Document N26NzrRzzvg58ZLk5mOwXpERg
March 8, 1984
TO: ALL SUPERVISION - LIST "A" FROM: S&F DIVISION - R. E. KEITH - CHAIRMAN
VICTORIA PLANT
CENTRAL SAFETY COMMITTEE SCHEDULED SAFETY AUDIT
A safety audit of Area IX, Adipic Acid CCR-ECR, Operation 2,3,&4, and the Cooling Towers, was conducted on March 8, 1984. Items noted by the committee were as follows:
Action Taken (Date)
CCR-ECR
No Items Noted.
Operation 2-3 (First Floor)
1. The ADBA truck unloading line is a tripping hazard and needs to be highlighted and/or protected to avoid hazard.
2. A floor hoist was not marked for capacity.
Second Floor
3. A steam hose station on the west end was
improperly valved.
-- > f Ja
S.-Z A- / . .
'
4 .'t>T h e
T<rri3 -A/V1 is a Valtek that appears
to be the defective topworks design and does
not have reinforcing plates and thru-bolts.
Third Floor
5. The overhead hoist was overdue for inspection.
6. Any spill from the Cesco soap tank could fall through the grating onto personnel below. A pan or bucket should be provided.
"SAFETY IS MY RESPONSIBILITY"
DUP 0801802
Victoria Plant Central Safety Committee Scheduled Safety Audit_____________ -2-March 8,
7. Listing tape that had been removed from tubing and was lying on"the grating near the north handrail, would tend to indicate that IH-10 (Asbestos Handling-Disposal) was not being fol1 owed .
8. Safety rope had been used to tie down a ladder i n a 1 adder rack.
9. The screen was missing from the vent on the solenoid on the #1 LTC Sep. wall rinse A/V.
10. Several Cesco piping (plastic) outlets were equipped with a plant air/or water hose fitting (cleco type).
Cooling Towers
ECR
11. The electrical cord on the air conditioning unit was overdue for inspection.
12. Two overhead hoists were overdue for in spection .
13. A storage area should be provided for electrical safety equipment.
Chemcial Tmt. Area
14. There was no light over the safety shower and the eyewash nozzle was plugged.
Operation 4 (First Floor)
15. There was an open flange at eye level on the 175# stm. Cesco tank heat-up header.
16. Two electrical cords in the Inst, blockhouse were overdue for inspection.
17. A safety belt in the Maint. room was overdue for inspection.
18. A floor fan in the re-work area should have hand guards.
19. A storage rack should be provided.for several long handled tools on the platform above the re-work area.
"SAFETY IS MY RESPONSIBILITY"
19 84
DUP 0801803
11 s*f?snj-
Victoria Plant
Central Safety Committee
Scheduled Safety Audit __________________- 3 -
Marcn e, 198*
Loading
20. Several cables on the loading tubes have sharp, frayed ends and are a puncture hazard.
Second Floor
21. An electrical junction box cover (north side) had most hold down screws missing.
22. Two bolts were missing from a flange exit the rotary valve on #2 FBC Bag Filter.
23. A pipe stand at FT4052 should be secured.
Third Floor
24. A footpad was missing on a five-step ladder.
25. ___
Several Cesco piping (plastic) outlets were equipped with a plant air/or water hose fitting (cleco type).
Gen e ra1 Comments
26. The committee recommended the area be reviewed for flange guards and valve packing leak deflectors, as several were noted to be missing or out of place.
27. Numerous Valtek valves were observed in service that are the defective design recognized on the plant 6-8 years ago that
have been reinforced with ss plates and thru-bolts to prevent failure of the valve operators. Personnel turnover in production during this time has contributed to a lack of
understanding of why these valves are reinforced. The committee feels the use of these valves should be reviewed and a program set-up to replace the defective valves at an early opportunity.
Audit Committee
R. E. Keith, Chairman R. Fagan, Jr. S. L. Lightbody G. H. Dietzel R. A. Keller G. D. DeDear
"SAFETY IS MY RESPONSIBILITY
DUP 0801804
?