We are writing in regard to our JulsXUL tqCltSaid meeting
at Eaton's Gallatin plant.
X
First, we appreciate all the
*b9\done since Director
Thrasher's visit. Eaton seems we)4)^>n tb^Mjpy to minimizing
the asbestos problem. From youj^ftjnpling Results, it would
appear that the grinding operatdXr is inTnompliance with TOSHA
standards. However, you willSjr'sjSallftWt those standards are based on feasibility cansid^ajfioq^tf^ar the entire asbestos
industry. As you know, therd^is nd^safe level for a carcinogen,
although the lower the lwi, the lower the risk. Even at levels as low as 0.2 fibers/c.a'Ov l/dJb^o^the current standard -- the
average worker woulds^kltale ajbo$!l:Ja million asbestos fibers in
the course of a workdraj". ^Ewpry' effort should be made to minimize
this exposure. Ws\unSei^t'Bja the company is investigating the possibility of b^iittinal^mgvrhe pad-grinding operation altogether.
We would appreciate continuing reports on your program at the
regular meetings'' o*<4&ie^Safety and Health Committee. Until then,
the corapanJ'.^siMuldiJbhyestigate the possibility of extra hooding
around theCMb.
. 2 grinders, in order to minimize the
openiugs^vtfhif thehby increase the efficiency of the local exhaust
syst\K5v g.3
me a^p^tos collector outside the building appears to be a
bigger Mrob^m. It is likely that the company is not in compli ance witXjidSHA standards in this area. For example, there are piles of asbestos dust on the ground near the collector. The grav^Mred makes it almost impossible to pick up all the asbestos, si^pXoniB of it falls between the gravel, only to be blown