Document NEx3j5ap72XE1knRDK5Y9axLb

(conoco) Interoffice Communication to From G. L. Foshee p. L. Fetzer -- Date January 17, 1980 Subject Summary Updatefor Ship Loading Dosimeter Data During 1979 '' Attached is the latest update of the ship loading dosimeter testing conducted during December, 7979* cc/ JAI)-WVH-NM-DFM-RHC-JEM-MJ Wc 019311 PATE Jatai 12/18-19/79 HOSE CONNECTION & BLIND REMOVAL 14.53 2.99 PEUSOt . DOSIMETER SUMMARY OF SluP MONITORING DATA HEEL SAMPLING LOADING OPERATION II. 0. ADDITION VENT DEC. DOCK SHACK FINISH CARGO SAMPLES 1.53 .42 .08(a) .37(a) .05(a) .08(a) .72(a) .09 3.07(a) .04(a) .30(a) .04(a) .43(a) HOSE DISCONNEG' & REBLINDTNG VVC 0 0 0 0 1 9 3 1 2 a - 8-hr dosimeter test \, DATE_____________ 9/4,5,6/79 Helios (VCM) HOSE CONNECTION & BLIND REMOVAL 0.20 5.40 0.04 1.91 1 PERSON L DOSIMETER SUMMARY OF S*_P MONITORING DATA HEEL SAMPLING 1 .06 II. Q. ADDITION <0.01 3.19 LOADING OPERATION VENT REC. DOCK SHACK 0.08(a) 0.02(a) 0.05(a) 0.03(a) < 0.01(a) 02(a) .01(a) .09(a) finish CARGO SAMPLES 10/6,7,8/79 Delta Gas 10/9,10/79 Beta Gas Hardanger 10/16, 18/79 1.20 5.07 11.32 6.15 16.87 5.6 1.07 1.97 0.25 0.46 7.0 12,76 0.10 0.03 0.40 0.41 .05(a) 1.08 .09(a) 08(a) 0.01(a) ,15 Epsilon Gas 10/30-31, 11/1/79 G. P. Barge 801/802 < ^ 11/13, 14/79 (a) 8 hour dosimeter o oo Koo (Jj *-- u> ,t 0.04 0.07 0.31 1.66 .66 1.11 0.59(a) 0.12 0.00 0.01(a) 0.01(a) 0.10(a) HOSE DISCONNEC' & REBLIMPING 1.05 56.94 8.11 2.01 .88 4.09 1 1.74 5.11 4.93 0.10 0.63 0.96 0.64 0.18 361.00 5.96 6.31 UPDATE SHIPLOADING FOR NOVt. .lsER , 1979 . DATE G.P. 601/802 7/29/79 G.P, 801/802 8/7,8,/79 Beta Gas 8/16,17,18/79 Sunny Duke 8/25,26,27,28/79 HOSE CONNECTION & BLTND RFMOVAL .40 .21 1.40 .64 .74 .80 1.34 .82 .10 .22 .28 .30 .41 .19 .19 0.14 0.51 1.88 0.45 0.24 0.33 0.40 PERSONNF DOSIMETER SUMMARY OF SHI* MONITORING DATA HEEL SAMPLING LOADING OPERATION II. 0. ADDITION VENT REC. DOCK SHACK .10(a) 0.71(b) 1.80(a) 1.80(a) 30.44 3.35(c) 1.65 .34 0.19 0.15 11(a) 08(a) 04(a) .04(a) .01(a) 07(a) 01(a) .01(a) 113(a) 05(a) 0.9(b) 0.1(a) 0.96(a) 0.60(a) 0.52(a) 0.26(a) finish CARGO SAMPLES 36.13 HOSt: DISCONNECT h REDLINDING .64 .30 0.01 6.54 6.18 6.64 1.44 1.50 0.5 0.08 (a) 8 hr. dosimeter (b) Job Function Test--task unknown (c) Taking sample for Oxygen in Vapor Space *Vc 0o0l 9Ji4 (conoco) Interoffice Communication To G. L. Foshee From P L. Fetzer Date January 12, 1979 subject Surmiary Update for Ship loading Dosimeter Data During 1978 Attached is the latest update of the ship loading dosimeter testing conducted through December, 1978. JM)-WVH-HTM-DRU-RHC-EEM vvc ooooi 9315 DATE G.P. Barge 1/13,14/78 HOSE CONNECTION AND FLANGE REMOVAL 5.46 Hose Conn. PERSONNEL DOSIMETER SUMMARY OF SHIP MONITORING DATA HEEL SAMPLING HYDROQUINONE ADDITION LOADING OPERATION VENT REC. DOCK SHACK 1.27 Oxygen on Tanks Epsilon Gas 1/22 ,23,24/78 Sunny Duke 2/18, 19, 20/78 G.P. Barge 2/20/78 .05 Blind Removal 1.20 Hose Conn. 1.16 Hose Conn. 6.38 Blind Removal 4.02 Hose Conn. .09 .02 .26 .08 .54 G. P. Barge 3/1/78 0.0 Hose Conn. 3.70 Blind Removal 0.72 Hose switching Delta Gas 4.81 Hose Conn 3/15,16,17,18,/78 0.00 Blind Removal 0.0 0.64 Oxygen on Tanks G. P. Barge 3/13,19/78 G. P. Barge Pentland Brae 5/24,25/78 0.0 Hose Conn. 0.0 Blind Removal 13.71 Hose Conn. 31.96 Blind Removal 5.27 Hose Conn 2.80 Blind Removal 1.42 (a) 0.26 0.54 0.17(a) 0.10 Head gas 0.70(a) 0.23(a) 0.0 (a) 0,15 (a) 0.30 (a) 0,12 (a) 0,0 (a) 0,0 (a) 0.80 (a) 0.57 (a) 0.85 (a) 0.35(a) 0.04(a) 0.72(a) 0.48(a) 9IE6I00 3/m FINISH CARGO SPL. HOSE REMOVAL AND FLANGE INSERTION 21.20 Hose Disconn. 32.63 Hose Disconn. 3.38 Insert Blind 128 Hose Disconn. 5.8 Insert Blind 0.0 Hose Disconn. 63.54 Hose Disconn. and blinding 19.72 Hose Disconn. 0.99 Reblinding 0.0 Hose Discorm. 239.37 Hose Di^conr.. 36.75 Hose Disconn. 31.60 Reblinding 2.51 0.59 check leaks (a) 8~hr Personnel Dosimeter - DATE GP Barge 7/13/78 Gamma Gas 7/18,19,20, 21/78 GP Barge 7/21/78 GP Barge 7/26,27/78 Beta Gas GP Barge 8/11/78 . Beta Gas 8/12/78 GP Barge 8/22/78 HOSE CONNECTION AND FLANGE REMOVAL 1.26 Hose Conn. 15.46 Blind Removal 0.06 Hose Conn. 1.76 Unblind 65.88 Hose Conn. 3.28 Unblind 0.75 Hose Conn. 5.62 Unblind 2.23 Hose Conn. 2.04 Unblind 1.11 Hose Conn. 1.0 Blind Removal 54.45 Hose Conn. 2.18 Blind Removal 1.06 Hose Conn. 3.47 Blind Removal 2.46 Blind Removal PERSONNEL DOSIMETER SUMMARY OF SHIP MONITORING DATA HEEL SAMPLING HYDROQUINOiiE ADDITION LOADING OPERATION VENT REC. DOCK SHACK 2.96 10.44 0.61 - . 0.30(a) 0.45(a) 0.22(a) 0.19(a) 0.03(a) 0.10(a) 2.51 1.46 0.38(a) 1.00(a) 0.70 0.76 > /X6r00nn - 00 3aa FINISH CARGO SPL. HOSE REMOVAL AND F:LANGE INSERTION 0) 1.67 Hose Disconn. 1.80 Insert Blind 45.96 Insert Blind 0.06(a) 6.54 Insert Blind 0.80 0.58 Hose Disconn. "5.02(1) Hose Disconn. 1.40 Reblind 1.71 Reblind 2.65 Hose Disconn. 2.23 Reblind 36.99 Hose Disconn. 7.41 Reblind 0.61 1.49 150 Hose Disconn. Hose Disconn. Reblinding 1.19 Hose Disconn. (1) Hose Disconnected GP 801 and Hose Connected to GP 802 r\ot in-.'. i - t . ~ t- .. DATE HOSE CONNECTION AND FLANGE REMOVAL PERSONNEL DOSIMETER SUMMARY OF SHIP MONITORING DATA HEEL SAMPLING HYDROQUINONE ADDITION LOADING OPERATION , VENT REC. DOCK SHACK Reina Del Rama i/26/78 9.29 Hose Conn. 2.40 Blind Removal 0.35(b) 0.14 i. P. Barge 1/19/78 >/20/78 i. P. Barge J/28/78 . P. Barge 0/6/78 . P. Barge 0/19/20/78 .P. Barge 11/3/78 psilon Gas 11/24/78 1.43 Hose Conn. 1.28 Hose Conn. 2.96 Blind Removal 0.51(a) 1.90 Blind Removal 0.45(c) 1.65 Hose Conn. 1.15 Blind Removal 0.53 Hose Conn. 1.78 Blind Removal 1.85 Blind Removal 0.18 2.30 0.06(a') 0.07(a) 0.06(a) 0.11(a) 0.05(a) 0.08(a) 0.05(a) 0.07(a) 0.06(a) 0.06(a) 0.07(a) 0.07(a) 0.06(a) 0.08(a) 0.11(a) 0.51(a) 0.75(a) FINISH HOS CARGO SPL. 2 AND FLANGE INSERTION o >> 10. 37 Hose Disconn. 2.98 Hose Disonn. 4.19 Reblinding 1.55 Hose Disconn. 1.29 Reblinding - 4-08 3.84 Hose Disconn. 24.42 Hose Disconn. 0.54 Hose Disconn. 0.54 Reblinding 5.04 Hose Disconn. 30.28 Reblinding (a) 8-hour personnel dosimeter (b) Head gas sampling (c) Both hose connection & blind removal DATE Gamma Gas 12/4/5/6 Mundo Gas Atlantic 12/30 to' 1/3/79 HOSE CONNECTION AND FLANGE REMOVAL 0.31 Hose Conn. 0.66 Blind Removal PERSONNEL DOSIMETER SUMMARY OF SHIP MONITORING DATA HEEL SAMPLING HYDROQUINONE ADDITION LOADING OPERATION VENT REC. DOCK SHACK o PO O' o o oo FINISH CARGO SPL. o> > 0.83 0.11 .04(a) .09(a) .07(a) .04(a) .34 HOSE REMOVAL AND FLANGE INSERTION 7.44 Hose Disconn. 0.83 Reblinding 0.19 Hose Conn. * 0.30 Blind Removal 0.06(a) 0.06(a) 0.02(a) 89.1 Hose Disconn. 1.20 Reblinding (a) 8-hr Personnel Dosimeter