RESEARCH AND DEVELOPMENT REPORT ANNISTON PLANT
OTHER LOCATIONS
GENERAL OFFICE
W. G. Engnan - Krummrlch
P. B. Hodges F. J. Holzapfel U. B. Papageorge W. R. Richard J. R. Savage
Raporf No. ________1___________
Job No. 446-514___________
DotoJonunrv IS, t Q71
ANNISTON PLANT
J. T. Bell J. L, Etheredge V. R. Hsupt J. C. Landwchr G. W. Miller W. F. Taffce E. G. Wright
Tlllei Peneeeeli Pfoblopi
Aroclor Pollution Study I. Renew A A. Helton (J. L. Brown) Removal of Aroclor from the waste water by flltratlon-adeorptlon.
Jastlflcetiem
Pollution Control
Sneryt
Aroclor was removed from the plane effluent by filtration of the neutralize tlon pit solIda on which Aroclor vae adsorbed and by adsorption on the filtration media. Aroclor concentrations (100-8,000) In the plant effluent were consistently reduced to 10 ppb upon passing through a four (A) inch diameter tube (packed to a bed depth of 5.5 Inch with activated carbon) at flow rates up to 350 cc/min. In the som) filtration study conducted under similar operating conditions, the Aroclor levels in the effluent were not consistently reduced to the target level (< 10 ppb).
The presence of 200-1000'ppm of solid particles (size range 1.5-25QM) tended to blind the filter, thus setting a maximum limit on the pressure and flow at which the unit had to be operated.
lsh Ransav PR&D Chemist
M0NS 087497
Aroclor Pollution Study FR&D Report
Peg* 2
BACKGROUND:
Initial Research effort* for removing Aroclor from the waste stream were cantered primarily around thre* conventional approaches: multiple distillation, adsorption and extraction. After considering the economic and technical factors Involved In each approach, It was fait the approaches should ba evaluated In sequence listed above. The following paragraphs ar* presented to up-date previously research efforts and to show the basis for tha work bring reported.
Cost evaluations were mads by Dr. Wise, CED, for both a distillation and extraction system for removing Aroclor from the waste water. Dr. Wist concluded that tha cost for either of theta systems was likely t- be considerable greater than that for an adsorption system. A decision was made at thla point to abandon these approaches and pursue the adsorption approach In depth.
Initial screening of various adsorbents (l.e, carbon typas, porocal, attapulgus day, powdered polyethylene) bysorptlon-rleotb*ro-.Mits was vary Inconclusive. The Aroclor levels were reduced to <10 pplT'tn alT tfie isotherm tests regardless of the adaorbant or the amount of adsorbent uaed. The reason for tha erroneous results was later found to 11a In the fact that Aroclor was being adsorbed on tha reactor walls, particulates In the solution, as well as the adsorbent being tested. Tic.-, tha lab Che rp dtudiedT fl.i. foTlotiliJg-couclus'lohs ware drawn AAliAvoelor levels in t>lnot .eftiu*ur.,cn be reduced to..an_gqss?SlblA.lAJ!i>i.--J> CC.IO WlO.by adsorption! b) Further evaluation should be dona on an adsorption column utilising a feed of constant Aroclor concentration.
Tha studies reported herein ware conducted at the original neutralisation pit (hereafter designated as pit #1) and newly constructed neutralisation (hereafter designated pit #2). Fit #1 was distinguished from pit #2, during the course of etudy, by both Its consistently higher suspended solid* end Aroclor concentre Clone. Fit #1 has been operational since 1961 while pit #2 ha* been operational since October, 1970.
In a 13 day pilot run at pit #1, Initial concentrations of 1,000-8,000 ppb Aroclor In the waste were reduced to a range of 0-15 ppb upon passing through a serlee of packed carbon bed* at a average flow of 25 cc/mln. Over 997. of Aroclor removal occurred In the prefilter. This unusual reduction was found to be due, in part, to the filtration of solids on which Aroclor was adsorbed. Since the average flow per square foot was quite low for this particular study, It was felt chat the prefilter observation should be evaluated at higher flow ratae. This report contains the result of the studies carried out using both carbon and aand filtering media for treating waste water from pit #1 and #2.
1. The adsorber consisted of a prefilter (3.5 Inch diameter packed to a 5.5 Inch bed depth end a series of one (1) Inch diameter columns pecked to a total bed depth of 13.5 ft.
hqns 08 749a
Aroclor Pollution Study PR&D Report
EXPERIMENTAL 1. Plow Diagram
CP By-Pas
Pit Jabaeo
Model P-6-M-6
Pump
Filter
Pag* 3
o
Preaaura Gauge
*A 3.5 inch diameter tube was used in the carbon atudy at the old neutralisation pit.
2. faraUaa
.
A 24 hour composite sample (300 ml) was taken by catching a 100 ml.sample every
8 hours.
Occasionally, smaller samples were caught at shorter Intervals
and composited.
,
3. Plow Rate
Plow to the filter was controlled by adjusting two needle valves (diagram above). A calibrated rotameter was used to measure flow. A given flow rate was difficult to maintain due to the back pressure created by the build up of fine solids in the filter. The unit was back washed when necessary to maintain a relative constant flow. In the studies conducted at pit Pi, flows ware started at the lowest rate (100 cc/mln.) end then Increased to maximum 350 cc/min. This approach was reversed in the send study at the pit #2. The maximum flow (350 cc/mln.) could not be maintained ever an eight (8) hour period due to the high beck pressure.
4. Analytical Analysis
The Aroclor was extracted from the aqueous sample into a hexane solvent. The hexane solution was then dried and analysed on a EC/GC. The concentration of Aroclor 1221, 1242, 1254 was determined by comparing the main peak height of the unknown with height of the same peak in the chromatograms of known Aroclor solutions of 1221 1242, and 1254.
MONS 087499
Aroclor Pollution Study FRAD Report
Page 4
DISCUSSION OF RESULTS
For clarity of the following dlacueelon, it la neceeeery here to explain the difference In the quality of the effluent from pltt #1 and #2.
During the courae of thla atudy, the effluent from pit #1 generally contained ahoutJjOOO ppm of aollda and Aroclor eoncentratlona In the range (1000-80000 ppb) Table 1 & 2. A prolonged atudy of the effluent quality (l.e. aollda and Aroclor levala) Indicator that high Aroclor eoncentratlona generally correapond to high aollda. Preeently, the aollda lavel In pit #2 la kept at minimum. The effluent from pit #2 normally contalna about^OO jppb of aollda and 50-100 ppb Aroclor except during perloda In which large quanltle'a of acid (HC1) are being eevered. Thla accounta for the higher valuer aeen In Tablaa 3 A 4.
Carbon conrlatantly reduced the rolld end Aroclor eoncentratlona In the effluenta from pita #1 A 2 to an acceptable level (< 10 ppb) at flow rater up to 350 cc/mln. (Table 1 A 3). The mechanlam by which Aroclor la being removed cannot totally bo explained, bitting evidence lndlcatee adaorpclon on the pit aollda. However, attempta to determine the adeorptlve capacity of the aollda were unauccaaaful. The lower quantity of aollda (200 ppm) in the effluent from the pit #2 had aeemingly little effect on the quality of effluent produced.
Ae it can be aeen from Tablet 2 A 4, the quellty of effluent reallxad in the aand filtration waa not aa dramatic at in the carbon atudy. Aroclor levele In pit #1 effluent (Table 2) were elgniflcantly and rather conelacently reduced without producing an acceptable effluent (< 10 ppb) quality. Comparatively, the effluent quellty produced at the pit #2 waa very lnconalatent (Table 4). The effluent quality varied between high and low valuer without draatlc changer In Influent Aroclor levele or operating conditioner
The following factora may explain the reaulta obtained:
a. The aollda level of Influent varied conalderably during the teat period. b. Silica type adaorbent requlrea a conalderably longer contact time to
adaorb Aroclor than carbon.
The teat data for both the aand and carbon atudlea auggeat that the Aroclor removal la taking place by filtration of pit aollda on which Aroclor haa been adaorbed and by adaorptlon on the filtering media lteelf. Further, it alao iuggerta that the adaorptlon aone with carbon la quite ahort and quite long with aand. '
The aollda in the waate atream cauaed conalderable operational dlfficultlea.
Theae aollda, of which 421 of ita particlea were In the 1.5 -
alze, tended
to bldnd the filter, eepeclally at flow ratea > 200 cc/min. Backwaahlng the
filter did not adequately remove the finer particlea. Hence^theae Aroclor con-
telning particlea were eventually waahed through the filter. Thla point waa
coneldered a breakthrough.
HONS 087500
Aroclor Pollution Study PR&D Report
Page 5
CONCLUSION
1. Aroclor It removed from the plant effluent by the filtration of the eollde on which Aroclor wee adsorbed.
3. The effectlvenete of aand in removing Aroclor la not aufflclent at the experimental bed depth.
4. SolIda removal la a primary concern In any final clean up method.
hotm-h0**
1. A pilot adeorptlon atudy haa been conducted In a aerlca of S Inch diameter columna. Theta reault are being compiled for an evaluation and recommendation. A report will be laaued by 1/28/71.
2. A pilot clarification (flocculation) unit la echeduled to be put In operation by 1/29/71. This unit will alao be uaed to carry out aeml* contlnuoua adeorptlon etudlee with other finely divided aollda.
Jw Attachment!
HONS 087501
V
Page 6
CARBON FILTRATION STUDY AT OLD PIT
TABLE 1
,
Velum Treated (Cal.)
38 *9 160 *173 198 236
Aroclor Con centratlon
of XnfLunt
(pp b) 1221 }242 1254
84 106 NDA
1750 188 NDA
MU 618 NDA
6051 2638 NDA
559 147 NDA
2106 441 NDA .
Average Dally Flow
(GFM)
Aroc or Concan eratlon oi Effluent
1221
(ppb) 1242
1254
0.0263 0.042 0.042 0.0263 0.0263 0.0263
NDA NDA NDA 21 14 NDA NDA MDA NDA
7 5 NDA NDA NDA NDA 4.0 1.2 NDA
Unit plugged. SolIda wara oread ehr nigh aa tba praaau on filter i created.
HONS OB 7 5 0 2
Toluaa Treated
36 76 114 152 190 228
SAND FILTRATION STUDT AT OLD NEUTRALIZATION PIT
TABLE 2 I
Aroclar
Cencentratlon
of
Influent
12421221
(ppb) 1254
Average Dally Flow (6PM)
ft
Arocior Concentration
of Effluent
1221
1242
1254
4100 4000 NDA
0.0263
---
8000 2750 NDA
0.0263
138 5
NDA
0.0263
48000 3650C NDA
0.0263
---
2594 844 NDA
0.0263
157 12
NDA
1800 400 NDA
178 12