Document MNgQjrVDxmYwok25xN27oq97
SAFETY - A. H. Sather
OCCUPATIONAL INJURIES
Injuries Treated
First Aid Medical Cases Restricted Workday Cases Restricted Workdays Lost Time
Injuries by Department
1979 May
4 0 0 0 0
1979 Year-to-Date
12 1 2
29 0
1978 Year-to-Date
24 3 1
10 0
Vinyl Operations Compound Operations Maintenance Laboratory Receiving and Warehouse Office
Injuries by Types
27 11 15 00 00 02
10 9 6 2 0 0
Cuts and Abrasions Eye Injuries Burns Bruises Sprains and Strains Other
13 03 35 04 03 00
12 3 5 4
.4 0
As of May 31, 1979, the plant operated 298 days or 393,167 man-hours without a disabling injury.
TRAINING
The plantwide lifting training program initiated in April was completed during the reporting period.
Five (5) casual employees and three (3) engineers received new employee safety orientation.
A. H. Sather attended the Managerial Grid Seminar May 6-11, 1979.
PLASTIC VESSEL/SPLASH INVESTIGATION
Two (2) in-plant teams conducted investigations regarding the use of plastic vessels and process hazards which could expose personnel to splash or spill hazards. Team members for each investigation are as follows:
DTH 000019299
PLASTIC VESSEL/SPLASH INVESTIGATION (Cont.)
Plastic Vessels - J. V. Uptain - Safety, F. W. Frantz - Maintenance, and V. L. Thornhill - Process Engineering.
Splash/Spill Hazards - E. L. Kieschnick - Vinyl Operations, C. R. Miller Compound Operations, J. R. McCrimon - Process Engineering, and A. H. Sather - Safety.
The reports were compiled and issued to C. L. Miller who assigned priorities for corrective action and distributed the final document to responsible personnel.
OSHA INSPECTION
On May 15, 1979, inspectors from the Occupational Safety and Health Adminis tration initiated an industrial hygiene inspection which was initially directed toward the handling of VCM. After the plant walk-around, some interest was shown with regards to lead handling in the compound area. The inspection lasted essentially seven (7) full days (May 16, 17, 22, 23, 24, 31 with half days on May 18 and 25, 1979).
The initial activity involved a detailed review of personnel monitoring records to define sampling requirements for their inspection, and a brief review of overall plant safety procedures. Samples were taken on operators from two (2) separate shifts in each of the two (2) reactor modules, one dryer operator and a maintenance mechanic. The sampling for lead was limited to an 8-hour sample on a line III compounder during a Western Electric run. In all cases, the plant parallel-sampled the OSHA samples.
Currently, the inspectors are awaiting the results of their sampling to deter mine if further sampling is required. The closing conference will be scheduled following that determination.
FACTORY MUTUAL INSPECTION
Factory Mutual Engineering conducted their semi-annual inspection on May 15, 16, 1979. The fire pumps were also tested and rated satisfactory.
OSHA COMPLIANCE
Lead - Activity in this area was limited to revising the process design for the building ventilation system baghouse air supply. The new design reflects air supply pressure requirements keyed to particulate loadings which normally would be found in that stream. Also, the forms for the finalized lead sampl ing plan have been received and the sampling procedures have been finalized.
DTH 000019300
OSHA COMPLIANCE (Cont.)
VCM - Seventy-four (74) samples were taken with six (6) indicating over exposure. The distribution of results and a brief explanation of over-
are shown below:
Range (ppm)
Number
Percent
0.0 - 0.5 0.5 - 1.0 1.0 - 5.0 5.0+
61 7 5 1
74
82.43 9.46 6.76 1.35
100.00
Six (6) personnel received exposures to VCM of 1.0 ppm or greater. Job classifications, jobs, and respirator usage were as follows: a Mechanic working in the reactor area was overexposed from an unknown source; a Mechanic changed a reactor VCM charge valve and was wearing a respirator; a Yard Operator was unloading VCM cars and wearing a respirator ; a Reactor Operator was overexposed to an unknown source; a Mechanic was unplugging a 3/4 inch VCM line which contained liquid and was wearing a respirator; and a reactor operator was involved in clearing a plugged VCM charge line and wore a respirator.
DTH 000019301
VINYL - E. L. Kieschnick
May had 31 accounting days (Y.T.D. is 151 accounting days).
Production
Month
Y.T.D.
Standard
1. Total Production, MM #'s 2. Production Rate, M #*s/C.D, 3. Charging, Rx B.A.'s/C.D. 4. Total Charges 5. Reactor Stream Factor, % 6. Drying Rates, Average #'s/Hr. 7. Dryers, Stream Factor, %
28.7 926
22.7 703
91,6 5860
94,0
123.6 819
20.7 3124
87.5 5519
88.2
The vinyl department production for the month was 28.7 MM pounds which represents a new monthly production record (old record 26.8 MM pounds in November, 1978). The 703 charges also represents a new record for 8 reactor operation. Items which contributed to the record production for the month were:
1. Utilization of dual initiators in 5425 production beginning May 4, 1979 which significantly reduced the 5425 polymerization times.
2. Continued success of the reduction in chem wash and swirl frequency in 5425 production and in elimination of swirl in 5385 production.
3. Improved reactor stream factor which was a result of:
a. Maintenance of an optimum batch size to control foaming/condenser fouling. D-400 and 742 were the only reactors which required condenser cleaning for the month.
b. Utilization of a new antifoam agent in all products beginning May 22.
Approximately 1.7 MM pounds of resin were bagged during the month, primarily to meet export orders.
Resin Quality
Resin Type
Prime Pounds
"BC" Grade
"H" Grade
% of Total Production
5305 5385 5425 5465 Sifter Overflow
2,226,413 21,959,448
4,052,375 272,505
0 45,000
0 0
( 3,000) (11,050) ( 2,250) ( 1,500) 169,090
(0.01) 0.12
(0.01) (0.01) 0.59
TOTAL
28,510,741
45,000
151,290
0.68
DTH 000019302
Quality performance for the month of May was 99.32% customer grade with 0.16% "BC" and 0.52% "H" grade. This represents the highest percent customer grade resin production since November, 1977. The variable cost variance for the vinyl department was ($340.4 M) with ($299 M) due to price and ($41.5 M) due to efficiency. The only major price variance was ($288.9 M) on VCM. The only major efficiency variance was ($59.0 M) on VCM. The raw material requirement for the month was 1.0339 pounds VCM per pound PVC versus a 1.01960 standard. General 1. A reactor opening loss test run was completed during the month. 2. A test batch of 5385 using PC-555, a liquid antioxidant replacement
for BHT, was produced with samples being forwarded to PAL for evaluation. The material will provide for easier handling and a reduction in cost.
DTH 000019303
COMPOUND - C. R. Miller
May had 31 accounting days (Y.T.D. is 151 accounting days)
Compound Production
Month
#1 s/Day
Y.T.D.
Line I, M Pounds Line III, M Pounds Total, M Pounds
1,870 60 7,686 3,092 100 14,533 4,962 160 22,219
Line I operated thirty-one days during the month at an average rate of 60 M pounds per day. Major items affecting productivity were the number of product changes (18 changes - 51 hours total) and maintenance on the blender scale system (24.3 hours).
Line III averaged 100 M pounds per day. Production included several compounds for Tenex and Western Electric including a test run on Western Electric compound 34861 gray 536. Items affecting productivity during the month were number of product changes (17 changes - 44.6 hours total) and downtime due to contaminated resin (12.9 hours). The only major mechanical downtime resulted from a motor and bracket failure on the pellet classifier (Sweco),
Quality performance on flexible compound was 2.8% of which 58% was due to mill scrap. The remaining off-grade was due to resin contamination (52 M #'s) and seal contamination (2.5 M #'s). "BC" production was 0.4% due to mis-charge. Reblending of "BC" grade compound totaled 330 M pounds.
The raw material requirement for flexible compound was 1.01789 pounds raw materials/ pound of compound versus a 1.01298 standard. (Y.T.D. is 1.01082)
The variable cost variance for compound was $7.4 M with ($23.3 M) due to price and $30.7 M due to efficiency. Variance due to product mix was $15.0 M. The only major efficiency variance for the month was $16.8 M for combined colors. The efficiency variance for the month was a result of ($20.4 M) variances due to off-grade production.
Dry Blend
Month
#1 s/Day
Y.T.D.
Total Production, M Pounds
4,153 181 19,943
Dry Blend operated twenty-three days during the month at an average rate of 181 M pounds per day. Production included 80172-B, 80273-G and 80274 dry blends, Major items affecting productivity included mechanical downtime on the, Orbitran unit (22.3 hours), product changes (13.2 hours) and quality testing (19.0 hours).
Quality performance for the month was 100% customer grade. reworked totaled 111 M pounds for May.
Off-grade dry blend
The raw material requirement for dry blend was 0,98924 pound raw materials/pound of dry blend versus a 1.00321 standard. (Y.T.D. is 0.99989)
DTH 000019304
The variable cost variance for dry blend was $12.0 M with ($2.4 M) due to price and $14.4 M due to efficiency. The efficiency variance reflects a favorable product mix of $16.7 M. The only other major efficiency variance was ($10.6 M) for combined stabilizers. There were no major price variances for the month.
Plasticizer
Month
#'s/Day
Y.T,D.
Total Production, M Pounds
1,398 74 5,497
Plasticizer operated nineteen days during the month at an average rate of 74 M pounds per day. The total monthly production of 1.49 MM pounds including VRP is a new record for the plasticizer unit on a five day operation. Production of plasticizers included DOP, 610-P and DIDP. VRP production for the month was 99 M pounds (7.1%).
The raw material requirement for plasticizer was 1.13704 pounds raw materials per pound of plasticizer versus a 1.10744 standard. (Y.T.D. is 1.12913)
The variable cost for plasticizer was ($29.6 M) with ($25.7 M) due to price and $3.9 M due to efficiency. The major price variances for the month were $22.1 M due to 2-ethyl hexanol and ($36.6 M) due to phthalic anhydride. There were no major efficiency variances for the month.
General
Total customer grade compound inventory increased from 6.5 MM pounds to 8.1 MM pounds during May.
DTH 000019305
MECHANICAL - S. J. Vincent
Vinyl - Area I
Two reactor condensers were cleaned during this month on D-400 and 742 reactors. Other work completed on D-400 included installation of equipment for reactor opening loss testing by PED and RD, Several valves were repaired on 742 reactor including the vent valve, catalyst injection valve, and the recovery valve.
A major failure of the gasket under D-300 condenser required the condenser to be lifted for replacement of the gasket. A metal filled gasket was installed since this type of gasket has had promising results on some of the other reactor condensers. The agitator drive motor also had to be replaced when it failed during the changeout of the condenser gasket. Three condenser head gaskets had to be tightened because of leakage. The failure of a fuseable plug in one of the new unit fluid couplings is being investigated. Polymer restrictions in the old module VCM charge line required several cleanings and replacement of some sections of piping. On D-600 the VCM charge valve and operator were repaired while on 743 reactor the main dump valve had to be replaced.
A new cooling water isolation valve was installed during the cleaning of the VCM charge line. A new rubber connector was installed on the new unit dump Sweco. Two new relief valves were installed on D-300 reactor condenser and on the vessel. The spare reactor gearbox was sent out to a machine shop to obtain an estimate of repair costs.
The dampers were removed from number seven dryer exhauster. The gearbox was replaced on number two Bird centrifuge. A complete PM inspection of number four dryer was completed. Some other work completed on number four included the installation of a new fuel gas regulator and the installation of a new trial level probe in the activator. A fresh air supply line was routed to the top of the two large blend tanks. The rotex sifter bottom was replaced on number six dryer. A small slurry tank transfer pump motor was repaired. Electronic DP cells were installed on several of the small blend tanks.
There were nine mechanical seals repaired on various pumps and compressors. Most of the seal failures were in the old module. Seven pumps and two compressors were overhauled and cleaned. A motor on the vacuum pump in the emission recovery system was repaired.
One of the new unit knockout drums was opened for cleaning. The relief valve was checked on one of the old unit receivers and reset. A monorail for the removal of the Corken compressors was installed at the tank farm. Some minor repairs were completed on the incinerator. Most of the equipment for the TV cameras was installed and is presently being checked.
Compound, Dry Blend, Storage Silos - Area II
A nitrogen supply header was connected to one of the compound silo vibrators for testing. The Banbury and FCM seals were replaced. An overhaul of one of the Line I dicers was completed. One of the Line III dicers was also overhauled. A new transfer line was installed to number two bagger. The storage area exhaust fans were repaired. Motors were replaced on the Line I jump conveyor and the Line III Sweco. A new scale was installed on the palletizer.
DTH 000019306
The number two Welex motor was removed and repaired. One Kason screen was replaced. Several sections of transfer line were repaired and some flexible hoses made for use. The blender relief valve discharges were routed to the sewer drains. The bearings were replaced in the north nitrogen blower. Two plasticizer reactor safety discs were replaced. The spare inert gas compressor was rebuilt. Several safety showers were relocated. The product transfer unit was given a major overhaul. The plant crane was sent out for boom repairs and has been returned to the plant. The boom on the plant truck was also repaired. Utilities and Services Five air compressor valve repairs were completed during this period. The desiccant was replaced in one of the V-10 air dryers. Number one boiler had a new front installed during the month. Improved performance has been realized with the percent excess air operating at about 3 to 4 percent. A PM and insurance inspection was also completed on this boiler. Number two boiler is presently shutdown for the same modifications. The refrigeration PM program is progressing. Several tubes in the Line III chiller had to be plugged because of internal leaks. Planning The planners work involved processing 26 invoices for payment and estimating 25 work orders. Material was purchased for 22 projects. There were 21 register tickets issued during the month. The plant shutdown list was updated several times. Miscellaneous The initial reports from MMS are being reviewed and checked.
DTH 000019307
PERSONNEL - J. L. Carter EMPLOYMENT During the month of May, there were two permanent new hires, Thomas Docherty, Chemical Engineer and John Windham, Mechanical Engineer. Plus two temporaries, Gregory Ashby, Summer Engineer and Elbert Solomon, Co-op Student. Eight casual labor employees were placed on payroll during the month. Total hours worked were 341. The bulk of these employees were utilized on the bagging and debagging operation. TO/FROM LEAVE OF ABSENCE None. TRANSFER/PROMOTION None. RETIREMENT None. TERMINATION None. DEATH/DISABILITY None.
DTH 000019308
U U l\ O W W
. ' -..V W/ V.Jl'?
Aberdeen, Mississippi
May 1979 MONTHLY PERSONNEL REPORT
alaried Employees
77*
Minority Employees #
ourly Employees otal Employees imployees (Hourly)
161 238*
Salaried Hourly Total
5** 63 68**
6.5%** 39% 28.6%**
New Employees Terminations
0 0
Hourly Min. Hired % Min. Hired
Hourly Min. Term. % Min. Term.
0 0
0 0
APARTMENTS PAR # EMPLOYEES MIN. EMP. . % MIN. NEW HIRES YTD TERM. YTD TURNOVER YTD
Warehouse
9
len. Plant 10 Maintenance 46 laboratory 22
Compound
38
'inyl
32
9 11 45 22 38 32
2
22%
0
00
00
5
45%
0
00
30
7
15%
0
00
10
3
14%
0
00
00
30
79%
0
00
00
13
41%
0
00
00
0 27% 2% 0 0 0
'lasticizer 4
4
3
75%
0
00
00
0
dumber of Applicants:
Month
22 Year to Date 27
\PPLICANT BREAKDOWN:
" Minority
10 % Minority 45%
*Female
% Female
*Include 3 temporaries, 1 summer employee and two co-op students.
**Include 2 temporaries, 1 summer employee and one co-op student.
Hires (Hourly)
Month
n
Year to Date
0
Terminations (Hourly) :
Month
0
Year to Date
4
Overall Turnover
Projected Annual Turnover
2.5%
DTH 000019309
Department Warehouse Maintenance Laboratory Compound Vinyl Plasticizer Utility Boiler House General Plant
Total
OVERTIME AND ABSENTEEISM May 1979
Straight Time Hours Worked
1569.00 6983.25 3873.75 6809.25 6467.75
765.25 663.00 1063.00 28194.25
Overtime Hours Worked Controllable Li) Non-Control lableUl
131.50
40.00
533.75
16.00
327.75
115.75
490.25
442.00
629.00
216.00
23.50
8.00
123.25
56.00
84.75
-0-
2343.75
893.75
Overtime as % of Straight Time
10.9% 7.9%
11% 15.7% 15.1%
4% 27%
7.9%
<s>
Absence Hours Lost -0128 80 568 88 -0-
8 672
Absence as a % of Straight Time
Sickness
Other
Total
Year to Date
-0- -0- -0-
.2%
100% -0- 1.8%
1.2%
100% -0- 2%
4.1%
95.5%
6.5%
5.4%
5.2%
100% -0- 1.4%
1.7%
-0- -0- -0-
.2%
-0- -0- -0-
-0-
100%
-0-
.7%
.5%
96.4%
3.6*
2.4%
2%
Note: (1) Controllable Overtime - all overtime excluding overtime due to working regular hours on a holiday and working the sixth day in operations. (2) Non-Controllable Overtime - that overtime due to working regular hours on a holiday and working regular hours on the sixth day in operations.
i DTH 000019310
PROCESS ENGINEERING - R. A. Frohreich
A. Specialty Compound Line
Crawford and Russel has completed the mechanical design for the project. Their only remaining work is to complete the mechanical catalogs. The contract for piping/structural has been awarded. The Contractor is to be on site June 19. Offsite piping will be complete the week of June 6. Electrical offsite work is presently awaiting shutdown for completion. The electrical and instrument bid package is out for bidding. Project mechanical completion is now projected for mid October.
B. Fire Water Revisions - Phase I and Phase II
Mechanical Engineering for the project is continuing. The underground piping basis of bids is expected to be received in the plant in June.
A class "A" process design for phase II will be issued in June.
C. Propane Vaporizer Replacement
The electrical contractor has begun work. Completion is scheduled for late June. Startup will commence as soon as possible after completion.
D. Plasticizer Exposure Abatement
Mechanical Engineering is complete on the project and the contract has been awarded. The filter delivery is scheduled for mid July.
E. Charge Water Heating Improvements
System installation is complete and an operating procedure has been issued. Problems with the temperature controller have delayed using the new system. The controller is being repaired.
F. Silo High Level Alarms
The prototype sensing element is in operation and is being tested. Problems with panel alarm units are being investigated.
G. Plant Dryer Debottlenecking
1. Remote Dryer Lighting
Plant mechanical engineering is proceeding on the project. All major equipment has been received. A prototype instrument system has been tested. Project completion is expected by the end of July.
2. V-10 Transfer System
Plant mechanical engineering is proceeding on the project. All major pieces of equipment have been ordered. Mechanical installation has begun. Project completion will be delayed due to a strike at the equipment manufacturer supplying the rotary air locks.
DTH 000019311
H. Silo Isolation Valves
The silo isolation valves have been received and will be installed.
J. Automatic Plasticizer Weighup System
The revised process design was issued. The panel drawings were approved for construction. Panel delivery is scheduled for the end of July.
K. Emission Recovery System
A definitive cost estimate was prepared for the modifications to the emissions recovery system to improve level control and to install an additional vacuum pump. An AFE request was submitted for the project.
L. Plant Air System
A study of the plant air system has been completed and reviewed. Process designs for three parts of the study have been issued and estimated. These designs include a new reactor area instrument air dryer, a new centrifugal air compressor for plant air and a new air header to the building ventilation baghouse. An AFE request for the instrument air dryer has been submitted. The AFE requests for the compressor and air header will be submitted in June.
M. VCM Receiver High Level Alarms
Two test sensors, a capacitance type and a sonic type, have been ordered. The capacitance probe has been received and will be installed during the first shutdown of the new unit,
N. Reactor Inert Vent Design
An AFE request for this project has been submitted.
O. QMS Addition System
A revised process design has been issued for this project. A cost estimate is being prepared.
P. New Slurry Blend Tank
A process design was issued for a new 150,000 gallon slurry blend tank for use in multigrade resin production. The CED cost estimate has been completed. Work is underway to submit an AFE request.
Q. New PVC Railcar Silo
A process design was issued for a new 200,000 lb. capacity railcar silo for use in multigrade resin production. The design has been sent to CED for cost estimation.
DTH 000019312
R. Water Treatment Revisions A process design for part one of this project has been issued and is being estimated. Part one includes installation of stormwater settling pits.
S. Capital Budget Work is proceeding on preparing the 1980 Capital Budget,
DTH 000019313
ENVIRONMENTAL HEALTH - J. R. McCrimon I. Particulates
The exhaust from one of the resin dryers was sampled for particulates. A meeting with the Mississippi Air and Water Pollution Commission was held to discuss the expansion permits. II. Water BOD and COD levels were within NPDES permit limitations in May. III. Vinyl Chloride In-plant emission testing and leak checking are continuing as specified in the Compliance Manual. Plant, R&D, and PED personnel conducted an extensive reactor opening loss test run on D-400 reactor. Results will be published in June. OSHA inspectors visited the plant and conducted a survey pertaining to the VCM and lead standards.
DTH 000019314
Flow GPM
Jan. - Ave. Max.
788 948
Feb. - Ave. Max.
Mar. - Ave. Max.
Apr. - Ave. Max.
May - Ave. Max.
756 773
669 760
743 930
730 881
June - Ave. Max.
July - Ave. Max.
Aug, - Ave. Max.
Sdpt. - Ave. Max.
. Oct. - Ave. Max.
Nov. - Ave. Max.
Dec. - Ave. Max.
TABLE I
WATER COMPLIANCE WITH
NPDES PERMIT PARAMETERS
BOD PPM LB./DY.
COD PPM LB./DY.
Sus. Solids PPM LB./DY.
Diss. 02
26 246 37 307
63 589 94 781
19 170 6.9-7.3 31 279
30 272 43 380
73 656 95 840
27 241 6,9^7.9 34 315
17 134 24 184
6 55 9 73
61 490 81 621
33 295 42 446
26 214 6,9-7,6 45 367
10 85 6.9-7.3 16 130
12 101 18 149
44 374 61 504
11 95 6.6-7.4 14 129
NPDES - Ave. Max.
-
32 387 43 520
- 1390 - 1940
- 605 - 909
6.0
Ph 7.5-8.2 7.7-8.0 7.3-7.9 7.3 7.3-7.9
6.0-8.5
DTH 000019315
ENERGY CONSERVATION - V. L. Thornhill I. Plant Operations
Total energy consumption for May was 115.2 MMM BTUs. The energy consumption per pound of product decreased from 3272 BTU/Lb, in April to 2908 BTU/Lb. in May. II. Plant Energy Conservation Program A. Steam Leaks
10 of 10 reported steam leaks were repaired during May. B, Charge Water Heating Improvements
Installation of hot water preheater was completed in May. Use of the system has been delayed due to problems with the temperature controller. The controller is being repaired. C. Boiler Burner Replacement Installation of new front on one of the 40,000 lb./hr. boilers has been completed and the unit has been started up. Initial operation of the burner shows favorable results with the boiler operating at an average of 20% excess air.
DTH 000019316
ITEM
ENERGY CONSERVATION DATA
Production, MM Lbs.
Resin Dry Blend Compound Plasticizer
TOTAL
Natural Gas
Consumption, MSCF Conversion, BTU/SCF Energy Consumption, MMM BTU
Electricity
Consumption, MM KWH Conversion, BTU/KWH Energy Consumption, MMM BTU
Propane
Consumption, M Gal. Conversion, BTU/Gal. Energy Consumption, MMM BTU
Total
Energy Consumption, MMM BTU Energy Consumption, BTU/Lb.
Boiler Operating Data
Avg. Stack Temp.
1978
1979
No. 1 No. 2 No. 3
388 409 371 421 429 464
1978 MAY
25.1 4.1 4.1 1.0
34.3
51401 1020
52.429
4.675 10000 46.750
1979 MAY
28.7 4.3 5.1 1.5
39.6
61055 1020
62.276
5.2896 10000 52.896
99.179 2892
115.172 2908
Avg. % Excess Air
1978
1979
70 54 74 100 82 120
DTH 000019317
MECHANICAL ENGINEERING - J, A. Dixon
AFE's Submitted, Approved, and Closed
The following AFE's were submitted and approved during May:
AFE No.
Title
Authorized
9569 9579 9589 9599
Misc. Projects Under $10,000 Additional Office Space Instrument Air Dryer Reactor Jacket Modifications
One additional project was submitted for AFE approval during May:
$125,000 12,500
110,000 21,000
Title
Reactor Inert Vent System
The following AFE's were closed to field charges during May:
AFE No.
Title
9048 9198
Resin Moisture Analyzers Debottlenecking - Centrifuge
Anti-Chatter Devices
Authorized $ 90,000
Authorized $ 17,000
70,000
A completion report was issued for the following AFE during May:
AFE No.
Title
Authorized
9058
Laboratory Equipment
$ 50,000
Design
Bids were requested for the following projects: Reactor Jacket Modifications, Piping - Equipment Installation Plasticizer Chemical Exposure Abatement, Piping Equipment Installation Dryer Operation Improvements, Electrical - Silo High Level Alarms, Installation of Dust Collectors - Resin Debottlenecking, the Mechanical Installation for the New Compound Line, and Electrical - Propane Vaporizer Replacement.
The contract was let for the New Compound Line Mechanical installation.
Definitive estimates were completed for the following: Waste Water Revisions Part I, Reactor Inert Vent System, Plant Air System Addition, Building Ventilation Air Compressor, and the Vinyl Area Air Dryer.
DTH 000019318
Design work is in progress on the following projects: Dryer Operation Improvements, Monorails for Blenders and Welex Equipment, Silo High Level Alarm, Resin Transfer Debottlenecking, Dryer Noise Abatement and Vinyl Area Air Dryer. Construction 1. Insulation work on the propane vaporizer project is complete. 2. The piping and electrical work for the Hot Water Charge Improvement
Project is complete. 3. The installation of the silo rescue davits is complete. 4. Installation of the number 1 and 2 Boiler Burner Replacement is complete. 5. The fabrication of the offsites piping for the new compound line is
complete. 6. A new cyclone was installed on the bagging hopper. 7. Air conditioning and electrical for the Additional Office Space is
complete.
DTH 000019319
(1) Thru April, 1979 Actual Accounting (2) Thru May, 1979
AUTH. CAPITAL NO. DESCRIPTION
9126 PVC Reactor Capacity Replacement
ABERDEEN AUT!k)Rl NATIONS REPORT
DATE
AUTH.
APPROVED AFE AMT.
(n (2)
EXPENDED COMITTCD
TO DATE TO DATE
FINAL TOTAL EST. COST COMP.
UNDER (OVER) AUTH. AMT.
EST. EST. COMP. CLOS. DATE DATE
REMARKS
7/8/76 8,577,000 8,147,787 8,194,505 8,194,505
382,495 12/78 6/79 Closed to field charges.
9276 Relief Valve Vent Containment
12/10/76
39,000
34,499
34,499
34,.499
4,501 12/78 6/79 Closed to field charges.
9286 Additional Slurry Blend Tank
12/7/76
9057 Vent Gas Incineration
4/1/77
9087 Resin Silo Aeration
5/16/77
9147 Phthalic Anhydride Exposure Reduction 6/30/77
9187 Emergency Reactor Vent Control
9/29/77
290.000 275,000 280,000
45,000 33,000
283,537 275,876 242,054
40,290 32,547
285,823 275,876 242,336
44,039 33,720
285,823 275,876 242,336
44,039 33,720
4,177 12/78 6/79 Closed to field charges. (876) 12/78 5/79 Closed to field charges.
37,664 12/78 6/79 Closed to field charges. 961 11/78 6/79 Closed to field charges.
(720) 5/79 7/79 Closed to field charges.
9197 Dryer ARea Noise Abatement
9/29/77
45,000
30,916
32,671
45,000
0 9/79 12/79 Installation proceeding.
9227 Plant Emergency Lighting System
10/10/77
65,000
50,441
63,475
65,000
0 6/79 9/79 To be closed.
9237 Heated Plastici2eT Addition System
10/11/77
37,000
7,628
8,057
37,000
0 9/79 12/79 Installation proceeding.
9247 Farrell Mixer Feeders
11/21/77
47,000
20,934
21,143
47,000
0 6/79 9/79 Mill take-off conveyors purchased.
9257 Resin Transfer Debottlenecking
11/16/77
56,000
31,879
54,111
56,000
0 9/79 12/79 Collectors to be installed.
9267 Dry Blend Production Expansion 9277 Truck Loading Safety Revisions
11/23/77 11/28/77
200,000 16,000
202,942 6,306
202,815 6,306
202,815 16,000
(2,815) 5/79 8/79 0 6/79 9/79
Closed to field charges. Installation proceeding.
9287 Plasticizer Yield Improvement Test
12/5/77
6,000
3,544
3,544
6,000
2,456 5/79 6/79 Closed to field charges.
9297
Automatic Plasticizer-Stabilizer Weighup System
12/14/77
60,000
873 43,718
60,000
0 9/79 12/79 Design in progress.
9307 Compound Project Conveying Lines
12/14/77
50,000
24,274
26,271
50,000
0 6/79 9/79 Installation proceeding.
9018 Critical Spare Equipment
1/31/78
63,000
60,855
63,502
63,502
(502) 12/78 6/79 Closed to field charges.
9028 Miscellaneous Items Under $10,000
1/31/78
50,000
42,002
49,083
49,083
917 12/78 7/79 Closed to field charges.
9038 Maintenance Equipment
2/3/78
18,000
18,213
18,213
18,213
(213) 12/78 7/79 Closed to field charges.
9048 Resin Moisture Analyzers
2/24/78
17,000
13,729
13,729
13,729
3,271 5/79 7/79 Closed to field charges.
9058 Laboratory Equipment
2/24/78
50,000
48,617
48,659
48,659
1,341 10/78 6/79 Closed to field charges.
9078 Mis. Projects Under $10,000
2/24/78
166,000
156,349 160,131
160,131
5,869 12/78 7/79 Closed to field charges.
9088 Replacement Inert Gas Generator
3/28/78
44,000
31,920
40,647
44,000
0 6/79 9/79 Installation proceeding.
9098 New Compound Line
4/17/78 2,050,000
9S7,520 1,496,233 2,083,934
(33,934) 12/79 3/80
Concrete work complete. Most tie-ins complete. Engineering 98% complete.
9108 Boiler Burner Replacement
5/12/78
170,000
1,469 166,968
170,000
0 7/79 10/79 Installation proceeding.
9138 Plant Guardhouse Improvement
8/14/78
19,000
18,540
18,S40
18,540
460 11/78 6/79 Closed to field charges.
9148
Plasticizer Chemical Exposure Abatement
8/21/78
152,000
7,399 111,874
152,000
0 7/79 10/79 Piping contract let.
9158 Fire Protection Improvements-Phase 1 9/19/78
176,000
2,494
24,097
176,000
0 9/79 12/79 Engineering in progress by CKO.
9168 Misc. Projects Under $10,000
9/21/78
59,000
43,772
52,117
52,117
6,883 12/78 7/79 Closed to field charges.
9178 Propane Vaporizer Replacement
9/21/78
175,000
99,020 128,787
175,000
0 9/79 12/79 Installation proceeding.
9188 Railcar Resin Heel Cleanup System
10/12/78
55,000
3,643
41,523
55,000
0 7/79 9/79 Fabrication of Satellite hopper in progress.
9198
Debottlenecking - Centrifuge Anti-Chatter Devices
11/7/78
70,000
65,085
65,085
65,085
4,915 5/79 6/79 Closed to field charges.
9208 Sparc Recovery Vacuum Pump 9218 Charge Water Heating Improvement
12/5/78 12/8/78
14,000 32,000
0 17,740
14,633 34,976
14,633 34,976
(633) 8/79 11/79 Vacuum pump on order. (2,976) 9/79 12/79 Installation proceeding.
9228 Dry Blend Silo Alarms 9248 Silo Isolation Valves 9258 Dryer Operation Improvements
12/13/78
25,000
12/14/78
25,000
12/14/78 315,000
3,991 0
4,037
4,287 15,589 138,795
25,000 25,000 315,000
0 8/79 12/79 Prototype installed.
0 7/79 10/79 Installation scheduled.
0 10/79 1/80 Piping and equipment contract lot.
DTH 000019320
I
AUTH. CAPITAL NO. DESCRIPTION' 9519 Critical Spare Equipment 9529 Misc. Projects Under $10,000 9539 Laboratory Equipment 9549 Safety Equipment 9559 Color Weigh Room Modifications 9569 Misc. Projects Under $10,000 9579 Additional Office Space 9589 Instrument Air Dryer 9599 Reactor Jacket Modification
EXPENSE 9238 Compound Line I Roof Collapse
(1) Thru April, 1979 Actual Accounting (2) Thru May, 1979
ABERDEEN AUTHORIZATION'S REPORT
DATE
AUTH.
APPROVED AFE AMT.
2/6/79
175,000
2/15/79
125,000
3/27/79
31,000
3/26/79
15,000
CD EXPENDED
TO DATE
(2) COMMITTED TO DATE
FINAL TOTAL ESI. COST COMP.
UNDER (OVER) AU'IU. AMT.
EST. EST. COMP. CLOS. DATE DATE
REMARKS
0 115,165
175,000
0 11/79 2/80 Purchases proceeding.
32,415
82,571
125,000
0 12/79 3/80 Forty projects approved.
0 9,648 31,000
0 10/79 1/80 Purchases proceeding.
0 3,429 15,000
0 10/79 1/80 Purchases proceeding.
4/19/79
25,000
0 0 25,000
0 10/79 1/80 Engineering in progress.
5/8/79 5/11/79
125,000 12,500
0 25,665 125,000 0 0 12,500
0 12/79 3/80 Twelve projects approved 0 8/79 11/79 Installation in progress
5/30/79
110,000
0 0 110,000
0 12/79 3/80 Quotes being obtained.
6/4/79
21,000
0 0 21,000
0 8/79 11/79 Modifications scheduled.
12/13/78
44,000
0 0 44,000
0 6/79 7/79 Insurance claim filed.
DTH 000019321
Date
5/3 5/8 5/8 5/10 5/11 5/15 5/21 5/21 5/25 5/29 5/29 5/29 5/30 5/30 5/30
LABORATORY - R. B. Martin
CUSTOMER COMPLAINTS
CUSTOMER
PRODUCT
COMPLAINT TYPE
NO. STATUS
Resin
Uniroyal
5425
Streamers
ARP-051679
Under Study
Compound
NECO
38963
Off-Color Pellets ACP-050479
Report by CRM
Anchor
15041
Metal Contamination ACP-051479
Under Study
Identification
PTLX 41829 PLCX 43193 PLCX 43191 PTLX 41660 PLCX 43233 PTLX 41645 PTLX 41821 T-2811 00641 00654 00656 00657 00662 00662 00666
WAIVERS RECEIVED
Product
Customer
Reason
5385-3 5385-3 5385-3 5385-3 5385-3 5425 5425 5425 5385 5385 5385 5385 5385 5385 5385
Simpson - OR Simpson - WA World of Plastics; LCP LCP Southwire C E Terminal Athol Eximplas Eximplas Eximplas Eximplas Eximplas Eximplas Eximplas
Particle Size Particle Size Particle Size Color Contamination Dry Time Dry Time Dry Time Particle Size Dry Time Dry Time Dry Time Particle Size Contamination Particle Size
Waived . by
GGD RDJ RDJ GGD GGD GGD RBM GGD GGD GGD GGD GGD JRW GGD RBM
QUALITY CONTROL TESTING
Resin
Regular Samples = 686
Other In-Process Samples = 3311
Bulk Shipments = 190 (Railcars = 123; Trucks = 67)
Dry Blend
Blenders Produced = 418
Blenders Tested = 274
Blenders Adjusted = 6.2%
Other In-Process Samples = 296
Bulk Shipments = 42 (Railcars = 20; Trucks = 22)
Compound
Blenders Produced = 900
Other In-Process Samples = 196
Blenders Adjusted = 1.0%
Bulk Shipments = 18 (Railcars = 11; Trucks = 7)
DTH 000019322
QUALITY CONTROL TESTING (Cont.)
Resin Heat Stability
Fifty-four (54) blends of resin were tested for oven heat stability. This included some experimental blends. All of the samples showed good heat stability.
5385 - 20 Blends 5425 - 22 Blends 5305 - 10 Blends 5465 - 2 Blends
Residual VCM - Shipments
A total of 142 samples were analyzed for RVCM which related to bulk resin shipments. The summary by product is listed below:
Product
Average ppm Number of Samples
5305
2 30
5385
0.7 82
5425
0.2 13
5465
0.2 2
Dry Blend
0.2 15
Raw Material Testing
Cyastab 523, tribasic lead sulfate stabilizer, was evaluated and approved for use in the Western Electric 34861 compound.
Ninety (90) lots of various plant raw materials were tested. There were no rejections during the month. Dow Chemical Co. has agreed that the lots of Methocel F-50 rejected in April give low values for solution viscosity and has agreed to accept return of these lots. On the other hand, Ponca City pilot plant tests have indicated that the low viscosity lots are more efficient than lots of Methocel with viscosities near the top of the spec ification range. Variations are the concern in operations.
PRODUCT DEVELOPMENT SERVICE
Date Shipped
5/8
5/8
5/15
5/16
5/21 5/23 5/29 5/29
Quantity
50# 50# 50# 50# 50# 100#
2# 2# 50# 50# 100# 50#
Product
Customer
Requested by
5385-1
Hartz Mountain Corp.
5425-1
27121 Wht. Perez 8 Jacard
28831 Blk.
26831 Blk. Perez Jacard
15041
Commercial Plastics Co.
Cl. Bl. 50
5385-1
Kohkoku
5305-1
5425-1
Geauga Plastics
26421 Nat. Tiga
5385-1
Sherwin-Williams Co.
14331
Vinyl Plastics, Inc.
Cl. Bl. 50
RNG
CLS
CLS MAS
RTM
JTW AMP MAS MAS
Shipped by
JRW
JRW
JRW HAP
HAP
JRW JRW HAP HAP
DTH 000019323
COMPOUND DEVELOPMENT AND SERVICE
Special Compound Testing
Western Electric specification tests were run on 4 lots of 34861 Gray 546 and on 3 lots of 36861 Natural.
Compound Verification Tests
Non-routine properties are being measured on seven (7) compounds in order to verify that they agree with published specification and typical values. All active compounds will be tested during the year as time permits.
SPECIAL PROJECTS Waste Treatment Test Run
A total of 55 samples of waste water were tested for COD, % solids, and Ph. This project is in support of work done by L. Evans of Ponca City on our waste water system and is a follow-up to the April test run.
Reactor Opening Test Run
During the month, a test run was held to measure reactor vapor space concen tration prior to dump and to. evaluate vapor space steam purging. A total of 52 bomb samples, 29 bag samples, 47 syringe samples, and 65 slurry samples were tested for VCM concentration during the run. Analytical Research supported the effort with people and equipment. Yield Study A total of 11 samples of #1 pond inlet water were tested for % solids in May as part of the continuing yield loss program. A new composite sampler was also checked out and is now in routine usage on our yield sampling program.
RVCM - Slurry Samples Of the 703 batches produced in May, 691 were tested for residual vinyl chloride monomer. The average RVCM for all batches tested was 182 ppm. The highest daily average was 262 ppm RVCM and the low daily average was 126 ppm.
RVCM - Dryer Samples - 5305 A total of 75 samples of 5305 from the dryers were checked. These averaged 3.7 ppm RVCM with a maximum of 28 ppm. During most of the month, 5305 truck shipments were released prior to analysis for residual VCM due to low VCM concentrations in dryer samples.
DTH 000019324
ORDER ENTRY AND TRANSPORTATION WAREHOUSE - J. C. Coffman $ J. E, Mays
Shipment by Product - M Lbs.
May Year-to-Date
Resin Plasticizer Dry Blend Compound
TOTAL
24,344 41
4,602 3,989 32,976
90,034 460
20,793 20,981 136,268
Number of Shipments by Mode
R/C 0.T, C.C. C.O.T. T0FC CPU TOTAL
Resin - Bulk
117 50 9
- Package
5
- Export - Aberdeen
1 53
176 8 4 17
54
Plasticizer - Bulk
11
Dry Blend - Bulk - Package
21 10 2
11 42 2
Compound - Bulk - Package
95
14
26 5 1 2 24 58
- Export Package
2
148 153 14
2 1 10 40 366
Number of Shipments by Month - Y.T. D.
R/C O.T. C.C. C.O.T. TOFC CPU TOTAL
January February March April May
100 166 12 101 119 10 110 145 21 117 191 11 148 153 14
7 7 56 351 0 3 36 269 2 8 49 335 1 4 42 366 1 10 40 366
Material Handling Report
M/Lbs.
T/L
Packaged Resin From Production Packaged Compound, Dry Blend From Production Transferred From Main to Prairie Transferred From Prairie to Prairie Reverse Transfer Resin to Plant Reverse Transfer Compound to Plant Shipment From Warehouses Special Packaging Transferred From Prairie to Main
1,836 2,876 1,093 1,134
364 446 5,103 2,228 1,174 16,281
46 71 27 28
9 11 126 55 29 402
DTH 000019325
Location MAIN-East
TOTAL M SO. FT.
48
ABERDEEN WAREHOUSE
CONTENTS Compounds Dry Blend Export Resin Conoco Resin
.5 .2 ___ dL
ESTIMATED MM POUNDS
OH FLOOR
OPEN TOTAL '
*
5.7 3.8 9.5
u > CO
r o PO
Prairie 12-1 12-2
* 12-3
12 Conoco
Jl i_____ _______
1.0
22 Compound
.1
resin
.1
Dry Blend
___dL * . .3
3.5
21 Comp 0.6.
Raw Materials
.2
12-4
12-5
22
21
-
Conoco Resin Conoco Resin Resin O.G. Mill Scraps Cmpd 0. G. Dry Blend 0. G. Sifter Overflow
_______dL :.3. 1.7 .......... 2-Q -1-5 LL_______ .5
:_3_
3.5 3.5
12-6
21
Resin 0. G.
-Compound Raw Materiel
1.2
.1
.9
1 .3
%
1 _ 2.5
2.2 3.5
12-7 21 12-8 21
Conoco Conoco
3 5 3.5
______
3.5
Total on Hand
10. 4 23 .6
34.0
*
Citrysler Resin
(.--1,6- )
40
P4-
*
20.9 Total Conoco
8.8 DTH 000019326
Off-Grade In Storage
Material
M/Lbs.
T/L
Sifter Overflow Resin "BC" Resin "H" Mill Scraps Compound "B" Compound "H" Dry Blend "O.G."
36 635 1,169
30 506
328 2,740
1 16 29
1 12
8 67
Chysler Storage
Balance, May Transferred during month
1,954 336
1,618
48 8
40
D. F, Operations
We met the May 9, deadline on the 2.2 MM lbs, Eximplast order. They also entered a new order for the same amount at the end of May for June 6, dead line. This order will only give us seven working days to complete and deliver to the wharf This material will have to come out of current production which has to be made.
Our total packaged inventory still remains about the same as previous month.
DTH 000019327
50 ..
45
40
35
ABERDEEN FIRST-AID CASES 12 MONTHS MOVING AVERAGE
4- --
-Freqtiency =--Totaj--Firrst--Aid (lases-X 12 4 'otalEmployees
i--r
-j------------
-4-------- (-
x
30 25
20 15
10
5
0 19. 78
~w
19. 80
DTH 000019328
20 -t--f
15
ABERDEEN OSHA RECORDABLE INJURIES 12 MONTH MOVING AVERAGE
-HI----
t--
Frequency = Total OSHARecordab Injuries X Total Employees
3
_l--,--
---- 1-
4- --
4- -
10
5
Jan. June
0 19_ 78
19. 79
19. 80
DTH
MONTHLY HOURLY TURNOVER
10 9 8 7
6 5 1
3 7
1 r
DTH 000019330
ABERDEEN PLANT PRODUCTION
350 300 250 200 150 100 50 ou 0
7. <
hd 2 Q< 60 MUl l
50 40 30 20 10 0
l a. 70 -* viIn- 60 > oz 50
40 a
30 .J az 20 u r) 10 .j 0
20 15 10 5 0
BUDGET ........................... ACTUAL _____ _________ _ dtH 000019331
KM Pounds
1979
On C year dy
DTH 000019332
% Off Grade " ........ | ..........i-----------1---------q
nKCrc*.}i1MN finIR/'iMi UrnKA/MnJnll
-- _
.0 0 0-- 00 0 0 0 0 0
c
0 o. 0
1979
. --- --
--
Standard 0.40
Standard 0.739
Standard 2.0
DTH 000019333
POUNDS OF RAW MATHRIAL/POUND OF PRODUCT
Standard 1.01960
Standard 1.01300
Standard 1.00320
Standard 1.12080
DTH 000019334
(fc . *
ENERGY USAGE
DTH 000019335