Document NE91B8GJ2mz6LwdMOMag08goE

CENTRAL ENGINEERING DEPT. DESIGN SECTION Salt Lake City, Utah November 17, 1971 Mr. J. W. English El Paso Plant EA-14-EP, N.Y. 2240, JOB NO. 550 CE-71-EP-28 - SOUTHWESTERN CONTRACTORS AND RIGGERS, INC. We have enclosed seven (7) sets of Construction Specifications for Steam Auxiliary Equipment and Piping for your use with Southwestern in supplying proper valves, fittings, insulation, etc., for the steam, condensate and water systems outlined on the drawings. Code designations on the drawings refer to these specifications. Concerning instrumentation we will hopefully place an order with Foxboro next week for all required components which were reviewed with Wellman-PG on Thursday, November 11th, in this office. Drawings are being prepared to interface this information with them and will be forwarded upon completion. AOM:jj .ends, cc:EHHaug WRKelly WRMahoney-w/epecs. LCBurt-w/specs. WRNasmyth-w/specs A. O. MARSH, Jr. PLAINTIFF'S EXHIBIT ASARCO ELP 0008861 CONSTRUCTION SPECIFICATIONS FOR STEAM AUXILIARY EQUIPMENT AND PIPING FOR CONVERTER GAS ACID PLANT EL PASO, TEXAS Prepared by Central Engineering Department Design Section Date November 17, 1971 ASARCO ELP 0008862 CONVERTER GAS ACID PLANT CONSTRUCTION SPECIFICATIONS Section on Steam Auxiliary Equipment and Piping Scope This section covers the installation of the following: 1. Steam auxiliary equipment. 2. All piping except in the Acid Plant proper. 3. Site clearance required for installing the above. Electrical and instrumentation work related to the above equipment will be covered under separate speci fications. Drawings The following drawings delineating the construction shall- be a part of these specifications. EP-17785 Power House-Boiler & Compressor Room-Arrgt. EP-17787 Site Clearance EP-17789 General Arrgt. Deaerator Installation EP-17790 Pipe Rack Plan-Area A EP-17791 Pipe Rack Sections-Area A EP-17792 Oily Condensate Filters-Area B-Plans EP-17793 Oily Condensate Filters-Area B-Sections EP-17794 Deaerator Plan Above Grade-Area C EP-17795 Deaerator Plan Above Elev. 3792'-4 -Area C EP-17796 Deaerator Sections-Area C EP-17797 Air Compressor Plan Above Elev. 3792'-4 -Area D EP-17798 Dump Condenser-Plan Above Elev. 3773'-0 -Area E EP-17799 Power House-Schematic-Modifications ASARCO ELP 0008863 2 EP-17802 Dump Condenser Plan Above Elev. 3798' 7-1/4 -Area E EP-17803 Dump Condenser Piping-Area E-Section A EP-17804 Dump Condenser Piping-Area E-Sections B & C EP-17811 Steam Drums-Plan-Area F EP-17812 Steam Drums-Section-Area F EP-17813 Converter Hood Piping-Area F EP-17814 Boiler Plans-Above 3773'-0 EP-17815 Boiler Sections-Area G EP-17816 Boiler Sections-Area G EP-17817 Boiler Sections-Area G EP-17818 Spray Chamber-Sections-Area H EP-17819 Pipe Support Details EP-17820 Pipe Support Details EP-17821 Key Plan and General Notes EP-17822 Air Compressor Plan Above Elev. 3773'-6 - Area D EP-17823 Air Compressor Sections-Area D EP-17824 Spray Chamber Piping Plans-Area H EP-17882 Converter Hood Piping Details-Area F EP-17883 Spray Chamber Air Piping & Misc. Details EP-17884 Spray Chamber Water Spray & Piping Arrgt. EP-17885 Spray Chamber-Acid Spray Piping EP-17886 Spray Chamber-Spray Piping & Controls-Schematic EP-17944 Boiler Plan Above Elev. 3803'-0 EP-17945 Steam Trap Details-Sheet #1 EP-17946 Tagged Item List & Steam Trap Details-Sheet #2 Manufacturer drawings of equipment furnished by Asarco. Drawings of existing installations pertinent to the work. ASARCO ELP 0008864 3. Work Conditions The Contractor shall do the work herein described furnishing all labor, supervision, tools, equipment and personnel facilities. The Contractor shall furnish all materials except as hereinafter described. The Contractor shall remove all demolished materials, equip ment and debris to disposal areas^designedPby the Plant ------- 2 Engineer. Equipment Furnished by Asarco Asarco will furnish the following equipment as specified in the listed Asarco requisitions. Air Compressor Req. No. CE-71-EP-3 Dump Condenser Req. No. CE-71-EP-4 Feedwater Pumps Req. No. CE-71-EP-5 Deaerator Req. No. CE-71-EP-6 Valves, Hoses & Nozzles for Spray Chamber Req. No. CE-71-EP-9 Orifice Flanges Reg. No. CE-71-EP-22 Condensate Storage Pumps Req. No. CE-71-EP-23 Boiler Check Valves Req. No. CE-71-EP-24 Spray Chamber Pumps On hand at Plant. Motors and Motor Starters Exceptions and Changes Requisitions pending. All exceptions or changes in these specifications or drawings shall be approved by the Asarco Project Engineer, and a written record maintained of all such exceptions and changes for sub mission to Asarco on completion of the project. ASARCO ELP 0008865 4. Site Clearance The Contractor shall clear the site as shown on the drawings for the installation of equipment and piping. This will include the removal of abandoned equipment and piping, the relocation and repiping of existing equipment, and the relocation of piping. Equipment The Contractor shall install all equipment shown on the drawings furnishing all except as listed above, and shall furnish and in stall all supports, structures and foundations required for the satisfactory installation and operation of the equipment. Manufacturer's installation instructions shall be followed in detail. Piping The Contractor shall furnish all material and equipment, including valves, hangers, supports and insulation; and shall fabricate and install all piping, fittings, appurtenances and devices necessary for complete piping system ready for operation. APPLICABLE PUBLICATIONS All piping shall conform to local codes if they are governing, and to the NBFU fire prevention code, as it applies, and Factory Mutual Engineering Corporation Standards. All welding shall conform to the requirements of the latest editions of the "American Standard Code for Pressure Piping" ANSI B 31.1a. Backup rings need not be used. All material furnished and procedures followed in the fabrication and erection of the pipe, valves and associated equipment shall ASARCO ELP 0008866 5. conform to the latest edition of "American Standard Code for Pressure Piping" ANSI B 31.1 and B 31.1a. MATERIALS AND WORKMANSHIP General; Materials of construction, valving and specialties shall be as hereinafter described. Piping Layout: Major piping shall be installed as shown-bn the drawings. Minor piping not shown on layout drawings shall be laid out in an orderly manner, grouping lines whenever possible and shall follow the diagrammatic layout shown on the drawings. Relocation in the field may be done only with the written consent of the Engineer. The installation shall be neat in appearance, and adequately supported. Every effort shall be made to locate piping and equipment which must be regularly serviced, inspected or tested so that this work may be done as easily as feasible. Lines shall slope in the direction of flow, a minimum of 1/8 inch per foot whenever possible, or as shown on the drawings. Pump piping arrangements shall be in accordance with the standard details shown on the drawings. Piping running through roofs, floors and walls shall pass through sleeves as follows: Floor: Sleeves shall be of standard weight pipe, anchored in floor, flush at bottom and projecting one inch above finished floor, sized to allow 1/2 inch minimum clearance from pipe and insulation, if required. Roof: Sleeves are to be made of galvanized sheet iron fastened to roof, and flashed with galvanized sheet metal. ASARCO ELP 0008867 6. Walls: Sleeves shall be of standard weight pipe, anchored in the wall and flush on each side of the wall. Sleeve shall provide 1/2 inch minimum clearance from pipe and insulation if required. Sleeves in exterior walls shall be filled with oakum and caulked after pipe is placed in sleeve. Vertical pipelines, passing through concrete, shall be pro vided with adequate protection to prevent corrosion at point of contact of pipe with concrete. Headroom clearance of 7 ft. 0 in. shall generally be provided below all piping, insulation and appurtenances. Supports, hangers, guides and anchors: The selection of support points shall be made to utilize Existing structural steel where feasible. The Contractor shall furnish and erect all hangers, brackets, rods, clips, clamps, plates, channels and other parts required for a complete installation as well as all necessary miscellaneous iron which may be required to transfer hanger reactions to building steel. All rigid hangers shall be fitted with means of vertical adjustments and suitable locking means shall be provided. All tie rods shall be fitted with adjustment and locknuts. All welded hangers, supports, guide or other attachments shall be of material similar to the pipe, and shall be subject to the same welding procedure as the pipe. Welded attachments to structural steel shall be such as to allow welding along the flange. Welding across the flange will not be allowed. Precautions shall be taken in piping installation to prevent stresses in piping and overstressing of flange ASARCO ELP 0008868 7 bolting at valves and equipment. Cold springing shall be used in pipe fabrication as shown on the drawings. Underground Piping: All pipe and fittings shall be carefully handled to avoid damage and shall be inspected for defects before being lowered into the trench. Special care shall be given to handling coated and/or lined pipe to avoid damage. Any damage to pipe, coating, or lining shall be repaired to the satisfaction of the Engineer before installation. . Trenching and Backfilling: The pipe trench shall be excavated along the alignment shown on the plans. Trenches shall be kept to a minimum workable width with trench walls vertical from the bottom of the trench to the top of the pipe. Suitable shoring timbering or sheeting shall be provided where necessary to support the sides of the trench prior to and during installation of the pipe. All shoring, timbering and sheeting shall be removed before backfilling. The open ends of the pipe shall be closed at the end of each day's work, and shall not be opened until work is resumed. After the pipe is laid on suitable fill in the trench, the line shall be backfilled, leaving only the field joints exposed so that the pipe will be protected until tested and accepted by the Engineer. In backfilling the trench around the lines, special care must be taken so as not to injure coatings or displace the pipe and to give it a solid bearing throughout its entire length. The remainder of the backfill above the pipe shall be sufficiently packed to prevent serious settlement. Open trenches across roadways or other areas to be paved shall be backfilled and compacted to a density at least equal to that of the surrounding earth. Sleeves made of steel ASARCO ELP 0008869 8. pipe shall be used for lines 12 inches and smaller crossing under truck roads and areas where concentrated loads may occur. In all cases, the sleeves shall be two nominal pipe sizes larger than the protected line except that minimum clearance between pipe and sleeve shall be 1-1/2 inches. CLEANING AND TESTING Testing and field inspection shall conform to USASI B 31.1 1955 and B 31.1a - 1965. All lines shall be thoroughly cleaned while disconnected from all equipment. All piping, except low pressure air> gas and vent lines, shall be tested at 1-1/2 times working pressure of line service. Low pressure air and gas lines shall be tested at 50 psi air and soapy water test. Underground Pipe Covering Underground pipe shall have a protective covering except as hereinafter specified, shall be mechanically applied in a factory or field plant especially equipped for the purpose. Specials and fittings that cannot be coated and wrapped mechani cally shall have the protective coating applied by hand, prefer ably at the plant that applies the covering to the pipe. Joints shall be coated and wrapped by hand. Hand-coating and wrapping shall be done in a manner and with materials that will produce a covering equal in effectiveness to that of the mechanically applied covering. The coating work shall be thoroughly inspected, and any flaws or holidays found shall be repaired by the Con tractor at no extra cost. The pipe covering shall consist of one of the following: Coal-tar Coating and Wrapping: A coat of coal-tar primer, a coat of coal-tar enamel, a wrapper of coal-tar-saturated asbestos felt. ASARCO ELP 0008870 9. a second coat of coal-tar enamel, a second wrapper of coal-tarsaturated asbestos felt, where indicated, and a wrapper of kraft paper or a coat of water-resistant whitewash, applied in the order named and conforming to the requirements of AWWA Standard C203 in all respects as to materials, thickness, methods of application, tests, and handling, except that interior lining will not be required. Joints and fittings shall be coated and wrapped either in conformity with AWWA Standard C203 or with the materials specified in Federal Specification HH-T-30, applied in accordance with the manufacturer's recommendation. Alternate No. 1: Asphalt Coating and Wrapping; A coat of asphalt primer, a coat of hot asphalt enamel, an asphalt-saturated-felt or asphaltsaturated-glass wrapper completely bonded to the enamel applied in the order named and conforming to the requirements of the Asphalt Institute Specification M-l in all respects as to materials, thickness, methods of application, tests and handling. Alternate No, 2: -Extruded polyethylene sheath conforming to Federal Specification L-C-530 and of thicknesses not less than 54 mils. Fittings and joints shall be covered in the manner and with the materials recommended by the applier of the sheath. Pipe Insulation All pipes carrying liquids or gases in excess of 150 F. shall be insulated with a metal reinforced fiberglass blanket, JohnsManville Thermobestos or equal covering all pipes, fittings and valves except as noted on drawings. Insulation shall be applied ASARCO ELP 0008871 10. in accordance with manufacturer's instructions. The insula*- tion shall have a protective covering of 0.010" thickness stain less steel #304 sheet. Alternate insulation of equal or better insulating value may be used if approved by Owner's representative1. Insulation thickness shall be as follows: 400# steam lines 2-1/2" 400" condensate lines 2" 150" condensate lines 1-1/2" 5# steam lines (6" dia. and larger)1-1/2" (5" dia. and smaller) 1" low pressure condensate lines 1" feed water lines (5" and larger) 1-1/2" (4" and smaller) 1" Pipe Painting and Coding Interior pipe shall not be painted. Exterior non-insulated pipe exposed to the weather shall be given a primer and finish coat in accordance with the general specifications for painting ex terior metal surfaces. Content of piping systems shall be identified according to the `Texas State color classification by a colored band completely encircling pipe, at least 8 inches in length (longer where necessary to accommodate full identification labels), painted on pipe or pipe covering in every location where identification labels are required. Pipes which are concealed or in covered pipe trenches need not . be identified. Identification labels: Identification shall be accomplished by use of Brady "Quik-Labels" (mastic book) as manufactured by the ASARCO ELP 0008872 11 W. H. Brady Company, Seton Nameplate Corporation, or equal (stenciling is acceptable). Straight lines of pipe shall be identified at intervals of 20 feet and at least once in each room. Piping shall also be identified at a point approximately two feet from all turns, valves and upstream side of distribu tional fittings or branches. The lettered label,.besides identifying the material, shall indicate unusual qualities of the pipe contents, i.e., hot, cold, pressure in pounds/square inch. On service piping, either liquid or air, apply black arrows of same height and with same background color as adjacent to identification labels to indicate direction of flow. Application: Labels shall be applied to the pipe so that the lettering is in the most legible position. Lettering size shall be in accordance with standards specified in USASI A 13; however, the nearest manufacturer shall be acceptable. Pipes to be marked shall first be wiped clean of dirt, dust, grease and moisture. Apply label over color band, using pressure, so that it lies smooth and flat. Apply a brush coat of clear lacquer, after label has been applied to pipe, making sure edges of label are well covered. Insulation of Equipment The deaerator shall be insulated with 1-1/2" thick Johns-Manville Thermobestos block insulation and covered with 0.010 thick 304 stainless steel sheet all applied in accordance with manufacturer's instructions. Alternate insulation if of equal or better insula ting value may be used if approved by Owner's representative. ASARCO ELP 0008873 12 Code Service Piping Schedule Pressure psig Temperature F Water WFH Feedwater, high press. 760 230 WFL Feedwater, low press. 25 or less 230 WCH Condensate 400# 400 450 CH Chemical Treatment, high pressure 760 amb. WP Plant Service 90 amb. WM Softener Makeup Water 90 WT Cooling Tower 60 amb. amb. WCI Condensate 150# 150 370 WCL Condensate low press. 50 200 CH Chemical Treatment, low pressure 90 amb. WCO Oily Condensate 25 or less 110 Steam SH Steam 400# 425 680 SL Steam 5# 5 240 Air AH Soot Blower Air 500 amb. 'AP Plant Compressed Air 90 amb. AI Instrument Air 90 amb. Natural Gas GH High Pressure 100 GI Intermediate Pressure 35 amb. amb. GL Low Pressure 5# & less 5 Acid amb. A Concentrated Acid 90 amb. Material Specificatioi M N *M M N N N N N N N M N M N N N N N N ASARCO ELP 0008874 13 Piping Material Specifications Specification M Nominal Rating 800 psig @ 300 F. 600 psig @ 700 F. Pie Black, ASTM A-106 Grade B seamless, plain ends 2" and larger - schedule 40 except feedwater, lines schedule 80 feedwater lines 1-1/2" and smaller - schedule 80 all lines Joints 2" and larger - butt weld 1-1/2" and smaller - socket weld weld neck flanges next to flanged equipment Flanges 600# pressure class, USASI B 16.5, ASTM A105 Grade II 1/4" raised face, weld neck Bolting stud bolts USASI B 16.5, ASTM A193 and hex nuts ASTM A194 Gaskets Spiral wound 304 stainless steel and asbestos for raised face flanges, Flexitallic Style CG. Fittings 2" and larger, schedule 40 and 80 to match pipe, butt welding, USASI B 16.9, ASTM A234 WPB. 1-1/2" and smaller, 3000# socket weld USASI B 16.11, ASTM A105, Grade II ASARCO ELP 0008875 14 Valves (Specification M - high pressure) mfgr. listed or approved equal Dwg. Code Type . Hi t- Description V-36 Check 600#, steel,buttweld, piston lift, Edwards 690 Y V-37 Check 600#, steel, flanged, piston lift, Edwards 690 V-42 Gate 2" and smaller, 800#, steel, flanged. Crane 3611XU V-43 Gate 2" and smaller, 600#, steel, flanged. Crane 3615XU V-46 Gate 2-1/2" and larger, 600#, steel, butt weld 8" and above integral bypass. Crane 76-1/2XU V-47 Gate 2-1/2 and larger, 600'#, steel, flanged, 8" and above integral bypass, Crane 76XU V-51 Globe 2" and smaller, 800#, steel, socketweld Crane 3652XW V-56 Globe 2-1/2" and larger, 600#, steel, buttweld, 8" and larger integral bypass, Edwards 616Y,618Y V-57 Globe 2-1/2" and larger, 600#, steel, flanged, 8" and larger integral bypass, Edwards 616, 618 V-58 Globe 2" and smaller, 600#, steel, flanged. Crane 3656XW V-59 Globe 2-1/2" and larger, 600#, steel, buttweld, angle stop check, Edwards 605 Y Specification N Nominal Rating 150 psi @ 400 F. and lower ASARCO ELP 0008876 15 gj& 14" and larger, schedule 10, black ASTM A53 seamless. Grade A or B 8" through 12", schedule 20, black ASTM A53 seamless. Grade A or B 6" and smaller, schedule 40, black ASTM A53 seamless. Grade A or B Pipe for underground service shall be coated and. wrapped in accordance with previous specifications. Joints 2" and larger - butt weld 1-1/2" and smaller - socket weld weld neck or slip on flanges next to flanged equipment Flanges 150# pressure class, USASI B16.9, ASTM A234 WPB, weld neck 1/15" raised face, except that flat faced flanges shall be used against flat faced valves or equipment. Bolting Stud bolts USASI B16.5, ASTM A193 and hex nuts ASTM A194 Gaskets Spiral wound 304 stainless steel and asbestos, Flexitallic Style CG Fittings 2" and larger, schedule 40, butt weld ANSI B16.9, ASTM A234 WPI 1-1/2" and smaller, 2000#, malleable iron screwed fittings, USASI B16.3 ASARCO ELP 0008877 16 Valves (Specification N - intermediate and low pressure) Mfgr. listed or approved equal Dwg. Code Type Description V-ll Ball 150# nodular iron, flanged, viton seats and seals. Crane Hiflex No'. 81102 V-35 Check 2-1/2" and larger, 150#, steel, flanged, swing, Crane 147X V-40 Gate 1-1/2" and smaller, 800#, steel, screwed. Crane 3607XU V-42 Gate 2" and smaller, 800#, steel, socket weld. Crane 3611XU V-45 Gate 2" and larger, 125#, iron, flanged. Crane 465-1/2 V-50 Globe 1-1/2" and smaller, 800#, steel, screwed Crane 3644 XU V-51 Globe 2" and smaller, 800#, steel, socket weld. Crane 3652 XW V-55 Globe 2" and larger, 150#, steel, flanged. Crane 143 XR V-60 Plug 1-1/2" and smaller, 200#, semisteel, screwed lubricated, Nordstrom 114 V-61 Plug 2" and larger, 200#, semisteel, flanged lubricated, Nordstrom 115 Related Specifications Construction in this section involving the following is covered by the general specifications: Concrete Structural Steel Painting Electrical ASARCO ELP 0008878 ASARCO PD 1 - REVISED 11/62 PI-ANT JOB NO. APPROPRIATION NO. PURCHASE ORDER AMERICAN SMELTING AND REFINING COMPANY DATE: 1 1PAGE OF 10/4/7-1-..... - --orper no. DUMMY OKDLk 71 - 1626 - 1 320 BROADWAY, NEW YORK, N.Y. 10005 REQUISITION NO. CE-71-EP-28 ASARCO ELP 0008879 CENTRAL ENGINEERING DEPT. DESIGN SECTION_________ ' Salt Lake City, Utah September 27, 1971 Mr. George Rafos New York Purchasing Dept. EA-14-EP, N.Y. 2240, JOB NO. 550 EL PASO CONVERTER ACID PLANT CONTRACT FOR CONVERTER GAS HANDLING CE-71-EP-28 We have enclosed our covering requisition CE-71-EP-28 to cover the issue of a construction contract to the Southwestern Industrial Contractors and Riggers, Inc., of El Paso, Texas for the construction of the Converter Gas Handling System as per our drawings and specifications dated September 10th entitled "Pre liminary Specifications for Converter Gas Handling System for American Smelting and Refining Company, El Paso, Texas." Checked drawings will be released on a scheduled basis for construction starting October 4th. AOM:j j ends. cc:EHHaug WRMahoney WRKelly LCTravis JWEnglish v' A. O. MARSH, Jr. ASARCO ELP 0008880 * *>RiNTCD IN THE U.S.A. ASARCO PO SB ML'viSED 3/S2 j ILAKT JOB NO. 550 | ( APPROPRIATION 224Q REQUISITION TO: AMERICAN SMELTING AND REFINING CO. Purchasing Department 120 Broadway New York . N Y, 10005 m scheduledj~tJATr IREQUIRED AT DESTINA' S H I P TO: ; SI Paso, Tsxss NOTES TO BUYER: 1 PAGE j PLEASE PURCHASE THE FOLLOWING: 1 quantity j UNIT 1 -------------------------------,----------------------- 1 FOLLOW SPECIFICATIONS MAS-*- .SSTP^'TIOSS FOR ( RE PARA T ON SEC 3E.C* i)S4 B' B2, C!. C2 CONSTRUCTION CONTRACT - CCHVEKTHR TEM , i jSfci* requisition is issued to cover the required ,construction contract with the Southwestern inidustrlal Contrecfcorr end Riggers, lac., of SI Peso, |Texas, for the Converter G& Handling system at the Aesrco SI Paso, Tex&s plant, all rs per drawings sad specifications entitled "Preliaifcnary specificstions for Converter Gas Handling System! dated ;September 10, 1971. i ; i j j jit is understood that ell work will be governed by ! the provisions of the Asarco contract and as per ! checked drawings released by our Central Engineering 1 |Department in Salt hake City, Utah Copies of Requisition and Purchase Order to> j | l E. H. tiaug. Salt Lake Office A. 0. Marsh, Jr., Salt Lake Office i l W. R. Mahoney, Salt Lake Office i L. C. Travis, Salt Lake Office ! i W. R. Kelly, El Paso Plant J. W. Englihh, El Paso Plant W. R. Nasmyth, El Paso Plant (3) R. 0. Covington, El Paso Supply Agent ii UNITS I I x j______ . A. 0. fiaish*;' Jr., September 27, 1971 DATC *" A. 0. Mfffhu, Jr September 27, 1971 viAie AKFROVCC ASARCO ELP 0008881 if i ) ! ASARCO ELP 0008860