EPA REGION 10 Enforcement Division INSPECTION REPORT
09/18/2023 08:40 AM (AKT)
Announced: No
09/18/2023 10:05 AM (AKT)
Access: Granted
RCRA
Compliance Evaluation Inspection (CEI)
Company Name Facility or Site Name Facility/Site Identifier Facility/Site Physical Address City, State, Zip Code County/Borough Generator Status NAICS Type of Operation Geographic Coordinates Mailing Address/Secondary Address
City, State, Zip Code
Petro Star, Inc. North Pacific Fuel - Valdez AKR000203844 254 Fidalgo Avenue Valdez, AK 99686 Valdez - Cordova Borough Very Small Quantity Generator (VSQG) 48833 Navigational Services to Shipping 61.126018, -146.354797 Mr. John Anderson, Operations Manager 254 Fidalgo Avenue Valdez, AK 99686
jfanderson@petrostar.com
CC: Ms. Monica Koethke, Environmental Specialist Petro Star Refinery mkoethke@petrostar.com
Petro Star, Inc. 3900 C Street Suite 802 Anchorage, Alaska 99503-5966 907-339-6600
Valdez, AK 99686
Permit Number (If Applicable) Not Applicable
Lead Inspector: Jon Jones
Jones, Jon EPA Region 10
Digitally signed by Jones, Jon Date: 2023.12.04 11:58:31 -09'00'
Jones.Jon@epa.gov
(907) 271-6329
Supervisor Review: Matt Quarterman
MATTHEW QUARTERMAN Date: 2023.12.14 16:14:09 -08'00' Digitally signed by MATTHEW QUARTERMAN
EPA Region 10
Quarterman.matthew@epa.gov (206) 553-2146
SECTION I - INTRODUCTION Site Entry and Purpose of the Inspection
1 of 4
North Pacific Fuel - Valdez Inspection Date(s):
Type of inspection: Compliance Evaluation Inspection (CEI)
09/18/2023 - 09/18/2023
EPA Region 10 Lead Inspector, Jon Jones, arrived at the North Pacific Fuel - Valdez Facility (the "Site" or "Facility"), located at 254 Fidalgo Avenue, Valdez, AK 99686, at 08:40 AM (AKT) on 09/18/2023 for an unannounced inspection. EPA Region 10 Lead Inspector presented credentials to and informed Mr. John Anderson, Operations Manager that this was an EPA Region 10 inspection to determine compliance with Resource Conservation and Recovery Act (RCRA). This was a Resource Conservation and Recovery Act (RCRA) inspection. The facility was inspected to ensure compliance with standards for hazardous waste generators and universal waste management (40 C.F.R. Part 262 through 273) and used oil management (40 C.F.R. Part 279). The inspection was conducted as part of a Core Program requirement for FY 2023.This report is based on information supplied by Noth Pacific Fuel - Valdez Facility representatives, observations made by the EPA Region 10 inspector, and records and reports maintained by the facility, but not limited to: direct observations made by the EPA Region 10 Inspector(s), photographs taken by EPA Region 10 inspector(s), physical evidence collected by the EPA Region 10 inspector(s), measurements or samples taken by EPA Region 10 inspector(s), verbal or written statements made by information supplied by the facility representatives during or subsequent to the on-site Inspection, and materials, processes, data, photographs, or documents shown, demonstrated, or submitted to the EPA Region 10 inspector(s) by the facility representatives during or subsequent to the on-site Inspection. In addition, information gathered prior to or subsequent to the Inspection from a review of USEPA, State, and public records may be included in this report.
Attendees
Title/Organization Name
Lead Inspector/EPA Jon Jones REGION 10
Phone
(907) 2716329
Operations Manager/North Pacific Fuel
John Anderson
Environmental Specialist/Petro Star, Inc.
Monica Koethke
(907) 8342143
RCRA Inspector/ADEC
Vanessa Schmidt
Email Jones.Jon@epa.gov
Opening Conf. Closing Conf.
Yes
Yes
jfanderson@petrostar.com Yes
Yes
mkoethke@petrostar.com Yes
Yes
vanessa.schmidt@alaska.gov Yes
Yes
Opening Conference
The following information was obtained from Mr. Anderson during the opening meeting of the inspection. The facility is a retail and distribution center for fuel and lubricants. The facility is owned by Petro Star Inc. but was previously being leased by Crowley Marine Services, Inc. for the last 3-5 years prior to Petro Star operating the site as North Pacific Fuel. The office building at this location has been present for 3 years and the warehouses have been present for 23 years.
During the opening conference, we were joined by Ms. Monica Koethke, Environmental Specialist with Petro Star, Inc. Ms. Koethke told us she was the Environmental point-of-contact at the Petro Star Refinery which is also located in Valdez, AK.
Facility/Site Information
Number of employees 8
Length of Facility at Location
~23 years
2 of 4
North Pacific Fuel - Valdez Inspection Date(s):
09/18/2023 - 09/18/2023
Operating Hours
Safety Training Provided to Inspector(s)?
Size of Facility
What type of generator facility notified?
What type of generator facility verified as?
Weather Conditions
Monday through Friday, 8:00 a.m. to 5:00 p.m. No
362,000 square feet Small Quantity Generator (SQG)
Verified To be a Very Small Quantity Generator (VSQG) during the inspection by Ms. Monica Koethke, Environmental Specialist Rainy
Process Description
According to Mr. Anderson, the following wastes are generated at the facility:
Sorbents collected from trucks transporting fuel Used oil Oily rags Vehicle batteries (recycled)
We were accompanied during the inspection by Mr. Anderson and Ms. Koethke. We looked at the facility's processes, hazardous waste management practices, generation points, and accumulation areas. We looked for wastes that facility representatives had not yet identified or designated as hazardous.
Only those areas in which we observed areas of concern or noted other pertinent issues are discussed in this inspection report.
Building(s) Building/Area/Sub-area Lube Warehouse Main Warehouse
Process Description Oily rag generation Used oil generation.
Area of Concern No No
SECTION II - OBSERVATIONS We inspected the areas listed above and everything observed was found to be consistent with that of a VSQG.
SECTION III - RECORDS REVIEW No records were reviewed given the VSQG status of the facility at the time of the inspection.
SECTION IV - AREA OF CONCERN We observed no Area(s) of Concern at the time of the inspection.
3 of 4
North Pacific Fuel - Valdez Inspection Date(s):
09/18/2023 - 09/18/2023
SECTION V - CLOSING CONFERENCE
Closing Conference At the conclusion of the inspection, we conducted a closing conference that was attended by those listed in the Attendees table, in Section I of this report. We thanked Mr. Anderson and Ms. Koethke for their time and cooperation during the inspection. We told Mr. Anderson and Ms. Koethke that we observed no areas of concern during our inspection of the facility. We then explained the follow-up process that would take place once the report was finished. We explained they would receive a copy of the report as would a case officer.
SECTION VI - SAMPLING ACTIVITIES AND ANALYTICAL RESULTS - No sampling was conducted.
SECTION VII - LIST OF APPENDICES No appendices are attached, as no photos were taken, and no documents were obtained during the inspection.