Document NEB7OBOD1rXa8k8d20XQ2b19E

b. Hard hai. c. Safety glasses without metal frames. J. Clean, dry leather gloves, or rated gloves. e. Long sleeve 100% natural liber shirt or Nomex jacket. f. High voltage probe on instrument. g. Removal of metal jewelry, such as watches, rings, tie clips, belt buckles, bracelets, etc. h. Rubber blankets. E. Material Handling 1. Contractor, if requested, shall provide proof of inspection and/or written certifi cation that material handling equipment (i.e. equipment used to lift materials) is safe and appropriate for the intended work. He shall restrict the operation of this equipment to properly trained person nel and shall, if requested, provide proofof training for those individuals. 2. Weights to be handled must be known before proceeding. J. Riggers must know the capacity and proper use of handling devices tcranes. forklifts, chain falls, come-alongs. clamps, chokers, and shackles) before proceeding. 4. Tag lines must be used to control loads. 5. Never raise or swing a load over people. 6. All protruding nails, wires or ragged metal edges must be removed or ham mered Hush, before handling. 7. Notify the Contract Administrator prior to using a crane or derrick of any type on -26- the Site. The following requirements also apply: a. Equipment shall meet OSHA require ments as stated in Construction Indus try--Siibpart N. 1926.550 -- Cranes and Derricks. b. Proof of compliance with Subpart N. 1926.550(6) shall be submitted to the Contract Administrator prior to start ing work. F. Stability Control Make every effort to ensure that materials and equipment are safe from unexpected movement such as falling, slipping, rolling, tipping, blowing over, or other uncontrolled motion G. Access. 1. Access routes to and from work >ites and safety aisles must be maintained free and clear of obstructions and be ade quately lighted. Consult with the Contract Administrator as to access routes for e\eavations. roofs*, process areas, and speciai equipment or areas. 2. Emergency equipment, electric discon nect switches, breaker panels, and saiets showers must not be blocked: nor mas anv cables, ropes, tape, hoses, or leads nc attached to such equipment. H. Excavations I. An Excavation Permit must be obtained from the Contract Administrator l'e!-re any excavation. While known utilities are indicated on existing drawings and most * The Contract Admumtraior will jftanec tor root crtr% . \r - 27 - DUP 09 t I 015