Document NBZBNj7KvJ4916p7LrKoENwy
PROCEDURE BULLETIN --TEXAS CITY PLAi
SIGN AND BARRICADE PROCEDURES FOR OVERHEAD WORK
P-0137
PLAINTIFF'S EXHIBIT I
I. PURPOSE
MON-1990
The purpose of this bulletin is to define the various safety measures which must be taken on all overhead work in the plant to assure safety to those at lower levels.
II. SCOPE
This procedure applies to all persons engaged in overhead work in the Texas City Plant including all contractors.
The term "barricading" used in this bulletin shall mean com pletely encompassing the area directly under overhead work with barricade tape, wooden barricades or other means so as to prevent personnel from freely walking under the work.
III. RESPONSIBILITY
. The Monsanto supervisor responsible for the work execution
will be accountable to see that the bulletin is enforced on
overhead work.
:v-
IV. PROCEDURE
K'i'i V
,v--V --r. A ' -/V'1'--'/'
In order to afford the proper protection necessary and yet
not place unreasonable burden upon the jobs, it is necessary
to break the overhead work into the three categories below:
A. Emergency or Short Duration Jobs (less than 4 hours)
On overhead jobs which are emergency or short duration jobs, less than 4 hours, the safety measures needed to protect personnel and facilities shall be left to the discretion of the supervisor in charge of the work. The only exceptions to this are as follows:
1. When lifts are being made (manually or with hoisting devices) it is mandatory to post signs and barricades or post a ground man for constant observation during hoisting operations.
2. High personnel risk areas as noted in "C" below. (Good rule to follow is "If in doubt, barricade.")
B. Overhead Work (4 hours or more)
LAM006825
All overhead jobs which have a duration of 4 hours or more shall meet the following criteria:
005615
1. Barricade tape, wooden barricades or other means to prevent personnel from freely walking under construc tion work shall encompass said work area.
ORIGINAL ISSUE: 3/25/77 REVISED:
PAGE JL OF.
PROCEDURE BULLETIN _TFXas OTv P, aMT
SIGN AND BARRICADE PROCEDURES FOR OVERHEAD WORK
2. Signs warning of overhead work shall be posted on barricades.
3. Barricades shall be positioned far enough away from impact area under work so as to prevent injury to personnel.
4. Supervisor in charge of work will be responsible for notifying Fire Chief and Security Supervision prior to posting any barricades in streets or accessways which may be needed during emergencies.
C. High Personnel Exposure Areas
Construction work over high personnel exposure areas,
designated walkways, sidewalks, streets, doorways, etc.
shall be barricaded and signs displayed no matter what
the duration of the job. The only exception shall be
emergency jobs in which time is of the essence.
i-
{V 'v
.. ' 9
' ' .r 4.'..
? ' -- i... ......
- ,s. , . ,
.' *
-fit * v - J
Reviewed by: '5' Plant Manager's
Safety Board
' * ,,
Prepared by: fn McfcurtJ! 'ft:*--Gatewood'
'fks-m&5%
ORIGINAL ISSUE-* 3/25/77
REVISED:
PAGE Jl OF-
'1
Li l-
sc
005614
LAM006824