Document N2Qjv9DwLYXOyN9qe5JDQ2xL8
v. 12', 1 N 7 L ^ O r` M C t MEMO
r ad A U JI u
pV MJ i* !.'J1
j'j ft 3 C.1 Vj? t Cli 'ij J
IDENTIAL NOV ;j 197 i
*> To M W. Williams
AT Piscatav/ay
H. B. Carr
at Flemingion
=' QUALITY ASSURANCE AMD TESTING SERVICES MONTHLY REPORT - OCTOBER, 1971
dai-- November 2, 1971
Copy :o VI. C. C/Wimp 1 OH
J. C. Fisher
P. Gawason D. A. Guerino H. R. Hortonn E. J. Hour ] V-^vq C. W. John 3 "t O/i E. L. Kariyok
I
RESIN FIANTS
Raw Materials
1. Bottle Polymerizer
Installation of the bottle polymerizer in the Analytical Control Laboratory was completed during October. With Dr. M. Koral in attendance, some initial' polymerizations were attempted to line out the equipment. Initial emphasis wil] be on the testing and control of DHW-80. A status report will issue during November.
2. Soda Ash
As reported in the September monthly, extremely high levels of metallic contamination were found in Diamond's soda ash. Diamond was contacted, and has stated that they are unable to reduce this contamination - apparently they mean at our usage level. Alternate approaches will be pursued including sodium bicarbonate and/or trisodium phosphate. In the meantime, however, no ill effects have resulted from eliminating soda ash from 315 formulation and, in fact, the light absorbance has remained at the same level. Of prime significance is the improvement in 315 metal count which has been reduced from an average count as high as 25 to current averages that range from 2-4 metal particles per pound since the removal of soda ash from 315 formulation.
Finished Resin
1. FDA
FDA sanction status of the entire resin product mix was reviewed and a summary report was issued to Marketing and other concerned groups citing our current FDA position. The report emphasized the point that appropriate marketing justification will be required before formulation and/or
COLORITE 011393
M, W. Williams
2- -
November 2, 1971
processing adjustments are pursued on products having .limited or no current PDA sanction.
2. 17F Kosher Requirements
At Marketing's request, a letter was issued to Reynolds Metal Co. stating that our 17F resin is both FDA sanctioned and kosher acceptable. This statement subsequently had to be qualified in that we have now learned that the entire product mix must be free of additives from animal fat origin. One additive, Emcol MST, which is utilized' in the 17P resin is from animal fat. In a meeting held with Witco on 11/1/71, we have learned that a kosher substitute, Emcol MSVK, Is available and pricing will be provided to Purchasing and evaluation samples to Product Development. Further word from Marketing will be awaited before this program is pursued.
3. Film Grade Resin for Arlington Heights
During the period, Arlington Heights experienced high gel levels when running flexible clears utilizing 225/16R resin. A review of Q.C. records indicated that while the resin lots in question were in spec, the fisheye level was to the high side. M. H. Berger, Arlington Heights plant manager, has been advised to order 17F for this application.and this has been set up with Purchasing.
General
1. Support to Nixon
As part of the bubble "applesauce" investigation at Nixon, four lot samples of 10R and one Irvinil 640 were analyzed by gas chromatography for head space volatiles. No signi ficant differences were noted in the samples when water and TCE content were compared. Additionally, total water and TCE content were determined and again no significant differ ences were noted with the total water content ranging from 7401,230 ppm and the TCE varying from 2,500-3,200 ppm with Irvinil 640 at 5>600 ppm.^
2. Personnel
Mrs. Else M. Gallagher joined the Analytical Control Group as an analytical control technician on 10/11/71.
COLORITE 011394
M. W. Williams
__-w
November 2, 1971
A
COMPOUND PLANT
1. Color Match Procedure
A color match procedure defining flow and format was coordi nated with CSL and Product Development and was instituted during October. The procedure requires definition of color limits by Marketing/CSL, match preparation by Product Devel opment, approval by CSL and confirmation by Compound Q.C. before the color is run in the plant.
2. Inventory Control
A color code system for liquid stabilizers, plasticizers and lubricants has been developed and will be instituted during November. This system will provide an improved inventory control of raw materials.
plasticizers
A shipment of DOP from Enjay was rejected and returned due to a 1.2/ DIDP contamination. Sufficient gas chromatographic data is now available to establish meaningful specifications and these will be reviewed with Purchasing during November.
4. Safety
Job safety analyses were written for the Quality Control technicians and were provided to plant management.
5. Personnel
Mr. Ed Lynn, Q.C. technician, will not be able to work until mid-November due to problems with his recurring illness, Lupes.
A&E
1. Mercury
A technical memorandum prepared by Y, B. Hanna was issued during October. The report summarized A&E*s testing program for mercury content in our plants* effluent streams. The main conclusion of the report was that our plants are in excellent control and well within any federal or state mercury limita tions. This program will be expanded to include lead and cadmium.
COLOR!TE 011395
M. W. Williams
4- -
November 2, 197]
2. Laboratory Rearrangement
The two new hoods were installed by the Maintenance Group (P. W. Randall and D. L. Ramsby) In Laboratory 23. Arrangements have been made to have a sheet metal contractor Install the exhaust system for the new hoods and for the Atomic
Absorption Spectrophotometer. Once complete. Laboratory 25 will provide much needed space to effectively and safely handle the increasing A&E workload.
3. October Time Allotment
Shown below is A&E's October time allotment versus the August and September levels:
August, 1971
CSL P.D. Nixon Q.C. P.R. Safety
24.0 28.6
28.5 10.8
2.1 6.0 IHOTO
4. Physical Testing
Sept., 1971 $
2 9.6 28.9 25.2 ' 12.4
2.2 1.7 TUfTTo
Oct., 1971 %
35.0 37.5 13.5
1.0
13.0 TOtJTTJ
Attached is a summary prepared by A. W. Luckert of physical testing work requests completed during October.
NIXON
With the divisional realignment effective 11/1/71, several areas involved in the transition of responsibility for Nixon Quality
Control are being reviewed with M. C. Spalding. It is expected that these areas will be defined by 11/5/71 and a report will issue.
HBC:em Att.
H. B. Carr
COLORITE 011396
PHYSICAL TESTING- - OCTOBER, 1971
Work Requests Received (9/28 to 10/?/(/Jl inc 1. )
Physicals
CSL & Product Development (Plexibles) Product Development (Plastisols) Product Development (Rigids)
Rheology
11 2 o
13
Product Development (Rigids)
1
Work Requests Completed (9/28/ to 10/27/71 incl.) Physicals
CSL & Product Development (Flekibles) Product Development (Plastisols) Product Development (Rigids)
Rheology
10 2 1
13
Product Development (Rigids)
1
Physical and rheological testing for the completed work requests were required for the reasons indicated on the attached.
A. W. Luckert 10/28/71
COXiORXTE 011397
PHYSICAL TESTING REPORT - OCTOBER, 1971
W. R. No.
Compound
Reason for Test
CSL & Product Development (Flexibles) Group
2730 2736 2788 2750, 2761
2751
2752
2768
2787
Elec. Elec. Elec. Elec.
Wire Insulation Wire Insulation Insulation Material Wire Insulation
Elec. Insulation Material
Elec. Insulation Material
Elec. Wire Insulation
Elec. Wire & Jacket Insulation
Raw Materials Evaluation Product Improvement Tenneco Specification Brochure Because of cost reduction of T-2802-1,
test of oil aged specimens required to determine if U.L. specification could be met. Verification of flame-retardant version of standard compound. Customer request for softer version of T-1105 compound.
Check on LMP-prepared compound prior to shipment to Packard Electric.
Request by Pacific Electricord to modify CS-106 compound.
Wo. of Specimens
24 37 24 72
24 24
6 36
Calc. Operations
1H 244 144 378
141 144
24 162
Total Hours
4.0 9.0 4.5 15.0
5.0 5.5 2.0 6.5
2758, Blending Resins 2769
Product Development (Plastisols) Group New Product Development
CSL Product Development (Plastisols) Group
289
2217
63.0
2737 Blending* Resins
2729 2707
Calendering (Tensile & Flexurals)
Profile Extrusion
(Rheology)
A. W. Luc kert 10/28/71
Data for Tenneco Newsletter
Product Development (Rigids) Group
Data for Marketing Brochure
Determine if shear sensitivity could be quantified by "instron" rheology.
75
10 Q
630
420 15.5
70 45 4 l/b
11.0 14.5 135.5
COLORITE 011398