To: Distribution
InliralMs CoHMMMiicallon
From: Data:
Subject:
M. G. Schneider January 10, 1992
1991 ANNUAL VOX SURVEY
The Annual VCM Survey has been completed. This survey is used by maintenance to locate and repair the listed VCM leaks and to determine fugitive VCM emissions.
Attached is a list of the VCM leaks found in the 1991 survey. The 1991 survey located a total of 6 leaks. It was conducted during the weeks of December 16 and December 30 1991.
All the leaks have been tagged and the list of the leaks have been given to the maintenance department.
M. G. Schneider Co-op Process Engineer
cc: RWS, DCS, JDO, DAM, JBA, BLT, DFJ, JEN, TRM, KGA, DEK
A
VAB.0001115210
A
VCM Leaks 1991 Annual Survey
PPM
LOCATION
1. 90
Pressure gauge between compressors 2 and 3 on the liquid line to the sphere under compressor shed at the vinyl tankfarm.
2.
130
Pressure gauge on the discharge of
compressor 5 to the railcars under
the compressor shed at the vinyl
tankfarm.
Pressure gauge on bleeder valve on VCM transfer pump PP-219.
4. 80
0.25 inch pressure gauge of rupture disc on south fresh VCM filter pack in the old module.
5.
110
0.25 inch pressure gauge on south
end of fresh VCM filter pack.
6- 140
Cutoff Valve of highest sightglass on the south RVCM reciever.
VAB.0001115211