HAZOP-PC 1.00
Company: DOW CHEMICAL CO. T~-ocess: HDPE - POLY B
Node: 4 Page: 1
+------------------------------------------------------------------------------------------------------------------------------------------------------------------ --
Node: 4 DR-2006 Outlet to Transfer System
Parameter: Flow +--------------------
Intention: 33,000 Lb / Hr
|GUIDEWORD DEVIATION POSSIBLE CAUSES
CONSEQUENCES
RECOMMENDATIONS BY |
No
No Flow Rotary valve
Plug dryer.
Alarm rotary
KW
failure.
Powder entrainment feeder shutdown.
Polymer plug.
to Sorbathene.
Train shutdown.
Trip feed to
KW
DR-2007.
Monitor amps on * motor (MDR-2008)
Reverse
Reverse Flow
Excessive wear. Incorrect clearances.
Plug dryer. See NODE 4.
Evaluate system location of blower control.
KW
Two rotary feeder * valves installed
H----------------------------------------- 1----------- ------------------------------------I--------------------------- ------- ------I--------- 1-
A 12095? CONFIDENTIAL
Worksheet
HAZOP-PC X.00
Company: DOW CHEMICAL CO. T''"Ocess: HDPE - POLY B
Node: 4 Page: 2
+-------------------------------------------------------------------------------------------------------------------------------------------------------------------------- +
Node: 4 DR-2006 Outlet to Transfer System
Parameter: Temperature H--------------------
Intention: 80 - 90 Deg. C
|GUIDEWORD DEVIATION POSSIBLE CAUSES
CONSEQUENCES
RECOMMENDATIONS BY |
Less
Lower
Loss of heat to High solvent level HAZOP water
GC
Temp
the jacket.
in the powder.
system.
Too high feed rate.
High emissions. High hydrocarbon
Limit flow to
*
Loss of
levels in the
DR-2007 / See
Sorbathene system check hopper.
Node #11.
Loss of nitrogen
to DR-2008.
HAZOP Sorbathene. GC
Loss of water to
the jacket.
Fouled jacket.
+------------------ 4------------------- +----------------------------------- +------------------------------------- +----------------------------------- +------+
DO A 120953 CONFIDENTIAL