To II. B. Carr
\
fricm-
-.vlj:' n:c. i BOhTPBY PKOGR Oc lobar, 1QY.1
At pjUx'.Lit I; , IjOl 1
At BUV.If] I ' _',tOl)
Da r:.
November 1,, l_97;i
co-v,o P/.VI, Kai'i/,1-:/,,rp;i :i o
During this 'report period, con'l :y\ charts for I-Iomopolyrtisr and Copolymer wore revi sod an;I Iwoi lit un to date. A specification
review is pciuiing for the suape a.ion products during the eairly part of November.
Control charts for Plustisoll products should be completed in the near future and arrangements ma.de for a specification reviev; of these products.
Further efforts were irm.de to obtai n usable resin for preshipment samples for Columbia Kecords. Soi> o ply type slurry was serve to the Pilot Plant for drying to hope.fully avoid any contamination that may be introduced by our d.ryul ny; system. The results of this, experiment were unsatlsfactory by the Quality Control contaTninaation chock which showed the same slurry dried through our system was lower in cent rumination than th c Pilot Plant dried slurry.
No faction has been taken with the test magnets in the plant be cause of continuing problems in keeping the lines e.i ear and run ning for any length of time. Plant Technical Cervices; is cur rently attempting to remedy this problem and if a solution is foundj Quality Control vrj.1.1 begin monitoring the metal contamina tion level.
Our new vacuum pump has been received and is in use. This pump will be used only for deaeration of Pl&stisol pastes and any fid trations to be done will be with our older vacuum pumps. A CAP. has been issued for the Haze and Gloss meter to aid in clarity determinations and also to begin monitoring gloss values on T/Yl type for Congo.
Magnetic contamination levels in our Copod ymer products still c-.cpear to be lower than they had been when s oda ash was; in use. do date, no problem has been encountered with light absorbance value,
A program has. been set up by which Quality Control will have
monthly safety meetings :i n the .lab rather than have technlei an--; attend Production safety meetings. Part o f these meetings w ill
used to review and standardize test method s and operating nr OC0 ures.
be
Attachments; (2) 1LPM/Jt
1.
f
i
'
Her }f1
COLORITE 015064
TENNEOO PLASTICS LIVI01ON QUALITY CONTROL
(OJECT NUMBER: p.j-opp
SI) NUMBER:
! KJ I
TITLE
I[30 Re:;; 1 m /\ scon ' i Tent.
ISSUED JijT TO: Ai;i;R(nT:0; NCIORT'OK 0
NT ei;
DAT]': S'j'ARTE'O
d /p/V,;
EOT. COMP. DAVE: y/-, ::/(
LATE _C_0;P;. :
EOT. MAN-HOURS: 20
MAN-IIOUKS:
OBJECTIVE:
Per A&E resort 1 ripy evaluate: the Impf >, od 1 50 resin vlscosii ty Lent and
Institute a,:; a standard tost.
STATUS AS OF:
6/25/70 Y/25/fO_________
no
/. ,./yo 10/25/70 11/25/70 j. 2/2 5/70 1/25/71 2/25/71 5/25/71 7/25/71 5/25/71. 6/25/71 7/25/71 6/01/71 0/22/7.! t0/25/7d
To st bein p, e, \> a lual;ed as of 6/21i/70, No re por t at thlis t i ine .
01
| eo
Q- C. tent rneth:o d i lumber J?-
s b e e.en us ed to test I
7 oe Tit: ' 11
v/i th yood restIts. Kor e t e s to f'A Ik j i e e d 0 d t r ' die c k OUI' ropi'ocl^ cl 0 i.l i ty. Esti)mite:d com t; p e t ion date:' 6/50/70 No report this pci,'iod .
No repo ft c n.i s p e r tod.
No report this per iod.
No report 0
No renort. No report this per Iod,,
No report this per'iod ,
Te:at be in:t run
lots ;ire produced on a I)AR `basis.
No report this perd od.
Nr.: renort this perTod ,, No report till s p G "!' Iod .
No re no r t tilts porTod.
Nn rei'.rf rllis "Vh;-nh. \o >'i. 1 his p"id n t h.
report this IiiOiTth.
COLORXTE 015065
*1 i `i,/; ;t i ti m v i ;i i on QUALITY COUTPOL
Pago Number:
\
Project Number:
Subo Numbur:
n
IU-O52 ;*,oc v
Title:
i!o fui'Ort L,Si:> r.iod.
9/25/71No j\:\) o r!, 1, idi moui Ti. 10/25/71 No rtYPp/i thia montJo^
.old