Document Mo049kngpKLRnDdjZEG9z50xV
F-V 10M*0*50 FTtNTBD IN U. *. A.
P. G.S* S. K. K.
rnMTpAfr #l827-Weirton Steel Co hay Fri.day
DAILY LETTER No- 285 pate Nov. 10. 1950
TEMPERATURE a A.M.. -3?1Z M 344 P.M. 34_____________________ WFATHrp ClOUdyTOTAU NUMBER OF MEN wnpriMrt -21A
' OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER
1
FIELD ENGINEER
11
ENGINEERING CORPS OFFICE MANAGER
3 1
CHIEF CLERK
1
PAYROLL DEPT.
3
MATERIAL DEPT. MASTER MECHANIC
3 1
BOILERMAKER FRMN.
1
BOILERMAKERS
7
BRICKLAYER FRMN.
3
BRICKLAYERS
24
BRICKLAYER APPRS.
CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS IRONWORKER FRMN. RONWORKERS
.ABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN
1
15 2
4 18
2
5 5 29
33 1 3
OILERS
PAINTERS
PIPEFITTER FRMN.
PIPEFITTERS
WATCHMEN
Truck Driver Toolroom Han
OPERATORS
2 2 6 33
1 1 2
TOTALS
214
DESCRIPTION OF WORK IN PROGRESS
mr. H.B. Lose, Gen'l Supt. of Constr.
Dear Siri-
3 PLAINTIFF'S j EXHIBIT I BEA-45
i
Bricklavers: Continued battery #7 oven brickwork: 18% complete through tier #44; 18% through tier #53; 26% through tier #61; 16% through tier #66; 12% through tier #70; 10% through tier #72. Tier #39 is floor; tier #73 is roof. Continued glazed tile brickwork at exhauster and booster building.
Caroenters: Continued sheeting-in battery #7 oven shed and lean-to. Erecting miscellaneous battery #7 brickwork scaffolding. Erecting forms for water strainer pit at water booster pumphouse. Erecting scaffolding for glazed tile at exhauster and booster building. Erecting screeds for finish floor at reversing room. Pinesetting ammonia liquor circulating pump.
Ironworkers: Unloading shipment of air and waste heat reversing valves. Continued assembling and placing rail chairs and rail braces for pusher track.. Erecting benzol building steelwork.
Laborers: Excavating trench for sludge drain piping from water strainers. Applying master builder's finish to finish floor of reversing room. Applying bituaastic coating to fuel gas piping to battery. Hauling cooling tower material to erection site. Stocking tiers #45 to #72 battery #7. Stocking glazed tile at exhauster and booster building.
-
f0ont'd " P- 2) .
'\
KftftCTlMQ ENQINKKft
NAME OF FIRM OR COMPANY
Fluor Corn.
Elliott Co.
S U B*CO NTRACTORS
NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
13 Continued erecting four-cell and three-cell cooling towers.
1 Service representative for booster and exhauster pumps.
I
F-7 10M-&-30 miNTCO IN U. t. A.
contract #1827-Weirton Steel Co. pay___Ecidar.
DAILY LETTER No.- 285
patp
Nov. 10, .1950
TEMPERATURE 0
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERIC PAYROLL DEPT. MATERIAL DEPT. MASTER MECHANIC BOILERMAKER FRMN. BOILERMAKERS BRICKLAYER FRMN* BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHER5 ELECTRICIAN FRMN* ELECTRICIANS 'RONWORKER FRMN* 'RONWORKER5 LABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN* PIPEFITTERS WATCHMEN
M4 P.WEATHERTOTAL NUMBER OF MEN WORKING___________________________ DESCRIPTION OF WORK IN PROGRESS
mr. H.B. Lose, Gen'l Supt. of Coastr.
Dear Smr-
.
Boilermakers: Continued, welding shell of new directtype primary cooler. Unloading bottom and intermediate sections of final cooler.
Pipefitters: Continued installing fuel gas Diping to
battery. Continued ihstalling emergency water piping for flushing liquor coolers. Installing blast furnace gas main bleeder piping. Installing exhaust steam, water. and oil piping .at booster pump. Installing live steam piping to nitration benzol column.
Electricians: Installing thermocouple wiring for record-
ing thermometers in gas piping from final coolers. In-
stalling power conduit to stack draft regulator house.
Installlgn lighting conduit at stack draft regulator
house. Installign power conduit for exhaust fans at
exhauster and booster building. '
'
Painters: Painting walkway for sulphate handling equipment. Continued painting bench and larry steelwork at
west end of battery.
Portland concrete poured today- 3 cu yds. Portland concrete poured to date- 3S30J cu yds. Pozzolanic concrete poured to date- 717 cu yds.
* '
OPERATORS TOTALS NAME OP FIRM OR COMPANY
/j
CRCCTINO CNOINEKR
SUBCONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
I
F-7 tOMP.30 PHINTCC *M U. A,
contract, #1827-Veirton Steel Co.
niv
Fridaydate______________________Not..JJL-,1950.
TEMPERATURE 8 A.M*-__36__________ ta m--A3a .m--------------------------5Q--------- wg*Tt<r_ Cleartotal number or men workingJ=26
- ------------1 ----1--. 1 -- --
aa-g-gg-- --
-==a~g----
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION OP WORK IN PROGRESS
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERK PAYROLL DEPT* MATERIAL DEPT. MASTER MECHANIC BOILERMAKER PRMN. BOILERMAKERS BRICKLAYER PRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER PRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS IRONWORKER PRMN. *RONWORKERS -ABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGR5. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
Toolroom Man Truck Driver
OPERATORS
1 '1
3 1
1
3 3 1 1 5 4 32
1 10
2 4 18 2 8 6 28 36 1 4
1 2 6 37
1 1 2
mr. H.B. Lose, Gen'l Supt. of Constr.
Dear Siri-
Bricklayers: Continued battery #7 oven brickwork: 11% complete through tier #44; 18% through tier #53; 10% through tier #61; 29% through tier #66; 6% through tier #72; 26% through roof level (tier #73). Crossovers are 26% in place; parapet walls are 21% in place; silica inspection walls are 10% in place.
Carpenters: Continued erecting forms for pusher track alterations. Continued erecting miscellaneous oven shed scaffolding. Erecting miscellaneous scaffolding at exhauster and booster building for pipefitters.
Ironworkers: Continued alterations to #2 pusher machine steelwork. Preparing to install gas or air and waste heat reversing valves. Continued erecting benzol building steelwork.
.
Boilermakers: Continued welding hsell of new primary cooler. Moving bottom section of final cooler to foundation site.
Laborers: Stocking tiers #45 to #78 battery #7. Excavating trench for sludge drain piping from water strainers. Hauling cooling tower material to erection site. Backfilling pump foundation and water strainer pits.
Painters: Continued painting bench and larry steelwork. Glazing window sash of #2 pusher machine.
(Cont'd on P. 2)
-
.
TOTALS
226
' ^| r
'KUKCTINO ENGINEER
SUBCONTRACTORS
NAME OF FIRM OR COMPANY
Fluor Coro.
Elliott Co.
" NO. OP MEN
DESCRIPTION OF WORK IN PROGRESS
13 Continued erecting three-cell cooling tower.
1 Service representative for booster and exhauster pump.
F-7 1OM0*SO PWINTCD IN U.f A*
DAILY LETTER No.. 292 contract__#1327-Weirton Steel Co. ruv Fridaydate_________________ Nov. 17. 19SO
TEMPERATURE * A.M.
S2 M.
.WEATHER.
.TOTAL NUMBER OF MEN WORKING.
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION Or WORK IN PROGRESS
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERK PAYROLL OCPT. MATERIAL OEPT. MASTER MECHANIC BOILERMAKER FRMN. BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS
iONWORKER FRMN. RONWORKERS .ABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
mr. H.B. Lose, Gen'l Supt. of Constr. Dear Smr-
Pinefitters: Testing guel gas header piping in battery basement. Continued installing fuel gas piping to battery. Preparing to installing flushing liquor overflow piping at primary cooler. Installing sludge drain piping from water strainers pit. Installing blast furnace gas main regulating piping. Installing tar circulating piping to final cooler. Installing new gaskets in wash oil puri fier.
Electricians: Installing lighting conduit and wiring at reversing room. Installing lighting wiring and fixtures at final coolers cooling tower. Mounting svdtches at #2 pusher machine. Grounding motors and conduit in benzol plant.
Note: Messrs:?.R. Griffin, Division Safety Director, and J.M. Carr, representative of Factory Insurance Association, visited contract today.
Portland concrete poured to date- 3857 cu yds. Pozzolanic concrete poured to date- 717 cu yds.
OPERATORS TOTALS NAME Or FIRM OR COMPANY
KRKCTIHO KNOINSKR
S UB-CONTRACTOR S NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
F 10M*30
MINTED JH U. S. A.
'n. !
DAILY LETTER No.____ 297
r-t%MTffACT #lS27-WgirfconStaftl Co----- pay____Wednesdaydate--Hpy-22, T?5Q
TEMPERATURE SAM. 3Q______<2 M 424 H.M. 42
- WORKINC-24?WEATHER .. ClOUfe_____________ TOTAL NUMBER OP MEN
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER
FIELD ENGINEER
ENGINEERING CORPS
OFFICE MANAGER
CHIEF CLERK
PAYROLL OEPT.
MATERIAL DEFT.
MASTER MECHANIC
BOILERMAKER FRMN.
BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
BRICKLAYER APPRS.'
CARPENTER FRMN.
CARPENTERS
CEMENT FINISHERS
ELECTRICIAN FRMN.
ELECTRICIANS
IRONWORKER FRMN.
^ONWORKERS
ABOR FOREMEN
LABORERS
MASON TENDERS
MILLWRIGHTS
OPERATING ENGRS.
FIREMEN OILERS
'
PAINTERS
PIPEFITTER FRMN.
PIPEFITTERS
WATCHMEN
Toolroom Han Truck Driver
OPERATORS
1 '1 3
1 1 3 3 1 1
6
3 42
1 16
2 3 19 3 9 4 22 45 1 5
2 2 6 37
1 1 2
DESCRIPTION OP WORK IN PROGRESS
mr. H.B. Lose, Gen'l Supt. of Constr. Dear siri-
Brldelayers: Continued battery #7 oven brickwork: 13$
complete through tier #53 J 13$ through tier #61; 35$
through tier #66j 6$ through tier #70; 13$ at roof level
(tier #73)j 20$ through tier #78. Battery brickwork is
now 70$ complete. Started laying quarry tile cove base
at reversing room.
.
Carpenters: Continued erecting second floor slab forms east addition benzol building. Started fabricating found ation forms for foul light oil storage tank. Continued erecting battery #7 brickwork scaffolding.
Ironworkers: Completed unloading collecting
steel
work. Continued installing gas or air and waste heat
reversing valves. Continued alterations to #2 pusher
machine steelwork. Continued bolting benzol building
steelwork. Welding reversing rods in battery basement.
Boilermakers: Continued welding shell of new direct-type
primary cooler. Continued erecting sections of new final cooler.
Laborers: Stocking tiers #54 to #78 battery #7. Stock ing quarry tile cove base at reversing room. Unloading car of pipe insulation for Philip Carey Mfg. Co. Hauling cooling tower material to erection site. Con tinued excavating for foundation of foul light oil storage tank. Resumed applying bitumastic coating to underground section of fuel gas piping to battery.
TOTALS
247
(Coat'd on P. 2)
SUB-CONTRACTORS
NAME OF FIRM OR COMPANY
Fluor Coro. Elliott Co.
NO. OF MEN
13
DESCRIPTION OF WORK IN PROGRESS
Continued erecting three-cell cooling tower.
1 Service engineer for booster and exhauster pumps
r 7 1QM-9*90 PfMMYKO VM U. s. a.
rnMTBirr #1827-Weirton Steel Co.
n.v Wednesdayna-rg
daily letter Mr.
Not. 22. 1950
297
TEMPERATURE 0 A.M*
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER
FIELD ENGINEER
ENGINEERING CORPS
OFFICE MANAGER
CHIEF CLERK
PAYROLL DEPT.
MATERIAL DEPT.
MASTER MECHANIC
BOILERMAKER FRMN.
BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
BRICKLAYER APPRS.
CARPENTER FRMN.
CARPENTERS
CEMENT FINISHERS
ELECTRICIAN FRMN.
ELECTRICIANS
IRONWORKER FRMN.
RONWORKER3
.ABOR FOREMEN
LABORERS
MASON TENDERS
MILLWRIGHTS
OPERATING ENGRS.
FIREMEN
OILERS
'
PAINTERS
PIPEFITTER FRMN.
PIPEFITTERS
WATCHMEN
-
** ---------WEATHER
TOTAL NUMBER OF MEN WORKING
DESCRIPTION OF WORK IN PROGRESS
mr. H.B. Lose, Gen'l Supt. of Conatr.
Dear Smr-
Pipefitters: Continued testing fuel gas header piping in battery basement. Installing flushing liquor overflow piping at primary cooler. Installing gas piping at exhauster pump. Installing tar circulating piping to final cooler. Installing oil filtering piping at exhauster pump.
Electricians: Installing limit switches for reversing machine. Installing control wiring for blast furnace gas piping iskania regulator. Installing control switches at #2 pusher machine. Installing power conduit for ammonia liquor circulating pump.
Painters: Painting suction main supports and recirculating water piping.
Portland concrete poured to date- 3864^ cu yds. Pozzolanic concrete poured to date- 717 cu yds.
-
OPERATORS TOTALS
-
NAME OF FIRM OR COMPANY
/ 1
+****=SRCCTINO KNOmCCK
SUB-CONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
F-7 10M-B-SO PRINTED in u. >. A.
Page 2 Of 2
CONTRACT. #1827-?eirton Steel Company DAY- Friday
52 T.TEMPERATURE 8 A.M.
12 M 57 7.
-A P.M 58 7. .WEATHER.
DAILY LETTER No.
355
.DATE January 19, 1951
Mild
235.TOTAL NUMBER OF MEN WORKING
OCCUPATION
NO* MEN CONTRACT
DESCRIPTION OF WORK IN PROGRESS
ERECTING ENGINEER
FIELD ENGINEER
ENGINEERING CORPS
OFFICE MANAGER
CHIEF CLERIC
PAYROLL DEPT,
MATERIAL DEPT.
MASTER MECHANIC
BOILERMAKER FRMN.
BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
BRICKLAYER APPRS.
CARPENTER FRMN*
CARPENTERS
CEMENT FINISHERS
ELECTRICIAN FRMN*
ELECTRICIANS
'RONWORKER FRMN.
RONWORKERS
LABOR FOREMEN
LABORERS
MASON TENDERS
MILLWRIGHTS
OPERATING ENGRS*
FIREMEN
OILERS
PAINTERS
PIPEFITTER FRMN.
PIPEFITTERS
WATCHMEN
OPERATORS
mr.H. B* lose. General Superintendent of Coin truction
Dear sutr-
painters: Painting primary cooler shell and platbfia at primary cooler, ammonia liquor circulating piping, emergency water overflow piping at final cooler, and steam piping to ammonia liquor coolers.
Laborers: Stocking fe^azed tile at new recirculating water pumphouse and at booster-exhauster building; tending masons. Stocking checker brick for regenerator chambers; tending masons. Helping masons cold pack pusher side oven door jambs.
Cleaning vertical flies, sole flues, and regenerator chambers. Continued placing concrete for battery basement finish floor; continued applying master builders finish to same. Started excavating for concrete runway in benzol area. Unloading insulation materials for Philip Carey Manufacturing Co.
Pipefitters:
Continued installing temporary heating-up piping at battery #7.
Continued installing nitration benzol reflux-and charging piping. -
Continued installing live steam and wash oil piping for apparatus.
Continued iis tailing live 3team piping to new ammonia liquor coolers
Continued installing gas piping at final cooler.
"
HieetricIans:
Continued installing lighting conduit and wiring at east end of btry Continued installing power conduit and wiring far door machiis s. . Continued installing power and lighting conduit and wiring for new recirculating water cooling tower and pumphouse. Continued installing power and lighting conduit for sulphate handling equipment.
TOTALS
235
NAME OF FIRM OR COMPANY
SUB-CONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
r.j iom a.90 ^*MTC0 IN USA
H. 8. L. P- g. s.'
nwroarr #1B27-Welrton Steel CortAY
Saturday
DAILY LETTER No.
365
datt January 27, 1951
16 F.TEMPERATURE 6 a m
tZ M
34F ap.m.oO^F. ,,wPATMg Cold
30.TOTAL NUMBER OP MEN WORKING.
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER)
FIELD ENGINEER
ENGINEERING CORPS)
OFFICE MANAGER
CHIEF CLERK
PAYROLL DEPT.
MATERIAL DEPT.
MASTER MECHANIC
BOILERMAKER FRMN.|
BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
BRICKLAYER APPRS.
CARPENTER FRMN. CARPENTERS
CEMENT FINISHERS
ELECTRICIAN FRMN.
ELECTRICIANS
RONWORKER FRMN.
`ON WORKERS
--ABOR FOREMEN
LABORERS
MASON TENDERS
MILLWRIGHTS
OPERATING ENGRS.
FIREMEN OILERS
.
PAINTERS
PIPEFITTER FRMN.
PIPEFITTERS
WATCHMEN
Truck Drlvai*
X 1 1 1
1 4
1 13 3
DESCRIPTION OF WORK IN PROGRESS
mr. E. B. Lose, General Superintendent of Construction
Dear Sir>-
'
Bricklayers: Continued lastallins regenerator face clay brick pusher side battery ."7; continued installing peep hole castings pusher
side and coke side battery $*1 Started bricking-in leveler bar openings battery #7 oven doors.
Laborers:
Stocking clay brick for regenerator faces and silica brick
for leveler bar openings of oven doors.
Clearing debris from oven3 area.
.
OPERATORS
30 1
_ //, '
.
KRKCTINft KNGIHUH
BA...I/Barbalt-e3*. ______
SUB*CONTRACTORS
NAME OP FIRM OR COMPANY
NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
Phili'o Carey Manufacturing Company
7 Continued insulating fuel gas piping in battery basement and live steam piping for booster and exhauster pumps. Started insulating shell of Stoppers' Elex Detarrer.
r ? a** ^tuhH i U.J.A.
(Sheet 1 of 2)
G. H. L.
DAILY LETTER No
192
fff>NTPA<~r #1827-Weirton Steel Co. njv WednesdayniTr August 9, 1950
TTMIiriATMr A U
62
.12 li
7?____ 4 U
80
CloudyWriTHCK____
__________ TOTAL NUMI OW UfN
250
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERKS PAYROLL DEPT. MATERIAL DEFT. MASTER MECHANIC BOILERMAKER FRMN BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS
IONWORKER FRMN. ION WORKERS LABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. FIFEFITTZRS WATCHMEN
Toolroom Man Truck Driver
OPERATORS
1 1 5 1 2 3 2 1
2 AO
4 3 26 1 2 4 3 15 6 50 43
4
1
4 24
1 1
DESCRIPTION OF WORK IN PROGRESS
MR. H. B. Lose, Gen'l. Sup't. of Constr.
Dear Siri-
Work is proceeding as follows:
BRICKLAYERS: CARPENTERS: IRONWORKERS: LABORERS:
Continued battery #7 oven brickwork: 195? complete
through Tier #34j 26? through Tier #26; 17? through
Tier #38; 38? through Tier #39 (floor level).
37.4? of silica and clay brick laid to date; 51.5?
of checker brick.
Continued placing glazed tile at coal bin electrical
room and at tar loading pumphouse.
Continued common brickwork at recirculating water
pumphouse.
Continued forming larry floor West End of battery.,
Continued erecting forms for blast furnace gas main
seal tank.
Continued erecting forms for wash oil coolers exten-
sion foundation.
Erecting oven shed and brickwork scaffolding.
Fabricating chutes to aid in removal of benzol washer
packing.
'
Continued erecting final cooler platform steelwork.
Continued erecting East End addition steelwork
Exhauster Booster 3uilding.
Continued riveting bench and larry steelwork East
End of battery.
Placing reinforcing steel for wash oil coolers
foundation.
Stocking tiers #35 to #LL battery #7; unloading oven
brick and silica fire clay.
Stocking glazed tile brick at coal bin electrical
room and at tar loading pumphouse.
TOTALS
250
(CONTINUED ON SHEET #2)
r. lkW:,r .
^1 ""CT",a *NO,N`*'*
NAME OF FIRM OR COMPANY
SUBCONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
'
r 7 raw t*s# pru*4 ia U.I.A.
(Sheet 2 of 2)
CONTRACT. #1827-Weirton Steel Co.
TEMPERATURE A. Mi.
.t2 M.
nAV
Wednesday
-WEATHER-
DAILY LETTER No.. 192 natf August 9, 1950
250-TOTAL NUMBER OP MEN WORKING.
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION OF WORK IN PROGRESS
ERECTING ENGINEER
FIELD ENGINEER
ENGINEERING CORPS
OFFICE MANAGER
CHIEF CLERK
PAYROLL DEPT.
MATERIAL DEPT#
MASTER MECHANIC
BOILERMAKER FRMN
BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
BRICKLAYER APPRS.
CARPENTER FRMN.
CARPENTERS
CEMENT FINISHERS
ELECTRICIAN FRMN.
ELECTRICIANS
RONWORKCR FRMN.
^ON WORKERS
LABOR FOREMEN
LABORERS
MASON TENDERS
MILLWRIGHT*
OPERATING ENGRS.
FIREMEN
'
OILERS
PAINTERS
PIPEFITTER FRMN.
PIPEFITTERS
WATCHMEN
mr. H. B. Lose, Gen*l. Sup't. of Constr.
Dear SiRr-
LABORERS: (Con'd) Excavating for sump pump discharge piping and
for fuel and lean gas mains West End of battery.
Demolishing abandoned west wall of Exhauster Booster
building.
Started excavating for by-products area cooling tower
foundation.
ELECTRICIANS: Continued installing battery basement lighting conduit.
Maintaining temporary wiring.
ST3AKEITTERS: Continued installing battery basement fuel gas header
piping.
Installing tar flushing piping at flushing liquor
coolers.
.
Unloading miscellaneous piping.
*N0TE:- Representative of Tri-State Roofing Company visited contract today.
Mr. L. S. Tucker, Operating Engineer, visited contract today.
OPERATORS TOTALS NAME or riRM OR COMPANY
.....
&KKCTINQ KNQIHCKH
SUBCONTRACTOR*
NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
Portland Concrete poured to date - 2492^ Cu Yds Pozzalanic Concrete poured to date - 717 Cu Yds
r 7 10M TM ta U.5.A.
i
TEMPERATURE A.M<
12 M.
-WEATHER.
115-TOTAL HUMBER OF MEN WORKING.
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER
FIELD ENGINEER
ENGINEERING eORPSj
OFFICE MANAGER
CHIEF CLERK
PAYROLL DEPT.
MATERIAL DEFT.
MASTER MECHANIC
BOILERMAKER FRMN
BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
.
BRICKLAYER APPRS.
CARPENTER FRMN.
CARPENTERS
CEMENT FINISHERS
ELECTRICIAN FRMN.
ELECTRICIANS
RONWORKER FRMN.
.`ON WORKERS
LABOR FOREMEN
LABORERS
MASON TENDERS
MILLWRIGHTS
OPERATING ENGRS.
FIREMEN
1
OILERS
PAINTERS
PIPEFITTER FRMN.
PIPEFITTERS
WATCHMEN
Toolroom Han Truck Driver
OPERATOWS
1 1 1 1
2 46
4
2 53
1 1
SCSCRimON OF WORK IN FROORESB
mr H. 3. Lose, Gen'l. Sup't. of Constr.
Dear Siri-
Work is proceeding as follows:
BRICKLAYERS: LA30RBRS:
Continued battery #7 oven brickwork: 16$3 complete through Tier 56; 23% through Tier #38; 5355 through Tier #39 (floor level); 18^ through 'Tier #44.
Stocking tiers #39 to #44 batter;'- #7; unloading oven brick.
Mixing silica fire clay and tending bricklayers.
TOTALS
115
NAME OF FIRM OR COMPANY
^ KRCCriHO KNOINKCN
SUBCONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
r-f IOM 12*10
pfMNTSD IN USA *
r,. H. L.
DAILY LETTER No-------- 377
mmirT #1827~Weirton Steel Company nav Saturdayn*.-n? February 10, 1951
2BF.TEMPERATURE 0 A*M*. .12 M 35F. ... 37F WEATHER-- Cold
.TOTAL NUMBER OF MEN WORKING--H.
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION OF WORK IN PROGRESS
ERECTING ENGINEER, FIELD ENGINEER
ENGINEERING CORPS|
OFFICE MANAGER
CHIEF CLERK PAYROLL DEPT.
MATERIAL DEPT.
MASTER MECHANIC
BOILERMAKER FRMN.|
BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
BRICKLAYER APPRS.
CARPENTER FRMN.
CARPENTERS
CEMENT FINISHERS
ELECTRICIAN FRMN.
ELECTRICIANS
>NWORKER FRMN.
INWORKERS
.BOR FOREMEN
LABORERS
MASON TENDERS MILLWRIGHTS
OPERATING ENGRS.
FIREMEN
'
OILERS
PAINTERS
PIPEFITTER FRMN.
PIPEFITTERS
WATCHMEN
1 1
1 1
1
4
mr. H. B. Lose, General Superintendent of Construction
Dear Sir:-
Bridelayers: Continued placing abestos paper covering and asphalt paper protection over expansion Joints oven top battery #7.
Laborer; Tending masons
TOTAL OPERATORS
11 5
NAME of firm or company
SUB-CONTRACTORS NO. or MEN
B. J*
er EftSCTtMO CNOIMCS*
DESCRIPTION OF WORK IN PROGRESS
F.T lOM I*.SO MINTED IM USA
a /--t #1827-Weirton Steel CompanyAV
Monday
Pag* 1 of 2
c . r H. L.
DAILY LETTER No..
date February 12, 1951
46F.TEMPERATURE 8 A.M. 17 u 54F. tm xA 54F. wntuM W&CTI
TOTH miur nr mfn womimc 206
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERK PAYROLL DEPT. MATERIAL DEPT.
MASTER MECHANIC BOILERMAKER FRMN. BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN.
CTRICIANS 1WORKER FRMN. IRONWORKERS LABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
Toolroom Man Track Driver
1 1
3 1 1
3 3 1 1
4 X 4 -
3 42 2
5 21 2 6
3 43 4 6
4
-
-
5 5 29 -
1 1
TOTAL
206
OPERATORS
6
DESCRIPTION OF WORK IN PROGRESS
mr. H. B* Lose, General Superintendent of Construction
Dear Sir.-
Bricklayers: Continued waterproofing expansion cracks in battery #7 oven bridkwork Washing glazed tile at exhauster and booster building.
Carpenters: Started dismantling battery #7 oven shed sheeting. Continued erecting screeds for battery #7 basement finish floor. Continued erecting protective sheds for heating-up at coke and posher side benches battery #7.
ironworkers: Set west offtake main bridge in place.
Relocating heat shields of door machines. Started fabricating steelwork for coke side bench alterations.
Boilermakers: Started erecting Pi handrailing and toe plates for collecting main.
' Millwrights;
Continued packing asbestos rope between sole flues and air and waste `
heat reversing valves battery #7. Continued gw replacing existing liners and glands of refining pumps
in benzol area with new liners and glands.
Painters;
`
Painting backstays at east end of battery, battery #7 basement
ventilation ducting, #2 pusher machine steelwork, final cooler shell.
Portland Concrete placed Today--- 15 Cubic Yards. Portland Concrete placed To Date-4606^ Cubie Yards,
f*
'________
b/& BerhaltertcTmo *NO,N**"
NAME OF FIRM OR COMPANY
SUB-CONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
Philip Carey Manufacturing eompany
6 Insulating shell and oaapartmsnts of fuel gas
detarrer and steam and tar piping in by-products area.
KOMHS
r-r>MTPAfT#1827-Weirtoa Steel Caapany nAV Monday
DAILY LETTER No. 379
DATE.
Fabraary 12, 1951
TEMPERATURE O a.m. 46 F. tg M
F A u 54 F. .WEATHER______ ----------------- TOTAL NUMBER OP MEN WOBKIN0.2Q6
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERK PAYROLL DEPT. MATERIAL DEPT. MASTER MECHANIC BOILERMAKER PRMN. BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN.
`RICIANS 1 WORKER FRMN. IftwN WORKERS LABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
DESCRIPTION OF WORK IN PROGRESS
mr. H. B. Loss, General Superintendent of Construction
Dear Sir:-
laborers:
-
Completed placing oonerete for battery #7 bascmskt finish floor;
completed applying master builders finish to same.
Helping masons point-up battery #7 oven brickwork for heating-up.
Helping earpenters remora battery #7 oven shad sheeting.
Grading to yard lerel area around new recirculating water pumphouse.
Dismantling brickwork scaffolding at exhauster and booster building.
pipefitters: Installing larger fuel gas nozzles in battery #7 heating-up piping. Continued fabricating orens lire steam piping for battery #7 top. Continued installing benzol area instrument piping, soda oirculating piping. Continued Installing 2 pusher machine hydraulics piping.
Continued installing tar drain piping at new primary cooler. Dismantling temporary air and steam piping at battery #7.
Slsetricians:
'
Dismantling temporary wiring at battery #7 oren shed.
Continued welding ladder rungs to pipe supports to provide
' aceess to yard floodlights.
Installing power wiring for yard floodlights.
Continued installing power wiring for water booster pump.
Continued installing power and lighting conduit for sulphate
handling system.
TOTAL OPERATORS
206
NAME of firm or company
SUB*CQNTR ACTORS NO. OF MEN
B. /<(BerhalterJ"CTmo INO,N"*
DESCRIPTION OF WORK IN PROGRESS
'
r,, 'o ta.so Ml^4TCP IN USA
3>. G. 1
DAILY LETTER No________ 380
>MTPirr #1827-Weirton Steel CompansbAvTuesdaypatt February 13. 1951
TEMPERATURE 6 A.M._. 56E__ -12 M-- 57F1 4 P. M _5gfWEATWER-- Warm
-----total number of men workinc_123
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERK PAYROLL DEPT. MATERIAL DEPT.
MASTER MECHANIC BOILERMAKER PRMN. BOILERMAKERS BRICKLAYER PRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER PRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS * "'NWORKER FRMN.
^WORKERS OR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
Toolroem Man Truck Driver
1 1 2 1 1 3 > 1
4 1 4
2 13 2 5 20 4 12 3 37 4 6 1
1 5 5 29
1 1
TOTAL
173
DESCRIPTION OF WORK IN PROGRESS
MR- H. B. Lose, General Superintendent of Construction
Dcar Sib.-
'
Bricklayers: ConilnueTTealing expansion cracks in battery #7 oven top. Beaumed glazed tile brickwork at exhauster and booster building.
Carpenters: Completed dismantling battery #7 area shea sheeting. Erected screeds for fuel gas reetifier building extension finish floo placing transits insulation on door machine. Erecting temporary brickwork scaffolding at exhauster and booster
building.
Ironworkers:
.
Started dismantling battery # 7 oven shed steelwork; loading same
on ears for shipment to another contract.
Continued adjusting battery #7 tie rod springs.
Continued fabricating steelwork for coke side bench framing
alterations battery #7.
Boilermakers: Continued erecting handrail poste and toe plates at battery #7 collecting main.
Millwrights: Continued packing asbestos rope between sole flues and air and
waste heat valves extensions battery #7. Continued replacing existing liners and glands of benzol area refining pump* with new liners and glands.
Painters: Painting battery #7 basement steelwork and eoncrete, blast furnace gas piping, new final cooler shell, and #2 pusher machine steelwork.
OPERATORS
7
BW. Berhalter *CTmo rNOm`"
SUB-CONTRACTORS
NAME OF FIRM OR COMPANY
NO. OF MEN
DESCRIPTION OF WORK IN PROORESS
Philip Casey Manufacturing Company 6 Insulating shell of Sappers Xlex Detarrer and
lire steam piping at exhauster and booster building Applying weatherproofing coating to new final
jrtland Concrete placed Today-
cooler Insulation. Cubic farda
portland Concrete Placed To Date 08& Cubic! Yards.
NoteiHessxs. S. Re infoId end A.O.
Smith, Oven Machinery Sections,
Sngrg. Dept., visited oontraot, Mr.W.Paljug, Operating Dept., re sorted to contract today.
r-v iom *.o PBIW*tO (N USA
DAILY letter Mn. 580
ontract flfi27HTe1rton Steal Company pay Tuesdaydate
Pebruary 13, 1951
TEMPERATURE 8 A-M _____w.
S7 T. . _57 T.12 M_____
_______ P.M
___WEATHER
TTSAS
ITSTOTAL MIIU.ro nr uru u/nir>un
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERIC PAYROLL DEPT. MATERIAL DEPT. MASTER MECHANIC BOILERMAKER FRMN. BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS
ONWORKER FRMN. ONWORKERS .BOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING CNGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
DESCRIPTION OF WORK IN PROGRESS
mr. E. B. Lose. General Superintendent of Construction
Dear Siri-
Laborers: StoeIcing glazed tile at exhauster and booster building; tending masons; helping masons seal expansion cracks in oven top. Clearing debris from ovens area; cleaning form lumber. Resumed cutting concrete for pusher track wall alterations battery #7. Placing concrete for fuel gas reotlfler building extension finish floor; applying master builders finish to same.
Pipefitters: Continued installing live steam piping battery #7 oven top. Started fabricating eater piping at alley level battery #7. Continued installing ovens and benzol area instrument piping. Continued dismantling temporary air and steam piping ovens area. Continued installing soda circulating piping in benzol area.
Slectrloians: Continued installing wiring for floodlights in ovens area. Continued installing power wiring for water booster pump; placing quenching oil in starter box. Continued installing power and lighting conduit for sulphate handling equipment. Continued installing power wiring for new recirculating water pumps.
TOTAL OPERATORS
175
NAME OF FIRM OR COMPANY
SUB-CONTRACTOR* NO. OF MEN
DESCRIPTION OF WORK IN PROCRCSS
jl,
rnuTBirr #lB27-Welrfcon Steel ComparghAv
DAILY LETTER Hn.
Thursdayratf February 15. 1951
382
TEMPERATURE 8 A. M..
28F. .12 M 30F.
. 31F.P-M.
wriTur.
Cold
165-TOTAU NUMBER OF MEN WORKING
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION OF WORK IN PROSRCSS
ERECTING ENGINEER; FIELD ENGINEER ENGINEERING CORPS| OFFICE MANAGER CHIEF CLERK PAYROLL DEPT. MATERIAL DEPT. MASTER MECHANIC BOILERMAKER FRMN. BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS
ONWORKER FRMN. ONWORKERS LABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
Toolroom Man Truck Driver
1
1
3
1
1
3 3 1
1
4
1
4
1 15 2 5 20 2
6
3 35 4 7 1
1 5 5 27
1 1
165
mr. H. B. Lose, General Superintendent of Construction
Dear Sirj-
Bricklayera: Continued sealing expansion cracks in oven top battery #7.
Continued glazed tile brickwork at exhauster and booster building.
Carpenters:
Fabricating chutes to permit removal of abandoned spiral packing at existing benzol washers. Continued erecting forms for pusher track walls alterations. Continued erecting transits insulation for door machines. Brdcting forms for concrete slope at battery basement oolumns.
.
Ironworkers: placing reinforcing steel for pusher track walls alterations. Continued loading oven shed steelwork on cars for shipment.
Boilermakers:
Continued erecting xhandrailing for collecting main; welding same. Erecting gin pole to permit installation cf foul light oil feed tank In temporary location.
Millwrighta; Started installing blast furnace gas reversing valxes coke side.
Painters:
Continued painting steelwork> piping, and concrete in battery
#7 basement.
.
Portland Concrete placed Today----- 2^ Cubic Yards. Portland Concrete piaeedTo Date---4613 Cubic Yards.
OPERATORS
7
B. erhalterECTmo
NAME OF FIRM OR COMPANY
SUBCONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
Philip Carey Manufacturing Company 6 'Continued insulating shell of Koppers*
Ilex Detarrer. Placing weatherproofing coating on final oooler insulation.
r.? to* ia.90 *himtco m USA
iTONTPAgT #IB27-<eirton Steal CQBpeny,aY ThursdayPflTF
DAILY LETTER No.
Pebruary 15> 1951
362
TEMPERATURE 0 A. M. 28 7. _I2 M 30 7. . p M 31 7. WEATHER
COH
165TOTAL. NUMBER or MEN Wnnriur
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION OF WORK IN PROGRESS
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERK PAYROLL DEPT. MATERIAL DEPT. MASTER MECHANIC BOILERMAKER FRMN. BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS
3NWORKER FRMN. ONWORKER5 LABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
MR. H. B. Lose, General Superintendent of Construction
Dear Sim-
Laborers: helping masons seal expansion cracks in oven top battery #7. Stocking glazed tile at exhauster and booster building; tending masons. Placing concrete for pusher track walls alterations west end battery. Applying master builders finish to conorete slope battery basement columns. Clearing debris in ovens area.
Pipefitters: Installing Hto steam and flushing liquoe piping at battery #7. Installing ovens and benzol area instrument piping. installing soda circulating and contaminated water drain piping. Preparing to install battery #7 west offtake main. Continued alterations to door machines hydraulics piping.
Electricians: Continued installing power conduit and wiring for door machines. Continued installing power wiring for ovens area floodlighting. Continued installing power wiring for new recirculating water
pumps and for new water booster pump. Continued installing power and lighting conduit for sulphate handling system. Maintaining temporary wiring.
.
TOTAL OPERATORS
165
NAME OF FIRM OR COMPANY
SUBCONTRACTORS
NO. OF MEN
//T^C^P^3 rt- .in
<
B. J r^Barhalter (***crma 1KO,N""
DESCRIPTION OF WORK IN PROGRESS
rfrirMioiml taUn.S^A* Cv... roarT jfl827-Weirton Steal Company oav Tuesday
u. rt. L.
K. Pago 1 of 2
-4.
DAILY LETTER No__422-
.pate March 27r 19*1
TEMPERATURE 0 A.M. 34 F.
t* M 38 F.
* P.M.. 44-Fjl__WEATHFP Cool
TOTAL NUMBER OP MEN WORKING_121
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERIC PAYROLL DEPT* MATERIAL DEPT. MASTER MECHANIC BOILERMAKER FRMN BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. E' 'rRICIANS t WORKER FRMN. `R /ORKERS LABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN* PIPEFITTERS WATCHMEN
Tool Room Man Truck firiver
OPERATORS
11 3 1 1 2 2 1 1 3 2 18 1 1 10 2
4 13 4 11 3 19 17 4 1
1
7 5 25
M
1 1 7
TOTALS
m
DESCRIPTION OP WORK IN PROSRESS
MR* C* W. Oillman, General Superintendent of Construction
Dear Sir.-
Bricklayers: Continued oven top paving battery #7--now 95% complete. Completed placing ovens by-pass plugs battery #7. Started placing oven brick above door jambs left out for heating-up period.
Carpenters: Continued erecting forms for concrete cove base second floor booster and exhauster building. Continued installing pusher track removable bumpers, dismantling foof slab forms at benzol building.
Ironworkers: Erecting handrailing for offtake mains bridges walks. Completed installing apron plates beneath door sills battery #7. Helping remove temporary heating-up hearths from ovens battery #7. Continued erecting handrail at benzol building roof slab*
Boilermakers: Continued riveting new manheads to shell of second of four existing benzol washers to be altered.
Millwrights:
Continued miscellaneous adjustments to oven Machinery operating mechanism.
Painters: Painting collecting main, ascension pipes heat shields, door machines
i
and ceiling concrete of new recirculating water pumphouse.
Note: Average horizontal flue temperature
battery #7 is now 1857F*
------
KRKCTtNO SNeiNCCR
B. J. 3erhalter
SUBCONTRACTORS
NAME OF FIRM OR COMPANY
NO. OF MEN
. DESCRIPTION OF WORK IN PROGRESS
Philip Carey Manufacturing Company 7 Continued instilating fuel gas piping to ovens.
Konners Metal Products Division
1 Preparing to place new ELex Detarrer in service,
Pv,, ..land Concrete Placed To Date------ -4357i Cut ic lards.
r T IOM*tiUll.I.X
Page 2 of 2
DAILY LETTER No.. 422
co.. futrr #1827-Weirton Steel Company pay______fuasdaypate-
March 27f 1951
34 F.rrMproiTURr A &.u< _ 11 M 36 F.M m.u. 44 F COOlWEATHER____________
WT11 NUMBER OR MEN WOlllNS 171
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION OP WORK IN PROORCSS
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERK PAYROLL DEPT. MATERIAL OEPT. MASTER MECHANIC BOILERMAKER FRMN BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPR5. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. Er "RICIAN3 li ORKER FRMN.
Rv .ORKERS lABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
MR. 0. W. Dillnan, General Superintendent of Construction
Dear Siri-
Laborers:
Completed removing temporary heating-up hearths from pusher side
battery #7j started removing coke side temporary heating-up hearths.
Stocking oven top paving brick battery
tending masons.
Continued pouring firebond grout behind oven door jambs battery #7*
Clearing debris from ovens area. .
Pipefitters:
Continued installing live steam, air, service water, and flushing
liquor piping at ovens.
Packing asbestos rope between ascension pipe elbows and collecting
main.
Preparing to place new Hoppers Slex Detarrer in service.
Continued fabricating ammonia liquor circulating piping to permit
alterations to existing piping.
Installing vent piping between tar and gas compartments of existing
final cooler.
'
Sleetriciana: Operating oven machinery. Bonding collector rails for oven machinery battery #7. Continued installing control and lighting wiring for offtake mains governor houses and offtake mains bridges..
OPERATORS TOTALS
171
.
NAME or FIRM OR COMPANY
SUBCONTRACTORS NO. OF MEN
/ Cy y* 1
--/
ahllvilifv anwirtaAA
B. Berhalter.
DESCRIPTION OF WORK IN PROGRESS
F.7 tOM ia.o
fAINTCO IN USA *
Page 1 of 2
MTPAffT#1827-wcirfcon Steel Company day
Wednesday
G. H. t.
DAILY LETTER No. 423
naTg
March 28, 1951
TEMPERATURE S A.M_______________12 MA P.MWEATHER Raj IT--Mild______TOTAL NUMBER OF MEN WORKING
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION OF WORK IN PROGRESS
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERK PAYROLL DEPT. MATERIAL DEPT. MASTER MECHANIC BOILERMAKER FRMN. BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. r` "CTRICIANS
WORKER FRMN. WORKERS LABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
Tool Boom Man Truck Driver
1. 1 3 1 1 2 3 1 1
8
2 13 1 1 10 2 4 13 3 7 3 17 17 4 2.
mm
8
5 25
1 1
TOTAL
161
OPERATORS
6
mr. B. W. Dillman, General Superintendent of Construction
Dear Sip:-
Bricklayers: Continued oven top paving battery #7. Continued placing oven brick above door jambs left out for heating-up period.
Caroenters:
Completed erecting forms for concrete cove base second floor exhauster and booster building. Continued repairing fence at benzol plant damaged during construction activities in benzol area.
Ironworkers: Continued adjusting battery iP7 cross tie rod springs. Helping remove coke side temporary heating-up hearths from ovens. Welding alley enclosure steelwork and erecting handrailing for offtake mains vails.
Boilermakers:
..
Completed riveting new manheads to shell of second of four existing
benzol washers to be altered.
.
. Welding collecting main joints.
Millwrights:
Continued miscellaneous adjusting of operating mechanism of oven machinery. Caulking asbestos rope in joints of air and waste heat reversing valves.
Painters:
Painting collecting main, door machines, ceiling concrete of new
recirculating water pumphouse.
Mote: Mr. C.W.Dillman, Gen'l. Sup*t.
of Const., Messrs. PH Lavely 4 A.O.
7%
.
Smith, Engrg. Dept., visited contract ' l/\ ,, ... k.ctino knoinu*
--toda-gy
-------------
-------- ................B. -oernaltar,--------------------
SUBCONTRACTORS
NAME OF FIRM OR COMPANY
Philip Carey Manufacturing Company Hoppers Metal Products Division
NO. OF MEN
7 1
DESCRIPTION OF WORK IN PROGRESS
Continued insulating fuel gas piping to ovens. Supervising placing new detarrer in service.
hlflnrt Cnni'.T'fit.A Plar**.rt To
- --A857J- C ubic Yards,
Note: Average horizontal flue tempi irature ba ttery #7 is now 1802F.
New Hoppers1 Blex Detarrer p! .aced in s ervice at 11:00 A.M. today, Mr. Stevel L. Wujs, reported to contra ct today.
r.y toM ta.so
MINTCO IN USA *
Page 2 ox' 2
.mtbact #L827-Weirton Steel ConpanvDAY__ Wednesday
DAILY LETTER No, 423
hatf March 23, 1951
TEMPERATURE 8 A.M..12 M4 P.M------------------------------------------------------------------------------- WEATHER Rfi.j Hr--Mild____ TOTAL NUMBER OF MEN WORKINS_ll
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER
.
FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER
CHIEF CLERK PAYROLL DEPT.
MATERIAL DEPT.
MASTER MECHANIC BOILERMAKER FRMN. BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
BRICKLAYER APPRS.
CARPENTER FRMN.
CARPENTERS
CEMENT FINISHERS ELECTRICIAN FRMN.
CTRICIANS
'WORKER FRMN.
I. WORKERS LABOR FOREMEN
LABORERS
MASON TENDERS
MILLWRIGHTS
OPERATING ENGRS. -
FIREMEN
OILERS PAINTERS
PIPEFITTER FRMN. PIPEFITTERS
WATCHMEN
DESCRIPTION OF WORK IN PROGRESS
mr.C. W. Hillman, General Superintendent of Construction
Dear Si*i-
Laborers: Stocking oven top paving brick battery ff7j tending masons. Continued pouring firebond grout behind oven door jambs battery #7. Continued removing coke side temporary heating-up hearth from ovens. Clearing debris from ovens area.
Pipefitters: Continued installing flushing liquor, live steagi, air, and service water piping at ovens. Installing ovens instrument piping. Continued fabricating ammonia liquor circulating piping to permit alterations to existing piping.
Electricians: Continued installing control and rinrt lighting wiring for offtake mains governor houses and offtake mains walks. Operating oven machinery. Installing miscellaneous lighting wiring at ovens battery #7* Maintaining temporary wiring.
TOTAL
161
OPERATORS
9 (/\.
KRKCTmO CNCmKKR
------ ..--------------------------- ------ -------------------------------- &--JL-3erhalter.----------------------
SUBCONTRACTORS
NAME OF FIRM OR COMPANY
NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
Pnntca u J.4.A.
#1827-'w'eirton Steel Company
. 'RACT.
DAY.
Briday
Page 2 of 2
DAILY LETTER No.___ A25
.date_ March 30. 1951
NAME OF FIRM OR COMFANY
NO. OF MEN
DESCRIPTION Or WORK IN PROGRESS
r1`fuT iIiMri4if*-W<*i.At
. B. U
s. h. k. Page 1 of 2
DAILY LETTER Na. *I*2^
C RACT. #1827-weirton Steel Company
TEMPERATURE 8 *-M.
so P
^ * *J2 M
60 F.
______Thursday
niTr March 29, 1951
58 E. Hain--Mild WEATHER.
144-TOTAL NUMBER OP MEN WORKING.
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION OF WORK IN PROGRESS
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OrriCC MANAGER CHter CLERIC PAYROLL DEPTMATERIAL DEPT. MASTER MECHANIC BOILERMAKER FRMN BOILERMAKERS BRICKLAYER FRMN* BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. EL* -^ICIANS IR >RKR FRMN*
' 9RKERS ,ABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
Tool Room Man Truck Driver
OPERATORS
1 1
4
1 1 2 2 1 1 8 2
13
1 1
n
3 4 13 5
11
4
22 11
4 4
1 8 2
1 1
7
TOTALS
144
MR. C. W. Dillman, General Superintendent of Construction
Dear Sih-
Bricklayers: ' Continued oven top paving battery #7. Continued placing oven brick above door jambs left out for heating-up period. Caulking asbestos rope between glazed tile regenerator faces and ovens brickwork battery #'7. Carpenters: Continued repairing benzol area fence damaged during construction activities in benzol area. Blocking Northwest Crane on flatcar. Completed erecting screed3 for finish floor of new recirculating water pumphouse. Erecting screeds for finish 3lafe of water basin of new three-cell cooling tower.
Ironworkers:
.
Placing reinforcing mesh for finish slab of water basin of new
three-cell cooling tower.
Placing Northwest Track Crane #82 on flat car for shipment.
Welding upper face plates and seal plates to oven steelwork.
Boilermakers: Continued welding butt strap joints of collecting main. Continued caulking asbestos rope between joints of air and waste heat reversing valves. Cleaning second of four existing benzol washers preparatory to installation of spiral packing in same.
.
Millwrights: Caulking asbestos rope between joints of air and waste heat reversing valves. Greasing oven door latches.
Note: ' Messrs. E. Preston and E.V.Scbulte, Operating Department, and T.A.Donehoo contract Engrg., visited contract.
3erhalter.
BUS-CONTRACTOR*
NAME Or FIRM OR COMPANY
Philip Carey Manufacturing Company Kr rs> Metal Products Division
NO. OF MEN
DESCRIPTION Or WORK IN PROGRESS
7 Insulating fuel gas piping to ovens and service water piping at ovens.
1 Supervising operation of Koppers Elex Detarrer
nortJand Concrete Placed Todajr------------3$ Cubic Yards., ortland Concrete Placed To Date----4861 Cubic ^ards,
Note: Average horizontal flue temperature battery #7 is now 1817F.
r.7 IOM iiJI
F miM u U.S.A.
Page 2 of 2
v Jtract #l.S27-Weirtan_.Steal CompanynAV
DAILY LETTER NoJ.ilk ThursdayDATE------March 20, 1Q51
TEMPERATURE 8 A.M.
60..E. 5&. Sai n Mi 112 M
_____ A P.M.____ -E. WEATHER
-d------- TOTAL number or men WORKING_JJJ+
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION or WORK IN PROGRESS
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERIC PAYROLL DEPT. MATERIAL DEPT* MASTER MECHANIC BOILERMAKER FRMN BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN.
TR1CIANS. . WORKER FRMN. I. WORKERS LABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
mr, C. W Pillman, General Superintendent of Construction
Dear Siri-
Laborers: Preparing to install new spiral packing in second of four existing benzol washers to be altered. Tending masons at battery ^7. Completed placing concrete for finish floor of new recirculating water pumphouse; applying master builders finish to same. Completed removing coke side temporary heating-up hearths from ovens battery #7.
Pipefitters: Idle--^ain.
Blectricians: Installing floor lights in ovens area. Continued installing lighting wiring for offtake mains governor houses Bonding pusher machine collector rails.
OPERATORS
TOTALS
2M
NAME OF FIRM OR COMPANY
BUB-CONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
pnoM i U.3.A,
H. B. U
Page 1 of 2
OAf.-r #1327-Weirton Steel Company nAV Friday
DAILY LETTER No- 425. nA,, March 30, 1951
WORIONC_iZ7TEMPERATURE 0 A. M<t2 MA P.MWEATHER_____ ^1----------------------- TOTAL NUMBER OF MEN
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERIC PAYROLL DEPT. MATERIAL DEPT. FASTER MECHANIC lOILERMAKER FRMN BOILERMAKERS BRICKLAYER FRMN.
IR1CKLAYERS .RtCKLAYER APPRS. .ARPENTER FRMN. 'ARPENTERS :EMENT FINISHERS LECTRICIAN FRMN. LECTR1CIANS EONWORKER FRMN. :r ikers
OREMEN BORERS A50N TENDERS ILLWRIGHTS DERATING ENGRS. REMEN LER5 .INTERS .EFJTTER FRMN. EFITTERS VTCHMEN
'ool Room Man ruck Driver
ERATORS
1
1.
4 1 1 2 2 1 1
-
2
13 1 2 14 3 4 12 5 8 4 41 4 4 3
--
'2 8 5 26
1 1 7
TOTALS
177
DESCRIPTION OF WORK IN PROGRESS
mr. C, W. Dillman, General Superintendent of Construction
Dear Swp-
Note:
Will charge coal into new battery #7 tomorrow, Saturday, March 31, at 9:00 A.M. Average horizontal flue temperature battery #7 is now . 1825F., baigg raised to 210op. for charging of battery.
Bricklayers:
Continued oven top paving battery #7.
Continued caulking asbestos rope between glazed tile faces
and regenerator walls battery #7.
Caroenters: Continued bracing Northwest Crane #82 on flatcar for shipment, Continued erecting screeds for finish slab of water basin of new three-cell cooling tower.
Ironworkers: V.elding top face plates and cover plates to oven steelwork battery irl Adjusting measuring sleeves of larry car. Welding coke side alley floor steelwork and platform steelwonc for peephole castings pusher side of battery. Erecting handrailing for collecting main walks battery #7.
Boilermakers: Idle--Weather.
Millwrights: Greasing oven doors. Adjusting oven machinery.
Painters:
Idle-Weather.
.
Note: Mr.A.O.Smith, Engrg.Dept,, visitedfs~)
contract Today.
1f
B. J.j/Bernalter,
SUBCONTRACTORS
NAME OF FIRM OR COMPANY
NO. Or MEN
DESCRIPTION Or WORK IN PROGRESS
lilip Carey Manufacturing Company ippers* Metal Products division
9 Insulating service water piping at ovens, 1 Service Engineer for Koppers Elex Detarrer,
>r. nd Concrete Placed Today-- >rtland Concrete Placed To Date-
55 Cup>: ic lards, 4916 Cupd: c Yards.
TEMPERATURE 0 A.M.
~t2 M
a p. mwriTur* Hai n
-TOTAL NUMBER OR MEN WORKINSTM^^
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION OP WORK IN PROGRESS
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERIC PAYROLL DEPT. MATERIAL DEFT. MASTER MECHANIC BOILERMAKER FRMN BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS II ORKER FRMN. IRl .ORKERS
ABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
mr. C. W. Dillnan, General Superintendent of Construction .
Dear Sir>-
Laborerst Placing concrete for finish slab of water basin of new three-cell cooling tower. Helping masons pave oven top battery #7, 61earing debris from ovens area.
Pipefitters;
Installing live steam and collecting main regulating piping at ovens.
Continued installing lubrication^ piping for oven machinery.
;
Installing ovens instrument piping.
Electricians: Installing control and lighting wiring in offtake mains governor houses. Operating oven machinery. Installing lighting wiring for offtake mains walks.
OPERATORS TOTALS
177
NAME OP FIRM OR COMPANY
SUB-CONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
CNCINCCR
OCCUPATION
NO. MEN CONTRACT
description or work in progress
ERECTING ENGINEER!
FIELD ENGINEER
ENGINEERING CORPS|
OFFICE MANAGER
CHIEF CLERK
PAYROLL DEPT.
MATERIAL DEPT.
MASTER MECHANIC
BOILERMAKER FRMN.I
BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
BRICKLAYER APPRS.
CARPENTER FRMN.
CARPENTERS
CEMENT FINISHERS
ELECTRICIAN FRMN. ELECTRICIANS
ONWORKER FRMN.
ON WORKERS
LABOR FOREMEN
LABORERS
MASON TENDERS
MILLWRIGHTS
OPERATING ENGRS.
FIREMEN
'
OILERS
PAINTERS
PIPEFITTER FRMN.
PIPEFITTERS
WATCHMEN
ToolRoom Mn Truck Hrivpj
3 1 1 2 2 1 1 5 1 4 1 2 11 1 1 4
4 23
4 1 1 -m
l ll
6
4
1 1
129
mr. C H Dillman, General Superintendent of Construction!
DCAR Sl*r
Bricklayers t laying up brickwork Benzol Building. (Around Structures, etc.)
Carpenters t Building miscellaneous scaffolds for Pipefitters, Cement Finishers,
and Bricklayers.
Boileraakerst Erecting scaffold at Benzol lasher.
Millwrights! Setting Bwnmatic Sulphate equipment.
Painters!
'
Painting Battery fl basement foundation.
Painting alley-way Bteel.
Painting Recirculating Water piping.
laborers!
'
Tending Masons and Carpenters.
Cleaning debris from Benzol, By-Products and Battery #1 areas*
Brush and finish concrete at 3-Cell later Cooling Tower.
Pipefitters! Making tie-in connections from Blast Furnace gas main to Iren Gas
reversing valves. Replaced Existing Ammonia Liquor piping. Fabricate end install Tar Over-flow and Vent piping at Final Cooler.
Install Recirculating later piping.
OPERATORS
7
B. J
CKKCTtNO KNOmCKJt
NAME OF FIRM OR COMPANY
Philip Cerey Mfg. Co,
SUBCONTRACTORS
NO. OF MEN
11
DESCRIPTION OF WORK IN PROGRESS
Insulate miscellaneous steam piping at By-Product! r/ Insulating Vapor to Oil Heat Exchanger. Insulating Hash Oil Still.
Placed 6-1/2 Ids. concrete at Pusher Trac k Foundation. (Old Concrete Foundation up to Hew)
(Foundation level.
)
Total yards of concreted to date 4926-3/4*/
I
F.7 lOM 12. BO MINTtO IN USA *'
Sheet 2 of 2,
DAILY LETTER No--------- 445.
contract. #1827 - Wairton Steal Co. dayThursdayoatf April l<?r 1Q57
8 1* Fair COplTEMPERATURE A.M MA P. MWEATHER
-- _____________________________________________ TOTAL NUMBER OF MEN WORK1NG_l29
OCCUPATION
NO. MCN CONTRACT
DESCRIPTION OF WORK IN PROGRESS
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERK PAYROLL DEPT. MATERIAL DEPT. MASTER MECHANIC BOILERMAKER FRMN. BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN* CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS IRONWORKER FRMN.
.ONWORKERS -ABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
c.mr. ff .Dillman, General Superintendent of Constructions
DEAR SlRr-
'
Electricianst Wiring at By-Products Plant. Teoporaty power and light maintenance.
-
-
TOTAL OPERATORS
129
NAME OF FIRM OR COMPANY
SUBCONTRACTORS NO. OF MCN
B. J.^Efcrhalter,
DESCRIPTION OF WORK IN PROGRESS
w.r iom t.so PftIMTCD tN USA A.
WA^
Ixomtsl
nwroirr #1827 - We*-ton Steel C0. nav
Friday
ciior
V* P.G.S. S.H.K.
G.h.l.
J.O.V.
.C.I.
' LETTER No.
PATE --Ua r 11, 1951
i
TEMPERATURE ft A.M-------------------------------------------12 m
------------------------------A p. -------------------------------------WEATHER________ ____________________TOTAL NUMBER OF MEN wnntfiMn
88
OCCUPATION
NO. MEN CONTRACT
DESCRIPTION OF WORK IN PROGRESS
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORP5 OFFICE MANAGER CHIEF CLERK PAYROLL DEPT. MATERIAL DEPT.
MASTER MECHANIC BOILERMAKER FRMN, BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS
CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS
^NWORKER FRMN.
NWORKERS *ABOR FOREMEN LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS.
FIREMEN OILERS
,
PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
Toolroom Van
1.
3 1
1 2 2
1 1
6
1
2
1 1 4
2
3 1 13
1
3
6
31
1
TOTAL
88
mr. C. 77. Dillman, General Superintendent of Construction:
Dear Sir:-
Carpenters * Building miscellaneous scaffolds for Pipefitters and Painters.
Boilermakers * Alterations to Benzdl Washer. Aligning Bubble Caps at Wash Oil Still.
Painters: Painting Recirculating Water piping.
laborers:
Tending Carpenters. Cleaning debfis from Benzol, Byproducts and Battery #7 areas. Excavation for emergency rater line tie-in between headers.
Pipefitters t
Install Ammonia Liquor piping.
Fabricate end install Tar Over-Flow and Vent piping at Final Cooler.
Install Recirculating Water piping.
Install light Oil piping at Benzol Plant.
. Electricians: Wiring at By-Products Plant. Temporary power and light maintenance.
Ironworkers Install Wire Fence Enclosure (Pusher Side).
Hillwriehts: Repair temporary construction equipment.
OPERATORS
7
B. J. B*e|lter,
ckoinuk
orNAME
FIRM OR COMPANY
Philip Carey uFg, Co.
SUBCONTRACTORS
NO. OF MEN
7
DESCRIPTION OF WORK IN PROGRESS
Insulate miscellaneous steam piping at By
Products area,
.
Insulating Wash Oil Still.
Insulating tight oil piping.
Insulating Water piping at Benzol Plant
P.7 IOM 12 90 PHINTCO IN USA
-ONTRACT. 82? - Weirton Steel Co, .DAY.
TEMPERATURE 8 A.M..
Monday
c.w.o.
P.G.S.
S.H.K.
G.H.L. J.O.V. DAILY LETTER No..
468
E.C.J.
DATE
*fey 14, 1951
Fa&t m ITiool 1.WEATHER
74TOTAL number of men working.
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERK PAYROLL DEPT. MATERIAL DEPT. MASTER MECHANIC BOILERMAKER FRMN. BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS "'ONWORKER FRMN.
NWORKERS nABOR foremen LABORERS MASON TENDERS MILLWRIGHTS OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
Toolroom Man
1 3 1 1 2 2 1 1 6
2
1 5
1 14
6 4 22
1
DESCRIPTION OF WORK IN PROGRESS
mr. C. W. Dillman, General Superintendent of Construction!
Dear Sir:-
Carnentera; Building miscellaneous scaffolds for Pipefitters and Painters.
Boilermakers : Alterations to Benzol Washer. Aligning Bubble Caps at Wash Oil Still.
Painters: Painting Recirculating Water piping. Painting miscellaneous steel work at Ovens.
laborers^ Tending Carpenters* Cleaning debris from Eenzol, By-Products and Battery #7 areas. Install spiral packing in Benzol Washer.
Pipefitters: Install Ammonia Liquor piping. Fabricate and install Tar Over-Flow and Vent Piping at Final Cooler. Install Recirculating Water piping. Install light Oil piping at Benzol Plant.
Electricians: Wiring at By-Products Plant. Temporary power and light maintenance.
TOTAL OPERATORS
74 7
NAME OF FIRM OR COMPANY
Philip Carey Mfg. Co.
__ M)-
B, J. Beifealter, *=t.h0
SUB-CO NTRACTOR S
NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
7 Insulate miscellaneous steam piping at By-Products area. Insulating light Oil piping. Insulating Water piping at Benzol Plant*
r.r tot* **.*o P**NTtD IN USA A.
.ONTRACT. #1827 - Welrton Steel Co. .DAY.
A1LY LETTER No.. 471 JfaT 17, 1951
TEMPERATURE 8 A.M..
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER FIELD ENGINEER ENGINEERING CORPS OFFICE MANAGER CHIEF CLERIC PAYROLL DEPT. MATERIAL DEPT.
MASTER MECHANIC BOILERMAKER FRMN. BOILERMAKERS BRICKLAYER FRMN. BRICKLAYERS BRICKLAYER APPRS. CARPENTER FRMN. CARPENTERS CEMENT FINISHERS ELECTRICIAN FRMN. ELECTRICIANS "RONWORKER FRMN.
3NWORKERS -aBOR foremen LABORERS MASON TENDERS MILLWRIGHTS . OPERATING ENGRS. FIREMEN OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS WATCHMEN
Truck Driver Toolroom Item
1
3 1 1 2 2 1 1 6
2 1 1 4 3 2 3 11
4 4 23
1 1
TOTAL
78
OPERATORS
7
X9cOrAi. NUMBER OF MEN WORKING JZ8. DESCRIPTION OF WORK IN PROGRESS
mr. C, W. DUlman, General Superintendent of Construction!
Dear Sir:-
Carpenters* Set groat foms top Bensol Building*
Boilermakers^ Testing Bensol Washer and remove scaffolding. Install man hole covers Wash Oil Still,
Blisterst Painting Recirculating Water piping. Painting miscellaneous steel work at ovens.
Iabroers* Tending Carpenters, Cleaning debris from Benzol, By-Products and Battery Install spiral packing In Bensol Washer,
areas.
ftjS&tSys.i. Install Imaonia Liquor piping. Fabricate and Install Tar Over-Flow and Tent piping at Final Coolers, Install Recirculating Water piping. Install Bensol Plant piping, (Oil, Gage, Etc,) Install Ventilating System at Reotifier House,
Electricians* Wiring at Ry-Produeta Plant, Wiring Door Service Rack, Temporary power and light maintenance.
Ironworkers* Install Sulphate Handling Equipment,
/39^1
B, J^erhalterV'lCTINO KNamtz*
NAME OF FIRM OR COMPANY
SUB-CONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
Philip Carey Itfg, Co,
7 Insulate miscellaneous piping at By-Products and Benzol Plants,
r.v iota **.*o rmtMTXQ in UA *
ONTRACT. #1827 - Weirton steel Co. .DAY.
rff'.C.V. I^-I tf'S.H^. ^ 1
;.u;___ _
_;_DAH.Y LETTER No------
21. 1951_
TEMPERATURE a A.M..
* ---- TOTAL NUMBER OF MEN WORKING__ 7j
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER FIELD ENGINEER
ENGINEERING CORPS OFriCE MANAGER CHIEF CLERK PAYROLL DEPT.
MATERIAL DEPT.
MASTER MECHANIC
BOILERMAKER FRMN.
BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
BRICKLAYER APPRS.
CARPENTER FRMN.
CARPENTERS
CEMENT FINISHERS
ELECTRICIAN FRMN.
ELECTRICIANS
NWORKER FRMN.
INWORKERS
..BOR FOREMEN LABORERS
MASON TENDERS MILLWRIGHTS
OPERATING ENGR5.
FIREMEN
-
OILERS
PAINTERS
PIPEFITTER FRMN.
PIPEFITTERS
WATCHMEN
Toolrooa )fen Truck Driver
1.
3
1 L
2 2 1 1 6
1 1 5
1 12
1
5 4 23
1 1
TOTAL
73
description or work in progress
mr. C. V. Billman| General Superintendent of Construction}
Dear Sim-
Boilermakers} Erect scaffolding Bensol Washer. Relocate Pore Condenser top of Bensol Building.
Paintarsi Painting miscellaneous piping By-Products Plant. Painting m iseellaneous steel work at Ovens.
laborerst Cleaning debris frca Bensol, By-Products and Battery #7 areas. Removing spiral packing from Bensol Washer.
Pipefitter#i Install Ammonia liquor piping. Install Recirculating Water piping. Install Bensol Plant piping. (Oil, Gage, Etc.,) Install Ventilating System at Rectifier House. Install safety guards at miseallaneous valves By-Products Plant.
*
Electricianst Wiring at By-Products Plant. Temporary power and light maintenance.
Ironworkers t Adjusting Battery #7 Expansion.
'
OPERATORS
6
B. J. Bei4^1ter.t"`CT,NO
NAME OR FIRM OR COMPANY
SUBCONTRACTORS NO. OF MEN
DESCRIPTION OP WORK IN PROGRESS
Philip Carey Itfg. Co.
Insulate miscellaneous piping at By-Products and Bensol Plants.
CONTRACT. #1827 - Weirton Steel Co, .DAY. Friday
TEMPERATURE 0 A.M..
P.M..
.WEATHER.
rc
1O,A, IU, 1, LETTER No.. 486 cwn'-E'i "J te 1, 1951
62NUMBER OF MEN WORKING-
CONTRACT. #1827- Weirton Steel Co. .DAY.
TEMPERATURE 8 A.M..
ISonday
i_
*i r.
DAILY LETTER No..
tC . JDATE.
-June 4, 1951
489
Hi rmflyi
52.TOTAL NUMBER OF MEN WORKING.
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER
FIELD ENGINEER
ENGINEERING CORPS OFFICE MANAGER CHIEF CLERIC PAYROLL DEPT. MATERIAL DEPT.
MASTER MECHANIC BOILERMAKER FRMN.
BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
.
BRICKLAYER APPRS.
CARPENTER FRMN. CARPENTERS
CEMENT FINISHERS
ELECTRICIAN FRMN. ELECTRICIANS
^ONWORKER FRMN.
^tONWORKERS .ABOR FOREMEN
LABORERS
MASON TENDERS
MILLWRIGHTS
OPERATING ENGRS*
FIREMEN
'
OILERS PAINTERS PIPEFITTER FRMN. PIPEFITTERS
WATCHMEN
Toolroom Man
1
3 1 1 1 2 1 1 4 1
2
1 2 1
1 10
3 3 12
1
DESCRIPTION OF WORK IN PROGRESS
mr. C. 17. Dillman, General Superintendent of Construction!
Dear Sir:-
Carpenters t Building miscellaneous scaffolding for Pipefitters.
Boilermakerst Alterations to Benzol Washer.
Painters^ Painting miscellaneous piping at By-Products Plant.
Laborers t Cleaning debris from Benzol and By-Products areas. Back fill.-water line by-pass at Cooling Tower.
Pipefitters!
'
Grease piping at Door Machine.
Install Ammonia Liquor piping.
Install Benzol.Plant piping. ( Oil, Gauge, etc.,)
Install safety guards at miscellaneous valves By-Products Plant.
Electriciansi Wiring at By-Products Plant. Temporary Power and Light maintenance*
TOTAL OPERATORS
8
NAME OF FIRM OR COMPANY
Philip Carey Mfg. Co*.
B. Zi( Berbalter,*',*CT,NO "
SUB-CONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
3 Insulate miscellaneous piping at By-Products and Benzol Plants.
OCCUPATION
NO. MEN CONTRACT
ERECTING ENGINEER
FIELD ENGINEER
ENGINEERING CORPS
OFFICE MANAGER CHIEF CLERK
PAYROLL DEPT.
MATERIAL DEPT.
MASTER MECHANIC
BOILERMAKER FRMN.
BOILERMAKERS
BRICKLAYER FRMN.
BRICKLAYERS
BRICKLAYER APPRS.
CARPENTER FRMN.
CARPENTERS
CEMENT FINISHERS
ELECTRICIAN FRMN.
ELECTRICIANS
'ONWORKER FRMN.
9NWORKERS
.BOR FOREMEN
LABORERS
MASON TENDERS
MILLWRIGHTS
OPERATING ENGRS.
FIREMEN
OILERS
PAINTERS
PIPEFITTER FRMN.
PIPEFITTERS
WATCHMEN
Toolroom Man Truck Driver
1
3
1 1 1 2 1 1
3
1
1
1 1 2 11
1
3 3 14
1 1
TOTAL OPERATORS
54
8
DESCRIPTION OF WORK IN PROGRESS
mr. C. W. Dillman, General Superintendent of Construction
Dear Sir:-
Boilermakers * Alterations to Benzol Washer. Erecting new catwalks on old Final Coder.
Electricianst Temporary power and light maintenance.
laborers t Back filling at By-Products Plant. Cleaning Scrubber at By-Products Plant. Moving spirals to Scrubber at By-Products Plant.
Millwright* Repairing Equipment.
Painters *
Painting miscellaneous piping at By-Producta Plant.
Painting miscellaneous steelwork at Ovens.
*
Pipefitters t Install Ammonia Liquor piping. Install Benzol Plant piping. (Gauge, etc.,) Install safety guards at miscellaneous valves at By-Products Plant,
'
Batterv #L Repairs* Fabricating temporary Bulkheads.
Ln B. J^erhalter,*"*CT,wo
NAME OF FIRM OR COMPANY
SUB-CONTRACTORS NO. OF MEN
DESCRIPTION OF WORK IN PROGRESS
Philip Carey Mfg. Co.
3 Insulate Miscellaneous piping at By-Products and Benzol Plants.
**I ' '
I
>
f
.?
o M H
VO
O O O
f
*
{
i