Document NENdX8G4DVreqqYZ8wXYnOewV
LOSS PREVENTION AUDIT Page 49
Management of Process Change/Project Reviews
MANAGEMENT OF CHANGE
REFERENCES: U.S. Area Standard No. 2, OSHA 1910.119 (1)
A 1. Yes [X] No Does your plant's program for Management of Change include a written procedure which complies with Dow's U.S. Area Standard No. 2? See Attachment.
A 2. When was your last audit for compliance with the Management of Change Standard? (Date) 10-20-94.
Yes [X] No Have all recommendations from your last audit been closed?
Please furnish documentation of your last audit findings.
B 3. What is the involvement of your operation and maintenance personnel in the Management of Change process? They have been trained and are part of the CA II plant checklist.
A 4. Please provide documentation of several completed checklists used for process changes during the pre-audit.
A 5. Yes [X] No Are all employees, Dow as well as contractor, informed of and trained for process changes that affect them prior to the initiation of the change?
How? Formal training sessions, tailgates, safety meetings, and communique book and yellow notes.
(Revised 02/18/94; cmk) 3/28/95; LADibwb
DO O
LOSS PREVENTION AUDIT Page 50 _______
Management of Process Change/Project Reviews
PROJECT REVIEWS
REFERENCES: Minimum Requirements, U.S. Area Standard No. 2
A 1. Yes [X] No 0 Does your department have Engineering Project Reviews or other Project Review Processes?
Who is involved? Project team members, operations, maintenance, safety, environmental, etc...
B 2. Describe your process for handling recommendations from the project reviews. No formal process - have meeting with Engineering, operations plant staff, etc, discuss recommendations and change as needed.
Please furnish documentation for the follow-up from these recommendations.
B 3. Describe how new projects are integrated into the plant's operating discipline. Training, tailgates, updating plant resources, new/modified procedures. P&ID updates, control programs, operating discipline updates.
(Revised 02/18/94; cmk) 3/28/95; LAD.-bwb
DO A 047P71 OONFTDFNTIA1
LOSS PREVENTION AUDIT Page 51______________ _______
E. Pre-Startup Safety Review
REFERENCES: Site Specific Standards, Dow Minimum Requirements, June
1989, OSHA 1910.119 (i)
A l. Yes [X] No Do you have a Pre-startup Safety Review for all new facilities or changes to existing facilities?
Plans: Safety & Loss Prevention Standard C-6.
A 2. Do the pre-startup reviews address the following:
a. Yes [X] Plans:
No 0 Construction and equipment in accordance with design specifications?
\ b. Yes [X] No Safety, operating, maintenance and emergency
procedures are in place and are adequate?
Plans: ________________________
Yes [X] No 0 Have the recommendations from the project
review process been completed or considered? Plans: _______________
Yes Q No [X] Recommendations from the plant Process Hazard Analysis have been resolved and implemented prior to startup?
Plans: No HAZOP reviews
Please provide documentation for 2.a.b.c.d.
[18/94; cmk) :bwb
DO A 047??; CONFTDFNT T Ai
LOSS PREVENTION AUDIT Page 52 ___________________
A 3. Yes [X] No Q Do you verify that training for all employees involved in operating the process has been completed prior to startup?
Plans:___________________________________________ _________ ______
Please provide documentation.
(Revised 02/18/94; crak) 3/28/95; LAD:bwb
DO A 047003
c oNrinrNTTAi
CHLOR-ALKALJII MANAGEMENT OF CHANGE NOTIFICATION OF PROCESS CHANGE CHECKLIST
iype: LEVEL 1 (minor)
O LEVEL 2 (moderate)
O LEVEL 3 (major)
Originator:Date of Origination:_________________
Proposed Date of Change: Area:
PERMANENT TEMPORARY From:To:
Description and Location of Change (Scope):
Technical Basis for Change:
Impact on: G Safety Type of Change: G Alarm G Shutdown Point
Q Instrument
G Loss Prevention G Environment GHealth GQuality OotherT
G Process Computer Control
G Addition/Removal of Equip. G Piping Modification
O Equip./Material Modification
G Chemical Addition
Q Job Procedure RL #_______
G Process Setpoint Change
G Product Specification Change
Q Other________________
Applicable
N/A Initials
Pre-Modification Checklist:
G Applicable N/A
Consult piping and equipment specifications.
G Applicable Gn/A
Perform Reactive Chemicals testing. O Yes Q No
In Process? O Yes No
G Applicable Gn/a
Add materials involved to Toxic Substance Control Act (TSCA) inventory.
G Applicable N/A
Calculate impact on F&EI and CEI.
G Applicable G N/A
Comply with Engineering Practices.
G Applicable Gn/a
Comply with Technology Center guidelines.
i Applicable Gn/a
Comply with Dow 'Environmental Protection Guideline for Operations".
G Applicable Gn/a
Comply with Safety & Loss Prevention and block requirements.
G Applicable Gn/a
Consult maintenance. (Name)_____________________________________________
G Applicable G N/A
Consult l&E supervisors/block contact. (Names)__
G Applicable Gn/a
Consult Computer/Programming Support. (Name),
G Applicable Gn/a
Consult parts supervisor. (Name)_______________
G Applicable G n/a
Consult Operations. (Names)___________________
G Applicable G Applicable
G n/a
G N/A
Evaluate and modify relief system. (Name)_______ Contact Industrial Hygiene/Environmental. (Name),
G Applicable G N/A
Contact Process Engineering. (Name)___________
G Applicable Gn/a
Complete required reviews. (Name Them)_____________
G Applicable Gn/a
CHAMPS - EMTS / P/PM Systems Updated. (List Them),
G Applicable Gn/a
ISO-9002 change - see ISO contact. (Name)___________
G Applicable G N/A
GMP change - see GMP contact (Name)______________
G Applicable Gn/a
Other. (Name Them)__ _________________ ;___________
Post-Modification Checklist (Before Startup)
G Applicable Gn/a
________
Perform pre-startup audit (C-6).
G Applicable Gn/a
________
Complete or update training program.
G Applicable Gn/a
________ Job/Emergency procedures written and approved (see RL #604).
G Applicable G N/A
________
Complete or update Reference Library (See Policy for Reviewing, Updating, and/or
Creating Procedures - RL #S85).
G Applicable Gn/a
________
P&ID's, process flowsheet and plot plans updated.
G Applicable G N/A
________
Personnel trained on the change.
G Applicable Gn/a
________
Computer code and documentation changed.
APPROVALS: Originator_____
st Reviewer:_
nnal Reviewer:
NAME:
DATE: Completion Date:,
gtdfAuguM 1. ItS4
1
on A 047004 CONF1 Df- NTT A!
CHL0R-ALKAL1II MANAGEMENT OF CHANGE INTERNAL DOCUMENTATION CHECKLIST
Check if Applicable:
CATEG-OBV
FI Heat and Material Balance Production Report / Calculations Freeze Protection 0 Heat Tracing List
CD PSV Design Basis & Documentation CD Air Permit Documentation
Log Sheets / Controlled Forms State Fire Marshal's Approval Mod5 Flow Diagram
CD SQC Charts / Input CD Equipment Access / Congestion CD Mod5 Program Change Checklist CD Plant Files Updated CD Block Electrical Diagram CD Instrument & Electrical Loop Sheets (B6 & B7) CD Electrical Equipment Tests CD Field Switches / MCC Starters / Equipment Labels CD Critical Instrument Checklist Updated CD LAD Environmental Project Checklist Reviewed
initials
( (
First Reviewer.
Date:
pWAugunt 1, It$4
C
2
DO A 047??5 CONFTDFNTIAl