Document MMBadG7rq1qzYovjb8ZYD0O8j
AGRICULTURAL PRODUCTS COMPANY, INC.
PO BOX 2831, CHARLESTON. WEST VIRGINIA 25330
INSTITUTE PLANT
lo (Name) Mr. G. F. Hurley Division Building 701/334 l ocation Technical Center
Floor Number
Date January 5, 1981 Originating Dent Industrial Hygiene
Floor Number
Copy to
Mr. A. S. Howard Mr. L. R. Noble Mr. H. L. Robinson Dr. R. J. Sexton Mr. E. C. Shipley Mr. F. Williams
Answering fetter dote
Subject Asbestos Exposure Monitoring
Monitoring for personal exposure to asbestos at the No. 1 Steam Plant on December 12, 1980, showed a maximum airborne level of 4.1 fibers per cc of air.
Twelve 511 Construction insulators and laborers were measured for 15 minute sample periods over a time period of 150 minutes. Two results (see attached data sheet) were at or above the present OSHA standard of 2.0 fibers per cc of workplace air.
This monitoring occasion was scheduled during peak activity of demolition of asbestos material from No. 6 boiler at operating floor level. A minimum number of Plant 512 employees were in the area at the time work was in progress. The area was properly barricaded, signs in place and Construction employees involved in the demolition process wore MSA Dust Foe 77 or 3M Model 8710 dust masks. Material being demolished was generally wet down but some dust was generated from the interior surfaces. Laborers bagged the material for disposal as the proiect progressed.
This demolition of asbestos material was carried out according to acceptable guidelines and airborne material was maintained generally at permissible levels. Future jobs of similar nature need to be performed in a like manner and continued use of respiratory protection be required.
Please inform the above participating employees of their individual monitoring results.
HHF:rac Attachment
/7 /J I
-
H. H. Frazier
UdlWICJIL CmEI?
/- 7- 7 /
INDUSTRIAL HT&fWt SZFL
UCC 024512
INDUSTRIAL HYGIENE SAMPLING
WORKPLACE LOCATION: No. 1 Steam Plant
CONTAMINANT:
Asbestos
DATE: 12/29/80
NAME: J. L. Miller
BUILDING: 5 OS HA TI.V 2 r/cc
Record - Sample
Number
Date
Sample Type/Name
Sample Time Mi.n.
Results
Air Cone
:ppci f / cn
TWAg*
W-2306- 12/12/80 G. W. Bradley, Jr. 15 0.4 7
Comments Location/Job i 5.SK.
Cleaning up asbestos insulation and loading it into plastic bags from the operating level floor.
W-23068
W-23069
D. W. Price M. E. Drake
15 0.1 15 0.6
H
W-2306-
W-230611
W-2306" 12
S. L. Barnette G. D. White
T. H. Hinzman, Sr
15 0.9 15 1.5
15 <0.1
11
W-2303-1 12/12/80 G. H. Landers
W-2305-2 W-2305-3 W-2305-4 W-2305-5 U-2305-6
M. L. Finney G. F. Sowards M. L. Wallace C. C. Bragg R. M. Dunlap
15 4.1
15 0.1 15 0.8 15 2.0 15 <0.1 15 0.3
insulator, vetting down and removing insulation from No. 6 i boiler at the operating level.
11
11
II
11
11
*TWAg applicable to personal samples only.
UCC 024513