Document N2qgMVjegpYLpKoV9k7k5opyw
from i.i aw ci W. B. 3APACJXX.CZ
OSW 0131*6
z PLAINTIFFS
lae
t&a
EXHIBIT
x
z
WATER PCB-SD0000017099
/ no
'JGK-
7 0 J/J'?
i '-T y
(.** f
20^0 \JJL^ %u.^
'pL
{ /</-*-* bp. yi/ic _, / T"V_ <W"-O0la^
C*-Lr fccr2^X
n-*~+rrf~ *} 'hxo^td^ (^ ) 0 0 0 ^j>y bj
c^-2A cXFu 'ms. ~n~o>~-~r
2 2 0<w*~^. '~ us L.) <uXoc^
*c
-lx, C'ilS/r.?
/ 0//70
UA"-Z^ s<*+sCZj^ dU^T*-*-^ < T^iU* <*.- c^> *i.' i
* ox--\^Ct/^jj:\
d-Su
Q/*+A 02-*--* a*.
o--r~ <c_x--u-^r--
e~i--
3( -ft-*-&~
OSU 013187
WATER PCB-SDOOOO017100
Ann is ton
S. T. Ball j. L. Cordar 0. Jassaa J. C. tinA'ahr H. E. Schulta
Ganarol Offica*
\ \ D. Oanna (1) 3. Kodgas B. Papageorga J. R. Savaga
South Sacond Si.
Othar Locations
r. Macdonald Newport
3. w. Carl aw W.G.E.
Anniston Plant
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Summary
SEPTEMBER 1970 AROCLOR WASTES
CSNEtOESTrAI. Read and dastrsv
Currant Laval
Aroclor loaaaa during Septaaber avaragad 32/day (2600 ppb). Fluctuation of loaaaa occurred and vara eauaad byi
1. Hia old limeatona pit vaa overloaded with and discharged aolida containing PCS.
2. Oaa of detergent to claan the Aroclor depart ment resulted in emulsification and dacraaaad afficiaacy of tha department auap.
3. Variable levering of Muriatic Acid which, at
high ratae, cauaaa PO carrythrough fro* old
llmaatrana pit.
.
4. Tha new 1tmaatone pit not discharging any PCS to tha plant affluaat.
Alabama Watar Improvamaat rnaataaloa Contacta
Contacts with AJfXC Technical Staff wara mada to arrange to dlacoae program and raaulta. Illnaaa of staff Bankers and praaa of othar bnalnaaa pravantad thalr Mating with ua in September. Va are now able to inform them that tha new limaatona pit waa a tartad up on Saptaabar 23. To data tha PO lava! in thla pit affluant haa bean from 0-3 ppb on fire 24-hour cnayoalta saaplee . (oorraaponding plant affluant waa 90-240 ppb or 1.1-2.S #/day). Thia aupporta tha prealaa for latarla action that Anniston's major discharge originatad in tha old limaatona pit. Acid aamplaa ahow that tha naw pit haa neutralised 100% of tha Hd which haa been ant to tha pit.
OSH 013188
ccxwotxTux iNaotuanoM
WATER PCB-SD0000017101
Soills
Cn drum of Therminol Jail tram a fork lift and broke opan. Approxiaately ona gallon entered the sewer. The raac was absorsed in the chat and vaa cl a an ad up.
Projects and Evaluations
The Pollution Job atatua raport ia attached.
Data input for solid waatas containing PCS has baan completed. will ba publiahad tba first week in Octabar.
A report
Preliminary evaluation for removing spent carbon from the HC1 carbon cowers without draping into the sewer is in progress. Sawar relocation and sump ravia ions will ba required.
Feasibility of purging the limestone pit sludge will ba determined in October test. This will raduca cost of periodic pit cleanout.
ATE 3605 was forwarded for approval to contain/decrease Aroclor department process leaks ($15,300 capital and $6,850 expense).
A test skimpier was installed in the Aroclor sump and has operated success fully in removing the built-up scvss floating in the sump.
:kd Attachment
OSW 013189
WATER PCB-SD0000017102
WATER_PCB-SDOOOO017103
1 WATER PCB-SDOOOO017104