Document NEw4xq7y8MVNNEv0XEkgv3RZR

A.Z. ?ufahl J. SIdlovsky J.51. Stevens *..J. Welsh Joolery n.J. Setter Gould lernard UNION CARBIDE CORPORATION CHEMICALS DIVISION PLAINTIFF'S EXHIBIT USG-480 REPORT OF CALL Credit Dept TecH Service lob Speciol Work Requested CHemicols Advtg CHonge Moiling list By Mr. Miller Mr. R.K. Carton & Hr. Fred Thonpso Dote March 5 thru 10 Full Name Address U.S. Gypsum Gelena Park, Texes M(rs of Interviewed (Give full names and titles) Mr. Charles Gaertner, Process On^ineer Mr. Harvey Givis, General Foreman Designate Persons Concoined And Unde-'line i Action *s Required N.B DSO Note Comp Info Tie objective of our trial at C.S. Gyps* vas to demonstrate retention effects of High Purity Asbestos as evidenced by product appearance improvement and savesI1 efficiencies. Since their senilla board is based on a waste paper furniah, filler retention is extremely hard to evaluate. During our initial trial in September 1966, tbe 2% asbestos add! tiou apparently created drying problems which caused U.S. Gypsum to slew their machine down. In order to avoid a repetition of this situation, we sutually asreed that 11 addition should be the first level evaluated during this trial period. The effect on speed and minor freeness of 11 addition appeared negligible. Although the asveall efficiency apparently i.up roved appreciably, it was suggested that our control period was not truly representative of tbeir saves11 ' standard performance and hence should be measured during their next run of manllla board. If this period duplicates our control period for this particular trial, then we have indeed shown a significant lsprovement. The next step taken during our week bong effort was the elimination of one out of three of the top11oar vats. Tbe purpose behind this action was to, hopefully, achieve casp arable topliner coverage with leas topllner. Mr. Pred Thompson has U.S. Cypsua's machine log figures on tbe liner caliper which will be compared against liner caliper measured during the period January 4, through January 13. To justify our asbestos on tUs basis, we estimate that a reduction In caliper of at least one half point would be necessary. Successive steps in our mill trial includad raising the asbestos addition to lfcZ and then DjI. Neither of these c he ages appear to affect machine Feed, Liner freeness, caliper, or seveail performance. (cone, next page) U.S. CYPSUH GALENA PARK TEXAS Page -2- (cont.) As soon as Hr. Fred Thompson reports the results of his analytical work, we will visit U.S. Gypsum and review our entire effort todate. At this stage, we cannot be optimistic as to the economic justification for High Purity Asbestos in this customer's rranilla board production. Following is a summary of sample data collected during the U.S. Gypsum trial. Please note that the figures are averages calculated to correspond with the various asbestos addition levels. RAM:bb REEL NO'S ASB SPEED 234-250 266-320 *322-356 *353-190 *392-400 0 405 17. 397 17. 396 1*7. 426 1*7. 415 * Two liner vats LINER FREE 239 195 188 211 205 &M GAL. LINER SOLIDS VATS 'JHITENATER SAVE-ALL IN OUT SM0C1 POROSITY NESS 32.0 30.8 42.2 42.3 38.2 10.1 10.7 7.3 7.7 "7.7 4.50 1.29 4.35 0.52 3.90 0.53 3.73 0.49 4.53 0.55 1.37 1.65 1.65 1.29 1.23 35 42 49 40 37