SAMPLE RESULTS AND GUIDELINES
rev 07/90
These are general guidelines oniy. If there are any question please consult with lead operator or foreman.
SAMPLE TEST SPEC NORMAL OUT-OP-RANGE ACTIONS
LSBII H20 0-100 0-50
Check Recovery Still btms 1st, then other streams. H20>100 should nor be tolerated.
2P-A
H20 0- 90 45-80
Check dryer status. Compare result w/bp. May exceed 90 short-term if bp is high.
DHB
0-100 0-75
Try adjusting steam/fd, check
reboiler for fouling, etc.
LHP
H20 0-100 0-10C
Do nor pump to Btms pit. Re
work ro DH still. May have
solids m tank if can't dry.
3P FECL3 0-10 0-4
Notify lead opr. Btms pit may need ro rework rank.
LSBII FECL3 0-25 0-15
High numbers usually seen with high BP irons. Chk all strms if BP is not high.
VDCM FECL3 0-30 0-20
Notify VDCM and ask them to take sreps to lower irons.
02/03 H20 0-150 0-50
Notify P/T if >100 and try to determine source or moisrure.
02/03 FECL3 0-25
10-20
Notify P/T if >25, identify source and correct.
02/03 GC/EDC 0-10 0-10
3-10 0-5
Without Vulcan exchange. With Vulcan exchange.
SL 001A12
LSBII GC/EDC 0-10
BP GC/EDC 0-50 SLUDGE pH 6-12
0-3
15-30 6-9
Notify EDC that Rec Still Btms
is high in EDC%.
coffSSJTctii- r?'
Subjec.t taoic-al m>-c',vy ri^
Low pH should be corrected bgf raising c 11 liquor flow.
"
TET CIW pH 1'.3-7.8 7.3-7.8 Add soda ash/acid as needed.
SAMPLE TEST SPEC NORMAL OUT-OF-RANGE ACTION
tetsop07
CTW *20-X40 120-140 If>140 increase biowdown,
if<120 decrease blowdown.
OW U-P04 15-20 15-20 If<15 add 2040, if >50 add 2040 crw f-P04 15-20 15-20 If (unfil - fil) >3 add 2020. aw 2020 30-50 30-40
aw f rse CL2 .1- .5 .1-.5