September 5> 1968 subject CEA 14}0-1452-1892
AtfCCCNCE
cc: T,. L. Faulkner
V. R. Haupt J. C. Landwehr W, B. Papageorge H. L. Williams
TO W. A. Kuhn
General Offices
and
These photos were taken August 29, 1968/lllustrate progress over the last ten working days,
Ehgte_No!_l4i
Looks south, right foreground shows additional grading
uftderway and spreading of rock sub-base for Sixth street
west of tracks. Also visible are the newly Installed dock
levelers Just to the left of the steps leading up to the warehouse floor. The roof is now Installed, ventilators being Installed (more In photo 4) and the siding erection is now underway with almost four bays covered.
Eko.t.o.No.i.
Looks west. Erection of the full length siding panels is evident. Five roof ventilators are also seen in this picture.
--Also looks west. The sun came out and we were a little over-exposed. Similar comments to Photo 2 otherwise.
EhatS-Mf-.A-.
Looks north from the third floor of Building 28. Roof ventilators being installed on the finished roof can be quite readily seen. More difficult to discern is the fact the flakers are in place, covered with plastic sheet, visible between and to the right of the two poles supporting the temporary transformer.
Pans t0 the left from photo 4 position. Most evident change here is progress on retaining wall around south end of railroad 'track. Electrically heated Thermlnol circulating unit will be
installed west of tracks.
Ekft&i&L&i. hooks east northeast. Footing visible at left margin is for . J00 M gallon benzene tank dike. Area has been graded flat
for tank foundation extending across the picture. Tank in background is the 200 M gallon refined Biphenyl storage tank.
HFTskd Enclosures