Document N9wm6Y7XQMe38yv9gJLbJbB8
UNION CARBIDE CORPORATION___________ Solvents and Coatings Materials
Texas City, Texas 77590-0471
February 24, 1987
Mr. Eli Bell Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723
Re: Renovation Notification
Dear Mr. Bell:
This is to notify you, as required by 40 CFR 61.146, that Union Carbide Corporation, Old Ridgebury Road, Danbury, Connecticut 06817, as owner, plans to engage in renovation activities as described below:
Insulation will be removed from 400 linear feet of equipment thawout gas header and forecooling structure at building #238, Number 3 Olefins at 3301 5th Avenue South, Texas City, Texas 77590. The equipment is approximately 19 years old.
Removal of the insulation is scheduled to start on March 15, 1987, with completion by May 15, 1987. Procedures to be employed in the handling and disposal of the asbestos material will conform to the requirements in 40 CFR 61.147 and 61.152.
All asbestos materials removed will be disposed at Gulf Coast Waste Disposal Authority, Loop 197, Texas City, Texas.
Yours very truly.
cc: Dr . E . R. Ibert - GCACD
Bcc: H. M. Buchanan
J. B. Evans - 500
R. F. Kelley
500
K. E. Martin
R. A. Mendez
L. D. Pell
S. K. Phillips - 500
G . L . Rivera
R. E. Woodcock
A.' p. Yalcinkaya
La Marque
UCTC 18934
UNION CARBIDE CORPORATION TEXAS CITY PLANT
Plant Procedure I-B-8 Attachment #1
NOTICE OF INTENTION TO DEMOLISH OR RENOVATE A STRUCTURE OR facility containing asbestos mate-rIaT
1. Description of the facility: Equipment thawout gas header and forecooling structure_______________ _______________________________________________________ Age (approx, years) 19 Size 2" Prior Use Thawout
2. Estimate of approximate amount of friable asbestos materials present: (Area in sq. ft. or linear ft.) 400 linear ft. Estimation technique used: walkout - estimate
3. Location of facility: No. 3 Olefins structure #238_________________________ 4. Scheduled starting day: 3-15-87
Scheduled completion day: 5-15-87 5. Nature of planned demolition or renovation: Deteriorated - needs replace
ment_________ Method to be used: wetting and close bagging 6. Name of person that prepared the form: M. H. Buchanan Location and telephone number: Bldg. 224 - No. 3 Olefins - Ext. 5345 Date: 2-13-87
NOTE:
This form must be completed and delivered to the EP Department (Bldg. #1) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, or as soon as possible following an emergency renovation operation.
April/I 985:1670s
MHB:PPIB8 2/13/87
UCTC 18935