W. B. PAPAOEOROE - ST. LOUIS December 7, 1970
PCB ENVIRONMENTAL PROBLEM NOVEMBER STATUS REPORT
P.J.A. Marsh V. S. Clark J. R. Durland M. V. Farrar 5. V. John R. 1. Keller R. M. Kounts T. L. Gossage P. S. Park V. R. Richard J. R. Savage E. P. Wheeler
BRUSSELS TOKYO 2nd Street 2nd Street
H. S. Bergen J. Mason J. E. Sprlnggate
EXHIBIT 1
Plf. 51% I
sfujcn- |
MARKETINGt NCR appears to be making very satisfactory progress toward the replacement of Aroclor 1242 in their carbonless reproduction paper solvent. To date, Monsanto has shipped nearly 100,000 pounds of the replacement product - monoisopropyl biphenyl (MIPB) to NCR. An additional 100,000 pounds is scheduled for delivery in January followed by 500,000 pounds in February. NCR is attempting to reach complete conversion by the end of February. Through our Australian organization we have received an inquiry from the Electracity Trust of South Australia. They have recently received corres pondence from General Electric Company, U.S.A., concerning the problems with Askarel Liquid Di electric. As a result, they are requesting infor mation from Monsanto as to the arrangements in Australia for the disposing of contaminated mater ials. Ve anticipate other inquiries from other parts of the world.. Ve met with Mr. Katayama of MMK in November. Ve discussed with him the PCB plans in the U.S. and re viewed the current situation in Japan. As a result, MMK representatives will meet with Kaneka (the other' major supplier ofpolychlorinated biphenyl in Japan) to discuss future PCB plans for Japan.
COMPANY CONFIDENTIAL
TRAN 003094
HARTOLDMONOQ28142
-2-
ENOXNEERlNOt Inolncratlon - Krummrlch - CEA 2415
Plot plans and layouts have been resolved* and process design Is oomplete. Design of piping* electrical* and instrumentation are proceeding on schedule.
HCS 1016 - Krummrlch - CEA 2417
Customer trials of the pilot plant produot indicated an undesirable high level of low boilers. Xn a meeting with Research and Manufacturing it was decided to provide facilities in the project for removing a percentage of low boilers as well as the high boilers. The projeot scope and estimate are being revised* and a revised Data Transmittal is scheduled for submission in late December. Tributyl Phosphate - Queeny - CRA 2371
An early pilot plant run indicated a severe yield problem in the process. Continued studies by Res earch and Engineering have pinpointed some of the problems* and it is believed a substantial yield improvement can be made.
Pre-approval funds have been requested to proceed with definitive design.
N-C Phosphate - Queeny - CEA 2451
Pilot plant studies are currently being made on this product* and a project scope report is being developed. Solids Waste Disposal - Krummrlch - CEA 8042
Engineering* Research, Manufacturing, and Marketing have been studying disposal of polychlorinated biphenyls on solids. A test was devised with Biviro-Chem, samples of wastes have been collected, and the test is scheduled to be run December 1.
Preliminary discussions have been held with potential
equlpm.nt vehdors.
COMPANY
CONFIDENTIAL
No new action or reports on toxicity to fish/animals. Court motion on suits on ;Van oil exposure humans continuing with attendant newspaper publicity. Major executives of company which processed bran oil cannot be located. More stringent testing and licensing of equipment using PCS as heat transfer will probably occur for food processing equipment.
TRAN 003095
HARTOLDMON0028143
3NCR-Japan rejecting HB-40 because they prefer one oil for both clay and resin-type granules and Jujo Paper is definitely avritehing to resin-coat, Kureha oil refined from heavy oil cracking bottoms (mixed aromatics of complex nature) la also being tested, MMK is pushing MIPS assuming NCR-Dayton preference for MIPB. No final decision yet, HB-40 also offered by MMK but MIPB provides better balance on biphenyl/terphenyl. EUROPE! 1. Hie deolslon has been taken to oease sales to non-
controllable applications in the UK by 1 March, 1971, 2. Sales will continue for all applications in continental
Europe until the end of 1971 tout reformulated products will toe Introduced where possible. 3. We will continue to supply products containing PCB's to Qerman mines through 1971 even where reformulated products are available, until approval is gained for the reformulated products. 4. Customers will be informed before the end of November 1970 of this policy. 5. We have been assured by the other European producers that they will not knowingly supply former Monsanto customers in the UK or USA* 6. Bayer have indicated that they are in agreement with the Monsanto timing for withdrawal from noncontrollable applications. 7. Progil/Caffaro do not yet agree and wish to study the problem further. We have invited their repre sentatives to Ruabon for technical discussion. 8. The UK Board of Trade, through their Marine Safety Department, have proposed that Aroclor should be classified under Class 9. Dangerous Goods, for the purpose of oarrlage by sea. We will meet with the Board of Trade, in December to discuss this and following discussion with J. T. Oarrett will attempt to persuade the Board of Trade to alter the pro posal.
COMPANY CONFIDENTIAL
TRAN 003096
HARTOLDMONOQ28144
MEDICAL l
Arrangements were made for initiating aeute and sub acute studies at Industrial Bio-Test Laboratory for Aroclor 1221, 5432, 5442 and MC3 1016. Sub-acute studies will Include 90 day rat and 90 day dog studies and sub acute fish studies (according to protocols to be devel oped). Rat and ohicken reproduction and rabbit tera tology studies are being deferred for the time being. Rabbit teratology studies were begun with Aroolors 12142, 1254 and 1260,
PUBLIC RELATIONSt
The Anniston Star, Anniston, Ala., obtained figures from the PDA whioh showed unusually high levels of PCB in fish samples taken from Choooolocoo Creek. A Star reporter contacted the Annlsten plant for comments on the data and information about our PCB production oper ations there. Public relations prepared replies to specific questions.
*0 Plant management convinced the reporter to visit the . plant for a firsthand view of what the plant was doing to eliminate PCB escape to the environment, A factual front-page feature appeared in the Star Sunday, November 22, edition reflecting the value of cooperation with news media planning PCB stories.
Quoting both plant management and the Alabama Water Improvement Commission, the feature emphasized the PCB problem was relatively new, was being solved by Monsanto and, at this point, was no cause for public alarm.
RESEARCH I (
Biodegradation Testing - St. Louis
COMPANY CONFIDENTIAL
Statistical analysis (t-tests) of the data accumulated to date in the semi-continuous activated sludge (SCAS) testing of the PCB Aroclor products indicates that some bacterial degradation is occurring. The percent dis appearance rates, based on a feed level of 1 mg/cycle, were as followst MCS 1043--55# p 0.05};.MCS 1016-- 11# (p - 0,05); Aroclor 1242--30 (p 0.05); Aroclor 1254--0% (p - 0.05), However, the observed deccradation
. TRAN 003097
HARTOLDMON0028145
-5-
rates are still highly scattered indicating that the units have not reached a steady state yet.
Other physical souroes of data scatter are being investi
gated. The addition of stirring, modification of the
sampling method and the elimination of the LAS from
the feed all appear to be steps in the appropriated
direction, but have by no means totally eliminated the
scatter.
SCAS testing of trichlorobenzene (TCB) and Arobromochlor 1232 at the 1 mg/cyole level have been started and analysis of the first samples is In progress.
River die-away (EDA) tests have been started for Aro-
clor 1242, Aroclor 1254, MCS 1016, MCS 1043 Arobromo
chlor 1232, and TCB, Completion of the EDA tests is
scheduled for 1-13-71
-
A liquid chromatographio method for the analysis of halogenated terphenyl systems is being developed. A liquid-liquid chromatography system using Zipax Permaphaze (a new DuPont chromatography packing) as the stationary phase and water/methanol as the mobile phase appears to give sufficient separation to characterize the isomerio distribution of the materials. The system is being optimized for solvent composition and oolumn length.
Environmental Program - U.S.
Analysis of & second set of Mississippi River fish collected above and below the VCK plant has been com pleted* The levels found in fillets from these fish ranged from 0,2 ppm to as high as 8 to 9 ppm total PCB's,
All the necessary equipment for PCB's, with the except
ion of two gas meters, required to sample the Biviro-Chem
St. Charles incinerator has been assembled and laboratory
tested, The PCB bum is now scheduled for 12-1-70.
Additionally, analysis of background samples taken at
the site 10-29-70 for PCB has been completed. Low
levels of apparent PCB's were observed in all cases.
The PCB analysis of the JF5 September and October sewer
water composites has been completed. The levels found,
77 ppb and 70 ppb respectively, were higher than in
previous months,
.
'
Shrimp from Escambia Bay, fat and liver from a dead pig found near the Anniston landfill, QE plant water samples, Delav/are River phthalio acid, and a U.S. Steel plant water effluent sarnple have also been analyzed for PCB's.
COMPANY
CONFIDENTIAL
IRAN
HARTOLDMON0028146
-6-
Partlcle size analysis by microscopy was performed on a solids sample from the Anniston limestone waste pit. Correlations are being developed between partlole size of adsorbent and waste retention in the Aroolor waste treatment studies. Aroclor 1121 and 1129 distillation fractions were anal yzed by OC for isomer distribution to compile data for plant design.
Aroolor 5442
We recently reported tetraohlorodibenzofuran as a possi ble impurity in Aroclor $442. Additional work has shown that this identification is not oonolusive; tetrachloromethyl biphenyl might interfere with this determination. Methylbiphenyl has been shown to be an impurity in the Santowax R used to make Aroclor 5442. Efforts are currently underway to develop a reliable method for distinguishing between chlorinated dlbenzofuran and chlorinated methylbiphenyl.
Environmental Studies - Ruabon
Workers at the Tolworth Laboratory of the Ministry of
Agriculture, Fisheries & Food have been studying effects
of feeding Aroclor 1242 to pigeons and quail. Their
analyses have Indicated, what we have ourselves sus
pected, that the residues tend to resemble 1254/1260.
Discussion with Bailey and Bunyan from this laboratory
shows that they now believe that Aroclor 1242 may be a
major source of the environmental pollution. They have
also "discovered" that reproducing paper of the no
carbon type is a potent source of Aroclor 1242 and,
although they have not published this information yet,
they may wish to do so as an explanation of the presence
of PCB in cardboard. Feeding trials using single Isomers
are also planned by the Tolworth group, who are hoping
to establish met&bolio routes for the degradation of
PCB's in animal organs. A visit was made to the Monks
Wood Experimental Station of the Mature Conservancy,
but little new information emerged from the dlsoueslon.
.
.................. ,, .
Biodegradation - Burton
COMPANY CONFIDENTIAL
It has been confirmed that 2,3,2', 3', 4', 5-hexachlorobiphenyl is degraded by C2 when mixed with lower chlorine Isomers. This has been achieved under less vigorous conditions of flask shaking than previously, which suggests that the addition of the lower chlorine Isomers has Increased the solubility of the material.
We are currently studying a pentachloro-biphenyl. which should degrade, and the 4,4'-dichloroblphenyl, which should be resistant, using a similar technique to im-
TRAN 003099
HARTOLDMON0028147
-7
prove solubility. The analytical results are awaited on these tests.
The results of degrading a series of PCB products with Cg until no further change with time can be observed are now available. Subject to limitations imposed by the difficulties of interpretation of the <3LC chromato grams it appears that the order of degradability, or the inverse order of apparent residues, is as followst
NCS 1016, MCS JIT, MCS 762, Pyralene 1500, Aroolor 1242
Satisfactory progress in the identification of isomers corresponding to the peaks obtained using high select ivity PLOT oolumns is reported, but development work is still needed on OLS - Mass before this can be util ized.
The most recent results on attempts to degrade HB-40 by Co have shown that at low concentrations (5 ppm) con siderable degradation has ocourred. The main problem in this investigation has been that of sensitivity in the analysis, but this problem now seems to be overoome.
Pydraul Reformulation
Faotory Mutual Visit
A representative of PM visited the fire test facility November 4 and 5. Tentative PM approval was obtained for Pydraul 625-A, F-9A, MCS 1063 (Turblnol 153A), MCS 1066 (312A), MCS 030T, 050T, 065T, 0115E, Santosafe W/0 15, 20 and 30. All fluids submitted were approved.
Pydraul 312A
A V105C pump test on MCS 1066 indicated excellent lubri city. A tentative prooess will be Issued shortly.
Pydraul 540B
The terphenyl version is tentatively defined. The 7R is equivalent to old 540. Approximately 3 of a poly glycol VI improver will be Incorporated to meet old 540 viscosity speos.
Pydraul 230A
*
A terphenyl blend has been developed which looks good on the FM spray test. It will contain 2 of a poly glycol VI improver to meet 230 visoosity 6pee8Qjyjp^|\]Y
CONFIDENTIAL
TRAM 003100
HARTOLDMON0028148
-8-
Py.draulJ35A
A blend of TCB, 5^32, oil and Santioiser Til has been developed which leoks excellent on the m spray test.
Turblnol 153A
MCS IO63 demonstrated good lubricity in a V105C pump test. The moderate wear noted was attributed to high TAN Krummrich CDP. This fluid also exhibited low deposits in the Aloor Deposition test.
Pydraul A-200B
.
A lower viscosity F-9A type blend was blended, tested
and a tentative process Issued to fill an order from
Chevy Messena. They refused to purchase any more fluid
containing PCB's.
A VI05C pump test was terminated at 225 hours due to mechanical failure of the pump. A lebe cracked off of the roter. This is oensldered to be a meohanioal failure and not fluid related. The test will be repeated Just to make certain, though. The wear observed up to 225 hours was very low (11.8 mg total) and no problems are expeoted.
Carbon Adsorption Study
The pilot unit (series of four five-inch diameter columns), that was put on stream 10/2, continues to operate with minimum difficulties. The initial flow of 2 gpm/ft2 was lnoroased to -4 gpm/ft* on 10/28. Effluent quality, at the present flow, is <10 ppb Aroelor for influent con centrations in the range 100-2,000 ppb. The present plan is to increase the flow to 6 gpm/ft2 by II/25.
MANUFACTURINGI
W. 0. Krummrich Plant
PCB Levels In Sewer
A. Aroolor losses from the Aroolor Department averaged about 1.0 lbs/day and ranged from about 0.4 to 2.5
lbs/day.
Losses from the Sauget Village treatment plant for the perled 10/l6 - ll/lo averaged 72 lbs/day (495 ppb). Range fer 9 samples was 32 to 115 lbs/day (220-79$ ppb).
COMPANY CONFIDENTIAL
TRAN 003101
HARTOLDMON0028149
-9-
Projects To Reduce Sewered PCB*s Prom Aroclor Department
A. Blow tank demister project was successfully demonstrated* About 100 lbs/day of mist Aroclor is being collected. Sev/er loss has been reduced from about 20 lbs/day to about 0.5 lb/day.
B. Project to provide paving, curbs, trenches, and catch basins in the tank car and truck loading areas has been approved as part of the Aroclor Incinerator project. The design package Is about 75# complete.
Program To Eliminate Sewered PCS* b prom Using Departments
A. A second meeting with Don Roush Is scheduled for 12/7/70. Don will discuss with plant production and engineering personnel design considerations for changing Therminol units to non-Aroclor Iherminols,
B. Status of work on Therminol units is as followsi
Dept. 255
Switched from PR-2 to Therminol 66 on 11/16/70.
e out these systems to Therminol 66 . EDO for all units Is 3/1/71.
Removal of Soluble PCB*8 Prom Sewer Stream
A test Is planned for the week of 12/7/70 to determine effect on Aroclor losses In the treatment plant effluent by neutralizing the sewer flow to the treatment plant. Lime will be added at Dept. 265 for about 3 days to hold the pH above 7.0 at the treatment plant. The re sulting floe Is expected to Improve PCB removal based on Anniston work.
PCB Levels In The Atmosphere
Sampling program has been completed. Only significant
area of loss Is at the mix tanks due primarily to the
nitrogen purge. Loss Is In the range of 4 to 5 lbs/day.
Plans are to replace the nitrogen purge with a nitrogen
blanket.
*
PCB Rework Project
Project approved as part of the Aroclor Incinerator project. Construction schedule will be determined in December*
COMPANY CONFIDENTIAL
TRAN
003102
HARTOLDMON0028150
-10-
Anniston Plant
PCB Levels In Sewer
Aroclor losses during November averaged 25#/day (4620 ppb). One high value accounted for l8#/dav, neglecting this the * November average would be 7#/day (1410 ppb). Based on knowledge of plant operations and performance of abatement devloea in November, much of the high level data is due to sample contamination.
Spills
Minor leaks were contained by use of sand and disposal in drums. No spills ooourred.
Projects and Evaluations
1, Laboratory work to date indicates the presence of minimal
amounts of PCB in the residue from Solid Aroclor distil- \
lation (Montar 5)* This eliminates lOH pounds per year \
or solid wastes from our PCB disposal plan.
.
\
2, Design work to collect spent carbon from HC1 oarbon
'
towers has been deferred to early 1971 to accomplish
the No, 1 HC1 Limestone Pit rebuild.
3, Solids removal from plant effluent (part of program to
reduce PCB in plant effluent to 10 ppb) is moving
forward with preliminary screening tests at Denver Equip
ment Company and Betz Laboratories indicating good to
moderate success with flocculation and settling. Fur
ther laboratory testing is scheduled for early December.
A project has been written, design is underway and equip*
ment modifications under study working with Monsanto
\
Blodlze to set up one of their larifiers at Anniston
for pilot soale testing of the apparent best techniques
..
reoommended by Denver and/or Betz,
4, A successful teBt was made of removal of limestone Inerts
from the #2 HC1 neutralization pit while in operation.
A total weight of 127,000 lbs was removed of which
3by weight was solids. Lab analysis of the' total
. material revealed more than 100,000 ppb Aroolor or 12
to 15 lbs of Aroclor. Present indications are that this
method of removal of solids while the pit is in operation
will Increase the efficient life of the pit by 25J.
;
5. A project for repair of the No. 1 KOI neutralization pit was written and approved. This project will be coordinated with the Niran pit project to apply an
. asphalt lining at the same time, to save money on mater ials.
COMPANY CONFIDENTS
TRAN 003103
HARTOLDMONOQ28151
11
Newport Plante She Ooteober Newport Report has not been received.
W. fi. PAPAaBDRQS
*%
sis
(-
COMPANY CONFIDENTIAL
TRAN 003104
HARTOLDMON0028152