SUPPLEMENTAL NOTICE NO. 3
To Inquiry No, 7128-20619 (Notice to Bidders with Proposal/Sub-Contract and Exhibits dated 9-27-68}
TO ALL BIDDERS:
Add the following new paragraph (e) under Item 2 of Exhibit "B" Items to be Supplied by Contractor" (Item 2 modifies or clarifies procurement responsibilities under certain Sections of Specifi cation No. 7128(3-20):
"(e) SECTION 1$ - MISCELLANEOUS ITEMS - and Section 7 -
GLASS AND GLAZING - Only the structural
steel framework for the structural wall
n panels (asbestos) and for glass shown
K
on the drawings of the north wall of the Furnace Pulpit will be furnished by
others. The framework will also be in
stalled by others".
The following new paragraphs hereby incorporated under Special Pro vision No. 8 of Exhibit "E" as additional modifications to Specifi cation No. 7128(3-20) describing Sub-Contractor^s responsibilities.
(e) SECTION 5 - Insert in parenthesis at the end of Item (2), "Roofer's base flashing", under sub-section 5.1.2:
"(including furnishing and installing flashing for expansion joint between Mechanical Room and Furnace Pulpit)".
(f) SECTION 17 - Add the following new paragraph under sub-section 17.U Ductwork:
-P.i* BRIGHT PINK, PURPLE
AKE-000002
i-
Supplemental Notice No. 3
2- - Oct. 17, 1966
l:
f, continued
"17.li.12 INSUIATION; Insulate ducts^fll un
conditioned areas with two (2) inch thick fiberglass insulation. ' Insulation shall have an aluminum foil facing, shall be blanket-wrap type, and shall be installed in strict conformance with insulation manufacturer's instructions for dual temperature ducting. All joints shall be taped and all penetrations covered to form a complete vapor barrier envelope. Insulation shall be Owens-Corning faced duct wrap type III (.002" foil) or equal.
(g) SECTION 17 - Sub-Section 17.1.2 - Add the following sentence after Item (l) "Charging Side Control Stations as shown on Drawing No. 659838":
"Contractor will furnish 8" pipe to be installed by Sub-Contractor. SubContractor will furnish and install pipe hangers, registers and sheet metal."
(h) SECTION 16 - Fainting Schedule on Page 16-6 ; ; Add the words "Exterior and Interior 5' Surfaces" after the word "Masonry" and
also add a new item as follows*
I.. ___Surface ________1st CoatFinish Coat
? hr
Asbestos Panels Pre-primed Armco Std. No. 52
*
Also add the following new Special Provision under Exhibit "E":
"16. The following is a part of The Work:
(a) Sub-Contractor shall furnish and install all asbestos panels per Section 15 of Specification No. 7128(3-20) and as shown on drawings. Ihe Schedule under Special Provision No. 6 was not intended to encompass this type of panel.
(b) Sub-Contractor shall install all panels shown on both the furnace side and the pulpit side of the Furnace Pulpit.
<!/
BRIGHT PINK, PURPLE
AKE-000003
Supplemental Notice No. 3
-3- Oct. 17, 1968
(c) In the Pulpit, Sub-Contractor shall install the liner panels which are attached to the exterior
if face of the S.O.F, structure".
All other portions of subject Proposal/Sub-Contract documents are unchanged.
Bidders shall acknowledge receipt of and conformance to this Supplemental Notice No. 3 in the space provided on the signature page of each Proposal/Sub-Contract Form.
Very truly yours,
KAISER ENGINEERS, INC Agent for Armco Steel Corporation
77^
Donald K. Carlson \ Project Purchasing Agent n^ - -
. DKC: jp
rrii
ii,' it'-'
t(*' u
if"
ir
5?i; fc
*1 ' -
.** >
ji
BRIGHT PINK, PURPLE
AKE-000004
J o e. r~
KAISER ENGINEERS, INC.
p. o. BOX F
MIDDLETOWN, OHIO 45042
October 9, 1?68
SUPPLEMENTAL NOTICE NO. 2
;? To Inquiry No. 7128-20619 k^er engineers
li'.
(Notice to Bidders with
MIDDLETOWN. OHIO
Proposal/Subcontract and
Exhibits dated 9-27-68)
TO ALL BIDDERS:
In Special Provision No. 9 of Exhibit "E?1 the words "shall furnish and install firebrick" are hereby changed to "shall install firebrick".
Section 1 - "Shop Drawings" of Exhibit "D" - Standard Conditions sets forth general requirements for submitting drawings for approval, and for permanent records; however, the following additional drawing and data requirements are hereby incorporated as Special Provision No. 15 of Exhibit "IF:
*15. Sub-Contractor shall submit for Contractor's approval three
(3) copies of the electrical wiring diagrams and electrical installation drawings on all heating, ventilating and air conditioning systems. After approval, Sub-Contractor shall submit seven (7) copies and one reproducible of each, as well as seven (7) copies and one reproducible of panel wiring diagrams which need not be approved prior to installation.
Also submit "as-builtvrevisions if any installations were made not in accordance with the drawings.
Submit eight (8) copies each of Spare Fhrts Lists, and of Installation, Operation and Maintenance manuals for any major equipment items furnished by Sub-Contractor for heating, ventilating and air-con ditioning.
BRIGHT PINK, PURPLE
AKE-000005
Supplemental Notice No. 2
2- -
All submittals must be in accordance with the instructions on both sides of Schedule 1 - "Engineering Bata Required with Sub-Contract" - Form No. S-12721}, which is attached and in >ifv` corporated herein. Electrical single line schematics, inter connection and panel wiring diagrams, and operating data are all marked on this form as required submittals."
Bidders shall insert the following in parenthesis before the colon on the second line of Item No. 1* on Page 3 of Exhibit "A" I as a qualification concerning the two (2) Electrical Bills of l Material?
;\U "(except for'electrical items other than lighting fixtures, wire, conduit, and lamps which are' Sbb-contractor1s
St procurement and installation responsibility):
All other portions-of subject Proposal/Sub-Contract documents are unchanged.
Bidders shall acknowledge receipt of and conformance to this Supplemental Notice No. 2 in the space provided on the signature page of each Proposal/Sub-Contract Form.
Very truly yours,
KAISER ENGINEERS, INC., Agent for Armco Steel Corporation
Donald K. Carlson Project Purchasing Agent
I' !
..
V
DKCtjp
* Contractors procurement responsibility for only lighting fixtures, wire, conduit, and lamps is clearly set forth in Item 13 of Exhibit "E", and Item 2(g) of Exhibit 3.
i
r.
:!
s
ir
:r:
BRIGHT PINK, PURPLE
AKE-000006
i
;tin<,uiryN0.
SCHEDULE 1
engineering data required with proposal AND PURCHASE ORDER OR SUE-CONTRACT
,W /-
sT'/c:,
Purchose O/dor
n\7~8-2.Q&lct
or Sub-Controct No,
See Definitions of
Engineering Date . On Reverse Side
Roquired with
Quotation
4 Set* "Preliminary"
For Approval ^3 Sot* Prints
Required After Purchoso
Certified os Approved
Peeked with Shipment
Sets Print* (Soo Note b)
l Set Pfints (see Note c)
As-Built Print &. Reproducible
1 Set Each (see Note d)
. L Drewina List 2. General Avongement Drawings
3,-Det oiled Orowlncji
: 4. Dimension Drowinos '/j, *i $ Electrical Drowinos
c, Single Line Orowinqs
b. SchomatJc Drowinos
c. Interconnection OrowtnQ*
r d. Ponet Wiring Diagram*
e. Outline Drawings
XX
!*
X X ...... ... . ..... . X
V X _ ___________ ______X
.... . X. ..... .
X
``5* Erection Drowinos *7. foundation Drawlnas
B, Plplna Drowinos iV. Hydraulic Plains Drowinqs MO. Lood Dlooroms H< Performance Oat a |$2. Wecrirtfl Part Drewlncs
1 ;
i
i i i ii 1
83. Motor List
*$4. Quotation for Recommended Spore Pert* J. Showing Unit Price*
*,$5. Bills of Mcteriol
j
A.l$f Operating Dote
; Spore Port* Llr.t "IF -------------------------------------
Installation Instructions
X
y
Operating Instructions
x: J . .
Maintenance Monupl * > copies to fho Project Engineer, (oo'dross shown bolow).
j/
... . x
SPECIAL INSTRUCTIONS
1___________ L________________________
(<*) All drawings must bo dimensioned in foot and inches. Drawing sizo must not bo less than i8" x 24", nor largor thon 24" x 36" *: without specific written opprovol from the Purchoser, All prints must bo dork lino on white background, direct roeding typo *o \ conform to tho minimum requirements for microfilming os shown on tho roverso side. Wo WILL NOT ACCEPT 8LUE*PRINTS.
t ; (b) Certified drowlngs must be so marked by tho Solior: Thoy must conform to approval drawings os finally approved by tho under* signed and must be forwarded promptly to the address shown below. Also, whon applicable, on additional 2 copies shall bo
;/ sent to the reiatod equipment builder (address furnished later), i.
V-* (a) Ooto to bo pocked with shipment it in addition to Pocking List specified in the marking ond shipping instructions. Containers to be clocriy marked "Operating Data and Erection Growings enclosed."
W) Reproduciblas shell conform to the standard reproducible spocificotions os shown on rovers* side, ond sent to the address shown below,
w.. ! One print of each "preliminary" drawing, if required, shall be attached to uach copy (priced and unpriced) of tho proposal end 1 returned to th# addresses indicated in the request for quotation.
(f) One copy of tronsmittol correspondence, less dote, to bo directed to: Kaiser Engineers, Inc., P.0. Box F Middletown, Ohio, 45042, Attn: Mcteriol Control lor.
* (g) Drawings for opprovol, unless otherwise specified,, are to be simultcnoowsly directed os follows:
MOO
BRIGHT PINK, PURPLE
AKE-000007
cii!*; rij.* V; '
i:
y- i
i
* .
DEFINITIONS OF ENGINEERING DATA REQUIRED
Drowing List - A complete list of oil Growings ond dote, by titlo, orvd the drowing submittol schedule which the seUer`expCcts to supply* on this order,
Generol Arrongcroent Drowings - Outline drowings to scale showing location end st to of bull ding focility ond/or mojor equipment, including locotion of reTotod occessorios and entire line arrangements.
Detailed Drawings - All detail s of components required for assembly. These shall be cross-referenced to oil other drawings.
Dimension Growings - Show dimensions required for loco tion of eoch major piece of equipment.
Electrical Drawings* All data pertaining to power supply ond electricot equipment. Include "one-line" drowings, schematic end interconnection wiring diagrams. All panel, desk, end control stotion internal wiring diogroms. Out line ond arrongement dr owing s of oil ponels, desks, ond control stations. Outline dimension drawings for oil ro tating equipment such os motor generator sets, motors, pilot generators, etc.'Static power supplies such os trans formers, rectifiers, etc., and all control devices such os limit switches, hot metal detectors, push buttons, etc.
Erection Drawings - All detoils ond data in sequence re* quired for the eroction of the facility.
Foundation Growings - AIJ dimensions and details re quired for foundation design including location, bloekouts, imbedded items, grout required, size, type and projection of onehor bolts.
Piping Drawings AH piping drowings except hydraulic piping (See Item 9) furnished with the equipment must show the locotions of purchaser's connection points ond roquired flows and pressures. All air piping schematic and interconnection diagrams must be in occordonce with J.I.C. stondards.
Hydraulic Piping Drawings Ail piping drawing of hy draulic systems must include o graphical diogrom using J.I.C. symbols, os described by figure 3 ASA Y14, paro* groph 17-4.3. Also a drawing showing sequence of oper ation, time cycle, operating pressures and flows must be furnished, as described by figure 30 AS A Y)4, porogroph 17-9.3 for fluid power diogroms.
10. Load Diogroms - Total static ond dynamic loads ond iood centers.
11. Performance Data- All performance data including graphs, test reports ond other pertinent information for the equip ment and machinery of the facility.
12. Wearing Ports Drawings * Exact scale drawings showing material of all component ports which require replacement due to wear in normol operation. Hoot troot data to be included where applicable.
13. MotorList- A complete I i st of oil electric motors supplied including oil normal nameploto data.
14. Quotation for Recommended Spore Ports Showing Unit Prices - (Complete list including component, manu facturers name and part number). Spare ports will either be purchasod with ihe equipment or in the future,
15. Bills of Material - Complete, detailed Bills of Material sholl be suppliod prior to shipment. These must show Item No., Shop Order No., Mark, Port No., or Pattern No,; Reference Drowing Description. Pocking slips described in the marking ond shipping instructions must hove the same Horn No. and identificotion as shown on the opplicable Bill & of Morenoi.
16. OPERATING DATA -
Spore Ports List - Should be o complete list or monuol (including component manufacturer** nomc ond port number) of ail replaceable ports, illustrated if possible.
Installation Instructions - As complete ond detailed as possible both for originot installation ond future removal ond replacement of equipment ond all components and ac cessories.
Operating Instructions - Should include all tho dotails ne cessary to insure proper procedure ond soquonces of oper ation.
Maintenance Monuols All phases of both preventive ond repair maintenance are required, including o dctoiled tub* rication chart, showing every point requiring lubrication, the grade of lubricant, .schedule for lubricotion and where indicated the correct amount of oil or greose necessary for refill offer drainage.
REPRODUCIBLE DRAWING REQUIREMENTS
A -In oddition to the prints required above, the seller shall furnish one (1) complete set of unfolded prints end one (1) set of reproducible* of "As-Shipped" drowings of:
(1) All machinery outlines, gonerol orrongement draw ings, alt assemblies ond details, ond complete bill of moterlaf.
(2) All service piping schematic and interconnection diogroms.
For Moist Machine (Fluid)
K&E Bruning Post Dietzgen Kodak
#26-3145 #26-200 #444 #254-A
* AT 1
For Dry Machine (ammonia)
Sepia Poper Translucent Sepio Sepia Line Paper VERI-VEL Dirccto Sepia Poper Autopositive Poper
<3) AU hydroutic piping system schematic ond intercon nection diagrams.
(4) All olectricol schematic and interconnection wiring diogroms. All ponei, desk, and control station inter nal wiring diogroms, outline and arrangement draw ings,
B Reproducible* shot) be dork line on white background, direct reading type, first generation reproduction, unretouched, on votlum, of one of the following ccceptoblo erodes except, electrical schematic diagrams ond desk foyotrts shall be on Mylar film or Linen.
K&E Bruning Post Diet tgen Kodak
#21*3145 #30-1124 #209
#244 #AT l
Sepio Line Poper Sepio Line Poper Standard Sepia Line Poper
Dry Print Septa Line Poper Autopcsitivc Paper
C- All rcprodueibJes shall bo full-size copy, with no group ing of drawings permitted. Our stondora drowing sixo is
24" x 36", however, we will accept smaller size draw ings whon printed individuolly, and full size, on one 18" x 24" roprodocibIc.
MINIMUM DRAFTING STANDARDS FOR MICROFILM PRACTICE
A* LETTERING
O) Only one (1) style of lettering shall bo used throughout eoch drawing.
(2) All lettering shall be at leost 1/8" high.
(3) Single stroke Gothic upper cose lettering is preferred.
(4) Either verticcl or inclined style is opproved.
(5) The size of the lettering shall not vory according lo the s*Jce of the format, or the scale of which the drowing is mode.
(6) Spaco between lines of lettering shall be 1/2 to 1-1/2 times the letter height, depending upon whether common fractions ore included.
(7) The dividing line between the numerator ond denominator. In common froctions, shall be horizontal if hand lettered.
(8) Lettering shall be mode with HB Grade (or softer) lead.
S-12420 REV, 6^60
B - LINE QUALITY
(1) Ail Unas, regardless of width, shall be of uniform density. Width voriations will comprise Alphabet of Lines**, not density variotion.
(2) Pencil lines made with 4H Grade ond harder load are not acceptable.
(3) Closely spoced section lining shall be avoided.
(4) Poroilel dimension lines sholl be spoced not less than 1/4" apart,
(5) No dimension fine shall be closer thon 3/8" to the out- * lino of the port.
C - TITLE BLOCK
A 3" x 6n space shall be provided within the body of tho drawing (preferably in tho lower right hand corner) for the oddition by Armco of <x> expropriate title block.
BRIGHT PINK, PURPLE
AKE-000008
KAISER ENGINEERS, INC.
P. 0. BOX F
I MIDDLETOWN, OHIO 45042
October 3, 1968
SUPPLEMENTAL NOTICE NO. 1 To Inquiry No. 7128-20619 (Notice to Bidders with Proposal/Subcontract and Exhibits dated 9-27-68)
TO ALL BIDDERS:
With reference to the "Type of Construction" shown for Room No. 32 in the schedule shown under Special Provision No. 6 on Page 2 of Exhibit 'E', Masonry ('M') is hereby changed to Pre-Fabricated Steel Building ("PFS"), and Bidders shall so correct their respective file copies of this page.
Contractor Is contemplating the possibility of doing its own erectiai of the seven (7) Armco Steel Pre-Fabricated Buildings described in the first five (5) paragraphs of Section L.1.2 of Specification No. 7128(3-20), which are identical to the first seven (7) items of the schedule under Special Provision No. 6, (including the correction to Room No. 32 as set forth above). Concerning this optional take-out of such work described in Specification Section h, and not applicable to any other type of work in such buildings, such as door installation, heating,air conditioning, etc. Bidder shall complete, sign and return with its completed pro posal forms three (3) copies of the attached memorandum entitled "optional take-out price proposal".
Attached and incorporated herein are the following three (3) revised pages changing and clarifying electrical work res ponsibilities which are hereby incorporated into subject documents superseding pages previously forwarded bearing the same Exhibit letter designations and page number designations:
IE C E 0 VC
OCT
KA'
<-
-v
BRIGHT PINK, PURPLE
AKE-000009
-2- October 3* 1968
Exhibit "B" - Items to be Supplied by Contractors
Fhges 2 and 3 only.
Exhibit "E" - Special Provisions:
Page Ij only.
You are instructed to destroy the three (3) superseded pages and insert the three (3) revised pages (each is printed ''Rev. 10-3-68").
All other portions of subject Proposal/Subcontract documents are unchanged.
Bidders shall acknowledge receipt of and conformance to this
:vI
Supplemental Notice No. 1 in the space provided on the sign ature page of each Proposal/Subcontract form.
I
Very truly yours,
KAISER ENGINEERS, INC., Agent for Armco Steel Corporation
Donald K. Carlson Project Purchasing Agent
|: DKC:jp
vv
I* <
V\
BRIGHT PINK, PURPLE
AKE-000010
Exhibit "B", continued
2-
e) Section 17 - Heating, Ventilating and Air Conditioning Only those items listed in the following Heating, Venti lating and Air Conditioning Bills of Material will be furnished by Contractor. Such items will be loaded by Contractor on Subcontractor's trucks at Contractor's storage compound on the sites
659786-P (Furnace Pulpit) Sheets 1 thru 11
659787-P (Pit Foreman's Area) Sheets 1 thru 7
659789-P (Lunch Room) Sheets 1 thru U
6^9838-P (Charging Side Control Sta's.) Sheet 1
f) Section 18 - Service Piping Systems - In addition to "materials by Contractor" as stated in Item No. 1 hereof, and also stated in Sub-section 18.3.1, all material and work is "by Contractor" for sanitary and drinking water systems including all necessary piping, plumbing, toilet fixtures, water heaters, and drinking fountains. Such systems and equipment are not within the scope of this section or within the Subcontract since Sub-section 18.1 (SCOPE) clearly limits Subcontractor's responsibility to steam, condensate, and air service systems complete
?; with equipment but mention is made here of other systems for clarification purposes only.
g) Section 19 - Electrical - All lighting fixtures, wire, conduit, and lamps loaded by Contractor on Subcontractor's trucks at Contractor's storage compound. In connection therewith, refer to Electrical Bills of Material listed under Item No. lj(b) of Exhibit "A". Also, the Sub contractor has no electrical responsibility whatsoever in the following rooms (all such electrical material and work by Contractor):
Room No. 12 - Booster Pump Enclosure
Room No. 19B - Motor Control Center
Room Nos. 2? & 28 - Air Lock No. 1 and No. 2
Room No. 3k - Grease Storage
Rev. 10-3-68
BRIGHT PINK, PURPLE
AKE-000011
Exhibit f'B", continued
-3-
Contractor has complete electrical responsibility for items and systems which are not a part of the Heating, Ventilating and Air Conditioning systems in the following rooms:
Room No. 16 - Scale House
Room No. 26 - FUrnace Pulpit
Raom No. 20 - Mechanical Room
3. Source of potable water.
It. Sources of temporary electrical power in the vicinity of the work - ItitO volt, 3 phase, and 110 volt, single phase.
5. All furniture and Basic Oxygen Shop process equipment and systems including control systems in place (also alarm in pulpit)
6. All steel joists, metal decking, and monorail loaded by Contractor on Subcontractor's trucks at Contractor's storage compound.
7. Furnish and install support steel for condenser unit C-l and channel base for heat pump HP-1.
: `iv
BRIGHT PINK, PURPLE
Rev. 10-3-68
<
AKE-000012
't- :
><
fj: .
fei' f
fc.
M .. C:
ik-;
r.
5}'..
jr:
i!
'%
Exhibit "E" continued
-L-
9. Subcontractor shall furnish and install firebrick along the west wall of the electrical control center since the condition on the face of that wall shall be the same as that shown on Drwgs. 659516 and 659b5? where firebrick is shown in the Booster Pump Enclosure and extending along one face of the motor control center.
10, As a part of its electrical responsibility. Subcontractor shall furnish all required electrical accessories such as conduit, boxes, outlets, switches, and conduit fittings, but, pursuant to Item 2(g) of Exhibit "B", .'Subcontractor i.s not required to furnish any lighting fixtures, wire, conduit, or lamps. Subcontractor has complete electrical res ponsibility for work and material except for furnishing the afore mentioned four (b) items, in all rooms and structures listed herein other than those rooms and structures where its electrical res ponsibility is exempted in whole or in part by the listings of rooms in Item 2(g) of Exhibit "B".
11, Subcontractor's piping responsibility is limited to piping which is a part of the systems for Heating, Ventilating and Air-Conditioning; steam, condensate, and air piping, and all such piping materials are furnished by Contractor pursuant to Item 1 of Exhibit "B".
12, The Bills of Material (designated as "Partial") listed under Item No. 3 do not represent all of the items that must be purchased by Sub contractor, over and above Contractor - furnished items (Bills of Material under Item It (a)). Temperature control components are to be purchased by Subcontractor but none are shown; other items may also be missing and it is agreed that Subcontractor shall not plead deception because of the incompleteness of the Bills of Material under Item No, 3 However, in defining Contractor's responsibility to furnish non-electrical materials for Heating, Ventilating and Air-Conditioning the Bills of Material under Item It (a) are complete. These are not designated "Partial".
13* Inasmuch as Item 2(g) of Exhibit "B" states that Contractor will furnish all lighting fixtures, wire, conduit, and lamps, it is agreed that if more of these items are required than are shown on the Bills of Material listed under Item It(b) of Exhibit "A", Contractor will provide the balance.
lb. Sub-section 17.9.11 of Exhibit "A" Specification No. 7128(3-20) is deleted in its entirety (alarm bell is furnished and installed by others).
i *
BRIGHT PINK, PURPLE
!
Rev. 10-3-68
AKE-000013
i
: i.';
TO: Kaiser Engineers, Inc. (Contractor, Agent for Armco Steel Corporation)
Subject: OPTIONAL TAKE-OUT PRICE PROPOSAL.
We hereby offer a price deletion in the amount of $_________ in the event "Contractor" exercises the "take-out" option described in the second paragraph of Supplemental Notice No. 1 dated October 3, 1968, to Inquiry No.7128-20619, dated September 27, 1968.
(Name of Bidder) (Signed) ________ (Date) __________
if., i
BRIGHT PINK, PURPLE
<"
AKE-000014
TO AT
COP1KS TO
INTER-OFFICE MEMORANDUM
Vern L. Frankson Middletown, Ohio - N. J&in St.
DATK PROM
September 30, 1968 Don Carlson
Please see distribution
AT JOB NO.
Middletown, Ohio N. Main St,
7128
Inquiry No. 7128-20169 - Miscellaneous Structures Distribution of Subcontract Bid Package.
f"
'it
ft,
:J!'. 3;- ' i-.; ';V
ii: IjBJgW4
Attached is a copy of subject package, mailed to or picked up by the following bidders:
J--, Jt7.
McGraw Construction Co. 1st & Canal Sts.
Middletown, Ohio Att: W. Lewis
S-K Construction Co. 2J?l2j Atco Avenue Middletown, Ohio
#Gold Key Builders 1700 Needtnore Road/Suite 10U Dayton, Ohio Uphill Att: Tom Deger
/ 4
),
* f.
Subsidiary of Oberer Construction Co.
Bid due date is October 21, 1968. (All work to be completed in four months; November, December, January, February)
DKC: jp
-%
Armco
H. V. Borneman T. R. Foley R. W. Adams P. R. Smith J. S. Lotz Reading File
D. A, Daly G. L. Roberts C. W. Graff S. Hansen R. C. Hulseman B. Scott
Wagner__ ^--Hv-----WulTekamp
C. H. Swain C. Billings F. N. Norton M. D, Wilson L.. J. Gillett - Oakland R. J. Wolf.'-.Oakland . R. D. Sahlberg - Butler (FIO)
BRIGHT PINK, PURPLE
AKE-000015
NOTICE TO BIDDERS
Inquiry No. 7120-20619 Vztei .September .21, 1968
Proposals will be received by Kaiser Engineers, Inc., as Agent Tor Armco
Ste*el Corporation (hereinafter called ''Contractor5')# in accordance with
the attachments hereto, for performing, the work set forth in the attached
Proposal.
.
Proposals, in quintuplicate, shall be sumitted only on the attached Proposal form, and shall be presented or mailed by the party executing said Proposal (hereinafter called "Bidder").
Proposals shall be presented or mailed under sealed cover to Kaiser' Engineers, Inc., Attention Hr. Vem L. Frankson, Manager - Procurement, P. 0. Box F, Middletown, Ohio, h$0h2. The envelope containing the Proposal shall.be conspicuously marked as follows;
INQUIRY NO. 7126-20619 Miscellaneous_____ __ Structures
p i-
DUS DATS; Proposals will be received by Contractor^at the above address
on or before
. 21. 1968 3;00 P.M., Eastern Standard Time,
LATE PROPOSALS WILL' NOT BE CONSIDERED: Contractor assumes no responsi bility. for late delivery of Proposals, whether due to delays in U. S.'Kail Service or .otherwise, or for'the loss of mishandling of Proposals.
WITHDRAWAL: The Proposal may be withdrawn by Bidder at any time prior to
the above due date by sxibroitting written Notice of Withdrawal to Contractor . prior to due date without prejudicing Bidder's right to file another
Proposal, provided such other Proposal complies with the terms and condi- tions hereof, and is received by Contractor or. or before the due date set forth above.
'REFERRALS; Proposals shall be submitted by Addressee only unless written permission to refer Proposal and attachments to another firm is first obtained from. Contractor.
REJECTION; -Altered, amended, modified, incomplete, or conditional Proposals may be rejected. Proposals are to bo submitted by Bidder, and will only be considered by Contractor, upon'the express understanding that Contractor, reserves the unconditional right to reject any or all Proposals, and to
waive irregularities therein, and the right in Contractor's absolute disCT&txon to accept any particular Proposal submitted by any Bidder, even
though the price or completion date, or both specified therein, may not be as favorable as any other Proposal.
BRIGHT PINK, PURPLE
vJwi-.vvv ..-k.ck-.
v*iA AKE-000016
NOTICE TO BIDDERS
-2- . Inquiry No. 7128-20619
SUB'"CONTRACT PROVISION: Enclosed is an instrument designated SubContract, which sets forth the terms, conditions, and provisions which shall he applicable to the proposed work.
ALTERNATE BIDS: Proposals must bo based upon the plans and specifications without deviation. Bidders are not to submit 'alternate Proposals separate from the base Proposal unless specifically called for in this Notice to Bidders.
QUALIFICATION: Contractor may require evidence that Bidder is properly qualified and licensed to transact business in the state where the work is to be performed as a condition precedent to an award of the work
hereunder.
SITS VISITATION: Bidders shall be deemed to have visited the sits of the work and to have made all necessary investigations so as to have ascertained fully all pertinent conditions which may in any manner bear upon the performance of the work and the price to be proposed for the
performance thereof, such as, but not limited to, the location, accessi bility and general character of the site, labor conditions, character and extent of existing work within or adjacent thereto, and other work being performed thereon.
Bidders wishing to visit the jobsite must make arrangements forty-eight
(k8) hours prior to arrival by contacting Mr'.' S. J. Hansen - Subcontract
Fng-? nsftrat telephone Area Code
513-It2j?-3633
WAGES AND WORKING.CONDITIONS': Bidders shall-ascertain the wages and working
conditions required by the Unions affiliated with the Building Trades Department (AFL-CIO) having jurisdiction over the work during its entire course. If awarded the Sub-Contract for the work. Bidder shall comply in all respects with the article of the Sub-Contract General Terms and Conditions entitled "Labor Provisions".
ADDITIONAL INFORKATICM2 Bidders requesting additional information regarding
xhrs bid, are advised to address their inquiries in writing to Kaiser
Engineers, Inc., P.' 0. Box F, Kidaletow., Ohio h$0li2, Attention D.K.
Carlson - Pro.j. Punch. Agent
-or telephone h25-2256 . . Such
inquiries or requests must be submitted in sufficient tine prior to Proposal
due date to enable Contractor to issue any necessary supplemental notices .
to this Notice to Bidders.
<
PURPLE
AKE-000017
I
ip'i i.; ifBflt|e;-,V'
I
Hi.
:;i !1'
;.i, fti
.'1 Ij.r.
$1.
I
l!v.
u
b
}<;::
!(' i-.
.r
*U ...
Notice to Bidders
3-
RSiURN UK PLANS AND SPECIFICATION:;: All Plans and Specifications enclosed herewith are the property of- Contractor or Owner, upon receipt of Notice of Award of the work to another Bidder, unsuccessful Bidders must promptly return all Plans and Specifications to Contractor.
Sincerely yours,
''
,
KAISER ENGINEERS, IwC., Agent for Armco Steel Corporation
Vena L. Frankson Manager - Procurement
VIFsjp
fA
BRIGHT PINK, PURPLE
AKE-000018
{ '
;r
PR OPOSAL/SUB-CONTRACT
Date of Proposal: October
, 1968
Proposal Number: 7128-20619
Bidder:
Date of Sub-Contract: Sub-Contract Number:
This Proposal/Sub-Contract is hereby submitted to Kaiser Engineers, Inc. (hereinafter called "Contractor") Agent for Armco Steel Corporation, (hereinafter called "Owner").
ACCEPTANCE: Contractor's acceptance of this Proposal/Sub-Contract shall be accomplished by Contractor's execution thereof and its insertion of a Sub-Contract Number and date as provided for above. Contractor will
return to the Successful Bidder one (1) signed and completed copy hereof.
Upon such acceptance, the Proposal/Sub-Contract shall constitute a |4 Sub-Contract between Contractor and the undersigned Successful Bidder and
shall thereafter be designated by the Sub-Contract Number specified above, and wherever the term "Bidder" is written herein it shall be construed ` to mean "Sub-Contractor", and wherever the words "Proposal/Sub-Contract" are written they shall be construed to mean "Sub-Contract".
*.. A.CKNOWLEDGMENT: Bidder acknowledges that he has visited and has thoroughly examined the site of the proposed work, and without limitation, has ascertained fully all pertinent conditions which may in any manner bear upon the performance of the work herein proposed and the compensation Bidder proposes therefor; acknowledges receipt of and familiarity with and understanding of the plans and specifications therefor, as' well as the various instructions, information, requirements, exhibits, terms and
conditions covering the same, all as mentioned or referred to herein.
REJECTION: It is recognized and understood that Contractor has reserved the unconditional right to reject any or all proposals or to waive irregularities therein. It is further recognized and understood that Contractor has reserved the right in its absolute discretion to accept any particular proposal submitted by any bidder even though the price or 'i ` completion date, or both, specified therein may not be so favorable as those set forth in some other proposal.
QUALIFICATION: Contractor may require evidence that Bidder is properly 1 qualified and licensed to transact business in the state where the work is to
be performed as a condition-precedent to an award of the work hereunder.
WAGES AND WORKING CONDITIONS: Bidder shall ascertain the wages and working
conditions required by the Unions affiliated with the Building Trades
*
Department (AFL-CIO) having jurisdiction over the work during its entire
course. Bidder shall comply in all respects with Article 28 of the Sub-
Contract General Terms and Conditions entitled "Labor Provisions".
FACE SHEET "A"
BRIGHT PINK, PURPLE
AKE-000019
WORK TO BE PERFORMEDi Bidder hereby agrees to perform all the work described in and in strict accordance with this Proposal/Sub-Con tract and the following attached documents which are by this reference incorporated as part of this Proposal/Sub-Contract:
Subcontract General Terms and Conditions (Article 1 thru 37) Exhibit 'A* - Plans, Drawings and/or Specifications Exhibit 'B' - Items to be Supplied by Contractor
Exhibit *0* - General Work Schedule Exhibit *D* - Standard Conditions Exhibit *E` - Special Provisions Supplemental Notices listed on Face Sheet 'C'
Without limiting the generality of the foregoing, the work to be performed includes the following:
SCOPE OF WORK: Furnish all labor, tools, supervision, materials, .
f
supplies, equipment, and transportation, (and do all things necessary/;
except as provided for in Exhibit 'B' hereof, to construct mis-
cellaneous metal or masonry structures and rooms within the Basic
?ii: Oxygen Shop, or the vicinity thereof, and to make such structures
and rooms (architecturally ana structurally Jcomplete7 and to install
I 'i-i- therein where "applicable heatingT^ventriacion, anJ air conditioning systems, and piping, lighting and electrical services, all in strict
accordance with Exhibit 'A'j all such work being hereinafter some
times called "The Work".
BOND: Not required.
LIQUIDATED DAMAGES: None. Article 31 of the General Terms and
-is*-*!.
Conditions hereof is inapplicable and is hereby deleted.
LOCATION OF WORK: Owner's Middletown, Ohio Works.
WORK TO COMMENCE: Offsite work as of the date of acceptance of this Proposal/Sub-Contract with field work to commence on date speci fied in Contractor's Notice to Proceed.
WORK TO MI C0MP1ETED: Time is of the essence of this Proposal/SubContract and all the work shall be completed by Bidder as soon as due diligence and good practice will permit, but in no event later than March 1, 1969, or such extended completion date as may be applicable in accordance with, and pursuant to the provisions of Article 1 of the General Terms and Conditions hereof.
BRIGHT PINK, PURPLE
FACE SHEET '3'
AKE-000020
COMPENSATION: Bidder agrees to perform The Vbrk for the following Compensation* which include all present and future. State, Federal and Local Exise and Transportation Taxes, and all other taxes pertain ing to the transaction, except the Ohio Sales and Use Tax applicable under the following circumstances:
Any Ohio Sales and Use Tax Liability on personal property transferred under the Subcontract by the Subcontractor to CXroer, will be accounted for by Owner under its Direct-Payment Permit No. 161-M. Any Chio Shies and Use Tax. Liability for materials transferred to Owner as improvements to Owner's real property will be determined by Subcontractor in cooperation with Owner; such tax is Subcontractor's direct responsibility, but Owner will reimburse Subcontractor over and above the price stated below for the amount of such tax.
LUMP SUM AMOUNT $
Bidder acknowledges receipt of Supplemental Notices specified below which are hereby incorporated and made a part of this Proposal/Subcontract.
;:
r The offer expressed by Bidder in this Proposal/Subcontract shall be bind ing upon Bidder for a period of 60 days from date of Proposal/Subcontract and may be accepted any time on or prior to said date.
<
j SUPPLEMENTAL NOTICES RECEIVED:
No. and Date
Signed: ______ _______ (Bidder)
(Address)
.& .
By : Title :
ACCEPTED THIS day of
, 19___
I KAISER ENGINEERS, INC., Agent for Afmco Steel Corporation (Contractor)
97 _
Title
FACE SHEET *C'
BRIGHT PINK, PURPLE
AKE-000021
EXHIBIT 'A' PLANS, DRAWINGS,, AND SPECIFICATIONS
1. Specification No. 7128(3-20) dated September 18, 1968, "Miscellaneous Structures".
2. DRAWINGS:
No. & Rev. 625128 0 659001 11
_Description Plot Plan - General Melt Shop - General
6591+50 6591+51 6591+52 6591+51+ 6591+51+ 6591+5? 659L58 6591+65 6591+66 6591+6? 6591+72 6591+73 6591+71+ 6591+76 6591+77 6591+78 659510
Architectural 5 Plan - Kitchen Floor - Pt. I 7 Plan - Kitchen Floor - Pt. II It Plan - Operating & Service Floors 1+ Plan - Batching, Piping, Flux Floors 1+ Plan - Roof 2 3uilding Sections (l) 3 Building Sections (2) 2 Pit Foreman Area 3 Interior Wall Details 2 Scale House 2 Pulpit - Plans and Elevations 2 Pulpit - Sections & Details 3 Pulpit - Sections & Details 2 Maintenance Office 6 Yard Workers Lunch Room 1 Toilet Rooms No. 3 & No. ? 8 Door Schedule
BRIGHT PINK, PURPLE
AKE-000022
V' Ki ];(
rfr
B iV
k;i-
!>;* >
r
m-
I
i(
n
. i'
2- -
659515 659516 659518
5 2 2
Room Finish Schedule Booster Pump Enclosure Motor Control Center
Heating, Ventilating, and Air Conditioning
659762 2
659765 659785 659786
3 0 2
Compressed Air 0-150 PSIG Steam - h25 PSIG at 750 Furnace Pulpit, Toilet No. 6 Pulpit & Maintenance Schematic
659787 2
Pit Foreman's Office
659788 0
Maintenance Office
659789 659799
1 1
Hot Metal Scale Pulpit H. & V. Steam Distribution Sheet 1 of 2
659800 1
Steam Distribution Sheet 2 of 2
659835 659838
0 1
Steam Condensate Details Charging Side Control Stations
659839 65986L
3 2
Piping Material Specs - Piping legend Process & Service Piping - General Distribution
659867 1
Process & Service Piping - General Distribution
Electrical
660161 I4.
Lighting - Misc. Office & Toilets
660162 1
Lighting - Misc. Offices & Toilets
3. Partial Bills of Material (not complete; for reference only) of Items for Heating, Ventilating and Air-Conditioning to be supplied by Subcontractor (all items on these sheets are marked "Project")*
#659785 (Furnace Pulpit) Sheets 1 thru 5 ##659788 (Maintenance Office)Sheets 1 thru 5
659789-P (Hot Metal Scale House) Sheet 5 Rev. 1 #Sheet 3, Rev. 1 (other sheets. Rev. 0) *#Sheet h, Rev. 1 (other sheets. Rev. 0)
BRIGHT PINK, PURPLE
AKE-000023
-3-
I4. Bills of Material of Items to be Supplied by Contractor in accordance with Exhibit *B' references:
(a). Heating, Ventilating and Air Conditioning
*659?S6-P (Furnace Pulpit) Sheets 1 thru 11
65978?-P (Pit Foreman's Area) - Sheets 1 thru ? Rev. 0.
659789-P (Y.W. Lunch Room) - Sheets 1 thru h Rev. 0.
i; 659838-P (C.S. Control Stations) Sheet 1* Rev. 0.
[;`s' H- Sheet it. Rev. 1 (other sheets. Rev, 0).
IP
(b) Electrical
660161 Rev. No. 3 - Melt Shop Lighting - Misc. Offices & Wash Room Sheets 1 and 2,
660162 Rev. 0 - Melt Shop Lighting - Misc. Office s & Wash Room Sheets 1 and 2.
BRIGHT PINK, PURPLE
AKE-000024
EXHIBIT B`
Items to be Supplied by Contractor
1. All items referred to in Sub-Section h.2.1 (including all Armco Materials mentioned in paragraphs 1-8 of Sub-Section U.1.2) of Specification Ho. 7128(3-20) under Section U - "Metal Buildings, Siding, and Roofing11 and in Sub-Section 1&.3.1 under Section 18 - "Service Piping Systems". Steel panel or steel building components under 1|.2.1 shall be delivered by Contractor to the erection sites, and. items under 18.3.1 (all steam, condensate, and air pipe, pipe fittings, valves, valve tags, and imprinted color coded pipe banding tape) shall be furnished and loaded by Contractor on Subcontractors trucks at Contractor's storage compound.
2. This exhibit, in addition to confirming the "material by others" references in Sections i( and 18 of Specification Ho. 7128(3-20) also clarifies the responsibilities for certain materials and work by listing the following items of material or work to be provided by Contractor under the applicable Specification Sections:
a) Section 1 - Concrete - All concrete shall be delivered to Subcontractor in ready-mix trucks to discharge points. Concrete slabs and curbs are not a part of "The Work" and will be provided by Contractor, in cluding openings for duct penetration.
b) Section 3- Refractory - All firebrick loaded by Contractor on Subcontractor's trucks at Contractor's storage compound. Also, Contractor will furnish and install firebrick for encasement of Columns F-23.3 and E.3-23*5.
c) Section 3 - Built-Up Roofing and Insulation: All metal decking loaded by Contractor on Subcontractor's trucks at Contractor's storage compound.
d). Section 6 - Metal Doors and Frames - and
Section 6 - Hardware
All materia] referred to in the above two sections will be loaded by Contractor n Subcontractor's truck at Contractor's storage compound as required for steel or masonry structures, walls, partitions.
5
<
BRIGHT PINK, PURPLE
AKE-000025
Esdiibit B continued
-2-
e) Section 17 - Heating, Ventilating and Air Conditioning Only those items listed in the following Heating, Ventilating and Air Conditioning Bills of Material will be furnished by Contractor. Such items will be loaded by Contractor on Subcontractor's trucks at Contractor's storage compound on the sites
6^9786-P (Furnace Pulpit) Sheets 1 thru 11
659787-P (Pit Foreman's Area) Sheets 1 thru 7
6^9789-P (Lunch Room) Sheets 1 thru U
6^9838-P (Charging Side Control Sta's.) Sheet 1
f) Section 18 - Service Piping Systems - In addition to "materials by Contractor" as stated in Item No. 1 hereof, and also stated in Sub-section 18.3.1, all material and work is "by Contractor" for sanitary and drinking water systems including all necessary piping, plumbing, toilet fixtures, water heaters, and drinking fountains. Such systems and equipment are not within the scope of this section or within the Subcontract since sub-section 18.1 (SCOPE) clearly limits Subcontractor's responsibility to steam, condensate, and air service systems complete with equipment but mention is made here of other systems for clarification purposes only.
g) Section 19 - Electrical - All lighting fixtures, wire, conduit, and lamps loaded by Contractor on Sub contractor's trucks at Contractor's storage compound. In connection therewith, refer to Electrical Bills of
Material listed under Item No. l*(b) of Exhibit 'A'. Also, the Subcontractor has no electrical responsibility whatsoever in the following rooms (all such electrical material and work by Contractor)*
Room No, 12 - Booster Pump Enclosure
Uot TEuE-
/Room No. 26 - Furnace Pulpit
Mo$t Oq <3w&- * Ci C tA ^ .
l.
Room No. 20 - Mechanical Room./
U V* Aye o c- i--t ^
3 Source of potable water.
U. Sources of temporary electrical power in the vicinity of the work - I4.UO volt, 3 phase, and 110 volt, single phase.
BRIGHT PINK, PURPLE
AKE-000026
Exhibit B, continued
3- -
LV.O T "T*f*J s> ~
c.
W<iM \ T . <\ , \ \ ,,
5. All furniture and Basic Oxygen 3aop process equipment and.......
systems including control systems in place /(also alarm in pulpitTo
,,^~na n i ini fiinv--`l---ncui _ti
,'
6. All steel joists, metal decking,and monorail loaded by Contractor on Subcontractor's trucks at Contractor's storage compound.
7. Furnish and install support steel for condenser unit C-l and channel base for heat pump HP-1.
|fe
.11 .... jv\ i
il'ill M
Ii'IN'O -:-
[l iV !
If
fnr*y: .
fey
fi I
m I1
1fe'j
K:
i: ill:
BRIGHT PINK, PURPLE
AKE-000027
EXHIBIT C*
GENERAL WORK SCHEDULE
It is anticipated that work can proceed within'.fifteen (1?) days of the contract signing. Completion of all of the work in each structure or room should be in accordance with the schedule below:
Name
Motor Control Center Air Locks No. 3, U, and 5
Pulpit Mechanical Room Air Locks No. 1 and 2
Booster Pump Enclosure
Scale House
Date December 1, 1968
December 1, 1968 December 1, 1968 December 1, 1968 January 1, 1969 January 1, 1969
Pit Foreman's Area
Maintenance Office
Toilets, except Toilet No. 2
Lunch Room
January 1^,1969 January 1, 1969 February 1, 1969
March 1, 1969
Toilet Room No. 2 Grease Storage
March 1, 1969 March 1, 1969
ft All other structures and
March 1, 1969
I rooms
II
TIIJI
I
(
<f
ft
BRIGHT PINK, PURPLE
AKE-000028
EXHIBIT E'
SPECIAL PROVISIONS
It is mutually understood and and agreed that the following Special Provisions are hereby incorporated:
1. Wherever in the *rmco Standard Specifications incorporated in Specification No. 7128 (3-20) of Exhibit 'A' the words "Contractor" and "Engineer" appear, they shall be construed to mean "Sub-Contractor" and "Contractor/Owner" respectively. The foregoing definition of terms supersedes the definitions set forth on Page 1 of the Concrete Manual which is a part of the Armco Standard Specifications.
.2 Action 14, "Use of Armco Materials", of Exhibit *D* is hereby modified by the addition of the following sentence at the end of the paragraph: "All other steel products used must be manufactured in the United States".
3. Contractor will endeavor to make areas available to Sub contractor in sequence so that intermittent work is kept to an absolute minimum.
1:. Freight elevator service will be available on a first come first serve basis.
$ Subcontractor has sole and complete responsibility to
procure and furnish all material necessary and to perform
all of the work described in the following sections of
Exhibit 'A'. Specification No, 7128(3-20); this is part
of the work generally_ reerred _tojan Face Sheet 'A' hereof
as ('making ~archi'tectura1ly compTete"lT\
-y
Section No.
______________Title
o
2 Masonry - Concrete Block
3 Built-up Roofing and Insulation (except for metal decking)
7 Glass and glazing
9 Ceiling Insulation
k- 10 Suspended Acoustical Ceilings
11 Seamless Resilient Flooring
12 Resilient Floor Tile 13 Metal Toilet Compartments
<
14 Caulking
BRIGHT PINK, PURPLE
AKE-000029
Exhibit lE' continued 15 16
2- Miscellaneous Items Painting
6. The following is a schedule of the "structures and rooms" referred to in the '`Work to be Performed" paragraph on Face Sheet 'A1 hereof, with each categorized as to type of constructions masonry (M), pre-fabricated steel building (EFS), or steel panel' (Panel) construction, and with each designated as to whether it requires heating, ventilating, and air conditioning or built-up roof, all as shown on the drawings hereof (in the event of conflict with Schedule;
drawings govern):
Room No.
Title
Type
of Constr.
H.V.
& A/C
Built Up
Roof
32 Toilet No. 2
M No No
3k Grease .Storage
PFS No. No.
19D Motor Control Center
PFS
No. No
16 Scale House
PFS Yes No
2i< Maintenance Office
PFS Yes No
si !:
y?
(2L A thru 2k G)
(except 2UF-pipe space)
pi
6 Lunch Room
PFS Yes No
9 Pit Foreman's Area
PFS Yes ^^-No'"''
(Incl. 9A, 9B, 9C)
(excgSyt 9B-pipe space)
kI
20 Mechanical room
Panel Yes
Yes
22 Covered Walkway (approx. 30')
Fanel No
Yes
29,35,36 Nos. 3,L, ? 5 Air Locks M
No Yes
11 Toilet Room No. 3
M No No
12 Booster Pump Enclosure M
No No
27, 28 Air Locks No. 1 & 2
Panel No
No
10, 31A Pipe Spaces
M No No
26 Furnace Pulpit
Panel Yes
Yes
21, 31 Toilet Rooms 6, & 7 M No No
...
Charging S. Control Sta. N/A
*Yes No
(Only work is sheet metal duct)
BRIGHT PINK, PURPLE
AKE-000030
Exhibit 'E1 continued
-3-
7. With respect to structures made of steel wall panels, (not pre-fabricated buildings) the installation of wall panels which are integral with the exterior face of B-O-F structure is the responsibility of Contractor, and not a part of "The tfork". This exclusion applies to the Covered Walkway, /with only about~thirty (30) lineaii feet of '^sTdTng^
(remaining as a part of Subcontractor's work, /''We"personnel door and frame m the walkway wall be furnished by Contractor and installed by Subcontractor (glass and glazing also by Subcontractor
.8 Specification No. 7128(3-20) of Exhibit 'A' is modified as follows:
a) Section 2 - Wherever "refractory wall" appears this shall be construed to mean "refractory walls".
b) Section U In the last sentence of paragraph (6) of sub-section U.1.2 delete the word "entire" in front of "walkway" and insert at the end of the sentences
! "except for approximately thirty (30) i lineal feet of wall panels as set forth ! in the Special Provision No. 7 of the
V Proposal/Subcontract documents".
c) Section 17 - In sub-section 17.1.2 insert in parenthesis after the first item "(the only work in volved is installing a sheet metal duct)" and, in the second item between the words "Furnace Pulpit" and "Toilet No. 6" insert the words "Mechanical Room". Also, add the following new items:
"(5) Pit Furnace Area as shown on Drawing No. 659787.
SLir-!- (6) Lunch Room as shown on Drawing 659789."
d) Section 18 - In the third line of the first paragraph .Tp*: place a comma after "steam" and insert the
word "condensate" before the words "and air service piping systems".
%
BRIGHT PINK, PURPLE
<
AKE-000031
Exhibit 'E' continued
Subcontractor shall furnish and install firebrick along the vest wall of the electrical control center since the condition on the face of that wall shall be the same as that shown on Drawings 695>l6 and 659b 3? -where firebrick is shown in the Booster Pump Enclosure and extending along one face of the motor control center.
As a part of its electrical responsibility. Subcontractor shall furnish all required electrical accessories uuch as conduit-... boxes, outlets, switches, and conduit fittings, but, .pursuant Item 2(g) of Exhibit *33', Subcontractor is not redxyed to fi^rOh any lighting fixtures, wire, . conduit, or lamps.
Subcontractor's piping responsibility is limited to piping which is a part of the systems for Heating, Ventilating and Air-Conditioning; steam, condensate, and air piping, and all such piping materials are furnished by Contractor pursuant to Item 1 of inhibit 'B'.
The Bills of Material (designated as "Partial") listed under Item Wo. 3 do not represent all of the items that must be purchased by Subcontractor, over and above Contractor furnished items (Bills of Ikterial under Item b(a)). Temperature control components are to be purchased by Subcontractor but none are shown; other items may also be missing and it is agreed that Subcontractor shall not plead deception because of the incomplete ness of the Bills of Material under Item No. 3. However, in de fining Contractor's responsibility to furnish non-electrical materials for Heating, Ventilating and Air-Conditioning the Bills of Material under Item b(a)) are complete. These are not de signated "Partial".
Inasmuch as Item 2(g) of Exhibit 'B: states that Contractor will furnish all lighting fixtures, wire, conduit, and lamps, it is agreed that if more of these items are required than are shown on the Bills of Material listed under Item U(b) of Exhibit 'A', Contractor will provide the balance.
BRIGHT PINK, PURPLE
i