Document N2nj0Z83YbYNqzeQOaQROdgz8

Section Number: Issue Number: Original Date: Revision Date: Title: References: Ethanolamines/Glycol Ethers Tier 3 Procedure 37 1.5 09-17-96 Author: Tim Dill 06-23-97 Blowing, Dumping, And Charging of D-51A While Piped to the DV-135 Charcoal Filter Glossary Of Equipment Identification (Text #114) 1713 Use of Flexible Hoses 1703 Blowing Out Product Lines and Equipment with Nitrogen 2000 Quick Disconnects and Bleeds 37. Blowing, Dumping, And Charging of D-51 A While Piped to the DV-135 Charcoal Filter 1.0 Objective: 1.1 To blow out DB from the charcoal inside D-51A so that it can be dumped, and replaced with fresh charcoal. D-51 A must be charged and in-service for all DB production to insure color stability and quality. This procedure also identifies when the charcoal is spent and must be changed. 2.0 Responsibility: 2.1 It is the responsibility of the operations personnel to ensure that this procedure is fully complied with. 2.2 It is the responsibility of the operations personnel to ensure that this procedure is executed in a safe and efficient manner. 3.0 Charcoal Spent/Inactive Identification: 3.1 If the delta color before and after the charcoal filter is 0.6 units or less, sample the filter again in one hour. If the delta is still 0.6 units or less, change the charcoal in the filter. Past experience has shown that the DB must pass through active charcoal to provide a stable color. Without the charcoal or if the charcoal is spent, the DB color will increase in the storage tank. 4.1 Method: 4.1 D-51 A is blown with Nitrogen into DV-113 or a tank truck which is later transferred to DV-113. The charcoal is then dumped into waste packs through the dump valve and the bed is recharged with fresh charcoal. The used charcoal is incinerated at environmental operations. 5.0 Inventory: 5.1 Ensure that we have enough charcoal in inventory to complete this job. The type charcoal to be used is Calgon. Date Printed: April 19, 1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGINAL\SPlA\D-5iACHG.DOC Page 1 of 8 DO A 058968 CONFIDENTIAL 5.2 Ensure that two replacement sacks of charcoal have been ordered for the next recharge/if the existing inventory is less than 4 super sacks. 5.3 Ensure that the office professional has been notified of the amount of charcoal used for this job. 6.0 Safety Notation: 6.1 Monogoggles, safety glasses, gloves and a dust mask are required to perform this task. 7.0 Special Notation: 7.1 We should not leave our charcoal beds full of product and not flowing. This can create a potential fire hazard. 7.2 Make sure that the D-51A tag on the G/E board reflects the status of the charcoal filter. 7.3 An operator should be present while spotting the truck at the filter. 8.0 Procedures: 8.1 Blowing: 8.1.1 Tag and isolate D-51 A for charcoal replacement. 8.1.2 Connect N2 hose to the vent line on D-51 A. Be sure all lines are isolated to prevent contamination. 8.1.3 Connect a flex hose to the 1" bleed at the bottom of D-51 A to the EB bullet trailer, if DV-132B does not contain DB, connect the flex hose to the P-132B suction block valve if DV-132B contains DB. 8.1.4 Start a flow through D-51 A (N2) to the EB bullet trailer or the P-132B suction block valve. 8.1.5 Blow until the D51-A is empty. Purse D-51 A into the EB waste trailer. 8.1.6 Install blind to isolate 130 overheads if on "P" series. 8.1.7 Flush D-51 A with water to the tank truck until the TOD is below 8000 ppm. 8.2 Dumping: 8.2.1 Connect one end of the flex hose to the dump valve and the other end in the waste packs. 8.2.2 Open the dump valve and turn on the N2 to blow the charcoal into the waste packs. Keep the N2 pressure between 5 & 10 pounds. Date Printed: April 19, 1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGINAL\SPIA\D-5lACHG.DOC Page 2 of 8 DQ A 058969 CONFIDENTIAL 8.2.3 As soon as all the charcoal is removed from D-51 A, close the dump valve and prepare to recharge the bed. Usually 25 to 35 waste packs are filled from the vessel. 8.2.4 Turn off the N2 and open the D-51 A vent to depad the vessel. 8.3 Charging D-51 A with fresh charcoal: 8.3.1 Inspect D-51 A through manway to insure that not a significant amount of charcoal is left inside the vessel. 8.3.2 Flush with water to remove the remaining charcoal. 8.3.3 Tag DB spool bottom BN closed. 8.3.4 Fill the bed with about 50% level of DB. The vessel must have visual supervision during the entire filling procedure. The vessel can be filled through the temporary line from P-135. I 8.3.5 Fill the bed with charcoal to about 80% (approximately 1600#) of capacity, (leave 2-3 feet of the bed top section empty to allow for charcoal expansion. Begin dumping charcoal through the top open man way. (Dust mask, gloves and monogoggles are required for this task) 8.3.6 Put the man way back on and bolt it up. I 8.4 Ordering Charcoal, Dak Packs and Wooden Pallets 8.4.1 It is the responsibility of the operations personnel to replenish the supply of charcoal Dak Packs and Wooden Pallets for the next recharge. 8.4.2 The operator must complete the Request Forms (attached to this procedure) and fax it to Inventory Management and to the Material Flow Specialist designated on the procedure. 8.4.3 The original request forms must be placed in the area engineer's mailbox after the faxing is complete. 8.4.4 The operator must complete the glycol ethers charcoal inventory depletion form (attached to this procedure) and place it in the office professional's mail box on her desk. 8.5 Placing D-51 A in service: 8.5.1 Connect a nitrogen hose to the bottom of the charcoal bed and purge the bed for 30 minutes through the top bleed. This will ensure that all oxygen is purged from the "system". 8.5.2 Fill the bed with DB using the top bleed to remove all the air in the vessel. 8.5.3 Backwash D-51 A with overheads flow into DV-113 or a tank truck until 3000 pounds has been put into the tank. This step is completed to remove the fines from the charcoal. Date Printed: April 19, 1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGINAL\SPIA\D-5iACHG.DOC Page 3 of 8 DO A 058970 CONFIDENTS! 8.5.4 Start the DB overheads flow forward through D-51A and using only one cotton filter, flow DB into DV-135 until the color is good. 8.5.5 Swap the flow to the other cotton filter. 8.5.6 Change out the first used cotton filter so it will be ready for service. 8.6 Disposal of rerun product: 8.6.1 Determine if this product is going to be rerun or burned at Environmental Operations. Regardless of which a truck transfer form should be filled out and faxed (see attached). 8.6.2 If material is to be rerun, a sample should be caught and the analyses attached to the return product truck paperwork until material ca be off-loaded. 8.6.3 If the material is to be burned, a sample must be caught and taken to Environmental Operations for analysis. The person catching the sample should log date, time and truck number in log book to indicate when sampling was done. This should be done by the person putting the product in the truck. 9.0 Revisions: Revision 1 11-19-96 Added to Section 8.4 Revision 2 02-14-97 Added Section 8.6 and attached Truck Transfer Sheet. Revision 3 02-17-97 Added Section 8.5.1 and renumbered. Revision 4 04-01-97 Added 8.1.6 and 8.3.2. Revised tank transfer request form Revision 5 06-23-97 Added 7.3 and 8.1.7. Revised 5.1, 5.2 and charcoal material request form. Dale Printed: April 19, 1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGlNAL\SPIA\D-5iACHG.DOC Page 4 of 8 DO A 058971 CONFIDENTIAL EA/GE MATERIAL REQUEST (Glycol Ethers Charcoal) FAX TO GERALD SANDERS AT 6914 DATE: CURRENT INVENTORY =Super sacks target inventory = 4 super sacks j JOB DESCRIPTION: Order Charcoal for Glvcol Ethers REQUESTED BY: COST CENTER: 78 Source #: 172870 SUGGESTED VENDOR: Caloon CONTACT: Rickv Creel_________ PHONE #: 504-267-0097 ACTUAL NEED DATE: Within 3 weeks of the above date. QUANTITY 2 super sacks CODE# 2070302 FULL DESCRIPTION WITH PART NUMBER IF NOT CODED PCB 12X30 P.O.# SPECIAL INSTRUCTIONS: Date Printed: April 19, 1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORlGlNAL\SPlA\D-5lACHG.DOC Page 5 of 8 DO A 058972 CONFIDENTIAL GLYCOL ETHERS CHARCOAL INVENTORY DEPLETION FORM Complete and Return to : Brenda Carbo Date: Number of bags of Charcoal used: ____ Type of Charcoal used: Calaon_________ Special Notes: Operator: Date Printed: April 19, 1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGINAL\SPIA\D-5iACHG.DOC Page 6 of 8 00 A 058973 confidential LAD MATERIAL REQUEST FAX TO INVENTORY MANAGEMENT AT 6021 DATE: JOB DESCRIPTION: Dak Packs and Wooden Pallets REQUESTED BY: Master No. Phone No. COST CENTER: 77 Source #: 172880 Priority: Routine I ACTUAL NEED DATE: WITHIN TWO DAYS OF THE ABOVE DATE i DELIVER TO: BLOCK 55 QUANTITY CODE# 40 ea. 10 ea. 1160302 2902650 FULL DESCRIPTION WITH PART NUMBER IF NOT CODED 25 Gallon Dak Packs 48" x 48" Wooden Pallets P.O.# Date Printed: April 19, 1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGINAL\SPIA\D-5lACHG.DOC Page 7 of 8 DO A 058974 CONFIDENTIAL DUPRE LOGISTICS: TANK TRANSFER REQUEST FORM ALTERNATE PHONE # 776-2070 COMMENTS: EXPLAIN EMERGENCY SITUATION: CIRCLE TYPE URGENCY DRIVER COORDINATOR PG# 296-2646 AND 296-2641 EMERGENCY BEFORE 4PM ROUTINE MUST RECEIVE FAX BEFORE A MOVE CAN BE AUTHORIZED. FAX TO 353-1677. Date Printed: April 19, 1998 Page 8 of 8 This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T\ORiGINAL\spiA\D-5iACHG doc Paper Copies Of DO A 0 5 8 9 7 5 CO NFIDENTIAL