SATURATED STEAM PRESSURE P S IG j-
PRESSURE D R O P -P S I PER IOO FT
376
CHAPTER 26
1960 Guide
PRESSURE OROP OUNCES PEP. SQ IN. PER 100 FT-
Bated on Moody Friction Factor where flow of condensate does not inhibit the flow of sfeoa.
Fig. 22 .... Bask Chart for Weight-Flow Rate and Velocity of Steam in Schedule 40 Pipe Based on Saturation Pressure of 0 Psig
(VVrffi Muttipfrar Charts for Obtaining Weight-Flow Kates end Veiocitiot of All Saturation Pressures Between 0 and 200 Prig)
Steam Heating Systems Fig. 22 (Continued).... Velocity Multiplier Chart
377
Example of Use of Basic and Velocity Multiplier Charts.
Given:
a. Weight-Flow Bate * 6700 Lb per hr.b. Initial Steam Pressure -- 100 psig. c. Pressure Prop *= 11 psi per 100 ft.
Find:
. Sue of Schedule 40 pipe required. . Velocity of steam in pipe.
Solution: The following steps are illustrated by the broken line on Fig. 22: Step 1. Enter Fig. 22 at a weight-flow rate of 6700 lb per hr
and move vertically to the horizontal line at 100 psig. Step 2. Follow along inclined multiplier line (upward and to
the left) to horizontal 0 psig line. The equivalent weight flow at 0 psig is about 2500 lb per hr.
Step 3. Follow the 2500 lb per hr line vertically until it inter sects the horizontal line at 11 psi per 100 ft pressure drop. The nominal pipe size is 2)1 in. The equivalent steam velocity at 0 psig is about 32,700 fpm.
Step 4- To find the steam velocity at 100 psig, locate the value of 32,700 fpm on the ordinate of the velocity multiplier chart at 0 psig.
Step S. Move along the inclined multiplier line (downward and to the right) until it intersects the vertical 100 psig pres sure line. The velocity as read from the right (or left) scale is about 13,000 fpm.
Note: The preceding Steps 1 to 5 would be rearranged or reversed if different data were given.
Table 5....Weigh! Flow Rate of Steam in Schedule 40 Pipe* at Initial Saturation Pressures of 3.5 and 12 Psig.b>0 {Weigfrf flow Kate Expressed b> Pounds per Hour)
Pressure Drop--Psi Per 100 Ft in Length
Nom. Pipe She lathes
Ks hi (l ox) Sot press. prig
K hi (2 oz) Sat. press. ptig
K hi (4 oz| Sat press prig.
K hi (8 ox) Sat press, prig
X hi (12 ox)
Sat press, psig.
1 Pri Sat. press, prig
2 Pri Sot. press, prig
3.5 12 3.5 12 3.5 12 3.5 12 3^ 12 3J 12 3.5 12
1X We 1X
2 2M 3 3H
4 5 8 8
10 12
9 11 14 16 20
24
29
35
361
43
42
50
60
73
' 17 21 26 31 37 46 54 66 68 82 81 95 114 137
36 45 53 66 78
96 111 138 140 170 162 200 232 280
56 70 84 100 120 147 174 210 . 218 260 246 304 360 430
108 134 -162 194 234 174 215 258 310 378 318 380 465 550 660 462 550 670 800 990
285 460 810 1218
336 540 960 1410
410 660 1160 1700
420 680 1190 1740
510 820 1430 2100
480 780 1380 2000
590 950 1670 2420
710 1150 1950 2950
850 1370 2400 3450
728 1200 1920 3900
800 1430 2300 4800
950 1680 2820 5570
1160 2100 3350 7000
1410 2440 3960 8100
1690 3000 4850 10,000
1980 3570 5700 11,400
2400 4250 7000 14,300
2450 4380 7200 14,500
3000 5250 8600 17,700
2880 5100 8400 16,500
3460 6100 10,000 20,500
4200 7500 11,900 24,000
4900 8600 14,200 29,500
7200 8800 10,200 12,600 15,000 18,200 21,000 26,000 26,200 32,000 30,000 37,000 42,700 52.000 11,400 13,700 16,500 19,500 23,400 28,400 33,000 40,000 41,000 49,500 48,000 57,500 67,800 81,000
Booed on Moody Friction Factor, where flow of -nmWwu doe* not inhibit the flow of etoem.
* The wei^Lt-flow rate* et JZ psig can be need to cover cet. press. from l tot prig, end the rate* at 13 prig can be med to cover tat. press. bom 8 to I# psig with an
error not
8 percent.
The etoem vetoritiea eomwponding to the weight-flow rates riven in this tebl* can be foond from the faerie chert end vwlodty maltip&r chart. Fig. 21.