Document MkOeL62kKbn1wKVJ81ReBaoM
* Grazes or the Annual -laetinc
-12-
June 28-29, 1978
'would be legal and feasible. Were there anti-trust implications vfron this type of research? Several members indicated that their companieswould' not ` contribute either directly or indirectly to fading of* such joint'reseorch; ^
Saference was made to a proposed New Jersey law vhih-vag-'scrapped about
a year ago which proposed to ban the manufacture^ use,or sale of any
carcinogenic material, which included asbestos./ If'such a statute were
to pass in one state it could effectively baa asbestos la brake linings
throughout the United States. This proposed Hew Jersey statute was
abandoned after it. was realized that it would ju3t about close down
the manufacturing Industry in Hew Jersey. Even if such a ban were
feasible, even Ur. Selikoff has indicated that there are controls that
can keep asbestos concentration! to non-hamful levels. Several delegates
indicated chat they were strongly opposed to any kind of joint research
project for the'development of a noc-asbestoe lining and this sujbect __
was then dropped. *
l {J
/
3SAKS PETJOEIASCE STUDY committee
Ur. Nelson. Chairman of the Brake Performance Study Committee prepared his consittee's report. Ur. Nelson could not attend this meeting and Ur. Son Cutler of Abes read the report. Please refer to Exhibit 7.
The Chairman's report discussed items such as the Quality Control Program and recent moves in Washington and the courts concerning Federal 'lotor Vehicle Safety Standard 121 (air brake systems standard). The Chairman also discussed Standard 105-75 and contact with Mr. Fred kedler of the National Eighway Traffic Safety Administration concerning Docket 1-4 (replacement brake shoe md lining assembly}, Be indicated that this docket was being reactivated and ve could expect to hear more on it In the near future.
Ur. Nelson reviewed his discussions with Ur. Fedler concerning projects that could effect brakes including such items as longer life friction materlals brake system inspectibllity, end the up-grading of both ehe
hydraulic and air brake systaae standards. Be also discussed AAMVi certification requirements and activities of the Vehicle Iquiposat Safety Commission. Bis noted that the Institute had bean in contact
with the Defense Supply Agency concerning the proposed federal braka lining specification BEL-36 IS, ad that the Defense Construction Supply Center indicated that the revision E variation of this specification
calling tor full dynaaomaees tests was not satisfactory* They indicated agreement with the Institute position about the uaworkabllity of Bevislen E The Defense Construction Supply Center is now working os e Hevision F which it is hoped will Include seme of the suggestions thee the Institute * made over the past year.
In reeding Ibr. Nelson's report!
Cutler commented oo the Quality
Control Progrin where he aaked for tome feed-back conearning work of the
Qualify Control Sub-committee. It was asked If members had been