Document NG3VjQD1K84J8gkn6rMoro89R
>
. 1. du Pont de Nemours & Company-Wilmington. Delaware
INOINOmNa 0SPAMTM1MT
May 3, 1968
^
CC: Adrian Linch-Orchem-Chambers 8. B. Lewis
H. D. Boyce
J C Lang
R. K. Mason
W. C. Wearer
"
Site Safety Supervisor -----
FIELD PROJECT MANAGERS
F. C. BATLIS, ASHTABULA V. S. BRIGGS, BEAUMONT J. J. BELL, BREVARD A. D. DAY, CAPE FEAR C. S. ANDERSON, CHAMBERS WORKS W. S. FREE, CHATTANOOGA
' H. S. STANTON, CIRCLEVILLE
K. G. CAUGHMAN, HOUSTON R. H. DAVIS, KINSTON R. G. STERNBERGER, LOUISVILLE
J. K. ADDISON, MARTINSVILLE V. A. SAMANS, MAT A. S. TRUMPORE, MEMPHIS H. F. REDMILE, OLD HICKORY H. J. FEINEN,SAVANNAHRIVER E. K. DRAWDY, SEAFORD
S. V. HINSON, VICTORIA
R. L.SPITZ, WASHINGTON WORKS S. KREWATCH, WAYNESBORO G. E. BARLOW, JR., WILM. AREA
DUST CONTROL - ENVIRONMENTAL AIR MONITORING
With reference to the writer's memorandum dated April 5, 1968, entitled
Safety - Dust Control, please be advised that a training session will be conducted for the purpose of instructing Safety Engineers who are assigned the responsibility of collecting air samples.
The meeting will be held May 21, 1968, 8:00 A.M. ,at Howard Johnson's Motor Lodge, Route #896, Newark, Delaware. The attached list of personnel will be expected to be in attendance. Reservations have
been made at Howard Johnson's Motor Lodge for the evening of May 20.
Participants may make return travel arrangements any time after 1:00 P.M. May 21, 1968.
The training session is being conducted to instruct those responsible
for applying the instrument and collecting the necessary technical data on how to administer the air monitoring program. Instruments will be assigned to each project representative In attendance*
Your usual cooperation is appreciated and if there are any further questions, please contact the writer.
CONSTRUCTION DIVISION
PLAINTIFF'S EXHIBIT DUP-1741
K. E. Keuper Division Safety Superintendent
KEK/dlm Attachment
errrse Twines pom bcttcn uvino ... thmovO* cmcmistmp
DUP U30906
DU 057278
E. I. do Pont oe Nemours 5 Company Wilmington, oslawarc imm
CMOlMCCIttMO OCPAKTMCNT
^ * 7 l' rr]
May 2, 1968
The following procedure was issued on April 5, 1968, to Du Pont's Field Project Managers at its various Construction sites.
SAFETY - DUST COI.'THOL
In order to assure atmospheric conditions in insulation fabrication shops which will not contribute to the employees' health problems when working with asbestos fiber-containing materials, the Construc tion Division is initiating the following permanent air quality control program to be effective June 1, 1968.
Air Monitoring
Environmental air monitoring shall be conducted to provide quanti tative data for site evaluation of dust control efficiency and assure conformance with established Threshold Limit Values (TLV).
1. The Threshold Limit Value for total dust count shall be 500,000 particles per cubic ft. of air.
2. Personnel monitoring will be conducted in the insulation shops on site locations. One employee will be requested to wear the air sampler one eight-hour day each month.
3. Trained site safety personnel shall be responsible for the control, operation and adjustment of the air sampling instrument, recording required technical data associated with the air sample, mailing of air sample to laboratory for analysis and compiling records of analysis reports.
L. When soliciting participation in the air monitoring program, craft supervision and Safety Engineer should anticipate who will be involved in work which will produce the greatest oust exposure for what day of that month.
eerren rmwea ron errree uvino ...rwaoueM entmiarmr
DIJP 1130907
DU 057279
*******
2 3o ry
Air Monitorinr. (Continued);
c c
r t
5. The personnel air sampling instrument used shall be a Universal Industrial Equipment Co., Hillipore filter Model 440B (qualified for explosion hazard areas) air sampler. The filter used shall be an .8 micron pore size, Millipore Cat. No. MAUG 037 AO, Type AA, in plastic holder. This equipment will be assigned to the sites where air monitoring is required by the Division Safety Office.
6. The filter in plastic holder, upon completion of air sampling, shall be nailed by the site Safety Engineer to Morton Corn, Ph.D., Graduate School of Public Health, University of Pittsburgh, Pittsburgh, Pennsylvania 15213, attention Felix Stein. A phase microscopy analysis of submitted sample will be made and a report submitted to the site and the Division Safety Office indicating: (a) fibers below 5 micron length, (b) fibers above 5 micron length, and (c) total number of particles. Reports indicating total particle count to be ap proaching or above the TLV will require determining cause of condition and taking corrective action to reduce particle count. After improvement has been applied, a second eight-hour sample shall be con ducted, analyzed and documented.
Atmospheric Dust Control
The application of the following recommendations should demonstrate conformance v;ith the established dust TLV and provide effective dust emission control.
> 1. Materials containing Crocidolite asbestos fiber shall not be purchased or accepted for use. Materials containing Chrysotile and Amosite asbestos fibers are acceptable for usa.
2. The pressure spray application of materials with any per cent of asbestos fiber content shall be eliminated.
3. All pov/er tool and equipment operations shall be isolated from other shop facilities and fabricating operations.
DUP II30908 DU 057280
-i Atn:ospheric I>ust Control (cor.-.inucd ):
H f /
U. All power shop equipment -hall, when operated, have installed exhaust ventilation of sufficient capacity to remove duct particles at point of origin. Exhausted dust particles shall be collected by an effective col lector system which will not allow vent-off of dust particles to the atmosphere.
5. Present controlled shop cleanliness programs shall be expanded. A vacuum clearer should be used in lieu of broom sweeping to remove iust particles from shop equipment work tables, ledges, floors, etc.
6. A controlled materials handling program should be adopted to eliminate the emission of dust; for example, when opening and removing materials from shipping cartons or in the handling and mixing of asbestos cements.
Respiratory Protection
Severe or isolated conditions may require that respiratory protective devices be used. Consideration should be made for adequate protection of peaplc in adjacent areas to the work location producing this condition. A supplied air respirator or a filter respirator manufactured by Mine Safety Appliance Co., Pittsburgh, Pa., Model Dustfoe 77 with filter number BM 21 B-9" should be used.
Tour usual cooperation is anticipated In administering these dust controls.
CONSTRUCTION DIVISION
S/ K. E. Keuper ivision Safety Superintendent
DUP 1130909
DU 057281
DUST SAMPLING PROGRAM
Air Analysis
1. Work environment evaluation - Consider not only insulation installation exposure but also dismantling work, grinding metals and cutting other materials, welding, etc.
2. Insulation exposure to be applied first week of each month. If results indicate improvement required after correction is.made, a second proof sample must be made within that specific month.
3. Selection of participant employee - Safety Engineer with the Craft Superintendent and Craft Foreman will select the participant. This should be based on that individual employee's work assignment(s) for the day of sampling. It is expected that the employee subjected to the most severe exposure in producing dust from the varied work assignments will be selected.
4. Introduction to employee wearing the instrument making air sample - Example of approach: "For your protection, we are interested in continuing to control the amount of dust in the air. We are requesting your participation by wearing this dust measuring instrument while you are working today. It will not interfere with your movements, and there are no adjustments that you will have to make."
5. Special dust problems - prior to collecting sample,contact Division Safety Office. This is to assure that analysis can be made on sample submitted. (V/e are limited to 30 samples a month.)
Use of Instrument
1. Instrument is assigned to you (Safety Engineer trained and qualified in operation of instrument) and you are held responsible for condition of instrument, application of instrument, recording technical data, mailing sample, and compiling- results at site location.
2. Preventive maintenance and/or re-calibration will be performed by Adrian Linch, Medical Section, Chambers Works. Frequency for re-calibration will be determined by Mr. Linch.
3. Work Sheet - This is made out in triplicate (3 copies). One carbon is to be retained at site and original and one carbon copy are to be submitted with sample plastic holder to Mr. Stein, University of Pittsburgh.
(OVER)
DUP 1130910
DU 057282
2 Check pump flow, instrument performance, work activity, material exposure and"record Dump flow rate (re-adjust if necessary to required flow;, time checked and sign. This is to be performed at a minimum of every two hours. III. Handling of Sample 1. Seal filter plastic container, insert plastic container along with two copies of work sheet in mailing tube and mail to:
Morton Corn, Ph.D. Attention: Felix Stein Graduate School of Public Health Dept, of Occupational Health University of Pittsburgh Pittsburgh, Pa. 15213
(
May 17, 1968 K. E. Keuper
DUP 1130911
DU 057283