SUBJECT: INCIDENT REPORT - ICG APRIL VINYL CHLORIDE TANK CAR DERAILMENT
Saturday, April 12, 1991, at 18:30, the Illinois Central Railroad
train derailed at least thirteen loaded hazardous material tank
cars: five were vinyl chloride, six were hydrochloric and two were
sodium hydroxide. One sodium hydroxide leaked about fourteen
thousand gallons to the ground.
Approximately four hundred
citizens were evacuated and there were no injuries.
Initial reports from the scene said one vinyl chloride tank car had ruptured but was not on fire. Later reports said there were no leaks, no fire, and no injuries. Chemtrec notified BFGoodrich at 19:00 hours and asked for assistance. Due to my absence as the primary responder, personnel at our Cleveland, Ohio, and LaPorte, Texas, vinyl chloride monomer plants were called. About four hours later I was contacted and began preparations to depart to the scene. During the four hour period in my absence, BFGoodrich informed ICG of O. H. Materials as a response contractor for vinyl chloride.
At 03:30, April 14, I met with ICG and local agency personnel to
begin the damage survey. It was this moment we recognized that
most of the contents of one 16,000 gallon caustic soda tank car had
leaked.
Areas of spillage were marked to prevent personnel
injuries. We decided that five vinyl chloride and two caustic soda
tank cars had to be transferred.
Sunday, Hulizer Emergency Services began clearing wreckage and O. H. Materials response cleanup contractor began equipment layout to treat the spilled caustic soda and transfer vinyl chloride tank cars. Working with ICG dispatchers, we had five empty vinyl chloride and one caustic car routed to Edgewood.
Monday afternoon, equipment was in place to begin vinyl chloride
and caustic soda transfers.
Two caustic soda trucks were
dispatched to receive the heel from the damaged caustic soda tank
car. By noon Wednesday, all damaged tank cars were transferred and
damaged cars were being loaded onto flat cars. I left the scene
late Wednesday for Calvert City, Kentucky.
CMA 111632
Page 2
With the formation of the VCNET vinyl chloride response team, and using this incident as an example and case to study and develop VCNET response team needs, I made the following list for review:
A. VCNET response team member contact procedures and equipment
for 24 hour days.
1. Home base response team member pecking order list.
2. Mobile communication for each to insure 24 hour contacts.
3. Week by week team member schedules for personnel
availability.
4. Response equipment list in working condition and
immediately available for 24 hour call out.
This
includes vehicle for carriage to the scene and security
while at the scene.
B. Team member training. 1. For situation exercise to aid on-scene decisions. 2. For VC1 tank car anatomy and condition. a. Tank size: to prevent overloads, etc. b. Pre-tank car checks: on defects, tank oxygen content, heels. c. Test dates, valve types d. Hood shield, tank metal thicknesses. 3. VC1 physical characteristics: i.e., understand the Canadian TIPS booklet entirely for leak rates, cloud patterns, etc. 4. On response contractor equipment to monitor their work. 5. MSDS information interpretation for other chemicals that may be involved. 6. Tank car wall damage assessment (can tank take added pressure, can it be moved, etc).
C. VCNET membership 24 hour contact list for: 1. Borrowing tank cars. 2. Emergency response assistance requests from railroads.
D. Develop guidelines on evacuation based on degree of VC1 release. Key in OSHA exposure maximums of 5ppm over fifteen minutes and how this would affect evacuation decisions versus the immediate physical hazards of VC1.
E. Detail on-scene acceptable practices. 1. Should damaged cars be depressured, i.e., gas pumped to good cars? This takes five hours longer per car. 2. Do you evacuate during transfers? 3. Can transfer hoses be laid under line trackage? 4. Should you be spokesman to news media? (Develop standard statements similar to Chlorep/s).
CMA 111633
Page 3 5. Should you have 16 or 24 hour surveillance? This dictates the number of technician responders who should go. 6. Record or log information of on-scene activity, i.e., car numbers involved, flat car numbers matched to damaged car numbers, personnel, outages and temporary cars transferred to, seal numbers, oxygen content. Should a check sheet be developed of on-scene information?
FHS/nam docl