WEST'S POWER EUTURE
wzzz/z w */
All Classes ot Energy Consumption Will Crow
8 Electricity hoi just begun to be applied accofding 10 esti- 1 Process needs for various products will boost indum mote of futu'o need: Increoitng population odds to growth / consumption of electrical energy way beyond present w,, \\ 'i
in the West. By 1775, tliey atimstelhS 47 million kw of this will be eceapd| cally developed, compered to tho MB million existing in 19S0. Tlte Bara feels that the oil and gas reserves, nf decreasing percentagewise compsn with tremendously increasing laws consumption, will not offer aay5n creased economical energy source 1 electric generation by 1975. They 1st see local oil' and gas-fired pilots ;f served lor peflking tnd emergency dal Asa result,coal and lignite, fig.9,aw produce the bulk of kwhr in 1975, vii hydro generating most of the temttsdi
Cool and lignite ore tho largest til ergy reserves we have in sight. A Ure
Mu, lie* in il> W=. TiJ. 4.
m&ud /crelo wy rve tmilnple 54 present research has shown
sjkle to esirsct chemicals and oils ifr) sad lignite, leaving a char Ey be burned for electric gen-
CORRECTION
In the special report on GAS TUUBINES, Deo 1952. p 106, identifica tion el `Builders," bottom of page, is In error. Beginning with first Item
^fforeau does nut estimate that heal, wind power, tides or
3J- energy will reach important
below it should read: C--Clark Bros Co, USA, (not EMou
s shown) K--Elliott Co, USA (not English
jusreisl proportions for electric genl by 1975. (As on interesting aidepetroil Edison Co has announced irorbinf on plans (or a nuclear
plant, designs to be completed It feels nuclear production
Ke'eompciiii** wilh present moth-
Electric, as shown) EE--English Electric Co, Ud, Eng
land El--Elsinore Shipbuilding & Eogrg
Co, Ltd, Denmark F.M--Cie Electro-Meeanlque, France FW--Esther Wyes, Switaerland
vCoaitnrction depends on Congres-
'u'lpproTol.)
"'rgy transportation. Fig. 3 show*
rapirlsen of kwhr needed by each
thed.srw in 197S with the gencr-
t could be produced locally.
___f_r problem Jics in choosing the the subsidy that government-built proj gMoaomtcsl method o| transporting ects enjoy. The higher fixed-charge rate
|y' (rotn the cool-rich slates to the would make electric transmission more
5iemaad areas. Should the coal costly than coal transportation. This
lignite be transported by roil to
fJimsnd regions and burned in o. plants there, or should the fuel
turned (o'mino-mouth plants and
phase of the study is largely academic, however, since comparative costs can change radically in the next 22 years. It may be likely that a combination of
, He.energy delivered over high-voli- the two methods of energy transport
^fripsDiIislon lines?
will prove most economical by 1975.
[be three major deposits of solid
The Bureau slotes, "No doubt, de
> are obout 400 to 660 miles from menti of the system will be constructed
jf'6rB energy-defielent areas. The Du- by various power agencies operating in
mo study concludes that for the longer the area, both ..public and private.''
energy can be transmitted in Prime value of the study lies in reveal
.st 500,000 volts for about 1.86 mills ing the exciting possibilities of. expan
fkwhr. They compare this with a sion during the next quarter century yspte of 2.19 mills per kwhr for transa- nd Indicating one course of develop
pertstios In the form of cool by rail, ment that might he followed. Fig. 5
OTte fixed-charge rate of 5.6% for shows the outlines of a 500-kv transmis
jbbtlatioRi and 4.75% for transmission sion-line network Ihot the Bureau en
l/jgw used by the Bureau disagrees wide- visions for the future. .
IgWth rates, from 10 to 15%. that pri-
Large steam plants with capacities of
l utilities would use. This reflects 1.5 to 2 million kw would he located In
the coal fields. Units of 300,000-kw ca pacity would be used to make op the station -capacity. Power from several
large plants would probably be brought to central substations for transmission over the high-voltage lines. Several parelie! lines would be needed to earry the energy. Substations in the load areas would step down the voltage for distribution.
Experimental high-voltage lines show them to be feasible. Principal trouble Ilea in radio interference. .While at the moment no satisfactory solution is In sight, probabilities are the problem will he licked.
Network Advontogts. At times a net work or Integration of power systems msy bo difficult to justify solely eco nomic grounds. Other features may sway the decision to integrate. A net-' work increases continuity of service. Improved flexibility may reduce oper ating costs by allowing fuller uoe of hydro power as it becomes available at a saving in fuel burned.
A network eoVering a large area eaves in generating capacity by having a lower total peak load than the sum of the peaks on individual parts of the system, Fig. 8. This peak diversity in our ease partly stems from the difference in time occurrence of darkneea. Other factors contributing to Increased diversity would be difference In local tem peratures and weather over such a farflung region, variations in local habits
and others. Integration makes s direct saving in
capacity because of the reduced reserve needed, Fig. 10. Considering the simple case of systems A end B, the tame reserve each requires for independent operation will do for combined opention since outages on the separata, sys tems would hardly ever nceur simul taneously.
!Lj Wo-Mto >W|, '* noem, lkn<
iNOINftBINO AND MANAGEMENT SECTION
Combining Power Systems Sores on Reserve Capacity
| When two od)aceni systems supply seporote loods each terconneeted, rasarva for one system will do for both combined, , .'"utt corry it| own reserve copodty. When systems ore tn- os forced outoges seldom occur at some time on both elements