E12EE AI6E20EE AI6E30EE A16E40EE AI6E4IEE
A16E50EE AI6E60EE A16E61EE A16E62EE A16E63EE A16E70EE
LB CS SPOOLS
S/A 3
LF
Le CS PIPE-RACK
S/A 3
LF
SB ALLOY PIPE-RACK S/A 3
LF
STEAM TRACE TUBING S/A 3
LF
S/3 3 DEKATRACE
LF
S/B 467 STM.TRCE SUBHDRS
LF
SMALL BORE CS PIPE S/A 4
LF
LARGE BURE CS PIPE S/A 4
LF
STEAM TRACE TUBING S/A 4
LF
S/B 467 DEKATRACE
LF
S/B 5 STM.TRACE SUBHDRS.
LF
SMALL BORE CS PIPE S/A 5
LF
LARGE BORE CS PIPE S/A 5
LF
SMALL BORE AL PIPE S/A 5
LF
LARGE BORE AL PIPE S/A 5
LF
STEAM TRACE TUBlNG S/A fa
LF
S/B 5 DEKATRACE
LF
ERECT COLUMNS 6 VESSELS
UNITS
ERECT PLATFORMNG REACTOR
UNITS
LOAD CATALYST
CF
ERECT STORAGE TANKS
UNITS
ERECT HEAT EXCHANGERS
UNITS
ERECT FIRED HEATERS
UNITS
ERECT PLTFRM HEATER 16FJ
UNI TS
INSTALL PUMPS 6 DRIVERS ....... UNITS
BLOMERS AND SPARES INSTALL GAS BOOSTER COMP
UNITS UNITS
RECYCLE GAS CENTRIF COMP
UNITS
RECYCLE GAS COMPRESSORS INSTALL OTHER EQUIPMENT
UNITS EA
463 13245
331
20 20 10 2555 2177 20 20 10 2852 1430 651 121 20 20 4200 100
0 400 4500 400 400
3600 500 200
100 200 3200
1115 11746
1041
11 11 11 2512 5270 11 11 11 2675 3132 751 574 ........ 11 11 5399 4500
0 168 7500 7181 21135
5223 1000 9900
6600 3300 1983
866
7677
866
7677
6676
5717
6676
5717
192 294 192 294
2408
966
2408
966
2520
1293
2520
1293
1155
1620
1155
1620
2496
9357
2496
9357
4003
16034
4003
16034
1257
816
1257
816
2100
856
2100
838
34 5
516
345
516
5248
17639
5248
18199
3503
21512
3503
21462
496
958
496
958
327
5052
327
5052
1847 ..... 875 ----------- 1B47~
875"
1904
761 1904
741
3900
10904
3900
10878
100
6536
loo "5536
0000
200
54 200
54
4600
11194
4600
11162
400
29809
400
29809
400
49480
400
49354
2 800 .......... 5824
2800 "....5825......
500
1771
500
1771
200
7573
200
7573
100 4669 100.................
..........................
4669
200
2341
200
2341
5900
1075
5900
1075
7677 CURVE-L 5717 CURVE-L
294 CURVE-L
966 CURVE-L 1293 CURVE-0 1620 CURVE-0 9357 CURVE-L
16034 CURVE-L 816 CURVE-L 856 CURVE-0 516 CURVE-0
17639 CURVE-L 21512 CURVE-L
958 CURVE-L 5052 CURVE-L
B75 CURVE-L 761 CURVE-0 10904 CURVE-E 6536 CURVE-E
0 BLOCK-E
54 CURVE-E i 1194 CURVE-E 29809 CURVE-E
49480 CURVE-E 5022, CURVE-E 1771 CURVE-E 7573 CURVE-E
........ 4669 CURVE-E 2341 CURVE-E 1075 CURVE-E
too 100 100 100 100 100 100 100 100 100 100 100 IDO 100 100 TOO 100 100 TOO
0
100 loo 100 100 100 100 100 100 100 100
100 100 too 100 100 100 100 100 ICO 100 100 100 100 100 ICC TOO 100 1 GO 100
0 ICO ICO 100 ICO TOO 100 100 ICO 100 100
O 8
1 *o
*
s fo 8
t9r. o
,7
'4 o H
,f 9
?!
9
2, ?
:< 9
?c
9
1? 13
9I'l
:p 17
'9
lr "
9
44
*
9
4"
-,r, s/
r,r
Cl
ff-
f
JOB NO. 19053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC
REPORT NO. C38022-90
F 0CuS MASTER FILE LISTING
RUN OATE PAGE
Ft/ 82
2
- -..... . -^^1
-------------------
........ -- " ~ 00 ' ~ ...... ..... -...
# 4f $$ # $ $ $ $ # %$4: *4:& 4:4f$ $ $
" $ 4:$$ $ 4: $4:4^
-------------- CTT! -OFFDATE 4: $4:
5/21/8? 4s&$4:4t4
UNITS OF
.CURREN--T--- --
BUDGET ....... ...........
---T--O-----D--A--T--E---
P. R. OG-- RESS
PROJECT
FORECAST
TRENO
.... . ------ FCST
PHYS TRENO PCT ...PCT ....
ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT
QUANT MANHOURS
QUANT MANHOURS
QUANT MANHOURS MANHOURS METHOD COMP CCMP
$4:4:4:4:4; 4: *
444444444
... Ai6J01J9 FAB INSTRUMENT SUPPORTS
EA ....
102
1995
3?3
35
35
373
3T1 CURVE-J 100
100
A16J11J9 F1EL0 MOUNTED INSTRUMNTS
EA
177 8179
203 9109
203
9109
9109 CURVE-J 100
100
A16J15J9 INSTALL MINOR INSTRUMNTS AI6J22J IDC I/O RACK
EA UNITS
779
2
7626 3
900 2817 300 276
900 2850 300 ~ 276
2817 CURVE-J 100 276 CURVE-J 100
100
too
A16J31JJ LOCAL CONTROL PANEL
UNITS
100
190 1900
792 1900
768
792 CURVE-J 100
100
A16J50JJ INSTRUMENT SHELTERS
EA
197 2627
32 233
32
217
233 CURVE-J 100
100
AI6J60JJ ANALYZER CONTROL PCKGE
EA
83 7266
15 695
15
627
69? CURVE-J 100
100
A16J7IJJ INSTR AIR TUBING
LF
1579
670
3100
1923
3100
1361
1923 CURVE-J 100
100
A16J79JJ A16J81JJ
A16J82JJ
INSTR AIR SUB-HEAOERS LOOP CHECK CALIBRATION TESTING
LF LOOPS EA
3383
169 1077
2365 1695 6515
7090 526 639
5375
3732 2709
7090 683 695
5229 3175 32 86
5375 CURVE-J 9B70 CURVE-J 2797 CURVE-J
100
77 98
100
77 99
A16J95JJ EMERGENCY SO REDUNDANCY
UNITS
100
1177
100
953
100
953 .
953 CURVE-J 100
100
A16LI1L1 INST CS PIPE 2 IN UNOER
LF
67 90
7609
0
0
0* 0
0 BLOCKS
0
0
A16L12
DELETE
Hill
0
0
0
0
0
0
0 BUDGET 0 0
A16L29L9 INST AL RACK LARGE BORE
LF
992 752
0
0
0
0
2068 BLOCK-9
0
0
A16L70LL INST L/G PIPING
LF
2301
5083
2 30 3
6263
2303
6263
6263 CURVE-L 100
100
A16LB0LL INSTALL STM TRACE TUBING
LF
6912
3932
0
0
0- 0
0 BLOCK-L
0
0
A16L 81
LF 0 0 0 0 0 0 0 BUDGET 0 0
A16L91LL ASSIST XR AY ST RELIEVE
UNITS
200
1900
200
3971
200
3971
T9TI CURVE-L 100 TOD
A16L98LL TESTING INSPECTION
LF
63033
6698
90932
16579
90932
16597
16579 CURVE-L 100
100
A16M10MM STEEL STRUCTURES
TONS
387 19530
300 17977
300 17977 17977 CURVE-M too loo
A16M20MM LADDERS G PLATFORMS
TONS
58 9575
190 13199
190
13199
13199 CURVE-M 100
100
A16M30MM PIPEWAY STEEL
TONS
12 950
22 1029
22
1029
1029 CURVE-M 100
100
A16N30 0 FIREPROOFING LUGS A16P12PP POWER CONTROL EQUIP
UNITS
1
1
EA 127 6218
82 7 899 209 5793
827 209
899 5664 "
899 CURVE-0 100 5745 CURVE-P 100
100 100
A16P13PP EMERGENCY STANOBY EQUP
EA
17 800
16 529
16
529
529 CURVE-P 100
100
A16P19PP LIGHT FIXTURES RECEPTL A16PI6PP REDUNDANCY ALARMS
EA EA.....
310 2 59
1998 320 ~
593 9093
593
....... 0 ............. 0 ................... 0*
9059
9093 CURVE-P
... --.......0 --------- - 0 BLOCK-P
100 0
100 0
A16P2IP6 INSTALL A/G RGS CONDUIT
LF
52878
29106
79819
97120
79819
95960
97120 CURVE-P 100
1,00
A16P23P6 INSTALL NON-MET CONOUIT
LF
25500
9117
17676
9183
17676
9183
9183 CURVE-P 100
100
.. A16P25PS INSTALL CABLE TRAY ... -.... ......LF
Iff -
15 ..... 895 ..... 1272
895
1266 ----------- T2T2 CURVE-P 100
100 ..
A16P31P7 PULL WIRE 600V 1KV
LF
297010
8998
252905
6732
252905
6701
6732 CURVE-P 100 ICO
A16P32P7 PULL CABLE 5KV ABOVE
LF
19900
1110
18285
725 18285
725
725 CURVE-P 100
100
A16P3JP7 PULL ELECTRNIC TC WIRE ...... LF .... ...... 99200
9629
86150
..... 9961 ... 86150
9961 ---------- 9961 CURVE-P 100 IOC
A16P39PP TERMINATIONS 600V C IKV
EA
9198
2353
5786
9092
5786
9029
9092 CURVE-P 100
100
A16P3SPP TERMINATIONS 5KV ABOVE
EA
102
320
117
986
117
967
986 CURVE-P 100
100
A16P36PP TERM!NATIONS ELECTR 6 TC
Ea .....
696 7
3697
7259
7S99S ..... 7254
.... 4485
9495 CURVE-P 100 .... 100.......
A16P91PP GROUNDING
UNITS
10900
3987
21815
2580
21815
2495
2580 CURVE-P 100
100
A16P92PP INSTALL GROUND WELL
EA
100
236
100
115
TOO
115
115 CURVE-P 100
100
A16P93PP ELECT HEAT TRACING
LF
8600
8256
2500
16 SB
2500
2oiI
1888 CURVE-P loo loo
A16P50P7 O/H POWER DISTRIBUTION
LF
13
9
0
0
0* 0
0 BLOCK-7
0
0
A16P 81IPP ELECT TESTING E CHECKOUT
UNITS
100
1280
100
1961
100
1999
1961 CURVE-P 100
100
A16P99 0 Secuno drop mat handling
QMIIRS ............... 1 ............. . 1
2 000
....... 2000
1799 -- ------- 1799 CURVE-0 100 .....100 ......
A1600100 FABRICATE REBAR
TONS
95 715
95 1266
95
1266
1266 CURVE-Q 100
100
A16Q11QQ PLACE FOUNDATION CONC
CY
2696
635U
9627
11098
9628
11098
11100 CURVE-Q 100
100
A160120U PLACE STRUCTURAL CONC
CY
22 51
869 3
2275
9037
2275
9037
903 7 CURVE-Q loo
100
A16U15QQ PLACE OTHER CONCRETE
CY
239
797
333
209
333
209
209 CURVE-Q 100
100
A16Q21QU PLACE FOUNDATION REBAR
TONS
132 3130
901 11622
901
11622
11622 CURVE-Q 100
100
O 8 1 2o
5
6o 0
9 III o
o
w
<1 21
9
9 A
23 3,
11
,,
37
*' *
44 K ,, 4'
,,
0
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MUC J[ REPORT NO. C38022-40
FOCUS
MASTER FILE LISTING
RUN OATE PAGE
5/24/02 3
o
o
/" ---------------------------------
o ,
hm......-- --........
........ .. ...
* $ $$$ $$$ $ *******<: $ $
00 .................
" . . ... -
2$
UNITS CURRENT
BUDGET 70-DATE PROGRESS
" PROJECT FORECAST
CUT -OFF DATE 5/21/82
TREND
PHYS TREND
o
OF
FCST
PCT
PCT
ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT
QUANT MANHOURS
QUANT MANHOURS
QUANT MANHOURS MANHOURS METHOD COMP COMP
C $$$$$$$ 4=* **
^ * * ** * $ $
YTTXT
0
8
A16U22QU PLACE STRUCTURAL REBAR
A16Q25QQ PLACE OTHER REBAR 9 A16Q31QQ PLACE E STRIP FDN FORMS
TONS TONS SF
223 16
17973
2858 375
6458
340 0
31715
21953 0
28507
341 0*
31715,
21953 0
28507
22038 CURVE-Q 0 BLOCK-Q
28507 CURVE-Q
100 0
100
loo 0
100
9 H' 0
l?
.0 A16U32QQ PLACE 6 STRIP STR FORMS
SF
37906
16t>7 2
70113
54213
70113
54213
54213 CURVE-Q loo 100........... " n
AI6Q35QQ PLACE E STRIP OTHER FORM
SF
1640
735
0
0
0* 0
0 BLOCK-G
0
0
<J
A16U6IQQ PLACE PRECAST CONCRETE
CY
478
1147
410
1780
410
17B0
1T80 CURVE-Q 100 100
l(
A16Q62QU PLACE PRECAST REBAR
TONS
82 1312
139
4193
139
4193"
"4193" CURVE-Q 100 100
Ai606300 PLACE PRECAST FORMS
SF
17700
7222
13015
9871
13015
9871
98T 1 CURVE-Q 100 100
,r 1
A16Q69Q0 SET PRECAST CONC ITEMS
CY
478
3824
410
7226
410
7226
7226 CURVE-Q 100 100
h: AI6071QU PLACE CONRETE PAVING
SF
70470
11275
36000
3894
36000
3894
3894 CURVE-Q 100 100
AI6Q73QU PLACE CONC ENVELOPES
CY
690
3312
685
3443
68 5
3443
3443 CURVE-Q 100 100
3
IS AI6R03
ELECTRICAL SUBSTATION
UNITS
100
560
100
1341
100
1345
1341 CURVE-0 100
100
10 A16R1U
BOILER FEED WATER BLOG.
UNITS"
100
270"
TOO
619
ruo
650"
619 CURVE-0 100 108
?n AI6R20
SATELLITE CONTROL ROOM
UNITS
100
350
100
1298
100
1300
1298 CURVE-0 100
100
A16S03S0 DEWATERING
BMHRS
2800
2800
4100
4673
4100
4673
4673 CURVE-S 100
100
21
,, A16SUS5 excavation e disposal .M AI6S12S5 BACKFILL C COMPACTION
CY CY
1702 9765
4953 7547
2900 5883
4804 5951
2900 5883
4804 5951
4004 CUftVE-5 TOO 5951 CURVE-S 100
ICO 100
v
A16S31S5 SEWERS 6 DRAINAGE
LF
3670
2466
3161
3415
3161
3415
3415 CURVE-S 100
100
Y.
Al6S32S5 PRECAST MANHOLES
UNITS..
2000
2450
"2400
3030
2400
3038
3038 CURVE-S 100 100
fi A16S41S5 FINE GRADING t. LEVELING
SF
70470
6146
46872
1781
46872
1900
1781 CURVE-S 100 100
.7 A16Y10 0 SCAFFOLDING AI 71 mi SMALL BORE CS PIPE S/A T
73 AI7L12L2 LARGE BORE CS PIPE S/A 7
BMHRS IF ......
LF
19186 1343 1027
19186
186T 2262
25390 1607 1908
77427 3371 6841
25390 ... ...1607
1909
77607 -------- 3371
6841
77427 CURVE-0 3371 CURVE-L 6846 CURVE-L
100 100 100
100 TOO....... 100
V
'
<0 AI7L21L1 INST AL PIPE 2IN L UNDER
LF
579
1101
336
445
336
445
44 5 CURVE-L 100 100
Tl AI7L80LL steam Trace Tubing s/a l
M A18L10
S/B 8 STM.TRACE SUBHORS.
LF LF
20 ..... 11 10 11
434 1488
168 3617
434 1489
168" 3617
160 CURVE-L loo 3619 CURVE-0 100
100 100
" a:-
!3 A10L11L| SMALL BORE CS PIPE S/A 8
LF
6978
8722
6732
22072
6732
21226
22072 CURVE-L 100
100
J4 AI8L12L2 Large bore cs pipe s/a a A18L21L1 SMALL BORE AL PIPE S/A 8
LF LF
2001 304
4100 475
2832 121
22114 327
2832 121
22007 32 7
22114 CURVE-L 100 327 CURVE-L 100
loo 100
:(
t A18L22L4 LARGE BORE AL PIPE S/A 8
LF
907
4017
1289
18764
1289
18764
18764 CURVE-L 100 too
V AI8L80LL STEAM TRACE TUBING S/A 8
LF
20
11 ........ 37iO
3652
3712
3552
3654 CURVE-l loo 100 "......... 4'.
A18L81
S/B 8 DEKATRACE
IF
20
11 4284
311 4284
311
311 CURVE-0 100 100
10 AI9L10
S/B 9 STM.TRACE SUBHORS.
LF
10
11
383
523
383
523
523 CURVE-0 100
100
A19LULI SMALL BORE CS PIPE S/A 9 4. A19L12L2 LARGE BORE CS PIPE S/A 9
LF LF
3036 1453
2604 3218
2108 2227
5355 11512
2l 1 3 2227
5355 11512
5369 CURVE-L loo 11512 CURVE-L loo
100 1U0
4? AI9L21L1 SMALL BORE AL PIPE S/A 9
LF
11
20
293
668
293
668
668 CURVE-L 100 100
,,
> AI9L22L2 LARGE BORE AL PIPE S/A 9
LF
7 31 48 1099 48 ......... 1099 ....... 1099 tURVE-L 100 100 .........
AI9L80LL STEAM TRACE TUBING S/A 9
LF
20 11 984 595 9e4 595 595 CURVE-L 100 100
4' A19L81
S/B 9 OEKATRACE
LF
20
11 1428
359
1428
354
359 CURVE-0 100 100
r.,.
4f A21L11LL INST CS PIPE 2IN C UNDER
LF
33
55
1636
2203
1636
2203
2203 CURVE-L 100 loti
r.
W A21L12L2 LARGE BORE CS SPLO PIPE
LF
26
50
1053
6745
1053
6745
6 74 5 CURVE-L 100
100
.1.0 A21LI7L2 LARGE BORE CS RACK PIPE A21L80LL STEAM TRACE TUBING SIB2I
LF LF
61
56
2982
4766
2982
4766
4766 CURVE-L 100 100
C1
20 11
191 444 .............191
191 CURVE-L 100 ....100 .........
A31E50EE INSTALL PUMPS E DRIVERS A31E70EE INSTALL OTHER EQUIPMENT
EA
ea
200 100
500 100
200 0
405 0
200 0-
405 0
405 CURVE-E 100
0 BLOCK-E
0
ICO a
w A31J01J9 FAB INSTR SUPPORTS
Ea
12 200
3 31
3 3i .................. 31 CURVE-J 1U0 100 .....
* A31J11J9 F1EL0 MOUNTED INSTRMENTS
EA
20 524
5 101
5
101
101 CURVE-J 100 100
''
... A31J15J9 INSTALL MINOR INSTRMENTS
EA
21 105
4 13
4 13 13 CURVE-J 100 loq
'
0
o
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC r> REPORT NO. C38022-40
FOCUS
MASTER FILE LISTING
RUN OATE PAGE
5/24/82 4
O
9
r ----------------- mmrn
' Mi
o?
$$$$$??*
$$$$$$$
UNITS
A ........ OF
o5 6
ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT #if$: & 4;$ $ $ $ s$ $ $$ ## $$ <! $$$#
I
oa
A31J50JJ INSTRUMENT SHELTERS A3U70JJ INSTALL ins tr tubeepipe
Ea LF
. A31J81JJ LOOP CHECK CALIBRATE
EA
10 A31J82JJ CALIBRATION E TESTING
EA
o A31L80LL STEAM TRACE TUBING
LF
A31M30MM PIPEWAY STEEL
TONS
n A3IP21P6 PLT 31 ELECT 1COMPOSITET
LF
oM
A31G40QQ PLACE CONCR TECCOMPOSITE1
CY
A31S11S5 EXCAVATION DISPOSAL
CY
16 A31S12S5 BACKFILL COMPACTION
CY
C IT 18
A31Y10
SCAFFOLDING
B09E10EE ERECT COLUMNS VESSELS
BMHRS EA
c ?i
B09E30EE B09E50EE B09E60EE
INSTALL HEAT EXCHANGERS INSTALL PUMPS DRIVERS INSTALL COIMPRESSORS
EA EA EA
B09E7OEE INSTALL OTHER EQUIPMENT
EA
?.l B09J11J9 FIELD MOUNTED INSTRUMNTS ?4 B09J15J9 INSTALL MINOR INSTRUMNTS
EA EA
B09J31JJ LOCAL CONTROL PANELS ?: B09J50JJ INSTRUMENT SHELTERS
UNITS EA
21 B09J70JJ INSTALL INST TUBE PIPE
LF
?a B09J81JJ LOOP CHECK
LOOPS
B09J82JJ TEST STORE
EA
B09L10L1 STEAM TRACE PIPE-SUBHORS
LF
B09L11L1 INST CS SPLD 2IN UNDER
LF
c i?
B09L12L2 INST CS SPLD 31N TO 6IN
LF
13 B09L70LL INSTALL U/GROUND PIPE
LF
14 B09L80LL STEAM TRACING
LF
c 15
B09L98LL TESTING INSPECTION
LF
36 B09M10MM STEEL STRUCTURES
TONS
37
V u*
B09M20MM B09M30MM B09P12PP
LADDERS E PLATFORMS PIPEWAY STEEL POWER CONTROL EQUIP
TONS TONS EA
* B09P14PP LIGHT FIXTURES RECEPIL
EA .......
4. B09P21P6 4? B09P31P7
43 " 809P33P7
INSTALL A/G RGS CONDUIT PULL WIRE 600V 1KV PULL ELECTRNIC ..IC WIRE
LF
LLFp
44 B09P34P7 TERMINATIONS bOOV 1KV
EA
44 B09P36P7 TERMINATIONS ELECTR TC
EA
46 B09P41P7 GROUNDING ...............
LF
B09P43PP ELECTRIC HEAT TRACING -<> B09P80PP ELECTRICAL TEST CHKOUT
LF UNITS
r. 80901100 PLACE FOUNDATION CONC
CY
>n
B09021QQ PLACE FOUNDATION REBAR B09Q31QQ PLACE E STRIP FDN FORMS
TONS SF
7 B0907100 PLACE CONCRETE PAVING
SF
o B09R90QQ BUILDING WORK
UNITS
,4 B09S11S5 EXCAVATION DISPOSAL
CY
o '
00 CURRENT "~ ' '
BUOGET
TO-OATE PROGRESS
PROJECT
CUT-0 FF "UA TE 5/Z1782
$#$$SSSSS$S$SSSSSS$S:$S
FORECAST
TREND
PHYS TREND
2 3
9
' FCST.......
....... PCT
PCT -------- b
QUANT MANHOURS
2 T~ 200
44 1
20 1 9
57
355~ 185 105
6 11 38
5 400
QUAN7 MANHOURS
- ? "---------------32
190
89
74
--r
4
00
5 1706 --
209 7^3
12 438
QUANT MANHOURS
4 190
7 7 0-
5 17116
12
32 89 11 10
0 209 793 438
MANHOURS METHOD COMP CCMP
$$$$$$$$$
vrvvr?
32^CURVE-J" too 100
89 CURVE-J 100 100
4 CURVE-J 100 6 CURVE-J IDO
100 100
0 BLQCK-L
0
0
209 CURVE-M 100 100
797TURVE-P 100 TOO
438 CURVE-Q loo 100
6#
fl
9
,n
I? 13 4
16
.0
60 103 746 500 600 400 100 300
0 0 0 0
230 370 746 38 7 272 290 500 ` 120
0 0 0 0
60 50
0 600 900 300 100 300
0 0 0 0
243 34 0
733 213
10 252
0 41
5 0
23
60 50
0* 600 900 300 loo 300
0* 00* 0*
243 34 0
733 2l3
10 252 160
41 5 0
23
243 CURVE-S 34 CURVE-S 0 TARGET
733 CURVE-E 213 CORVE-E
10 CURVE-E 252 CURVE-E 190 BLOCK--E
41 TO-OATE 5 TO-OATE 0 BLOCK-J
23 TO-OATE
100 loo
0 100 100 loo loo 100
0 0 0 0
100 loo
0 100 1G0 ICO 100
0 100 100
0 100
X ?, j;
?
?r
?tt
.11,
14
0 1 149
0 0 0 9 0 0
0 4
345 0 0 0 8 0 0
0 25
22 0 0 0
117 0 0
0 105
85 40 26 302 168 44 75
os 25 22
OS os
os
117 os
OS
0 105
85 40 26
302 168
44 75
0 BLQCK-J 105 CURVE-J
85 CURVE-J 40 TO-OATE 26 fO-OAfE 302 TO-OATE 168 CURVE-L 44 TO-OaTE 75 TO-OATE
0 100
100 0 0 0
100 0 0
0 ,6
100 100
-17 11
1G0 ioo
40 4,
100
1?
100
.....loo.............. 4-
100
4f,
13 466
8 210
8
210
210 CURVE-M 100 100
41
13
842 ~
-j
T039
" " 7'
1039
1039 CURVE-M 100 "100
15 574
42 1458
42 1458 1458 CURVE-M 100 100
lb 755
13 174
13 174 174 CURVE-P 100 ioo
44 ........252 ............. ' 26 .... ... ..... 67 ........... .....26....~ ...............67
.........67 CURVE-P 100 100 .......
3814
2259
5250
1840
5250
1840
1840 CURVE-P loo 100
S4
36200
805
17400
328
17400
328
328 CURVE-P loo 100
6250
305
... "2265 ... " ' "77"
2265...
77
77 CURVE-P 100 IOC
315
201
100
54 100
54
54 CURVE-P 100 ICO
320
187
80 118
80 118 118 CURVE-P 100 100
950 800 100
302 2517
250
iOoo 50
100
227 50
158
looo 50
100
............227 ....227 CURVE-P
50 50 CURVE-P
158
158 CURVE-P
100 100 100
100 ........ r.i
100 r
100
''
122 .............. 317
133
........391 ............... 133 "
391 ..391 CURVE-0
TOO ..... 100
5 126
7 715
7 715 715 CURVE-Q 100 100
4700
1965
2690
1024
2690
1024
1024 CURVE-Q 100 100
4080
660
4090
340
4080
340 .............. 340 CURVE-Q 100 100 -------
100
240
0
0
OS 0
0 BLOCK-Q
0
0
BOO
1611
653
1324
653
1324
1324 CURVE-S 100 100
n
...
GARRARD 00000670
e# # # 0
JOB NO. 14053-000 ROBINSON REFINRY MODERN2TN PROJ-MOC REPORT NO. C38022-40
FOCUS MASTER FILE LISTING
RUN QATE PAGE
5/24/62 5
<5
9
r i 4*
AaA. gk4g iAp 4.aA. Ag <4?
00 ********* ************
CUT-OFF DATE 5/21/82 ******
1
79
3
UNITS CURRENT
BUDGET TO-DATE PROGRESS PROJECT FORECAST
TREND
PHYS TREND
4 OF
FCST
PC? PCf
5 acct. no DESCRIPTION OF ACCOUNT RC QUANT
QUANT MANHOURS
. QUANT MANHOURS
QUANT MANHOURS MANHOURS METHOO COMP CCMP
0
* *$ $*4: * * * * ** <:* 4= * *$ 4:*4: $ * ****************** *********** ********
*********** ********* *6$3$$S 3 3*3
****** *****
9
; B09S12S5 BACKFILL 6 COMPACTION
B09S31S5 SEWERS DRAINAGE 0 B09S32S5 PRECAST MANHOLES
CY LF EA
650 300
348 . 171
499 287
310 1209
4W 287
3 to 1209
HO CURVE-5 100 1209 CURVE-S 100
TOO 100
9
10 9
1 136 1 4 1 4 4 CURVE-S 100 100
10 B09S41S5 FINE GRADING LEVELING
SF
2200
215 2200
65 2200
65
65 CURVE-S loo 100
B09Y10
SCAFFOLDING
1? B20U40QU PLACE CONCRTEICOMPOSITEI
11 B20S11S5 EXCAVATION BACKFILL
.4 B21E10EE ERECT COLUMNS VESSELS
IS B21E50EE INSTALL PUMPS DRIVERS
,0 B21LUL1 INST CS PIPE 2IN UNDER
MHRS CY CY EA EA LF
0
7 13 100 400
0
0
100 40 25
1005 0
0
0 .0
100 600
0
2052
0 0 59
314 0
0* 0$
0* 100 600
0*
2052 0 0
59
314 0
2052 TO-DATE 0 BLOCK-Q "0 BLOCK-5
59 CURVE-E 314 CURVE-E
0 BLOCK-1
0 0 15 100 loo 0
100 0 0
100 100
0
9 ,,
><
"3
1/ B21L12L2 LARGE BORE CS SPLD PIPE 16 B21L1TL2 LARGE BORE CS RACK PIPE
LF LF
0
0
0
0
0 1
0 BLOCK-2
0
0
3
0
0
0
0
03 35
0 BLOCK-2
0
0
J.
.0 B21L22L4 LARGE BORE AL SPLO PIPE
LF
230 385
0
0
03 0
0 BLOCK-4
0
0
?
M B21L24L4 LARGE BORE AL RACK PIPE
LF
360 596
0
0
03 0
0 BLOCK-4
0
0
21 B21L98LL TESTING INSPECTION
LF
0
0
0
0
03 0
0 BLOCK-L
0
0
Jr
n B21M30MM PIPEWAY STEEL '3 B21M40MM MISCELL STRUCT STEEL
TUNS TONS
462 17380 59 4420
327 16443 5 108
327 16443 16443 CURVE-M loo 100 5 180 108 CURVE-M 100 100
?? r t
B21P12PP POWER CONTROL EQUIP BZ1P14PP LIGHT FIXTURES RECPTLE X B21P21P6 INSTALL A/G RGS CONDUIT
EA Ea LF
10 640
a 97
8
97
97 CURVE-P 100 100
1;
9 2700
. 80 1696
0 600
0 291
03 600
80 291
O BLOCK^F
0
291 CURVE-P 100
0 100
V, !:
n B21P31P7 PULL WIRE 600V 1KV LF 15100 560 1200 74 1200 74 74 CURVE-P 100 ICO
/fl B21P32PB PULL CABLE 5KV ABOVE 74 B21P34PP TERMINATIONS TESTING
LF ............... 1 ............. 81....... EA 20 157
0 50
0 ... 126
~.. 03 50
-0 126
-- 0 FLOCK-8 ......0.....
0 ....... 1,
126 CURVE-P 100 ICO
1" 3
m B21P43PP ELECT HEAT TRACING 11 B21Q40QG PLACE CONCRTElCtMPOSITEI
CLFy
3B002 '
320 1362
2800 217
622 2698
2800 217
622 2698"
622 CURVE-P 100 ICO 269B"CURVE=Tr 100" 100
17 B21SUS5 EXCAVATION DISPOSAL
CY
1305
3465
469 1107
469
1107
1107 CURVE-S 100 100
'1' 3
n B21S12S5 BACKFILL COMPACTION
CY
1224 535 288 333 288 333 333 CURVE-S 100 100
14 B23E 10EE ERECT COLUMNS VESSELS 15 B23E30EE ERECT HEAT EXCHANGERS
lb B23E 31Ec ERECT CONDENSER 23E-9
EA EA EA
looo 1200
100
2000 520
1980
1400 ----------4525
1300
843
100 1100
1400 1300
100
4 525 ....
843 1100
4525 CURVE-E 843 CURVE-E
1100 CURVE-E
100 100 100
100 .... ..
100 4. 3
100
B23E40EE ERECT FIRED HEATERS
....... EA
.... 100
2300 ...... ... 100 ----------4688
loo...
4688
46BB TURVE-E "100 100----------
3" B23E50EE INSTALL PUMPS DRIVERS
EA
2200
3900
2000
1443
2000
1443
1443 CURVE-E 100 100
3
39 B23E70
OTHER EQUIPMENT
UNITS
300
150
ZOO
82 200
74
82 CURVE-0 loo ICO
V.
4b B23J01J9 FAB INSTRUMENT SUPPORTS
EA
24 ......... 405
15 91 ....... ' 15.... ... ....... 91 ........ 91 CURVE-3 loo 100 .........
1 B23J11J9 FIELD MOUNTED INSTRUMNTS 47 323J15J9 INSTALL MINOR INSTRUMNTS
EA EA
40 231
1282 1679
71 1016 186 1083
71 186
1016 1083
1016 CURVE-J 100 1083 CURVE-J 100
100 100
v Q:.4
,3 B23J31JJ Local control panel
UNITS
100
36 100
16 100 ------ 16
16 CURVE-J loo ICO
44 B23J50JJ INSTRUMENT SHELTERS
EA
23 768
22 617
22 617 617 CURVE-J loo 100 <3
4S B23J50JJ ANALYSER CONTROL PCKGE
EA
15 140 1 8 1 8 8 CURVE-J 100 100
"= B23J70JJ INSTALL INSTR TUBEEPIPE
Lf
1180
730
1600
1643
1600
1627
1643 CURVE-J 100 100
B23J81JJ LOOP CHECK 41 B23J82JJ CALIBRATION TESTING
EA EA
32
400
134
883
134
883
883 CURVE-J 100 100
Qc.
310 1748
80 639
80
639
639 CURVE-J 100 100
fi
41 B23J95JJ EMERGENCY SO REDUNDANCY
UNITS
ido
449
0
0
03 0
0 BldCK-J
0
0
H B23L10L1 STEAM TRACE PIPE-SUBHURS
LF
5
7 1279 3147 1279 3147 3147 CURVE-L loo 100
O
B23L11LI INST CS PIPE 2IN UNDER
LF
5168
5665
3053
8711
3052
3711
8711 CURVE-L 100 100
B23L12L2 INST CS SPLD JIN 10 6IN
LF
50 86
13915
3711
12583
3 711
12587
12583 CURVE-L loo 100
B23L21L1 INST AL PIPE 2IN UNDER
LF
2 80 611
0
0
03 5800
0 BLOCK-1
0
0
o
B23L70LL INSTALL U/G PIPE
; LF
490
581
990
1236
990 1236 1236 CURVE-L loo loq
oo
GARRARD 00000671
9
O
JOB NO. 1`053-000
ROBINSON REFINRY MOOERNZTN PROJ-MOC
FOCUS MASTER FILE LISTING
RUN DATE PAGE
5/24/82 6
O
0 REPORT NO. C38022-40
o
-.
i
.....
00
CUT-OFF DAtE 5/21/82
1
7
3
S
6
,
ACCT. NO B23L80LL
DESCRIPTION OF ACCOUNT inst stm Trace tubing
UNITS OF
RC QUANT
$$$$$$$$$
LF
CURRENT QUANT 2 50
BUOGET MANHOURS
135
TO-DATE PROGRESS
QUANT MANHOURS
4400
3055
PROJECT FORECAST QUANT MANHOURS
TREND FCST MANHOURS METHOD
PHYS PCT CCMP
TREND PCT
CCMP
4405"
1005
3005 CURVE-L 100
100
29
5
69
0 9
9
i0
1
2
!
' C<
B23L91LL B23L93LL B23L98LL B23M10MM B23M20MM
B23M30MM 823N30
B23N40
ASSIST XRAY E ST RELIEVE FAB TIE-IN SPOOLS TESTING E INSPECTION STEEL STRUCTURES PLATFORMS E LAOOERS PIPEWAY 3TEET"" FIREPROOFING LUGS FIREPROOF STRUCT STEEL
UNITS EA LF TUNS TONS TONS UNITS CF
100
L 17055
60 28 62
1
3537
225 13
1933 2385 2075 2540
1
12462
"
100
36 "2421T
7 34 17 725
0
483 901 4195' 650 4055 816 808
0
100
36 "24212"
7 34 17 725
09
483 901 - 4195
650 4055
BT5" 808
0
483 CURVE-L 901 CURVE-L ------ 4T95" CURVE-L 650 CURVE-M
4055 CURVE-M BPS "CURVE-M 808 CURVE-0 0 TARGET
100 100
TOO
100 100 100 100
0
100 100
100 .......
100 100 "100 100
0
9.0
1
9
>
9
7
6
i ft
823P12PP B23P13PP
B23P14PP B23P21P6 B23P23P6
B23P25P8
POWER E CONTROL EQUIP EMERGENCY E STANDBY EQUP
LIGHT FIXTURES E RECEPTL INSTALL A/G RGS CONOUIT INSTALL NON-MET CONOUIT INSTALL CABLE TRAY
EA EA
EA LF LF
LF
1
53 21915
3100 400
.....
2400 400
480 12456
400 240
..... 52
0
203 26500
3470
0
---------- 1239.....
0
683 TO 460
563
0
--- -------52 09
203
26500" 3470 09
.....1239 ........... 1239
0
683 10476"--
563
0
683 10460
563
00
CURVE-P BLOCK-P CURVE-P CURVE-P CURVE-P BLOCK-8
TOO
0
100
"TOO 100 0
... 100...........
0
100
TOO 100
0
2,
2.
2 B23P3IP7 PULL WIRE 600V E 1KV
LF ' 66360 ... i9l5
>3 B23P32P7 PULL 5KV E ABOVE CABLE
LF
14 1
B23P33P7 pull electrnic e tc wire
LF
40375
1792
T6Ij
B23P34P,P terminations 6oov g ikv
EA
1168
: ,
B23P35PP 5KV E ABOVE TERMINATIONS B23P36PP TERMINATIONS ELECT E TC
EA EA
1
3087
a 1749
64000 1700
30000 850 36
2900
1259 25
1293 " 238
86
970
64000 1700
30000
BOO 36
2900
1259 25
1293 230
86
970
1259 CURVE-P 25 CURVE-P
1293 CURVE-P 230 CURVE-P 86 CURVE-P
970 CURVE-P
100 100 100 100 100 100
loo 100
100 100
100
100
2*1 3(
12
' "8 29
30
31
B23P41PP B23P43PP B23P50P7 B23P80PP
GROUNDING
ELECTRIC HEAT TRACING 0/H POWER DISTRIBUTION ELECT TESTING E CHECKOUT
LF LF LF UNITS
1500 3850
53
100
480 3775
10
385
2020
0
1725
100
445
0
240 364
2020
09 1725
loo
445
0
240 364
445 CURVE-P 0 BLOCK-P
240 CURVE-P 364 CURVE-P
loo
0 100 100
100
0 100
"Too
3/ v:
7
B23P99
SECOND DROP MAT HANDLING
BMHRS
1
1
0
0
09 0
0 TARGET 0 0
B23U01Q0 FABRICATE REBAR
TUNS
1
16
10 1285
10
1285
1285 CURVE-Q 100
100
}4
35
36
- 3?
B23QUUQ B2 3012 QQ 823U21QQ B23Q22QQ
PLACE FOUNDATION CONC
PLACE STRUCTURAL CONC PLACE FOUNDATION REBAR PLACE STRUCTURAL REBAR
CY CY TONS ..... TONS
412
1059
10 38
16 359
T ........ ~ 13
410
114 27
10
2090
442 2016 no*!...
-
4io 114
27
10
2090 442
2016 1199
2090 CURVE-Q 442 CURVE-Q
2C16 CURVE-Q 1199 CURVE-0
100
100 100
TOO
100
ICO
100
100......
ns M
' in
jn
B23Q31QQ PLACE E STRIP FON FORMS D23U32QQ PLACE E STRIP STR FORMS
SF SF
8455 98
3611 44
7200 6326
4266 3919
7200 6326
4266 3919
4266 CURVE-Q 100 3919 CURVE-Q 100
100 100
40 B23Q61QQ PLACE PRECAST CONCRETE .......CY
10 .............. 24 .......... 171
557 .... m ........... 557 .....
557 CURVE-Q TOO 100
B23Q62QQ PLACE PRECAST REBAR B23063QU PLACE PRECAST FORMS
TONS
1 16 28 1531 28 1531 1531 CURVE-Q 100 100
SF 10 4 7541 5676 7541 5676 5676 CURVE-Q 100 100
43 B23Q69
SET PRECAST CONC ITEMS
CY
10
80
17 3
3619
.... 17 J
3619
3619 CURVE-0 100 TOO
B23Q71QQ PLACE CONCRETE PAVING
B23Q73QU PLACE CONCRETE ENVELOPES
4f B23R01
BUILDINGS
SF CY MHRS
2199U 93
0
5592 445 0
21990 108 0
2760 1258
0
21990 108 0
2760 1258
0
2 760 CURVE-Q 1258 CURVE-Q
0 BUDGET
100 100
0
100 100
0
B23R95 0 REVAMP EXISTING BLDGS B23S03S5 DEWATERING
UNITS BMHRS
100 870
299 875
100 756 870 4306
100 870
756 4306
756 CURVE-U 100 4306 CURVE-S 100
100 100
49 B23S11S5 EXCAVATION E DISPOSAL
CY
2664
3560
3745
4490 .... 374 5 ........ 4535 ... ...4490 CURVE-S TOO TOO .....
50
,1
B23S12S5 BACKFILL COMPACTION B23S31S5 SEWERS E DRAINAGE
CY
2711
1060
3676
3671
3676
3671
3671 CURVE-S 100 100
"
LF
1033
688 1537 3366 1537 3366 3366 CURVE-S 100 100
.2 .......B23S32S5 'il 823S41S5
B23S98 65
PRECAST MANHOLES
F1NEGRA0ING E LEVELLING
DEMOLITION
,
EA
SF UNITS
7 21990
100
855 1925 449 6
8 21990
100
579 920 6613
....... a 21990
100
579 ............579 CURVE-S
768 920 CURVE-S
6613
6613 CURVE-S
100 100 100
100 ..... "
100
"
100
oO
o
_!
JOB NO. I<(053-000 ROBINSON REFINRY M00ERN2TN PRQJ-MOC REPORT NO. C38022--40
FOCUS MASTER FILE LISTING
RUN DATE PAGE
5/24/82 7
o o
--------------- ---
1
---------- --------------
H ...........
7 *:*$*$$*******jJ: *Jj! $ $* * ** $ #$*$ $ $ % $ ****#**
OC ***********
********** *********************
3
UNITS CURRENT .......OF....
BUDGET
--TO--D- ATE- -
PROGRESS `'
PROJECT FORECAST
'-OFF
TREND FCST......
0ATE 5/21/87 ******
PHYS TRENO PCT ... PCT
--
o
S ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT
QUANT MANHOURS
QUANT MANHOURS
6
************************** ***$#$* *********
********* **********
QUANT MANHOURS MANHOURS METHOD COMP CCMP ********** * **** **$ ******* 3 ***** ******
o
? S2 3Y 10 0 SCAFFOLDING .....................
BMHRS
20978
20926 " "70928"
"28735
70428
78735 " -------Z1735~CLfKVE-0 TOO
100.....
3
ft B24L1IL1 INST CS PIPE 2IN G UNOER a B24L12L2 INST CS SPLD 3IN TO 6IN
LF LF
10
11
2031
4689
2031
4689
4689 CURVE-L 100
100
H
10
27
2531
7493
2531
7493
7493 CURVE-L 100
100
10 B24Y10
SCAFFOLDING
MHRS
0
0
0 1585
d* 1585
1585 TO-DATE
0 100
1
-i B2 5L11L1 INST CS PIPE 2 IN G UNOER i? B25LI2L2 INST CS SPLD 3IN TO 6IN
LF LF
10
11
1542
2053
1542
2053
2053 CURVE-L 100
100
10
27
168T
5281
1687
5281
5281 CURVE-L 100
100
B25Y10
SCAFFOLDING
MHRS
0
0
0 1982
0* 1957
T982 70-0ATE
a- 100
t
'I B28E10EE ERECT COLUMNS 6 VESSELS
EA
1200
1050
TOO
771
TOO
771
771 CURVE-E 100
100
9
B28E30EE ERECT HEAT EXCHANGERS 16 B28E50EE INSTALL PUMPS 6 DRIVERS
1' B28E70EE INSTALL OTHER EQUIPMENT ie B28JOIJ9 FAB INSTR SUPPORTS
EA EA EA EA
500 300
200
14
200 120 1200
235
200 0
200
4
34
0
231 18
200
a*
200
4
34
0
239 18
34 CURVE-E 0 BLOCK-E
231 CURVE-E 18 CURVE-J
100 0
100 100
100 0
100 100
?
?t
19 B28JI1J9 FIELD MOUNTED INSTRUMNTS
EA
17 516
12 144
12 144 144 CURVE-j 1U0 loo
?0 B28J15J9 INSTALL MINOR INSTRUMNTS
21 B28J50JJ INSTRUMENT SHELTERS 2? B28J60JJ ANALYSER G CONTROL PCKGE ?:) B28J70JJ INSTALL INSTR TUBEGPIPE
EA EA EA LF
B6 16
2
752
729 377 355
686
48
8 0
600
176 147
0
214
48
8
04 600
176 147
0
214
176 CURVE-J 147 CURVE-J
0 BLOCK--J 214 CURVE-J
100 100
0 100
100 100
0 100
.9 ?
B28J8IJJ LOOP CHECK
EA
22 194
29
92
29
92
92 CURVE-J 100
100
1
2f. B28J82JJ CALIBRATION G TESTING
EA
128
737
12
30
12
30
30 CURVE-J 100
ICO
9B28J95JJ EMERGENCY SO REDUNDANCY
UNITS
100
660
0
0
04 0
0 BLOCK-J
0
0
21 B28L10L1 STEAM TRACE PIPE-SUBHDRS 26 B28L11LI INST CS PIPE 2IN G UNDER
20 B28L12L2 INST CS SPLD 3IN TO 6IN 3C B28L21L1 INST AL PIPE 2IN 6 UNOER
LF LF LF LF
2
4483 1705
10
3 5058 2933
44
412 308 3
1102
0
639 .... 6557
3475 0
412 3083
1102
04
639 6557 3475
0
639 CURVE-L 6557 CURVE-L 3475 CURVE-L
0 BLOCK-1
100 100 100
0
100
TOO....
100 0
t,
7
' 3
11 B28LT0LL INSTALL u/g PIPE
12 B28L80LL STEAM TRACING 33 B28M10MM STEEL STRUCTURES 1, B28M20MM PLATFORMS G LADDERS
LF LF TONS TONS
10 22
50 27
32 I
------------1--7- 72S5--
0 888
1
13
6
1327 65
1044
04
888 1
..."""........ 13...
6
1327 65
...... 1044
6 TO-DATE 1327 CURVE-L
65 CURVE-M 1044 CURVE-M
0 100 100 100
100 100 100
....loo.....
* 9
<
9Ji B28N40
FIREPROOF STRUCTURAL STL
CF
891
3200
0
0
04 0
0 TARGET 0 c
* B28P12PP POWER 6 CONTROL EQUIP
EA
8 294
0
8
C4 8
8 TO-DATE
0 100
If B28P14PP LIGHT FIXTURES G RECEPtL ..... EA ....
... 26
160
39 "71 ................ 39 ........... 71
71 CURVE-P 100 .... 100...."
<
ifl B28P21P6 INSTALL A/G RGS CONDUIT
LF
19 B28P31P7 PULL HIRE 600V G 1KV
LF
til B28P33P7 PULL ELECTRNIC G TC WIRE ..... LF
5150 15420
3670
2729 39 7
... 222
5 000
12000
...........3065
......
1872
5000
122
12000
130 -----------3065.....
1872
122
......... 130
1872 CURVE-P -----------1132Q2 CURVE-P
CURVE-P
100 100 100
100 100 100
9
' B28P34PP TERMINATIONS 600V G 1KV
B28P36PP TERMINATIONS ELECT G TC
43 B28P41PP GROUNDING
44 B28P43PP ELECT HEAT TRACING
4', B28Q1LQQ PLACE FOUNDATION CONC
46 B28U21QQ PLACE FOUNDATION REBAR
,, 828Q31QQ PLACE G STRIP FDN FORMS
ie B28Y10
SCAFFOLDING
EA EA LF LF CY Tons
sf
MHRS
88
418 700 2700 142
5 2923
0
139 229 225 2640 335 107 1150
0
100
400 480 5300
81 4
2191
0
29
7030
1930 250 435
1120
964
100
400 450 5300
81 4
2191 04
29 70 83 1930 250 435
1120
964
29 CURVE-P 70 CURVE-P 83 CURVE-P 1930 CURVE-P 250 CURVE-Q 435 CURVE-0 1120 CURVE-Q 964 TO-OATE
100 100
100
100
100 100 100
0
100 100 100 100 100
... 100 .....
100 100
*O
V,
s o
DO
61
of,;
B29E10EE ERECT COLUMNS 6 VESSELS B29E30EE ERECT HEAT EXCHANGERS
BMHRS EA
loo500
35 650
300
100
....... 42 383
300
100
.... 42 383
4? CURVE-E .. 100 .. I CO......
383 CURVE-E 100
100
55
ro o
B29E50EE INSTALL PUMPS G DRIVERS * B29J01J9 FAB INSTRUMENT SUPPORTS
B29JU J9 INSTRUMENTS B29JI5J9 INSTRUMENTS
EA EA EA EA
400
0 0 0
800
500
0 ......... 0
00
a0
229
0 8
25
500 04 04 04
229
0 8
25
229
0 8
25
CURVE-E BLOCK-9 TO-DATE TO-OATE
loo ...... 0
0 0
100
....... 0 ICO
1001
CP W
o
n
oo
___3
0
JOB NO. 14053-000 ROBINSON REF1NRY MODERNZTN PROJ- MOC
e REPORT NO. C38022-40
FOCUS MASTER FILE LISTING
RUN DATE PAGE
5/24/82 a
a a
--...............
MM - ...........................-
M
'
c
1 A
c
6
$ % $$$* j* $$ $
ACCT. NO #$$$$$$ J.
DESCRIPTION
B^B |A> .Ab
OF ACCOUNT
A. b4b b
bA. *4. B^B B.B
RC
*A
UNITS OF
QUANT
00" * --
CURRENT
BUDGET
QUANT MANHOURS
TO-DATE PROGRESS PROJECT FORECAST
QUANT MANHOURS
QUANT MANHOURS
$ $ # TjS$ $$4S $$ $ $$ * $S *
--CUT^UFFTWTF 577I7B2"~ $$$$$$ **
TREND
PHYS TREND
FCST
PC 1
PCT
MANHOURS METHOD COMP CCMP
*****
1
l9 4
>
*3
*
7
I > n
n 10
r 11
i,. 7
in
,0
??
B29J50JJ B29J60JJ B29JT0JJ B29J81JJ B29J82JJ B29J95JJ B29LlOLl B29L11L1
B29L12L2 B29LT0LL B29L80LL B29L98LL B29M10MM B29N40 B29P12PP
B29P14PP B29P21P6
INSTRUMENTS ANALYSER L CONTROL PCKGE INSTRUMENTS LOOP CHECK CALIBRATION E TESTING EMERGENCY SO REDUNDANCE STEAM TRACE PIPE-SUBHORS INST CS PIPE 2IN 6 UNOER INST CS SPED 3IN TO bINN INSTALL U/G PIPE STEAM TRACING TESTING E INSPECTION STEEL STRUCTURES FIREPROOF STRUCT STEEL POWER E CONTROL EQUIP LIGHT FIXTURES E RECEPTL INSTALL A/G RGS CONDUIT
EA EA LF EA EA UNITS LF LF LF LF LF LF
Tons CF
EA EA LF
0 7 100 14 72
100 0
263 561
5 0 0 5 243 11 21 3685
0 155
86 140 459
75 0
241 1112
7 0 0 200 900 480 320 2285
0 0 379 29 18 0 0 83
534 180
0 0 1 0 17 38 7500
10 0
139 348
87 0
47 131 3156
468 121
65 20
0 289
174 2895
0* O'* 379 29 18 0* 0*" 83 534 180 0* 0*
--j
0*
17
38
7500
10
10 TO-DATE
0
0
0 BLOCK-J
0
139 348
139 CURVE-J 100
348 CURVE-J 1150
87 87 CURVE-J 100
0 jjy-
0 BLOCK-J 47 TO-OATE
0 0
131 131 CURVE-L 100
3142
3156 CURVE-L 100
468 ~ ...... 468 CURVE-L ..loo
121
121 TO-OATE
0
65
65 TO-OATE
0
20 20 CURVE-fT TOO
0
0 TARGET
0
289
289 CURVE-P 100
174
174 CURVE-P 100
2895
2895 CURVE-P 100
TOO 0
100 100 100
0 ruo loo 100 loo... 100 100 100
0 100 100 ICO
i"n
.?
13
M <1
It
If 3
?r " 7.
77
M 2'i ?r
74 36
?4 B29P23P6 INSTALL NON-MET CONDUIT 70 B29P25P8 INSTAlLTaBlE TRAY B29P31P7 PULL WIRE 600V E1KV
LF LF LF
900 820 9200
160 T3SB 1037
0 0 12400
0 0 505
0* 0*
12400
0 0 505
0 BLOCK-6 0 BLOCK-B 505 CURVE-P
0 0 100
0 0 100
37 33 31
H B29P33P7 PULL ELECTRNIC E TC WIRE
LF
17100
875
15700
346
15700
346
346 CURVE-P 100 100
If
,'fl ......B29P34PP TERMINATIONS 600V EKV........ 74 B29P36PP TERMINATIONS ELECT E TC
EA EA
189 429
138 272
300
300
141 225
300 300
141 225
141 CURVE-P 100 22 5 CURVE-P 100
100 .......... 17
100
36
10 B29P41PP GROUNOING )l B29P43PP ELECTRIC HEAT TRACING V B29U40QQ PLACE CONCRTE(COMPOSITE!
LF LE CY
300 1025
43
160 1025
810
400 0
29
81 0
581
400 d*
29
81 0
581
81 CURVE-P 0 BLOCK-P
581 CURVE-Q
100 0
100
100 0
100
10 1. .1?
1.1 B29QUQQ PLACE CONCRETE PAVING
.4 B29U73QQ place concrete envelopes 15 B29S11S5 EXCAVATION E DISPOSAL
SF CY........ .. CY
2534 ....... 18
440
585
500
25
.... 105 --------------- 0 .......-' 0
690
126
916
500
25
0* ..................0
126
916
25 CURVE-Q - o BLOCR-a
916 CURVE-S
100 .... 0 100
100
11
".....0............ 1-
100
If
10 B29S12S5 BACKFILL E COMPACTION ,7 " B29S31S5 SEWERS C DRAINAGE ................
CtFY
437 ..... 174
215
88
170 .............179
261 400"
88 179
261 400
261 CURVE-S 100
100
400 CURVE-S 100 _ log...
r 1.
B29S41S5 FINEGRAOING E LEVELING
SF
2534
225
500
66 500
66
66 CURVE-S 100 100
.10 B29Y10
SCAFFOLDING
MHRS
Q
Q
0 98
0* 98
98 TO-OATE
0 100
40 B30PUPP POWER DISTRIBUTION EQUIP EA .................. 9 ............2590 " - ....... 8 ............... 359 .............. 8 ............ 359 ...........359 CURVE-P 100 100.............
11 B30P21P6 INSTALL A/G RGS CONDUIT
LF
200
560
245
111 245
111
111 CURVE-P 100 ICO
47 830P23P6 INSTALL NON-MET CONDUIT
LF
300
320
0
0
0* 0
0 BLOCK-6
0
0
.,1 ` ""B30P35PP TERMINATIONS 5KV E ABOVE 41 B30P50P7 O/H POWER DISTRIBUTION
EA LF
... 35 ... 2386
312 ........... ' ' 36 ------- ----300 "
36....
1279
13400
3248
13400
300 3248
' 300 "CUR VE-P luo
3248 CURVE-P too
TOO .. 100
"
V. B30P80PP ELECT TESTING E CHECKOUT
UNITS
100
160
100
87 100
87
87 CURVE-P 100 100
,t
ir, B30Q73QU PLACE CONCRETE ENVELOPES
CY
s 100
io
2 10
2
2 CURVE-Q 100 100
n
B30S11S5 EXCAVATION E DISPOSAL
CY
34 70 10 8 10 8 8 CURVE-S 100 100
m B30S12S5 BACKFILL E COMPACTION
CY
25 30
8
0
8
0
12 BLOCK-5 100
0
44 B32E20EE ERECT STORAGE TANKS
EA
200
100
300
57
300 ...............57 ' `
57 CURVE-E 100
loo
B32E50EE INSTALL PUMPS E ORIVERS
EA
300
1250
300
1696
300
1696
1696 CURVE-E 100 100
> B32E70EE INSTALL OTHER EQUIPMENT
',7 B32JI1J9 FIELD MOUNTED INSTRUMNfS
B32J15J9 INSTALL MINOR INSTRUMNTS B32J31JJ LOCAL CONTROL PANELS
EA EA EA UNITS
600
0 0 100
917
0 0
35
800 0 0
100
390
4 44
0
BOO
0* 0*
100
390
4 44 35
390 CURVE-E
4 TO-OATE 44 TO-DATE 20 BLOCK-J
100
0 0
100
100
100 100
0
O'
'
'r
GARRARD 00000674
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC
REPORT NO. C3802Z-40
FOCUS
MASTER FILE LISTING
RUN DATE PAGE
5/24/82 9
oo
UNITS CURRENT
... OF
~
BUDGET
H#Xf 4s
TO-DATE
4=*4! $4:4: $$$4:$4:4:$$ 4=4=4:4:$4:4:4:4:$4:
PROGRESS PROJECT FORECAST
------------ CQT^BFF DATE 57217 82
TREND PCS?
... ...
PHYS TREND
PCT
PCT
o o
,
9 .0 >1
n
|4
ir i/
>8
19
?>
?2
24 ?5
T 2b
n
42
V.
.
t" J`i " 4?
f 44
16
r
*
Q
o
o
B32J60JJ
B32J70JJ B32J81JJ B32J82JJ B32L10L1 B32L11L1 B32LI2C2
B32L70LL B32L80LL B32L91LL
B32L98LL B32M40MM B32P12PP B32P14PP
B3ZP21P6 B32P22P6 B32P31P7 B32P32P7 B32P33P7 B32P34PP B32P35PP B32P36PP B32P41PP B32P43PP B32P50P B32QUQQ B32Q21QQ B32Q310Q B32Q73QQ B32R10 B32S11S5 B32S12S5 B32S31S5 B32S32S5 B32S41S5 B32Y10 B33L70LL
B33L98LL B35L11L1 B41L11L1 B41L12L2 B41L17L2 B41L9BLL B41Y10 B42L11L1 B42H2L2 B42L17L2 B42Y10
ANALYZER PACKAGES
.......
INSTRUMENT AIR TUBEEPIPE
LOOP CHECK
TLST-CALlBRAlE-STORE
STEAM TRACE PIPE-SUBHDRS
INST CS PIPE 2IN UNDER
INST CS SPED 3IN TO 6IN
INSTALL U/G PIPE
STEAM TRACING
ASSIST XRAY 6 ST RELIEVE
TESTING E INSPECTION
MISC. STEEL
POWER E CONTROL EQUIP
LIGHT FIXTURES E RECEPTL
INST A/G RGS CONOUIT
INST U/G CONDUIT
PULL WIRE 600V E IKV
PULL CABLE 5KN E ABOVE
PULL ELECTRNIC E TC WIRE
TERMINATIONS 600V E IKV
TERMINATIONS 5KV E ABOVE
TERMINATIONS EL EC TR E TC
GROUNOING
ELECT HEAT TRACING
0/H POWER DISTRIBUTION
PLACE FOUNDATION CONC
PLACE FOUNDATION REBAR
PLACE E STRIP FDN FORMS
PLACE CONCRETE ENVELOPES
CHEMICAL INJECTION BLDG.
EXCAVATION E DISPOSAL
BACKFILL E COMPACTION
SEWERS DRAINAGE
PRECAST MANHOLES
FINE GRADING E LEVELING
SCAFFOLDING
INSTALL U/G PIPING
TESTING E INSPECTION
INST CS PIPE 2IN E UNDER
SMALL BURE PIPE
LARGE BORE SPOOLED PIPE
LARGE BORE RACK PIPE
TESTING E INSPECTION
SCAFFOLOING
SMALL BORE PIPE
LARGE BORE SPOOLED PIPE
LARGE BORE RACK PIPE
SCAFFOLOING
EA ~
0
0
LF 0 0
EA 9 84
EA
43 ~
271
LF 0 0
LF 0 0
LF "
0 ............. IT
LF 95 164
LF 0 0
.. UNITS
loo
400
LF
253
18
TONS
IT 411
EA a 480
EA 41 400
LF
5650
4536
LF
1000
160
LF 13500 358
LF
3000
240
LF
3800
190
EA
L58
204
EA 24 145
EA
180
235
LF
1340
488
LF
650
640
LF
2500
960
CY
335
642
TONS
38 575
SF
6457
1689
CY 30 105
UNITS
LOO
145
CY
1268
1459
CY
1840
450
LF
1000
4262
EA 4 280
SF 10 1
MHRS 0 0
LF
1155
2119
LF
1455
255
LF
170
180
LF 0 b
LF
719
1189
LF
8357
5677
LF
7 27 32
5158
MHRS 0 0
LF 0 0
LF
439
b40
LF
10219
7934
MHRS 0 0
0 0 29
10 0 0 0
2091 0 0
544 22 15 69
7000 320
23870 4400 3800 150 24 180 1825 1600 0 68 5 32
12072 16
100 3088 2958
976 6
3400 0 0
0 0 0 1812 4442 58869 0
0 1093
05593
0 0
124 25 0 81
361
4257 0 0
11 1630
602
247 2955
46 728
128 52
143
73 67 425
383 0
3100 2935 8345
338 1302 3368 3267
..... 33832?9
413 1740
0
0 0 305 4956 4293 2594 1479
32 2999 4627
920
...0*
0* 29
10 0* 00*
2091 0$
~ ...... 0$
544 22 T5 69
7000 320
23870 4400 3800 150
24 180 1825 1600
0* 68 5
32 12072
16 100 3088 2958 976
6 3400
0* ~~ o4
0* 0* 0* 1812 4442 58869 0* 0* 1093 5593 0*
TT
0 BLOCK--T
0
0
0
0 124
0 BLOCK-J
0
124 CURVE-J 100
0 100
25 25 CURVfc-J IDO 100
1
0 BLOCK-1
0
0
3
81
81 TO-OATE
0 100
361
361 TO-DATE
a 100
4257 0
....... 0
4257 CURVE-L 100 100
0 8L0CK-L
0
.............. 0 BtflCK-L ....... 0......
00 -------
11 1630
11 CURVE-L 100 1630 CURVE-M 100
100 100
3
60?
602 CURVE-F loir 100
24 7 2955
247 CURVE-P 100 2955 CURVE-P 100
100 100
3
46 728 126
52
46 CURVE-P 728 CURVE-P 128 CURVE-P
52 CURVE-P
100 100 100 100
100 loa ICO 100
K3 :i? 1-
3143
143 CURVE-P 100 100
73
73 CURVE-P 100 loa
V
67 425
67 CURVE-P 100 425 CURVE-P 100
100 100
1! 3
383 2
383 CURVE-P 100
0 TARGET
0
100 0
.49
4
3100 2935 8345
338 1302
3100 CURVE-Q 2935 CURVE-Q 8345 CURVE-Q
338 CURVE-Q 1302 CURVE-0
100 100
100 100 loo
100 100 loo 100 100
3
14
Itff 9
1<
3368
5368 tURYE-S 100 100 .....
3267
3267 CURVE-S
3329
3329 CURVE-S
........ 817 --------- --- 837 CURVE-S
100 100 100 100
100...... 100............
9
413
1740Q
413 CURVE-S 1740 TO-DATE
0 0LOCK-L
100 0 0
100 100
0.....
9
5?
0
0 BLOCK-L
0
0
" 0
0 305
0 BLOCK-l 305 TO-DATE
00
60
0 100 ........
4956 4293
4956 CURVE-L 100 4293 CURVE-L 100
100 100
O
... 2 504 1479
32 2999 462 7
920
2504 CURVE-L 1479 TO-OATE
32 TO-OATE 2999 CURVE-L 4627 CURVE-L
920 TO-OATE
100 0 0
100 loo
0
100 ..... `
o100
.100
100 ........
o100
'
100
o
o
JOB NO. 14053-000 ROBINSON REFINRY H0DERN7TN PROJ-MOC
a REPORT NO. C38022--40
FOCUS MASTER FILE LISTING
RUN DATE 5/24/82 PAGE 10
o 9
c> ? 3
r
*4= $$ 4= 4= S99
* 9S
00
units CURRENT
BUOGET TO-DATE PROGRESS
.......................................... ~~............. ........ .. OF "
ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT WW44 44 44 44 l( 44 4* 44 4r.vA* 4v4 w4444T44T44i4r4T44 4Y4 4V4 r4'*w44 4w4 44Y44W44 44w44 4v4 4-4T44 4i4r4r4
QUANT MANHOURS
QUANT MANHOURS
$7S $ $ $ *^ * $ **
PROJECT FORECAST QUANT 1ANH0URS
CUT-OFFTIAT E-------572X7*2 ^vv**t***r
TRENO
FCST MANHOURS METHOD
PHYS TREND PCT...... PCT...... COMP CCMP
39 9
j ..... B43L11L1
8
4
B43L12L2 B43L17L2
SMALL BORE PIPE LARGE BORE SPOOLED PIPE LARGE BORE RACK PIPE
LF LF LF
rra ----------- 1759
327
632
9991
3733
2066 718
2306
1222
2512 2986
2066 718
2306
1222
2512 2986
1222 CURVE-L 2512 CURVE-L 2986 CURVE-L
1UU
100 100
IUU
100 100
9
, 2
B43Y10 B44L11L1 B44L12L2 B4 4 L 17 L 2
SCAFF0L0ING SMALL BORE PIPE LARGE BORE SPOOLED PIPE Large bore rack pipe
MHRS LF LLFT
0
9029 1581 29251"
0
6269 3086 25596
0
8391 3879 17998"
895 9032 13036
TZZ59
0* 8391 3879 15998
896 9032 13036 12299
895 TO-DATE 9032 CURVE-L 13036 CURVE-L 12299 CURVE-L
0
100 100
TOO
100 100 100 100
13
9
.7
r c
B44Y10 B45L11L1 B45L12L2
SCAFFOLDING SMALL BORE PIPE LARGE BORE SPOOLED PIPE
MHRS LF LF
0
990 25
0
762 59
0
1930 ............ 56
9753
0* 9753
930
1930
930
............909..... .....
56 ........... 909.......
9753 TO-DATE 930 CURVE-L
.....909 CURVE-L
0
100
too
100 100 100
9
c; a
4
B45L1TL2 B45Y10 B90L70LL B99J11J9 B99J15J9
LARGE BORE RACK PIPE SCAFFOLDING Install u/g pipe
install xmitters install minor instrument
LF MHRS LF EA EA
5011
0
75 3 9
8361
0
130
102
70
2851
0 0 10 21
5972 2368
0
80 95
2851 0* 0*
10 21
5972 2368
0
80 95
5972 CURVE-L 2368 TO-DATE
0 BLOCR-L
80 CURVE-J 95 CURVE-J
100 0 0
100 100
100 100
0 100 100
24
2
c3 c
B99J31JJ B99J50JJ B99J70JJ B99J81JJ B99JB2JJ B99L10L1
LOCAL CONTROL PANELS INSTRUMENT SHELTERS INST AIR TUBE G PIPE LOOP CHECK TEST-STORE-CALIBRATE STEAM TRACE PIPE-SUBHDRS
UMTS ........... loo
EA 1
LF 90
~ LOOPS
' ~~~5~
EA 9
LF 33
135
0
0
0* 0
0 BLOCK-J
0
0
28
2
8
2
8
8 CURVE-J 100
100
99
650
199
650
199
199 CURVE-J 100
100
17
759
zr
IT
21
17
17 CURVE-J 100 100
23
8 11
8
11
ii CURVE-J 100 100
M
55
1093
2678
1093
2678
2678 CURVE-L 100 100
>G
9
c9 0
B99L11L1 B99L12L2 B99L80LL
INST CS PIPE 21N UNDER....
INST CS PIPE GTR THAN 2" STEAM TRACING
LF
LF LF
......... 39 2 39 50
...... 66 395 27
906 ..."....... 803.......
882
2205
8359
3759
906 ........... 903
882
2205
8359
3759
803 CURVE-L 2205 CURVE-L 3759 CURVE-L
TOO 100 100
ICO............. .1/
100
100
40
, B99L98LL TESTING E INSPECTION............. LF
99 7 ".. 06 6 TB6 6 6 CURVE-L 100 ICO
e?
B99S31S5 SEWERS 6 DRAINS
B99Y10
SCAFFOLDING
LF MHRS
90 . 25 00
90 189 0 109
90 0*
189 109
189 CURVE-S 100
109 TO-OATE
0
100 100
H
4 .......C50J21JJ
c C50J26JJ V. C50M40MM ......C50P11PP
MAIN CONTROL ROOM PANEL PROCESS CONTROL COMPUTER MISCELL STRUCTURAL STEEL DISIRBT HGH VLTG PWR EQ
EA--------
UNITS TONS EA..... .
' ......6 100 IB
....."" 3
....
626 100 1220 360 ~~
........ 6 70 22
.... ...........3
..... ...... 555....... ....'.... 6
283
70
1391
22
....... .......956...... ....... " 3
.............555
... 555
283
283
1391
1391
............. 956 .... .. *56--------------
CURVE-J CURVE-J CURVE-M CURVE-- P'
100 100 100 100
.. 100 ........
100
4'
100 100-----
-t Y
c C50P12PP POWER G CONTROL EQUIP
C50P13PP EMERGENCY 6 UPS EQUIP
UNITS 108 1020 EA 9 2086
100 9
962 1557
100 9
962 1557
962 CURVE-P 100 1557 CURVE-P 100
100 100
,, C50P14PP LIGHTING FIXTURES/RECPTL
EA
19 ........70
10 ............. 120
....... ..... 10 ............. 120 ... ..... 120 CURVE-P 100 100
C50P15P0 OTHER ELECTRICAL EQUIP
EA
C50P16PP PROGRAMABEL CONTR MASTER
EA
131 3
9755 1580
209 9
3912 91
209 9
3912 91
3912 CURVE-P 100 91 CURVE-P 100
100 100
C50P20P6 INST A/GRGS COND MAINS
LF.......
1900 ~..... 1090
.....2561 -----------3296.......
2561
3296 ~ ~3296 CURVE-P 100 100 .......
C C50P21P6 INST A/G RGS COND BRANCH LF
C50P22P6 INST U/G CONDUIT
LF
3550 3990
1917 1115
3965 5390
2611 1528
3965 5390
2611 1528
2611 CURVE-P 100 1528 CURVE-P 100
100 100
C50P25P8 INST CABLE TRAY
LF
11220
16952
10920
15638
10920
15638..... 15638 CURVE-P 100 100
IC 4H
C50P30P7 PULL DATA HIGHWAY CABLE C50P31P7 PULL WIRE 600V G 1KV
LF LF
50620 7260
1619 218
108950 19200
6965 759
108950 19200
6965 759
6965 CURVE-P 100 759 CURVE-P 100
100 100
C50P32P7 PULL CABLE 5KV G ABOVE
LF
12200
1223
10000
1621
1C000
1621..... ... 1621 CURVE-P 100 100.............
, C50P33P7 PULL ELECTRNIC G TC WIRE
C50P34PP TERMINATIONS 600 G 1KV
LF EA
79B00 600
3393 386
11101 652
1199 378
11101 652
1199 378
1199 CURVE-P 100 378 CURVE-P 100
100 100
cr, J
....C50P36PP TERMINATIONS ELECT L TC
C C50P41PP GROUNDING
C50P42PP GROUNO WELL INSTALLATION
EA LF
EA
5961 58380
100
3612 9170
356
5167 17306
101
2315 3019
535
5167 17306
101
2315 3019
535
..... 2 315 CURVE-P 3019 CURVE-P
535 CURVE-P
TOO 100
100
100.............
100 n
100
cO
e0
c
_ri
j
B ;
9
12 n M
l 17
20 21 72 23
75 2C 77 28 79 30 M 1? 13 J< 35 W 3' w 30 <0 3, 47 4,1
47 48
e
'f il
o
o
JOB NO. 16053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38022--40
FOCUS MASTER FILE LTSTING
.... TV?V T T 4
ACCT. NO
C50P80PP C50P95PP C50U60QQ CSOQ73QQ C50R01 0 C50S11S5 C50SX2S5 C50Y10 0 C51J01JJ C51J10JJ C51J11J9 C51J15J9 C51J17J9 C51J19J9 C51J22JJ C51J50JJ C51J70JJ C51J81JJ C51J82JJ C51L11L1 C51L80LL C51P12PP C51P16PP C51P20P6 C51P21P6 C51P25P8 C51P31P7 C51P33P7 C51P36PP C51P36PP C51P37P7 C51P61PP C51P62PP C51P90PP C52J01JJ C52J10JJ C52JU JS C52J22JJ C52J82JJ C52L11L1 C52P12PP C52P16PP C52P20P6 C52P21P6 C52P25P8 C52P31P7 C52P33P7 C52P36PP
00
$$$$$$$$$
UNITS CURRENT
BUOGET
OF
DESCRIPTION OF ACCOUNT RC QUANT
$ $ $$$$$$$
QUANT MANHOURS
ELECT TESTING CHECKOUT
OSPOSLERMOVL OF EXSTG EL
UNITS UNITS
100
l
1919
1
PLACE CONCRTE(COMPOSITEI
CY
n 220
PLACE CONCRETE ENVELOPES
CY
81 380
CONTROL ROOM ARCHITECT
UNITS
100
1751
EXCAVATION E DISPOSAL
CY
350
601 ,
BACKFILL E COMPACTION
CY
2 60
216
SCAFFOLOING
BMHRS
1608
160 8
INSTRUMENT SUPPORTS
EA
29 368
PRE ASMB TRANSMETRANSDUC
EA
333
1303
FIELD MOUNTED INSTRUMNTS
EA
192
7806
INSTALL MINOR INSTRUMNTS
EA
110
227
INSTALL P/I TRANSDUCERS
EA
30 750
INSTALL I/P TRANSDUCERS
EA
138
966
CONTRL CONSL SATLITE RKS INSTRUMENT SHELTERS
UNITS EA
100
173
168 366U .
INST INSTR TUBE E PIPE
LF
6177
1810
LOOP CHECK
EA
369
2559
TESTESTOREECALIB INST
EA
627
TT806
INST CS PIPE 2IN E UNDER
LF
1660
1760
INST STM TRACE TUBING
LF
8693
6926
POWER E CONTROL EQUIP
EA
22 772
PROGRAM CONTR SATELLITE
EA
36 517
INST A/G RGS COND MAINS
LF
6300
3370
INSf A/G RGS COND BRANCH
LF
16583
9099
INST CABLE TRAY
LF
100
160
PULL WIRE 600V E 1KV
LF
581
31
PULL ELECT E TC WIRE
LF
99000
3168
TERMINATIONS 600V E 1KV
EA
53
TERMINATIONS ELECT E TC
EA
5098
3896
PULL ELECTRONIC MAINS
LF
5000
660
GROUNDING
LF
2200
866
GROUND WELL INSTALLATION
EA
100
237
ELECTRONIC DISCONNECTS
EA
233
... ....639
INSTRUMENT SUPPORTS
EA
26 288
PRE ASMB TRANSMETRANSOUC
EA
232
902
FIELD MOUNTED INSTRUMNTS
EA
132
5370
CONSOLE SATELLITE RACKS
UNITS
100
168
TESTESTOREECALIB INST
EA
282
1160
INST CS PIPE 2IN E UNDER
LF
1015
1225
POWER E CONTROL EQUIP
EA
9 160
PROGRAM CONTR SATELLITE
EA
17 258
INSTALL A/G RGS COT MAIN
LF
150U
1175
INST A/G KGS COND BRANCH
LF
3626
164b
INSTALL CABLE TRAY
600 V E 1KV WIRE
PULL ELECT TC WIRE
LF LF
200
180
3209
LF
63300
1818
600 V E 1KV TERMINATIONS
EA
15 a
TO-DATE PROGRESS
QUANT MANHOURS
19 369
100
37 2
36 902
113
683
100
1806
165
837
107
266
1386
1636
55 196
352 ............... 775
98 1560
37 160
32 235
. 57
160
100
179
69 378
670
256
630
1232
603
' 729"
0 11
876
695
19 593
32 55
3685
3255
13653
7300
8U 907
8290
369
32303
838
230
329
6987
6958 '
3180 <,06
1000
263
100
659
.... ..... 13 .... ""...... 27
00
266
631
0 136
100
256
302
536
0
26 31 633 6365 250 6606 8 760 320
0
660 69
688
1901 328
111
176 73
RUN DATE
5/2A/82
PAGE 11
0 9
PROJECT
FORECAST
CUT-OFF DATE~~ 5/21/82
3 <:2$Jjs
& *$
' TREND FCST
PHYS TRENO
PCT
PCT
?9
QUANT MANHOURS
MANHOURS METHOD COMP CCMP
***$$
9
19
369
369 CURVE--P 100
loo
100
36
372 902
372 CURVE-P 100 902 CURVE-Q 100
100 100
9
113
683
683 CURVE-Q 100
100
100
165
1806 83 7
1806 CURVE-0 100 83 7 CURVE-S 100
100 100
9
,,
107
266
266 CURVE-S loo
100
1386 55
1636 196
1636 CURVE-0 100 196 CURVE-J 100
100 100
9
352
775
775 CURVE-J loo loo
98
1560
1560 CURVE-J 100
100
9
37
32
160 235
^13650-tCuUkRvVeE--Jr
100
TOO
100
lor
57
160
160 CURVE-J 100
100
loo
179
179 CURVE-J 100
100
69
378
378 CURVE-J [00
loo
670
630
603~
0*
256 1232
729
11
256 CURVE-J 1232 CURVE-J
729 CURVE-J 11 TO-OATE
100 100
loo
0
100 100 100 100
C
3.
876
695
695 CURVE-L 100
100
19 32 3685 13653 80 8290 32303 230 6987 6958
1000
100
593 55
3255 T300
907 369 838 329
3180
606
263 659
593 CURVE-P 55 CURVE-P
3255 CURVE-P 7300 CURVE-P
907 CURVE-P 369 CURVE-P 838 CURVE-P 329 CURVE-P
3180 CURVE-P 606 CURVE-P 263 CURVE-P
659 CURVE-P
100
100
100
loo
100
100
100
luo
100
ISO
100
100
100 100
3
100 -:j
loo
100
4;' i
100
loo
100
<
100
100............ 4 1
100
100
v
....... ..... 13... ....... 27
27 CURVfc-P 100
100
0* 266
0
631
0 BLOCK-J
0
631 CURVE-J 100
0 100
9
06 136
136 TO-BATE
0 100
100
302 0*
26 31 633
256 536
0
660 69
688
256 CURVE-J 536 CURVE-J
0 BLOCK-1 660 CURVE-P
69 CURVE-P 68 8 CURVE-P
100 100
0 100
100
loo
ICO
100 0
100 100 100
9 r.( 61 r.; 9
6365 250
1901 328
1901 CURVE-P 100 328 CURVE-P 100
100
ICO
Q
6606
111 ......
Ill CURVE-P 100
100
8760 320
1 76 73
176 CURVE-P 100 73 CURVE-P 100
100 100
Q
0
o
r
ft
3
j 1
Gs
6
J' "$
18 * 10
c> n
M
r. i 6
JOB NO. 14053-000 ROBINSON REF1NRY M0DERN2TN PROJ-MOC REPORT NO. C38022-40
FOCUS MASTER FILE LISTING
RUN DATE 5/24/82 PAGE 12
o
......... ....................... A A; ^
'
VT TTV
00
---------CUTr-OFF DATE-------------5/21/82------------------
ACCT. NO
DESCRIPTION OF ACCOUNT
UNITS
OF...........
........
RC QUANT
CURRENT QUANT
BUDGET MANHOURS
TO-DATE PROGRESS QUANT MANHOURS
PROJECT FORECAST QUANT MANHOURS
TREND nS I MANHOURS METHOD
PHYS PCT COMP
TREND PCT
COMP
$ & j{i $ $ $ * $ ^ $ $ $ $ 4:$ $ ^
C52P36PP TERMINATIONS ELECT E TC
C52P37P7 PULL ELECTRONIC MAINS
C52P41PP GROUNDING
C52P42PP GROUNCWELL INSTALLATION
C52P43PP ELECT HEAT TRACING
C53J01JJ INSTRUMENT SUPPORTS
C53J10JJ TRE ASMB TRANSHETRANSUUC
C53J11J9 FIELD MOUNTED INSTRUMNTS
C53J15J9 INSTALL MINOR INSTRUMNTS
C53J1/J9 INSTALL P/I TRANSDUCERS
C53J19J9 INSTALL I/P TRANSDUCERS
C53J22JJ CONSOLE SATELLITE RACKS
C53J50JJ
C53J70JJ INST INSTR TUBE PIPE
C53J74L1 INST AIR SUBHEADER
C53J82JJ TESTGSTOREECALiB INST ..
C53L11L1 INST CS PIPE 2IN E UNDER
C53P12PP POWER E CONTROL EQUIP
C5IP16PP "Program conIr satellite
C53P20P6 INST A/G RGS CONO MAINS
C53P21P6 INST A/G RGS CONO BRANCH
C53P25P8 INSTALL CABLE TRAY..... ..... "
C53P31P7 PULL HIRE 600V E 1KV
C53P33P7 PULL ELECT E TC HIRE
C53P34PP TERMINATIONS 600V E~lKV
C53P36PP TERMINATIONS ELECT E TC
C53P37P7 PULL ELECTRONIC MAINS
C53P41PP GROUNDING
..............................
C53P42PP GROUNO HELL INSTALLATION
C53P90PP ELECTRONIC DISCONNECTS
C54J01JJ INSTRUMENT SUPPORTS ............
C54J10JJ PRE ASMB TRANSMETRANSDUC
C54J11J9 FIELD MOUNTED INSTRUMNTS C54J15 J9 INSTALL MINOR INSTRUMNTS
C54J17 J9 INSTALL P/I TRANSDUCERS
C54J19J9 INSTALL I/P TRANSDUCERS
C54J22Jj CONSOLE SATELLITE..RACKS
C54J50JJ INSTRUMENT SHELTERS
C54J70JJ INST INSTR TUBE PIPE
C54J82JJ TesTeSToreecalib Inst
C54L11L1 INST CS PIPE 2IN E UNDER
C54P12PP POHER E CONTROL EQUIP
C54P14
C54P16PP PROGRAM CON TR SATELLITE
C54P20P6 INST A/G RGS CONO MAINS
C54P21P6 INST A/G RGS CONO BRANCH
C54P25P8 INSTALL CABLE TRAY
C54P31P7 PULL WIRE 600V E lKV
EA LF
LF EA " ~ LF
EA EA EA
EEAA -
EA
UNITS
EA
LF
LF
EA
LF
EA
EA
LF
LF
LF
LF
LF
EA
EA
LF
LF
EA
EA
EA "
~
EA
EA
EA....... ....
EA
EA
UNITS
EA
LF
EA
LF
EA
ea ......
EA
LF
LF
LF
LF
2131
12 39
1964
746
1964
746
100
13 2239
92 2239
92
2200
864
860
177
860
177
100
237
100 ......
130 ~
100
"TBO
3125
2000
0 15
0* 15
24 129 ......
288 419 ~
28 249 ------------- 299
2 249
8 299
48 2081 37 83 18 450
1 250
1
----------- 0,-0 0 --------------------------------ff-
0*
0
250 0 o..
70 490 0 0 0* 0
100
148
200
127
200
127
50 1000 0 0 0* 0
1598
690
16
0 16
0
2
1 1505
414
1505
414
356
1552
391
652
391
652
435
525
0
0
o 0
23 480
41 915
41 915
20 262
0 122
0* T22
3295
2582
6112
5165
6112
5165
11850
6189
12284
7555
12284
7555
5 8 440 879 440 879
25
1 12180
616
12180
616
44975
1855
42090
1147
42090
1147
20 n 274 46 278 46
2243
1248
4047
2188
4047
2188
4000 2200
544 864
7452 540
539
7452
539
220 540 .. 220....
100
23 7
117
367
117
367
2V1
4 ........ 288 ......
0
.....6"
220l
0* 0 6 221
304
1209
210
224
210
224
113 106
4508
... 214
0 492
0* 492
' .......6 .... ......... 18..... ............. 6........... 18.....
24 600 0 0 0- 0
74
TOO ..
479 283
5
----- llo ....
1lfe039 .
5 109
no .. .. 163
102
2040
0
8
0* 8
4200 313
1747 1318
0 352
137
473.....
0* 352
137
473.....
1370
1650
0
0
0* 0
22 810 00
49 1099
49 1099
0 o... ........... o ... ..... 0
20 262
2 185
2 185
52 30
4382
14774
6161
14774
6161
18318
9399
16641
9718
16641
9718
10G
160
97 335
97 335
1175
47 8804
200
e804
200
7S6 LUKVt-P 1UU
IOO
92 CURVE-P 100 100
177 CURVE-P 100 100
130 CURVE-P 100 IOO
15 TO-DATE
0 100
8 CURVE-J 100 100
^ 299" CURVfc--J IOO IOO
250 CURVE-J 100 100
0 BLOCK-9
0
0
" - 0 BLOCK-9 ..... 0 ...... 0 ......... ..
0 BLOCK-9
0
0
127 CURVE-J 100
-------- jj- BLOCK-J
0
100 (J
4 BLOCK-J 100
0
414 CURVE-L 100 100
652 CURVE-J loo loo
0 BLOCK-1
0
0
915 CURVE-P 100 100
1 ?2 TD-DATE
0 IOO
5165 CURVE-P 100 100
7555 CURVE-P 100 100
879 CURVE-P loo
loo
616 CURVE-P 100
100
1147 CURVE-P 100 100
46 tURVE-P loO IOO
2188 CURVE-P IOO 100
539 CURVE-P 100
100
.. 220 CURVE-P 100 IOO ....
367 CURVE-P 100 100
0 BLQCK-P
0
0
2 21 CURVE-J IOO 100
224 CURVE-J 100 100
492 TO-DATE
0 100
..........13 CURVE-J 100 ICO
0 BLOCK-9
0
0
109 CURVE-J 100 100
"163"CURVE-J 100..... 100 ......
a TO-OATE
0 IOO
137 TO-DATE
0 100
..... 473 CURVE-J IOO 100
0 BLOCK-1
0
0
1G99 CURVE-P 100 1U0
............0 BUDGET... 0.... ... a
185 CURVE-P 100 100
6161 CURVE-P 100 100
9718 CURVE-P 100 100
335 CURVE-P 100 ICO
200 CURVE-P 100 100
9 9 9 9
9
O
e
e
'' ? 1
4
S 6 1 9 .0
.3 -4 IS 6 >' 18 K
n
t,
29
11 I.1 31 >4 IS ie u
v. 4.)
-7
.1
#
44 4'
c
4, ,!
c
o
JOB NO. 15053-000 ROBINSON REFINRY MODERNZTN PROJ- HOC REPORT NO. C38022-50
FOCUS MASTER FILE LISTING
RUN OATE 5/24/82 PAGE 13
ACCT. NO
4rrrri*rirr y
C55P33 P7 C55P35PP C55P36PP
C55P37P7 C55P51PP C55P52PP C55P90PP C55R01 0 C55J01JJ C55J10JJ C55J1IJ9 C55J15J9
C55J17 J9 C55J19J9 C55J22JJ C55J50JJ C55J70JJ C55J82JJ C55L1IL1
C55P12PP C55P16PP C55P20P6 C55P21P6 C55P25P8 C55P31P7 C55P33P7 C55P35PP C55P36PP C55P37P7 C55P51PP C55P92PP C55P90PP C56J01JJ .. C56J10JJ C56J11J9 C56J15J9 C56J17J9 C56J19J9 C56J3IJJ C56J50Jj C56J82JJ C56L1IL1 C56P16PP C56P21P6 C56P31P7 C56P33P7
C56P35PP C56P36PP
DESCRIPTION OF ACCOUNT
PULL ELECT TC WIRE TERMINATE WIRE 600V/1KV TERMINATIONS ELECT TC PULL ELECTRONIC MAINS GROUNOING GROUNO WELL INSTALLATION ELECTRONIC DISCONNECTS COKER CR STRUCTURAL MOOS INSTRUMENT SUPPORTS PRE ASMB TRAN5MCTRANSDUC FIELD MOUNTEO INSTRUMNTS INSTALL MINOR INSTRUMNTS INSTALL P/I TRANSDUCERS INSTALL I/P TRANSDUCERS CONSOLE SATELLITE RACKS INSTRUMENT SHELTERS INST INSTR TUBE PIPE TESTSSTOREECALIB INST INST CS PIPE 2IN UNOER POWER CONTROL EQUIP PROGRAM CONTR SATELLITE INSTALL A/G RGS COT MAIN INST A/G RGS COND BRANCH INSTALL CABLE TRAY PULL WIRE 600V 1KV PULL ELECT TC WIRE TERMINATIONS 600V IKV TERMINATIONS ELECT TC PULL ELECTRONIC MAINS GROUNDING GROUNO WELL INSTALLATION ELECTRONIC DISCONNECTS INSTRUMENT SUPPORTS PRE ASMB IRANSMETRANSOUC FIELD MOUNTED INSTRUMNTS INSTALL MINOR INSTRUMNTS install p/i Transducers INSTALL I/P TRANSDUCERS LOCAL CONTROL PANEL INSTRUMENT SHELTERS TESTEST0RE6CALIB INST INST CS PIPE 2IN UNDER PROGRAM CONTR SATELLITE INST A/G RGS CONDUIT PULL WIRE 600V IKV PULL ELECT TC WIRE TERMINATIONS oOOV IKV TERMINATIONS ELECT TC
00 FFFF$$4=FFF
CUT-OFF DATE FFFFFFFFSFFFFFFFFF
5/21/832$
UNITS CURRENT
BUOGET
TO-DATE PROGRESS
PROJECT FORECAST
OF
RC $Q$$UA$N$T$
QUANT
MANHOURS $it
QUANT MANHOURS
QUANT MANHOURS
$ it$ 4=$ *F FF F FFFF 4=F FFF F * FF F FF
TREND FCST MANHOURS METHOD
PHYS TREN0
PCT
PCT
CCMP CCMP
LF
100932
3263
38562
1357
38562
1357
1357 CURVE-P 100 100
EA 15 a 155 113 155 113 113 CURVE-P 100 100
EA
3157
1827
898
1950
898
1950
1950 CURVE-P 100 100
LF LF EA EA UNITS EA EA EA EA
EA EA
UNITS EA LF EA LF
EA EA LF LF LF LP LF EA EA LF LF EA...... ' -
7318 2000
100 66 0 29
157 90 69 6 69
300
82 1975
208 7 00
20 38
ITiou
9350 900 500
83000 5
6099 2000 3000
100
936 800
23 7
218 0
398 617 3656 199
150 998
999 1690
859 852 890
320 522 7 8U
22 36 690
31
2512 3
....... 1516
256 1120 ........ 237
12308
1030
12388
1000
365
1000
100
350
100
0 15
0*
0 0 0*
3 58
3
172
150
172
3 265
3
8 50
a
0 0 OF
0 0 0*
300
225
300
3 127
3
0 0 0*
201
353
201
0 0 0*
60 821
60
36 151
36
1709
739
.... 1789
5 301
2251
5301
552
537
39632 ............ trr
552 39612
2678
88 2678
751
.... 3191
258
751
.. Tllo.. .......3191...
5750
206
5750
2000
195
2000
101 .........201
..... 101
1030 365
. 350 19 0 58
150 265
50 0 0
225 127
0 353
0 821 151 739 2251 537 611
88 ln25o8
206 195 2DI-
1030 CURVE-P 365 CURVE-P 350 CURVE-P 15 To-oaTE 0 BLOCK-O
58 CURVE-J 150 CURVE-J 265 CURVE-J
50 CURVE-J 0 BLOCK-9 0 BLOCK-9
225 CURVE-J
127 CURVE-J 0 BLOCK-J
353 CURVE-J
(T BLOCK-1 821 CURVE-P 151 CURVE-P 739 CURVE-P 2251 CURVE-P 537 CURVE-P
sir CURVE-P
88 CURVE-P 258 CURVE-P 1110 CURVE-P 206 CURVE-P 195 CURVE-P 201'CURVE-P
100 100
100 100
100 100
0 loo
00
100 100
loo loo
100 100
100 1 GO
00
00
100 100
100 100
00
100 100
00
100 100
100 100
100 100
100 ICO
100
100
itjct 100
100 100
100 100
100 ....100
100 100
100 100
100^ ICO
EA
159
397
0
7
0* 7
7 TO-DATE
0 100
EA 29 EA....... ......... 257
280 .... 1062
00 ....... 185 ..... ...... 175....
0* 0 185 ...... 175
0 BLOCK-J
0
0
175 CURVE-J 100 .. 100
EA
171 6525
0 318
OF 318
318 TO-OATE
0 100
EA
109
258
21
65
21
65
65 CURVE-J 100 100
EA
..... 6
150 ...'..... 7 ..... 1 ? 3.. ".............. 7
121"
123 CURVE-J 100 100
EA 95 665 2 5 2 5 5 CURVE-J 100 100
UNITS
100
100
100
88 100
88
88 CURVE-J 100 ICO
EA..... 126 2520
19 310
19 310 310 CURVE-j loo 100
EA
272
1152
253
716
253
716
716 CURVE-J 100 100
LF
1070
1290
0
0
OF 0
0 BLOCK-1
0
0
EA
28 272
0
0
OF
0 ...... .... 0 BLOCK-P
0 ......... 0
LF
22 80
2105
5875
1968
5875
1968
I960 CURVE-P 100 100
LF
75
3 5815
158 5815
158
158 CURVE-P 100 100
LF
67000
226 3
5520
181 5520
lei
181 CURVE-P loo loo
EA 5 3 335 151 335 151 151 CURVE-P 100 100
EA
3327
1972
2063
892 2063
e92
092 CURVE-P 100 100.
c
e
<3
G 1 *r `
p
5 1( 1, ,,
?-l
?'
1,
1i;! 4440.; 44 4f 41 .4
SI r; r.,
R
e
r
JOB NO. 14053-000
ROBINSON REFINRY MODERNZTN PROJ-MOC
FOCUS MASTER FILE LISTING
RUN DATE
5/24/82
PAGE 14
3
Cl REPORT NO. C38022--40
^ ^_ 1 ---------------------- ..... ----------------
?
,1
$ $# $ $ # $ $:$ $ $ $ $
4
6 ACCT. NO DESCRIPTION OF ACCOUNT ft
OC
UNITS CURRENT OF .....
BUDGET '
RC QUANT
QUANT MANHOURS
TO-DATE PROGRESS QUANT MANHOURS
PROJECT QUANT
FORECAST
MANHOURS ^r*vr*T*
' CUT-OFF DA IE 5/21/82" ***$
TREND ~FCS1 MANHOURS METHOO
PHYS TREND
PCT.... ....PCT
COMP CCMP $$
\
? 3
s
* '
,
B
I? n
i r.
./ IB 14
11 ?i
?<> TO 1.
)1
K YC V
10
"
M
10
C56P37P7 C56P41PP C56P90PP C61J01JJ C61JU J9 C61J15J9 C61J1Tj9 C61J19J9 C61J5UJJ C61J70JJ C61J8IJJ C61L80LL C61P2IP6 C61P3IP7 C61P34PP C61P36PP C61P90PP C62J01JJ C62JI1J9
C62J15J9 C62J17J9 C62J19J9
C62J50JJ C62J70JJ C62J9IJJ
C62L80LL CbZPZlP6 C62P31P7 C62P34PP C62P36PP C62P90PP C63J0IJJ
C63JIIJ9 C63J15J9 C63J17J9 C63J19J9 C63J50JJ C63J70JJ C63J74JJ C63J81JJ C63LBOLL C63P21P6 C63P3IP7 C63P34PP C63P36PP C63P90PP C64J01JJ C64J11J9
PULL ELECTRONIC MAINS
LF
TOO
13
GROUNDING
LF
1000
480
ELECTRONIC DISCONNECTS
EA
119
276
PREFAB INSTR SUPPTS-CQNV
EA
1 12
INSTALL XMITTERS -CONV
EA
2 79
INSTALL MINOR INSTR-CONV
EA
20 41
install p/i transor-conv
EA
...... 1
25
INSTALL I/P TRANSDR-CONV
EA
17
MOUNT INSTR SHELTER-CONV
EA
1 20
PNUEMATIC TUBING -CONV
LF
23 ....
10
LOOP CHECK
-CONV
EA
3 22
INSTALL STEAM TRACE-CONV
LF
74
Replace flex coNdit-ConV .. ... LF
37 20
PULL 600V/1KV WIRE -CONV
LF
19 1
TERMINATI0NS-600V -CONV
EA
53
TERMINATIONS ELE/TC-CONV " EA
..... " 4 .... ........... 3
REMOVE EXIST INSTR -CONV
EA
20 41
PREFAB INSTR SUPPTS-CONV
EA
1 12
INSTALL XMITTERS -CONV
EA
2 79
INSTALL MINOR INSTR-CONV
EA
87 190
INSTALL P/I TRANSOR-CONV
EA
INSTALL I/P TRANSOR-CONV ..... EA.........
19 9tr .......
475
686
MOUNT INSTR SHELTER-CONV
EA
121
2420
PNUEMATIC TUBING -CONV
LF
3000
1300
LOOP CHECK
-CONV
LOOPS
248
~l8l9
INSTALL STEAM TRACE-CONV
LF
6050
3430
REPLACE FLEX CONDIT-CONV
LF
100
45
PULL 600V/1KV WIRE -CONV
LF
20 1
TERMINATIONS-600V -CONV
EA
10 6
TERMINATIONS ELE/TC-CONV
EA
100
58
REMOVE EXIST INSTR-CONV
EA
..... "...160 "... ... ...320
PREFAB INSTR SUPPTS-CONV
EA
1 12
INSTALL XMITTERS -CONV
EA
10 395
INSTALL MINOR INSTR-CONV
EA
49
INSTALL P/I TRANSOR-CONV
EA
1 25
INSTALL i/p transor-conv
EA
17
MOUNT INSTR SHELTER-CONV
EA
2 40
PNUEMATIC TUBING -CONV
LF
598
258
INST AIR SUBHEADER
LF
21
LOOP CHECK
-CONV
EA
106
.........778
INSTALL STEAM TRACE-CONV
LF
2600
1475
REPLACE FLEX CONOIT-CONV
LF
1010
557
PULL 600V/1 KV WIRE
Lf
375
19
TERMINATIONS-600V -CONV
EA
11 7
TERMINATIONS ELE/TC-CONV
EA
100
56
REMOVE EXIST INSTR -CONV
Ea
39 156
PREFAB INSTR SUPPTS-CONV
EA
1 12
INSTALL XMITTERS -CONV
EA
1 33
4065
275
4065"
775 "
7T5"CURVE-P "100 - ICO
T
.0
j
0 2
0 0* 0 0* 83 ........... 12 ...
0 0
83
0 BLOCK-P 0 BLOCK-P 83 CURVE-J
0 0 100
0 0 100
o
109
893
109
093
893 CURVE-J 100
100
9
8
9
8
8 CURVE-J 100
100
o~ 69
0
155
0Sf 69
0
155
0 BtUCK-9
0
155 CURVE-J loo
u
100
i: 'r
3 ............. 50
221
0
------------------------42
1720
3 50----------------------
221
.....
0
42 1720
34 BLOCK-J .. A2 CURVE-J 1720 CURVE-J
100
0
100 .... 100 ........... 2.
100
100
r.
800 --9I5-
1200
411 ------ 489
37
800 915
1200
411 48 9"
37
411 CURVE-L 100 484 CURVE-P TOO
37 CURVE-P loo
100
TOO
100
2r
258 164 6
380
83 90S 384
258 l646
380
83 905 384
83 CURVE-P 905 CURVE-P 384 CURVE-P
100 100 100
100 100 100
V
H174
56 1246
51 54
14 147
51
56 T244
54
56 CURVE-J 1746" CURVE-J
54 CURVE-J
100
100"
100
100 100 100
3? n u
21
........ 105 lb
467
21
............. 176... ............ 105 ...
216
18
467
467 CURVE-J
176 -------------176 CURVE-J
216
216 CURVE-J
100
loo
100
100
100..........
100
nr
549
84 549
84
84 CURVE-J 100
100
395 " T350
390
T350"
1350 CURVE-J TOO 100
11
870
200
870
200
200 CURVE-L 100
100
3689
1137
3689
1137
1137 CURVE-P 100
100
....6972 ............... 301
155
11
.... 6972 .......... 381 ............. 381 CURVE-P 100 155 11 11 CURVE-P 100
100 100
<s IT
2355 296
947 ........ 351
2211
296
947 ... 351"
947 CURVE-P 107 35 X CURVE-P 100
100
TOO
"
18 101
18
101
101 CURVE-J 100
100
184
1673
184
1673
1673 CURVE-J 100
100
44 .............. 109
44 ............. 109 ... ~... . 109 CURVE-J 100
100...........
32 308
32
308
308 CURVE-J 100
100
111
644
111
644
644 CURVE-J 100
100
;;
15 820
94 ------ ---- 15...
163
820
94 163
94 CURVE-J 100 16 3 CURVE-J 100
100 100
P
645
86 645
86
86 CURVE-J 100
100
........ 444
2007
444
200?
200 7 CURVE-J loo ICO
888
130
888
130
130 CURVE--L 100
100
1789 1358
72
627 41 7
1790 ... 1357
72
6A27r
7
627 CURVE-P ..... ........ 41 CURVE-P
7 CURVE-P
100 100
100
100 100
100
s. ...... rf
:r
1997
576
1997
576
576 CURVE-P 100 100
7 B 244
78
244
244 CURVE-P 100
100 ....
fi-i
21 96 21 96 96 CURVE-J 100 100
139
1333
139
1333
1333 CURVE-J 100 100
GARRARD 00000680
o
JOB NO. 14053-000
ROBINSON REFINRY MOOERNZTN PROJ-MUC
I REPORT NO. C38022--40
FOCUS MASTER FILE LISTING
RUN DATE 5/24/82 PAGE 15
o 9
$*$$$
UNITS
OF
ACC I. NO DESCRIPTION OF ACCOUNT RC QUANT =**$*=$*$
C64J15J9 INSTALL MINOR INSTR-CuNV
EA
C64J17J9 INSTALL P/I TRANSOR--CONV
EA
C64J19J9 INSTALL I/P TRANSOR-CONV
EA
C64J50JJ MOUNT INSTR SHE LTER-CONV
EA
C64J70JJ PNUEMATIC TUBING -CONV
LF
C64JB1JJ LOOP CHECK
-CONV
LCOPS
C64L80LL INSTALL STEAM TRACE-CUNV
LF
C64P21P6 REPLACE FLEX CONOIT-CONV
LF
C64P31P7 PULL 600V/1KV WIRE -CONV
LF
C64P34PP TERPINATI0NS-600V -CONV
EA
C64P36PP TERMINATIONS ELE/TC-CONV
EA
C64P90PP REMOVE EXIST INSTR -CONV
EA
C65J01JJ PREFAB INSTR SUPPTS-CONV
EA
C65J11JJ INSTALL XMITTERS -CONV
EA
C65J15J9 INSTALL MINOR INSTR-CONV
EA
C65J17J9 INSTALL P/I TRANSDR-CONV
EA
C65J19J9 INSTALL I/P TRANSOR-CONV
EA
C65J50JJ MOUNT INSTR SHELTER--CONV
EA
C65J70JJ PNUEMATIC TUBING -CONV
LF
C65J81JJ LOOP CHECK
-CONV
LCOPS
C65L80LL INSTALL STEAM TRACE-CONV
LF
C65P21P6 REPLACE FLEX CONDIT-CONV
LF
C65P31P7 PULL 600V/1KV WIRE -CONV
LF
C6.5P34PP TERMINATI0NS-600V -CONV
EA
C65P36PP TERMINATIONS ELE/TC-CONV
EA
C65P90PP REMOVE EXIST INSTR -CONV
EA
C66J01JJ PREFAB INSTR SUPPTS-CONV
EA
C66J11J9 INSTALL XMITTERS -CONV
EA
C66J15J9 INSTALL MINOR INSTR-CONV
EA
C66J17J9 INSTALL P/I TRANSOR--CONV
EA
C66J19J9 INSTALL I/P TRANSOft-CONV
EA
C66J50JJ MOUNT INSTR SHELTER-CQNV
EA
C66J70JJ PNUEMATIC TUBING -CONV
LF
.... C66J81JJ LOOP CHECK
......... -CONV
LOOPS
C66LBOLL INSTALL STEAM TRACE-CONV
LF
C66P21P6 REPLACE FLEX CONOIT-CONV
LF
C66P31P7 PULL 600V/IkV WIRE -CONV
LF
C66P34PP TERM INA TI0NS-60GV -CONV
EA
C66P36PP TERMINATIONS ELE/TC-CONV
Ea
C66P43PP ELECTRIC HEAT TRACING
LF
C66P90PP REMOVE EXIST INSTR -CONV
EA
SOON 18 OA AREA C INSULATION FSC 18
LF
SOON21 A EQUIP INSLN PlT16 FSC 21
SF
SOON22 A PIPE INSLTN PLT16 FSC 21
SF
S00N23 A EQUIP INSLN OFF PL FSC 24
SF
S00N24 A PIPE INSLTN OFFPL FSC 24
ELF
S00N25 A FIREPRF VSSL SKRT OFF PL T SF
SOON 26 A FIREPRF STR STEEL OFFPLI
CF
00
CURRENT
BUOGET
QUANT MANHOURS
T-
1 6 1 20 331 48 00 1000
2 25 38 20
9 2427 2811
516
25 10 1000 10
1 2 3 1 1 1 25
1 6 577 33 12 79 7 25 7 20 .......ii
168 4150
100 20 5 18
1232 2355
49
T()
32 1 2 4 1 1.... 1
-
83 12 79 10 25
7
20
2940 .... 297
62 50 50 25 5 69
100 19
17830
1280 2178 3502
51 I
3 40 98 44 10219
3 3000 71670 12830 73914
2200
11220 25951
3977 1995 7
260
1323
4661
-------------------------- ~TUt=OFF D'ATF 5/21/82
TO-OATE PROGRESS
PROJECT FORECAST ------------
TRENO FCST
PHYS TREND .............PCI ...... PCI
9
QUANT MANHOURS
QUANT MANHOURS MANHOURS METHOD COMP CCMP
9
117 - -12B-
1TT
128
128 CURVE-J 100 100
19 115
29 1957
461 691 2326 6017 193 3009
92 25 94 31
a 63 17 215 468 925 1348
' 5980 120 0 102 22 0
------ 8 3
18 42 6 486 721 1094
0 66 2095 40 241
133
19
320
115
221 29
219
1957
2353
442
112
691
1170
2326
443
6017
32 193
1024
3009
37 86
------------ 9225-
513
94
30 31
123 8
172 63
59 17 53 215
1563
468
197 925
2 74
04 8
0*
0*
T540
5980
185 120
0 0*
1144
102
32 22
0 0-
... 245.....
83
113
18
52 426
1405 ... .. ..... 486
122 721
767 14
1094 0*
10 66
80 3
2095
32 40
259
241
133 320 221 219 2353 112 1170 44 3
32 1024
37 86 513 30 123 172 59 53 1563 197 274
185 0
1144 32 0
25S 113
52 1405
122 767
15 10 803 32 259
133 CURVE-J 320 CURVE-J 221 CURVE-J 219 CURVE-J 2353 CURVE-J 112 CURVE-L 1170 CURVE-P
443 CURVE-P 32 CURVE-P
1024 CURVE-P 37 CURVE-P 86 CURVE-- j~
513 CURVE-J 30 CURVE-J
123 CURVE-J 172 CURVE-J
59 CURVE-J 53 TTURVE-3 1563 CURVE-J 197 CURVE-L 274 CURVE-P
BLOCK-7 BLOCK-P CURVE-P 185 CURVE-P 0 BLOCK-J 1144 CURVE-J 32 CURVE-J 0 BLOCK-9 255 CURVE--J
113 CURVE-J 52 CURVE-J
" 140 5 CURVE-J 122 CURVE-L 76 7 CURVE-P 15 10--DA 1 b 1U CURVE-P 803 CURVE-P
".... 32 CURVE-P 259 CURVE-P
100 100 loo 100 104 loo loo 100 100 100 100 100 100 100 100 100 IU0 100 100 100 100
100 100
0 100 100
0 100 100 100 100 100 100
0 100 100 100 100
100 100 loo 100 100 100 100 100 100 ICO 100 loo 100 100 100 100 100 100 100 100 100
TOO 100
0 100 100
0 100 100 100 100 100 100 100 100 100 100 100
9 9
8786
6263
8786
6263
6263 CURVt-0 100 100
23973 20970 12288 24767
9746 2793
9814 10270
6047 8414 1032
1993
29712 50000 12288 4400C
9 74 7
2893
9233 18878
1800 14750 .......
2 500 2000
I2I63_CURVE--0 24487 CURVE-0
6C47 CURVE-0 14948 CURVE-C
1032 CURVE-0 2064 CURVE-0
... 81 42
100 56
100 97
81
42 0
100 56 ..... .
100 Q ____
oO
GARRARD 00000681
JOB NO. 1 <i053-000 ROBINSON REEINRY MOOERNZTN PROJ-MOC REPORT NO. C38022-40
F 0C0 S MASTER FILE LISTING
............ "fll
...... -................. ....
TWYTr TV W YYVYYVirWir''PVV*WVYY'TY'Yl*Y*-YV
--
00
UNITS CURRENT OF
BUDGET
ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT
QUANT MANHOURS
TO-DATE PROGRESS ... "
QUANT MANHOURS
PROJECT FORECAST QUANT MANHOURS
SOON2T
FIREPRF VSSL SKRT-PLT 16
SOON28
FIREPRF STR.STEEL-PLT 16
SU0N30
INSTR INSULATION OFFPLOT
S00XI0
PAINTING
FSC
S00X40 A LARK PAINTING
FSC 40
S00Z01 A LE00 CONSTRCTION FSC 1
SOOZ02 A POTTER ELECTRIC FSC 2
S00Z03 A SHEEHAN PIPELINE FSC 3
S00Z05 OA MORRIS CONSTRCT FSC 5
soozoa a CENTRAL IL POWER FSC 8
S00Z09 A CONNOR CONNOR FSC 9
S00Z13 OA MAECO CONSTRCT FSC 13
S00Z16 OA MAECO CONSTRCT FSC 16
S00Z19 A STURM HEATING FSC 19
S00Z22 A FIELD X-RAY
FSC 22
S00Z23 A MISCELL BUILDINGS FSC 23
SOOZ26 A REACTOR INTERNALS FSC 26
S00Z27 A MAECO PL16 ROAD FSC 27
S00Z28 A STRESS RELIEVING FSC 28
S00Z29 A HEATER REFACTORY FSC 29
S00Z30 A ERECT COOLIN TOWR PO E30
S00Z32 A STURM-WATER CHILL.. FSC 32...
S00Z34 A MARTINSVL ROOFING FSC 34
S00Z36 A CLEAN COMPR PIPE FSC 36
S00Z38 A REWORK EXIST 29C-1FSC 38
S00Z91 A ACOUSTIC EMISSIONS TEST
S00Z99 A MAINTENANCE ROADS
S05Z60 A COMP AREA REWORK FSC...........
S09J11J9 MORRIS-INSTALL XMITTERS S09JI5J9 MORRIS-INSTALL MIN INST
S09J3Ijj MORRIS LOCAL CONTROL PL
S09J50JJ MORRIS MOUNT INST SHELTR
S09J70JJ MORRIS--INST AIR TUBCPIPE
S09H0L1 MORRIS-STEAM TRACE PIPE
S09L11L1 MORRIS - 2" UNDER RCS
S09L12L2 MORRIS - 3" OVER SPOOLS
S09L17L2 MORRIS - 3M6 OVER RACK
S09L2IL1 MORRIS-ALLOY PIPE
S09L70LL MORRIS-UNDERGROUND PIPE
S09L8QLL MORRIS-STEAM TRACING
S09L98LL MORRIS-HYDROTESTING
S09M30MM PIPEWAY STEEL
S09XXX
MORRIS DISTRIBUTABLES
S29J01J9 ALLEN-MODIFY INSTR SUPPT
S29J11J9 ALLEN--INST ALL TRANSMTTRS
S29J15J9 ALLEN-INST ALL MINUR INST
S29J50JJ ALLEN-MOUNT INSTR SHELTR
S29J60JJ ALLEN-ANALYZER
SF
57 50
690
6641
1898
7850
0
SF
27
95
213
168
1022
0
EA 1 5 10 32 188 0
SF
75800
8340
37885
1730
5T760
2750
SF
15000
750
19425
899
19425
899
UNITS
200
9430
200
10148
200
10148
UNITS 100 2400
100
2648
loo-
2648
UNITS
100
6500
100
6528
100
6528
UNITS
100
9980
100
11948
100
11948
UNITS
100
376
50 188 100 376
UMTS
100
200
200
464
200
572
CY
22193
9823
27662
11317
27662
11317
EA
7 840
7 1024
7 1024
UNITS
100
200
100
165
100
165
UNITS
100
578
300
1663
300
1663
UNITS
5 00
1169
800
If To
800
1770
UNITS
1100
4705
1100
5927
1100
4616
UNITS D-INS
_ 1-00g-
1820
100 24ir
80 161" "
100 2417
80 361
UNITS
100
1550
100
7531
100
5680
UNITS
100
3000
100
2502
100
2500
units
100
100
100
64 100 ............ .....64
UNITS
100
80 300 168 300 160
UNITS
1
12
100
2444
100
500
UN ns
100
191$
100
riU6
150
1700
UNITS
1
2 100 338 100 192
BMHRS
688
688
688
183
688
183
UNITS .... 100 ...... 2000 '
.......... 0
........... 0 ..... ..... ...... 09
0
EA
12 361
27 207
27 628
EA UNITS'" ~
117 loo
805 ..... . 35
66 100 ...
53 ...... 0
66 ........ 105"
35325
EA 1 20 13 34 13 130
LF
1000
766
1200
546
1200
689
LF ...... ................ 3 ... ;............ 5
..... 1461
..... 1290.... .......... 1461 "........1142
LF
3366
4337
2039
3553
2039
2906
LF
1409
2973
2261
6664
2261
6891
LF
2815
2633
14t 4
1474
1297
LF
275
630
623
1171
623
1109
LF 1 1 10 118 10 20
LF
50
27 3981
1447
3981
1728
LF
4615
503
9292
1027
9292
959
TONS
1 38
1 39
1 65
BMHRS
1
1 ...............0 ..........1091 ............. 0$ ............. 425
EA
13 215
3 12
3 50
EA
IS 608'
18 243
18 544
EA
35 136
58 137
se 169
EA
21 375
3 30
3 80
EA 0 0 0 0 09 0
RUN OATE 5/24/82 PAGE 16
CUT-OFF DATE 5/ZF/82
TREND
FCST MANHOURS METHOD
PHYS PCT... COMP
TREND PCT
COMP
2244 CURVE-CT 806 CURVE-0 940 TARGET
- "2638 CURVE-0 899 CURVE-0
10148 CURVE-0 2F4TT CURVE-0 6528 CURVE-0
11948 CURVE-0
376 CURVE-0 464 CURVE-0 11317 CURVE-0 1024" CURVE-0 165 CURVE-0 1663 CURVE-0 1770 CURVE-0 5927 CURVE-0
80 CURVE-0 36T curve
7531 CURVE-0 2502 CURVE-0
64 CURVt-0 168 CURVE-0 2444 CURVE-0 TT56" CURVF-0 338 CURVE-0 183 CURVE-0
0 TARGET 20 7 CURVE-J
53 CURVE-J 20 BLOCK-J
34 CURVE-J 546 CURVE-J 1290 CURVE-L 3553 CURVE-L 6664 CURVE-L *54 CURVE-L 1171 CURVE-L 118 CURVE-L 1447 CURVE-L 1027 CURVE-L
39 CURVE-M .... 1091 TO-OATE
12 CURVE-J 24 3 CURVE-J 137 CURVE-J
30 CURVE-J 0 BLOCK-J
85 .. 85 21 21
53
66 66...
100 IOC
100 100
TOO IOO
100 100
100 100
50 50
100 ICO
100
100
io<r 1W
100 100
100 100
loo ioo
100 ICO
100 100
iutr 100
100 100
100 100
loo '... loo
100 100
100 IOC
100 TOO
100
100
100 100
0 ..... 0
100 100
100 100
TOO .........0
100 100
100 100
loo 100
100 100
loo 100
100 .... 100
100 100
100 100
ioo loo
100 100
100 100
0 TOO
100 100
100 100
loo lod
too 100
00
o
9
;
9
s
' 9 fl
ir> 9
17
9
. IP >, 21
21 75
it 29
.2 V, .13 ir. V
Id
M If
4-
'
,1
r.n
M r.' '*
O
e0
*
JOB NO. 14053-000
ROBINSON REFINRY MODERNZTN PROJ-MOC
_#] REPORT NO. C38022-40
FOCUS MASTER FILE LISTING
RUN OATE 5/24/82 PAGE 17
0
c
7
T
4
ACCT. NO 6 $$$$$$$$$
, S29J70JJ ,, S29L10L1
S29L1IL1 10 .... S29L12L2 H S29L17L2 17 S29L70LL
n S29LBOLL
14 S29L9BLL S29XXX
>0 S31L11L1 ,7 S3IL12L2 19 S31L98LL
14 S32J1IJ9
S32J15J9
S32J31JJ
S32J50JJ
;'j S32J60JJ
?* S32J70JJ
S32L10L1 /f S32L11L1
?; S32L12L2 7H S32L70LL ?y S32L80LL TO S32L98LL U S32XXX V S45L11LI
S45L12L2
S45L17L2
S99L11LI
S99L 12L2 37 X70110 0
X70120 0
34 X70130 0 4, X70160 0
,1 X70170 0
X70190 0
f 44
4..
c>
47
m
4'
c '<
o
I
X70210 0
X70224 X70231 0 X70232 0 X70250 0 X70260 0 X70270 0 X70510 0 X70520 X70530 0 X70540 X7I110
DESCRIPTION OF ACCOUNT
*******
UNITS .. OF
RC QUANT
ALLEN-INST AIR TUBE PIP...... ALLENSTEAM TRACE PIPE ALLEN2" 6 UNDER RK SP ALLEN3" OVER SPOOLS ALLEN-3" OVER RACK PIPE ALLENUNDERGROUNO PIPE ALLENSTEAM TRACING ALLENHYOROTESTING ALLEN-OISTRIBUT ABLES INST SC PIPE 2IN UNDER INST CS SPED 3IN TO 6IN TESTING INSPECTION hoke-install TRANSMITTER HOKE-INSTALL MINOR INST HOKE-LOCAL CONTROL PANEL moke-mount Inst shelter ....
HOKE--ANAL YZ ERS HOKE-INST AIR TUBE EPIPE HOKE--STEAM TRACE PIPE HOKE--2" t UNDER RK SP
HOKE--3" OVER SPOOLS HOKE--UNDERGROUND PIPE HOKE--STEAM TRACING HOKE--HYDROTESTING HOKE-OISTRIBUTABLES INST CS PIPE 2IN UNOER LARGE BORE CS SPLO PIPE LARGE BORE CS RACK PIPE HOKE-2" UNOER RK SP HUKE-3" OVER SPOOLS TEMPORARY BUILDINGS TEMP WORK AREA BAYS TEMP ROADS PRKG FENCES TEMP WATER AIR SEWAGE MINOR TEMP CONSTRUCTION WEATHER PROTECTION GENERAL E FINAL CLEAN-UP RUBBER SAFETY BLANKETS FIRST OROP MAT HANDLING WAREHOUSING UNALLOCATED LABOR ON E OFF EXPENSES SURVEYING WELOER TESTING WELDER UPGRADING SHOW-UP TIME BOILRMKR HOLIDAY HOURS TEMPORARY BUILDINGS
LF LF LF IF..... LF LF LF LF BMHRS
LF LF LF EA EA
UNITS EA EA LF LF LF LF LF LF LF
BMHRS LF
LF LF LF LF BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS BMHRS MHRS BMHRS
00 $SS*******
#$***$#* $#$***:$*:*:$
Cut-off date $$***************
5/21/82 *****
,
7
CURRENT
BUOGET
.. ..................
TO-OATE PROGRESS PROJECT FORECAST
TREND
......... ........... ................
... FCST
PHYS TREND PCT.... PCT.....
QUANT MANHOURS
M*
710 52
2541 g74 401
505
4570 0
3822 1125 4915
4 29
0 2 3 110 32 703
609 69
2700 ... 2210
670 6
.......... 27 433 0
4914 2047
367 114 251
0 42 280 98 41 676
" '
QUANT MANHOURS
QUANT MANHOURS
MANHOURS ME THOO COMP
****# TVYYVVY*VTY$**$**
776
313
` 775"
70(7
31 ff CURVE-J" 300
211 1486 1266'
217
1643 4137 -
211 1486 1266
434 2 592 3768"
"
217 CURVE-L 1643 CURVE-L 4137 CURVE-L
100 100 100
224
0 224 334 621 BLOCK-2 100
34 478
77 416
34 478
74 ..685"
77 CURVE-L 100 *ij. 6 CURVk-L 100
4481
664
4481
435
664 CURVE-L 100
0 556
759 696 ...
0* 556
230 693 ....
759 TO-DATE
0
696 CURVE-L 100
586 842
"5
2549 24
122
586 1142y
2549 40
101 '
2549 CURVE-L 34 CURVE-L
ITT CURVE-J
100 74
100
50 55 50 493 55 CURVE-J 100
0
0
0# 0
0 BLOCK-J
0
2 33
2 42 33 CURVE-J loo
3 560 347
98 459 "26
3 560 347
280
445 439
98 CURVE-J 459 CURVE-J
26 TURVE-L
100 100 100
1395
3490
1395
2045
3490 CURVE-L 100
CCMP
100
R 1*
loo 100
i
100-- ---------
0
100 100
,,
100
100
100 100
7.
71
100
100
0
100 100
r TO
100 100
IV
100
1957 5
50
2454 0
185
116 1419
4 6 4663 3951
5211 9
27 179
0 320 266 2367
5 11 4663. 3551
1120 To 9
350 1796
0 600
269 793
46 199 4663 3951
...
5241 89
417 33
205 508
2086 2330
147 202 7103 3493
1120 109 350
1796 0*
600
269 793
46 199 4663 3951
5521 216 459 249 203"
1213 447
1179 101 507
6941 3493
5241 CURVE-L " m curve-1
417 CURVE-L 33 CURVE-L
205 "TO-DATE 508 CURVE-L
2086 CURVE-L 2330 CURVE-L
147 CURVE-L 202 CURVE-L 7103 CURVE-0 3493 CURVE-0
100 loo 100 100
u 100 100 100 loo
100
lod 100
100 loo 100 100
TOO 100
100 loo 100 100 100.......... 100
n 4b
44
"
3820 25 30
728 1388 2768
3820 25 30
728 1388 2768
3320 2530
72 8 1388 2768
3208 761
710 1490
3413
3820
2850
"........ 2530.... ........... 761
728
646
1388
1385
2768
1339
3208 CURVE-0 761 CURVE-0
710 CURVE-0
1490 CURVE-0 3413 CURVE-0
100 100 100 100 100
100 TOO............
100 100 " TOO
V
8644 1392 6 5390b
6073 8000
8644 1392 6 53806
6073 8000
8644 13926
53470 6073 8000
6308 13926
72262 8461 9601
8644 13926
53806 6073 8000
5400 14200 64000
6488 6000
6308 CURVE-0 13926 CURVE-0 ....72716 CURVE-0
8461 CURVE-0 9601 CURVE-0
100 100
99 100 100
100 100
99 100 100
4
1.1 6. r a
15 ODD 8272 1602
15039
15000 8272 1602
15039
15000 8272 1602
15039
13384 7438
146*! 17462
15000 8272 1602
15039
13900 5986 1120
2 0000
... 13384 CURVE-0 7438 CURVE-0 1464 CURVE-0
17462 CURVE-0
100 100 100 100
100 100
100 100
cG
0 2318
0 2318
0 2318
224 2692
0* 2318
0 2575
224 TO-DATE
0
2682 CURVE-0 100
100 100
c
ic
GARRARD 00000684
JOB NO. 14053-000 ROBINSON REFINRY MOOERN2TN PROJ-MOC
FOCUS MASTER FILE LISTING
RUN DATE 5/24/82 PAGE 18
REPORT NO. C38022-40
-------------- ..
?
3 4
B------------ --------------
f ~..... .......
DO
4T.14T.AT A.A A.A *** &*:$* 4: $4:4:4:4:: #4:
UNITS CURRENT
BUOGET
OF
- TO-DATE PROGRESS
PROJECT
cu r=OFF DATE " 5721/82
$*$$***** * $$<## $ * * * * * ** *
******
FORECAST
TREND FCST
PHYS TREND
PCX
PCT
r.
ACCT. NO **** ** **
DESCRIPTION OF ACCOUNT RC QUANT
QUANT MANHOURS
********
QUANT MANHOURS
QUANT MANHOURS
MANHOURS METHOO COMP COMP *****
, X71120
a X71I30 0 X7I150
TEMPORARY WORK AREAS TEMPORARY ROADS
TEMPORARY POWER
BMHRS BMHRS BMHRS
1899 418
13866
1899 418
13866
1899 416
13866
1133 310
19080
1899 418
13866
1296 288
15556
1133 CURVE-0 310 CURVE-0
19080 CURVE-0
loo 100 100
100 100 100
IQ X7116U X71I70
TEMPORARY SEWERS MINOR TEMPORARY CONSTCTN
BMHRS BMHRS
4792 2704
4792 2704
4792 2 704
787 2267
4792 2704
2090 2759
787 CURVE-0 loo 2267 CURVE-0 100
lod 100
,, X71190
WEATHER PROTECTION
BMHRS
3959
3959
3959
7395
3959
2903
7395 CURVE-0 100 100
13 X712IO M X71220
X71250 l<". X71270
X72I10 ie X72120
CLEAN UP MAINT TOOLS 6 EQUIPMENT UNALLOCATED LABGR SURVEYING TEMPORARY BUILDINGS TEMPORARY WORK AREAS
BMHRS BMHRS
BMHRS BMHRS BMHRS BMHRS
13605 20200
6505 0
1588 1755
13605 20200
6505 0
1508 1755
13605 20100
6505 0
1588 1755
24639 16248
9742 0
2692 1480
T3603 20200
650 5 0
1588 1755
10965 15268
7325 0
2875 1666
24689 CURVE-<r 16329 CURVE-0
9742 CURVE-0 0 BUCGET
2692 CURVE-0 1480 CURVE-0
ICO 100 100
0 100 100
100 100 loo
c 100 100
V, X72130
TEMPORARY ROADS
BMHRS
502
502
502
443
502
414
443 CURVE-0 loo IOC
X72160 X72170
TEMPORARY SEWERS MINOR TEMPORARY CONSTCTN
BMHRS BMHRS
3119 590
3119 598
3119 598
957 418
3119 598
1079 727
957 CURVE-0 100 418 CURVE-0 100
100 100
X72190 'J1 X72210
WEATHER PROTECTION CLEAN UP
BMHRS BMHRS
1126 7869
1126 7869
1126 7 06 9
2291 12881
1126 7869
799 8505
2291 CURVE-0 loo 12881 CURVE-0 100
100 100
X72250
UNALLOCATED LABOR
BMHRS
5652
5652
5652
5959
5652
7737
5959 CURVE-0 100 100
X72270
SURVEYING
BMHRS
0
0
0 15
0
0
35 TO-DATE
0" TOO
,f X 73110
TEMPORARY BUILDINGS
BMHRS
931
931
931
1697
931
1609
1697 CURVE-0 100 100
3/ X73120
TEMPORARY WORK AREAS
BMHRS
65
65
65
82
65
82
82 CURVE-0 100 100
ro X73130
TEMPORARY ROADS
BMHRS
39
39
39 48
39 48
48 CURVE-0 100
100
?9 X73160
TEMPORARY SEWERS
BMHRS
0
0
0
0
0* 0
0 BUOGET 0 0
30 X 7 3170
MINOR TEMPORARY CONSTCTN
BMHRS
70
70
TO
60
70
60
60 CURVE-0 100 100
x73i90
WEATHER PROTECTION
BMHRS
27
27 ............. 27
90"
77
18
90" CURVE-0 "TOD 100
X73210
CLEAN UP
BMHRS
2137
2137
2137
2527
2137
2441
2527 CURVE-0 100 100
X73250
UNALLOCATED LABOR
BMHRS
807084 B CM KEMP-CHNG TO Fl X GSKT...... Hill
2690
2690
.... 0 ................ 0
2690
3295
2690
3196
0 ............ 176 - ........... 0 ......'
0
32r7965
CURVE-0 TO-DATE
100 0
IOC 100
IS 816005C B REPLACE DAMAGED BLADES
mu
0
0
0 56
0$
0
56 TO-DATE
0 100
36 816011 8 ITT-GRINNEL
mu
0
0
0 829
a*
0
829 TO-DATE
0 100
37 816012 B BRAND INSULATION ...................... Hill ............0
0
0 ..... ~ 0 .....
0"
U 0 BUCGET 0 0
816013 B INGER-RAND;16G-1A
MHRS
0
0
0 30
0*
0
30 TO-DATE
0 100
31 816014 B GKN-B 5REPAIR F2 SECTION
MHRS
0
0
0 24
0$
0
24 TO-OATE
0 100
816016 B Ml SC BCS FOR RELNC TRUCK
Hill
0
0
0 409 ` .......... 0 -
0 ------ --- 409 TO-DATE
0 .... ICO
816018 B IR RET PULS TANKS TO IR
mu
u
0
0 254
0*
0
254 TO-DATE
0 100
816019 B HAPPY-16E- A/8 COILS
MHRS
0
0
0
0
0* 0
0 BUCGET 0 0
U 816020 B GKN-B j16F-3 SIR. STL.
mu
0
a
0
... 100
..... .....0*
0
100 TO-DATE
15 100
4
4.
816021 B GKN-B;I6F-l*2.4 STACK 816023 B GKN-B; REWORK 16F-5
MHRS MHRS
0 0
0 0
0a
0 83
0* a
0 BU CGET 0 0
0*
a
83 TO-OATE
0 100
-C 816024 B GKN-B;F3 CONV.BOX #4
MHRS
0
0
0
0
0* 0
0 BUCGET 0 0
7
816025 B GKN-B;F5 0UCT.F3 STACK
MHRS
0
0
0
0
0* 0
0 BUOGET 0 0
*a 816026 B GKN BIRW/RWK PLTFMR F124
nm
0
0 0 761
o*
0
761 TO-DATE
0 100
i- 816027 B 6KN BIRW/F5 FLNG AT 12MI
mu
0
0
0
7
0*
....... 0 --------------- 7 TO-DATE
0 100
S1602B B GKN-B;REWORK F3 MANIFOLD
mu
0
0
0 80
0
0
80 TO-DATE
0 100
816029 B GKN-B;16F-1 CUIL BEVEL
mu
0
0
0
0
0* 0
0 BUCGET 0 0
>' 816030 B GKN--B;VC HTR.RWRK PIPING
am
0
a
0
0
0$ 0
0 BUOGET
0 ........e
816032 8 GKN-B!REPAIR F3 BURNERS
MHRS
0
U
0 101
0*
0
101 TO-OATE
0 100
816033 B GKN-B;REBVEL MK16F3C
mu
0
0
0 1253
0-
0
1253 TO-OATE
0 100
f
0
<3
9
"1
?9
4 *
9
If
9
.2 15
11 9
71
n
*' .?
V. ,,
V!
'
/r
r.1 r.
1
?
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC
FOCUS MASTER FILE LISTING
RUN DATE 5/24/82 PAGE 19
REPORT NO. C3B022-40
%$$ $# j*s $ $
00
CUT -OFF DATE 5/21/82
a
}
ACCT. NO
DESCRIPTION OF ACCOUNT
UNITS CURRENT
BUOGET
......... OF
RC QUANT
QUANT MANHOURS
jjr#
$$sj: #
# 4?
TO-DATE . '............ QUANT
PROGRESS PROJECT
............... .
........ "
MANHOURS $***::$ $**;
QUANT
FORECAST MANHOURS
TREND
FCST MANHOURS METHOD
PHYS PCT COMP
TREND PCT
CCMP
.......816034 B GKN-B;REPR.PNLS.MKIA29R 816035 B GKN B; FI.2 RwK RAO TUBS 816036 B GKN-9;PROVIDE ACCESS DRS 81603T B GKN-B;FLAP DAMPERS 816038 B GKN-B;REPK.COLD AIR OUCT 816039 B GKN-9; F3.FLANGE MK5A13 816040 B gkn-b;spring Hanger rods 816041 B GKN-B;RAD.MALL RESTRAINT 816042 B gkn-b;compens.to damper 816043 B GKN-B F5 GUILLOTIN DMPR 816045 B GKN-B;REWK ASST 16F3 osg
816046 B F12.4 RAOIANT ROOF PANEL
816047 B GKN-B;F3-STRWYS/PLtFORMS 816048 B gkn-b;pltfrm.at elev.ioi
816049 B GKN-B;PLTFMS.l1,12.13614 816050 B INGERSOL-RANO;COMPRESSOR 816051 B LECTRODRYER 816053 B GKN--B;VC HTR-REV.CO PIPE
816055 B GKN-B;REF AB.16HS-1208 816056 B ECKO;CUT/REWELD 11/4CHRM 816057B B REPLC DMGOEMISNG REF 16--3
816058 B GKN- B; F1 - R E V R S E F L ANGE S 816062 B RELCT E REWLD BEAMS--F3 816064 B INGERSOLL RAND 816065 8 ECKO;RWRK.SPL.16P-208-1D
816066 B ECK0;RWRK.SPL.16P-203-lB 816067 B ECKO;RWRK.SPL.16P-204-1B 816068 B ECKO;RWRK.S PL16P--205--IQ 816071 B GKN-B;WIND BRACING-VCHTR 816072 B JOHNSON SCRN16C--25 MOUIF 816075 B GKN-B INSTL RING SF-16F4
816076 B GKN-B;CONV.RESTRAINTS F3 816077 B ELLIOTT MTRL ONLY THRMW 816080 B SAUOER INO. 16C-25 MODIF 816089 B TIE-DOWN STORAGE SHED
816090 B I.R.--UNLOADER VALVES 816091 B ECKO;REFAB.SPL.16P--1401A 816093 B GKN-B;RELOC.DAMPER CNTRL 816094 B GKN--B;HOR.BOX REV.16F-3 816095 B REVISING BRACKETS 816108 B BRAND INS. CLEAN-UP 818035 B GKN-B;RWRK.RAO.SECT.TUBE 821004 B STR STEEL REPAIRS 823010 B SMITHCO ENG. RECOMB FINS 823052 B B UNIV. LOCKPORT TGTN BOLT 823055 B REFAB 16-HS-1208 823070 B INDIRECT L WORK TO ACM 823085 B STEEL MESH ON VSL SKIRTS
j
mil
...-..... 0
urn
0
mu
0
mu
0
mu
0
mu
0
iiiir
0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
0
urn
0
mu
0
mu
0
mu
0
mu
0
iiiir
0
mu
Q
mu
0
...... mil ......
0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
....... 0
mu
0
mu
0
mu
0
mu
0
mu
0
mu
0
um
0
mu
J
mu
0
um
0
um
0
0 0 0 0 0 0 0 0 0 0 u
0 0 0 0 0 0 0 0 0 u ..... 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .....................0 0 0 0 0 0 .................0 0 0 0
0
0
0
92~ ' -... 0*
10 ...
0 20
0$ 0
0 0 0* 0 0 0 0* 0
0 0 0* 0
0 125
0* 0
--D~ 0
XT .................0* 0 0*
0 0
00 0 ...... ......116 ....
o* 0 0* ................. 0 ....
0 2637 0 0
0 48
o* .
0
0 0 0* IT 0 0 0* 0
0 0 0* 0
0 127
0* 0
0 49 0 0
0 0 0$ 0
0 0 0* 0
0 204 0 675
0* 0 0* . 0
...0 207 ...... ......0* ..... .... 0
0 8 o* 0
0 242 0 0
a
0 ------- 122
0
0 37 0 0
0 12 0 0
0 64 0 0
0 26 0 0
0 56 0 0
0 ............. 23 0 0
0 55 0 0
000 0
0 118 0 0
0 17 0 0
0 46 0 0
......... 0
74
0
0~
0 615 0 0
0 140 0 0
0 48 0 0
0 48 0 0
0 0 0* 0
0 173
os 0 -------
0 140 0 0
0 82
os 0
00 0 0
0 13 0 0
0 38 0 0
.... 92 TO-DATE
0
20 TO-DATE
0
0 BUDGET
0
0 BUCGET
0
0 BUDGET
0
125 TO-OATE
0
0 BUDGET
u
0 BUOGET
0
0 BUDGET
0
116 TO-DATE
0
2637 TO-OATE
0
48 TO-DATE
0
0 "BUDGET
0
0 BUCGET
0
0 BUDGET
0
127 TO-DATE
0
49 TO-OATE
0
0 BUDGET
0
0 "BUDGET
0
204 TO-DATE
0
675 TO-DATE
0
207 TO-OATE " n
a TO-DATE
0
242 TO-OATE
0
122 TO-OATE
0
37 TO-DATE
0
12 TO-OATE
0
64 TO-OATE
0
26 TO-DATE
0
56 TO-DATE
0
23 TO-DATE
0
55 TO-DATE
0
0 BUOGET
0
118 TO-DATE
0
17 TO-DATE
0
46 TO-DATE
0
M "TO-DATE " 0
615 TO-OATE
0
140 TO-OATE
0
48 TO-DATE
0
48 TO-OATE
0
0 BUOGET
0
I73 TO-DATE .... 0
140 TO-OATE
0
82 TO-DATE
0
0 BUCGET
0
13 TO-DATE
0
38 TO-DATE
0
100 ....... 4
100
"
0
0
0
IOC 0
,r
0
0
100
100
100 0
M ?'
0
0
ICO..... " "
100
0 3. IT
100
100
IOC.........
100
1U0 100
...
100
100 100 ICO
r. 4',
'
100
100 ...... n
100
G
100.........
100
100
,e
loo
100
100
100
8.
100
0
100 ICO
P-
100
0............... .
ICO
loq
0
e
JOB NO. 14053-000 ROBINSON REFINRY MQDERNZTN PROJ- MOC
# REPORT NO. C38022-40
FOCUS MASTER FILE LISTING
RUN DATE 5/24/82 PAGE 20
0 o
OO
c ****************
UNITS CURRENT
BUOGET
..... Of .......... ......
r ACCT. NO DESCRIPTION OF ACCOUNT RC QUANT
6
QUANT MANHOURS
; 826031
r e 826036
828022 .0 ....B30U17
r 832009 .2 870008 900044 l4 900097
B NO DESCRIPTION B GKN-B PROVIOE ACCESS ORS B ELECTRODRYER 280-1 SKID B HESTlNGHOUSE VENDOR REP B BCKCHRG FOR TOWR SBCNTRT B REPAIRS ON 4100 CRANE C23E-14 MONORAIL E "TROEE? C FUEL GAS BYPASS
iim mu mu inn
mu imi IZUT mu
"
~xr
0 0 0
0 0 0 0
' _
a 0 00
0 0 0 0
900217 C ROAC REPAIR
00
M 900218 C DRAIN VLV IN O'BRIEN BOX 900219 C INVERT XMITTER FLANGES
.A 900220 C INSTALL BLOWDOWN VALVES
00 0a
00
14 900221 C ASSISTANCE TO HONEYWELL
00
900222 C INST BOX PWR FEED BY PLT
00
71 900223 C COKER QUENCH PANEL
mil
0
0
72 ^ 900226 C RELOCATE LIGHT FIXTS-CCR 73 900228 C RELOCATE TEMP A/C UNIT
BMHRS
0 0
0 a
900229C C CIPS RAILROAD CROSSING
mu
0
a
900234 C RECEPTACLES IN CONTR RM 76 900235 C DISTRIB FIREPROOF
mil mu
0 0
0 0
900236 C INSTALL NDZ2LES ON TANKS
?e 900238 C DRAINS ON O'BRIEN BOXES 79 900244 C BECHTEL--TIE--INS TO 900245 C SMALL BURE ADDS 23-28
imi mu mu
mu
0 0 0 0
0 0 0 0
II 900248 C DELETION OF FUEL OIL PIP
J? 900249C C REV. TO FUEL GAS LINES 13 900252C C ADD SPLASH BAFFLES H 900257 C PLANT 7 PSV BYPASSES 15 900265 C SEAL WELD INSTRUMENTS lli 900268 C NAPTHA STRUCTURE
SI 900300 C COKER CNTRL RM MODIFICTN
mil mil mil ILILI
mu mu
0 0 0 0 0 0 ....a
0
0 0 0
0 0 -0
>8 900306C C CORRECT HEAT PROBLEMS
mil
19 900313 C NEW T/C TAGS
mu
10 9003I6C C ARTF MOD CAT CRACKER .............. mu
1. 900318 C HONEYWELL GROUNDING
mu
1.' 900323 B MOD.SECURITY SYSTEM
mu
0 0
0"
a
0
0 0 0 a 0
.....900535 C LOST TIME
...............
.c 901244 C ALLEN-PLANT 29 TIE-INS
BMHRS
mu
... 0 .... 0
0 0
TO-DATE PROGRESS
QUANT MANHOURS
IT ~
648
06
0 132
0...................113
0 70
00
0T
00
00
00
00
00
00
00
00
00
.0
0
00
00
0 25
00
0 28
00
00
00
00
00
"" "------- o....... -......... 0
0 120
0 82
0 .................0
00
00
................. 0..... ....... 263
00
00
'........ 0..............
0
.0
0
PROJECT FORECAST
CUT-OFF OAT E 57217BT $$$*
TREND
PHYS TREND
o
FCST
PCT PCT
QUANT MANHOURS MANHOURS METHOD COMP CCMP
0
0*
0
0* - - 0?r
8
0
649 TO-DA 1t
0 100
9
0
6 TO-DATE
0 100
K. 0
0 0"
132 TO-OATE I13T0-DAT E
------ 0Q
100 .....ioo....
..." 13
0*
0
70 TO-DATE
0 100
14 0
0# 0
0 BUCGET 0 0
1(
a 0 ' 0 BUDGET 0 u
0
0
0 BUCGET 0 0
IP
3000
3000
0 BUCGET 0 a
*.
0
0
0 BUCGET 0 0
71
0
0
0 BUDGET 0 0
?;
0 0 0 BUDGET 0 0
0
0
CTBUMET 0 0
?
0 0 0 BUOGET 0 0
0 0 0 BUCGET 0 0
0
0
0 BUCGET 0 0
n
0 0 0 BUDGET 0 c
0
0
0 BUDGET 0 0
17
IT 0
0 0
"STODGE! 25 TO-OATE
00 0 100
13 14
0
a
0 BUCGET 0 0
3f
0
0
28 TO-OATE
0 loo
17
0
0
0 BUOGET 0 0
10
0
0
0 BUDGET 0 a
4fl
0
0
T BUDGET
00
4.
0
0
0 BUOGET 0 0
47
.." "..
00 0... ---------- ---- 0 _ 00
0 BUOGET
0
0 BUCGET ..... 0
120 TO-OATE
0
0 44 0 '...."" 4' 100 ir,
0
0
82 TO-OATE
0 100
li
0
0
0"BUDGET
0
0
.17
0 0 0 BUCGET 0 0
0 0 0 BUCGET 0 0
.....0 " ....."......0
...... 263 TO-DATE ....... 0
ICO
0 0 0 BUOGET 0 0
0 0 0 BUDGET 0 0
2000
2000"
0 "BUDGET...
0 .... ..0
a 0 0 BUCGET 0 0
I END OF MASTER FILE LIST
950 RECORDS ON FILE
-.1
.............. -
o
1
'
4
L
R
10
.?
13
18 ?C
?1
?4 n 21 2!i
JOB NO1405 3-000 ROBINSON REFINRY M00ERNZTN PR0J-M0C REPORT NO. C38022--40
X LIMIT 20 "PCT
CURVE CODE
-0-
E 4= J4 L* M*
P$ U* S*
.CO .00 .00 .00 CO .00 .00
-10-
.00 .00 .00 .00 .00 .00 .00
FOCUS FORECAST LIMITS AND CURVES
-20-
1.17 .97
1.18 1.23 1.11 1.03 1.19
-30-
1.15 1.14 1.22 1.25 1.22 1.08 1.32
-40-
1.13 1.25 1.23 1.23 1.28 1.15 1.30
-50-
1.11 1.19 1.19 1.20 1.25 1.18 1.21
-60-
1.09 1.11 l.ll 1.15 1.19 1.15 1.14
-70-
1 .07 1.04 1.05 1.10 1.14 1.12 1.08
V LIMIT 15 PCT
-80- -90- -100-
1.05 .99
i.o2 1.04 1.08 1.07
1.04
1.03 .98
rai 1.01 1.03 I.01
1.01
1.00 1.00 1.00 1.00 1.00 1.00 1.00
END OF REPORT C38022- 40
DATE PAGE
5/24/82 1
13
1$ ir
V.
0
a
o
2o
o
R 111?
a
If
"3
?;
}
y>
31 V
3; )!!
"
40 .............................
......................................... -
----- .
............ .............................................................................
GARRARD
ooooo
s. ...... --....................... - -
.
CD
00
'
GARRARD 00000688
c
_<rf
o
c
c
c c r
c
r c "
C c c c c c G
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MQC REPORT NO. C38040-35
FOCUS ***P ERFORMANCE REPOR T ***
SUMMARY OF
TOTAL PROJECT
RUN DATE PAGE
5/24/82 I
C ALCJJL AT igNS _HASEQ_ ON_BUDGE_T_
LINE ITEM
AREA
PROJECT FCS.T DATE 11/20/81* FCST 004
CUT-OFF DATE 5/21/82
........
CURRENT BUDGET ..... .... _ MANHOURS
PROJECT..........TRENC FORECAST FORECAST MANHOURS MANHOURS
....... THIS WEEK
TG-OATE
PERFORMANCE FACTOR PERCENT
CALC
ACTUAL
CALC
ACTUAL THIS TO TRND COMPLETE
MANHOURS MANHOURS___ MANHOURS MANHOURS____..W..E.E..K._.._._._..O- A T'E__' _*_$F<C=*S*<TTRNOPHYS
HYDRTRETR/PLATFRMR OFF-PLOTS TOC CONVERSION SUBCONTRACTS DISTRIBUTABLES
TOTAL PROJECT
445993 ..... 660945
331899
39703T
263844
181295
130293168959
248644
246790
1470673
1855026
866557 391191 181333 189094 290531
1918706
1193
0 0
3069 960
5222
JOlt
0
.544542, 335016
863203 390969
1.69____ 1.59 .00 1.17
1.58 100 100 1.17 100 100
0 255682 181295 .00 .71 .71 100 100
.2967_____ 147114______162284______ .97____ l.JO_____ 1.10___ *<>....... 86
686
248208
289996
.71 1.17
1.17 100 100
5661
1810 7747
_1.23_
98
1530562
1.09
1.23
98
ol
O o o o o 9 9 9 9 9 9 9 9 9 9 O o :o o o %
s
& JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC
0 REPORT NO. C38040-35
FOCUS ^PERFORMANCE REPOR T
SUMMARY OF
TOTAL PROJECT
RUN DATE PAGE
CALCULATIONS BASEO ON BUDGET
5/24/82
1
c PROJECT FCST DATE 11/20/81, FCST 004
CUT-OFF DATE 5/21/82
c
"
r c
.............................
................... CURRENT
LINE
BUDGET
ITEM CATEGORY
MANHOURS
$ '$: $ <s # :$ $ $ tJ: <r * ^ 4
PROJECT " TREND FORECAST FORECAST MANHOURS MANHOURS
$E $J $L $M w~ N *P T c$
$R
S #X Y 2 *1 2
5
EQUIPMENT INSTRUMENTATION PIPING STRUCTURAL STEEL INSULAT K FlREPRF ELECTRICAL CONCRETE
BUILDINGS SITEWORK
PAINTING SCAFFOLOING MISCEL SUBCONTRCTS TEMP FACILITIES TEMP SERVICE OTHER OPERATIONS
94260 148277 2795C1
53744 93599 288399 97909
3615 55436
9091
42468 55730 56856 166875 24913
149706 12687
506719 60870 57081
269198 223047
7159 66403
4504 126667
64195
52920 166764
27106
149920 717 36
505121 60772 72651
270483
223134 7122
66403 5592
126486 68755 60677
203266 26588
THIS ifE EK
CALC
ACTUAL
MANHOURS MANHOURS
TO-DATE
CALC
ACTUAL
MANHOURS MANHOURS
PERFORFSNCEFACTOR PERCENT THIS TO TRND COMPLETE WEEK DATE FCST TRND PHYS
0 1193
0 0 2654 0 0 0 0 415 0 0 58 902 0
0 730 180
0 2T4T~ 1091
0 0 0 224 13 0 0 686 0
94880 146690 314656
44915 4 5416
330944 132592
3375 55877
5139
47702 6U168 56856 166439 24913
149730 70482
502399 60772 4T588
270483 223047
7122 66391
4684 126486
68567 60677 202731 26588
.00 .61 .00 .00 "Tien.00 .00 .00 .00 .54 00 .00 .00 .76 .00
1.58 .48
1.60 1.35 1.05
.82 1.68
2.11 1.19
.91 2.65 1.14 1.07 1.22 1.07
1.58 .48
1.60 1.35 r.os..
.82 1.68 2.11 1.19
.76 2.65 1.14 1.07 1.22 1.0 7
100 98 99
100 66
100 100 100 100
84 100 100 100 100 100
100 <59
100 100
iT
100 100 100 100
70 100 100 100 100 100
TOTAL PROJECT
1470673
1855026
1918706
5222
5667
1887747
1.23
98
1530562
1.09
1.23
98
ar
o
O
17 13 M9
1C
9 ?c r1 9
7.
V 9
9
13
O
3 9
9
'0
GARRARD 00000689
e JOB NC. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MUC REPORT NO. 038040-35
FOCUS --P ERFORMANCE REPOR T
_____ DETAIL OF HYORTRETR/PLATFRMR A
RUN DATE PAGE
CALCULATIONS 8ASE0 ON BUDGET
5/24/e2 1
o Q
PROJECT FCST OATE 11/20/81, FCST S 004
CUT-OFF OATE 5/21/82
O
LINE ITEM. CATEGORY
CURRENT PROJECT
TRENO
THIS WEEK
TO-DATE
BUDGET
FORECAST FORECAST
CALC
ACTUAL
CALC
ACTUAL
MANHOURS__MANHOURS___ MANHOURS___ MANHOURS__ MANHOURS___ MANHOURS MANHOURS
PERFORMANCE FACTOR PERCENT
THIS
TO TRNO COMPLETE
WEEK DATE FCST TRND PHYS
9
. .......... E ..... EQUIPMENT._______ ,,
J INSTRUMENTATION
L
___ M
PIPING STRUCTURAL STEEL
_
N INSULAT FIREPRF
P ELECTRICAL
......... a ... CUNCREIE ........... ....
R BUILDINGS
s SITEUORK
- _V_ _ .SCAFFOLDING. .
74489 41688 110971 ....... 19593
1 75900 ............ 7 5275
1180 26964 .. 19932
131451 23006
307897 31854 849 92183
468745)
24058 77607
131635 24387
310812 31854 849 93564
168832 3258
23939 77427
1193
0 0 0 0 0 0 0 0
14596
730
40890
180
156631
0 23322
0 827 91 96210
0..... .. 98844 0 1180
0 26650 13 25390
131635 23211
308721 31854 849 93564
168745 3258
23939 77427
oq .61 .00 .00 .00
.00 .00 .00 .00 .00
1.76___ 1.76
.57 .57
1.97 1.97
1.37
1.37
1.03 1.03
.97
.97
1.71
1.71
2.76 2.76
.90
.90
3.05 3.05
100......100. 95 96
:;o
99 100 100 100
::o`
100 ioo......... " '
100 100
100 100
100 100 100
100 100 100
9
-A
HYORTRETR/PLATFRMR
445993
860945
866557
1193
14 544542 863203 1.69 1.59 1.58 100 100
19
9
9
9
9
9
9
O
O
o
o
GARRARD 00000690
o
fV
e
/1 ? 3 4 6
'
9 10 2
1.1 H
If, 7
ie
,r.
22
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C3B040-35
FOCUS
^PERFORMANCE REPORTS
DETATL OF OFF-PLOTS
B
RUN OATE PAGE
CALCULATIONS BASEO ON BUDGET
5/24/82 2
*************VAVATATA-.V.AP-tfAVRAOTVVJ. EAVC*T**F*C*S*T***D*A*TE* 11/20/81 $v $$F$C$S$T$$$ i0r0V4TVvriv ***********
CURRENT PROJECT
TREND
this week
TO- OATE
LINE
$$$IT$E$M$$$
CATEGORY ********************
BUDGET MANHOURS
FORECAST FORECAST
CALC
MANHOURS **m*a*n*h*o*u*r*s***manhours
ACTUAL MANHOURS
CALC
ACTUAL
MANHOURS $$$M$ANH$O:U$R$S$
CUT-OFF OATE *******
vv5v/2v1/82
PERFORMANCE
THIS
TO
WEEK OATE
factor PERCENT
TRND COMPLETE
FCST
TRND
$$$$
phys
*****
E EQUIPMENT J INSTRUMENTATION
19771
18255
18285
0
0
20282
18095
.00
.89
.90 99 100
14131
8219
8220
0
0 12334
8200
.00
.66
6? 100 100
L PIPING
109073
157111
151284
0
0 122243 151284 .00 1.24 1.24 100 100
M STRUCTURAL STEEL
32893
27610
27538
0
0
20064
27538
.00 1.37 1.37 100 100
N INSULAT G FlREPRF
16563
808
803
0
0
775"
"TRJB
.00
1*11
1*11 100 100
P ELECTRICAL
67965
41189
41093
0
0
76548
41093
.00
.54
.54 1U0 100
Q CONCRETE
22034
52917
52917
0
0
32498
52917
.00 1.63 1.63 100 100
R BUILDINGS
684
2058
2053
0
0
444
2058
.00 4.64
100 100
S SITEkORK
27857
41244
41363
0
0
28950
41351
.00
1.43
1.43 100 100
Y SCAFFOLDING
20928
47626
47625
0
0
20928
47625
.00 2.28 2.28 100 100
OFF-PLOTS
331899
397037
391191
0
0 335016 390969 .00 1*17 1.17 100 100
"
;e
29
30
19 14 r, ]6 17
10
9 79 A Q5 9 8 9
9 "9
"
?. r.
7' ?n ?9 3f: 11
37
*
............. -- -................ ............
-
i2 ,1
GARRARD 00000691
O
O 3
w
M IF
>8 >0 ??
JUB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38040-35
FOCUS
PERFORMANCE REPORT*
DETAIL OF TOC CONVERSION___ C ______
RUN OATE PAGE
CALCULATIONS 3ASED ON BUDGET
5/24/82 3
Tri-TXTTl-V-i-V-iTTTVT
LINE ITEM
CATEGORY
PROJECT FCST OATE 11/20/81. FCST 004
CUT-OFF OATE 5/21/82
CURRENT PROJECT
TREND
THIS WEEK
.... TO-OATE
............ ..... PERFORMANCE FACTOR PERCENT
BUDGET
FORECAST FORECAST
CALC
ACTUAL
CALC
ACTUAL
THIS TO
TRNO COMPLETE
MANHOURS
MANHOURS MANHOURS MANHOURS MANHOURS ****************************************
**M*A*N*H*O*U*RS****M*A*N*H*O*UR*S****W**EE*K*_*__*_*O*A*T*E****F*C*S*T*J*T*R*N*O**P*H*Y*S*
J INSTRUMENTATION
87723
36724
36762
0
0
88060
36724
.00
.42
.42 100 100
L PIPING
25793
1678
1678
0
0
3283
1678
.00
.51
.51 100 100
M STRUCTURAL STEEL
1220
1341
1341
0
0
1491
1341
.00
.90
.90 100 100
P ELECTRICAL
144534
135826
135826
0
0 158186 135826 .00 .86 .86 100 ICO
Q CONCRETE
600
1385
1385
0
0
1250
1385
.00 1.11
1.11 100 100
R BUILOINGS
1751
1806
1806
0
0
1751
1806
.00 1.03 1.03 100 100
S SITEWORK
615
1101
1101
0
0
277
1101
.00 3.97 3.97 100 100
Y SCAFFOLDING
1608
1434
1434
0
0
1384
1434
.00 1.04 1.04 100 100
rC TOC CONVERSION
263844
181295
181333
0
0 255682 181295 .00 .71 .71 100 100
GARRARD
O;
>"
ooooo
CD CD
J A
6
'
10
"
1? M
10
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38040-35
F o c y .S P E R F 0 R M A N C E R E P 0 R T$$*
DETAIL OF SUBCONTRACTS
S
RUN OATE PAGE
CALCULATIONS BASEO ON BUDGET
5/24/82 4
LINE ITEM
CATEGORY
CURRENT BUDGET MANHOURS
PROJECT FCST DATE 11/20/81. FCST S * $ $ 4? $ $ *$41 <:
PROJECT
TRENO
THIS WEEK
FORECAST FORECAST
CALC
ACTUAL
MANHOURS MANHOURS MANHOURS MANHOURS
004
CUT-OFF DATE ***<
TO- DATE
PERFORMANCE FACTOR
CALC
ACTUAL
MANHOURS MANHOURS
THIS WEEK
TO DATE
TRND FCST
5/21/82
PERCENT COMPLETE TRND PHYS
J L M N X Z
*S
INSTRUMENTATION PIPING STRUCTURAL STEEL INSULAT E FIREPRF PAINTING MISCEL SUBCONTRCTS
SUBCONTRACTS
4735 33664
38 77035
9091 55730
1B0293
4738 40033
65 55424
4504 64195
168959
2367 41347
39 70994
5592 68755
189094
0 0 0
2654 415
0
3069
0 0 0
2743 224
0
2967
5406 32499
38 43864
5139
60168
147114
2347 40716
39 45931
4684 68567
162284
.00 .00 .00
1.03 .54
.00
.97
.43 1.25 1.03 1.05
*91 1.14
1.10
.44 1.2 7 1.03 l.OB
.76
1.14
99 98
100
65 84
100
100
100
100
67 70
100
1.10
86
86
0
9
>9
9
0
9>0
1? 13
M9
16
IE IS
21 ?: ?<
7<
n
00 Jl
GARRARD 00000693
r
a
GARRARD 00000694
V
e
>
<* ? 3 A
<
'
"
12
T
18
.4
20 2. 22 23 4
28 21) 3Q
3? )) >1
U
jb
* H
P
,2
<
n
>
JQ3 NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38040-35
FOCUS
**P ERFORMANCE REPOR T
DETAIL OF HYDRTRETR/PLATFRMR A
RUN DATE PAGE
CALCULATIONS BASEO ON BUDGET
5/24/82 1
3$* 333#
333$$3$3$3$3$$
PROJECT FCST DATE 11/20/81 FCST 004
CUT-OFF OATE 5/21/82
3333333333 33333333333 33333333 333$$$$$3$$$$$33333$$$ 3333333333333 333333 3333333333
CURRENT PROJECT
TREND
THIS WEEK
TC- DATE
PERFORMANCE FACTOR PERCENT
LINE
BUOGET
FORECAST FORECAST
CALC
ACTUAL
CALC
ACTUAL THIS TO TRNO COMPLETE
ITEM COMMODITY
manhours MANHOURS manhours MANHOURS MANHOURS MANHOURS MANHOURS
WEEK
OATE
FCST TRND PHYS
333$$ 33333333#$*###$#*$## 333#3#33333333
333333333# 33333333 $3# 333$##$3 A
iA( >A* A. <A* A 3$3#3333$$33
A. <A A <Ai A 33333$ 3333333 33$
E10 Ell E12 E20 E30 E40 E41 E50 E60 E61 E62 E63 ETO J01 Jll J15 J22 J31 J50
J60 J70 J71 J74 J81 J82 J95 L10 HI L12 L17 L21 L22
L24 L70 LBO
L81 L91 L98 Ml 0 M20 M30 N30 PI 2 PI 3 P14 PI 6
ERECT COLUMNSGVSLS PLATFORMING REACTR LOAD CATALYST ERECT STORAGE TANK HEAT EXCHANGERS FIREC HEATER PLATFORMG HEATERS PUMPS G DRIVER C0MPRESS0RS60RIVER GAS BOOSTER COMP RECYCLE GAS C/COMP RECYCLE GAS COMPRS OTHER EQUIPMENT PREFAB INST SUPTS
INSTALL XMITTERS REMOVCINST ALL INST SATELLITE RACKS LOCAL CONTROL PANL INSTRUMENT SHELTER
ANALYZERGPACKAGE INSTR TUBE GPI PE
INSTL INTRU TBGPIP INST AIR SUBHEADER LOOP CHECK CALIURATIONGTESTNG OISPUSAL EXIST INS STEAM TRACE PIPGSH SPL 2 INGSM PIPE SPL 2.5-6 IN PIPE INST CS RACK3IN-6I SPL AL 2INGSM PIPE SPL AL 2.5--61NPI PE
RCK AL 2.5-6IN PIP
OU/G CS PIPE STM Trace tbg COMMODITY X-RAY6STR RELIEVNG tesTinggInspect ion STEEL STRUCTURE LADDERSGPLAT,6HRL PIPEWAY STEEL INSULATE INSTRUMTS
POwERGCONTROL tQUP JPS EQUIPGSTCBY LIGHT FIXTURES6RCT PROGRAM CONTROLLER
5399 4500
0 168 7500 7181 21135 5723 1000 9900 6600 3300
2083 2195
8703 7731
3 140 2982 7266 185 . 670 2365 1750 6521 1177
88 43004 28902 11802
3388 6213
752 5083 3553
88
1400 6698 14530
4575 488 1
6218 800
1498 320
10878 6536 0 54
11162 29809 49354
6229 1771 7573 4669 2341 1075
404 4210 2863
276 768 249 627
89
1361 5224 3186 3296
453 11530 94007 120555 10483
2692 27292
0 6263 9604 5453 3471 16547 17477
13144 1233 849
5664 524
4054 0
10904 6536 0 54
11194 29809 49480
6229 1771 7573 4669
2341 1075
404 4210 2830
276 792 265 645
tJ9
1423 5375 4874 2751
453 11532 94505 ...120725 10483
2692 27292
2069 6263 9706 5496
3471 16579 17477
13144 1233 849 5745
524 4093
0
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0 10
00
0 24
0 16
00
00
00
00
830
566
363
114
00
00
0 180
......- .... 0
...--0
00
00
................ 0... ...............0
00
0 ~.............. 0
0 o
00
00
00
00
00
00
00
0 48
00
0 39
00
5013
10904
4500
6536
00
84 54
7667
11194
7181
29809
21135
49480
4562
6229
1000
1771
9900
7573
6600
4669
3300
2341
36 56
1075
735
404
9511
4210
8831
2830
450
276
2660
792
625
265
1313 176
645 89
1320
1423
4922
5375
5293
3736
3877
2713
......... 1177
453
6613 39853
11530 94491
54239
I20T20
8658
10483
2537
2692
..........9724 .........27292....
00
5087
6263
8440 .............9 704
10471
5496
1400
3471
9609
1657 9
11264
17477
11043
13144
1015 827
1233 849
9988
5745
753
524
2866
4093
00
.00 .00 .00 .00 .00 .00
.00 .00 .00 .00 .00 .00 .00
.00 .00 .00 .00 .00
.00 .00 .00 .00 .68
.31 .00 .00 .ou
DO" .00 .00 .00 .00 .00 .00 .00 .00 .00 .00
.00 .00 .00 .00
.ou
.00 00
!
oi
O!
i
2.18 1.45
.00 .64 1.46 4.15 2.34 1.37 1.77 .76
.71 .71 .29 .55
.44 .32 .61
.30 .42 .49 .51
1.08 1.09
.71 .70 .38
1.74 2.37
2.23 1.21 1.06
2.81 .00
1.23 I.I5
.52 2.48
1.73 1.55 1.19
1.21 1.03
.58 .70
1.43 .00
2.18 1.45
.00 .64 1.46 4.15 2.34 1.37 1.77 .76 .71 .71 .29 .55
.44 .32 .61
.30 .42 .49 .51
1.08 1.09
.71 .70 .38
1.74 2.37
2.23 1.21 1.06
2.81 2.75 1.23 I.T5
.52 2.48 1.73 1.55 1.19
1.21 1.03
.58 .70 1.43 .00
100 100
0 100 100 loo 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100
77 99 ICO 100 100
100 100 100 100
0 100 100 100 100 loo 100 100
100 100 100 100 100
0
100 100
0 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100
ICO 100 100 100
77 98 100 100 100
100 1 00 100 100........
0 100 100
100 100 loo 100 100
loo
100 100
loo
100 0
?
,,
G a
l
13 M ig
2. 7>
21 rn 70 34 77 33
11
70
)7 )? 30 3-
12 11 IS K 'V
,f .
01
0/
i-
c
%)
C
Ld
; c*
i <
'
" , '
m
,
"
" . >
>
3n
n
' >
> > ' "
> >< ' 'r "
I"
'
J
" " "
t ,
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38040-35
FOCUS ***P ERFORMANCE REP OR TSS*
' DETAILJJF HYDRTRETR/PLATFRMR A__________
RUN DATE PAGE
CALCUtATIONS BASED ON BUDGET
5/24/82 2
******** **********************
LINE ITEM
COMMODITY
CURRENT BUDGET MANHOURS
PROJECT FCST OATE 11/20/81 t FCST a 004
***********
TV *********
PROJECT
TREND
THIS WEEK
FORECAST FORECAST
CALC
ACTUAL
MANHOURS MANHOURS MANHOURS MANHOURS
*********** ********* ***********
TO- OATE
CALC
ACTUAL
MANHOURS MANHOURS
*********
CUT-OFF OATE 5/21/82 $$$$$$$ ssssss *****
PERFORMANCE FACTOR THIS TO TRNO
WEEK OATE FCST
********************
PERCENT COMPLETE
TRNO PHYS
*****
P21 P2 3 P25
P31 P32 P33 P34
P35 P36 P41 P4 2 P43 P50 P80 P99
QO1 oil QI2 Q15
Q21 Q22 02 5 031 Q32 Q35 040 Qb 1 Q62
063 069 Q71 Q73 R0 3 RIO
R20 S03
SI 1 SI 2 S31
S32 S41 Y10
RGS BRANCH CONDUIT NON-METALLIC COND CABLE TRAY
600VC1KV CABLE 5KV6 LARGER CABLE ELECTCTC WIRE TERMNTN 600VG1KV TERMNTN 5KVGAB0CE TERMNTN ELECTRGTC GROUNDING GROUNDUELLS ELECT HEAT TRACING 0/H POLE LINE OIST
TESTING MATERIAL HANDLING FABRICATE REBAR \ FOUNOATN CONCRETE*
STRUCT CONCRETE OTHER CONCRETE FOUNC REBAR STRUCT REBAR OTHER REBAR FOUNO FORMS STRUCT FORMS OTHER FORMS MISC CONC ICOMP 1 PRECAST CONCRETE PRECAST REBAR PRECAST FORMWORK SET PRECST ITEMS CONCRETE PAVING CONDUIT ENVELOPES ELECTRICAL SUBSTAT BUILDING SATELLITE CONT.RM. DEWATERING E XC AVA TIQNGOISPOSL BACKFILLGCOMPACTIN SEWERS ORA INAGE PRECAST MANHOLES FINE GRADINGCLEVIG SCAFFOLDING
29111 4117 15
8448 1110 4624 2353
320 3697 3487
236 8256
9 1280
1 715 6350
8643 797
3180
2858 375
6458 16672
735 4C0 1147 1312 7222 3824 11275 3312 560 270 3 50 28C0
5183 7917
2468 2450
6146 19932
46753 4183 1268
6701 725
4961 4029
467 4485 2495
115 2011
0 1949 1799 1266 1098
90 37 204
11622 21953
0 28507 54213
0 438 1780 4193 9871 7226 3894 3443 1345 650 1300 4673 5047 5905 3415 3038 1900 77607
47913 4183 1272
6732 725
4961 4092
486 4495 2580
115 1888
0
1961 1799
1266 11100
9037 204
11622
22038 0
28507 54213
0 438 1780 4193 9871 7226 3894 3443 1341 619
1298 4673 5047 5985 3415 30 38 1781 77427
0
0 0
0 0 0 0. 0 0 0 0 0 0 0 0 0 0
0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 T)
0 0
0
o
0 0 0 0
764 0 0
10 0 0
58 0 0
48 0
112 0
12 0 0 b 0 0 0
0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
o
0 0 0 13
44884 2854 1343 7193 1409 4229
3282 367
4147 6979
236 2400
0 12 80 2000
715
TTI04 8735 1110 9660
4357 0
11396 30837
0 84 984 2224 5310 3280 5760 3288
560 2 70
350 4100 8669 4727
2126 2940 4088 25390
47913 4183 1272 6732 725 4961 4092 486 4495 2580 115 1888 0 1961 1799 1266
11098 9037
204 11622
21953 0
28507 54213
0 438 1780 4193 9871 7226
3894 3443 1341
619
1293 4673 5047 5985 3415 3038 1781 77427
.00 .00 .00 .00 .00 .00 .00
.00 .00 .00 .00 .00 .00
.00 .00 .00 .00" .00 .00 .00
.00 .00 00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00
1.07 1.47
.95
.94 .51 1.17
1.25 1.32 1.08
.37 .49 .79 .00 1.53 .90 1.77 nr. o0 1.03 .18 1.20
5.04 .00
2.50 1.76
.00 5.21 1.81 1.89
1.86 2.20
.68 1.05 2.39 2.29
3.71 1.14
.58 1.27
1.61 1.03
44 3.05
1 .07 1.4 7
.95
.94 .51 1.17 1.25 1.32 1.08 .37 .49 .79 .00 1.53 .90 1.77 1.00
1.03 .18
1.20
5.04 .00
2.50 1.76
.00 5.21 1.31 1.89
1.36 2.20
.68 1.05 2.39 2.29 3.71
1.14 .58
1.27 1.61 1.0 3
.44 3.05
100 100 100 100 loo 100 100 100 100 100 roo loo
0 100 100 100 loo 100 100 100
100 0
100 100
0 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 loo 100
100 100 100 100
reo
100 100 100 100 100 TOO 100
0 100 100 100 10O ICO 100 100
100 0
100 100
0 100 100 100 100 100 100 100 100 100 100 100
100 100
100 100 100 100
a
a ln
n'
u
a
1?
13
Ma
If,
"i
r. -
r
.
1,,n A, " A, A. 1r Af 33 s;
,f
M
cr
*A
HYDRTRETR/PLATFRMR
445993
860945
866557
1193
2014
544542
863203 1.69 1.59 1.58 loo 100......... .....
ir
Q
C
V
e
0>
/"
A 0
'
JOB NO. 14053-000 ROBINSON REFINRY M00ERN27N PROJ-MCC REPORT NO. C3804Q-35
FOCUS P E R F 0 R M A N C R E P 0 R T***
DETAIL OF OFF-PLOTS
B.
RUN DATE PAGE
CALCULATIONS BASED ON BUDGET
5/24/82 3
LINE ITEM COMMODITY
$
CURRENT BUDGET MANHOURS
PROJECT FCST DATE 11/20/81 FCST 8
$$
PROJECT
TRENO
THIS WEEK
FORECAST FORECAST
CALC
ACTUAL
MANHOURS MANHOURS MANHOURS MANHOURS
004
TO- DATE
CALC
ACTUAL
MANHOURS MANHOURS
CUT-OFF OATE 5/21/82
PERFORMANCE FACTOR PERCENT THIS TO TRND COMPLETE WEEK date FCST TRNO PHYS
1
2
4
5
f'
B
'
10
*'
,'j 4 ?? \\
?7
j ?9
30 )l " lr 37 r* *>
n V. 'h ,,
51
*
E10 E20 E30 E31
E40 E50 E60 E70 J01 Jll J15 J31
J50 J60
J70 J81 J82 J95 L10 LI 1 LI 2 LI 7 L21 L22 L24 L70 L80 L91
L93 L98 Ml 0 M20 M30 M40 N30 N40 Pll P12 PI 3 P14 P21 P2 2 P2 3 P25 P31 P32
ERECT COLUMNSEVSLS ERECT STORAGE TANK HEAT EXCHANGERS CONDENSOR 23E-9 FIRED HEATER
PUMPS ORIVER COMPRESSORS*! DRIVER
OTHER EQUIPMENT PREFAB INST SUPTS INSTALL XMITTERS REMOVEINSTALL INST LOCAL CONTROL PANL INSTRUMENT SHELTER ANALVZEREPACKAGE
INSTR TUBEEPIPE LOOP CHECK
C ALIBRATIONETESTNG OISPOSAL EXIST INS STEAM TRACE PIPESH SPL 2 INESM PIPE SPL 2.5-6 IN PIPE INST CS RACK3IN-6I SPL AL 2INESM PIPE SPL AL 2.5-6INPIPE RCK AL 2.5-6IN PIP UU/G CS PIPE STM TRACE TBG X-RAYESTR RELIEVNG
TIE-IN WORK TESTINGE INSPECTION STEEL STRUCTURE LADOERSEPLAT ,EHRL PIPEWAY STEEL MISCELL STRCT STEL INSULATE INSTRUMTS FIREPROOF STRUT SL POWER DISTRB EQP POWERECONTROL EQUP UPS EUUIPESTDBY LIGHT FIXTURESERCT RGS BRANCH CONDUIT U/G CONDUIT NON-HETALLIC COND CABLE TRAY 600VE1KV CABLE 5KVE LARGER CABLE
3497
ICO 1642 1980 2 300 7365
500 2387
640 1900 2478
106
1173 650
1546 871
3583 1184
65 20017 24165 51301
655 385 596 3691 189 625
13 7371 4 776 2992
20294 4831 1
16562 2590 5049 400 1692
26521 160
880 1600 5072
322
6130 57
1473 1100 466 8 3692
252
863 109
1293 1378
51 805
8
2129 1569
877 0
6552 34072 58759
29207 5800 0 0 6135 8256 483 901 6946 945 6138
18717 1810
.....808....
0 359 2409
0 1322 20440
46 563
0 3016
151
6130 57
1473 1100
4688 3692
252 893 109
1293 1378
36 805
8
2145 1569
877 0
6551 34072 58768 29172
0 0 0 6135 8256 483
901 6946
945 6138 18717 1738
808....
0 359 2409
0
1242 20424
46
563 0
3016 15 3
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 .... .... 0
0 0 0 0 0 0 0
0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 ...... ..... 0 0 0 0 0 0 ..............0 0 0 0 0 0
4007 150
1181 1980 2300 7521
500 2643
320 2980 1922
71 980
9 2459 2798
795 0
4231 30328 39938 27572
0 0 0 5140 7370 225 468 6971 659 3948 14550 - 970275
0 2302 5603
0 3479 ......... 32156
51 448
0 4619
473
6130 57
1473 1100 4688 3692
252
703 109
1293 1378
16 805
8
2145 1569
877 0
6551 3407 2 58768 29172
0 0 0 6135 8256 483 901 6946 945 ........ 6138.... 18717 1738 ........ BOB
0 359 2409
0
1242 20424.......
46 563
0 3016
153
.00 .00
1.53 .38
1.53 .38
.00 1.25 1.25
.00
.56
.56
.00 2.04 2.04
.00
.49
.49
.00
^ 50
.50
.00
.27
.34
.00
.34
.34
.00
.43
.43
.00
.72
.72
.00
.23
.51
.00 .00
.82 .89
.82 .89
.00
.87
.87
.00
.56
.56
.00 1.10 1.10
.00
.00
.00
.00 1.55 1.55
.00 1.12 1.12
.00 1.47 1.47
.00 1.06 1.06
.00 .00
.00 .00
.00 .00
.00
.00
.00
.00 1.19 1.19
.00 1.12 1.12
.00 2.15 2.15
fio 1.93 1.93
.00 1.00 1.00
.00 1.43 1.43
.00 1.55 1.55
.00 1.29 1.29
.00 1.92 1.92
.00 l.II 1.11
.00
.00
.00
.00
.16
.16
.00... .43 .....43
.00
.00
.00
.00
.36
36
.00 ` .64..... .... .64
.00 .90 .90
.00 1.26 1.26
.00 .00 .00
.00
.65
.65
.00
.32
.32
100 100 100 100 loo 100 100
79 100 100 100
44 100 100
100 100
100 0
100 100 100 100
0 0 0 100 100 100
loo 100 100
loo 100 100 100
0 100 100
0 100 100 100 100
0
100 100
100
100 100
13
M
100 loo 100
it IP
100
100
?1
100
100 f4
100 100 loo
r :(.
7fl
100
100
100
100
0
100 100 100
K
3.' 1"
100 0
40 4,
0
0
100 ICO
If
100
loo
41
100
100
100 ...........
100
100
100 ......
0
100 100............ f,l
0
100
100 .......
100
100
0........ "
100
'
100
<
GARRARD 00000698
1 #f
6
? 3 4
0
s J
3
S
jo
>3
A
' 29 JO 11
)?
J3 y y V t 11 10
4'
c:
(
A
JOB NO . 14053-000 ROBIMSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38040-35
F 0C U S SS*P E R F 0 R M A N C E R E P 0 R T*3
DETAIL OF OFF -PLOTS
6
RUN DATE PAGE
CALCULATIONS BASED ON BUDGET
5/24/82 4
PROJECT FCST DATE 11/20/81, FCST 3 004
CUT-OFF OATE 5/21/82
LINE ITEM
COMMODITY
CURRENT BUDGET MANHOURS
PROJECT FORECAST MANHOURS
TREND FORECAST MANHOURS
THIS WEEK
CALC
ACTUAL
MANHOURS MANHOURS
TO- DATE
PERFORMANCE FACTOR PERCENT
CALC
ACTUAL THIS TO TRND COMPLETE
MANHOURS MANHOURS WEEK DATE FCST TRND PHYS
$ $ $$ $$ sjt4s $$ $ 4s * Jfr
4= 4=4=*$
P3 3 ELECTETC WIRE
3384
1898
1898
0
0
2620
1898
.00
.72
.72 100 100
P34 TERMNTN 600VE1KV
1541 731 731
0
0 1509
731 .00 .48 .48 100 100
P3 5 TERMNTN 5KVEABUCE
465
459
459
0
0 754 459 .00 .61 .61 100 100
P36 TERMNTN ELECTRETC
2672
1450
1450
0
0
23 34
1450
.00
.62
.62 100 100
P41 GROUNDING
1655
1261
1261
0
0
1996
1261
.00
.63
.63 100 100
P4 3 ELECT HEAT TRACING
10917
2985
2985
0
0
9901
2985
.00
.30
.30 100 100
P50 0/H POLE LINE DIST
2249
3490
3488
0
0
7508
3488
.00
46
46 100 100
P80 TESTING
795
609
609
0
0
795
609
.OU
.77
.77 100 100
P99 MATERIAL HANDLING
1 0 0 0 0 0 0 .00 .00 .00 0 0
QOl FABRICATE REBAR
16 1285 1285
0
0
160
1285
.00 8.03 8.03 100 100
QIl FOUNDATN CONCRETE
2353
5831
5831
0
0
2904
5831
.00 2.01 2.01 100 100
Q12 STRUCT CONCRETE
38 442 442
0
0
433
442
.00 1.02 1.02 100 100
021 FOUNO REBAR
1167
6101
6101
0
0
1352
6101
.00 4.51 4.51 100 100
Q22 STRUCT REBAR Q31 FOUNO FORMS
13 1199 1199
0
0
130
1199
.00 9.22 9.22 100 100
8415
14755
14755
0
0
82 20
14755
.00 1.80 1.80 100 100
Q32 STRUCT FORMS
44 3919 3919
0
0
2840
3919
.00 1.38 1.38 100 100
Q40 MISC CONC (COMP)
2272
3279
3279
0
0
4150
3279
.00
.79
.79 100 100
Q61 PRECAST CONCRETE
24 557 557
0
0
410
557
.OU 1.36 1.36 100 100
Q6 2 PRECAST REBAR
16 1531 1531
0
0
448
1531
.00 3.42 3.42 100 100
Q63 PRECAST FORMWORK
4 5676 5676
0
0
3016
5676
.00 1.88 1.38 100 100
Q69 SET PRECST ITEMS
80 3619 3619
0
0
1384
3619
.00 2.61 2.61 100 100
Q71 CONCRETE PAVING
6837
3125
3125
0
0
63 67
3125
.00
.49
.49 100 ICO
Q7 3 CONDUIT ENVELOPES
755
1598
1598
0
0
684
1598
.00 2.34 2.34 100 100
ROI MISCELL ARCHITECT
0 0 0 0 0 0 0 .00 .00 .00 0 0
RIO BUILDING
145
1302
1302
0
0
145
1302
.OU 8.98 8.98 100 100
R90 PACKAGED BLDGS
240 0 0 0 0 0 0 .00 .00 .00 0 0
R95 REVAMP EXIST BLDGS
299
756
756
0
0
299
756
.00 2.53 2.53 100 100
S03 DEWATERING
875
4306
4306
0
0
875
4306
.00 4.92 4.92 100 100
Sll EXCAVAT IONEDISPOSL
10895
11258
11213
0
0 113 37 11213 .00 .99 .99 loo 100
S12 BACKFILLECOMPAC TIN
2638
7842
7854
0
0
2606
7842
.00 3.01 3.01 too 100
S31 SEWERS DRAINAGE
5316
8493
8493
0
0
5579
8493
.00 1.52 1.52 100 100
S32 PRECAST MANHOLES
1271
1420
1420
0
0 1533 1420 .00 .93 .93 100 100
S41 FINE GRAOINGELEVIG
2366
1312
1464
0
0
2524
1464
.00
.58
.53 100 100
S98 DEMOLITION
4496
6613
6613
0
0
4496
6613
.00 1 .47 1 .47 100 100
YIO SCAFFOLDING
20928
47626
47625
0
0
20928
47625
.00 2.28 2.28 100 100
SB OFF-PLOTS
331899
397037
391191
0
0 335016 390969 .00 1.17 1.17 100 100
c
V
A
6
i 4 '
3
H
11
* 2. 2: r-
i:
1( )/ 111 ,0 1. '1, AA *' At 46
St ;;
{'
"
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN 0 REPORT NO. C38040-35
"""............. ' e>
< s
c '
LINE ITEM
COMMODITY
g J01 .0 j 10
Jll 17 J15
Jlf
J19
J21
... J22
J26
IB J31
n J50
J70
?| J74
77 "................jai
n J82
7, LI 1
LBO
M40
n Pll
:-3 P12
PI 3
P14
P15
PI 6
P2 0
W P21 T, P22 r> P25
v P30
n A .........
P31 P32 P33
U P34
P36
P37
.M P41
P42
P43 1* P80
P90
P95
r Q40
Q7 3
R01
Sll
SI 2
PREFAB INST SUPTS PREASSEMBLE XMITRS INSTALL XMITTERS REM0V6INSTALL INST INSTALL P/1 trnors INSTALL I/P TRNORS MAIN CONTROL PANEL SATELLITE RACKS PROCESS COMPUTER LOCAL CONTROL PANL INSTRUMENT SHELTER INSTR TUBEEPIPE INST AIR SUBHEADER LOOP CHECK CALIBRATIONETESTNG SPL 2 INtSM PIPE STm Trace tbg MISCELL STRCT STEL POWER DISTKB EQP POWERECONTROL EQUP UPS EQUIPESTD3Y LIGHT FIXTURESERCT OTHER ELECT EQUIP PROGRAM CONTROLLER RGS CONDUIT MAINS RGS BRANCH CONDUIT U/G CONDUIT CABLE TRAY DATA HGHWY CABLE
600V61KV CABLE 5KVE LARGER CABLE LLLC1ETC WIRE TERMNTN 600VEIKV TERMNTN ELECTRETC ELECT/TC WIRE MAIN
grounding
GROUNDWELLS ELECT HEAT TRACING TESTING ELECT DISCONNECTS ELECT DEMOLITION MISC CONC (COMP) CONDUIT ENVELOPES MISCELL ARCHITECT EXCAVATIONED ISPOSL BACKFILLECOMPACTIN
PROJ-MOC
....... ...
CURRENT BUDGET MANHOURS $ $* $* ** * $
1920 5512 30593 1180 2700 3800
626 1171
100 100 13200 7974
2 11015
7830 7290 18503 1220
360 3562 2086
70 4755 3673 13379 33830 1115 17740 1619
364 1223 18222
450 17952
2402 14162
1541 2098 1919 2011
1 220 380 1751 401 214
FOCUS PERFORMANCE REPORT
DETAIL OF TOC CONVERSION
C.
RUN OATE PAGE
CALCULATIONS BASED ON BUDGET
5/24/02 5
0
9 \
PROJECT FCST OATE 11/20/81, FCST S 004
CUT-OFF DATE * $$ * * <t# * sjc *#
5/21/82
79
PROJECT
TREND
FORECAST FORECAST
MANHOURS MANHOURS ***$$$*
THIS WEEK
CALC
ACTUAL
MANHOURS MANHOURS
TO- DATE
CALC
ACTUAL
MANHOURS MANHOURS
PERFORMANCE
THIS
TO
WEEK DATE
FACTOR PERCENT TRNO COMPLETE FCST TRNO PHYS
9
n
3
903 2044 9802
624 1389
1965 555 950
283 88
1526 1006
500 11630 "
3459
11 1667 1341
456 4330
1557 120
........ 3912 663
19104 377o8
1528 18624
6465 3740
1621 4919
1481 18166
2546 4238 2292
47 369
1508 372 902
483 1806
837 264
903 2044 9802
624 1389
1965 555 950
283 08
1560 1010
500 11630
3459
11 1667 1341
456 4330 1557
120 3912
663 19104 37768
1528 18624 ..... 6465.......
3740 1621 4919
1481 18166
2546 42 38 2292
47 369
1509
3 72 902 483 1806 837
264
0
0 1872
903
0 0 5413 2044
0
0 34553
9802
0 0 744 624
0 0 2975 1389
0 0 4190 1965
0 0 626 555 "..... 0 .....--.... a ......... ri4? ------------ 950....
0 0 70 283
0
0 100
88
0 0 3820 1526
0 0 1986 1006
0
0 1076
500
o 0 212 70 11630
0r
0
8018
3459
0 0 0 11
0
0
3283
T667
0 0 1491 1341
0 0 360 456
0 0 5650 4330
0 0 2086 1557
0 0 50 120
0 0 7405 3912
0
0 3585
663
0
0 23627
19104
6 0 39796 37768
0 0 1747 1528
0 0 18266 18624
...... (1 ........ .........a"~
34 84 ....
6465
0 0 5100 3740
0 0 1003 1621
...........0
0 4990 ............4919.....
0 0 2064 1481
0 0 24143 18166
0 ..................a
5043
2546
0 0 4808 4238
0 0 1507 2292
0 0 39 47
0 0 365 369
0 0 2880 1508
0 0 100 372
0 0 720 902
0 0 5 30 483
o 0 it 5 i 1806
0 0 189 837
0 0 88 264
.00 .00 .00 .00 00 .00 .00 .Ou
.00 .00
.00 .00 .00 .00 .00
.00 .00 .00 .00 .00
.00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00
.00 .00 00 .00
.48 .38 .28 .84 .47 .47 .89 ........71
4.04 8B .40 .51 .46 .55 .43 .00
.51 .90 1.27 .77 .75 2.40
.53 .18 .81 .95 .87
1.C2 ~~I.B6
.73 1.62 ...99
.72 .75 " .50... .88 1.44
1.21 1.01
.52 ..3.72
1.25
.91 1.03 4.43 3.00
.48 .38 .28 .84 47 .47 .89 .71..
4.04 .88 .41 .51 .46 .55
.43 .00 .51 .90 1.27 .77 .75
2.40 .53 .13 .81 .95 .87
1.02 1.86
.73 1.62 .....99
.72 .75 .50
.88 1.44 1.21 1.01
.52 3.72 1.25
.91 1.03 4.43 3.00
100
loo
100 100
IDO 100 100 100
100 100
98
100 100
100
100 100
loo
100
100 100
100 100
100 100 100 100 100
100
roo
100 100 100
100 100
loo
100 100
loo
100 100
100 100
100 loo 100 100
100
9
100 100 100
n M9
roo 100 100
'' 1
100..... .......
100
4
100
7,
IOO
100 100 100 100
4
71! 79 -K
0
100
100
loo 100
>r,
100
100
>f)
ICO 100
1?
100
ioo V,
100
V
100
100
100
100
100
100
100
IOO
100
100
ICO
6.
100
100
100...............
100
r.r
100
,h
100
100
100
r
GARRARD 00000700
GARRARD 00000701
t)
0
'
!. ! 4
i6 '
y ,0 n
.3 .4
!., 1/ IB IR
?l ?? M M ?S
.'I a ?o 30 1. 37 34 33
.37
)') in 4, >7 13
*r 47
'.3
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38040-35
FOCUS ***P ERFORHANCE REPOR T**<
DETAIL OF SUBCONTRACTS
RUN OATE PAGE
CALCULATIONS BASEO ON BUDGET
5/24/82 T
PROJECT FCST DATE 11/20/81 , FCST tf 004
CUT-OFF DATE 5/21/82
$44444444444444444444 4444 44444444 4444444
44444 44 4=44
CURRENT PROJECT
TREND
IHIS WEEK
TC- OATE
PERFORMANCE FACTOR PERCENT
LINE
BUDGET
FORECAST FORECAST
CALC
ACTUAL
CALC
ACTUAL THIS TO TRNO COMPLETE
ITEM COMMODITY
MANHOURS MANHOURS MANHOURS MANHOURS MANHOURS MANHOURS MANHOURS WEEK DATE FCST TRND PHYS
******** ******************** 4=4=4= *********** ****,= *4:*$ *********** **********
*************
$4444
J01 JII J15 J31 J50 J60 J70 L10 LIT LI2 LI 7 L2I L70 LBO L98 M3 0 NIB
N2I N22 N2 3
N24 N25 N26 N27 N28 N30 XXX XIO X40 701
702 703 705 70B 709 713 716 719
722 723 726 72 7 728 729
730 732
PREFAB INST SUPTS
INSTALL XMITTEKS
REMOVEINSTALL INST
LOCAL CONTROL PANL
INSTRUMENT SHELTER
ANALYZERGPACKAGE
INSTR TUBEGPIPE
STEAM TRACE PIPESH
SPL 2 INESM PIPE
SPL 2.5-6 IN PIPE
INST CS RACK3IN-6I
SPL AL 2INESM PIPE
OU/G CS PIPE
STM TRACE TBG
TESTINGEINSPECTION
PIPEWAY STEEL
AREA C INSUL FSCIB
BRAND EOP IN FSC21
AREAA PIP IN FSC21
ARE AB EQP IN FSC24
AREAB PIP IN FSC24
FRPF VSL SKT OFF PL
FRPF SIR' STL OFFPL
FRPF VSL SKT PL 16
FRPF STR STL PL 16
INSULATE INSTRUMTS
S/C SUPPLIED DISTR
PAINTING
FSC35
LARK PAINT FSC40
LEDO CONSTR FSC 01
POTTER ELEC FSC 02
SHEEHAN
FSC 03
MORRIS
FSC 05
IL POWER
FSC 08
CONNOR
FSC 09
MAECO SITEWK FSC13
MAECO GRNDML FSC 16
STURM STM HO FSC19
FIELD XRAY FSC 22
STURM HVAC FSC23
REACTOR INTERNALS
MAECU
FSC27
STRESS RELVE FSC28
HEATER REFRACTORY
ERECT COOLING TWR
STURM CHILLR FSC32
215 1103 1192
35 437 280 1473
115 12952 12718
5670 630 16 81
1402 38
"10219
11220 25951
397r
19957 260
4661 690 95 5 1
8340 750
9430 2400 6500 9980
3 76 200 9823 840 200
578 1169 4705
180 2
1550 30C0
ICO
50 1273 1014
35 252 2 80 1834 2015 9550 19683 2810 1109 310 2873 1683
65 6263 9233 1B878 1800
14750 2500 2500 0 0 0 855 2750
- gW-
10148 2648 6528
11948
376 572 11317 1024 165 1663 1770 4616
80 361 5680 2500
64
12 572 245
20 97 98 1323 1533 10037 20879 3405 1171 284 22 80 1758 39 6263
12163 24487
6047 14948
1032 2064 2244
806 940 2055 2638 899 10148
2648 6528 11948
3 76 464 11317 1024 165 1663 1770 5927
80 361 7531
2502 64
0 0 0 0 0 0 0 0 0 0
0 0 0
0 0 0 0 140 1066 25
359 42
694 328
0 0 0 415 Q
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 331 912 0 832 135 ----------- 6?-
436 0
32 0
------2- 24Q
0 0 0 0 0 .... "5...... 0 0 0 0 0 0 0 0 0 0 0
0 0 ......... 0 0 0 -------- 0 0 0 0 0 0 0 0 0 0 0 0
50 14 89 1112
35 356 200 2084 3160 7358 13002 3076 1427
247 2597 1632
38 50 36 8151 7593 3809 6687 1152 9040
797 749
50 0
4168 - g7I
9430 2400 6500 9980
188 400 12244 840 200 1734 18 70 47 05 180 604 1550 3000 100
12 572 245
0 97 98
1323 1533 10037 20879 2784 1171
284 2280 1748
39 6263
9814 10270
6047
8414 1032 R9T 1898
168
32
2055 1730
899 10148
2648 6528 11948
188 464 11317 1024 165 1663 17 70
....... 5927.... 80
361 7531 2502
6^
.00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00
.00 2.36
.86 .00 2.32 3.21 .09 1.33 .00 .00 .00
.54 .00 .00
.00 .00 .00 .00 .00
.00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00
.24 .38 .22 .00 .27 .35 .63 .49
1.36 1.61
*91 .82 1.15 .88 1.07 1.U3 1.24
1.20 1.35 1.59
1.26 .90 .20
2.38 .22 64 .00
.42 .93 1.08 1.10 1.00 1.20 1.00 1*16 .92 1.22 .83 .96 .95
1.26 .44 .60
4.86 .83 .64
.24 .38 .22 .57 .2 7 .35 .63 .49 1.36 1.61
1.11 .82
1.15 .88
1.06 1.03 1*24 1.20 1.35 1.59 1.26
9Q .20 2.38 .22 1.00 .00
.42 .93 1.03
1.10
r.oo
1.20 1.00 1*16
.92 1.22
.87 .96 .95
I .26 .44 .60
4.86 .83 .64
100 loo 100
0 100 loo 100
100 100 100
82 100 100 100
99 100 loo
81 42 100 56 100 97 85 21
3 100
66 100 100 100 100 100
50 100 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100 100 100 100 100 100
99 100 IflO
81 42 100 56 100 97 85 21
5 0 66 180 100 100 100 100 50 100 100 100 100 100 100 100 100 100 100 100 100
0
9
2n , S *n S '
9 13
9 If IH
M
r> i 12 n if 17 V! 10 11 1? 11 *'
r.i
"
. J
e
4
c
'
y 10
<
1?
M
16
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-NOC REPORT NO. C38040-35
FOCUS =S=**P ERFORHANCE REPOR T-*
DETAIL OF SUBCONTRACTS
S
RUN DATE PAGE
CALCULATIONS BASED ON BUDGET
5/24/82 B
LINE ITEM
COMMODITY
CURRENT BUDGET MANHOURS
PROJECT FCST DATE 11/20/81, FCST S
4= *4=4=* 4= $4=44=4=
PROJECT FORECAST MANHOURS
TREND FORECAST MANHOURS
THIS WEEK
CALC
ACTUAL
MANHOURS MANHOURS
9V^ Y.T8.'T'Jllf. *W4. 48. WVW
004
$$=* **$$ 4**4=*:4=4=4
TO- DATE
CALC
ACTUAL
MANHOURS MANHOURS
CUT-OFF OATE 5/21/82
** *4=4=4=4:4:4:4=S*4=4:*4:4:4=*4:
PERFORMANCE FACTOR PERCENT
THIS WEEK
TO DATE
TRND COMPLETE FCST TRND PHYS
Z34 Z36 Z38 Z60 Z91 199
ROOFING
FSC34
CLEAN COMPR PIPE
REWORK 29C-1 FSC38
COMP AREA REWORK
ACOUSTIC EMISSIONS
MAINTENANCE ROADS
*S SUBCONTRACTS
80 12 1915 2000
2 688
180293
160 500 1700
0 192 183
168959
168 2444 1106
0 338 183
189094
0 0 0 0 0 0
3069
0 0 0 0 0 0
2967
240 1200 1915
0 200 688
147114
168 2444 1106
0 338 183
162284
.00 .00 .00 .00 .00 .00
.97
.70 2.04
.58 .00 1.69 .27
1.10
.70 2.04
.58 .00 1.69 .27
100 100 100
0 loo 100
100 100 100
0 100 100
1.10 86 86
f
8
''
K
*
17
,, 1/
:
GARRARD 00000702
"
fU
n
f)
?
3
<
' C
.n
12
<
73 /'
-
JOB NO. 14053-000 ROBINSON REFINRY MODEKNZTN PROJ-MOC REPORT NO. C38040-35
FOCUS S-SSP ERFORMANCE REPOR T$<
DETAIL OF DISTRIBUTARLES
X.
RUN DATE PAGE
CALCULATIONS 0ASEO ON BUOGET
5/24/82 9
LINE ITEM
no 120 130 150 160 170 190 210 220 224 231 232 250 260 270 510 520 530 540
*X
COMMODITY
TEMP BUILDINGS TEMP WURK AREAS TEMP ROADS G PRKG TEMP POWER TEMP WATER.A1R.SWR MINOR TEMP CONSTR WINTERIZATION GENERAL CLEAN-UP MAIN! TOOLS G EQUP RUBBER SFTY ULANKT FIRST DROP WAREHOUSING UNALLOCATED LABOR ON-OFF EXPENSES SURVEYING WELOER TESTING WELDER TRAINING SHOW-UP TIME B.M. HOLIDAY HOURS
OISTRIBUTABLES
$
PROJECT FCST DATE 11/20/81. FCST S 004 $$ <s*= fc <c $ $ $ $ $4s $$ $$ * $ $ $
CUT-OFF DATE 5/21/82 $<
CURRENT
project
BUDGET
FORECAST
MANHOURS MANHOURS
TRENO FORECAST MANHOURS
This WEEK
calc
ACTUAL
manhours MANHOURS
TO-OATE
PERFORMANCE FACTOR
CALC
ACTUAL THIS TO TRNO
MANHOURS MANHOURS WEEK DATE FCST $
PERCENT.... COMPLETE TRND PHYS
?
"" 5
69
R 9
9500 7670 4779 13866 10441 4100 6500 26379 20200 8644 13926 53806 20920 8000 15000 82 72 1602 15039
0
246644
14000 6537 3600
15556 3930 4192 5105
23250 15268
5400 14200 64000 24746
6000 13900
5986 1120 2U0U0
0
246790
14174 6188 4009
19080 2505 3455
11266 43510 16329
6308 13926 72716 27457
9601 13419
7438 1464 17462
224
290531
58 0 0 0 0 0 0
192 160
0 0 470 80 0 0 0 0 0 0
960
0 0 0 0 0 0 0 116 0 0 0 376 65 89 40 0 0 0 0
686
9500 7670 4779 138 66 10441 4100 6500 26379 20100 8644 13926 53470 20920 8000 15000 82 7 2 1602 150 39
0
248208
14174 6188 4009
19080 2505 3455
11266 43510 16248
6308 13926 72262 27457
9601 13419
7438 1464 17462
224
289996
.00 .00 .00 .00 .00 .00 00 .60 .00 .00 .00 .80 .81 .00 .00 .00 .00 .00 .00
.71
1.49 .81 .84
1.38 .24 .84
1.73 1.65
.81 .73 1.00 1.35 1.31 1.20 .89 .90 .91 1.16 .00
1.17
1.49 .81 .84
1.38 .24 .84
1.73 1.65
*81 .73 1.00 1.35 1.31 1.20 .89 .90 .91
1.16 .00
100 100
loo.. loo.......
100 100
100 100
100 100
100 100
100 100
100 100
100 100
100 100
100 100
99 99
100 100
100 100
100 100
100 100
100 100
100 100
100
0
1.17 100 100
9
1' M9
IF
1
1
7,
Jf ?'
*1
37 J
3. V V
'
------- ------ - - -
-...- -...............
i.
.......................... -
........................... .
::
-- -.. -........ - -- ......... ----------- ---------
GARRARD 00000703
GARRARD 00000704
oo
GARRARD 00000705
i
, 0!
6
JOB NO. 14053-000
ROBINSON REFINRY MODERNZTN PROJ-MOC
REPORT NO. C38090-S8
_____
________
______ _ _
FOCUS QUANTITY AND UNIT RATE REPORT
PLATFORMING RE AC TR Ell
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82
PAGE
2
BUDGET
WEEK 116 OF 121
ACCOUNT DESCRIPTION
UNIT---------------------------- QUANTITY-------------------------- ------------------------ MANHOURS--------------------------- --------------------UNIT MANHOURS-----------------
OF
BUDGET
FCSTTO
JTHIS^ BUDGET ___ FCST_TO
THIS BUDGET____ J^CST
TO JHIS
........
ACCT 8 QUANT
#004
DATE
WEEK
...... . 8004
OATE WEEK
8004
DATE
WEEK
$********** t**^**t*it**4:*****it***s*#*s***i**i*i:^*4;*^^t*t*********-^i-**-*----**^*---*-*^
ERECT PLATFORMNG REA A16E11 UNITS . **J0TA L__ PL ATFORMING,RE ACTS
100 100
100 100
100 100
0 4500 0 4500
6536 6536
6536 6536
0 45.00 65.36 65.36 0 45.00 65.36 65.36
.00
TREND FORECAST MH
6536 TREND FORECAST PERF
1.45
PERFORMANCE RATIOS **
1.00
1.45 1.45
.00
o 9
GARRARD 00000706
JOB NO. 14053-000 ROBINSON REFINRV MOOERNZTN PROJ-MOC
0 REPORT NO. C30090-58
FOCUS
QUANTITY ANO UNIT RATE REPORT
LOAD CATALYST
E12
0
DATE 5//24/82
PAGE
3
PERFORMANCE BASED DN BUCGET
WEEK ENDING 5/21/82
WEEK 116 OF 121
0 ACCOUNT DESCRIPTION UNIT - -- QUANTITY----------
--MANHOURS----------
-Unit manhours-----------------
OF BUCGET FCST
TO
THIS BUDGET
FCST
TO THIS BUDGET FCST TO THIS
...............
..................... ACCTff QUANT
#004'
DATE
WEEK"..........
#004
QATE WEEK...........
#C04
DATE...... WEEK
L0AO CATALYST
......... A16E12 CF
C
*PT0TAL LOAD CATALYST
___ _____
o .00 .00 .00 .00 o
c
TREND FORECAST MH
0 TREND FORECAST PERF .00 *# PERFORMANCE RATIOS
.00
.00
.00
.00
o 9 9 9 9 9
c JOB NO. 14053-000 ROBINSON REFINRV MODERNZTN PROJ-MOC REPORT NO. C 38090--58
FOCUS QUANTITY AND UNIT RATE REPORT
ERECT STORAGE TANK E20
DATE 5/24/82
PAGE
4
PERFORMANCE BASED ON BUDGET
WEEK ENDING 5/21/82
WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCTS
UNIT OF BUDGET
QUANT
--QUANT ITY----------
FCST
JTO
S004
DATE
THIS___ BUDGET WEEK
--MANHOURS----------
FCSITO
"004
DATE
THIS WEEK
BUOGEL
-UNIT MANHOURS-
FCST
TO
0004
DATE
THIS WEEK
' ERECT STORAGE TANKS B32E20 EA..........
200........
e
....**T0TAL ERECT STORAGE TANK . - -... -- ..... 200
300 300
300 300
TREND FORECAST MH
57 TREND FORECAST PERF
ERECT STORAGE TANKS A16E20 UNITS
400
200
200
**TOTAL ERECT STORAGE TANK
400.. ... 200......
200
-
TRENO FORECAST MH
54 TREND FORECAST PERF
0 100 57 57 0
0 100
57
57 0
.38
PERFORMANCE RATIOS
0 168 54 54 0
0 ... 168....................54______ 54 ...... 0
.64
PERFORMANCE RATIOS **
.50
.19
.50 _____ .19....
1.00
.38
.42
.27
..... .42 .........27...
1.00
.64
.19......... .00
.19
....00
.38
.00
.27
.00
.27
.64
.00
a
9 9
oo
GARRARD 00000707
9 9 9 fQ cO
co
o o
jQ 6
e
o
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
heat exchangers
E 30
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82
PAGE
5
BUCGET
WEEK 116 OF 121
ACCOONT DESCRIPTION
UNIT -----------------OF BUCGET
.............. ACCTS QUANT
..........
vr'rV'rxTrvr'rTi'if'Tr'rTrvr-rvYWv^-r'T'rvxYV
-QUANTITY--------------------------
FCST
TO
THIS
;;ooa
oaTe
week
-------------BUDGET
-MANHOURS--------------------------
FCST
TO THIS
*004
DATE WEEK
--------------------UNIT MANHOURS----------------
BUOGET FCST
TO
THIS
"004
DATE ....... BEER
INSTALL HEAT EXCHANG B09E30 EA ERECT HEAT EXCHANGER 823E30 EA ERECT HEAT EXCHANGER 828E30 EA ERECT HEAT EXCHANGER B29E30 EA
600 1200
500 500
900 1300
200 100
900 1300
200 100
$*TOTAL HEAT EXCHANGERS
2800
2500
2500
TREND FORECAST MH
1473 TREND FORECAST PERF
ERECT HEAT EXCHANGER A16E30 UNITS
4500
4600
4600
$$TOTAL HEAT EXCHANGERS
4500
4600
4600
TREND FORECAST MH
11194 TREND FORECAST PERF
0 0 0 0
0
1.25
0
0
1.46
2 72 520 200 650
213 843
34 383
213
843 34
383
0 0 0 0
1642
1473
1473
0
PERFORMANCE RATIOS
7500
11162
11194
0
7500
11162
11194
0
** PERFORMANCE RATIOS **
.45 .43 .40 1.30
.59
1.00
1.67
1.67
1*00
.24 .65 .17 3.83
.59
1.25
2.43
2.43
1.46
.24 .65 .17 3.83
.59
1.25
2.43
2.43
1.46
.00 .00 .00 .00
.00
.00
.00
.00
.00
C
8
6
<3
4
c
12 13
15 <1
If
1
20
in
i )i
i
c:
C
r
GARRARD 00000708
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C3B090--58
FOCUS
QUANTITY AND UNIT RATE REPORT
CONDENSQR 23E-9
E31
DATE 5/24/82
PAGE
6
PERFORMANCE BASEO ON BUCGET
WEEK ENDING 5/21/82
WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT#
UNIT------------------OF BUCGET
QUANT
--QUANTITY----------
fcst ____ TO
#004
DDAATTEE
THIS BUOGET WEEK
--FCMSATNHOURS- TO
#004
DATE
TH?S WEEK
BUOGET
-UNIT MANHOURS-----------------
JFCST
TO
THIS
#004
DATE
WEEK
ERECT CONDENSER 23E- B23E31 EA **TOTAL... CONDENSOR 23E-9_____ __
TREND FORECAST MH
100
100
100
100
100
100
TRENO FORECAST PERF
0 1980
1100
1100
0 19.80 11.00 11.00
0 1980
1100
1100
0 19.80 11.00 11.00
.56
PERFORMANCE RATIOS
1.00
.56
.56
.00 .00 .00
<
i c
c% c* ci r9 1 CQ cQ o ::o
Go o
o
GARRARD 00000709
c
r
'
g
l?
tfl
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-HOC REPORT NO. C38090-58
ACCOUNT DESCRIPTION ACC t H
UNIT OF BUCGET
QUANT
FOCUS
QUANTITY ANO UNIT RATE REPORT
FIREO HEATER
E40
DATE 5/24/82
PAGE
7
PERFORMANCE BASEO ON BUDGET
WEEK ENOING 5/21/82
WEEK 116 OF 121
--QUANTITY--------
FCST
TO
!004
DATE
THIS BUDGET WEEK .............
--MANHOURS------------
FCST
TO
#004
DATE
THIS BUDGET
W^EEK .^...... .
-UNIT MANHOURS-----------------
FCST
TO
THIS
M0^4 ^ DATE..........WEEK
ERECT FIRED HEATERS B23E40 EA
100
100
100
s*TOTAL FIRED HEATER
100
100
100
TREND FORECAST MH
6688 treno FORECAST PERF
ERECT FIREO HEATERS A16E40 UNITS
400
400
400
**TOTAL FIRED HEATER ____
400......... 400........ 400
TREND FORECAST MH
29809 TRENO FORECAST PERF
0 2300
4688
4688
0
0 2300
4688
4688
0
2.04
$*= PERFORMANCE RATIOS **
0 7181 29809 29809
0
0_
4.15
7181
29 809
29809 .......... 0
PERFORMANCE RATIOS
23.00 23.00 1.00 17.95 1T.95 1.00
46.88 46.88 46.88 46.88
2.04 2.04 74*52 74.52 74.52 74.52
4.15 4.15
.00 .00 .00 OTT .00 .00
17
*
o
9
9
9 1
9
17 n
9
ir.
9r-
l
78
l
jr.
GARRARD 00000710
ii
9
\
*o
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC
REPORT NO. C38090-58
ACCOUNT DESCRIPTION ACCTJ
UNIT OF BUDGET
QUANT
FOCUS
QUANTITY AND UNIT RATE REPORT
PLATFORMG HEATERS
E41
DATE 5/24/82
PAGE
8
PERFORMANCE BASED ON BUDGET
WEEK ENDING 5/21/82
WEEK 116 OF 121
--QUANTITY---------
FCST
TO
#004
DATE
THIS BUOGET WEEK ~.............
-MANHOURS--------------------------
FCST
TO THIS
#004
DATE........ WEEK
BUOGET
-UNIT KANHOURS-
FCST
TO
#004
DATE
THIS WEEK
ERECT PL TERM HEATER A16E41 UNITS
400
400
400
**T0TAL PLATFORMG HEATERS
!0
TREND FORECAST MH
400
400
400
49480 TREND FORECAST PERF
0 21135
49354
49480
0
0 21135
49354
49480
0
2.34
PERFORMANCE RATIOS --
52.84 123.39 123.70
52.84 123.39 123.70
1.00
2.34 2.34
.00 .00 .00
1? 13
]! ?! ??
;;
o o o o
:,d
d
d
:q
01
::Q
i-'
::a
::o
n
n
c
!S
c
GARRARD O'
c
*
3 A 6 * 9 10 1? n
19
2.
2 25 21
30 )> 12 n
Jh
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MCJC REPORT NO. C38090--5b
FOCUS QUANTITY AND UNIT RATE REPORT
PUMPS & DRIVER
E50
DATE 5/24/82
PAGE
9
PERFORMANCE BASED ON BUCGET
WEEK ENDING 5/21/82
MEEK 116 OF 121
ACCT#
3$ $ $ $ $ * # $ <: * :$ $:
OF QUANT
$5 * $ $
BUCGET
INSTALL PUMPS G ORIV A31E50 EA INSTALL PUMPS G DRIV B09E50 EA INSTALL PUMPS G DRIV B21E50 EA INSTALL PUMPS G DRIV B23E50 EA INSTALL PUMPS G DRIV B28E50 EA INSTALL PUMPS G DRIV B29E50 EA INSTALL PUMPS G DRIV B32E50 EA
200 400 400 2200 300
400 300
FCST #004
20U 300 600 2000
0 500 300
TO OATE
THIS WEEK
*******
BUDGET
200 300 600
2000 0
500 300
0 500 0 290 0 1005 0 3900 0 120 0 800 0 1250
FCST #004
405 10
314 144 3
0 229 1696
TO DATE
THIS BUDGET WEEK
$$$:
FCST #004
TO OATE
THIS WEEK
405 10
314 1443
0 229 1696
0
2.50
2.03 2.03
.00
0
.73
.01
.03
00
0
2.51
.52
.52
.00
0
1.77
.72
.72
.00
0
.40
.00
.00
.00
0
2.00
.46
46
.00
0
4.17
5.65 5.65~
.00
SSTOTAL PUMPS G DRIVER_____
42 00
3900 ..._ 3900 ....... 0 ... 7865 ..... 4097_______ 4097 ........ 0 ........ 1.87 _____ 1.05... 1.05 ........00
TRENC FORECAST MH
4097 TREND FORECAST PERF
.51
PERFORMANCE RATIOS $$
1.00
.51
.51
.00
INSTALL PUMPS 6 ORIV A16E50 UNITS
3600
2000
2800
0 5223
5824
5824
0
1.45
2.08 2.08
.00
--TOTAL PUMPS G DRIVER
3600
2800
2 800
0 5223
5824
5824
0
1.45
2.08 2.08
00
TRENO FORECAST MH
5824 TRENC FORECAST PERF
1.43
** PERFORMANCE RATIOS **
1.00
1.43 1.43
.00
a
1
4
5
9 10 1? 13 'r 16 Ifl 'P
___
i:i }' 2'
?n
31 3? 1.3
V
*0 l
l
to ....................... -.................
..................... -.............. - -------- ---------------
................. ................ ................. ..............-.......... -
.....-...... -..........~~ .................. ...............
............................ 41
-...................... -....... -......... *..................
r
GARRARD 00000712
-.......................................
- ............................. -
-
- ..........................
" -......................-........--
c
JOB NO. 14053--COO ROBINSON REFINRY MODERN/TN PROJ-MOC REPORT NO. C380V0-58
FOCUS QUANTITY ANO UNIT RATE REPORT
COMPRESSORSGORIVER E60
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 10 BUCGET MEEK 116 OF 121
ACCOUNT DESCRIPTION UNIT OF BUDGET
..................................................ACCTS QUANT
--QUANTITY--------------------------
FCST
TO THIS
1004
DATE
WEEK
------------------------ MANHOURS------------
BUDGET
FCST
TO
5004
DATE
---------THIS WEEK
--------------------UNIT MANHOURS-----------------
BUDGET FCST TO THIS
~
5 C04
DATE
WEEK
INSTALL COIMPRESSCRS U0SE60 EA...
fflOTAL COMPRESSORS^DRIVER................
TRENO FORECAST MH
BLOW CRT AND SPA RES aI6F60 UNITS
sSTOTAL.... COMPRESSORSCDRIVER
TREND FORECAST MH
1
100
10U
100
0 500
252
252
0
100
100
100
0 500
252
252
0
TREND FORECAST PERF
.50
** PERFORMANCE RATIOS
500
500
500
0 1000
1771
1771
0
500 .... .... 500________ 500 _____ 0 ____1000
1771.......... 1771______ 0
TREND FORECAST PERF
1.T7
$$ PERFORMANCE RATIOS
5.00 5.00 1.00 2.00 2.00 1.00
2.52 2.5F
.00
2.52 2.52
.00
.50
.50
.00
3.54 3.54
.00
3.54..... 3.54 _____ .00
1.77 1.77
.00
GARRARD 00000713
* O eo
c- o
o
&o
e
JOB NO. 14053-000 ROBINSCN REFINRY MODERNZTN PROJ-MOC
d REPORT NO. C38090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
GAS BOOSTER COMP
E61
PERFORMANCE WEEK ENDING
BASEO ON 5/21/82
DATE 5/24/82 PAGE 11
BUOGET WEEK 116 OF 121
o ACCOUNT DESCRIPTION UNIT---------------------------- QUANTITY---------------------- --------------- ------- MANHOURS-------------------------- --------------- --UNIT MANHOURS-----------------
OF EUCGET FCST
TO
THIS BUDGET
FCST
TO
THIS BUOGET
FCST
TO
THIS
ACCTC QUANT .... ............
0004
DATE
WEEK.........
" 0004
DATE WEEK.........
0004
DATE
WEEK
c
f\
l
ttoo j
i i
Install gas booster Ai6E6i units
200
200
200
0 9900
**TO.TAL GAS BOOSTER COMP___
___
200___ ___ 200_____ 200.. _______ 0___ 9900
7573 7573
7573 7573
0 37.87 37.87
0
49.50
37.87 37.87 _____ .00
___
TREND FORECAST MH
1` TREND FORECAST PERF
.76
PERFORMANCE RATIOS
1.00
.76
.76
.00
14
c
O
JOB NO. 16053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--58
FOCUS QUANTITY AND UNIT RATE REPORT
RECYCLE GAS C/COMP E6Z
DATE 5/26/82
PAGE 12
PERFORMANCE BASED ON BUCGET
WEEK ENDING 5/21/B2
WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCTS
UNIT ------------------OF BUCGET
QUANT
-- QUANTITY-------------------------- ------------------------ MANHOURS-------------
FCST
TO
THIS BUDGET
FCSTTO
SJ006..... DATE
WEEK.. ............. #006
DATE
THIS BUDGET WEEK ..........
-UNIT MANHOURS-
FCST
TO
#006.........DATE
THIS WEEK
RECYCLE GAS CENTRIF A16E62 UNITS
TOTAL RECYCLE GAS C/COMP ...........
TRENO FORECAST MH
6<
100
100
100
100
100
100
TREND FORECAST PERF
0 0 .71
6600
6669
6669
6600
6669
6669
** PERFORMANCE RATI!
0 66.00 66.69 66.69 0 66.00 66.69 66.69
1.00
.71
71
.00 .00 .00
GARRARD 00000715
19 Q Q
::c
c.
JOB NO. 14053-000 ROBINSON REFINRY MQDERNZTN PROJ-MUC
REPORT NO. C38090-5B
FOCUS QUANTITY AND UNIT RATE REPORT
RECYCLE GAS COMPRS E63
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE 13 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT U
UNIT---------------------------- QUANTITY---------------------------
OF BUCGET FCST
TO THIS
QUANT
<,'004 " DATE
WEEK
*******
RECYCLE GAS COMPRESS A16E63 UNITS
200
200
200
0
------------------------ MANHOURS--------------------------- --------------------UNIT MANHOURS
BUDGET
FCST
TO THIS BUDGET FCST TO THIS
#004 *********
DATE WEEK ******
$004
DATE ...HEEk
xr***vv 2*.
r*?*?xx-rr
3300
2341
2341
0 16.50 ii.7i
.oo
STOTAL RECYCLE GAS COMPRS
200
200
200
0 3300
2341
2341
0 16.50 11.71 11.71
.00
TRENO FORECAST MH
2341 TRENO FORECAST PERF
.71
PERFORMANCE RATIOS **
1.00
71 .71
00
o
39
s
9 fl
9
1C
?: 24
?Q
?! 31
33
2? 36
V 23
33 30
41 I?
1C 43
GARRARD 00000716
9
o
6
JOB NO. 1 <*053--000 ROBINSON REFINRY MOOERNZTN PRQJ-MOC REPORT NO. C38090-58
FOCUS
QUANTITY ANO UNIT RATE REPORT
OTHER EQUIPMENT
E 70
PERFORMANCE MEEK ENDING
BASED ON 5/21/82
OATE 5/24/82 PAGE 14 BUDGET WEEK 116 OF 121
* ACCOUNT DESCRIPTION i OF BUCGET < ACC T# QUANT
**** 4=4= 4=4= 4=4= ** ****** 4= *4= 4= 4== 6
INSTALL OTHER EQUIPM A16ET0 EA s INSTALL OTHER EQUIPM A31E70 EA 9 INSTALL OTHER EQUIPM B09E70 EA 10 INSTALL OTHER EQUIPM B28E70 EA
INSTALL OTHER EQUIPM B32E70 EA
3200 100 300
200 600
FCST #004
5900 0
300 200 800
TO OATE
5900 0
300 200 800
THIS WEEK
BUDGET $***$**
FCST #004
0 1983 0 100 0 120 0 1200 p 917
1075 0
160 239 390
TO OATE
1075 0 0
231 390
THIS WEEK
UNIT BUDGET FCST
#004 TrTTrrrrr
MAN HOURSTO
DATE
THIS WEEK
0
.62
.18
.18
.00
0
1.00
.00
.00
.00
0
.40
.53
.00
.00
0
6.00
1.20 1.16
.00
0
1.53
.49
.49
.00
n 4ST0TAL OTHER EQUIPMENT
4400
72 00
7200
0 4320
1864
1696
0
.98
.26
.24
.00
..... ............... TREND FORECAST MH... .............1886 TRENO FORECAST PERF ______. 30 ...............
PERFORMANCE RATIOS $$
... 1.00.... . ... .30 .. .27 ............00
a
8
J
' 3 M
;; u _____ 21
OTHER EQUIPMENT ie
B23E70 UNITS
SSTOTAL OTHER EQUIPMENT
300 300
2 00 200
200 200
TRENO FORECAST MH
82 TRENO FORECAST PERF
/?
0 150 74 82 0 .50
0 150
74
82 0
50
.82
PERFORMANCE RATIOS
1.00
.37 .37 .74
.41 .41 .82
.00 00 .00
?: ?4
7( 71
.12
a ll
?r> JO
::
,,
44
9 e o
..... ....................... 9 Q
- --
- --... -....... ----------------------- . .
9
aV. a
a
o
' o
{ _ ______
c
5
C
GARRARD 00000717
JUB NO. 19053-000 ROBINSON KEFINRY MOOERNZTN PROJ -MOC REPORT NO. C3B09O--58
6
F0CU s
QUANTITY AND UNIT RATE REPORT
PREFAB INST SUPTS
JOl
PERFORMANCE WEEK ENDING
BASED on 5/21/82
DATE 5/29/82 PAGE 15
budget
WEEK 116 OF 121
8
ACCOUNT DESCRIPTION UNIT .1 OF EUCGET
ACCT # QUANT $$$$$$
6
/ FAB INSTRUMENT SUPPO A16J01 EA FAB INSTR SUPPORTS A3UUI EA FAB INSTRUMENT SUPPU B23J01 EA
.0 FAB INSTR SUPPORTS B28J01 EA M FAB INSTRUMENT SUPPO 829JOI EA
INSTRUMENT SUPPORTS C51J01 EA . 1 Instrument supports C52J01 EA
INSTRUMENT SUPPORTS C53J01 EA INSTRUMENT SUPPORTS C59JU1 EA INSTRUMENT SUPPORTS C55J01 EA 1/ INSTRUMENT SUPPORTS C56J01 EA IB PREFAB INSTR SUPPTS- CblJOl EA IB PREFAB INSTR SUPPTS- C62J0I EA PREFAB INSTR SUPPTS- C63J0I EA PREFAB INSTR SUPPTS- C69J01 EA PREFAB INSTR SUPPTS- C65J01 EA PREFAB INSTR SUPPTS- C66J01 EA ALLEN-MUDIFY INSTR S S29J01 EA
102 12 29 19 0 29 29 29 29 29 29 l 1 1 1 1 1 13
FCST #009
35 3
15 9 0
55 0 2 6 3 0
12 19 18 21 25
0 3
TO DATE
35 3
15 9 0
55 0 2 6 3 0
12 19 IB 21 25
0 3
THIS WEEK
BUDGET *r*
0 1995 0 ZOO 0 905 0 235 00 0 398 0 288 0 288 0 288 0 398 0 288 0 12
0 12 0 12 0 12 0 12 0 12 0 215
FCST #009
37 3 31 91 18 0
199 0 8
221 58 0 83
56 101
96
86 0
50
.....
TO DATE
THIS WEEK
373 31 91
18 0
199 ~0
8 221
58.... 0
83 56 101 96
86 0
12
0 0 0 0 0 0 0 0 0 ....... 0 0 0
0 0 0 0 0 0
BUOGET FCST ~#609
$*****
umiQC--
TO DATE
THIS
WEEK $$$$#$$
19.56 10.66
16.67 10.33
16.88
6.07
16.79 .00
9.50 .00
12.00
3.53
12.00
.00
12.00
9.0C
12.00 36.83
...12.00 .....19.33
12.00 12.00
.00 6.92
~ 12.00
9.0IT
12.00
5.61
12.00
9.57
12.00
3.99
12.00
.00
16.59 16.67
10.66
.00
10.33
.00
6*0 /
.00
A 50
.00
.00
.00
3.53
.00
.00"
.00
9.00
.00
36.83
.00
19.33.. .........00 ........
.00
.00
6.92
.00
~~9700
.00
5.61
.00
9.57
.00
3.99
.00
.00
.00
9.00
.00
4
5 G 7 9 10 u 13 M I-.
7, ?/
?!
?r TP
3;
SSTOTAL PREFAB INST SUPTS
?U TRENO FORECAST MH ?1 li>
325
216
216
1928 TRENO FORECAST PERF
0 9970
1966
192 8
0 15.29 6.79 6.61
.
.98
PERFORMANCE RATIOS
1.00
.99
00!^
.00 .00
-
11
1
l
i I
)( ) ......................................... ....................................... 3S
11
....-- ------------- -......--....... . -- -- -------------------------- ---.... --......... - ------------------------------ -................... --.. ........ - ................-
5
,,
i
;
GARRARD 00000718
1'
JOB NO. 14C53-000 ROBINSON REFINRY MODERNZTN PRQJ-MUC REPORT NO. C38090--58
FOCUS QUANTITY AND UNIT RATE REPORT
PREASSEMBLE XM1TRS J10
DATE 5/24/82
PAGE 16
PERFORMANCE BASED ON BUDGET
WEEK ENDING 5/21/82
WEEK 116 OF 121
****
ACCOUNT DESCRIPTION ACCTS
UNIT
OF BUDGET FCST
QUANT
#004
trTVVTYiviTi
PRE PRE PRE PRE PRE PRE
A SMB AS MB ASMB ASMS ASMB ASMB
TRANSMGTRAN C51J10 TRANSMGTRAN C52J10
TRANSMGTRAN C53J10 TRANSMGTRAN C54J10 TRANSMGTRAN C55J10 TRANSMGTRAN C56J10
EA EA EA EA EA EA
333 232 129 304 1 57 257
352 246 249 210 172 184
TO OATE
352 246 249 210 172 184
**TOTAL PREASSEMBLE XMITRS
1412
1413
1413
TRENO FORECAST MH
2044 TRENO FORECAST PERF
THIS
week
BUDGET
FCST
45
*
#004 4: 4:
#
TO THIS
DATE WEEK # * *4* * $ 4
BUDGET
~MNfT MA
FCST
TO
#004
DATE
0 0 0 0 0 0
0
.38
1303 902 419
1209 617
1062
77 5 431 299 224 140 175
77 5 431 299
224 140 175
0 0 0 0 0 0
5512
2044
2044
0
WAT PERFORMANCE RATIOS **
3.91 3.89 3.25 3.98 3.93 4.13
3.90
1.00
2.20 1.75 1.20 1.07
.81 .95
1.45
.38
2.20 1.75 1.20 1.07
.81 .95
1.45
.38
THIS WEEK
.00 .00 .00 .00 .00 .00
.00
.00
1
.
* n Y "
?s
GARRARD 00000719
O o
o o
o
&
# u
GARRARD 00000720
*
' 3 A 6 ' 0 10 .2
n
,4
18
?2
2' ?4
28
30 "
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
INSTALL XMITTERS
Jll
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE IT
BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
ACCT#
Ar A A* A* jAj A* Av Ap Aa A* Ap*Aa ^ Aa Aa Aa Aa Aa A* Aa aj
UNIT
OF EUCGET FCST
QUANT
#004
Aa A> Aa lA A A> Aa a^ ^Aa aAa A
FIEL0 MOUNTED INSTRU FIELD MOUNTED INSTRM FIELD MOUNTED INSTRU FIELD MOUNTEO INSTRU FIELD MOUNTEO INSTRU
INSTRUMENTS FIELD MOUNTED INSTRU INSTALL XMITTERS FIELD MOUNTED INSTRU FIELD MOUNTED INSTRU FIELD MOUNTEO INSTRU FIELO MOUNTED INSTRU FIELD MOUNTED INSTRU FIELD MOUNTEO INSTRU
INSTALL XMITTERS INSTALL XMITTERS INSTALL XMITTERS INSTALL XMITTERS INSTALL XMITTERS INSTALL XMITTERS MORRIS-INSTALL XMITT aLlen-instaLL transm HOKE-INSTALL TRANSMI
A16J11 A 31J11 B09J11
B23J11 B28J11 B29J11
B32J11 B99J11 C51J11 C52J11 C53J11 C54J11 C55J11 C56J11 C61J11 C62J1I C63J11
C64J11 C65J11 C66J11 S09J11
S29J1I S32J11
EA EA EA
EA EA EA
EA EA EA EA
EA EA EA EA EA EA EA EA EA EA EA
EA EA
177 20 0
40 17
0 0 3 192 132 48 113 90 171 2 2 10 1 2 2 12 19 4
203 5 0
71 12
0
0 10 98
0
1 0 3 0 109 147 184 139 94 102 27 18 3
TO
THIS BUDGET
FCST
TO
DATE
WEEK
******* S :
#004
DATE
************
203 5 0
71 12
0
0 10 98
0 1 0 3 0
109 147 184 139
94 102
27 18
3
0 8179 0 524 00 0 1282 0 516 00
00 0 102 0 7804 0 5370 0 2031 0 4508 0 3656 0 6425 0 79 0 79 0 395 0 38 0 79 0 79 0 361 0 608
0 134
4109 101 41
1016 144 8
4 60 1540 136 250 492 264 318 893 1246 1673 1333 "513 1144 628
544 101
4109 101 41
1016 144 8
4 80 1540 136 250 492 264 318 893 1246 1673 1333 513 1144 207
243 122
THIS BUDGET
WEEK $$$$$
-.iikirr MAKiuntQC--
FCST #C04
TO DATE
THIS WEEK
0 0
. .0. 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0
0 0 0 0
46.21 26.20
.00 32.05 30.35
.00 .00 34.00 40.65 40.68 43.35 39.89
40.62 37.57 39.50 39.50 39.50 38.00 39.50 39.50 30.08 32.00 33.50
20.24 20.20
.00
20.24 20.20
.00
14.31 12.00
.00
14.31 12.00
.00
.00 8.00 15.71
.00 8.00 15.71
.00
.00
250.00 250.00
.00
.00
88.00 88.00
.00
.00
8.19 a. 19
8.4 8 8.48
9.09 9.09
9.59 5.46
9.59
11.22 11.22 23.26 7.67
30.22 13.50 33.67 40.67
.00 .00 .00 .00 .00 .00
00 .00 .00 .00
.00 .00 .00
.00 .00 .00 .00 .00 00 .00 .00
*00 .00
**TOTAL INSTALL XMITTERS
1057
1226
1226
0 42299
16578
15877
0 40.02 13.52 12.95
n ......................
TREND FORECAST MH
15877 TREND FORECAST PERF..... ..... .33
PERFORMANCE RATIOS $$
1.00...
.... .33
.00
-
,,
j|
! I*s,
oo
? 4
s
7
i-r> ,7 13 M
16
2T ?1 7-1 ?
.1* If V
T.
-................. ................ -
-...................................................................
........ -....
....... -........................... --
;
C
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN HRUJ-MOC
REPORT NO. C38090-58
6
'' ACCOUNT DESCRIPTION UNIT
3 OF BUCGET 4 ACCTit QUANT s ****************************
8
INSTALL PINOR INSTRU A16J15 EA
INSTALL PINOR INSTRM A31J15 EA
INSTALL PINOR INSTRU B09J15 EA
10 INSTALL P1NUR INSTRU B23J15 EA
INSTALL MINOR INSTRU B28J15 EA
12 INSTRUMENTS
B29J15 EA
n INSTALL MINOR INSTRU B32J15 EA
.4 INSTALL MINOR INSTRU B99J15 EA
INSTALL PINOR INSTRU C51J15 EA
-0 INSTALL MINOR INSTRU C53J15 EA
-7 INSTALL MINOR INSTRU C54J15 EA
18 INSTALL MINOR INSTRU C55JI5 EA
in INSTALL MINOR INSTRU C56J15 EA
INSTALL MINOR INSTR- C61J15 EA
INSTALL MINOR INSTR- C62J15 EA
22 INSTALL MINOR INSTR- C63J15 EA
23 INSTALL MINOR INSTR- C64J15 EA
?4 INSTALL PINOR INSTR- C65J15 EA
INSTALL PINOR INSTR- C66J15 EA
* MORRIS-INSTALL MIN I S09J15 EA
ALLEN-INSTALL MINOR S29J15 EA
HOKE-INSTALL MINOR I S32J15 EA
779 21 0
231 86 0
0 9 110 37 106 66 109 20 87 6 1 3 4 117
35 29
* *$TOTAL REMOVE INSTALL INST
1852
FOCUS QUANTITY AND UNIT RATE REPORT
RE MOVEINST AL L INST J15
PERFORPANCE MEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 18
BUCGET WEEK 116 OF 121
FCST #004
TO DATE
THIS BUDGET
FCST
TO THIS
WEEK
#004
DATE WEEK
$$$$ ********* ********$** $$$$$
BUDGET
FCST #CC4
NUflilR^--
TO THIS
DATE
WEEK
900
900
0 7626
2850
2817
10
9.79
3.17 3.13
.00
4
4 0 105
13
13
0
5.00
3.25 3.25
.00
0
00
0
5
50
.00
.00
.00
.00
186
186
0 1679
1083
1083
0
7.27
5.82 5.82
.00
48
48
0 729
176
176
0
8.48
3.67 3.67
.00
0
00
0
25
25
0
.00
.00
.00
.00
0
00
0
44
44
0
.00
.00
.00
.00
21
21 0 70
45
45
0
7.78
2.14 2.14
.00
37
37
0 ` 227
140
140
0
2.06
3.78 3.78
.00
o.......
' ......0
~o
83
0
0
0
2.24
.00
.00
.00
6
6 0 214
18
18
0
2.02
3.00 3.00
.00
8
8 0 149
40
40
0
2.33
5.00 5.00
.00
21
21 0 248
65
65
0
2.28
3.10 3.10
.00
9
9 0 41
8
a
0 2.05
.89
.89
.00
51
51 0 190
54
54
0
2.18
1.06 1.06
.00
44
44 0
9
109
109
0
2.25
2.48 2.48
.00
117
117
0
2
128
128
0
2.00
1.09 1.09
.00
31
31 0
7
30
30
0
2.33
.97
.97
.00
22
22 0 10
32
32
0
2*50
1.45 1.45
.00
66
66 u 805 352
53
0
6.86
5.33
.80
.00
58
58
0 136
169
137
0
3.89
2.91 2.36
.00
50
50 0 251 493
55
0
8.66
9.86 1.10
.00
1679
1679
0 12581
5879
5077
10
6.79
3.50 3.02
.00
TREND FORECAST MH
5077 TREND FORECAST PERF
.40
PERFORMANCE RATIOS T *
1*00
.47
.40
.00
8
2
*
H >r
21 w. t;
3!
V
::
16 18 37
1!
:
GARRARD 00000721
- --..........- -------- -------------........ ...............................................
--
-
- - ......... - ......... -
- ---- --------
......... -.........
..................... -----
60
i
J
*iiiiiiittttttt GARRARD 00000722
e 6
1
4
0 " 12
>8 ,,
3, ?? 33 24
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PRQJ-MOC REPORT NO. C38090-58
FOCUS QUANTITY AND UNIT RATE REPORT
INSTALL P/I TRNORS J17
ACCOUNT DESCRIPTION UNIT OF
ACCTS QUANT ******** ********************
BUCGET
FCST #004
TO THIS BUDGET
DATE
MEEK
******* *******
FCST #004
t
PERFORMANCE MEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 19 BUDGET MEEK 116 OF 121
TO DATE
THIS WEEK
8UDGET
.IIMIT M AklUnilQC--
FCST #004
TO DATE
THIS
WEEK $$$$$$
INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL
P/I P/I P/I P/I P/I P/I P/I P/I P/I P/I P/I
TRANSUUC TRANSOUC TRANSOUC TRANSOUC TRANSOUC TRANSORTRANSORTRANSORTRANSORTRANSORTRANSOR-
C51J1T C53J17 C54J1T C55J17 C56J17 C61J17 C62J17 C63J17 C64J17 C65J17 C66J17
EA EA EA EA EA EA EA EA EA EA EA
<=*TOTAL INSTALL P/I TRNDRS
30 18 24
6 6 1. 19 1 1 1 1
108
32 0 0 0 7 0
21 32 19
8 0
119
32 0 0 0 7 0
21 32 19
8 0
119
0 750 0 450 0 600 0 150 0 150 0 25 0 475 0 25 0 25 0 25 0 25
0 2700
235 0 0 0
123 0
467 308 133 123
0
1389
235 0 0 0
123 0
467 308 133 123
0
1389
0 25.00 7.34 7.34
0 25.00
.00
.00
0 25.00
.00
.00
0 25.00
.00
.00
0 25.00 17.57 17.57
0 25.00
.00
.00
0 25.00 22.24 22.24
0 25.00 9.63 9.63
0 25.00 7.00 7.00
0 25.00 15.38 15.38
0 25.00
.00
.00
0 25.00 11.67 11.67
.00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00
oo
TREND FORECAST MH
1389 TREND FORECAST PERF
.47
$$ PERFORMANCE RATIOS
1.00
.47
.47
00
0
9 a
?9 4
5
6n
8 9
Ur 9
9
ir,
9
1
2'
29
32 1,1
IF 10
:
........... -.............................. ............................. -.......... - .......... - -.................
---------------------- -------------------
,
:
ii -
O
......................-
.................................................... ..........-- -.......
------------------- -..... - .....................................
.............. .................. ..........-....................
-.............-..........
-
6l
<
C
JOB NO. 14053-000
FOCUS
DATE 5/24/82
ROBINSON REFINRY MOOERNZTN PROJ-MOC
QUANTITY AND UNIT RATE REPORT
PAGE 20
REPORT NO. C38090--58
INSTALL I/P TRNORS J19
PERFORMANCE BASED ON BUDGET
WEEK ENOING 5/21/82
WEEK 116 OF 121
ii
ACCOUNT DESCRIPTION UNIT ------------------
-QUANTITY---------
--------- ------------------------ manhours--------------------------- --------------------UNIT MANHOURS------------------
OF BUDGET FCSL _ TO
THIS BUDGET
FCST
TO
THIS BUDGET FCST
TO
THIS
ACC T 8 QUANT
8004
date
WEEK ..........................#004
OATE WEEK
.........
0004....... DATE
WEEK
7 INSTALL I/P TRANSDUC C51J19 EA
INSTALL I/P TRANSOUC C53J19 EA
i
* INSTALL I/P TRANSDUC C54J19 EA INSTALL I/P TRANSDUC C55J19 EA
" INSTALL I/P TRANSOUC C56J19 EA
INSTALL I/P TRANSOR- C61J19 EA
n INSTALL I/P TRANSDR- C62J19 EA
INSTALL I/P TRANSDR- C63J19 EA
INSTALL I/P TRANSOR- C64J19 EA
.6 INSTALL I/P TRANSDR- C65J19 EA
17 INSTALL I/P TRANSOR- C66J19 EA
18
SSTOTAL INSTALL I/P TRNDRS
138 70 74 64 95 1 98 1 6 1 1
549
57 0 5 0 2
69 105 111 115
63 83
610
57 0 5 0 2
69 105 111 115 ... 63
83
610
0 0 0 0 0 0 0 0 0 "0 0
0
966 490 479 448 665
7 6 86
7 38
7 7
3800
140 0
109 0 4
155 176 644 320 172 245
F965
140 0
109 0 4
155 176 644 320 172 245
1965
0
7.00
2.46 2.46
.00
0
7.00
.00
.00
.00
0 6.47 21.80 21.80 .00
0
7.00
.00
.00
.00
0
7.00
2.00 2.00
.00
0
7.00
2.2 5 2.25
.00
0
T.00
1.68 1.66
.00
0
7.00
5.80 5.80
.00
0
6.33
2.78 2.78
GO
0
7.00
2.73 2.73
.00
0
7.00
2.95 2.95
.00
0
6.92
3.22 3.22
.00
a-i 21
TREND FORECAST MH
1965 TREND FORECAST PERF
.47
$$ PERFORMANCE RATIOS
1.00
.47
.47
.00
s
I :
<
4
a
4
4
4
I? n
M4
,( "
"1
r
21
?X
21 ?
7' 14
4
4
:4
:;4
:i
i
GARRARD 00000723
:a
61 :q
::c
Cl
::c
;:c
'5
e> c
JOB NO. 14053-000 ROBINSON REFINRY MODERNZ TN PROJ-MOC REPORT NO. C38090--58
FOCUS QUANTITY AND UNIT RATE REPORT
MAIN CONTROL PANEL J21
PERFORMANCE WEEK ENOING
BASEO ON 5/21/82
DATE 5/24/82 PAGE 21 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
..........................................
ACCf #
UNIT -
------- QUANTITY----------
OF BUCGET FCST
TO
QUANT
.... #004 ... DATE
THIS BUDGET
WEEK
"
-MANHOURS-------- ----------------- -------------
FCST
TO THIS BUDGET
#004
DATE WEEK..............
-UNIT MANHOURS-
FCST
TO
#004
DATE
i=$4 $=**=*<=**$$
THIS WEEK
rvyty*t
MAIN CONTROL ROOM PA C50J21 EA ..TOTAL MAIN CONTROL PANEL _
TREND FORECAST MH
666 666
D FORECAST PERF
0 0 .39
626
555
555
0
626
555
555
0
** PERFORMANCE RATIOS **
104*33 104*33
1.00
92.50 92.50
92*50 92.50
.89
.89
.00 .00 .00
'
1? 13
1C
GARRARD 00000724
t
V
c
.1 A 5
* 8
.0 12
.6 18
JOB NO. 14053--COO ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C3B090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
SATELLITE RACKS
J2Z
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
OATE 5/24/82 PAGE 22 BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
OF EUCGET FCST
ACCT # QUANT
#004
sss-z-t.s^st^ss***********
***********
IOC I/O RACK
A16J22 UNITS
CONTRL CONSL SATLITE C51J22 UNITS
CONSOLE SATELLITE RA C52J22 UNITS
CONSOLE SATELLITE RA C5JJ22 UNITS
CONSOLE SATELLITE RA C54J22 UNITS
CONSOLE SATELLITE RA C55J22 UNITS
2 100 100 100 100 300
300 100 100 200 110 300
TO DATE
300 100 100 200 110 300
THIS WEEK
0 0 0 0 0 0
rJIJU T MAJUUnifOC
BUOGET
FCST
TO THIS BUDGET FCST
#004
DATE WEEK
#004
******** **$********* ******* ***********^**
TO OATE
3 148 148 148 283 444
276 179
256 127 163 225
276 179
256 127 163 225
0
1.50
.92
.92
0
1.48
1.79 1.79
0
1.48
2.56 2.56
0
1.48
.64
.64
0
2.83
1.48 1.48
0
1.48
.75
.75
THIS WEEK
.00 .00 .00 .00 .00 .00
S4T0TAL SATELLITE RACKS
702
1110
1110
0 1174
1226
1226
0
1.67
1.10 1.10
.00
TREND FORECAST MH
1226 TREND FORECAST PERF
.68
PERFORMANCE RATIOS **
1.00
.68 .68
.00
73 24
77
a
a
7^
4
1
1^
7
It
1
4 >g
11 14 K 17 4G
"
i i
T
L
7 4*
0
Q
r
0t
r.
0
['<______ ____
o
C
GARRARD 00000725
e
JOB NO. 14053-000
ROBINSON REFINRY MODERNZ TN PROJ-MOC
4 REPORT NO. C3B090-58
FOCUS
GUANTITY AND UNIT RATE REPORT
PROCESS COMPUTER
J26
DATE 5/24/82
PAGE 23
PERFORMANCE BASED ON BUCGET
WEEK ENDING 5/21/82
WEEK 116 OF 121
o
8
ACCOUNT DESCRIPTION ACCT#
UN I T
OF BUCGET FCST
QUANT
#004
**********
TO DATE
THIS BUDGET WEEK
FCST 2004
TO OATE
THIS BUDGET WEEK
FCST #004
TO
DATE 2$
?
THIS
t
WEEK... ............
*******
6
PROCESS CONTROL COMP C50J26 UNITS
100
70
70
**TOTAL PROCESS COMPUTER
100 70 70
TREND FORECAST MH
283 TREND FORECAST PERF
0 0 4.04
100
283
283
0
100
283
283
0
S* PERFORMANCE RATIOS **
1.00
i.oo
1.00
4.04 4.04 4.04
4.04 4*04 4.04
.00 .00 .00
10
IT IF
9
9
9 9 :
:9 :: 9'
GARRARD 00
:: #
i
JOB NO. 14053-000
ROBINSON REFINRY MODERNZTN PROJ- MOC REPQRT NO. C38090-56
FOCUS QUANTITY AND UNIT RATE REPORT
LOCAL CONTROL PANL J31
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
OATE 5/24/82 PAGE 24 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACC T It
UNIT -- OF BUDGET
QUANT
--QUANTITY--------------------------
FCST
__ TO
THIS
004
DATE
WEEK
BUOGET
--MANHOURS--------------------------
FCST
TO THIS
004
DATE........ WEEK
BUOGET
-UNIT MANHOURS-----------------
FCST
TO
THIS
a004
OATE WEEK
<3
i ; i \' 0 1 : ' 1? 3
'
!'
LOCAL CONTROL PANEL LOCAL CONTROL PANELS LOCAL CONTROL PANEL LOCAL CONTROL PANELS LOCAL CONTROL PANELS LOCAL CONTROL PANEL MORRIS LOCAL CONTROL HOKE-LOCAL CONTROL P
A16J31 B09J31 B23J31 B32J31 B99J31 C56J31 S09J31 S32J31
UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS
100 0
100 100 100 100 100
0
1900 0
100 100
0 100 100
0
1900 0
ICO 100
0 100 100
0
3-TUTAL LOCAL CONTROL PANL
600.... " 2300
2 300
TREND FORECAST MH
936 TREND FORECAST PERF
0 0 0 0 0 0 0 0
0
.33
140 0
36 35 35 100 35
0
768 0
16 35
0 88 35
0
792 0
16 0 0
88 0 0
3 81
942
896
PERFORMANCE RATIOS
24 1.40 0 .00 0 .36 0 .35 0 .35 0 1.00 0 .35 0 *00
24 ......... .64
-*
oo
.40 .00 .16 .35 .00 .88 .35 .00
...... .41
.33
.42 .00 .16 .00 .00 .88 .00 .00
.39....
.31
.00 .00 .00 .00 .00 .00 .00 .00
1. "
.00............. ?
.00
?
}
GARRARD 00000727
a
t? :;Q Ml
:;c
::c ::c
c
0 6 '
0
i <
0b
10 " n ,4
l> "
n
-i.
78
30 31 \! 13
JOB NU. 19053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-- 58
FOCUS QUANTITY ANO UNIT RATE REPORT
INSTRUMENT SHELTER J50
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/29/82 PAGE 25 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
ACCT it *****i=*********C*:***
UNIT
OF BUCGET FCST
TO THIS
QUANT
3009
OATE
WEEK
****************-**** ******* ******
BUDGET
FCST 3009
TO DATE
THIS BUDGET WEEK
FCST 3009
TO OATE
THIS WEEK
INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENTS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS INSTRUMENT SHELTERS MOUNT INSTR SHELTERMOUNT INSTR SHELTERMOUNT INSTR SHELTER-
MOUNT INSTR SHELTERMOUNT INSTR SHELTERMOUNT INSTR SHELTERMORRIS MOUNT INST SH ALLEN-MOUNT INSTR SH HOKE-MOUNT INST SHEL
A16J50 A31J50 B09J50 B23J50 B28J50 B29J50 B99J50 C5IJ50 C53J50 C 59J 50 C55J50 C 56J 50 C61J50 C62J50 C63J50
C69J50 C65J50 C66J50 S09J50 S29J50 S32J50
EA EA EA EA
EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA
197
32
32
0 2627
217
233
16 17.87 6.78 7.28
.00
27
9
9 0 355
32
32
0 13.15 8.00 8.00
.00
0
0
00
0
23
23
0
.00
.00
.00
.00
23
22
22
0 768
617
617
0 33.39 28.05 28.05
.00
16
8
8
0 377
197
19 7
0 23.56 18.38 18.38
.00
0
0
00
0
10
10
0
.00
.00
.00
.00
1
2
2 0 28
8
8
0 28.00 5700 5700
.00
173
69
69
0 3960
378
378
0 20.00 5.98 5.98
.00
50
0
0 0 1000
0
0
0 20.00
.00
.00
.00
102
0
0 0 2090
8
8
0 20.00
.00
.00
.00
82
3
3
0 1690
127
127
0 20.00 92.33 92.33
.00
126
19
19
0 2520
310
310
0 20.00 16.32 16.32
.00
1
3
3 0 20
0
0
0 20700
.00
.er
.00
121
18
18
0 2920
216
216
0 20.00 12.00 12.00
.00
2
15
15 0 90
99
99
0 20.00 6.27 6.27
.00
1
29
29
0
20
221
221
0 20iOO 7.62 7.62
.00
1
17
17 0 20
59
59
0 20.00 3.97 3.97
.00
l 1
18 13
1l38
0 20 0 ........ 20"
113
113
rio-- 19
0 20.00 6.28 6.28 0 20700 ..10.00 2.52
.00 .00
21
3
3 0 37 5
80
30
0 17.86 26.67 10.00
.00
2
2
2 0 92
92
33
0 21.00 21.00 16.50
.00
$*=T(JTAL INSTRUMENT SHELTER
898
277
277
0 17792
2832
2693
16 19.81 10.22 9.72
.00
TRENO FORECAST MH
2727 TREND FORECAST PERF
.97
PERFORMANCE RATIOS
1*00
.99
.97
.00
o
8
9
* J9
-0 9
l? .3
,4
It 7 H' X 21
?4
;(
x 79 30 37
r.
'
V w
40
l
:
I
if
............ -
... ------ ------- .......-.......... ........ *.....
Ifl
GARRARD 00000728
- v'
-------- -----
7
.................
O
o
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090--58
-
--
FOCUS
QUANTITY AND UNIT RATE REPORT
ANAL YZERCPACKAGE
JfcO
Account description 3 OF BUCGET 4 ACCT # QUANT S **************************** $
c
7 ANALYZER CONTROL P A16J60 EA 8 ANALYSER CONTROL P B23J60 EA
tt ANALYSER CONTROL P B28J60 EA 10 ANALYSER CONTROL P B29J60 EA
ANALYZER PACKAGES 12 ALLEN-ANALYZER
B32J60 EA S29J60 EA
U MOKE-ANALYZERS
S32J60 EA
83 15
2 7 0 0 3
FCST #004
15 1 0 0 0 0 3
TO DATE
15 1 0 0 0 0 3
THIS MEEK
BUOGET
********
0 7266 0 140 0 355 0 155 00 00 0 280
FCST #004
627 8 0 0 0 0
280
DATE PAGE PERFORMANCE BASED ON BUDGET
5/24/82 26
TO THIS BUOGET
DATE WEEK *4=4s4=$4=4=4=4:4t$
_tlklTT MANUnilQC-
FCST
TO
#004
DATE
?T?TTVT?
THIS WEEK
645 8 0 0 0 0
98
0 87.54 41*80 43.00
0
9.33
8.00 8.00
0 177.50
.00
.00
0 22.14
.00
.00
0
.00
.00
.00
0
.00
.00
.00
0 93*33 93.33 32.6F"
.00 .00 00 .00 .00 .00 .00
CD
4-TOTAL ANALYZERSPACKAGE 16
TREND FORECAST MH
110 19 19 751 TRENO FORECAST PERF
0 .47
8196
915
751
0
PERFORMANCE RATIOS 4=4=
74.51 1.00
39.53
.57
.47
.00 .00
7
A
p
" .7 .3 ..I ,6 e ?f
77 7:
>>
77
24
z
30
z. 13
4< 36
3?
9 3H 40
4?
Q =C ... ---- ---------- -......... -.... - ...... -....-
O
GARRARD 00000729
S3
- ................................................
--
..........
o
--
o
o
---
-
y
1
e
JOB NO. 1 <,053-000 ROBINSON REFINRY MOQERNZTN PROJ -MOC REPORT NO. C38090-58
F 0CUS
QUANTITY AND UNIT RATE REPORT
INSTR TUBEEP IPE
J70
.
ACCOUNT DESCRIPTION ACCTff
UNIT
OF EUCGET FCST
TO THIS BUDGET
QUANT
S005
DATE
MEEK
*********** ********** ****** *:**$*$*=$:*
FCST 1*005
PERFORMANCE MEEK ENOING
BASEO ON 5/21/82
DATE 5/25/82 PAGE 27 BUDGET MEEK 116 OF 121
TO DATE
THIS BUDGET MEEK
FCST
TO
3005
OATE
$$$$$$$$
THIS MEEK
INSTALL INSTR TUBE6P A3IJ70 LF
INSTALL INST TUBE E B09J70 LF
INSTALL INSTR TUBEEP B23J70 LF
INSTALL INSTR TUBEEP B28J70 LF
ii INSTRUMENTS
B29J70 LF
u INSTRUMENT AIR TUBEE B32J70 LF
INST AIR TUBE E PIPE B99J70 LF
INST INSTR TUBE E PI C51J70 LF
INST INSTR TUBE E PI C53J70 LF
INST INSTR TUBE E PI C5<|J70 LF
INST INSTR TUBE E PI C55J70 LF
IS PNUEMATIC TUBING - C6IJ70 LF
PNUEMATIC TUBING - C62J70 LF
1= PNUEMATIC TUBING - C63J70 LF
PNUEMATIC TUBING - C65J70 LF
PNUEMATIC TUBING - C65J70 LF
PNUEMATIC TUBING - C66J70 LF
MURRIS-INST AIR TUBE S09J70 LF
ALLEN-INST AIR TUBE S29J70 LF
HOKE-INST AIR TUBE E S32J70 LF
200
190
190
0 185
89
89
0
.93
.57
.57
.00
0
0
00
0
0
0
0
.00
.00
.00
.00
1180
1600
1600
0 7 30 1627 1653
0
*62
1.02 1.03
.00
752
600
600
0 686
215
215
0
.91
.36
.36
.00
100
379
3 79
0
86
139
139
0
.86
.37
.37
.00
0
0
00
0
0
0
0
.00
.00
.00
.00
<,8
650
650
0
55
159
159
0
.92
.23
.23
.00
5177
570
570
0 1810
256
256
0
.53
.55
.55
.00
1598 16 16 0 690
0
0
0
.53
.00
.00
.00
<,2 00
0
0
0 1757
137
137
0
.52
.00
.00
.00
1975
0
0 0 859
0
0
0
.53
.00
.00
.00
23
50
50 0 10
52
52
0
.53
.85
.85
.00
3000
559
559
0 1300
85
85 0 .53 .15 ~7T5 ;oo
598
820
820
0 258
163
163
0
.53
.20
.20
.00
20 1957 1957
0
9
219
219
0
.55
.11
.11
.00
25 215 215 0 11
53
53
0
.55
.25
.25
.00
2950
526
526
0 1280
52
52
0
.55
.12
.12
.00
1000
1200
1200
0 766
689
556
0
.77
.57
.56
.00
710
776
... f 76
0 609
700
" 315
0
*06
.90
.51
.011
110
560
560
0
98
555
559
0
.89
.79
.82
.00
CD
"0 **TOTAL INSTR TUBEEPIPE
22656
10558
10558
0 11178
5058
5563
0
.59
.55
.00
TRENO FORECAST MH
5567 TRENO FORECAST PERF
.68
PERFORMANCE RATIOS
1.00
.75
.68
.00
V
}5
,,
4 5 6
9 10
13 M If,
?. 2"
7'
7" 3(' 3?
.Vi yi
<10
<
GARRARD 00000730
.........................-................................ ..................................
...........
o
-- ............--............... ......---------------- ---------------------------------------------
c
e
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MQC REPORT NO. C38090--58
FOCUS QUANTITY AND UNIT RATE REPORT
INSTL INTRU T86PIP J71
DATE 5/24/82
PAGE 28
PERFORMANCE BASED ON BUDGET
WEEK ENDING 5/21/82
WEEK 116 OF 121
ACCOUNT DESCRIPTION
..................................
"yf* y A. jA> <A>
ACCfs
A* A*
A* jAj
UNIT -------------------------- QUANTITY--------------------------
OF BUCGET FCST
TO THIS
QUANT
004... DATE
WEEK
------------BUOGET
-MANHOURS-----------
FCSJ
TO
S004....... DATE
--------
THIS WEEK
------------ ------- UNIT MANHOURS------------------
BUDGET^ fCST
TO
.......... SCO A......... DATE
JHIS WEEK
INSTR AIR TUBING
A16J71 LF
**TOTAL INSTL INTRU TB6PIP
TREND FORECAST MH
1574
3100
3100
1574
3100
3100
1423 TREND FORECAST PERF
0 0 1.08
670
1361
1423
0
670
1361
1423
0
PERFORMANCE RATIOS =*=
*43 .43 1.00
.44 .44 1.0 3
.46 .46 1*08
.00 .00 .00
1? n
GARRARD 00'
\-
f 10
c>
o-
ooo
CO
3 a
:;a
o :;o
c
JOB NO. 1 <053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC ty REPORT NO. C38090-58
FOCUS QUANTITY ANO UNIT RATE REPORT
INST AIR SUBHEADER J78
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/28/82 PAGE 29
BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION UNIT -
OF BUCGET FCST
TO
THIS BUDGET
FCST
ACCTff QUANT
8009
DATE
WEEK
jm*r
o
INSTR AIR SUB-HEADER A16J78LF INST AIR SUBHEADER C53J78 LF
INST AIR SUBHEAOER C63J78 LF
3383 2 2
70<r0 1505
685
7080 1505
685
0 2365 01 01
5228 818 86
TO
date
5375 818 86
THIS BUDGET WEEK
UNIT FCST
*r 0.0 S
MA Nuniioc-^. TO THIS
DATE ... BEER $$****
0
.70
.78
.76
.00
0
.50
.28
.28
.00
0
.50
.13
.13
.00
$$T0TAL INST AIR SUBHEADER ..... .... TREND FORECAST MH "
5875 TREND FORECAST PERF
.98
2367
5 72 A
5875
PERFORMANCE RATIOS
1.00
T95
.98
.00
2
3 5
9
9
9
9
9
9
9
G>)
73 73
>
73 D
9 O
oOooo
00
1 .m\ 6
w
-
m
(.
'
--
y
10
" i?
n
JOB DO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-58
nvTt)tJI| 1 UL j 11 1 1 U<v
OF
ACCT # QUANT
v4*TYVV'r4*^v4'XTTT"VVTVVT^'VT *4
eUCGET
LOOP CHECK C CALIBRA A31J81 EA
LOOP CHECK
B23J81 EA
LOOP CHECK
B28J81 EA
LOOP CHECK
B29J81 EA
LOOP CHECK
B32J81 EA
LOOP CHECK LOOP CHECK LOOP CHECK
C51J81 EA
- C61J81 EA - C63J81 EA
44 32
22 14
9 349
3 106
F 0C U S
UUANTITY and unit RATE REPORT
LOOP CHECK
J81
-QUANTITY
FCST
TO
S 004
DATE
*
THIS WEEK
BUDGET *$*$**$$
FCST S004
7 134
29 29 29 4 30 221 444
7 134
29 29 29 4 30 221 444
3 105 0 400
0 194 0 140 0 84 0 2559
0 22 0 778
11 88 3
92 348 124 1232 1720 2007
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE 30 BUDGET WEEK 116 OF 121
TO DATE
4 883
92 348 124 1232 1720 2007
THIS BUDGET FCST
TO
WEEK
#004
DATE
***** YTY-r-rY-YY-Y
0
2.39
1.57
.57
0 12.50 6.59 6.59
0
8.62
3.17 3.17
0 10.00 12.00 12.00
0
9.33
4.28 4.28
0
7.33
2.87 2.87
0
7.33
7.78 7.78
0
7.34
4.52 4.52
THIS WEEK
.00 .00 .00 .00 .00 .00 .00 .00
* ..... SSTOTAL '
u
LOOP CHECK ............... TREND FORECAST MH
9
2, 22
LOOP CHECK LOOP CHECK LOOP CHECK
A16J81 B09J81 B99J81
LOOP CHECK
2-1 LOOP CHECK
- C62J81 - C64J81
,,
LOOP CHECK LOOP CHECK
- C65J81
- C66J81
6410
LOOPS LOOPS LOOPS LOOPS LOOPS LOOPS LOOPS
5/9
TRENO
164 1 5
248 331 168 297
1323
FORECAST
683 25 21
390 442 468 466
1323
PERF
526 25 21
390 461 468 486
- .... 42 82
6417
6410
6
.61
PERFORMANCE RATIOS
82 1645 04 0 49 0 1819 0 2427 0 1232 0 2178
3175 105 17
1350 2353 T563 1405
3732 105 17
1350 2353 ~1563 1405
566 0 0 0
.o 0 0
7.40
1.00
10.03 4.00 9.80 7.33 7.33 T.H 7.33
4.85
.61
4.65 A.20
.81 3.46 5.32 3.34 2.89
4 85 ~..... .00 *.......
.61
.00
7.10 4.20
.81 3.46 5.10
3.34 2.89
6.90 .00 .00 .00 .00 .00 .00
29 10
*'PTOTAL LOOP CHECK
TREND FORECAST MH
1214
2515
2377
11663 TRENO FORECAST PERF
82 .57
9354
9968
10525
566
PERFORMANCE RATIOS
7.71 1.00
3.96 .49
4.43 .56
6.90 .69
-........... ---...... -..................---...... ..-...... -.-- ----.... -.. --- -..-... -- 1........ .....-------.. -... --- -........... ----------- -----------
9
3
9
1
;9
7
1
f
1
9 i :
:t
,1
;
;*
p
\%
-
<n
i
i ; 0-
.... --.... -....... --.. ----- ..- --
....------------- ------ - V
------------ ---------
i
-...----- -.......... .........
9
..... -.... - ....-..........
Q
0
<j 0
6G 0 -o
o
. _ ... .... J
C
GARRARD 00000733
l 9
in
JOB NO. 1*053--COO ROBINSON REFINRY HOOEKNZTN PROJ-#OC REPORT NO. C38090--58
FOCUS QUANTITY AND UNIT RATE REPORT
CALIBRATIONETE STNG J82
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/2*/82 PAGE 31 BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT #
UNIT-----------------------------QUANTITY---------------------------
OF BUCGET FCST
TO THIS
QUANT
SOO*
DATE
WEEK
------------------------ MANHOURS--------------------------- --------------------UNIT MANHOURS
BUDGET
FCST
TO THIS BUDGET FCST TO THIS
SOO*
OATE WEEK
SOO*
DATE
MEEK
4* 4-4-4-44-4- ****** 444$444444444 4-4-4-4-4 4*4- *,:**,
CALIBRATION E TESTIN CAL I BRAT ION TESTIN TEST E STORE CALIBRATION E TESTIN CALIBRATION G TESTIN CALIBRATION E TESTIN TEST-CAL IBRATE-STORE TEST-STORE-CALIBRATE
TESTESTOREECALIB INS TESTESTOREECALIB INS TESTESTOREECALIB INS TESTESTOREECALIB INS TESTESTOREECALIB INS TESTESTOREECALIB INS
A 16J 82 A31J82 B09J82 B23J82 B28J82 B29J82 852182
B99J82
C51J82 C52J82
C53J82 C54J82 C55J82 C56J82
EA EA EA EA EA EA EA
EA
EA EA
EA EA EA EA
**T0TAL CALIBRATIONETESTNG
TREND FORECAST MH
1077 1
1*9
310 128
72 *3
* *27 282 356 313 208 272
6*5 7
22 80 12 18 10
6 *03 302 391 352 201 253
63* 7
22 80 12 18 10
8 *03 302 391 352 201 253
36*2
270*
2693
7087 TREND FORECAST PERF
59 6515 16 0 3*5 0 1 7*8 0 737 0 *59 0 2 71
0 23 0 1806 u 1160
0 1552 0 1318 0 852 0 11*2
3286 10 85
639 30 37 25
11 729 536 652 *73 353 716
2709 *
85 639
30 87 25 11 729 536
652 *73 353
716
11* 0 0 0 0 0 0 0 0 0 0 0 0 0
60 1793*
7632
70*9
11*
.56
$$ PERFORMANCE RATIOS **
6.05 6.00 2.32 5.6* 5.76 6.38 6.30" 5.75 *.23 *.Il *.36 *.21 *.10 *.20
*.92
1.00
5.09 1.43 3.86 7.99 2.50 *.83 2.50 1.38 1.81 1.77 1.67 1.3* 1.7 6 2.83
2.82
.60
*.27 .57
3.86 7.99 2.50 *.83 2.50 1.38 1.81 1.77 1.67 1.3* 1.76 2.83
2.62
.56
1.93 .00 . .00 .00 .00 00 00~ .00 .00 .00 .00 *00 .00 .00
1.90
.31
o 9
8 9
9 9 9
9
9
?n
.>9 10
GARRARD 00000734
:9
9o ') O'
ft
f t ' i
f
R 9
I>
1 f.
JUB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC
REPORT NO. C38090-58
FOCUS QUANTITY AND UNIT RATE REPORT
DISPOSAL EXIST INS J95
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/29/82 PAGE 32 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT it
OF BUCGET FCST
QUANT
0009
$$ **********4
TO THIS
OATE
WEEK
*******
BUDGET
FCST
TO
0009
DATE
******** ************ ******
THIS WEEK
BUDGET
FCST SG09
TO THIS
DATE
WEEK
irvvrvr'rir rvvr vv
EMERGENCY SO REUUN0A A16J95 UNITS EMERGENCY SO REDUNDA B23J95 UNITS EMERGENCY SO REDUNDA B28J95 UNITS EMERGENCY SO RE0UN0A B29J95 UNITS
100 100 100 100
100 0 0 0
100 0 0 0
0 1177 0 999 0 660 0 75
95 3 0 0 0
953 0 0 0
0 11.77 9.53 9.53
0
9.99
.00
.00
0
6.60
00
.00
0
.75
.00
.00
.00 .00 .00 .00
**TUTAL DISPOSAL EXIST INS
900
100
100
0 2361
953
953
0
5.90
9.53 9.53
.00
TREND FORECAST MH
953 TRENO FORECAST PERF
.38
PERFORMANCE RATIOS
1.00
.38
.38
.00
?<: 21 21 >3
a
' 4
<9
;
9
13 If.
r
?i
?
r
1H ='
"
.................. -................................................ -............................................................ 41
I" '
-.......... -..........- -- -----------------------
- -........-.......... ------------------ --- ....... -.................- ............................ .......................... ........ -........ ....
--
-........ -----
-........... -.......--
-....... -...............- - - -
-
5
5/
9
--.............
9
O
,3 .................-................. - -..... .. ............ .....-- O'
O
7
o
o
GARRARD 00000735
fil
e
r
19 ?? ?3 2`
;
JOB NO. 14053-000 ROBINSON REFINRY MQDERNZTN PROJ- MOC RtPQRT NO. C38090-58
FOCUS QUANTITY AND UNIT RATE REPORT
STEAM TRACE PIPESH L10
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 33
BUDGET WEEK 116 CF 121
--"--
OF 8UCGET ACCT ii QUANT
S/B 6 STM.TRACE SUBH A06L10 LF S/B 1. STM.TRACE SUBH A11L10 LF S/B 2 STM.TRACE SUBH A12L10 LF S/B 3 STM.TRACE SUBH A13L 10 LF S/B 4E7 STM.TRCE SUB A14L10 LF S/B 5 STM.TRACE SUBH A15L10 LF S/B 8 STM.TRACE SUBH A1BL10 LF S/B 9 STM.TRACE SUBH A19L10 LF STEAM TRACE PIPE-SUB B09L10 LF STEAM TRACE PIPE-SUB B23Lio LF STEAM TRACE PIPE-SUB B2BL10 LF
STEAM TRACE PIPE-SUB B29LI0 LF STEAM TRACE PIPE-SUB B32L10 LF STEAM TRACE PIPE-SUB B99L10 IF
MORRIS-STEAM TRACE P S09L10 LF ALLENSTEAM TRACE PIP S29L10 LF HOKE --STEAM TRACE PI S32L10 LF
10 10
10 10
10
10 10
10 0
5
2
0
0 33
3 52 32
FCST #004
402 357 1432 449 1155 345 1489 383
0
1279 412
0
0 1093 1461
211 34 7
TO DATE
THIS BUDGET WEEK
402 357 1432 449 1155 345 1488 383
0
1279 412
0
0 1093 1461
211 347
0 0
0 0
0 0 0
0 0 0 0
0
0 0 0 0 0
11 11
11
11
11
11 11
11 0
7 3
0
0 55
5 69 41
FCST SO 04
589 739
2811
1115 1620
516 3617
523 40
3147 639 47 1
267 8 1142
434 439
TO DATE
THIS BUDGET WEEK
IIMtT MAf
FCST
TO
#004
OATE
THIS WEEK
589 739 2811 1115
1620 516
3617
523 40
3147 639 47 0
2678 1290
217 26
0
1.10
1.47 1.47
.00
0
1.10
2.07 2.07
.00
0
1.10
1.96 1.96
.00
0
1.10
2.48 2.48
`.00
0
1.10
1.40 1.40
.00
0
1.10
1.50 1.50
.00
0
1.10
2.43 2.43
.09
0
1.10
1.37 1.37
.00
0
.00
.00
.00
.00
0
1.40
2.46 2.46
.00
0
1.50
1.55 1.55
.00
0
.00
.00
.00
.00
0
.00
.00
.00
.00
0
1.67
2.45 2.45
.00
0
1*67
.78
.88
.00
0
1.33
2.06 1.03
.00
0
1.28
1.27
.07
.00
S3TOTAL STEAM TRACE PIPESH TREND FORECAST MH
19616 TRENO FORECAST PERF
1.40
268
20097
19614
PERFORMANCE RATIOS
0
1.44 1.40
.00
o
9 9
oO GARRARD 00000736
O C: O
JOB NO. 14053--000
FOCUS
ROBINSON REFINRY MOOERNZTN PROJ-MOC
QUANTITY AND UNIT RATE REPORT
REPORT NO. C38090-58
SPL 2 INESM PIPE
Lll
6
1
H1^ vU Uli 1
1 A U11
3
OF BUDGET FCST
TO THIS BUDGET
4
ACCT # QUANT
#004
DATE
WEEK
6 ********************************** $* $ **************
FCST #004
PERFORMANCE WEEK ENDING
BASEO ON 5/21/82
DATE 5/244/82 PAGE 34
BUDGET WEEK 116 OF 121
TO DATE
THIS BUDGET FCST
TO
WEEK
#004
OATE
******* ********* *******
THIS WEEK *******
e 1
; : '
SMALL BORE CS PIPE S AOfaLll LF
8 SMALL BORE CS PIPE S AULI1 LF
'> small bore cs pipe s Ai2Lii LF
10 SB CS PIPE-RACK
S A13LI1 LF
" SMALL BORE CS PIPE S A14L11 LF
SMALL BORE CS PIPE S A15L11 LF
13 INST CS PIPE 21N U A16LI1 LF
M SMALL BORE CS PIPE S A17L11 LF
SMALL BORE CS PIPE S A18L11 LF
'8 SMALL BORE CS PIPE S AI9L11 LF
INST CS PIPE 2IN U A21LU LF R INST CS SPLD 2IN U B09L11 LF
IP INST CS PIPE 2IN U B21L11 LF
z.; INST CS PIPE 2IN U B23L1I LF
2. INST CS PIPE 2IN U B24L11 LF n INST CS PIPE 2IN U B25L11 LF
INST CS PIPE 2IN U B28L11 LF
INST CS PIPE 21N U B29L11 IF
> INST CS PIPE 2IN U B32L11 LF
INST CS PIPE 2IN E U B35L11 LF
71 SMALL BORE PIPE
B41L11 LF
79 SMALL BORE PIPE
B42L11 LF
SMALL BORE PIPE 30 SMALL BORE PIPE
B43H1 LF B44LI1 LF
SMALL BORE PIPE
B45L11 LF
3? INST CS PIPE 2IN U B99L11 LF
)3 INST CS PIPE 2IN U C51L11 LF
H INST CS PIPE 2IN U C52L11 LF
33 INST CS PIPE 21N U C53L11 LF
3C INST CS PIPE 2IN U C54LI1 LF
3? INST CS PIPE 21N E U C55L11 LF
INST CS PIPE 21N U C56L11 LF 30 MORRIS - 2"E UNOER R S09L11 LF 30 ALLEN2" UNDER RK S29LII LF 1, INST SC PIPE 2IN E U S31L11 LF HOKE--2" UNOER RK S32L11 LF 13 INST CS PIPE 2IN U S45L11 LF 4., HOKE-2" E UNDER RK S99L11 LF
SSTOTAL SPL 2 INSM PIPE
689 2031 5395 3100 2555 2852 6790 1343 6978 3036
33 0 0
5168 10
10 4483
263 0
170 0 0
1111 4024
440 39
1460 1015
435 1370
700 1070 3366 2541 3822
703 185
4
794 2169 5267 3189 2496 5248
0 1607 6732 2113 1636
0 0
3052 2031 1542 3083
83 0 0 0 0
2066 8391 1430
406 0 0 0 0 0 0
2039 1486
556 1395
600 46
794 2169 5267 3189 2496 5248
0 1607
6732 2108 1636
0 0 3053 2031 1542 3083 83 0 0 0 0 2066 8391 1430
406 0 0 0 0 0 0
2039 1486
556 1395
600 46
67191........ 59457...... 59453
0 524 1375 1375
0
0 2267
6726
6726
0
0 5867
19410
19608
151
0 8302
6785
6785
0
0 2512
9357
9357
0
0 26 7 5 18199 17639
29
0 7609 0 0 0
0 1867
33 71
3371
0
0 8722 21226 22072
0
0 2604
5355
5355
0
0 55 22U3 2203 0
0 0 26 26 0
0 0 0 00
0 5665
8711
8711
0
0 11 4689 4689 0
0 11 2053 2053 0
0 5058
6557
6557
0
0 241 131 131 0
0 0 81 81 0
0 180 0 0 0
0 0 305 305 0
0 0 32 32 0
0 1759
1222
1222
0
0 6264
9032
9032
0
0 762
430
430
0
.76 1.12 1.09 2.68
.98 .94 1.12 1.39
1.25 .86
1.67 .00 *00
1.10 1.10 1.10 1.13
.92 .00 1.06 .00 .00 1.58 1.56 1.73
1.73 3.10 3.69 2.13 3.75 3.47
.00 2.10 3.15 2.53 1.35
.00 .00 2.85
2.31 1.33 2.13 1.58
.00 .00 .00 .00 .59 1.08 .30
1.73 3.10 3.72 2.13 3.75 3.36
.00 2.10 3.28
2.54 1.35
.00 .00 2.85 2.31 1.33 2.13 1.58 .00 .00 .00 .00 .59 1.08 .30
.00 .00 .00 .00 .00
oo .00 .00
.00 .00 .00 .oo .00 .00 .00 .00 oo 00 .00 .00 00 .00 .00 00 .00
" ,, M
w " ,, ?
^ ?r ,, . ; ,? >1 " ,, "
,0
"
0 66 0 1760 0 1225 0 525 0 1650 0 840 0 1290
0 4337 0 2 700 0 4914 0 676
803 11 0
0 0 0 0 2906 2592 693
2045
803 11 0 0 0 0 0
3553 1643
696
3490
0
1.69
1.93 1.98
.00
'
0
1.21
.00
.00
00
,,
0
1.21
.00
.00
.00
v
0
1.21
.00
.00
.00
"
0
1.20
.00
.00
.00
,,
0
1.20
.00
.00
.00
v>
0
1.21
.00
.00
.00
0
1.29
1.43 1.74
.oo
0
1.06
1.74 1.11
.00
0
1.29
1.25 1.25
.00
''
0
.96
1.4 7 2.50
oo
;
0 320 1213 0 5 101
508 147
0
1.73
2.02
.85
.00
W
0
1.25
2.20 3.20
.00
;
o 83263 137640........138611 ... 180....
Cl 1.24 .....2.31 ....2.33... ... .00....'......... o,
______ ____ _____ TREND FORECAST MH
138625 TREND FORECAST PERF
1.79 - --........... PERFORMANCE RATIOS.................. 1.00
1.78 1.79....
00
GARRARD 00000737
--.................................' -................ V.
-...................
o
o
m JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC
9 REPORT NO. C38090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
SPL 2.5-6 IN PIPE
L12
' c< ACCOUNT
3
..........................
DESCRIPTION ACCt#
t
OF BUDGET FCST
TO
QUANT
#004 ~ DATE
*************
THIS BUDGET MEEK
FCST #004
PERFORMANCE WEEK ENDING
BASED ON 5/21/B2
DATE 5/24/82
PAGE 35 BUDGET
WEEK 116 OF 121
TO DATE
THIS BUDGET
MEEK *$***$*= *$$****
IIKlTT
FCST #004
MANUntiDC--.
TO DATE
THIS
WEEK -r vr tt* r
r o
II 17
,r Ifl .3 *
i2
.`0
n
,4
ic
LARGE BORE CS PIPE S A06L12 LF
LARGE BORE CS PIPE S A11L12 LF
LARGE BORE CS PIPE S A12L12 LF
LB CS SPOOLS
S A13L12 LF
LARGE BURE CS PIPE S A14L12 LF
LARGE BORE CS PIPE S A15L12 LF
LARGE BORE CS PIPE S A17LI2 LF
LARGE BORE CS PIPE S A18L1Z LF
LARGE BORE CS PIPE S A19L12 LF
LARGE BURE CS SPLO P A21L12 LF
INST CS SPLD JIN TO B09L12 LF
LARGE BORE CS SPLO P B21L12 LF
INST CS SPLO 3IN TO B23L12 LF
INST CS SPLD JIN TO B24L12 LF
INST CS SPLD 3IN TO B25H2 LF
INST CS SPLO 3IN TO B28LI2 LF
INST CS SPLO JIN TO B29L12 LF
INST CS SPLO 3IN TO B32L12 LF
LARGE BORE SPOOLEO P B41H2 LF
LARGE BORE SPOOLEO P B42H2 LF
LARGE BORE SPOOLED P B43L12 LF
LARGE BORE SPOOLEO P B44L12 LF
LARGE BORE SPOOLED P B45L12 LF
INST CS PIPE GTR THA B99L12 LF
MORRIS - 3"E OVER SP S09L12 LF
ALLEN3" 6 OVER SPOOL S29L12 LF
INST CS SPLO JIN TO S31L12 LF
HOKE--3" C OVER SPOO S32L12 LF
LARGE BORE CS SPLD P S45L12 LF
HOKE-3" 6 OVER SPOOL S99L12 LF
343 1652 2436
463 2177 1430
1027 2081 1453
26 0 0
5086
10 10 1705 561
0 719 439 327 1581
25 239 1409 874 1125 1957 116
6
505 3070 4623
866
4003 3503
1909
2832 2227 1053
0 0 3711
2531 1687 1102
534 0
1812 1093
718 3B74
56 882 2261 1266
586 1120
269 199
505 3070 4623
866 4003 3503 1908 2832 2227
1053 0 0
3711
2531 1687 1 102
534 0
1812 1093
718 3874
56 882 2261 1266
586 1120
269 199
0 721 0 3918 0 5116 0 1115 0 5270 0 3132 0 2262 0 4100 0 3218 0 50 00 00 0 13915 0 27 0 27 0 2933 0 1112 00 0 1189 0 840 0 632 0 3086 0 59 0 345 0 2973 0 2210 0 2047 0 5211 0 266 0 11
1175 9299
17803 7677
16034 21462
6841 22007 11512
674 5
302 l
12587 749 3 5281 3475 3142 361 4956
2999 2512 13036
409 2205 6891 3763 2549 5521
447 507
1175 9299 17811 767 7 16034
21512 6841
22114 11512
6745 302 0
12583
7493 5281 3475 3156
361 4956 2999
. 2512 13036 409 2205 6664 4137 2549
5241 2086
202
0
2.10
2.33 2.33
.00
0
2.37
3.03 3.03
.00
0
2.10
3.85 3.85
.00
0
2.41
8.86 8.86
.00
0
2.42
4.01 4.01
.00
0
2.19
6.13 6.14
.00
0
272 0
3.58 3.59
.00
0
1.97
7.77 7.81
.00
0
2.21
5.17 5.17
.00
0
1.92
6.41 6.41
.00
0
.00
.00 .00
.00
0
.00
.00
.00
.00
0
2.74
3.39 3.39
.00
0
2.70
2.96 2.96
.00
0
2.70
3.13 3.13
.00
0
1.72
3.15 3.15
.00
0
1.98
5 .88 5.91
.00
0
.00
.00 .00
.00
0
1.65
2.74 2.74
.00
0
1.91
2.74 2.74
.00
0
1.93
3.50 3.50
.00
0
1.95
3.37 3.37
.00
0
2.36
7.30 7.30
.00
0
1.44
2.50 2.50
.00
0
2.11
3.05 2.95
.00
0
2.53
2.98 3.27
.00
0
1.82
4.35 4.35
.00
0 2.66 ....... 4.93 4.68 od
0
2.29
1.66 7.75
.00
0
1.83
2.55 1.02
.00
<1
8
?9
S
"9
>
910
1? 1.1
M9
,e
9
9
,0
n
r. 17 IP
AO
-If
$*TOTAL SPL 2.5-6 IN PIPE TREND FORECAST MH
29277
4 8292
48291
2003 72.... TREND FORECAST PERF
0 65785 198997 200367
0
1.87 .......... ' AX ~ PERFORMANCE RATIOS --X3C....
2.25
4.12 4.15
.00
... 1.00 .... 1.86 .....1.87.... .........00
.....
OELETE
A16L12 Hill
0
0
0
SSTOTAL SPL 2.5-6 IN PIPE
000
TREND FORECAST MH
0 TREND FORECAST PERF
0 0 .00
0 0 0 0 .00 0 0 0 0 .00
PERFORMANCE RATIOS **......... ... .00
.00 .00 .. .00
.00 .00 .00
.00 .00
f
.00 ....... -
i
GARRARD 00000738
-............. -...............................
v.
.......... -....... ..........-......
--
o
GARRARD 00000739
>
'
;a
,n 12 M
'
18 ,,
n >3
JOB NO. 14053-000 ROBINSON REF 1NRY MODERNZTN PROJ-MOC
REPORT NO. C38090-58
FOCUS QUANTITY AND UNIT RATE REPORT
INST CS RACK 31N-61 LIT
i
PERFORMANCE WEEK ENDING'
BASED ON 5/21/82
DATE 5/24/82 PAGE 36 BUDGET MEEK 116 OF 121
ACCOUNT DESCRIPTION OF BUCGET
ACCTU QUANT
TA'. TAG 'ABG A't.TvrTAG ^rA'GrAiArvAGTAGWpAp A'GrJTG --TG AWlp JGVApVAGVApTAG 'ArGirApTAGrTAG MAp aGr **********
UUWlT 1 11 5--------------"
FCST
TO
S004
DATE
THIS WEEK
BUDGET
FCST
TO THIS BUDGET
S004
DATE WEEK
$$$$$$$$$$$ *************
FCST SC04
TO
DATE
-------
THIS WEEK
Lb CS PIPE-RACK
S A13L17 LF
LARGE BORE CS RACK P A21L17 LF
LARGE BORE CS RACK P B21L1T LF
LARGE BORE RACK PIPE B41L17 LF
LARGE BORE RACK PIPE B42L17 LF
LARGE BORE RACK PIPE B43L17 LF
LARGE BORE RACK PIPE B44L17 LF
LARGE BORE RACK PIPE B45L17 LF
MORRIS - 3"E OVER RA S09L1T LF
ALLEN- 3"6 OVER RACK S29H7 LF
LARGE BORE CS RACK P S45L17 LF
13245 61 0
8357 10219
4441 29251
5011
2815 401
1419
6676 2982
0 4442 5593 2306 15448 2851
1474 224 793
6676 2982
0 4442 5593 2306 15448 2851
1474 224 793
**TOTAL INST CS RACK3IN-6I
75220
42789
42789
TREND FORECAST MH
43060 TREND FORECAST PERF
0 11746
0.
56
00
0 . 5677
0 7934
0 3733
0 2 5596
0 8361
0 2633
0 670
0 2367
5717 4766
35 4293 462 7 2486 12294 54 72 1297
334 1179
5717 4766
0 4293 4627 2486
12294 5472
454 0
2330
0 68773
42500
42439
1.10
PERFORMANCE RATIOS
0 0 0 0 0 0 0 0 0 0 0
0
.89 .92 .00 .68 .78 .84 .88 1.67 .94 1.67 1.67
.91
1.00
.86 1.60
.00 .97 .83 1.08 BO 1.92 .88 1.49 1.49
.99
1.03
.86 1.60
.00 .97 .83 1.08 .80 1.92 .31 .00 2.94
.99
1.08
.00 .00 . .00 .00 .00 .00 .00 .00 00 .00 .00
.00
.00
19 >0 )1 12 n
36 V
:
40
,t -
*T
...............
................... -............ -
0
?
,,
8 9
*
1.3
i
,,
"a
m m
t
;
n
f
04
:: 9
0
?
i0 a
JUB NO. 14053-000 ROBINSON REFINRY MODERN2TN PROJ -MOC
REPORT NO. C38090-58
FOCUS QUANTITY AND UNIT RATE REPORT
SPL AL 2INESM PIPE L21
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 37
BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
ACCT#
> ^v^,Taw** ^'Ti.r^a*arAa**a'aif`c *,rAavWWwV. T<AWa ^aTi>r>afiirv^aV.9.i^r*
OF QUANT
BUCGET
FCST S004
TO THIS BUDGET
OATE
WEEK
$$ ********
FCST
TO THIS
#004
DATE WEEK
*********** *******
.(INIT MAN
BUOGET FCST
TO
~S004
DATE
******** *********
THIS WEEK
SB ALLOY PIPE-RACK S A13L21 LF SMALL BORE AL PIPE S A15L21 LF
INST AL PIPE 2IN E U A17L21 LF
SMALL BORE AL PIPE S AI8L21 LF
SMALL BORE AL PIPE S A19L21 LF
INST AL PIPE 21N 6 U B23L2I LF
INST AL PIPE 2IN E U B28L21 LF
MORRIS-ALLOY PIPE
S09L21 LF
331 651
5/9 304
11 280
10 275
192 496 336 121 293
U 0 623
192 496 336 121 293
0 0 623
0 1041 0 751 0 1101 0 475 0 20 0 611 0 44 0 630
294 958
445 327 668 5800
0 1109
294 958 445 32 7 668
0 0 1171
0
3*15
1.53 1.53
0
1.15
1.93 1.93
0
1.90
1.32 1.32
0
1.56
2.70 2.70
0
1.82
2.28 2.28
0
2.18
.00
.00
0
4.40
.00
.00
0
2.29
1.78 1.88
.00 .00 .00 .00 .00 .00 .00 .00
**TOTAL SPL AL 2INESM PIPE
2441
2061
2061
0 4673
9601
3863
0
1.91
4.66 1.87
.00
TREND FORECAST MH
3863 TREND FORECAST PERF
.97
PERFORMANCE RATIOS
1.00
2.42
.97
.00
9 9
GARRARD 00000740
1
i!! C
o
JOB NO. 14053-000 ROBINSON REFINRY H0DERN2TN PROJ-MGC I REPORT NO. C38090--53
FOCUS QUANTITY AND UNIT RATE REPORT
SPL AL 2.5-61NPIPE L22
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 38
BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT#
UNIT ------------------OF BUCGET
QUANT
--QUANTITY--------------------------
FCST TO THIS
#004
DATE
WEEK'
------------------------ MANHGUHS -------------------------
BUDGET
FCST
_ TO
THIS
#004
DATE WEEK
--------------------UNIT MANHOURS------------------
BUOGEf ^CST TO THIS
................ #004......... DATE
WE EK
LARGE BORE AL PIPE S A12L22 LF LARGE BORE AL PIPE S A15L22 LF LARGE BORE AL PIPE S A18L22 LF LARGE BORE AL PIPE S A19L22 LF LARGE BORE AL SPLO P U21L22 LF
--
SSIUIAL SPL AL 2. 5-61NPIPE
357 121 907
7 230
1622
505 327 1289
48 0
2169
505 327 1289
48 0
2169
TREND FORECAST MH
27292 TREND FORECAST PERF
0 0 0 0 0
0
2.81
1591
574 4017
31 385
2377 5052
18764 1099 0
2377 5052 10764 1099
0
6598
27292
27292
PERFORMANCE RATIOS
4.46 4.74 4.43 4.43 1.67
4.71 15.45 14.56 22.90
.00
4.71 15.45 14.56 22.90
.00
4.07 12.58 12.58
L.OO___ .. 2.81 .....2.81
.00 .00 .00 .00 .00
.00
.......00
GARRARD 00000741
a
o 0
IO
I;O
GARRARD 00000742
e
JOB NO. 14053-000
ROBINSON REFINRY MODERNZTN PROJ-MOC
REPORT NO. C38090--58
FOCUS QUANTITY ANO UNIT RATE REPORT
RCK AL 2.5-6IM PIP LZ4
PERFORMANCE WEEK ENOING
BASEO ON 5/21/82
OATE 5/24/82 PAGE 39 BUDGET WEEK 116 OF 121
> ACCOUNT DESCRIPTION UNIT - ------------------------- QUANTITY--------------------------- ------------------------ MANHOURS-
-UNIT MANHOURS
OF 8UCGET FCST
TO
THIS BUDGET
FCST
TO THIS BUDGET FCST TO THIS
ACCT3 QUANT
........ ..... 3004
DATE
WEEK
3004
OATE WEEK '
MO 4
DATE
WEEK
C pvvr*^*^***^
INST AL RACK LARGE B A16L24 LF
992
0
0 0 752
0
00
.76
.00
.00
.00
LARGE BORE AL RACK P B21L24 LF
360
0
0 0 . 596
0
0
0
1.66
.00
.00
.00
**T0TAL RCK AL 2.5-6IN PIP
1352 0 0 0. 1348 0 0 0 1.00
.00
.00
TRENO FORECAST MH
2068 TRENO FORECAST PERF
2.75
PERFORMANCE RATIOS **
1.00
oo
.00
.00
9
9
1?
9
9
9
11
$ o
o
0
6 '
-
c
*
'
*
> ?3
JOB NO. 14053-000 ROBINSON REFINRY M0DERN2TN PROJ-MOC REPORT NO. C38090--58
FOCUS
QUANTITY AND UNIT RATE REPORT
OU/G CS PIPE
L 70
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE AO
BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCTS
OF QUANT
BUDGET
***********************************
FCST
TO
2004
DATE
********* -A* A. A
A
THIS BUDGET
FCST
TO THIS
WEEK
2004
DATE WEEK
******************** $:$$$$#
BUOGET
FCST SC 04
TO DATE
*******
this
WEEK
INST U/G PIPING
A 16L70 LF
INSTALL U/GROUNU PIP B09L70 LF
INSTALL U/G PIPE
B23L70 LF
INSTALL U/G PIPE
B28L70 LF
INSTALL U/G PIPE
B29L70 LF
INSTALL U/G PIPE
B32L70 LF
INSTALL U/G PIPING 833L70 LF
INSTALL U/G PIPE
B90L70 LF
MORRIS-UNDERGROUND P S09L70 LF
ALLENUNDERGROUNO PIP S29L70 LF
HOKE--UNDERGROUND PI S32L70 LF
2301 9
490 10 5 95
1155 75 1 5 5
2303 117 990 0 180
2091 0
u
10 34 109
2303 117 990 0 180
2091 0 0
10 34 109
**T0TAL OU/G CS PIPE
4151
5834
5834
TREND FORECAST MH
12682 TREND FORECAST PERF
0 0 0 0 0 0 0 0 0 0 0
0
1.21
5083 8
581 22 7
164 2779
130 1 6 9
6263 168
1236 6
468 4257
0 0 20 74 216
6263 168
1236 6
468 4257
0 0 118 77 89
0 0 0 0 0 0 0 0 0 0 0
8790
12708
12682
0
PERFORMANCE RATIOS **
2.21 .89
1.19 2.20 1.40 1.73 2.41 1.73 1.00 1.20 1.80
2.12
1.00
2.72
1.44 1.25
.00 2.60 2.04
.00 .00 2.00 2.18 1.98
2.72 1.44 1.25
.00 2.60 2.04
.00 .00 11.80 2.26 .82
2.18 2.17
1.21 1.21
.00 .00 .00 .00 .00 00 .00 .oo .00 .00 . 00
.00
.00
?e
30
w 33
---------------------- -...................................................... - ------------------- ----------
............... .................
------------------ ------ - -........ -...........- ................ - ....................-- -- -.............................................. --..... -..... -- - -- - -........ ................ ----------------------------
.
; '
e
< ,r ,,
>3
1
,r.
;
.3
'
1!'
1
-
J?
.! 1.2
o S3 o
............................. -
y. S'
- -.............
.................... ---- - -------------------
6.
64 CS 66
cn
"o
o
__________ ______ ___ _____.___ 5
o
GARRARD 00000743
it
*
<>
GARRARD 00000744
c
st 7
,,
9 .0 - ,2 r
16
?? 34 25
75 n
*> n "
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--58
FOCUS QUANTITY AND UNIT RATE REPORT
STM TRACE TBG
180
OF BUDGET FCST
TO THIS BUDGET
ACCt QUANT
004........... DATE 'week
*********************************** *********
$ ****** ********
FCST 004
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE PAGE
5/24/82 41
BUDGET
WEEK 116 OF 121
TO THIS BUDGET FCST
TO
DATE WEEK
004
DATE
*******
rriY**TT r- v-VT4*Tirr
THIS WEEK
o
'
9
5
79
STEAM TRACE TUBING S AObL80 IF
STEAM TRACE TUBING S A11L80 LF
STEAM TRACE TUBING S A12L80 LF
STEAM TRACE TUBING S A13L80 LF
STEAM TRACE TUBING S A14L80 LF
STEAM TRACE TUBING S A15L80 LF
INSTALL STM TRACE TU A16L80 LF
STEAM TRACE TUBING S A17L80 LF
STEAM TRACE TUBING S A18L80 LF
STEAM TRACE TUBING S A19L80 LF
STEAM TRACE TUBING S A21L80 LF
STEAM TRACE TUBING A31L80 LF
STEAM TRACING
B09L80 LF
INST STM TRACE TUBIN B23L80 LF
STEAM TRACING
B28L80 LF
StEAM TRACING
829L80 LF
STEAM TRACING
B32L80 LF
STEAM TRACING
b99LB0 LF
INST stm Trace Tuuin c5iLeo lf
INSTALL STEAM TRACE- C61L80 LF
INSTALL STEAM TRACE- C62L80 LF
INSTALL STEAM TRACE- C63L80 LF
INSTALL STEAM TRACE- C64L80 LF
INSTALL STEAM TRACE- C65L80 LF
INSTALL STEAM TRACE- C66L80 LF
MORRIS-STEAM TRACING S09L80 LF
ALLENSTEAM TRACING S29L80 LF
HOKE--STEAM TRACING S32L80 LF
....
20 20 20 20 20 20 6412 20 20 20 20
20 0
250 50 0 0 50
8893 7
6050 2600 4800 4150 6250
50 50 50
844
844
632
632
2785 2408
2785 2408
1257
1257
1847
1847
00
434 3712
434 3710
984
.... 9 84
444
444
00
00
4400
4400
888
888
00
0 8359
0 8359
874
8 74
800
800
870
870
888 691
808 691
925
925
721
721
3981
3931
478
478
....350 ...... ~ 350
0 0 0 0 0 0 0 0 0_.
0 0 0 c 0 0 0 0 0 0 0 ,0 0 0 0 0 0 ......... 0
11 491
11 431
11 1519
11 966
11 816
11 875
3432
0
11 168
11 3552 , i 59 5
11 191
11 0
0 44
135
3005
27 1327
0 121
00
27 3759
4926
495
4 411
3430
200
1475
130
2811
112
2 355
197
3502~
27 1728
27 686 27" ..... ...... ............... "
491 431 1519 966 816 875
0 163 3652 595 191
0
44 3005
132 7 121 0
3759
495 411 200 130 112 197 122 1447
U4176
0 .55 0 .55 0 .55 0 `55 0 .55 0 .55 0 .54 0 .55 0 .55 0 .55 0 .55 0 .55 0 ;ocr 0 .54 0 S4 0 .00 0 .00 0 .54
0 .57 0 .57 0 .5 7 0 .57" 0 .59 0 .57 0 56
0 .54 0 .54 g" ---------- .54"
.58 .68 .55 .40 .65 .47 .(TO .39 .96 .60 .43 .00 H30 .68 1.49 .00 .00 .45 .57 .51 .23 .15 .16 .21 .17 .43 1.44 1.31
.58 .68 .55 .40 .65 .47 CO .39
.98 ...... .60...
.43 .00 .00 .68 1.49 .00 .00 .45 .57 .51 .23 .15 .16 .21 .17 .36 .87 1.19
.00
it
.00 in 9
.00
1?
.00
n
9.00
M
.00
.00
17
.00 16 9
.00
.GO .00 .00
2: 9
700
.00
.00
.00 .00
7-1 30
.00 .00
3.-
:n
.00
.00
.00 .00
.11 in
.00 .00
AO
A.
.00
-17
.00 AA ......00...... .......
-STOTAL STM TRACE TBG TREND FORECAST MH
39682
39572
395 70
21909 TREND FORECAST PERF
0 1.01
22326
22400
21907
0
PERFORMANCE RATIOS A.A
.56 1.00
.57 1.03
.55 1.01
.00 .00
A6
M
-.... -...... -......... .......-------------
"
-................
-
O
--.......-....
...... -........- - ..................................-
o
_!
6
w
c ?. ft
,u
U M
, ,
2? 23
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PRQJ -MOC REPORT NO. C3809O-58
F 0CU s
CUANTTTY AND UNIT RATE REPORT
DETAIL
. L81
DATE 5/24/82 PAGE 42 PERFORMANCE BASED ON BUDGET WEEK ENOING 5/21/82 WEEK 116 OF 121
OF BUCGET FCST WTti *TAp TwTl. TwT*. ^Wp V. -TA.TAp'PVTAp'^Yp Y<Ap YAp *"Ap3<Ap^*ATpTAp1Jp* AiTAp C^Yp^CTp*TMTpSATT^P YQTpUATp ^ArpTNApTT>Ap ************ S004
------ MANHOURS
TO THIS BUDGET FCST
TO THIS
DATE MEEK
SO 04
OATE WEEK
****** ******** ******* ************$$$#*$
S/0 6 DEKATRACE S/B 1 DEKATRACE S/B 2 DEKATRACE S/B 3 OEKATRACE S/B ACT OEKATRACE S/B 5 DEKATRACE
S/B 8 DEKATRACE S/B 9 DEKATRACE
A06L81 LF
A11L81 LF A12L81 LF A13L81 LF
A14L81 LF
A15L81 LF A i 6L 61 If A18L81 LF
A19L81 LF
20 20 20 20 20 20
0 20
..... ...20___
1148
1456 4200 2520 2100
1904 0
4284
1428____
1148 1456 4200 2520 2100
1904 0
4284
1428
0 0 0 0
0 0 0 0
..... 0
11 368 368 11 794 794 11 754 754 11 1293 1293 11 838 856 11 741 761 000 11 311 311 ....11 _____ 354 ___ ..359
0 0 0 0 0 0 0 0
...... 0
BUDGET
.55 .55 .55 .55 .55 .55 .00 .55 .55
FCST SG04
.32 .55 .18 .51 .40 .39 *00 .07 .25
TO THIS DATE WEEK *rx?^v
.32 .55 .18 .51 '
.41 .40 .00 .07 *25
.00 .00 .00 .00
.00 .00 .00 .00
.00
9
a
,A
,
'? A "1
1A ,
__
$$TOTAL DETAIL
88 5453 5496
0
TRENO FORECAST MH
5496 TREND FORECAST PERF
.52
PERFORMANCE RATIOS
1.00
.52 .52
.00
V
10
U
rj
i
j 1 f
>
^
"
.
u
c9
C
O >o
o Ori
GARRARD 00000745
JOB NO. J4053-000 ROBINSON REFINRY MOOERNZTN PRQJ-MOC >' REPORT NO. C38090--58
FOCUS QUANTITY AND UNIT RATE REPORT
X-RAYESTR RELIEVNG L91
DATE 5/24/82
PAGE 43
PERFORMANCE BASED ON BUDGET
1 WEEK ENDING 5/21/82
WEEK 116 OF 121
o
9
6
UNIT
t)U A is 1 Ilf
OF
BUCGET
FCST
TO
THIS BUOGET
FCST
...................
ACCTS QUANT
#004
DATE
WEEK ` "" ......... . #004
C *
*******
TO THIS BUDGET FCST TO THIS
DATE WEEK
1004
oaTe
WEEK......
******* ********* ******* *
ASSIST XRAY 6 ST KEL A16L91 UNITS
c ASSIST XRAY ST REL B23L91 UNITS ASSIST XRAY ST REL B3ZL91 UNITS
200 100 100
200 100
0
200 loo
0
0 1400 0 225 0 400
3471 483 0
3471 483 0
0 7.00 17.36 17.36 .00
0
2.25
4.83 4.83
.00
0
4.00
.00
.00
.00
9
9 9
c $*TOTAL X-RAYSTR RELIEVNG
400
300
300
0 2025
3954
3954
0 5.06 13.18 13.18 .00
9
TREND FORECAST MH
3954 TRENO FORECAST PERF
2.43
PERFORMANCE RATIOS
1.00
2.43 2.43
.00
c9
9
9
v
19
-'0
:;3
GARRARD 00000746
O
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-5B
FOCUS
QUANTITY AND UNIT RATE REPORT
TIE-IN WORK
L93
'
ACCOUNT DESCRIPTION
,
OF EUCGET FCST
TO
THIS BUDGET
FCST
ACCTIf QUANT
S 004
DATE
WEEK
if 004
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE 44
BUDGET WEEK 116 OF 121
TO DATE
THIS BUDGET WEEK
FCST #CC4
kiuntif?*:--
TO DATE
THIS WEEK
' FAB TIE-IN SPOOLS
B23L93 EA
.1 SSTOTAL TIE-IN WORK
10
TREND FORECAST MH
1 36 36 1 36 36 901 TREND FORECAST PERF
0 0
1.93
13 901 901 0 13 901 901 0
** PERFORMANCE RATIOS **
13.00 13.00
1.00
25.03 25.03 25.03 25.03
1.93 1.93
.00 .00
.0
0
" 13 ;;
21
IS 19 K
?1
/8
l V)
13 53
1
'
GARRARD 00000747
> *
---------- ------- ..........--.... 6? 9 64 CC o
:: o
o
o
JOB NO. 14053-000
ROBINSON REFINRY MODERN!TN PROJ -HOC
* REPORT NO. C3B090-5B
6
'
W) ACCOUNT DESCRIPTION OF EUCGET
..............
ACCTff QUANT
c6
TESTING 6 INSPECTION A16L98 LF
TESTING E INSPECTION B09L98 LF
TESTING INSPECTION B2IL98 LF
to TESTING 6 INSPECTION B23L98 LF
TESTING 6 INSPECTION B29L98 LF 12 TESTING E INSPECTION B32L98 LF
testing e Inspection U33L98 LF
M TESTING INSPECTION B41L98 LF
TESTING INSPECTION B99L98 LF
H, MORRIS-HYOROTESTING S09L98 LF
' ALLENHYDROTESTING
S29L98 LF
.0 TESTING INSPECTION S31L98 LF
HOKE--HYOROTESTING S32L98 LF
63033 0 0
17055 0
253 1455 72732
99 4615 4570 4915 2454
FOCUS QUANTITY AND UNIT RATE REPORT
TE ST INGINSPECTION L98
FCST
TO
#004
DATE
******* *********
90432 0 0
24212 0
544 0
58869
18b 9292 4481 1142 1796
90432 0 0
24212 0
544 0
58869
186 9292 4481
842 1796
THIS WEEK
0 0 0 0 0 0 0 .0 0 0 0 0 0
BUDGET
********
6698 0 0
19-33 0
18 255 5158
7 503 4 33 367 179
FCST #004
16547 75 0
4195 65 11 0
2594 6
959 435
40 249
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 45 BUDGET WEEK 116 OF 121
TO
DATE $$ $$
THIS BUDGET
WEEK $$$ *
FCST #004
TO THIS
DATE
WEEK ...
******* *******
16579
0
.11
.18
.18
.00
75
0
.00
.00
.00
.00
0
0
.00
.00
.00
.00
4195
0
.11
.17
.17
.00
65
0
.00
.00
.00
.00
11
0
.07
.02
.02
.00
0
0
.18
.00
.00
.00
2594
0
.07
.04
.04
.00
6
0
*07
.03
.03
.00
1027
0
.11
.10
.11
.00
664
0
.09
.10
.15
.00
24
0
.07
.04
.03
.00
33
0
.07
*14
.02
.00
2, TOTAL TEST INGE INSPECTION
171181 190954 190654
0 15551
25176
25273
0
.09
*13
.13
.00
oo
"
TRENO FORECAST MH
25283 TRENO FORECAST PERF
1.39
PERFORMANCE RATIOS **
1.38 1.39
30
>
n
:
o
9
8
9
5
6 }
9
9
10 9
17
13
M9
If,
U
is 9
20 21
24 ?e
3` 3t
"
w 39 40
43
4C.
......... -.....
............ -.....
....................... - ................ .....-........ - -- --------- -- -...... --....-..... ------------- -----
j
o
i
GARRARD 00000748
- --.................... -..................... -.........................
.............. -
..........- - -
.... -............. ................. ------------- --------
-- -------------------------------
....... ........... --- -............. -...........-
r,
0
Jj
6
3
tc 12 n ,5
JOB NO. 14053-000 ROBINSON KEFINRY MOOERNZTN PROJ-MGC REPORT NO. C38O9O-50
FOCUS
QUANTITY AND UNIT RATE REPORT
STEEL STRUCTURE
M10
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE 46 BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
ACCT2 ********************
OF QUANT
BUCGET **********
UUAN I l IY
FCST
TO
oo4
DATE
THIS MEEK
BUDGET ********
FCST SQ04
TO OATE
THIS BUDGET WEEK
FCST "004
TO OATE
THIS WEEK
STEEL STEEL
STEEL STEEL STEEL
STRUCTURES STRUCTURES
STRUCTURES STRUCTURES STRUCTURES
A16M10 TONS B09M10 TONS B23M10 TONS 112 BM10 TONS B29M10 TONS
387 13 60 32 5
300 8 7 1 I
300 8 7
l 1
"STOTAL STEEL STRUCTURE
497
317
317
TREND FORECAST MH
18422 TREND FORECAST PERF
0 14530 0 466
0 2385 0 1725
0 200
1747 7 210 650 65 20
17477 210
650 65 20
0 0 0 0 0
0 19306
18422
18422
0
1.55
PERFORMANCE RATIOS $$
37.55 35.85 39.75 53.91 40.00
38.85
1.00
58.26 26.25 92.86 65.00 20.00
58.26 26.25
92.86 65.00 20.00
58.11 58.11
1.55 1.55
.00 .00 .00 .00 .00
.00
.00
a
3
?
8
1C 12
IE
r. ?
GARRARD 00000749
9 Q
o
o o
JOB NO. 14053-COO ROBINSON REFINRY MOOERNZTN PROJ-MGC
ft' REPORT NO. C30O9O-58
FOCUS
QUANTITY AND UNIT RATE REPORT
LADDER'SEPLAT HRL
H20
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/02 PAGE 47
BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT#
OF QUANT
LAOUERS 6 PLATFORMS LAOOERS 6 PLATFORMS PLATFORMS LADDERS PLATFORMS LAOOERS
A16M20 B09M20 B23M20 B2BM20
TONS TONS TONS TONS
BUCGET
58 13 28
1
FCST
TO
THIS BUDGET
FCST
TO THIS BUOGET
#004
DATE
WEEK
#004
OATE WEEK
***********
********** **********
***** ********
********
140 7
34 13
140 7
34 13
0 4575 13144 13144
0 842 1039 1039
0 2075
405 5
4055
0 75 1044 1044
0 78.88 0 64.7 7 0 74.11 0 75.00
UNIT FCST #004
HA fcunniK-'--
TO THIS
OATE
WEEK
T'rn-r'rrvY- V-*TTTr
93.89 148.43 119.26
60.31
93.89 148.43 119.26
80.31
.00 .00 .00 .00
3ST0TAL LADDERSEPLAT HRL
100
194
194
0 7567 19282 19282
0 75.67 99.39 99.39
.00
TREND FORECAST MH
19202 TREND FORECAST PERF
1.29
4* PERFORMANCE RATIOS
1.00
1.29 1.29
.00
<1
9 9 9
9
GARRARD 00000750
o
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC
REPORT NO. C38090-58
6 ''
ACCOUNT DESCRIPTION OF BUCGET
ACCT3 QUANT
6
PIPEWAY STEEL PIPEWAY STEEL PIPEWAY STEEL K. PIPEWAY STEEL PIPEWAY STEEL PIPEWAY STEEL
A16M30 A31M30 B09M30 B2IM30 B23M30 S09M30
TONS TONS TONS TONS TONS TONS
12 1
15 462
62 1
FOCUS
(JUANTITY AND UNIT RATE REPORT
PIPEWAY STEEL
M30
FCST 3004
22 5
42 327
17 1
TO DATE
$$$*$$
THIS WEEK
BUOGET
********
FCST 3004
22 5
42 327
17 1
0 450 0 3B 0 5 74 0 17380 0 2340 0 38
1024 209
1458 16443
816 65
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 48
BUCGET WEEK 116 OF 121
TO THIS DATE WEEK
$
BUDGET
FCST 3004
TO
DATE vrv**r*
THIS WEEK
1024 209
1458
16443 816 39
0 37.50 46.55 46.55 0 38.00 41.80 41.80 0 38.27 34.71 34.71
0 37.62 50.28 50.28 0 37.74 48.00 48.00 0 38.00 65.00 39.00
.00 . 00 .00 .00 .00 00
**TOTAL PIPEWAY STEEL
553
414
414
0 20820
20015
19989
0 37.65 48.35 48.28
.00
TREND FORECAST MH
19989 TRENO FORECAST PERF
1.28
PERFORMANCE RATIOS
1.00
1.28 1.28
.00
16
70 .
71 22 ?i
2/ 28
8
;
e
" ", " " ,t
" : 7*1
?'
"
*
33 3* 3?
,, A3
c
c
o c
......... -................-.......... -............................. -..................... .......... -............. -............. -.....-............... -
-
l
61 f.:
o
GARRARD 00000751
JOB NO. 14053--COO RUBINSON REFINRY MOOERNZTN PROJ-HOC REPORT NO. C38090-58
FOCUS QUANTITY AND UNIT RATE REPORT
MISCELL STRCT STEL M40
PERFORMANCE WEEK ENDING
BASEO ON 5/21/82
DATE 5/24/82
PAGE 49 BUDGET
WEEK 116 OF 121
ACCOUNT DESCRIPTION UNIT---------------------------- QUANTITY---------------------------
OF BUCGET FCST
TO THIS
ACCT3 QUANT
3004
DATE
WEEK
r*rirTTVT^*'rvTW'rY`T'`*rv'r
*******
MISCELL STRUCT STEEL B21M40 TONS
59
5
50
MISC. STEEL
B32M40 TONS 17 22 22 0
MISCELL STRUCTURAL S C50M40 TONS 18 22 22 0
------------------------ MANHOURS---------------------------
BUDGET
FCST
TO THIS
3004
DATE WEEK
4420 411
1220
180 1630 1341
108 1630 1341
0 0 0
--------------------UNIT MANHOURS----------------
BUDGET____FCSTTO ........... JH TS
3004
DATE
WEEK
74.92 24.18 67.78
36.00 74.09 60.95
21.60 74.09 60.95
.00 .00 .00
**TOTAL MISCELL STRCT STEL
94
49
49
0 6051
3151
3079
0 64.37 64.31 62.84
.00
TREND FORECAST MH
3079 TRENO FORECAST PERF
1.2B
PERFORMANCE RATIOS **
1.00
1.31 1.28
.00
5 6
9 10
17 13
15
JOB NO. 14053-000 RUBINSCN REFINRY MODERN/TN PROJ-MOC REPORT NO. C38090-5B
FOCUS QUANTITY AND UNIT RATE REPORT
AREA C INSUL FSC18 NIB
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE 50
BUDGET WEEK life OF 121
ACCOUNT DESCRIPTION ACCT #
UNIT---------------------------- QUANTITY--------------------------- ------------------------ MANHOURS--------------------------------------------------- UNIT MANHOURS
OF BUCGET FCST
TO
THIS BUDGET
FCST
TO THIS BUDGET FCSt
TO
QUANT
#004
DATE
WEEK
#004
DATE WEEK
#004
DATE
= *********** *********
****** *********
*******
AREA C INSULATION FS S00N18 LF
17B30
8786
8786
0 10219
6263
6263
0
.57
.71
.71
**TQTAL AREA C INSUL FSC18
17830
8786
8786
0 10219
6263
6263
0
.57
.71
.71
TREND FORECAST MH
62fe3 TREND FORECAST PERF
1.24
** PERFORMANCE RATIOS **
1.00
1.24 1.24
THIS WEEK
.00 .00
If
i*
oO ' 1
9
1 5 C> `
!1
n
3 1
d o
G ::o' ::o
o
GARRARD 00000753
o
CD
GARRARD 00000754
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-HOC
f? REPORT NO. C3 8090--58
FOCUS QUANTITY AND UNIT RATE REPORT
BRANO EQP IN FSC21 N21
DATE 5/24/82
PAGE 51
PERFORMANCE BASEO ON BUCGET
WEEK ENDING 5/21/82
WEEK 116 OF 121
e ACCOUNT DESCRIPTION UNIT
-QUANTITY-------------------------- ------------------------ MANHOURS--
-UNIT MANHOURS-
OF EUCGET FCST
TO
THIS BUOGET
FCST
TO THIS BUDGET FCST TO THIS
ACCTtf QUANT
S004
DATE
WEEK
?;oo4
DATE WEEK
S004
DATE
WEEK
A. iA. A. A. A.
.A. tA. *A <A
EQUIP INSLN PLT16 FS SOON21 SF
33000
29712
23973
412 11220
9233
9814
331
.34
.31 .41
<=*TOTAL BRANO EQP IN FSC21
33000
29712
23973
412 11220
9233
9814
331
.34
.31 .41
.80
TREND FORECAST MH
12163 TRENO FORECAST PERF
1.20
PERFORMANCE RATIOS 4=
1.00
.91 1.20
2.36
o
9 9 9 9 9 9 9 9 9 9 9
o Oo
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090--58
FOCUS QUANTITY ANO UNIT RATE REPORT
AREAA PIP IN FSC21 N2?
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 52 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION UNIT
-QUANTITY-
-MANHOURS-
-UNIT MANHOURS-
OF EUCGET FCST
TO
THIS BUDGET
FCST
TO THIS BUOGET FCST TO THIS
-
ACCT 0 QUANT
0004
DATE
WEEK
0004
DATE WEEK
0004
DATE
WEEK
*********
************
********* $$$***$*
' PIPE INSLTN PLT16 FS S00N22 SF
71670
50000
20970 2944 25951
18878
10270
912
3 10
s*T0TAL ARE AA PIP IN FSC21
TREND FORECAST MH
71670
50000
20970
24487 TREND FORECAST PERF
2944 1.35
25951
18878
10270
912
** PERFORMANCE RATIOS **
.36 .36 1.00
.38 .38 1.04
49 .49 1.35
.31 .31 .86
9 9
<1*
& #
to
GARRARD 00000755
9 O o Co O
JOB NO. 1*1053-000 ROBINSON REFINRY MODERN!TN PROJ-MOC
9 REPORT NO. C30O9O-5B
F 0C0 S QUANTITY AND UNIT RATE REPORT
AREAB EQP IN FSC29 N23
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/29/82 PAGE 53
BUCGET WEEK 116 OF 121
s
9 ACCOUNT DESCRIPTION UNIT
UNIT MAN
OF EUCGET FCST
TO
THIS BUDGET
FCST
TO THIS BUDGET FCST TO THIS
.......................ACCT# QUANT
#009
DATE
MEEK
#009
DATE WEEK
TRTOTf..... DATE..... SEEK
... ~
e9
SF
12B30
12288
12288
80 3977
1800
609 7
0
.31
P*TOTAL.... AREAB EQP IN FSC29
12830
12288
12288
80 3977
1800
6097
0
.31
TREND FORECAST MH
6097 TREND FORECAST PERF
1.59
PERFORMANCE RATIOS
1.00
.15 .15 .97
.99 .99 1.59
.00 .00 .00
9
3
19
9
9
9
9
O o
o'.
o
o; 9 9
9
GARRARD 00000756
9
9 O
n
ft
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MCC REPURT NO. C38090-50
FOCUS QUANTITY AND UNIT RATE REPORT
AREAS PIP IN FSC24 N24
OATE 5/24/82
PAGE 54
PERFORMANCE BASED ON BUOGET
WEEK ENDING 5/21/82
WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCTJf
UNIT OF eUCGET
QUANT
---QUANTITY----------
FCST
TO
#004
DATE
THIS BUDGET WEEK
-MANHOURS--------------------------
FCSJ
TO THIS
#004 ~ OATE WEEK
------------BUOGET
-UNIT MANHOURS-
_F_C__S_T____ tO
#004
DATE
THIS WEEK
PIPE INSLTN OFFPL FS S00N24 ELF
73914
44000
24767
T^TOTAL.....AREAB PIP IN FSC24
73914
44000
24767
TRENO FORECAST MH
14948 TRENO FORECAST PERF
1330 19957
14750
0414
832
1330 19957
14750
8414
032
1.26
PERFORMANCE RATIOS *4=
.27 .27 1.00
434 *34 1.24
.34 .34 1.26
63 .63 2.32
<1
GARRARD 00000757
t
> ;;o
oO
CO
m O O
GARRARD
O*
c
3
c
JOB NO. 14053-000 ROBINSON REF I NRY MOOERNZTN PROJ-MOC REPORT NO. C38090r58
FOCUS QUANTI TV AND UNIT RATE REPORT
FRPF VSL SKT OFFPL N25
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 55 BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT
UNIT---------------------------- QUANTITY-------------
OF BUDGET FCST
TO
QUANT
#004
DATE
THIS WEEK
BUDGET
------ MANHOU RS--------------
FCST
TO THIS
0ATE WEEK
BUDGET
MANHOURS--
FCSf TO THIS
S0C4
DATE
WEEK
FIREPRF VSSL SKRT OF S0CN25 SF 60TOTAL FRPF VSL SKT OFFPL
TREND FORECAST MH
2200
9747
9746
1032 TREND FORECAST PERF
352 .90
260
2500
1032
135
260
2500
1032
135
** PERFORMANCE RATIOS
.12 1.00
.26 2.17
.11 .90
3.25
IQ
,
9 9
9 "
>1
n 3?
9
36
3
1C 31
o*7
A3
:: o.
:; 3
9
57
:i
ooooo O cn
:
r.Fi ;
:::
:: o
o
1 6 '
"
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ- MOC REPORT NO. C38090--58
ACCOUNT DESCRIPTION
**$$***
ACCTS
UNIT OF EUCGET
QUANT
FOCUS QUANTITY AND UNIT RATE REPORT
FRPF STR STL OFFPL N26
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 56 BUCGET WEEK 116 OF 121
-QUANTITY-
FCST
TO
#004
DAT
THIS WEEK
BUDGET
jA. V. .A. A
--MANHOURS-
FCST
TO
#004
jA. jA. .fc A. .
DATE
THIS BUDGET WEEK
-UNIT MANHOURS-
FCST
TO
#004
DATE
THIS WEEK
FIREPRF STR STEEL OF S00N26 CF S*T0TAL FRPF STR STL OFFPL
TRENO FORECAST MH
1323
2893
2793
2064 TREND FORECAST PERF
197 .20
4661
2000
1993
65
4661
2000
1993
65
** PERFORMANCE RATIOS **
3.52 1.00
.69
.71
.20
.20
.33 .09
in
V 30
GARRARD 00000759
9 O oo o O
e
'
4 : I' 5*
1?
i:,
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PRUJ-MOC REPORT NO. C38090-58
FOCUS QUANTITY ANO UNIT RATE REPORT
FRPF VSL SKT PL 16 N27
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE 57 BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT it
UNIT OF
QUANT
BUCGET
----- QUANT ITY--------------
FCST
TO
0004
DATE
THIS WEEK
-----------------MANHOURS-----------------
BUDGET
FCST
TO THIS
#004
DATE WEEK
--UNIT MANHOURS-
BUDGET FCST
TO
#004
DATE
THIS WEEK
FIREPRF VSSL SKRT-PL SOOM27 SF **T0TAL FRPF VSL SKT PL 16
TREND FORECAST MH
5750
7850
6641
2244 TREND FORECAST PERF
2736 2.38
690
0
1898
436
690
0
1898
436
PERFORMANCE RATIOS
.12
1.00
O
O
.00
.29
.16
2.38
1.33
o
3 O o o 3 3 3
GARRARD 00000760
9 O
o
. A
.
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PRGJ-MCC REPORT NO. C38090-58
FOCUS QUANTITY AND UNIT RATE REPORT
FRPF STR STL PL 16 N28
PERFORMANCE MEEK ENDING
BASED ON 5/21/82
OATE 5/26/82 PAGE 58 BUCGET KEEK 116 OF 121
ACCOUNT DESCRIPTION
.............
............ ACCTS
A A Ar .A. Ar A. A. A. A. .W A A. A' A. A. A. A. A* A. A. A.
UNIT---------------------------- QUANTITY---------
OF BUCGET FCST
TO
QUANT ..................... #004 .....DATE
A A A A A AAA A. <A A. A. jV ^ AA AAA A AA^ A. A. A A A A A
--------- ------------------------ MANHOURS---------
THIS BUDGET
FCST
TO
WEEK
#004
... DATE
A'r. rA'.KMW A'vAr. -Ar. Av. irATAWXA. 'Ar.nA*'AT. AV AbYvA.rAr.vMbYA. T*^b TA. AT. ATAi.rAir. ArT^W A'i.'Ar.
--------- --------------------UNlt MANHOURS-----------------THIS BUDGET FCST TO THIS WEEK ............ " ..... ' #004....... DATE........ WEEK
FIREPRF SfR.STEEL-PL S00N28 SF........ .....
27 .. 1022
213
0
95
0
168"
0 " 3752
700
.73
.00
`TOTAL FRPF STR STL PL 16 TRENO FORECAST MH
806 TREND FORECAST PERF
.22
95 0 168 0 -= PERFORMANCE RATIOS **
1.00
.00
.22
.00
?<
4?
ooo
03
IT
-10
<16
5? 60
fS
CR
10
GARRARD 00'
c
r
' .i A
6
/ c0
*
"
-
JOB NO. 14053-000 ROBINSON REFINRY M00ERN2TN PROJ-MCC REPORT NO. C38090-58
FOCUS QUANTITY AND UNIT RATE REPORT
INSULATE INSTRUMTS N30
PERFORMANCE WEEK ENDING
BASEO ON 5/21/82
DATE 5/24/82 PAGE 59 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
:$ A*
ACCT Hr *A, <A. #
UNIT OF
QUANT fc:*:****
BUDGET
INSTR INSULATION OFF S00N30 EA
FIREPROOFING LUGS
AlbN30 UMTS
FIREPROOFING LUGS
B23N30 UNITS
1 1 1
FCST
TO
THIS BUDGET
FCST
#004
DATE
WEEK
#004
********** ******* ******* ******** ***********
TO OATE
188 827 725
10
827 725
0 0 0
5 0 32 l 849 849 1 808 808
THIS BUDGET FCST
WEEK
#004
$$$$$ ********* ********
TO DATE
32
5,00
.00
3.20
0
1.00
1.03 1.03
. .0
1.00
l.ll
1 11
THIS WEEK
*******
.00 .00 .00
$TUTAL INSULATE INSTRUMTS
7 1657 168 9 32
TREND FORECAST MH
2597 TREND FORECAST PERF
1.04
PERFORMANCE RATIOS
1.00
.66
1.05
.00
o
;
4 6
8
<>
10
,,
IF
y.
? 2 7f o
28
31 o 13 o
3/
o
A?
1
............ -........ 41
- .........-.......................................
........................* ............... ...................-............. --
-................... - -
-.......... -............ -- '......... .......................... .....-..... ------------------ ------- ....................... -........-
GARRARD 00000762
IB
3 ......... -...............................
............................--
................................ - ......------- --------------- ---------
r,'
- -......................... -------------------------
6/
.................. -.............-
..................................................
o
o
oo
GARRARD 00000763
0
7
(i ' t)
M 16
10 19 ?1
a
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PRQJ-MOC REPORT NO. C30090--5B
FOCUS GUANTITY ANO UNIT RATE REPORT
FIREPROOF STRUT SL N40
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/02 PAGE 60 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT it
OF QUANT
eUCGET
FIREPROOF STRUCT STE B23N40 CF FIREPROOF STRUCTURAL B28N40 CF FIREPROOF STRUCT STE B29N40 CF
3537 891 243
FCST 3004
0 0 0
TO DATE
THIS BUDGET
FCST
TO
WEEK
3004
DATE
******* *********************
0 0 12462 0 0
0 0 3200 0 0
0 0 900
0
0
THIS WEEK
BUDGET
FCST TO THIS
3004
DATE
WEEK
******** TTVn-TT-r-rvr-r'rT
0
3.52
.00
.00
.00
0
3.59
.00
.00
.00
0
3.70
.00
.00
.00
SSTQTAL FIREPROOF STRUT SL
4671
0
0 0 16562
0
0
0
3.55
.00
.00
.00
TRENO FORECAST MH
0 TREND FORECAST PERF
** PERFORMANCE RATIOS
1.00
.00
.00
.00
zs 'I?
?
3 '
l? '
70
?;
7fc ' " 39 V
<12 44
o
........ -.......................... -
51
J; 9
s:
a
.............. -..............- --..........-.....--
........................... *
O'"' ............----------- ---------------------
6i
6FT
t' C
o
C!
.......--....... ........ _____________
o f
o
o
JOB NO. 1 <(053-000 ROBINSON REFINRY MODERN/TN PROJ-MQC REPORT NO. C38090-58
ACCOUNT DESCRIPTION UNIT------------------OF BUCGET
Af.CT m..... QUANT................. "
FOCUS
UUANTITY AND UNIT RATE REPORT
POWER DISTRB EQP
Pll
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 61
BUCGET WEEK 116 OF 121
--QUANTITY------
FCST
TO
S004..... ~ DATE
THIS WEEK
-MANHOURS------------
BUDGET
FCST
TO
...... "SQOT " DATE
THIS WEEK
BUDGET ..... '
-UNIT MANHOURSFCST TO THIS
.1004
DATE .......WEEK
POWER DISTRIBUTION E B30P11 EA D1STRBT HGH VLTG PWR C50P11 EA
TOTAL' POWER DIS TRB EQP......... .
TRENO FORECAST MH
12 11 11 815 TRENO FORECAST PERF
2590 360
359 456
359 456
287.78.. ...44.88 44.88 120.00 152*00 152.00
0 2950
815
815
0 245.83 74.09 74.09
.31
PERFORMANCE RATIOS
1.00
.31
.31
*00 .00
.00
.00
GARRARD 00000764
?
8
13 14
If.
"
K
?t
r\
.'8
ii
14
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTA PROJ-MOC REPORT NO. C38090-58
ACCOUNT DESCRIPTION UNIT---------OF EUCGET
. ACCT # QUANT
FOCUS QUANTITY AND UNIT RATE REPORT
POWERECONTROL EQUP P12
PERFORMANCE WEEK ENOING
DATE 5/24/82
PAGE 62
BASED ON BUOGET
5/21/82
WEEK 116 OF 121
--QUANTITY
FCST
TO
#004
DATE
THIS WEEK
------- MANHOURS
BUDGET
FCST
TO
#004
DATE
THIS WEEK
. .. -UNIT MANHOURS--
BUDGET FCST TO THIS
#004
DATE
WEEK
0
a
s
POWER CONTROL EOUI A16P12 EA POWER CONTROL EOUI B09P12 EA
POWER E CONTROL EGUI B21P12 EA POWER CONTROL EQUI B23P12 EA POWER CONTROL EOUI B28P12 EA POWER CONTROL EGUI U29P12 EA POWER CONTROL EOUI B32P12 EA POWER CONTROL EOUI C51P12 EA POWER CONTROL EGUI C52P12 EA POWER CONTROL EOUI C53P12 EA POWER CONTROL EQUI C54P12 EA
POWER CONTROL EOUI C55P12 EA
127 16
10
44
8
11
8
22
9 23
22
20
204 13
a
52
0
17 15 19 24 41 49 60
204 13
8
52
0
17 15 19 24 41 49 60
SSTGTAL POWERECONTROL EQUP
320
502
5 02
TREND FORECAST MH
12022 TREND FORECAST PERF
POWER E CONTROL EQUI C50P12 UNITS
108
100
100
0 6218 0 755 0 640 0 2 400 0 294 0 480 0 480 0 7 72 0 160 0 480 0 810 0 320
5664 174 97
1239
8
289 602 593 440 915 1099 821
5745 174 97
1239
8
289 602 593 440 915 1099 821
0
.59
13809
11941
12022
** PERFORMANCE RATIOS
0 1U20
462
462
48 0.
0 0 0 0 0 0 0
0 0
48
0
48.96 47.19 64.00 54.55 36.75 43.64 60.00 35.09 17.78 20*8 7 36.82 16.00
43.15
1.00
9.44
27.76 13.38 12.13 23.83
.00
17.00 40.13 31.21 18.33 22.32 22.43 13.68
23.79
.59
4.62
28.16 13.38 12.13 23.83
.00
17.00 40.13 31.21 18.33 22.32 22.43 13.68
23*95
.59
4.62
.00 .00 .00
9;
.00
.00
.00
.Off""" "
.00 .00
.......00
.00 .00
:
?! '
... ...... . ?'
A :
.00
:
.00 .00
;
**TOTAL POWERECONTROL EQUP TREND FORECAST MH
108
100
100
462 TRENO FORECAST PERF
0
.49
1020
462
462
0
PERFORMANCE RATIOS **
9.44
1.00
4*62 .49
4.62 .49
.00 .00
:
.\
.
:>
r ii
r r
r *
:7
G)
>
73
73
>
.i -------
73
D M
O v ........................................... O
Ooo O
(c3n1
.
r
6 C
r
................................... ------------------- ------------ ............................ ..........................*. .
/o :...if
it oj
.............................................. ">
` O'
JOB NO. 14053--000 ROBINSON REFINRY MOOERNZTN PROJ-MUC REPORT NO. C36090-58
......... ............... -
FOCUS
QUANTITY AND UNIT RATE REPORT
UPS EQUIP&STOBY
P13
--
ACCOUNT DESCRIPTION
..............
..................ACCT 0
A* A jJ. X X X XX X X ^A. X X X X X X X X X X jJj
UNIT OF
QUANf
BUCGET
FCST 0004
TO DATE
THIS BUDGET WEEK
FCST 0004
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 63 BUCGET WEEK 116 OF 121
TO THIS
DATE WEEK $$$$$$$
BUDGET
VIVA 9 1 1 ni|M UU U J
FCST
TO
0004
DATE
THIS WEEK
EMERGENCY E STANDBY A16P13 EA EMERGENCY E STANDBY B23P13 EA EMERGENCY E UPS EQUI C50P13 EA
17 16 16
1 00
444
<=*TOTAL ....
UPS EQUIPESTDBY
----- ------
TRENO FORECAST MH
2081
22
2U
20
TREND "FORECAST" PERF `
0 0 0
0
-73
800 400 2086
524
0
1557
524
0
1557
3286
2081
2081
$$ PERFORMANCE RATIOS
0 47.06 32.75 32.75
0 400.00
.00
.00
0 521.50 389.25 389.25
0 149.36 104.05 104.05
1.00
.7 3
.73
00
.00 .00
.00
.00
o
9
8
79
9
9
to 9
1?
9
,, 9
GARRARD 00000766
9 o
e
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC r REPORT NO. C38090--58
FOCUS
QUANTITY AND UNIT RATE REPORT
OTHER ELECT EQUIP
P15
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 65
BUCGET WEEK 116 OF 121
o ACCOUNT DESCRIPTION UNIT
OF BUCGET FCST
t *$$4=4^4=:* 4=4= *4=4:4:
ACC T # QUANT
#004
TO DATE
THIS WEEK
BUDGET ***
FCST #004
TO DATE
THIS BUOGET WEEK
FCST #004
TO DATE
THIS WEEK
Aj AA
OTHER ELECTRICAL EQU C50P15 EA
**TOTAL OTHER ELECT EQUIP
131 131
204 204
204 204
0 , 4755 0 4755
3912 3912
3912 3912
0 36*30 19*18 19.18 0 36.30 19.18 19.18
.00
.oo
TREND FORECAST MH
3912 TREND FORECAST PERF
.53
4=4= PERFORMANCE RATIOS 4=4=
1.00
.53
.53
.00
9
;
5
g9
8
9
"
15
9
16
9IB
?C 21
9?:
?: 74 ?r
77 9
9
9
9
9
GARRARD 00000768
9
o
JOB NG. 14053-000 ROBINSON REFINRY MOOERNZTN PRQJ-MOC REPORT NO. C38090-58
FOCUS QUANTITY AND UNIT RATE REPORT
PROGRAM CONTROLLER P16
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82
PAGE
66
BUDGET
WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT#
UNIT OF
quant
******
BUDGET
--QUANTITY
FCST
TO
if 004
DATE
------MANHOURS
THIS BUDGET
FCST
WEEK
#004
****** ****** ***********
TO DATE
THIS WEEK
-UNIT MANHOURS-
BUDGET FCST
TO
#004
DATE
.**:*.* $* $ $ *$ * $ $#
THIS WEEK
REDUNDANCY ALARMS
A16P16 EA........
PROGRAMABEL CONTR MA C50P16 EA
PROGRAM CONTR SATELL C51P16 EA
PROGRAM CONTR SATELL C52P16 EA
PROGRAM CONTR SATELL C53P16 EA
PROGRAM CONTR SATELL C54P16 EA
PROGRAM CONTR SATELL C55P16 EA
PROGRAM CONTR SATELL C56P16 EA
259 3
34 17
...
20
20
38 28
0
4 32 31
0
2
36
0
0
4 32 31
0
2
36
0
......**TQTAL PROGRAM CONTROLLER
......... 419
..... 105 ~....... 105
TREND FORECAST MH
663 TREND FORECAST PERF
0 0 0 0 0 0 0 0
---
.18
320 1580
517 258 262
262 522 272
0
91 55 69
122
185 141
0
0
91 55 69
122
185 141
0
0 0 0 0 0 0 0 0
3993
663.."... 663....
0
PERFORMANCE RATIOS **
1.24 526.67
15.21 15.18 13.10 13.10 13.74
9.71
9.53
1.00
.00
22.75 1.72 2.23
.00
92.50 3.92
.00
.GO 22.75
1.72 2.23
.00
92.50 3.92
.00
.00 .00 *00 .00 .00 .00 .00 .00
6.31... 6.31 ....... .00......
.18
.18
.00
6 1
4
f 9 Ip
17
*
JOB NO. 14053-COO ROBINSON REFINRY MQDERN2TN PROJ-MOC REPORT NO. C 38090- 58
FOCUS
GUANTITY AND UNIT RATE REPORT
RGS CONDUIT MAINS
P20
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82
PAGE
6T
BUCGET
WEEK 116 OF 121
ACCOUNT DESCRIPTION
ACCTS ************ ********
OF BUCGET QUANT
********
INST A/G RGS COND MA INST A/G RGS CONO MA INSTALL A/G RGS COT INST A/G RGS COND MA INST A/G RGS CONO MA INSTALL A/G RGS COT
C50P20 C51P20 C52P20 C53P20 C54P20 C55P20
LF LF LF LF LF LF
1400 4300 1500 3295 5230
1000
WU 1 J. * V
FCST
TO
004
DATE
2561 3485
433 6112 14774 1789
2561 3485
433 6112
14774 1789
THIS BUDGET WEEK
0 1090 0 3370 0 1175 0 2582 0 4382 0 7 80
FCST 004
3296 3255
488 5165 6161
739
TO OATE
THIS BUDGET FCST
MEEK
~1?C04
****$***
TO DATE
***
THIS WEEK
3296
0
.78
1.29 1.29
.00
3255
0
.78
.93
.93
.00
488
0
.78
1.13 1.13
.00
5165
0
.78
.85
.85
.00
6161
0
.84
.42
.42
.00
739
0
.78
.41 .41
.00
**TOTAL RGS CONDUIT MAINS
16725
29154
29154
u 13379
19104
19104
0
.80
.66
.66
.00
TREND FORECAST MH.............19104.... TRENO FORECAST PERF
.81
** PERFORMANCE RATIOS
.....
1.00 ............ .81
.81.... ..... .00
8
IP 17 13 .f. 'B
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PRO J- MOC REPORT NO. C 3 6090-58
FOCUS QUANTITY AND UNIT RATE REPORT
RGS BRANCH CONOUIT P21
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 68 BUOGET WEEK 116 OF 121
`
ACCOUNT DESCRIPTION
3
OF BUCGET FCST
TO
********
f,
A C C T if QUANT
#004
Afc# * i#. JG .A. .j. .Aj WC *A
********** *******
DATE
THIS WEEK
BUDGET
FCST
S004
******** ***********
TO DATE
THIS WEEK
BUOGET
.HMfT
FCST #004
UAMlimiDC.
TO DATE ******
THIS WEEK
INSTALL A/G RGS CONO A16P21 LF " PLT 31 ELECT ICOMPOS A31P21 LF 9 INSTALL A/G RGS CONO B09P21 LF
INSTALL A/G RGS CONO B21P21 LF 11 INSTALL A/G RGS CONO B23P21 LF
INSTALL A/G RGS CONO B28P21 LF " INSTALL A/G RGS CONO B29P21 LF
INSTALL A/G RGS COND B30P21 LF INST A/G RGS CONOUIT B32P21 LF ,r, INST A/G RGS CONO BR C50P21 LF INST A/G RGS COND BR C51P21 LF INST A/G RGS COND BR C52P21 LF ,4 INST A/G RGS COND BR C53P21 LF .C INST A/G RGS COND BR C54P21 LF ?! INST A/G RGS COND BR C55P21 LF ?? INST A/G RGS CONOUIT C56P21 LF M REPLACE FLEX CONDIT~ C61P21 LF REPLACE FLEX CONDIT- C62P21 LF
REPLACE FLEX CONDIT- C63P21 LF -v, REPLACE FLEX CONOIT- C64P21 LF
REPLACE FLEX CONDIT- C65P21 LF REPLACE FLEX CONOIT- C66P21 LF
52878 9
3814 2700
21915 5150 3685 200
5650 3550 16583 3624 11850 18318 4350 2280
37 100 1010 1000 100
50
79819 1706 5250 600
26500 5000 7500 245 7000 3965
13453 4345
12284 16641
5301 4875
915 36 89
1790 2326 1348
1094
79819 1706 5250 600
26500 5000 7500 245 7000 3965
13453 4345
12284 16641
5301 4875
915 3689
1789 2326 1348
1094
0 29106 05 0 2259 0 1696 0 12456 0 2729 0 2285 0 560
0 ' 4536 0 1917 0 9099 0 1648 0 6189 0 9399
0 2236 0 2104 0 20 0 45
0 557
0 516 0 49 0 51
45960 793
1840 291
10476 1872 2895 111 2955 2611 7300 1901 7555 9718
2251 1968
489 1137
627 1170
274 767
47120 793
1840 291
10460 1872 2895 111 2955 2611 7300 1901
7555 9718
2251 1968
489 1137
627 1170
274 767
764 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0
.55 .56 .59 .63 .57 .53 .62 2.80 .80 .54 .55 .45 .52 .51
.51 .92
.54 .45
.55 .52 .49
1.02
.58 .46 .35 .49 .40 .37 .39 .45 .42 .66 .54 .44 .62 .58
.42 .40 .53 .31 .35 .50 .20 .70
.59 .46 .35 .49
.39 .37 .39 .45 .42 .66 .54 .44 .62 .58
.42 .40 .53 .31 .35 .50 .20 .70
.00 .00 .00 .00
GO .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00
.00 .00 .00" .00 .00 .00
**TOTAL RGS BRANCH CONOUIT
158853 205646 205645
0 89462 104961 106105
764
.56
.51
.52
.00
"
TREND FORECAST MH
106105 TREND FORECAST PERF
.91 '
** PERFORMANCE RATIOS **
1.00
.90
.91
.00
a
a
?
13
l>.
?: z* ?'
!.! * V
4(
l
SI 5-
GARRARD 00000771
o-
-........... ............. - ------------------------------......................
...................... .................
6 6*
6/ o
0
o
7
o
S
o
C
1
'?
,,
JU3 NO. 14053-000 ROBINSON REF INRY MOUERNZTN PROJ-MOC
REPURT NO. C 38090-5 8
FOCUS
QUANT I TV AND UNIT RATE REPORT
U/G CONDUIT
P22
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 69 BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCTii
UNIT -
--QUANTITY---------- --------- ------------------------ MANHOURS--------------------------- --------------------UNIT MANHOURS------------------
OF BUCGET FCST
TO
THIS BUDGET
FCST
TO THIS BUDGET FCST
TO
THIS
QUANT
#004
DATE
WEEK
J!004~"... DATE WEEK
5004
OATE...... WEEK "
rwir4*vrT`<i`*AAwAwvt wtxwA AwVI*.*rirvAwwwwwwwA wrirvwi* wn* irJ*brATAAAJbTJ>TiMrTirv*virv*TTTA^*ATArAVAwA. vAWvkvAAT> AVXVit>'rA`r*AAAvAJTk AT
INST U/G CONOUIT INST U/G CONDUIT
B32P22 LF C50P22 LF
SSTOTAL U/G CONDUIT
1000
320
320
0 160
46
46
0
.16
14
.14
.00
3440
5390
5390
0 1115
152 8
1528
0
.32
.28 .28
.00
4440
5710
5710
0 1275
1574
1574
0
.29
.28
.26
.00
TREND FORECAST MH
1574 TREN0 FORECAST PERF
.88
4* PERFORMANCE RATIOS
1.00
.88
.88
.00
18
?| ??
9
9
/
GARRARD 00000772
9
d
JOB NO . 14C53-000 ROBINSON REFINRY MQDERNZTN PRO J -MOC REPORT NO. C38090-58
F 0CU s
QUANTITY AND UNIT RATE REPORT
NON -METALLIC COND
P23
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
OATE 5/24/82 PAGE 70 BUDGET WEEK 116 OF 121
rYYTTirr-r
ACCTtf
UNIT OF BUDGET
QUANT $ ***********
FCST #004
TO THIS BUDGET
DATE
WEEK
****** *********
FCST #004
TO THIS
DATE WEEK *******
BUDGET FC St
#004 $******$
TO DATE
This WEEK
INSTALL INSTALL INSTALL INSTALL
NON-MET NON-MET NON-MET NON-MET
CONCI CONO COMB COND
A16P23 B23P23 B29P23 B30P23
LF LF LF LF
25500 3100 900 300
17676 3470
0
0
17676 3470
0
0
0 4117 0 400 0 160 0 320
4183 563
0
0
4183 563
0
0
0
16
.24
.24
.00
0
.13
.16
.16
.00
0
18
.00
.00
.00
0 1.07
.00
"TOTAL NON-METALLIC COND
298U0
21146
21146
0 4997
^746
4746
0
.17
.22
.22
.00
TREND FORECAST MH
4746 TREND FORECAST PERF
1.44
PERFORMANCE RATIOS **
1.00
1.44 1.44
.00
O O
9 9
9
9
9
9
io
IO
GARRARD 00000773
e
' ft
f
6
f
" ,7 13
10
JOB NO 14053-000 ROBINSON REFINRY MODERN2TN PROJ-MOC REPORT NO. C3B090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
CABLE TRAY
P25
PERFORMANCE WEEK ENDING
.
BASEO ON 5/21/82
OATE 5/24/82 PAGE 71 BUDGET WEEK 116 OF 121
o 9
w*i*v
ACCTff
mrTVTrT
UNIT OF
QUANT
BUCGET
FCST .004
TO THIS
DATE
WEEK
********
BUDGET
FCST
TO
r004
DATE
******* ************
THIS BUDGET
WEEK *:$$$
**
uit i i rtMiwiuurj
FCST
TO
SC04
DATE
1
1
!
INSTALL CABLE TRAY INSTALL CABLE TRAY INSTALL CABLE TRAY INST CABLE TRAY INST CABLE TRAY INSTALL CABLE TRAY INSTALL CABLE TRAY INSTALL CABLE TRAY INSTALL CABLE TRAY
A16P25 LF B23P25 LF B29P25 LF C50P25 LF C51P25 LF C52P25 LF C53P25 Lf C54P25 LF C55P25 LF
10 400 820 11220 100 200
5 100
.......... 400
895 0 0
10920 80
250 440
9r
..... 542
895 0 0
10920 80
2 50 440
97
_ 542
0 15 0 240 0 1360 0 16452 0 160 0 320 08 0 160
0 _ 640
1268 0 0
15638 907
32 8 879 335
537
1272 0 0
15638 907
328 879 335 537
0
1.50
1.42 1.42
0
.60
.00
.00
0
1.66
.00
.00
0
1.4 7
1.43 .. 1.43
0 1.60 11.34 11.34
0
1.60
1.31 1.31
0
1750
Z.00 ~2 00
0
1.60
3.45 3.45
0
1.60
.99
.99
SPTOTAL CABLE TRAY
13255
13224
13224
0 19355
19892
19896
0
1.46
1 .50 1.50
TREND FORECAST MH
19896 TRENO FORECAST PERF
1.01
s# PERFORMANCE RATIOS **
1.01 1.01
N*
oo o
O
THIS WEEK
9 9
.00 .00 .00 .00 .00 .00 .00.......... ' .00 .00
9
so 35 to
43
oo
GARRARD 00000774
;; o
o
GARRARD 00000775
GARRARD 00000776
cn
6
f) 3
c
c 17
<
1/
71 7?
7.1
?
?K 7)
;e
?<i
17
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090--58
ACCOUNT DESCRIPTION ACC T #
UNIT UF
QUANT
BUDGET
FOCUS
QUANTITY AND UNIT RATE REPORT
600V81KV CABLE
P31
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 73 BUDGET WEEK 116 OF 121
--QUANTITY---------------
FCST
TO THIS
#004
DATE
WEEK
BUDGET
------- MANHOURS FCST
#004
.
TO DATE
__.
THIS WEEK
----
BUOGET
UNIT MANHOURS--
FCST TO THIS
#004
DATE
WEEK
PULL WIRE 600V & IKV PULL WIRE 600V 8 IKV PULL WIRE 600V t 1KV PULL WIRE 600V 8 IKV PULL WIRE 600V 8 1KV PULL WIRE 600V 8lKV PULL WIRE 600V 8 IKV PULL WIRE 600V 6 IKV PULL WIRE 600V 8 1KV 600 V 6 IKV WIRE PULL WIRE 600V 6 1KV PULL WIRE 600V 8 IKV PULL WIRE 600V 8 IKV PULL WIRE 600V 8 1KV PULL 600V/1KV WIRE PULL 600V/1KV WIRE PULL 600V/I KV WIRE PULL 600V/1KV WIRE -
600V/1KV WIRE PULL 600V/1KV WIRE -
A16P31 H09P31 B21P31 B23P31 B28P31 B29P31
B32P31 C50P31 C51P31 C52P31 C53P31 C54P31 C55P31 C56P31 C61P31 C62P31 C63P31 C64P31 C65P31 C66P31
LF LF LF LF LF
LF LF LF
LF...... LF LF LF LF LF LF
LF LF LF LF
LF
297010 36200 15100 66360 15420 9200 13500 7260 581 180 25 1175 580 75 19
20
375 25
20
25
252905 17400
1200
64000
12 000
12400 23870 14200
8290 6 404 12180 8804 39632 5815
1200
6972 1357 6017
~0
0
252905 17400
1200
64000
12000
124C0 23870 14200
8290 6 404 12180 8804 39632 5815
1200
6972 1358 6017 '0
0
S3T0TAL 600VS1KV CABLE
463150 494646 494647
TRENO FORECAST MH
13488 TRENO FORECAST PERF
0 8448 6701 6732 10 .028
0 805
328
328
0 .02 2
0 560 0 1915
74 1259
74 1259
0 .037 0 .029
0 397
122
122
0 .026
0 1037
505
50 5
0 .113
0 358
728
728
0 .027
0 218
759
759
0 .030
0 31 369 369 0 .053
0 9 111 111 0 .050
0 1 616 616 0 .040
0 47 200 200 0 .040
0 31 611 611 0 *053
0 3 158 158 0 .040
0 1 37 37 0 .053 0 j-- 381 381 0 .050
0 19 41 41 0 .051
0 1 443 443 0 .040
"0
1
0'
0
0 .050
0 1 14 14 0 .040
0 13884
13457
13488
10
.030
*
.798
$$ PERFORMANCE RATIOS
1 .000
*027 .019 .062
.020
.010
.041 031 .053 .045 .017 .051 .023 .015 .027 C31 053 .030 .074 000
.000
.027 .019 .062
.020
.010
.041 031 .053 .045 .0 17 .051 .023 .015 .027 .031 .055 .030 .074
.000
.000
.027 " .027
.796 .798
000
.000 .000 .000 .000 .000
.cob
.000 .000 .000 .000 .000
GOO 000
.000 .000 .000 .000 .000 .000
.000
.000
>5 30
17
..................
''
.......................................... ..........
....... -......... .......... .......... ' ............. " -......... ......-..........
---- ------ ----- ------ -------------
----- ---------
<r -1'
n
;o
.?
S'
-
o
9
} 4 5
8 10
t? 13
16 " 70 ?! ?; 74 2 ?f
79 30 37 33 31 16
1? 43
46
r.1
V
S'
!>7 r.n
60
6
o06
C-'I
; n
Q
o
m
1 'i 8
0
?
\--
J08 NO. 14053-000 ROBINSON REFINRY MOOEKNZTN PROJ- MOC REPORT NO. C38090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
5KVE LARGER CABLE
P32
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
OATE 5/24/82 PAGE 74 BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION UNIT -
--QUANTITY---------- ---------- ------------------------ manhours------------- ------------ --------------------UNIT MANHOURS------------------
OF EUCGET FCST
TO
THIS BUDGET
FCST
TO THIS BUDGET fCST______TO
THIS
ACCT it QUANT
I!004
DATE
WEEK " .......... ~~ 3004
DATE ...WEEK
3004
DATE
WEEK
4 rr*v*r*TTTV:rv'**Y;r'rr:rrT*4`r:!:v**'!:TTi::rT?ri
PULL PULL PULL PULL PULL
CABLE CABLE 5KV E CABLE CABLE
5KV E 5KV E ABOVE 5KN E 5KV E
ABU ABO CAB ABO ABO
A16P32 B21P32 B23P32 B32P32 C50P32
LF LF LF LF LF
SSTOTAL 5K V E LARGER CABLE
TRENO FORECAST MH
14400
1
14 3000
12200
18285
0
1700 4400
10000
18285
0
1700 4400
10000
29615
34385
34385
2499 TREND FORECAST PERF
0 0 0 0 0
0
.866
1110
81
1
240 1223
725
0
25 126 1621
725
0
25 128 1621
2655
2497
2499
PERFORMANCE RATIOS
0 .077 0 81.000 0 .071 0 .080
0 .100
0 .090
1.000
.040
.000
.015 .029 .162
OTT
.865
.040
.000
.015 .029 .162
.^73
.866
.000 .000 .000 .000 .000
.000
.000
GARRARD 00000777
o co
O
0 ti
> * 3 4
>
6
>
10
n 4
IB
"
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ- HOC REPORT NOi C38090-58
F 0CUS
QUANTITY AND UNIT RATE REPORT
ELECTETC WIRE
P33
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE 75 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT#
UNIT OF eUCGET
QUANT
PULL PULL PULL PULL PULL PULL PULL PULL PULL PULL PULL PULL PULL
ELECTRNIC TC ELECTRNIC TC ELECTRNIC 6 TC ELECTRNIC TC ELECTRNIC TC ELECTRNIC TC ELECTRNIC TC ELECT TC MIRE ELECT TC WIRE ELECT TC WIRE ELECT E TC WIRE ELECT TC WIRE ELECT TC WIRE
A16P33 B09P33 B23P33 B28P33 B29P33 B32P33 C50P33 C51P33 C52P33 C53P33 C54P33 C55P33 C56P33
LF LF LF LF LF LF LF LF LF LF LF LF LF
942 00 250
40375 3670
17100 3800
74800 99000
63300 44975 100932 83000 67000
FCST #004 *$**$
86150 2265
30000 3065
15700 3800
11101
32303 8740
42090 38462
2678 4420
TO DATE
THIS BUDGET
FCST
TO THIS BUDGET
WEEK
#004
DATE WEEK
r-ri TT'VTT ******** <=*=**:!:***$*: $$$*$$$ $$$$$
86150 2265
30000 3065
15700 3800
11101
32303 8740
42090 38462
2678 4420
0 4624 0 305 0 1792
0 222
0 875 0 190 0 3343 0 3168 0 1818 0 1855 0 3263 0 2512 0 2263
4961 77
1293 130 346 52
1144 838 174
1147 1347
88
181
4961 77
1293 130 346 52
1144 838 174
1147 1347
88
181
0 .049 0 .049 0 .044 0 .060 0 .051 0 .050 0 .045 0 .032 0 .029 0 .041 0 .032 0 .030 0 .034
FCST #004
.058 .034 .043 .042
.022
.014 .103 .026
.020
.027 .035 .033 041
TO DATE
.058 .034 .043 .042
.022
.014 .103 .026
.020
.027 .035 .033 .041
THIS WEEK
.000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000
SSTOTAL ELECTETC WIRE
698402 280774 280774
0 26230
11778
11778
0
a 038
042 .042
000
TREND FORECAST MH
11778 TREND FORECAST PERF
.995
PERFORMANCE RATIOS **
1 .000
.99 5 .995
.000
.'8
10 11
o
8
4 5
G
fl * 1C 17 n M
?l
?r ? ?II 30
3' 3f
:n *0
'll
Jfi
.... -.... -....... -- -----.......-...-... ------------------ -................
GARRARD 00000778
" "
53 fi( 01 o;
"
...... -----
-- ...... ..... - ............. .......--
c
oo iiittt iiiiiiittttttt
GARRARD 00000779
JOB NO. 14053-000 ROBINSON REFINRY MODERN/TN PROJ-MOC REPORT NO. C38090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
TERMNTN 600VE1KV
P34
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
OATE 5/24/82 PAGE 76 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION UNIT
OF EUCGET FCST
TO THIS BUDGET
ACCT # QUANT
#004
OATE
WEEK
VT-rT'rvY'rTVTVViri-r-rrTvrTr-rTTVA **************** ********** rTYvvrv Trvvrv *********
FCST #004
TO OATE
THIS BUOGET
WEEK ******
NuniiR*:-
FCST
TO
#004
DATE
********
THIS WEEK
' TERMINATIONS 600V 6 A16P34 EA n TERMINATIONS 6O0V 6 B09P34 EA 9 TERMINATIONS TESTI B21P34 EA
.0 TERMINATIONS 600V U23P34 EA " TERMINATIONS 600V E B28P34 EA ,P TERMINATIONS 600V EK B29P34 EA
TERMINATIONS 600V E B32P34 EA M TERMINATIONS 600 1 C50P34 EA
TERMINATIONS 600V E C51P34 EA ,0 600 V E IKV TERMINAT C52P34 EA
TERMINATIONS 600V E C53P34 EA IB TERMINATE WIRE 600V/ C54P34 EA 19 TERMINATIONS 600V E C55P34 EA
TERMINATIONS 600V C56P34 EA
21 TERMINAT IONS-600V - C61P34 EA TERMINATI0NS-600V - C62P34 EA
TERMINAT IONS-600V - C63P34 EA
TERMINAT IONS-600V - C64P34 EA r, TERMINAT IONS--600V - C65P34 EA rf TERMINATIONS-600V - C66P34 EA
4148 315
20
1168
88
189 158 600
5 15
20
15 5 5 5
10
11
10
5 5
5786
100
50 800
100
300 150 652 230 " 320 274 155 751 335 258 155
72 193
0
66
5786
100
50 800
100
300 150 652 2 30 320 274 155 751 335 258 155
72 193
0
66
0 2353
0 201
4029 54
4092 54
58
0
.57 *64
.70 .54
.71 .54
.00 .00
0 157
126
126
0
7.85
2.52 2.52
.00
0 702 0 139
238 29
238 29
0
.60
.30
.30
.00
0
1.58
.29
.29
.00
0 138 0 204 0 386
141 143 378
141 143 378
0
.73
.47
.47
.00
0 1.29 .9 5 .95 *00
0
*64
.58
.58
.00
0 _ _ Q3
0
329 73
329 73
0 0
.60
.53
1.43 .23
1.43 .23
.00 .00
0 11
46
46
0
.55
.17
.17
.00
0
8
113
113
0
.53
.73
.73
.00
0
3
248
248
0
60
.33
A 33
.00
0
3
151
151
0
.60
.45
.45
.00
0
3
83
83
0
.60
.32
.32
.00
0 6 11
11
0
.60
.07
.07
.00
07
7
7
0
.64
.10
.10
.00
0
6
32
32
0
.60
.17
.17
.00
03
0
.600 0
.00
.00
.00
0
3
10
10
0
.60
.15
.15
.00
28 **TOTAL TERMNTN 600VEIKV
6797
10747
10747
0 4344
6241
6304
58
.64
.58
.59
.00
TREND FORECAST MH
6304 TREND FORECAST PERF
.92
$$ PERFORMANCE RATIOS $$
.91
.92
.00
>6
,,
9
' .
'*
M ,'l ?: 'I' ,, -1.
3r ' ",
5 5-;
47
* L
.....-..........
.......... -.... - ..--...... ....- ........... .............. -.... ..... fil
rr, o .... --
o
-o b
O
.
; A i|
12
'<
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-5B
F 0C0S QOANTITY ANO ONIT RATE REPORT
TERMNTN 5KVKABOCE
P35
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE 7T BOCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCTi?
UNIT OF
QUANT
--------- QUANTITY-------------------------- ------------------------ MANHOURS----------------------1-- ------------- UNIT MANHOURS-----------------
BUDGET
FCST
TO
THIS BUDGET
FCST
TO THIS BUDGET FCST TO THIS
1/004......... DATE ...... WEEK .........
SC04....
DATE......WEEK...... ...... . --------- SOW-- DAT E
WE EK
TERMINATIONS 5KV 6 A 5KV ABOVE TERMINAT
TERMINATIONS 5KV 6 A TERMINATIONS 5KV G A
AI6P35 B23P35
B30P35 B32P35
EA EA EA EA
SSTOTAL TERMNTN 5KVGABOCE
TREND FORECAST MH
102
1
35 24
117 36 36 24
117 36 36 24
162
213
213
945 TREND FORECAST PERF
0 320
08
0 312 0 145
467
86
300 73
486
86
300 73
0
3.14
3.99 4.15
0
8.00
2.39 2.39
0
8.91
8.33 8.33
0
6.04
3.04 3.04
0 785
926
945
0
4.85
4.35 4.44
.84
PERFORMANCE RATIOS
1.00
.83
.84
.00 .00 .00 .00
.00
.00
o
9 9 9
GARRARD 00000780
O o
JOB NO. 14053-000 ROBINSON REFINRY MODERN2TN PRO J-- MQC REPORT NO. C 38090--50
FOCUS
QUANTITY AND UNIT RATE REPORT
TERMNTN ELECTRDTC
P36
6
'*
ACCOUNT DESCRIPTION
j
OF BUDGET FCST
TO
THIS BUDGET
FCST
-
ACCT If QUANT
#004
DATE
WEEK
5 A.A A A A A A AArA A A A A -A A A AJ ******* *****************
#004
> TERMINATIONS ELECTR A16P36 EA TERMINATIONS ELECTR B09P36 EA 9 TERMINATIONS ELECT B23P36 EA 0 TERMINATIONS ELECT B28P36 EA
TERMINATIONS ELECT B29P36 EA
TERMINATIONS ELECTR B32P36 EA TERM INAT IONS ELECT C50P36 EA K TERMINATIONS ELECT C51P36 EA
TERMINATIONS ELECT C52P36 EA .6 TERMINATIONS ELECT C53P36 EA
TERMINATIONS ELECT C54P36 EA a TERMINATIONS ELECT C55P36 EA to TERMINATIONS ELECT C56P36 EA
.o TERMINATIONS ELE/TC- C61P36 EA
?l TERMINATIONS ELE/TC- C62P36 EA ** TERMINATIONS ELE/TC- C63P36 EA ri TERMINATIONS ELE/TC- C64P36 EA
?4 TERMINATIONS ELE/IC- C65P36 EA
TERMINATIONS ELE/TC- C66P36 EA
6467 320
3087 418 429 180
5461 5098 2131 2243 3147 6099 3327
4
100
100
1000
18 69
7254 80
2900 400 300 180
5167
4987 1964 4047
898 3191 2063 1646
2211
1997 3009 5980 2095
7254 80
2900 400 300 180
5167 4987
1964 4047
B98 3191 2063 1646 2355 1997 3 009
5980 2095
0 3697 0 187 0 1749 0 229 0 2 72 0 235 0 3612 0 3894 0 1239 0 1248 0 1827 0 3416 0 1972 03 0 58 0 56 0 577
0 10
0 40
4485 118 970 70 225 67
2315 3180
746 2188 1940
1110
892
905 947 576 1024 1540 803
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE
5/24/82
PAGE
78
BUDGET
WEEK 116 OF 121
TO THIS BUDGET FCST
**D*A*TE*****W*E*E*K********** #004
TO DATE
4495 118 970 70 225 67
2315 3180
746 2188 1940
1110
892
905 947 576 1024 1540 803
0
.57
.62
.62
0
.58
1 .48 1.48
0
.57
.33
.33
0
.55
.18
.18
0
.63
.75
.75
0
1.31
.37
.37
0
.66
.4 5
.45
0
.76
.64
64
0
.58
.38 .38
0
.56
.54
.54
0
.58
2.16 2.16
0
.56
.35
.35
0
.59
.43
.43
0
*75
.55
.55
0
.58
.43
.40
0
.56
.29
.29
0
.58
.34
.34
0
.56
.26
.26
0
.58
.38
.38
THIS WEEK
.00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00
8
? 4
' * I?
... 11
2*
2-1
If
II IV 'n
$#T0TAL TERMNTN ELEC TRTC
.'9 TREND FORECAST MH 10
39698
50369
50513
24111 TREND FORECAST PERF
0
.79
24321
24101
24111
0
$$ PERFORMANCE RATIOS **
.61
1.00
.48 .79
.48 .79
.00
311 40
1? .............. -.............. -..................... - ......
-......... ---- ------------- --------- ------......... - -..... -- -........-........... ........-...... -- - ---------------- ----------- --------------- ....-....-.... -- ---- --------- --- - -------- ---- ---------
-------- --------- -- --
44 .r
oo
GARRARD 00000781
41
O
9
V
Q
G<1 /( O ............. _*________ 11
o 0
o
e
c> /
10
" 1? M
>8
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-58
ACCOUNT DESCRIPTION ACCT#
UNIT-------------------
OF BUDGET
QUANT
......
FOCUS QUANTITY AND UNIT RATE REPORT
ELECT/TC WIRE MAIN P37
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 79 BUDGET WEEK 116 OF 121
--QUANTITY--------------------------
FCST
TO THIS
004
DATE
WEEK
------------------------ MANHOURS-
BUDGET____ FCST
TO THIS
004 " DAT E...... WWEEEEKK
BUDGET
-UNIT MANHOURS-
FCST
TO
3004
DATE
THtS WEEK
PULL PULL PULL PULL PULL PULL
ELECTRONIC ELECTRONIC ELECTRONIC ELECTRONIC ELECTRONIC ELECTRONIC
MAIN C51P37 MAIN C52P37 MAIN C53P37 MAIN C54P37 MAIN C55P3T MAIN C56P37
LF LF LF LF LF LF
$TOTAL ELECT/TC WIRE MAIN
TREND FORECAST MH
5000
100
4000 7318
2000
100
6958 2239
7452 12388
5750 4065
6958 2239
7452 12388
5750 4065
18518
38852
38852
2546 TRENO FORECAST PERF
0 640 404 404 0 .13 U 13 92 92 0 .13 0 544 539 539 0 .14 0 936 1030 1030 0 .13 0 256 206 206 0 .13 0 13 275 275 0 .13
0 2402
2546
2546
0
.13
.50
PERFORMANCE RATIOS
1.00
.06 .04 .07 .08 .04 .07
.07
.50
.06 .04 .07 .58 .04 .07
.07
.55
.00 .00 .00
"05
.00 .00
.00
.50
2?
o
9 o o 9 9 9 9
*e V
GARRARD 00000782
co J'
Co
e
''
1
3
K.
"
1?
H, Ifl 15 21 22 ft
n
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-HOC REPORT NO. C38090-58
FOCUS
CUANTITY AND UNIT RATE REPORT
GROUNDING
P4I
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 80 BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
T T TV $$ V V
ACCT it
UNIT OF
QUANT
BUCGET
FCST <,`004
TO OATE
THIS BUDGET WEEK
FCST 3004
TO OATE
THIS BUDGET FCST
TO
WEEK
004
DATE
$$ *$$$$*$*
THIS WEEK
GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING GROUNDING
B09P41 B23P41 B28P41 B29P41 B32P41 C5QP41 C51P41 C52P41 C53P41 C54P41 C55P41 C56P41
LF LF LF LF LF LF LF LF LF LF LF LF
950 1500
700 300 1340 58380
2200
2200
2200
2000
3000
1000
1000
2020
480 400 1825 17306
1000
860 540
1000
2000
0
1000
2020
480 400 1825 17306
1000
860 540
1000
2000
0
44TOTAL GROUNDING TRENO FORECAST MH
75770
28431
28431
5499 TREND FORECAST PERF
GROUNDING
A16P41 UNITS 10900
21815
21815
**TOTAL GROUNDING
10900
21815
21815
TRENO FORECAST MH
2580 TRENO FORECAST PERF
0 302 0 480 0 225 0 160 0 488 0 9170 0 864 0 864 0 864 0 800
0 1120
0 480
227 44 5
83 81 42 5 3019 263 177
220
365 194
0
227 445
83 81 425 3019 263 177
220
365 194
0
0 318 0 320 0 .321 0 533 0 364 0 .157 0 .393 0 .393 0 393 0 .400 0 .373 0 .480
0 15817
5499
5499
0 .209
.808
PERFORMANCE RATIOS
1 .000
0 3487 2495 2580 48 .320
0 3487
2495
2580
48
320
.370
W T PERFORMANCE RATIOS
1 .000
.227
.220
.173 .203 .233 .174 .263 .206 .407 .365 .097
.000
.193
.808
.114
.114
.358
.227
.220
.173 .203 .233 .174 .263 .206 .407 .365 .097
.000
.193
.808
1 IB
.118
.370
.000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000
.000
.000
.000
.000
.000
.
8
' ,
1 1
, ' ' , , ;
2
;
;
' 3
n< it
?(!
GARRARD 00000783
...................... ......................-
.........
A2
-................................ ' *
:
C-
....................- --- -........... ........--
........................- ---------------------
............................ -- ----------------------
-- ..................
-.......................
............. -...........-........ ........ --............
......-........---
6'
D? C
9
OS
QGfi
6?
fj'J
Q
in
O
O
0
6
e 3 4
6
/ t
.0
9"
1?
JUB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PRO J -MOC REPORT NO. C38090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
GROUNOWELLS
P42
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
OATE 5/24/82 PAGE 81 BUOGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCTS
UNIT OF
QUANT
At
tUCGET A A Atr Ai A
-QUANTITY
FCST
TO
THIS BUDGET
FCST
TO
#004
DATE
WEEK
#004
DATE
J ********* vttvr^ $****** ******** ************
THIS BUOGET
WEEK $$*$$$$
FCST #004
TO DATE
INSTALL GROUND WELL A16P42 EA
100
GROUND WELL INSTALLA C50P42 EA
100
GROUND WELL INSTALLA C51P42 EA
100
GROUNOWELL INSTALLAT C52P42 EA 100
GROUND WELL INSTALLA C53P42 EA
100
GROUNO WELL INSTALLA C54P42 EA
1U0
GROUND WELL INSTALLA C55P42 EA
100
100 101
100 100
117
100 101
100 101 100 100
117
100 101
0 236 0 356 0 237 0 237 0 237 0 237 0 237
115 535 659 180 367 350
201
115 535 659 180 367 350
201
0
2.36
1.15 1.15
0
3.56
5.30 5.30
0
2.37
6.59 6.59
0
2.37
1.80 1.80
0
2.37
3.14 3.14
0
2.37
3.50 3.50
0
2.37
1*99
1.99
**TOTAL GROUNOWELLS
TOO
719
719
0 1777
2407
2407
0
2.54
3.35 3.35
TREND FORECAST MH
240T TREND FORECAST PERF
1.32
PERFORMANCE RATIOS =8=*
1.00
1.32 1.32
THIS WEEK
.00 .00 .00 .00 00 .00 .00
.00
.00
?1 ?} 24
V 21
"
,,
:
"
-
a
9 a
1
9 4
5
6 7
9
A
a m9
i?
3
9
ie
'?l
n a n ?n 30 31 J3
}K
39
43
tf, 48
-.................... ................
------
t. 6 r
ff
GARRARD 00000784
n
-0 $ 0
' 3
1
c 7
B
'0
n H
ill
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090--58
FOCUS OUANTITY ANO UNIT RATE REPORT
ELECT HEAT TRACING P43
PERFORMANCE WEEK ENDING
BASEO ON 5/21/82
DATE 5/24/82 PAGE 82 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT#
UNIT OF
QUANT
EUCGET
FCST #004
ELECT HEAT TRACING A16P43 LF ELECTRIC HEAT TRACIN U09P43 LF ELECT HEAT TRACING B21P43 LF ELECTRIC HEAT TRACIN U23P43 LF ELECT HEAT TRACING B28P43 LF ELECTRIC HEAT TRACIN B29P43 LF ELECT HEAT TRACING B32P43 LF ELECT HEAT TRACING C52P43 LF ELECTRIC HEAT TRACIN C66P43 LF
8600 800
300 3850 2700 1025
650 3125
100
2500 50
2800 0
5300 0
1600 0
..... 40
TO DATE
THIS BUDGET
WEEK $$$$$*$
2500 50
2B00 0
5300 0
1600 0
40
0 8256 0 2517
0 320
0 3775 0 2640 0 1025
0 640 0 2000 u 90
FCST #004
2011 50
622 0
1930 0
383 15 32
TO THIS BUDGET
DATE WEEK
*A
******
FCST #004
TO DATE
1888 50
622 0
1930 0
383 15 32
112 0 0 0 0 0 0 0 0
.960 3.146 1.067
.981 .978 1.000 98?r .640 .980
.804 .755 1.000 1.000
.222 .222 .000 .000 .364 .364 .000 .000
.259" .239
.000 .000 .800 .800
**TOTAL ELECT HEAT TRACING
21150
12290
12290
0 21271
5043
4920
112
1.006
.410 .400
TREND FORECAST MH
4920 TREND FORECAST PERF
.399
PERFORMANCE RATIOS **
1.000
.409 .399
THIS WEEK
.000 .000 .000 .000 .000 .000 .000 .000 .000
.000
.000
?7 n
*
?!>
*
57 3-<
"
,,
2
9
'
12 :4 H
r. r
71 T! )i
: V 11! 11
AS 48
42 y
GARRARD 00000785
:
:o n
O-
c
.......... .....................
E' G5 67
..... - -...-...... --
;
rj
0
c
6
7 4
6 / "
17
JOB NO. 14053-000 ROBINSCN REFINRY MOUERNZTN PROJ- MOC REPORT NO. C 38090--58
FOCUS QUANTITY AND UNIT RATE REPORT
0/H POLE LINE DIST P50
PERFORMANCE WEEK ENDING
BASEO ON 5/21/82
DATE 5/24/82 PAGE 83 BUDGET WEEK 115 OF 121
ACCOUNT DESCRIPTION ACCTS
UNIT OF
QUANT
BUDGET
ii*tt
0/H 0/H 0/H 0/H
POWER POWER POWER POWER
01 SIRIBUTI 01STRIBUTI OISTRIBUTI 01STRIBUT I
A16P50 B23P50 B30P50 B32P50
LF LF LF LF
13 53 2386 2500
FCST #004
0 1725 13400
0
TO OATE
THIS WEEK
*******
0 1725 13400
0
0 0 0 0
BUOGET
********
9 10 1279 960
FCST #004
0 240 3248
2
TO THIS
OATE wlEk ******
BUOGET
FCST #004
TO OATE
0
0
.69
.00
.00
240
0
.19
*14
.14
3248
0
.54
.24
.24
0
0
.38
.00
.00
*TOTAL 0/H POLE LINE OIST TRENO FORECAST HH
49 52
15125
15125
3488 TRENO FORECAST PERF
0 46
2258
349 0
3488
0
** PERFORMANCE RATIOS **
.46 1.00
.23 .46
.23 .46
THIS WEEK
.00 .00 00 .00
.00
.00
o
e 1
9
s
69
A *
to 9
1? n
9
,,
9
l
*
2'<
?8
3P
M
V.
'
--
-............. - -
TO
30 31
9 IS 9
*
... - ............... - ..... -...... -
....... ..... ....... ........... --.....
17 O
AS
-If 9
46
9
SI 9
S.' O
-........ ....... -............-.....
f.7
6
9
.......-...... ...........
9
-.................
------------------------
9
O
d
GARRARD 00000786
JOB NO.
14053-000
ROBINSON REFINRY MQDERN2TN PROJ-MOC
REPORT NO. C38090-58
6 '*
FOCUS QUANTITY AND UNIT RATE REPORT
TESTING
P80
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATEPAGE
5/24/82 84
BUCGET
WEEK 116 OF 121
ACCOUNT DESCRIPTION
UNIT
OF
BUCGET
FCST
A
ACCT #
QUANT
#004
k
4Tk44k1
WV 4k 4k iaitvap
t4krw4. 4k ^k 4. ^4 Ar v v<4. t w
***** l.4.4.A.AA.4.;4A4;A
6
> ELECT TESTING CHEC A16P80 UNITS " ELECTRICAL TEST CH B09P80 UNITS
ELECT TESTING CHEC B2JP80 UNITS .r. ELECT TESTING CHEC B30P80 UNITS
ELECT TESTING E CHEC C50P80 UNITS ,7
100 100 luo 100 100
100 100 100 100
19
n
TOTAL
TESTING
500
419
TO DATE
100 100 100 100
19
419
THIS WEEK
BUOGET
FCST
TO
THIS
BUDGET
#004
DATE
WEEK
******** ************ ******* *******
UNIT MAN uniiac--
FCST
TO
#004
DATE
THIS WEEK
0 1280 0 250 0 385 0 160 0 1919
0 3994
1949 158 364 8T 369
2927
1961 158 364 87 369
2939
12 0 0 0 0
12
12.80 2.50 3.85 1.60
19.19
7.99
19.49 1.58 3.64 .87
19.42
19.61 1.58 3.64 .87
19.42
6.99
7.01
.00 .00 .00 .00 .00
.00
TREN0 FORECAST MH
2939
TREN0 FORECAST PERF
1.20
PERFORMANCE RATIOS
..... 1.00.....
.......1.20....... .... 1.20
00
14
15
"
:3
0
9
8
79
A
9
s 9
9It'
u
9
IF
9
__ 20
71
"
?;
315
3.1 3S
rJ'' <' a;
GARRARD
-
as
e c -O O O O O
00
............................................. - -........ -............................
...... -...... -------- ---------------- -------------------------------- -------- -------------------- -..... -............... ......... - -................................
9
'fi
....... -......... -.......-...... ............. -............
9
........................................... ---51
O
o
s?
6`J
ID o
7
o
5
d
0
0
,
I n 9 10 II
,6 IG IH
71
24 ?!> :f a
JUB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
ELECT DISCONNECTS
P90
DATE 5/24/82
PAGE 85
PERFORMANCE BASED ON BUDGET
WEEK ENDING 5/21/82
WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCTw
UNI T OF
QUANT
BUCGET
ELECTRONIC OISCONNEC C51P90 EA
ELECTRONIC OISCONNEC C53P90 EA
ELECTRONIC OISCONNEC C54P90 EA
ELECTRONIC OISCONNEC C55P90 EA
ELECTRONIC OISCONNEC C56P90 EA
REMOVE REMOVE
EXIST EXIST
INSTR - C61P90 INSTR - C62P90
EA EA
REMOVE EXIST INSTR - C63P90 EA
REMOVE EXIST INSTR - C64P90 EA
REMOVE EXIST INSTR - C65P90 EA
REMOVE EXIST INSTR - C66P90 EA
233 1
66 154 119
20 160
39 10 32 19
FC ST S004
13 0 0 0 0
3 80 296
78 92 120 241
TO OATE *******
THIS WEEK
BUDGET
13 0 0 0 0
380 296
78 92 120 241
0 439 04 0 218 0 397 0 2 76 0 41 0 320 0 156 0 33 0 83 0 44
FCST 3604
27 0
14 ?
0 384 351 244
37 185 259
#
TO DATE
27 0
14 -
7 0 384 351 244 37 185 259
THIS WEEK
BUDGET
FCST S00'4
Nuni ioc --
TO BATE
THIS BEER
# $ ^ <: <: <: # $ $ $ $ $ $
'
0
"1788
2.0TT
2.68
0
4.00
.00
.00
0
3.30
.00
.00
0
2.88
00
.00
0
2.32
.00
.00
0
2.05
1.01
1.01
2.060
1.19
1.19
0
4.00
3*13
3.13
0
3.30
.40
.40
0
2.59
1.54
1.54
0
2.32
1.07
1.07
.00 .00 .00
.06
.00 .00 .00
.00 .00 .00 .00
*4>T0TAL
ELECT DISCONNECTS
8 53
1220
1220
0 2011
1508
1508
0
2.36
1.24
1.24
.00
TREND FORECAST MH
1508
TREND FORECAST PERF
.52
PERFORMANCE RATIOS
1.00
.52
.52
.00
o
m
'
9
i
69
6
m9
? (3
M9
IE
If
?C ?.
j:
!! 57 71
Jfl
31 32
Jf
10 ii
l
in
.................- - -.........-- ------------------- ------- - -- .. ......................
--......-............ -- -,4
57
GARRARD 00000788
ii.
e;
L-
9 n
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-58
f
7 ACCOUNT DESCRIPTION
.................................. ......................................
................... acc! #
OF QUANT
BUDGET
FCST
.................. ............... ~ S004
FOCUS
QUANTITY AND UNIT RATE REPORT
ELECT DEMOLITION
P95
PERFORMANCE WEEK ENDING
BASEO ON 5/21/82
DATE PAGE
5/Z9/82 86
BUDGET
WEEK 116 OF 121
TO DATE
THIS WEEK
BUDGET
nANHLUHj FCST SO09
TO OATE
THIS WEEK
BUDGET
-MUTT UAMUnilOC-
FCST 3004
TO OATE
THIS WEEK
1 DSPOSLGRMOVL OF EXST C50P95 UNITS
1
100
100
$TOTAL
ELECT DEMOLITION
1 100 100
TREND FORECAST MH
372
TREND FORECAST PERF
t?
0 0 3.72
1 372 372 1 372 372 ** PERFORMANCE RATIOS
0 0
1.00 1.00 1.00
3.72 3.72 3.72
3.72 3.72 3.72
.00 .00 .00
a f
1C
-- ------------------- ------
---........................
- ------------------------------------ --------- ---------......-----------------------------
.............. -- -----------------:----------------- -............ -- -
-......................... -..........-...........--- --
IU in
GARRARD 00000789
9 O Q O eo
C) 0
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-HOC REPORT NO. C38090--58
F 0 CO S
QUANTITY ANO UNIT RATE REPORT
MATERIAL HAMOLING
P99
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE PAGE
5/24/82 87
EUCGET
WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT
UNIT---------------------------------
OF QUANT
EUCGET ............................
--QUANTITY----------------------
--MANHOURS----------------------
FCSJ #004
TO DATE
THIS
BUOGET
........ WEEK......... `.......
................
FCST #004
TO DATE
THIS `WEEK
BUOGET
--UNIT MANHOURS-
FCST
TO
#004
DATE
THIS
WEEK
SECOND OROP MAT HAND A16P99 BMHRS SECOND DROP MAT HAND B23P99 BMHRS
--TOTAL
MATERIAL HANOLING
2000 0
2000 0
_________________ ____ TRENO FORECAST MH
1799
TREND FORECAST PERF
.90
1799
0
1799
0
2 1799 1799
0
PERFORMANCE RATIOS **
uoo 1.00
1.00
.90
.00
.90
.00
.90
.90
.00 .00
.00
ix s
GARRARD 00000790
0 (o
'V
*> JOB NO. 14053-000 ROBINSON REFINRY MODERN2TN PROJ-HOC REPORT NO. C38090-58
FOCUS QUANTITY AND UNIT RATE REPORT
FABRICATE REBAR
QOl
DATE 5/24/82
PAGE 88
PERFORMANCE BASED ON BUDGET
WEEK ENDING 5/21/82
WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCf#
UNIT-----------------------------QUANTITY--------------------------
OF BUCGET FCST
TO THIS
QUANT
#004
DATE
WEEK
*<=*****$
------------------------ MANHOURS---------------------------
BUDGET
FCST
TO THIS
#004
DATE WEEK
--------------------UNIT BUOGET FCST
#004
MANHOURS TO
DATE
THIS WEEK
'rxvTTT-r rvrvtvyt
FABRICATE REBAR
A16QU1 TONS
45
45
45 0 715 1266 1266 0 15.89 28.13 28.13
FABRICATE REBAR
B23Q01 TONS
1 10 10 0 16 12B 5 1285 0 16.00 128.50 128.50
=*$TOTAL FABRICATE REBAR
46 55 55 0 731 2551 2551 0 15.89 46. 3B 46.38
TRENO FORECAST MH
2551 TREND FORECAST PERF
2.92
PERFORMANCE RATIOS
1.00
2.92 2.92
.00 .00
.00
.00
a
i
f>
1? 13
1
m
1 ?n
i t f 'i
18
GARRARD 00000791
Cl
::a
"O o "o
c
6
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MGC REPORT NO. C38090--50
FOCUS
QUANTITY AND UNIT RATE REPORT
FOUNOATN CONCRETE
Qll
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE 89 BUCGET WEEK 116 OF 121
6
ACCUUNT DESCRIPTION
3 OF BUCGET FCST
A
ACCT 8 QUANT
8004
.bTT^Yb TVT.bTJbArT T JTb Vrfk ,Tb .b *Ar V^b .rb ^4'TA*V^0 JTbYb *Ap ^b Wb J r^TYT-rTTVTn
b
> PLACE FOUNDATION CON A16QU CY H PLACE FOUNDATION CON B09QI1 CY a PLACE FOUNDATION CON B23Q11 CY
,0 PLACE FOUNDATION CON B28Q11 CY PLACE FOUNDATION CON B32011 CY
?
2646 122 412 142 335
4628 133 410 81 685
n SFTOTAL FOUNOATN CONCRETE
3657
5937
TO DATE
4627 133 410 81 685
5936
....... TREND FORECAST MH
....... ... . - - --
16931 ...TREND FORECAST PERF___
8
THIS WEEK
BUDGET
FCST
TO THIS BUDGET
8004
DATE WEEK
4: $* $$ 4s $$4 # $ 41 $ $$$$$$
FCST TO THIS
8004
DATE
WEEK
#$$ $$$ $$ $
29
3
5
]9
0 6350 0 317 0 1059 0 335 0 642
11098 391
2090 250
3100
11098 391
2090 250
3100
0 8703 16929 16929
1.21 ________ performance RATIOS
0
2.40
2.40
0
2.60
2.94
0
2.57
5.10
0
2.36
3.09
0
1.92
4.53
0
2.38
2.85
..... 1,00 _______1.21
2.40 2.94 5.10 3.09 4.53
2.85
1.21...
.00 .00 .00 .00 .00
.00
* 9
12
14 9
15 ie
9 .00_______
9
920
/I
22 \
i3 ?0 9
25 31
?. T 9
28 17
29 9
12 9
II * 9
3?
9
S' S'
9"
57
9Sf
r>o Cl
c9
GARRARD 00000792
9
1: 9
12
O-
V ....... .. ____ ...........................
o
JOB NO. 14053-000 ROBINSON REFINRY MODERN2TN PROJ-MOC REPORT NO. C38090-58
FOCUS QUANTITY AND UNIT RATE REPORT
STRUCT CONCfcETE
Q12
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
OATE 5/24/82 PAGE 90 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
...................
ACCTS
UNIT OF EUCGET
QUANT
--QUANTITY--------
FCST
TO
;;0o0o4
DATE
this budget
WEEK
--MANHOURS-
FCST
TO
0004
OATE
THIS BUDGET WEEK
-UNIT MANHOURS-
FCST
TO
0004
DATE
THIS WEEK
PLACE STRUCTURAL CON A16Q12 CY PLACE STRUCTURAL CON B23Q12 CY
2251
10
2275 114
2275 114
8643 38
9037 442
9037 442
0
3.84
3.97 3.97
0
3.80
3.88 3.88
TOTAL STRUCT CONCRETE...
2261
2389
2389
0 8681
9479
9479
3.84
3.97 3.97
TREND FORECAST MH
9479 TREND FORECAST PERF
1.03
PERFORMANCE RATIOS
1.00
1.03 1.03
.00 .00
.00
.00
GARRARD 00000793
m a o
o co
C
1
s
i i l
GARRARD 00000794
C
r
e<
1
' 9 "
JOB NO. 14U53-OOU ROBINSON REUNRY MOOERNZTN PROJ-MOC REPORT NO. C3B090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
OTHER CONCRETE
Q15
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 91
BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT 8
UNIT OF
QUANT
BUDGET
-QUANTITY-
FCST
TO
....SJ004
... DATE
THIS WEEK
BUDGET
-MANHOURS-
FCST
TO
3004
DATE
THIS WEEK
BUDGET
-UNIT MANHOURS-
FCST
TO
DATE
tr$ $ $ $* * #^* *$
THIS WEEK
PLACE OTHER CONCRETE A16Q15 CY 3ST0TAL OTHER CONCRETE
TREND FORECAST MH
239
333
333
239
333
333
204 TREND FORECAST PERF
0 0
. 18
? 97
204
204
0
797
204
204
0
** PERFORMANCE RATIOS **
3.33 3.33
1.00
.61 .61 .18
.61
.61 .18
.00
00
.00
---.......... -.... --
------------------ -- -.... -...... -.......-....-....--
JOB NO. 14053-000 ROBINSON REFINRY MODERN2TN PROJ-MOC REPOR1 NO. C38090-58
6
FOCUS QUANTITY AND UNIT RATE
FOUNO REBAR '
REPORT Q21
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 92
BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION UNIT
3 OF BUDGET 4 ACCT# QUANT
$*$$$$ rTTV-rTT'fTTTTrVT'r'VTTVV $$$
' PLACE FOUNDATION REB A16Q21 TONS PLACE FOUNDATION REB B09021 TONS !> PLACE FOUNDATION REB B23Q21 TONS 1" PLACE FOUNDATION REB B28Q21 TONS
PLACE FOUNDATION REB B32Q21 TONS 1?
$*TOTAL FOUND REBAR
132 5
16 5
38
196
FCST #004
401 T
27 4
32
471
TO DATE
401 7
27 4
32
471
THIS BUDGET
FCST
TO THIS
WEEK
#004
DATE WEEK
****** 3:$$3:$$$$$$ *******
0 3180
11622
11622
0 126
715
715
0 359 2016 2016
0 107
435
435
0 575 2935 2935
0 0 0 0 0
BUDGET
24.09 25.20 22.44 21.40 15.13
UNIT FCST #C04
MA hiumiQC-
TO THIS
DATE
WEEK
******* $$
28.98 102.14
74.67 108.75
91.72
28.98 102.14
74.67 108.75
91.72
.00
00
.00 .00
.00
0 4347 17723 17723
0 22.18 37.63 37.63
.00
TREND FORECAST MH
17723 TREND FORECAST PERF
1.61
PERFORMANCE RATIOS
1.00
1.61 1.61
.00
6
Jl n
<3
9
e
92
1
A
9
9
910
n
9
tr
9
?t
?A *
?; ?3 3C ji 12
v
-At - -.......................
,<
y
V
>
if 4R
S-:
-------- ------------------------- ------------------------
............... -................... -
9
......-.........................
C'J ------------------------------------
61
96;
6`
G5
M 6/
O
M
42
o
5
n
GARRARD 00000795
JOB NO. 14053-000 ROBINSON REFINRY MODERN/TN PROJ-MOC REPORT NO. C38090--58
FOCUS
QUANTITY AND UNIT RATE REPORT
STRUCT REBAR
Q22
PERFORMANCE WEEK ENDING
BASEO ON 5/21/82
DATE 5/24/B2
PAGE 93 BUDGET
WEEK 116 OF 121
ACCOUNT DESCRIPTION
******
ACCT #
UNIT---------------------------- QUANTITY--------------------------- ------------------------ MANHOURS--------------------------
OF EUCGET FCST
TO
THIS BUOGET
FCST
TO THIS
QUANT
#004...... Bate "... Week .... `............ 7Td04
~ BATE........WEER
--------------------UNIT MANHOURS
BUOGET FCST
TO
HrC'04
DATE
THIS
WEEK ********
PLACE STRUCTURAL REB A16Q22 TONS PLACE STRUCTURAL REB B23Q22 TONS
S3T0TAL STRUCT P.EBAR
'
223
1
224
341
10
351
340
10
3 50
0 2858 21953 21953 0 13 1199 1199
0 2871 23152 23152
0 12.82 64.38 64.57 0 13.00 119.90 119.90
0 12.82 65.96 66.15
.00 .00
.00
TREND FORECAST MH
23237 TRENO FORECAST PERF
5.16
PERFORMANCE RATIOS
1.00
5.14 5.16
.00
6
9 10 12 13 15 16
o; 64
1(
fl
GARRARD 00000797
0
6
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PRO J- MOC REPORT NO. C38090- 58
FOCUS
QUANTITY AND UNIT RATE REPORT
FOUND FORMS
Q31
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/25/82 PAGE 95
BUCGET WEEK 116 OF 121
********
OF
ACCT a QUANT $$$
EUCGET
FCST #009
TO DATE
PLACE 6 STRIP FON FO A16Q3I SF PLACE 6 STRIP FON FG B09Q31 SF PLACE G STRIP FON FO B23031 SF PLACE G STRIP FON FO U2UQ31 SF PLACE G STRIP FON FO B32Q31 SF
TOTAL
FOUND FORMS ........... ...........- ..... -................ .
179T3 5700 8555 2923 6957
90508
31715 2690 7200 2191.....
12072
31715 2690 7200 2191
12072
55868 ~ 55 868
TREND FORECAST MH
53262 TREND FORECAST PERF
THIS WEEK
0 0 0 0 0
0
BUDGET
FCST
TO
#009
DATE
******* ********
6958 1965 3611 1150 1689
28507 1029 9266
1120
8395
28507 1029 9266
1120
8395
19873
93262
93262
THIS BUOGET FCST
WEEK
SC05
****$** $$$$$$$$
0
.36
.90
0
.52
.38
0
.53
.59
0
.39
.51
0
.26
.69
0
.37
7T
TO DATE
THIS WEEK
.90 .38 .59
.51 .69
.00 .00 .00
... .00
.00
.tr ~ .00
2.21
PERFORMANCE RATIOS
1.00
2.21
2.21
.00
8
5
;
9 10 13 14
n
?3 Mi 31
IT
0
GARRARD 00000798
JOB NO. 16053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090--58
FOCUS
QUANTITY ANQ UNIT RATE REPORT
STRUCT FORMS
Q32
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/26/82 PAGE 96 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
********
ACCTtf
UNIT OF
QUANT
--QUANTITY-------
EUCGET
FCST
TO THIS BUDGET
*006 ..........DATE ..... WEEK
*********
*******
6
PLACE 6 STRIP SIR FO A16Q32 SF
37906
70113
70113
0 16672
PLACE 6 STRIP STR FO B23Q32 SF
98 6326 6326 0 66
-- MANHOURS------------
FCST
TO
8006 .......OATE
THIS BUDGET WEEK... . ' "
-UNIT MANHOURS-----------------
FCST TO
THIS
900A OATE
WEEK "
56213 3919
56213 3919
.66
.65
.77 .62
.77 .62
.00 .00
**TOTAL STRUCT FORMS
38006
76639
76639
0 16716
58132
58132
.66
.76
76
.00
>
TREND FORECAST MH
58132 TREND FORECAST PERF
1.73
,00
1.73 1.73
.00
a a
a a a a a
GARRARD 00000799
a o o
O
V1
r
'
9
1?
JOB NO. 14Q53-C00 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-58
FOCUS
QUANTITY ANO UNIT RATE REPORT
OTHER FORMS
Q35
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 97 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
UNIT--------------------OF BUCGET
ACCT 0 QUANT......................
ATW ATb ATW ATW <fAV( A.TAWIAr. YA. BT^ lAYW ATW ATW AYW AWTWTbJTW AY* AWTAWb AW ATW 'AAb B^TB AWYA'.VAW mbAW bAAW *ATb bATW bArb 'AY. bAWb (A* rbAY. bAb'TbAb AbA. 'AYb bArW'rbAbYA
--QUANTITY--------------------------
FCST^
TO THIS BUDGET
004........... DATE
WEEK
WAArbTbIWriAAb b'Arb-avW *AbTAW'rATW AlbMAWrATW A`rWrbJiWrAWTbAWb AW. bATb AW AYb AW"bA. AwW AWTAW4bA
--MANHOURS---------------
FCST
T0 THIS
S004 ~ DATE WEEK
BUDGET
-UNIT MANHOURS----------------
FCST
TO THIS
0004....... DATE
WEEK
PLACE STRIP OTHER A16Q35 SF
1640
0
0 0 735
0
0 0 45
.00
.00
**T0TAL OTHER FORMS
1640
O
0 0 735
0
.450 0
.00
.00
.00
TREND FORECAST MH
0 TREN0 FORECAST PERF
.00
PERFORMANCE RATIOS **
1.00
.00
.00
.00
IS
0
9 9 9 9 9
oo
GARRARD 00000800
O O
0
6 ' 3
S
, H j .0
l3
JOB NO. 15053-000 ROBINSON REFINRY M00ERNZTN PR0J -MOC
REPORT NO. C38090--58
F 0C U s
QUANTITY AND UNIT RATE REPORT
MISC C0NC I COMP I
Q50
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/25/82 PAGE 98 BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION UNIT
OF
Y bAb
AL..A. bAb A- iAp bA.
ACCTS QUANT .A.bAb bAb A* Ab Ab <Ab .Ab bAb bA
*****
PLACE PLACE PLACE PLACE PLACE
CONCRTEICOMPOS CONCRTEICOMPOS C0NCRTEICCMP0S CONCRTEICCMPOS CONCRTEICOMPOS
A31Q50 B20Q50 B21Q50 B29Q50 C50Q50
CY CY CY CY CY
EUCGET
57 7
82 53 11
FCST #005
12 0
217 29 36
TO
THIS BUDGET
FCST
TO THIS
DATE ******
WEEK ****************
XAA#A0A0A5.AAA.AA.AbOAJAI.bTI.Ea
aa
WEEK
IKiTT MAMUnilDC.
BUDGET FCST #005
TiA-r-riprY-r'Y
TO DATE
THIS WEEK
12 0
217 29
36
0 500 0 100 0 1362 0 810 0 220
538 0
2698
581 902
538 0
2698
581 902
0 7 ."02 36.50 36.50
0 15.29
.00
.00
0 16.61 12.53 12.53
0 18.85 20.03 20.03
0 20.00 25.06 25.06
*00 .00 .00 .00 .00
<=*T0TAL MISC C0NC IC0MP)
200
295
295
0 2892
5619
5619
0 15.56 15. T1
.00
TREN0 FORECAST MH
5619 TREND FORECAST PERF
PERFORMANCE RATIOS _
...... 1.00..... .... .93
53
.00
t
8 ?
8
9
in .?
"
in
?.
? ?< ?
4
P
IP
^4
GARRARD 00'
JS
'
ooo 0o0
r>:
67
C
c
(pi
!
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--58
ACCOUNT DESCRIPTION ACCT
UNIT----------------OF BUDGET
QUANT ..............
FOCUS
QUANTITY AND UNIT RATE REPORT
PRECAST CONCRETE
Q61
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 99 BUDGET WEEK 116 OF 121
-QUANTITY----------
FCST
TO
,',*ou4 ........oate
-------- ------------------------ MANHOURS---------------------------
THIS BUDGET
FCST
TO THIS
WEEK ........................#004
DATE WEEK
------------------- UNIT MANHOURS----------------
BUDGET FCST
TO
THIS
#004 .... OATE... ... WEEK
PLACE PRECAST CONCRE A16Q61 CY PLACE PRECAST CONCRE B23Q61 CY
SSTOTAL PRECAST CONCRETE
TREND FORECAST MH
47B
10
410 171
410 171
488
581
581
2337 TREND FORECAST PERF
0 0
0
1.68
1147 z<*
1171
1780 557
2337
1780 557
2337
PERFORMANCE RATIOS
0 0
0
2.40 2.40
2.40
1.00
4.34 3.26
4.02
1.68
4.34 3.26
4.02
1.68
.00 .00
.00
.00
<
4
<3
a
8
9 10 l? t3
H.
2*1
2!
29 3*1
30
31
>?
GARRARD 00000802
f.o
n
V
r
JUB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--50
FOCUS
QUANT IT Y ANO UNIT RATE REPORT
PRECAST REBAR
062
PERFORMANCE WEEK ENDING
BASEO ON 5/21/82
OATE 5/24/82 PAGE 100 BUCGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCT f
UNIT OF BUCGET
QUANT
--QUANTITY-------------------------- ------------------------ MANHOURS-------------
FCST
TO
THIS BUDGET
FCST_______ TO
f 004
DATE
WEEK
if004
DATE
---------
THIS WEEK
-------- ---------- umjt MANHOURS-----------------
BUDGET FCST
TO
THIS
... S004 DATE
WEEK
PLACE PRECAST REBAR A16Q62 TONS PLACE PRECAST REBAR B23Q62 TONS
82 139 139 1 28 28
TOTAL""' PRECAST REBAR
................
TREND FORECAST MH
5 724 __TRENO FORECAST PERF
2.14
1312 16
4193 1531
4193 1531
1328
5724
5724
PERFORMANCE RATIOS <
16.00
16.00
30.17 30.17 54.68 54.68
.00 .00
1.00
2.14 2.14
.00
t
6
8 <3
<3
a a a
a
4
4
4 1
GARRARD 00000803
e
JOB NO. 14053-000 ROBINSON REFINRY MQDERNZTN PROJ-MOC o REPORT NO. C38090-58
FOCUS
QUANTITY AND UNIT RATE REPORT
PRECAST FORMWORK
Q63
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 101 BUCGET WEEK 116 OF 121
c ACCOUNT DESCRIPTION UNIT -
-- QUANTITY-------------------------- ------------------------ MANHOURS-------------
-UNIT MANHOUPS-
OF BUCGET FCST
TO
THIS BUDGET
FCST
TO THIS BUDGET FCST TO THIS
A C C T ii QUANT
0004
DATE
WEEK
'004
.... oaTe
WEEK
0CC4 DATE
WEEK
o
^f-jr.Tj.Ta.-TTVlrTjT. l
PLACE PRECAST FORMS A16063 SF r PLACE PRECAST FORMS B23Q63 SF
17700 ID
13015 7541
13015 7541
7222 4
9871 5676
1871" 5676
,41 .40
.76 .75
76 .75
.00 .00
--TOTAL PRECAST FORMWORK
17710
20556
20556
0 7226 15547 15547
.41
.76
.76
.00
TREND FORECAST MH
15547 TRENO FORECAST PERF
1.87
** PERFORMANCE RATIOS
1.00
1.87
.00
00
GARRARD 00000804
e
JUB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--58
FOCUS
QUANTITY ANO UNIT RATE REPORT
SET PRECST ITEMS
Q69
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 102 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCf S
UNIT---------------------------- QUANTITY----------
OF EUCGET FCST
TO
QUANT
S004
DATE
THIS BUDGET WEEK ~
--MANHOURS----------
FCST
TO
?004
DATE
--------THIS WEEK
--------------------UNIX MANHOURS-----------------
BUDGET FCST
TO
THIS
S004
DATE ..........WEEK
SET PRECAST CQNC ITE A16Q69 CY SET PRECAST CONC ITE B23Q69 CY
478 10
410 173
410 173
'TOTAL..... SET PRECST ITEMS
488
583
583
_______ ______TRENO FORECAST_MH___
10845__ TRE ND FOREC A ST _P E RF
0 2.33
3824 80
7226 3619
7226 3619
3904
10845
1C845
PERFORMANCE RATIOS
8.00 8.0U
8.00
1.00
17.62 17.62 20.92 20.92
18.60 18.60
2.33 2.33
.00 .00
.00
.00
<3
GARRARD 00000805
j i
>
:q
M "Q
::q ii?
::c
c
e
JOB NO. I4053-000 ROBINSON REFINRY MODERNZTN PROJ-HOC REPORT NO. C38090--58
FOCUS
QUANTITY and UNIT RATE REPORT
CONCRETE PAVING
Q71
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 103 BUDGET WEEK 116 OF 121
e ACCOUNT DESCRIPTION UNIT
OF eUCGET FCST
TO
THIS BUOGET
FCST
TO THIS BUOGET FCST TO THIS
ACCT it QUANT
5004
OATE
WEEK
#004
DATE WEEK
o * 4 44 4:4= 4= *4 4 *4 = 4 4 4 4 4=4= 4= 44 $^vrirrvvvrr
iiiiiiiitttttttt it
****
444=44**44444 4444444
5C04
DATE
WE Ek
44444444
: ! ! \
PLACE CONRETE PAVING A16Q71 SF
70470
36000
36000
0 11275
3894
3894
0
16
.11
.11
oo
PLACE CONCRETE PAVIN B09Q71 SF
4080
4080
4080
0 660
340
340
0
^16
.08
.08
.00
PLACE CONCRETE PAVIN B23Q71 SF
21990
21990
21990
0 5592
2760
2760
0
.25
.13
.13
.00
PLALfc CONCRETE PAVIN B29Q71 SF
2534
500
500
0 585
25
25
0
.2 3
.05
.05...
.00
44T0TAL CONCRETE PAVING TREND FORECAST MH
99074
62570
62570
7019 TRENO FORECAST PERF ------------ - - - -... - ... - - ' . . . . . . _
0 18112
7019
7019
0
.18
.58
44 PERFORMANCE RATIOS 44
1.00
___ ________ __ .... .... ...................... ...... ... ... ......... .. __ _____ ..
.11
.11
.00
.58
.58
.00
.. ............ .... ________________
GARRARD 00000806
>
4
l(
"
" .1
JOB NO. 14053-000 ROBINSON REFINRV MOOEKNZTN PROJ-MQC REPORT NO. C3809Q--58
FOCUS
UUANTITY AND UNIT RATE REPORT
CONDUIT ENVELOPES
QT3
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE 104 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION
YTTr r->rr vv rr ty
Accf #
UNIT OF
QUANT
BUDGET
-QUANT IT Y-
FCST
TO
#004
DATE $:
THIS WEEK
BUDGET
-MANHOURS-
FCST
TO
#004
OATE
THIS WEEK
BUDGET
-UNIT FCST
#004
MANHOURSTO
DATE
THIS
HEEK $$$$$$
PLACE CONC ENVELOPES A16Q73 CY PLACE CONCRETE ENVEL B23Q73 CY PLACE CONCRETE ENVEL B29Q73 CY PLACE CONCREfE ENVEL B30073 CY PLACE CONCRETE ENVEL B32Q73 CY PLACE CONCRETE ENVEL C50Q73 CY
--TOTAL CONDUIT ENVELOPES
TREND FORECAST MH
690 93 18 9 30 81
685 108
0 10 16 113
685 lua
0
10
16 113
921
932
932
5524 TRENO FORECAST PERF
0 0 0 0 0 0
0
1.23
3312 445 105 100 105 380
3443 1258
0
2 338 483
3443 1258
0
2 338
483
0 0 0 0 0
0
4447
5524
5524
0
-- PERFORMANCE RATIOS 4c 4t
4.80 4.78 5.03 11.11 3.50 4.69
4.B3
1.00
5.03 11.65
.00 .20 21.13 4.27
5.03 11.65
.00 .20 21.13 4.27
5.93 5.93
1.23 1.23
.00 .00 .00 .00 .00 .00
.00
.00
1
GARRARD 00000807
o0
JOB NO. 14053-000
ROBINSON REFINRY MODERN/TN PROJ-MOC 0 REPORT NO. C38090--58
FOCUS
QUANTITY AND UNIT RATE REPORT
MISCELL ARCHITECT
R01
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 105 BUCGET WEEK 116 OF 121
O ACCOUNT DESCRIPTION UNIT - ------------------------- QUANTITY-------------------------- ------------------------ MANHOURS--------------------------- ----------------- -UNIT MANHOURS-----------------
_ OF BUCGET FCST
TO
THIS BUDGET
FCST
TO
THIS BUDGET FCST
TO
THIS
ACCT # QUANT
#004....... DATE
WEEK
...........3004 ~ .....DATE WEEK ' ~ "
#004
DATE "WEEK
' *
10
BUILDINGS
B23R01 MHRS
SSTUTAL MISCELL ARCHITECT
TREND FORECAST MH
000 000 0 TREND FORECAST PERF
0 0 .00
00 0 00 0 S* PERFORMANCE RATIOS
0 0
.00 .00 .00
oo
!
i
.00 .00
.00 .00 .00
CONTROL ROOM ARCHITt C50R01 UNITS
: COKER CR STRUCTURAL C54R01 UNITS
;; s*TOTAL MISCELL ARCHITECT
100 0
100
100 0
100
100 0
100
10
TREND FORECAST MH
1806 TREND FORECAST PERF
0 0
0
1.03
1751 0
1806 0
1806 0
1751
1806
1806
$$ PERFORMANCE RATIOS
0 0
0
17.51
.00
17.51
1.00
18^56 18.06
.00
.00
1io*0
CD
18.06
1.03 1.03
.00
.00 .00 .00 .00 .00 .00
71
27
GARRARD 00000808
Q
O
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC REPORT NO. C38090-58
ACCUUNT DESCRIPTION ACCT It
UNIT-------------------
OF BUOGET
QUANT
......
FOCUS
QUANTITY AND UNIT RATE REPORT
ELECTRICAL SUBSTAT R03
PERFORMANCE MEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE ICfe BUDGET MEEK 116 OF 121
--QUANTITY----------
FCST
TO
if 00 4 "......DATE
THIS BUOGET MEEK ..............
--MANHOURS----------
FCST
TO
004
DATE
THIS BUOGET MEEK "......... .
-UNIT MANHOURS-
FCST
TO
if004
DATE
THIS WEEK
ELECTRICAL SUBSTATIO A16R03 UNITS
100
100
100
SSTOTAL ELECTRICAL SUBSTAT___________ ______________________________ __
TREND FORECAST MH
1341 TREND FORECAST PERF
2.39
560
1345
1341
0
560
1345
1341
0
PERFORMANCE RATIOS **
5.60 13.45 13.4T
1.00
2.40 2.39
.00 .00
i
i
i
i i
c c c c
r
GARRARD 00000809
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-5B
ACCOUNT OESCRIPTIUN ACCTS
UNIT------------------OF BUCGET
QUANT
FOCUS
UUANTITY AND UNIT RATE REPORT
BUILDING
RIO
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 107 BUCGET MEEK 116 CF 121
-- QUANTITY--------------------------
FCST
TO THIS
0004
DATE
WEEK
------------------------ MANHOURS-------------
BUDGET
FCST
TO
........ 0004
DATE
THIS BUDGET WEEK
UNIT MANHOURS-----------------
FCST
TO
THIS
0004
DATE
WEEK
BOILER FEED WATER 9L A16R10 UNITS
100
100
100
CHEMICAL INJECTION b B32R10 UNITS
100
100
100
**TOTAL.... BU1L0ING
......
..........
TREND FORECAST MH
1921 TREND FORECAST PERF
4.63
2 TO 145
650 1302
619 1302
415
1952
1921
** PERFORMANCE RATIOS **
2.70 1.45
6.50 6.19 13.02 13.02
.00 .00
1.00
4.70 4.63
.00
GARRARD 00000810
JOB NO. 14053-000
FOCUS
DATE 5/24/82
I I
Oooo00
GARRARD O'
&
JOB NO. 14053-000 ROBINSON REFINRY MODERN!TN PROJ-MOC REPORT NO. C38090-58
FOCUS
QUANTITY AND UNIT RATE REPORT REVAMP EXIST BLDGS R95
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 110 BUOGET WEEK 116 OF 121
I
ACCOUNT DESCRIPTION ACCT it
UNIT OF
QUANT
BUDGET
******
BLDG B23R95 UNITS
100
-QUANT IT Y-
FCST
TO
#004
OATE $$$$$$$
THIS WEEK
BUOGET
100
100
0 299
-MANHCURS-
FCST
TO THIS
"004
DATE WEEK
VTT*VT'C:`*^fT*T
BUDGET
-UNIT MANHOURS-
FCST TO THIS
#004
OATE
WEEK
******
756
756
0
2.99
7.56 7.56
.00
EXIST BLDGS
100
100
100
0 299
756
756
0
2.99
7.56 7.56
.00
ORECAST MH
756 TREND FORECAST PERF
2.53
$*= PERFORMANCE RATIOS
1.00
2.53 2.53
.00
I
A
4
B
41C
17
'* 4
4
4
4
4
4
1
1
4
4
4
4
G
GARRARD 00000813
C
c c
C
e
JQ9 NCJ. 14053--000
ROBINSON REFINRY MODERNZTN PROJ-MOC
0 REPORT NO. C38090--58
FOCUS
QUANTITY ANO UNIT RATE REPORT
DEWATERING
S03
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 111 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACCTtf
UNIT---------------------------- QUANTITY--------------------------- ------------------------ MANHOURS---------------------------
OF EUCGET FCST
TO THIS__ BUOGET_____ FCSTTO_____ THIS
QUANT ................. ........ S604
..DATE
WEEK. ......................#004
DATE WEEK
------------------- UNIT MANHOURS------------------
BUDGET_____FCSTTO__ THIS___
'
#004
DATE
WEEK
DEWATERING DEWATERING
A16S03 BMHRS B23S03 BMHRS
SSTOTAL DEWATERING
TREND FORECAST MH
2800 870
4100 870
4100 870
3670
4970
4970
TRENC FORECAST PERF
0 2800 0 875
----
3675
467 3 4306
8979
4673 4306
8979
1.80
<=* PERFORMANCE RATIOS
1.00 1.01 T.uu 1.00
1.14 4.95
r.ai
1.80
1.14 4.95
1.81
1.80
.00 .00 .00 .00
\ f
16 37
]' ] :\
0 c
1
I
:: <
38
:: *
:<
SJ
i
i
*
on
i;
c
c
GARRARD 00000814
ft
1 6
1
f>
10
IS
PC 21 ??
21
ft
- ft
ft
JOB NO. 10053-000 ROBINSON REFINRY MOOERNZTF PRO J- MOC REPORT NO. C38090-58
F 0CU s QUANTITY ANO UNIT RATE REPORT
EXCAVATIONEDISPOSL Sll
PERFORMANCE WEEK ENOING
BASED ON 5/21/82
DATE 5/24/82 PAGE 112 BUDGET WEEK 116 CF 121
ACCOUNT DESCRIPTION ACCT5
OF BUDGET
QUANT $
FCST 5004
TO OATE
THIS WEEK
BUDGET
FCST
TO
5004
DATE'
******* $$
THIS BUDGET
WEEK ***TTTT
uniioc..
FCST TO THIS
5004
DATE
WEEK
*# $$
EXCAVATION DISPOSA A16S11 CY EXCAVATION DISPOSA A31S11 CY EXCAVATION DISPOSA B09S11 CY EXCAVATION BACKFIL B2CS11 CY EXCAVATION DISPOSA B21S11 CY EXCAVATION OISPOSA B23S11 CY EXCAVATION OISPOSA B29S11 CY EXCAVATION OISPOSA B30S1I CY EXCAVATION E DISPOSA B32S11 CY EXCAVATION DISPOSA C50S11 CY
1702 60
800 13
1305 2664
440 34
1268 350
2900 60
653 0
469 3745
126 ID
3080 165
2900 60
653 0
469 3745
126 10
3083 165
0 4953 0 230 0 1611 0 40 0 3465
0 3560 0 690 0 70 0 1459 0 401
4804 243
1324 0
1107 4535
916 8
3368 837
4804 243
1324 0
1107 4490
916 a
3368 83?
0
2.91
1*66 1.66
.00
0
3.83
4.05 4.05
.00
0
2.01
2.03 2.03
.00
0
3.08
.00
.GO
.00
0
2.66
2.36 2.36
.00
0
1.34
1.21 1.20
.00
0 1.57 ~T.27 7.27 00
0
2.06
.80
.80
.00
0
1.15
1.09 1.09
.00
0
1.15
5.07 5.07
.00
TOTAL EXCAVATIONEDISPOSL
8636
11216
11216
0 16479
17142
17097
0
1.91
1.53 1.52
TREND FORECAST MH
1709T TRENO FORECAST PERF
.85
** PERFORMANCE RATIOS
1.00
.85
.85
.00
ao
26
Pi 30 31
33
3f 37
IP
"
IT)
.........
V
5
6 f 6 6 r 6 6 A _____ 7
GARRARD 00000815
GARRARD 00000816
a
3
-
6 7 10
-
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090-58
FOCUS
QUANTITY ANO UNIT RATE REPORT
B ACK FT LLCOMPAC TIN S12
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 113 BUDGET WEEK 116 OF 121
A C vU Uri V
AJ 1 l U I.
UUAi ! 11 V
OF BUCGET FCST
TO
* ACCT # QUANT
#004
OATE
********* ***********rA4,<VA TTAH. A". 4`A.T'F4>*4A-*--4TA.'*rA4. 4M4 JF4 Air'FA*TA14l4`44 V4. l4r4
THIS BUDGET
FCST
WEEK
#004
**********
TO THIS
DATE WEEK $$$
BUDGET
FCST #004
TO OATE
THIS WEEK
BACKFILL COKPACTIO A16S12 CY BACKFILL COMPACTIO A31S12 CY BACKFILL COMPACTIO B09S12 CY BACKFILL COMPACTIO B21S12 CY BACKFILL COMPACTION B23S12 CY BACKFILL COMPACTIO B29S12 CY BACKFILL COMPACTIO B30S12 CY BACKFILL COMPACTIO B32S12 CY BACKFILL COMPACTIO C50S12 CY
9765 103 650
1224 2711
437 25
1840 260
5883 50
499 288 3676
88 8
2958 107
5883 50
499 288 3676
88 8
2958 107
PPTOTAL UACKFILLECCMPACT IN
17015
13557
13557
TRENO FORECAST MH
14103 TRENO FORECAST PERF
0 7547 0 370
0 348 0 535 0 1060 0 215 0 30 0 450 0 214
5951 34
310 333 3671 261
0 3267
264
5951 34
310 333 3671 261
0 3267
264
0 0 0 0 0 0 0 0 0
0 10 769
14091
14091
0
1.90
** PERFORMANCE RATIOS **
.77 3.59
.54 .44 .39 .49 1720 24 .82
.63
1*00
1.01 .68 .62
1.16 1.00 2.97
.00 1.10 2.47
1.04
1.90
1.01 .68 .62
1.16 1.00 2.97
Off 1.10 2.47
1.04
1.90
.00 .00 .00 .00 .00 .00 00 00 .00
.00
.00
JOB NO. 14053-000 ROBINSON REFINRY MODERNSTN PROJ-MOC REPORT NO. C38090--58
$$$$$*:**:**
OF BUCGET ACCTff QUANT
SEWERS DRAINAGE SEWERS DRAINAGE SEWERS ORA INAGE SEWERS ORAINAGE SEWERS DRAINAGE SEWERS DRAINS
AI6S31 LF B09S31 LF
B23S31 LF B29S31 LF B32S31 LF B99S31 LF
36T0 300
1033 174
1000
______ 40
**TOTAL SEWERS ORAINAGE
6217
TREND FORECAST MH......il908 TREND
FOCUS
QUANTITY AND UNIT RATE REPORT
SEWERS ORAINAGE
S31
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 114 BUCGET MEEK 116 OF 121
FCST
TO
S004
DATE
#$**$*$*? ******
THIS WEEK
n >u u Htj
BUDGET
FCST
TO
S004
DATE
******** *******************
THIS WEEK
BUDGET FCST
SO04 *********
TO This
DATE
WEEK
*******
3161 287
1537 179 976
90
3161 287
1537 179 976 90
.0 2468 0 171 0 688 0 170 0 4262
0 25
3415 1209 3366
400 3329
189
3415 1209 3366
400 3329
189
0
.67
1.08 1.08
.00
0
.57
4.21 4.21
.00
0
.67
2.19 2.19
.00
0
.98
2.23 2.23
"".Off"
0
4.26
3.41 3.41
.00
0
.63
2.10 2.10
.00
6230
6230
FORECAST PERF
0 1.55
7784
11908
11908
"PERFORMANCE "RATIOS ~
0 1.25 ........ 1.00
i
i
Oil
o il
1.91
1.91
.00
1.55..... ..... .00 ...
i
8
10 4 4
* !'
?0
c
0
6
b f,
10
18 o ?l
JOB NO . 14053-000 ROBINSGN REFINRY MOOERNZTN PRO J -MOC REPORT NO. C 38090--58
F 0CUS
QUANTITY ANO UNIT RATE REPORT
PRECAST MANHOLES
S32
PERFORMANCE WEEK ENDING
BASEO ON 5/21/82
OATE 5/24/82 PAGE 115
BUDGET HEEK 116 OF 121
RCXU Uli 1 UL 4 ^ 1 1 UH
OF ACCT# QUANT 33****** $$$$WTW JVA *I8T. YV.WX"A.W<^k J^W V* IrVTWafVc A*ir*AY* V*AY. '
BUDGET
FCST 5004
TO DATE
rYYYYYYYYYrrYk'1
PRECAST MANHOLES PRECAST RANHOLES PRECAST RANHOLES
BOSS 32 EA B23S32 EA B32S32 EA
lIl 78 8 466
**TOTAL PRECAST MANHOLES
12 15 15
TREND FORECAST MH
1420 TREND FORECAST PERF
PRECAST RANHOLES ......A16S32 UNITS
2000
2400
2400
SSTGTAL PRECAST MANHOLES
2000
2400
2400
TREND FORECAST MH
3038 TREND FORECAST PERF
THIS WEEK
0 0 0
BUOGET
FCST
TO THIS BUDGET FCST TO THIS
$004
OATE WEEK
"$cor
DATE
week
******* *$*****$#*$* 333333 333333* YTYYYYYY 333333333 ****** *3******
136 855 2 80
4 579
837
4 579
837
0 136.00
4.00 4.00
0 122.14 72.38 72.38
0 70.00 139.50 139.50
.00 .00 .00
0 1271
1420
1420
0 105.92 94.67 94.67
.00
.93
** PERFORMANCE RATIOS **
1.00
.93
.93
.00
0 2450
3038
3038 ..........0...
1.23 ... 1.27 ..1.27
.00
0 2450
3038
3038
0
1.23
1.27 1.27
.00
1.03
3* PERFORMANCE RATIOS **
1.00
1.03 1.03
.00
GARRARD 00000818
Ik '
fl ''
3 '3
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC REPORT NO. C38090--58
ACCOUNT DESCRIPTION Accra
UNIT OF
QUANT
BUDGET
FOCUS QUANTITY AND UNIT RATE REPORT
FINE GRAOINGELEVIG S41
FCST #004
TO DATE
THIS BUOGET WEEK
FCST #004
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 116 BUDGET WEEK 116 OF 121
TO DATE
THIS BUOGET WEEK
FCST 0004
TO DATE
THIS
WEEK $$$$**$
FINE GRAOING 6 LEVEL FINE GRADING 6. LEVEL FINEGRAOING 6 LEVELL FINEGRAQING LEVELI FINE GRADING 6 LEVEL
A16S41 B09S41 B2JS41 B29S41 B32S41
SF SF SF
SF SF
*$TOTAL FINE GRADINGELEVIG
TREND FORECAST MH
70470
2200
21990 2534
10
46872
2200
21990 500
3400
46872
2200
21990 500
3400
97204
74962
74962
3245 TRENO FORECAST PERF
0 6146
1900
1781
0
.09
0 215 65 65 0 .10 0 1925 768 920 0 .09
0 225 66 66 0 .09
0 1 413 413 0 .10
0 8512
3212
3245
0
.09
.49
** PERFORMANCE RATIOS
1.00
.04 .03 .03 .13
.12
.04
.49
.04 .03 .04 .13
.12
.04
.49
00
.00 .00 .00 .00
.00
.00
?0
2'
23
5 F 9 13
''
20 30 37
1?
--
0
<1
3!
*
V-
- -..................... ............... ............ ..................
.............. .........................
61
6'.
Cl
6-
fA
rr
.0 6 ?(
......... ..........l_______ ______
fs
GARRARD 00000819
flU
JOB MO. 19053-000
ROBINSON REF INRY MQDERNZTN PROJ-MOC REPORT NO. C38090-5B
FOCUS
QUANTITY ANO UNIT RATE REPORT
DEMOLITION
S98
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/29/82 PAGE 117 BUDGET WEEK 116 OF 121
ACCOUNT DESCRIPTION ACC T
UNIT - OF
QUANT
CGET
DEMOLITION
B23S98 UNITS
SSTOTAL DEMOLITION ......
100 100
-QUANTITY-
FCST
TO THIS BUOGET
aoo9
date
WEEK
********
******** ******
100
loo
0 9996
100
100
0 9996
MANHCURS-
FCST
TO
-UNIT THIS BUDGET FCST
*009
~ DATE" WEEK"
aoo9
******** ********
MANHOURSTO
DATE
$$$$$$
65 n
5613
0 99.96 66*1 3 66 *13
6613
6613
0 99.96 66.13 66.13
THIS WEEK
.00 .00
3
......- *
?
9 IP
12
TREND FORECAST MH
6613 TREND FORECAST PERF
1.97
PERFORMANCE RATIOS
1.00
1.97 1.97
.00
GARRARD 00000820
*
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PRQJ-MGC REPORT NO. C3B090--58
FOCUS QUANTITY AND UNIT RATE REPORT
S/C SUPPLIED DISTR XXX
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 11B BUOGET WEEK 116 OF 121
ACCOUNT DESCRIPTION UNIT-----------------------------QUANTITY--------------------------- ------------------------ MANHOURS--------------------------- ------------ ------- -UNIT MANHOURS
OF EUCGET FCST
TO
THIS BUOGET
FCST
TO THIS BUDGET FCST
TO
ACCT QUANT
********************* $$$$$ $3*
********
004
OATE
WEEK $
004
OATE WEEK
004
OATE
********* ********* ******** v,rv TY"r
MORRIS DISTRIBUTABLE S09XXX BMHRS
1
0
00
i
42 5
1091
0
1.00
.00
.00
ALLEN-DISTRIBUTABLES SZ9XXX BMHRS
0
0
00
0
230
759
0
.00
. .00
.CO
HOKE-DISTRIBUTABLES S32XXX BMHRS
0
0
00
0 200
205
0
.00
.00
.00
THIS WEEK
.00 .00 .00
oi
: O
**TOTAL S/C SUPPLIED OISTR
1
0
0o
1
855
2055
0 1.00
.00
.00
TREND FORECAST MH
2055 TREND FORECAST 'PERF.00
^PERFORMANCE RATIOS **
1.00
.00
.00
.00
'
in u 13
e
JOB NO. 14053-000 ROBINSON REFINRY MODERNZTN PROJ-MOC > REPORT NO. C38090--58
FOCUS
QUANTITY ANO UNIT RATE REPORT
PAINTING
FSC35 X10
PERFORMANCE WEEK ENDING
BASED ON 5/21/B2
DATE 5/24/82 PAGE 119
BUCGET WEEK 116 OF 121
0
e
ACCOUNT DESCRIPTION UNIT-------------------
-QUANTITY---------------
------------------------ MANHOURS
-UNIT MA NHOURS--
o
OF BUCGET FCST
TO
THIS BUDGET
FCST
TO THIS BUDGET FCST TO THIS
...........
ACCT if QUANT
3004
DATE
WEEK
3004
DATE WEEK
3004
DATE
KEEK.... "
***$*$*<
*******
******************** JrW-WrfeTV^1.-WrW .tAriWpW
$ tTVTVTTT - V-*- T TTT
o
PAINTING
FSC S00X10 SF
**TOTAL PAINTING......... FSC35
75800 75800
57760 57760
37885 37885
3775 3775
8340 8340
2750 2750
030 1730
224 224
li .11
.05 .05
.05 .05
06 06
o
) TREND FORECAST MH
FORECAST PERF
.42
PERFORMANCE RATIOS
1.00
.43
.42
.54
o
ro
co c0 ca
t9
c
c
c
GARRARD 00000822
o
!
im
lo
i '*
GARRARD 00000823
f
'
#
JOB NO. 1 <(053-000 ROBINSON RF.FINRY HOOERNZTN PROJ-MOC REPORT NO. C38090-58
ACCOUNT DESCRIPTION ACCffi
UNIT-----------------OF EUCGET
QUANT ..................
FOCUS QUANTITY AND UNIT RATE REPORT
LARK PAINT FSC<tO X40
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 120
BUOGET WEEK 116 OF 121
-QUANTity---------
FCST
TO
#004 ..........DATE
VVVrVXTvrTTTT
THIS WEEK
------------------------ MANHOURS--------------
BUDGET
FCST______ TO
.......
#004
Bate
THIS WEEK
------------ .------ unit manhours------------------
BUDGET FCST
TO THIS
...# C 04.......... DATE
WEEK
LARK PAINTING
FS S00X40 SF
15000
19425
19425
0 750
899
899
0
.05
.05
.00
I
--*TOTAL LARK PAINT FSC40
15000
19425
19425
0 750
899
899
0
.05
.05
.05
.00
TRENO FORECAST MH
899 TREND FORECAST PERF
.93
PERFORMANCE RATIOS **
1.00
.93
.93
.00
9
2<:
y A
c...........
.........
JOB NO. 14053-000 ROBINSON REFINRY MOOERNZTN PROJ-MOC jpl REPORT NO. C38090-5B
o' J
OF BUCGET ACCT# QUANT ** JritrJ* JY* **,,JptvJ4tJMr Jit`JrtYJr-Jvr JrAVJ* JrrrATJrTJrvrfc t*'-J*r^-rJrrJ-WrJTr JrTJrVJrx*vJWrJ^rJvr rrV
.
FOCUS
QUANTITY AND UNIT RATE REPORT
SCAFFOLDING
Y10
UIT -
FCST
TO
#004
DATE
THIS BUDGET
WEEK ****** $4* $
FCST #004
PERFORMANCE WEEK ENDING
BASED ON 5/21/82
DATE 5/24/82 PAGE 121 BUCGET WEEK 116 OF 121
TO THIS BUDGET
DATE WEEK ******* $$****
FCST #004
TO OATE
THIS WEEK
to to to to to to i to 1 to
SCAFFOLDING n SCAFFOLDING
SCAFFOLDING SCAFFOLDING
A16Y10 BMHRS A31Y10 BMHRS B23Y10 BMHRS C50Y10 BMHRS
19186 746
20928 1608
25390 0
20928 1384
25390 0
20928 1384
0 19186
77607
7 742 7
13
1.00
3.06 3.05
.00
0 746
0
0
0
1.00
.00
.00
.00
0 20928
28735
28735
0 1.00 ! 1.37 1.37 .00
0 1608
1434
1434
,0 1.00 ' 1.04 1.04 .00
*STOTAL SCAFFOLDING
42468
47702
47702
0 42468 107776 107596
13
1.00
2.26 2.26
.00
TREND FORECAST MH
107596 TRENO FORECAST PERF
2.26
$ PERFORMANCE RATIOS **
1.00
2.26 2.26
.00
SCAFFOLDING SCAFFOLDING SCAFFOLDING SCAFFOLDING SCAFFOLDING SCAFFOLDING SCAFFOLOING SCAFFOLDING SCAFFOLDING SCAFFOLDING
SCAFFOLDING SCAFFOLOING
B09Y10 MHRS
0
0
00
0 2052 2052
0
.00
.00
.00
.00
B24Y10 MHRS
0
0
0a
0 1585 1585
0
.00
.00
.00
.00
B25Y10 MHRS
0
0
00
0 198 2 1982
0
.00
.00
CO
.00
B28Y10 MHRS
0
0
00
0
964
964
0
.00
.00
ocT
.00
B29Y10 MHRS
0
0
00
0
98
98
0
.00
.00 .00
.00
B32Y10 MHRS
0
0
00
0 1740 1740
0
.00
.00
.00
.00
B41Y10 MHRS
0
a
00
0 1479 1479
0
.00
.00
.00
.00
B42Y10 MHRS
0
0
00
0
920
920
0
.00
.00
.00
.00
B43Y10 MHRS
0
0
00
0
846
845
0
.00
.00
.00
.00
B44Y10 MHRS
0
0
00
0 4753 4753
0
00
iOO~ TO
.00
B45Y10 MHRS
0
0
00
0 2368 2368
0
.00
.00
.00
.00
B99Y10 MHRS
0
0
00
U
104
104
0
.00
.00
.00
.00
$*T0TAL SCAFFOLDING
0
0
00
0 18891 18890
0
.00
.00
.00
.00
TREND FORECAST MH
18890 TREND FORECAST PERF
.00
* PERFORMANCE RATIOS **
.00
*00
.00
*00
8 .
40 43
y. 48
42
GARRARD 00000824
65
.'Ci