Monsanto rHO. iNA'-l % LOCATION l R. S. Yates - General Offices oit November 6, 1967 aa.iainci Minutes of Project Meeting #4 Held November 3, 1967 CEA 1800 - Aroclor Expansion - WGK TO : Messrs. Present J. P. Blankenship R. B. Degenhardt J. R. Fullgraf D. D. Kick 0. A. Klingler R. Q. Brown W. J. Burkett J. G. Clifton R. R. Cook T. A. Jackson UA-MS8!H9t' R. P. Stevens R. B. West Review of Project Progress: 1. Schedules and Control Schedule will be published as the Master Project Schedule by 11/10/67. Schedule problems arise because P&S does not schedule with the Design Coordinator and Project Manager the equipment specification completion dates. These dates are necessary so AC&M drafting can schedule its drafting load properly. We will leave the project in Area 1. Problems in chang ing equipment numbers at this late date will result in extra paper work and present chance for design errors. 2. Models a. Tank Farm Preliminary model has been reviewed by Mr. Ray and found acceptable. Mr. Tfi99 can now proceed with definitive piping plans and elevations. b. Manufacturing Area Mr. Farroll will begin work on the preliminary model the week of 11/6/67. 3. Process and AC&M Design Process design is behind schedule due to lack of manpower and the unexpected illness of Mr. Gabelman, PM of CEA 1430. Mr. Yates has had to devote some effort on CEA 1430 at the expense of CEA 1800. TOWOLDMONOQ45164 Minutes of Meeting 2 November 6, 1967 Specs are complete on tank farm pumps, filters and biphenyl storage tank and pump. Work is proceeding on chlorinators and associated equipment. Instrumentation has been added to engineering flow dia grams and these have been reviewed with Mr. Ray. Biphenyl feed system and therminol unit flow diagrams have not been completed,, Mr. Fullgraf has completed an equipment specification log sheet but it lacks completion dates. 4. Soil Tests We expect a soil test report from our consultants next week. Preliminary tests indicate the soil conditions are poor and the preliminary recommendation is for a driven pile foundation. Alternate methods will be evaluated for us. Time of Meeting: 30 minutes R. S. fates vo Ol2*752 TOWOLDMONOQ45165