Document NEx3j5ap72XE1knRDK5Y9axLb
(conoco)
Interoffice Communication
to
From
G. L. Foshee p. L. Fetzer
--
Date January 17, 1980
Subject
Summary Updatefor Ship Loading Dosimeter Data During 1979
''
Attached is the latest update of the ship loading dosimeter testing conducted during December, 7979*
cc/ JAI)-WVH-NM-DFM-RHC-JEM-MJ
Wc 019311
PATE
Jatai 12/18-19/79
HOSE CONNECTION & BLIND REMOVAL
14.53 2.99
PEUSOt . DOSIMETER SUMMARY OF SluP MONITORING DATA
HEEL SAMPLING
LOADING OPERATION II. 0. ADDITION VENT DEC. DOCK SHACK
FINISH
CARGO SAMPLES
1.53
.42
.08(a) .37(a) .05(a) .08(a) .72(a) .09 3.07(a) .04(a) .30(a) .04(a) .43(a)
HOSE DISCONNEG' & REBLINDTNG
VVC 0 0 0 0 1 9 3 1 2
a - 8-hr dosimeter test
\,
DATE_____________ 9/4,5,6/79 Helios (VCM)
HOSE CONNECTION & BLIND REMOVAL
0.20 5.40 0.04 1.91
1
PERSON L DOSIMETER SUMMARY OF S*_P MONITORING DATA
HEEL SAMPLING
1 .06
II. Q. ADDITION
<0.01 3.19
LOADING OPERATION VENT REC. DOCK SHACK
0.08(a) 0.02(a) 0.05(a) 0.03(a) < 0.01(a)
02(a) .01(a) .09(a)
finish
CARGO SAMPLES
10/6,7,8/79 Delta Gas
10/9,10/79 Beta Gas
Hardanger 10/16, 18/79
1.20
5.07 11.32
6.15 16.87
5.6
1.07 1.97 0.25 0.46
7.0 12,76
0.10 0.03
0.40 0.41
.05(a)
1.08
.09(a) 08(a)
0.01(a)
,15
Epsilon Gas 10/30-31, 11/1/79
G. P. Barge 801/802
< ^
11/13, 14/79 (a) 8 hour dosimeter
o oo Koo
(Jj
*-- u> ,t
0.04 0.07 0.31
1.66 .66
1.11 0.59(a)
0.12 0.00
0.01(a) 0.01(a)
0.10(a)
HOSE DISCONNEC' & REBLIMPING
1.05 56.94
8.11 2.01
.88
4.09 1 1.74
5.11 4.93
0.10 0.63 0.96 0.64 0.18
361.00 5.96 6.31
UPDATE
SHIPLOADING
FOR NOVt. .lsER , 1979
.
DATE G.P. 601/802 7/29/79 G.P, 801/802 8/7,8,/79 Beta Gas 8/16,17,18/79
Sunny Duke 8/25,26,27,28/79
HOSE CONNECTION & BLTND RFMOVAL
.40 .21 1.40
.64 .74 .80
1.34 .82 .10 .22 .28 .30 .41 .19 .19
0.14 0.51 1.88 0.45 0.24 0.33 0.40
PERSONNF DOSIMETER SUMMARY OF SHI* MONITORING DATA
HEEL SAMPLING
LOADING OPERATION II. 0. ADDITION VENT REC. DOCK SHACK
.10(a)
0.71(b)
1.80(a) 1.80(a) 30.44
3.35(c)
1.65 .34
0.19 0.15
11(a) 08(a) 04(a) .04(a) .01(a) 07(a) 01(a) .01(a)
113(a) 05(a)
0.9(b) 0.1(a) 0.96(a) 0.60(a) 0.52(a) 0.26(a)
finish
CARGO SAMPLES
36.13
HOSt: DISCONNECT h REDLINDING
.64 .30
0.01
6.54 6.18 6.64 1.44 1.50
0.5 0.08
(a) 8 hr. dosimeter (b) Job Function Test--task unknown (c) Taking sample for Oxygen in Vapor Space
*Vc 0o0l 9Ji4
(conoco)
Interoffice Communication
To G. L. Foshee
From P L. Fetzer
Date January 12, 1979
subject
Surmiary Update for Ship loading Dosimeter Data During 1978
Attached is the latest update of the ship loading dosimeter testing conducted through December, 1978.
JM)-WVH-HTM-DRU-RHC-EEM
vvc ooooi 9315
DATE
G.P. Barge 1/13,14/78
HOSE CONNECTION AND FLANGE REMOVAL
5.46 Hose Conn.
PERSONNEL DOSIMETER SUMMARY OF SHIP MONITORING DATA
HEEL SAMPLING
HYDROQUINONE ADDITION
LOADING OPERATION
VENT REC.
DOCK SHACK
1.27 Oxygen on Tanks
Epsilon Gas 1/22 ,23,24/78
Sunny Duke 2/18, 19, 20/78
G.P. Barge 2/20/78
.05 Blind Removal 1.20 Hose Conn.
1.16 Hose Conn. 6.38 Blind Removal
4.02 Hose Conn.
.09 .02
.26
.08 .54
G. P. Barge
3/1/78
0.0 Hose Conn. 3.70 Blind Removal 0.72 Hose switching
Delta Gas
4.81 Hose Conn
3/15,16,17,18,/78 0.00 Blind Removal
0.0 0.64 Oxygen
on Tanks
G. P. Barge 3/13,19/78
G. P. Barge
Pentland Brae 5/24,25/78
0.0 Hose Conn. 0.0 Blind Removal
13.71 Hose Conn. 31.96 Blind Removal
5.27 Hose Conn 2.80 Blind Removal 1.42 (a)
0.26
0.54
0.17(a)
0.10 Head gas
0.70(a) 0.23(a)
0.0 (a)
0,15 (a)
0.30 (a) 0,12 (a) 0,0 (a) 0,0 (a) 0.80 (a) 0.57 (a)
0.85 (a)
0.35(a)
0.04(a) 0.72(a) 0.48(a)
9IE6I00 3/m
FINISH CARGO SPL.
HOSE REMOVAL AND FLANGE INSERTION
21.20 Hose Disconn. 32.63 Hose Disconn.
3.38 Insert Blind
128 Hose Disconn. 5.8 Insert Blind
0.0 Hose Disconn.
63.54 Hose Disconn. and blinding
19.72 Hose Disconn. 0.99 Reblinding
0.0 Hose Discorm. 239.37 Hose Di^conr..
36.75 Hose Disconn. 31.60 Reblinding
2.51 0.59 check leaks
(a) 8~hr Personnel Dosimeter
- DATE
GP Barge 7/13/78
Gamma Gas 7/18,19,20,
21/78
GP Barge 7/21/78
GP Barge 7/26,27/78 Beta Gas
GP Barge 8/11/78 .
Beta Gas 8/12/78 GP Barge 8/22/78
HOSE CONNECTION AND FLANGE REMOVAL
1.26 Hose Conn. 15.46 Blind Removal
0.06 Hose Conn. 1.76 Unblind
65.88 Hose Conn. 3.28 Unblind
0.75 Hose Conn. 5.62 Unblind 2.23 Hose Conn. 2.04 Unblind
1.11 Hose Conn. 1.0 Blind Removal
54.45 Hose Conn. 2.18 Blind Removal 1.06 Hose Conn. 3.47 Blind Removal 2.46 Blind Removal
PERSONNEL DOSIMETER SUMMARY OF SHIP MONITORING DATA
HEEL SAMPLING
HYDROQUINOiiE ADDITION
LOADING OPERATION
VENT REC.
DOCK SHACK
2.96
10.44
0.61
-
.
0.30(a) 0.45(a) 0.22(a) 0.19(a) 0.03(a) 0.10(a)
2.51
1.46
0.38(a) 1.00(a)
0.70
0.76
> /X6r00nn - 00 3aa
FINISH CARGO SPL.
HOSE REMOVAL AND F:LANGE INSERTION
0) 1.67 Hose Disconn. 1.80 Insert Blind 45.96 Insert Blind
0.06(a)
6.54 Insert Blind
0.80
0.58 Hose Disconn. "5.02(1) Hose Disconn.
1.40 Reblind 1.71 Reblind
2.65 Hose Disconn. 2.23 Reblind
36.99 Hose Disconn. 7.41 Reblind
0.61 1.49
150
Hose Disconn. Hose Disconn. Reblinding
1.19 Hose Disconn.
(1) Hose Disconnected GP 801 and Hose Connected to GP 802
r\ot
in-.'. i - t . ~ t-
.. DATE
HOSE CONNECTION AND FLANGE REMOVAL
PERSONNEL DOSIMETER SUMMARY OF SHIP MONITORING DATA
HEEL SAMPLING
HYDROQUINONE ADDITION
LOADING OPERATION
,
VENT REC.
DOCK SHACK
Reina Del Rama i/26/78
9.29 Hose Conn. 2.40 Blind Removal
0.35(b)
0.14
i. P. Barge 1/19/78 >/20/78
i. P. Barge J/28/78
. P. Barge 0/6/78
. P. Barge 0/19/20/78
.P. Barge 11/3/78
psilon Gas 11/24/78
1.43 Hose Conn.
1.28 Hose Conn. 2.96 Blind Removal
0.51(a)
1.90 Blind Removal 0.45(c)
1.65 Hose Conn. 1.15 Blind Removal
0.53 Hose Conn. 1.78 Blind Removal
1.85 Blind Removal
0.18
2.30
0.06(a') 0.07(a) 0.06(a) 0.11(a)
0.05(a) 0.08(a) 0.05(a)
0.07(a) 0.06(a)
0.06(a) 0.07(a)
0.07(a)
0.06(a) 0.08(a) 0.11(a) 0.51(a) 0.75(a)
FINISH
HOS
CARGO SPL. 2 AND FLANGE INSERTION
o >>
10. 37 Hose Disconn.
2.98 Hose Disonn. 4.19 Reblinding
1.55 Hose Disconn. 1.29 Reblinding -
4-08
3.84 Hose Disconn. 24.42 Hose Disconn.
0.54 Hose Disconn. 0.54 Reblinding
5.04 Hose Disconn. 30.28 Reblinding
(a) 8-hour personnel dosimeter (b) Head gas sampling (c) Both hose connection & blind removal
DATE
Gamma Gas 12/4/5/6
Mundo Gas Atlantic 12/30 to' 1/3/79
HOSE CONNECTION AND FLANGE REMOVAL
0.31 Hose Conn. 0.66 Blind Removal
PERSONNEL DOSIMETER SUMMARY OF SHIP MONITORING DATA
HEEL SAMPLING
HYDROQUINONE ADDITION
LOADING OPERATION
VENT REC.
DOCK SHACK
o
PO
O'
o
o oo
FINISH CARGO SPL.
o> >
0.83
0.11
.04(a) .09(a) .07(a) .04(a)
.34
HOSE REMOVAL AND FLANGE INSERTION
7.44 Hose Disconn. 0.83 Reblinding
0.19 Hose Conn.
*
0.30 Blind Removal
0.06(a) 0.06(a) 0.02(a)
89.1 Hose Disconn. 1.20 Reblinding
(a) 8-hr Personnel Dosimeter