Project Descriptions
Twelve capital projects are included in the Lake Charles VCM Plant Compliance Plan. A listing of these projects and individual project descriptions are as follows:
1) Combustion Air Control
$ 95.OM
This project provides for the installation of an
improved combustion air control system to minimize
incinerator bypasses due
to flameouts.
The
existing combustion air control system will be
revised to include: 1) vent header feedforward, 2)
liquid byproduct flow feedforward; 3) natural gas
flow feedforward; 4) firebox oxygen- concentration
feedback; and 5) feedback control of flame or
firebox temperature.
These modifications will
improve the control of excess oxygen and
incinerator firebox temperature to ensure complete
combustion and thereby minimize incinerator
bypasses due to flameouts.
2) Standby Blower Autostart
$ 39.5M
This project provides for -the installation of
automatic controls to start a standby incinerator
combustion air blower when the on-line blower
approaches maximum capacity. The proposed system
will;, minimize
incinerator
bypasses
due
to
flameouts that result from incomplete combustion
.associated with combustion air supply limitations.
3) 'Incinerator Burner Modifications
$158.OM
This project provides for the installation of new
burner assemblies in
Incinerators 1-901
and
I-901B. The new burner assemblies will improve
mixing of combustion air, fuel gas, "and vent
streams and thereby minimize incinerator bypasses
which result from incomplete combustion due to
insufficient mixing. *
CUM 00001146?
4) Oxygen Analyzers
$ 17.9M
This project provides for the installation of a
new in-situ oxygen analyzer in each of the
Incinerators to improve the control of excess
oxygen requirements for complete combustion.
Installation of the new in-situ oxygen analyzers
will provide
for
quicker response of the
combustion air blower to changes
in the
incinerator load and thereby minimize incinerator
bypasses due to flameouts.
5) Flame Arrestor Level Control
$ 9 . OM
This project provides for the installation of
instrumentation to prevent incinerator bypasses
due to low liquid seal flame arrestor level.
The
proposed system..provides .for. a. board mounted alarm
to indicate a malfunction of the emergency make-up
water valve.
Installation of these position
alarms will allow for quicker operator response
and thereby minimize incinerator bypasses due . to
low liquid seal flame arrestor level condition.
6) Auto Tie Breaker
$ 27.5m
This project will provide for the installation of
an automatic tie breaker system at the Stauffco
Substation.-- .The..new auto tie breaker provides for
a programmable controller system to sequentially
detect- a...-.loss of ..-.voltage on an incoming line,
check for ground faultsoh the secondary side of
the substation-, open' the switch on the-feed.-.which
lost power,
and close
the tie breaker.
Installation of this
auto tie breaker
will
minimize incinerator bypasses due to electrical
power- failures.-
7) Wet Vent and D.C. Vent Flow Alarms
$ 6.1M
This project ... provides,, for the installation of operator adjustable flow alarms for the wet vent and direct chlorination vent to alert the incinerator operators of changing conditions which could impact the incinerator. Installation of the adjustable flow alarms will provide for quicker operator response to changes in the incinerator load and thereby minimize incinerator bypasses due to high vent flows.
CWH 00001.1470
8) S-207 A&B Restriction Orifice
$ 0.2M
This project provides for the replacement of the existing restriction orifice in the vent line from the Flake Caustic Dryers, S-207 A and B. The new restriction orifice will limit the maximum vent flow and minimize incinerator bypasses due to high vent flow from the Flake Caustic Dryers.
9) HC1 Column Control
$142,014
This project provides for the installation of new HCl Column instrumentation to improve the control of the " column ' 'overhead and bottom product compositions. The proposed system will prevent excessive HCl concentrations in the tower bottoms and the resulting carryover to the .VCM Column. The Improved control., system^ will reduce , the need, to vent the * vinyl column condensers - and thereby minimize incinerator bypasses due to high vent flow from the vinyl column condensers.
10) Direct Chlorinator Feed Restriction
$ 4.1M
This project provides for the installation of new
'instrumentation'to prevent incinerator bypasses
resulting from impurities in the chlorine and
ethylene feedstock to the Direct Chlorinator. -The
proposed system, will provide two... high vent flow
alarms to alert operators such that the necessary
corrective., action -.-pan - be made to prevent
incinerator'bypasses which result from high/vent
flows associated-.with-- feedstock impurities..
cr
11) S.-102 Flow Indicator- Alarm
-- - -$ 4.6M
This project provides for the installation of a
flow indication for the vent from the Light Ends
Column Accumulator (S-102).
The flow indication
and alarm wi'ir~aid 'in"manual'venting management as
well as alerting main plant operators to. changing
conditions which could impact the incinerator.
12) Tank Farm Vent Eductor
$58.0M
This project provides for the installation of a
backup system for the Tank Farm Vent Blowers,
BL-412A and B to prevent incinerator bypasses due
to blower failure.
The proposed system provides
for a Kynar eductor using nitrogen as the motive
fluid to compress the tank vents.
The backup
system is
activated automatically when
the
operating blower trips out.
C'UH 000011471
March/ 1985
March 18 (10 min)
Flame failure high vents from oxy and R-101 S/U.
March 26 (3 min)
DC header due to low/low S-911B level - instrument problem.
April/ 1985
April 16 (90 min)
Power interruption to BL-902 controls - loss of air. Ignitor head to be replaced also.
Mav, 1985
May 7 (20 min)
Low combustion air flow. BL-902 trip out.
Julv. 1985
July 21 (50 min)
Plantwide 4160 power failure.
July 26 (15 min)
DC high vent flow - Pascal ship lined compressor to us.
Auaustz 1985
August 17 (2)
Related to C-203 startup activities, malfunction of a hand valve on condensers caused too much flow.
October r 1985
October 26
DC R/D blew for 9 hours. t
November, 1985
November 4 (45 min)
High amp S/D on BL-901A.
November 7 (12 min)
Loss of natural gas - LCCP closed valve.
November 28
High ethane LCCP S/U overamped blower.
Februarv, 1986
February 3 (2) a. Upset in EDC wash system put liquid in vent header.
b. High vent - undetermined source.
CUH 0000.U47
February 7
April, 1986
April 20 April 21 May, 1986 May 25
BL-902 trip out. BL-412 down due to T-450 steaming, later found line plugged on discharge.
BL-902 tripped. Wet vent valve tripped on - air line broke, maintenance.
Wet vent bypass, ship loading with DC vents split to both - wash system upset.
CWH 000011473