Document MwkV7RL7kvLxaGVorBeeXEv7

CHECK ACTION STEPS AS THEY ARE COMPLETED Following is a list of the "standard" items to leak-check after an OHC Reactor outage where the catalyst was dumped. The leak inspector should be observant of the entire system for leaks or other irregularities that might hamper start-up. Work that was done during the outage that needs to be leak-checked should be noted at the end of the list. I. JOB SAFETY INSTRUCTIONS REVIEWED. 2. ENSURE THAT YOU ARE WEARING PROPER SAFETY EQUIPMENT. 3. Decide if the system is to be leak-checked with nitrogen or a mixture of nitrogen and HCl. If only nitrogen is to be used, all flanged joints to be checked will have to be taped. k. Make sure that the Oxygen Feed System is isolated up to, and including, the FCV. 5. Make sure that the Ethylene Feed System is isolated up to, and including, the Inlet Block Valve to the Jet Compressor. SL 006905 pg 1 of 3 CONFIDENT!AnSubject of 14 til Ju Prefer t Court 6. Depending on whether HCi is to be used: A. If HCI is to be used, line the system up to the FCV. B. If HCI will not be used, make sure the system is isolated up to, and including, the FCV. 7. Make sure that the Reactor MLS, the Large Pressure Control Valve and the Small Pressure Control Valve are closed and blocked in. 8. If only nitrogen is to be used, bring the system pressure up to 35 psig (verify pressure outside) with nitrogen and check all lines listed below for leaks. 9. If HCI will be used, bring the system up to approximately 20 psig with nitrogen, block the nitrogen system in, and then, bring the system up to 35 psig with HCI (verify pressure outside) and check all lines listed below for 1eaks. ITEMS TO INSPECT: _____ 10. Mixed Feed Piping _____ 11. Fluidization Air Valve _____ 12. Oxygen Feeding Piping (including SRV, Rupture Disk, manway) _____ 13. HCI Preheater, and inlet and outlet piping _____ 1^. Reactor Head Flange _____ 13. Both Reactor Head Dump Nozzles, Valves, and Blinds CONFIDENTIAL! Subject to Protective Order of 14th Judicial District Cbbrfc No. 91-1145 pg 2 of 3 16. All Reactor Thermowell Nozzles: k @ 2 ft 2 @ S ft 2 @ \k ft 2 < 20 ft 2 @ 26 ft 2 @ 27 ft 2 @ 28 ft 2 in dome 17. Catalyst Addition Ram Valve 18. Rupture Disks Southeast Sou thwest 19. Cyclone Flanges 20. Primary Condenser Mixing Tee Flanges and connecting piping 21. Primary Condenser Head and Piping 22. Secondary Condenser Head and Piping 23. Secondary Condenser Connecting Piping 2k. All instrument connections 25. Other (items recently worked on, etc.) SL .ective Order ~ J ud1i. isi trict Court No. 9l-\n1 4* 5*pg 3 of 3