Document N78KvO47YE7g7a4zNgooZ82V
Subject:
VCM OSHA Compliance Texas City Status Report for 1/14/75 VCM Steering
Committee Meeting
From:
Texas City VCM Ad Hoc Committee, R. W. Sesler, Chairman
I. Work Place Concentrations 1/75
A. Solvent Resin Department
1. Area ranges - 0 - 5,8 ppm
2. Employee exposure ranges - 0. 5 - 2. 5 ppm
3. MaXk time - 2 hrs,/shift - 1 operating position
See Attachment I for area range and employee exposure details
4. VCM area levels and employee exposure have been reduced during 1974 as a result of completing the projects listed on Attachment II. Carbon tube 8 hr. TWA data indicates a downward trend for most areas.
B. Suspension/Non-Solvent Resin Department
1. Area ranges - 0, 5 - 10, 0 ppm
2. Employee exposure ranges 2.0 -6,0 ppm 3^ Mask time - Q. 8 hours/shift 2 * operating positions
See Attachment IH for area range and employee exposure details. *
4. VCM area levels and employee exposure have been reduced substantially during 1974 as a result of completing the projects listed on Attachment IV. 8 hr. TWA data indicates a downward trend for most areas.
Area data from the VFA will be more meaningful when it is processed by the micro computer. The computer is due late 1st quarter 1975,
H. State of preparedness to cope with other requirements
A. Record keeping - Employee Records and Payroll Departments will
review proposal developed by South Charleston - no progress to date.
M. E. Eisenhour has been assigned follow up and coordinating
responsibility for this item.
ucc
042454
VCM OSHA Compliance Texas City Status Report
Page 2.
B. Health surveillance - Dr. Glenn is now performing medical screening per the proposed new standard. He has not initiated the form to notify employees of their suitability to continue employment in VCM area and use of protective equipment and respirators. Form will be available when needed per Dr. Glenn.
C. Regulated area - Have everything ready to identify area as marked on map. Roadways have been excluded at this time. Possible problem with action level of 0. 5 ppm and wind direction. Materials on hand. Project on hold for future implementation pending court actions on standard.
D. Cartridge type respirators - Problem area - none on order at this time.
E. Training - Training Department will have draft of proposal ready for critique 1/30/75.
III. Problem areas related to compliance with the permanent standard
A. Limited sensitivity of sequential vinyl chloride VFA analyzer below 1 ppm.
B. Identification and control of regulated area.
C. Procurement of NIOSH approved respirators.
D. Roster of authorized persons entering regulated areas -
(record keeping).
%
E. Identification of unknown sources of VCM emissions.
**
F. Preparation of VC1 tank cars for maintenance.
G. Unclear meaning of vinyl chloride standard.
H. Detection system to alert workers in excessive vinyl chloride c one ent rations.
I. Employee health limitation which prohibit prolonged use of respiratory protection, especially maintenance personnel.
J. Manpower requirements to fulfill gas masks maintenance requirements in VC1 standard.
IJCC
042455
VCM OSHA Compliance Texas City Status Report
Page 3.
IV. Present programs underway to reduce area levels and employee exposure.
A, Solvent Resin Department
1. Expense items 1975 $ 1Q0M
2. Working Budget 543M (Present estimate)
Original estimate for Texas City was $280M (Approved 1974) See Attachment V and V(a) for project list and priorities.
B. Suspension/Non-Solvent Resin Department
1. Expense items 1975 $ 100M
2. Working Budget
43 9M
See Attachment VI for detail.
V. Future programs to reduce area levels and employee exposure.
A. Solvent Resin Department - revise remaining stripping stills $150M. No additional programs are recommended at this time. The present programs need to be completed and evaluated in order to provide a sound basis for any future expenditures.
B. Suspension/Non-Solvent Resin Department No additional programs are recommended until we get an OSHA standard that is reasonable and it appears there will be no regulatory problem with continued operation.
If we get a reasonable standard the Suspension Unit will want to install a gas holder to provide improved VCM recovery and a place to vent low pressure streams - probable cpst is $1. 5MM.
ucc
042456
ATTACHMENT X
EMPLOYEE VCM EXPOSURE DATA SOLVENT VINYL RESINS - TEXAS CITY
Job 114 115 117
121 East 121 West
Area
Control Room Outside
Control Room Third Level First Level
Control Room Outside Tank Area 1 Compressors
Control Room Outside
Control Room Outside
Clarification DI Water System
8-Hr. Job TWA
Avg. Area Exposure
0. 1 0
0. 2
1.0 (18. 5% in Respirator) 1.0 5. 8 1.4
1. 8
1. 5 1. 5 3. 3 4. 3
2. 3
0. 7 4. 2
1.2 0. 7 1. 3
0. 6 0. 8
.0
NOTE: 115, 117 data from chromatograph; 114, 121, 122 from carbon tube.
ucc
042457
' / Attachment ii //
*/
/ t
COMPLETED VCM EXPOSURE REDUCTION PROJECTS
SOLVENT VINYL RESINS - TEXAS CITY
Improved Maintenance Program for autoclave agitator packing.
Enclosed VCl compressors' shaft packing glands, venting outside building.
Rerouted blowdown lines from compressor intercoolers to outside
building.
*
*
Improved Monitoring Program for compressors.
Substituted sample bombs for open cold falsks for feed samples.
Respirators used for autoclave sampling and analyses.
115 lab isolated from control room.
Dynatrols in service on B-2 and B-9-
UCC
042458
ATTACHMENT III TEXAS CITY SUSPENSION/NON-SQLVENT UNIT
CALCULATION OF 8-HR TWA VINYL CHLORIDE EXPOSURE FROM VFA DATA
Operating Position
1. Non-Solvent autoclaves
Bldg. 174 control room (6 hrs.)
Outside
(2 hrs. )
2. Off-Gas Recovery
Bldg. 174 Control Room (6 hrs. )
Outside
(2 hrs. )
3. Suspension Utility
Bldg. 174 Control Room (2 hrs. )
Outside
(6 hrs.)
*
4. Suspension, North line autoclaves
Bldg. 174 Control Room (6 hrs.)
Outside
(2 hrs. )
5. Suspension, South line Autoclaves
Bldg. 174 Control Room (6 hrs.)
Outside
(2 hrs. )
6. Suspension, East line Autoclaves
Bldg. 174, Control Room (5. 6 hrs. )
Outside
(2.4 hrs.)
7. Dryer, Inside
Bldg. 120, Control Room (6. 4 hrs. )
Outside
(1.6 hrs.)
8. Dryer, Outside
Bldg. 120, Control Room (2. 4 hrs. )
Outside
(5.6 hrs.)
9. Refrigeration & VCl Unloading Bldg. 113 Control Room (6.5 hrs.)
Outside
(1.5 hrs.)
10. Chief Operator
Control Room - 174 & 120 (4. 8 hrs.)
Outside
(3.2 hrs.1)
Area (ppm) 8-Hour TWA (ppm)
1 5
1 10
1 8 * 1 6
1 6
1 7
0. 5 6
0. 5 6
0. 5 7
2 3 6 2 2 3 2 4 2
3 1 5
To prevent operator exposure to over 50 ppm VCM currently requires two operators to wear respiratory equipment 5% of the time. This is equivalent to one percent of the total operator time.
UCC
042459
January 10, 175
ATTACHMENT IV
ACTION TAKEN IN 1974 TO REDUCE VINYL CHLORIDE EXPOSURES IN THE SUSPENSION/NON-SOLVENT/ VINYL REFRIGERATION UNIT
1. Discontinued standard operating procedure of water rinsing D-autoclaves to pad between batches. a*
2. Installed 20 point VFA/VC1 analyzer ($20M) in Bldg. 174 control room to
analyze and record VCl concentrations at sample heads Located throughout
the unit. .
*
3. Issued instructions to operating personnel to log, locate, and stop sources of vinyl chloride emission whenever the VFA/VCl high exposure alarm sounds.
4. Relocated dumping of Nos. 3 and 4 stripping tanks from highly traveled area to remote location.
5. Purchased portable vinyl chloride analyzer (MSA) for testing vessels (which previously contained vinyl chloride) for vinyl chloride content to minimize personnel exposure upon vessel entry.
6. Conducted in-depth stripping study to determine relative importance of operating parameters in reducing residual monomer content.
7. Replaced styrene with more efficient sodium nitrite terminator for "killing" runaway reactions.
8. Revised procedure to use resin analysis as a guide instead of "boil-off" sampling of recovered monomer.
9- Developed method for heating suspension autoclaves to reaction temperature using direct steam injection.
10. Replace PVP suspending agent with HEMC to provide more stable VAc/VCl copolymer reactions.
11. Installed Off-Gas Recovery system to recover vinyl chloride flashed from resin in vacuum strippers.
UCC
042460
Action Taken in 1974 To Reduce Vinyl Chloride Exposures in the Suspension/Non-Solvent/Vinyl Refrigeration Unit
2.
12. Issued SOP to vent autoclaves with high reaction pressure to Off-Gas Recovery system vacuum header instead of the atmosphere.
13. Used 50 M gallon suspension surge tank in Non-Solvent service to provide additional surge capacity between Non-Solvent autoclaves and dryers to prevent overflow of resin slurry.
14. Reduced premature D-autoclaves rupture disc failures by changing from type PLDV to type RB-90 for more accurate bursting pressures.
15. Modified No. 1 VC1 recovery system to allow recovery of contained vinyl chloride in the high pressure vent by scrubbing in Solvent Vinyls acetone stripping system.
16. Modified No. 2 VC1 recovery system to send high pressure vent stream to the No. 1 Powerhouse for burning in boilers as fuel.
17. Revised Off-Gas Recovery System to send high pressure vent to the No. 1 Powerhouse for incineration as boiler fuel.
18. Enclosed the atmospheric packing areas of Nos. 1 and 2 compressors for venting outside the compressor room.
19* Designed and installed exposure-proof slurry samplers for D-autoclaves.
2 0. Added an additional operating position to allow closer monitoring of vinyl chloride recovery facilities.
21. Barricaded compressor room doors with chains and hung signs on each doorway which read, "Entry Without Fresh Air Protection Requires Chief Operator Approval".
22. Changed packing on Nash compressor to improve reliability and Lessen vinyl chloride emissions to the atmosphere.
23. Revised procedurs for flushing skin-pots to minimize operator exposures to vinyl chloride.
24. Relocated maintenance eating facilities outside the manufacturing area to reduce potential exposures.
ucc
042461
w
Action Taken in 1974 To Rteduce Vinyl Chloride Exposures in the Suspension/Non -Solvent/Vinyl Refrigeration Unit
r
3. t
25. Revised piping to allow decanting of recovered monomer tanks to a closed vessel instead of the sewer.
26. Removed walls from Bldg. 127 (upstairs) to improve ventilation and lessen operator exposure.
27. Increased technical staff (67%) to devote more time to minimize vinyl
chloride monomer losses.
*
.
28. Installed DMV in No. 1 Blowdown tank feed header to avoid autoclave blowdowns
during vacuum stripping which result^n blown rupture discs.
%
29. Revised piping to vent VC1 filters to an enclosed vessel rather than the atmosphere prior to opening for maintenance.
30. Install piping on all VCl pumps to allow priming to an enclosed vessel instead of the atmosphere.
31. Purchased portable Century OVA/VCl analyzer for use as a tool for locating emission sources of vinyl chloride.
32. Revised piping to recover vinyl chloride and vinyl acetate in seal water in the No. 3 vacuum stripper.
33. Modified pilot plant operating procedures to recover most vinyl chloride emissions in the No. 2 VCl recovery system.
Otis A. Shelton January 13, 1975
UCC 042462
ATTACHMENT V
CURRENT APPROVED 930 PROJECTS SOLVENT VINYL RESINS - TEXAS CITY
Project
Original Issue, M$ Present Estimate, M$
VFA Monitor No. 1 Dynatrols AutocLave Mechanical Seals
'A
30 148
80
30 148 "* 2 50
Control Room Pressurization %
22
25*
VFA Monitor No. 2
40
Stripping Still Revisions (one)
-
50
TOTAL
280
543
FUTURE 930 PROJECTS Revise Remaining Stripping Stills
100
IJCc 042463
r
.-ATTACHMENT V{k)
VCM PROJECT PRIORITIES SOLVENT VINYL RESINS
mm*#- . 'w-wii.
V *'
.
.Vr-'Mv
' >*''' *.* v*-.;
V **
frf' ^ *
fe .
'4 df*'*. ` ,. - f-.r .
' V-1* ;
..C ' ?
' y-k ' * 'i J
. jXf.- A
*"*- V' A ,,
" Wsv . _\ .V
s ' - v-
1.
A. ^
V.
Priority I 1. Mechanical seals for autoclaves.
- r' ~* *? L!'*;?- * r- -
V1
.V '
2. Installation of Dynatrols and relocation of 115 lab. ;
'J,
* '. i ,!. , ' " 3. Modifications to stripping stills to reduce VCM in varnish, ' i-L^'
-:;**- . -
Va \* * >v i
' :vt-'
4. Pressurization of 117 control room and relocation of4ab.
.> f~ .j
-v
5. Tank Area 1 valves and pumps maintenance.
s- , . *>V. -Jt
.6 117 compressor^ maintenance.
y,
7. Establish regulated areas.
.8 Purchase required respiratory equipment.
C >*
frv.y'',
Priority II
1. Bldgs. 115, 117 valves and pumps maintenance. 2. VCM monitors. 3. 72T pump mechanical seals. 4. VC1 pumps acetone wash system. 5. VC1 isolation motor valves (as operations permit).
.<4 V
f-v A-rflt
- - <**
1 t-J* . . - -
-4*1' -
'V >. ^ -V-*->W.
f ,, ,1
*4w'^ >
^
' m\4 '
--
...x
*- ` ,4
` C* .V.-'Sf*! .
Priority III 1. 115 sample point hoods (now have masks; Dynatrols may greatly;-
--* ;v
reduce or eliminate sampling; if not, re-rate as Il-la). .* *L.-.
' " -1` ' j. V
2. Fresh air stations (25 ppm qeiling lessens immediate .need; .some v
yij
already installed; if I and II completed successfully, may alte'rJjieeds);
Priority IV
. '?.
r- -
\ , ,< ,r^v
"
t'
1. 115 process leads in control room (need 2 transmitters).
. * _ . 4"
f
2. Tank Area 1 filters out of se rvice.
.C
3. Miscellaneous VCM containing vents to scrubber or flare. 4, .
A , *. f # .
' v"t
A-'|^ '
ucc
042464
ft. ,
tt.1 iAL hMili N T VI
' ,v
INTERNAL CORRESPONDENCE
UC U9~ Z
CHEMICALS AND PLASTICS
ro (name) Mr. R. W. Sesler
company LOCATION
Texas City Plant
copy to Mr. M. E. Eisenhour
DATE
P. O. BOX 471, TEXAS CITY, TEXAS 77590
January 13, 1975
SUBJECT
-v
Expenditures to Reduce VCM Exposures at Suspension/Non-Solvent Vinyls Resins Unit
Current
Capital Working Budget 1. Install scrubbing system utilizing MEK to recover VCM from high pressure vents. $300,000 - Completion Third Quarter 1975 2. Spare Off-Gas Recoery Vacuum pump. $100,000 - Completion Third Quarter 1975 3. Second multi-point VFA analyzers. $39,000 - Completion Second Quarter 1975
Expense Numerous "09" revisions totaling about $100,000 in 1975.
Future
If a reasonable regulation (at least 5 or 10 ppm TWA) is finally issued by the government, which will allow the Suspension/Non-Solvent Unit to remain in operation, a gas holder costing an estimated $1. 5 MM will be requested.
Very truly yours,