Document N2xr80xQKVbL7mYw2zLVLk9kw
UNION CARBIDE CORPORATION p. o. box 471, texas CITY, TEXAS 77SSO
HEALTH & ENVIRONMENTAL AFFAIRS
June 13, 1985
,*
Mr. Herb Williams, Regional Director Texas Air Control Board, Reg. 7 5555 West Loop, Suite 300 Bellaire, TX 77401
*
Subject:
Report of Emergency Air Emission, Vinyl Chloride Release, June 10, 1985, Solution Vinyl Resins Process, Tank Car Unloading Rack, Tank Car Valve and Piping Malfunction______
Dear Mr. Williams:
The attachments to this cover letter describe the emergency that resulted in the release of approximately 1300 pounds of vinyl chloride monomer on Monday, June 10, 1985 at 0930 hours. A TACB Long Form for Rule 7 Major Upsets is included along with a copy of the Department Head's accident investigation report. This release occurred at our tank car unloading rack in the plant as a consequence of pipe fitters attempting to repair a leaking fitting on the transfer piping on the tank car dome prior to unloading the car.
In addition to the above documents, also included are:
Standard Operating Procedure for Unloading Vinyl Chloride Tank Cars.
Schematic Drawing of the Tank Car Dome piping connections.
VCM ambient air monitoring locations and results by Industrial Hygiene Lab.
Plant plot plan showing unloading rack location.
Mr- Herb Williams June 13, 1985 Page 2
Remedial action to prevent recurrence is listed on the last page of the Accident Investigation Report, along with a photograph of the dome after the leak was stopped- Personnel exposure to this release was very low as indicated by the Industrial Hygiene monitoring samples in the immediate downwind vicinity of the tank car.
If any further information is desired, please contact me.
Yours^yery truly.
JFE:IR:VinChlor
Attachments
Cc:
Emergency Response Branch
EPA , Region 6, Dallas
Dr. Ed Ibert, GCACD, La Marque
Bcc:
0. H- Cunningham/R. C. Wise -
T. T. Do C. L. Dudnick - 500 M. E. Eisenhour L. B. Feldcamp - Baker & Botts S. J. Footer/F. S. Provenzano J. B. Leverton K. E. Martin/A. P. Yalcinkaya R. A. Mendez (Letter only)
S. M. Norwood/D. R. Hall
J.' F- Erdmann, P.E.
/Envir. Protection Coordinator
(409) 948-5126
ucc 050649
TEXAS AIR CONTROL BOARD (TACB)
REPORT FORM FOR NOTIFICATION REQUIREMENTS FOR MAJOR UPSET (RULE 7), PLANNED MAINTENANCE (RULE 8), START UP OR SHUTDOWN
MSSL Account No.
Region
VII <This line for State use only)
Company Name Union Carbide Corporationi Solvents and Coating Materials Division
Plant Location Texas City. Galveston County. TI____________________________________ _
P.0. Box U71 or Mailing Address 3301-5th Avenue Southcity Texas City
State
n
.Zip. 77590
Owner, Operator or Responsible Management F-S "Foley" Proveniano; Plant Manager
Telephone Number U09-9b5-7illl
_____________ _______
Nature of Unit or Process Affected land Other Processes Affected, if any) Vinyl Chloride tank car unloading rack. 4th Ave and D St., Texas City Plant.
Inclusive Dates if for Shutdown and Start-up Monday, June 10, 1985 Time and Expected Duration of Excessive Emissions 0930 to 0950, 20 minutes
Reason or Cause.
Maintenance Q
Major Upset J7J
Test Q
Explanation In the course of connecting the piping for unloading Vinyl Chloride from tank
car PPGX-9070, pipe fitters were working to repair a leaky fitting when the liquid discharge valve was inadvertently bumped a partial turn to allow VCM vapors to escape
from the piping they were working on. (Which had not been closed up yet) _________
I
Level of Emissions (give basis for estimate): Physical and Chemical Composition. Rate, Concentration, and Duration
Tank car full of Vinyl Chloride (25,000 gal) normal specs, no reaction, fire or
explosion involved. Loss of VCM (by reweiqhing tank car and comparing to received weight) was approx. 1300 pounds. (Wind direction S to SSE, 5 to 7 mph, temperature
82F).
Measures (to be) Taken to Minimize Quantity and Duration of Emissions Water Spray put On tank to prevent
possible vapor cloud ignition. Toxic gas alarm and fire alarm were both activated. Fire
truck and emergency response personnel responded Perimeter amhient. air levels of VCM-- checked, nearby building occupants evacuated. Two men put on protective suits and fresh air masks to go in and shut the partially opened valve, and stop the flow. Total time: 20 min. __
Measures (to be) Taken to Prevent Recurrence (Jf not determined yet, give date when measures will be submitted)
See attached Accident Investigation Report. Procedural changes to prevent valve opening
by accident -- keep tank car dome closed when working on external piping. Seal weld the
piping components where possible to minimize development of piping leaks.
Date, Time, and Means of Notification (letter, telephone, etc)
| National Response Center
i wwtitacxofflMeiScBXMXXX
Juno 10. 'flFS. 1114 hrs.. phone tn Petty Off. M. Brvan hv ,1. F. Frdmann
TACB Regional office_.J.une 10,'flS. 1106 hrs. phone to Mr. Cliff Farnum. bv J. F. Erdmann
CB Local Program ^une TO, '85, 1122 hrs, phone to Ms. Phyllis Gilliland, by J. F. Erdmann
Date June 13, 1985 Forra sent tot TACB-Austln
TACB-Region 7
Signed
Oalroston Coifity Air Control X J- F. Erdmann, P.E.
U.S. E.P.A< -Dallas
7-- Envlr. Prot. Coord.
Rational Response Center ____
ucc 05065t
UNION CARBIDE CORPORATION CHEN ICA IS AND PLASTICS DIVISION
6ACCIDENT INVESTIGATION REPORT"
Please route and review as shnwn. Oept. Hd (s)
1. S. M. Norwood
Signify w mi r II/A hy initialing nr atlanh rnmments
Mgrs, Dept
S i FP or H t EP Depts
3. R. A. Mendez
5- F. G_ Phtnney
2. 4.
6.
Accident Report # :__ 0249_____
Loss Description: Pollution/Air
Accountable Denar tment: OCAR Solution Vinyl ResMopidingV. Tk. Car Rack pate ol Accident- 6/10/85 ;
G3 0 Q3 QPotential Accident Classification:
Actual Accident Classification:
__ Probability Recurrence:
Remote
__
Q] Loe m Moderate
[TJ High
H EIGIB
m
Loss Analysis 4* B. J + C. i
-t- 0. s
A. $
300 Material Loss (J Loss/Unit x # Units )( in lbs; eaIs; e
Product Mixup (Rerun, Devaluation,etc.)
*
Equipment Dange (J to Replace/Repair)
Business Interruption (J V-M Loss)
+ E. s
+ F. t
4,000
Med./Comp. Constant Productivity Loss (Est. Manhours x S/Manhour) and/or Cleanup Costs
Oo
ro
Wl
Total Loss
DETAILED REPORT
Accident Summary
A vinyl chloride leak occurred on Tank Car PPGX-9070 while it was on the southeast spot of the VCM Tank Car Rack.
Investigation
Tank car PPGX-9070 was connected to the unloading hoses on 6/9/85. The nitrogen pressure
test on 6/10/85 (Midn. Shift) showed a minor leak. The Day Shift Operator on 6/10/85 re
tested the unloading hoses toidentify a leak in the pipe threads above the hammer coup
ling. The Chief Operator was notified of the leak & Pipefitters were requested to repair
the leak. The Pipefitter removed the hammer coupling, taped the pipe threads, & re
assembled the coupling. The pipe threads still leaked due to the apparent wear of the
pipe nipple. The nitrogen hose to the pipe nipple was removed & the nitrogen hose end
was broken off in this process. The Pipefitters left for coffee break. The Pipefitters
& the Operator returned after coffee break to replace the pipe nipple & the nitrogen
hose. The Pipefitters were attemptingto remove the pipe nipple from the end of the host
when a VC1 leak started. VCl leaked through thehand valve on the tank car & out through
the hammer union which had been loosened., to remove the pipe nipple. The toxic gas alarm
#623 was turned in at 9:35 a.m. and the fire spray system was actuated. The Fire Squad
arrived & provided additional water spray protection. The Fire Squad personnel entered
the area with protective clothing & closed the hand valve on the tank car which was open
less than 1/4 turn.
ucc
(continued on attached page)
Q50S51
CT- 20?3B
J
Investigation (continued)
Additional Facts:
1* There was no VC1 leak during the coffee break nor anytime prior to the reported leak. The hammer union had been loose for several minutes including the coffee break without any VC1 leakage.
2. There was a 24-inch pipe wrench inside the wheel of the leaking hand valve. The end of the pipe wrench was placed down between the valve wheel spokes. ---
3* VCl area monitors read a maximum of 5.1 ppm during the incident. Peremeter monitors set by the Industrial Hygiene Department showed up to 7 ppm VCM approx. 100 yards downwind of the leak during the incident.
4. The loss of VCl was 1300 lbs per the tank car weigh tickets before after the incident.
Chairperson: Members:
ACCIDENT //20249 INVESTIGATION TEAM
S. M. Norwood
R. A. Mendez J. E. Tipton M. Williams J. Foreman D. L. Berringer M. E. Durdin H. Terrell W. E. Alford, Jr. Y. Cantu D. R. Hall D. B. Rygaard R. J. Bocek J. R. Rex M. E. Eisenhour J. D. Summers A. P. Yalcinkaya K. E. Martin J. F. Erdmann
Dept. Head
Ass't. Pit. Mgr. Pipefitter Leadman Pipefitter Pipefitter Maint. Superv. Maint. Area Superv. Shift Prod. Superv. Chief Operator Operator Group Leader Day Prod. Supervs. Prod. Engr. Day Prod. Supervs. Sr. Staff Engr. Safety Engr. Industrial Hygiene Industrial Hygiene Environmental Protection
ucc
050652