Document N20M2YVMRzb2gJMbYEGm36d9D

TO: WAYNE HILGEKS VKZKUY REPORT A Safety There were no injuries recorded for the reporting period. Resin Operations Data MM Lbs. % of Budge t Current 7-Day Average Month-To-Date (Es t.) YTD FY1993 May,, 1993 June, 1993 (Est.) 1371.5 21.5 332.3 40.0 39.8 103.2 101.1 96.6 97.1 100.0 Resin production for the seven-day period totalled 9.6MM pounds. Operations were normal during the reporting period with no unusual downtime. Compound Operations Data Flexible % of Compound Budget Plasticizer % of Budget Current 7-Day Average, M Lb./C.D. Month-To-Date (Est.), MM Lbs. YTD FY1993, MM Lbs. May, 1993, MM Lbs. June, 1993 MM Lbs. (Est.) 246.0 3.8 56.0 7.0 7.3 120.1 118.3 103.5 111.3 118.5 51.0 .98 13.7 1.3 2.0 87.1 104.0 87.7 70.0 113.5 Flexible Compound Total production for the seven-day reporting period was 1.7MM pounds. Compound Lines I and III operated seven days averaging 74.1M pounds per day and 133.6M pounds per day, respectively. Compound Line V operated six days averaging 44.6M pounds per day. Plasticizers The plasticizer unit operated seven days producing 359.9M pounds. R. W. Seymour Plant Manager rah cc: JDO, SCH, CMM VAB.0001187957