lots. The Du Pont Administrator wtll furnish the contractor with-a copy of the Belle Plant Parking Lot Rules. (Safety Manual Procedure M-7)
0 6. Shipments in and out of the plant are to be coordi nated through the Du Pont Administrator. Truck shipments in and out of the plant will be through either the main gate or the east truck gate, which ever is specified by the Du Pont Administrator. Contractor should notify the Du Pont Admin istrator ahead of time of shipments expected to arrive at the plant for the contractor. All railroad cars will be shifted and spotted by Du Pont, and movement of contractor's railroad cars will be co ordinated by the Du Pont Administrator.
ID 7. Property passes signed by contractor's supervision
and countersigned by a member of Du Pont's
supervision as specified by the Du Pont Admin
istrator are required for all tools, equipment, and materials taken out of the plant by contractor's personnel. Du Pont will periodically check such items as tool boxes, etc., on contractor's vehicles exiting the plant.
(D 8. Du Pont fire hydrants must not be used by the contractor for non-fire fighting purposes.
13 E.
DAILY FORCE REPORTING Before 9:00 a.m. each day. the contractor is to telephone the Du Pont Administrator or the person
he may designate and give the total number of employees (including subcontractor's employees) expected oh the site that day.
F. SPECIAL PROCEDURES UNIQUE TO TH!<?