Document MM6Dj69mDMG69xyMLOm1RnMzM

LIMIT SWITCH REPLACEMENT - PHASE III Aberdeen Chemical Plant November 25, 1987 WORK BY: Frank G. Jeanson PROCESS ENGINEER p REVIEWED AND APPROVED BY Veldon E. Messick CHIEF PROCESS ENGINEER VAB.0001098831 LIMIT SWITCH REPLACEMENT PHASE III Aberdeen Chemical Plant TABLE OF CONTENTS I. PURPOSE AND PROCESS DESCRIPTION II. VALVE LOCATION III. INSTRUMENT SPECIFICATIONS IV. DRAWINGS A VAB.0001098832 t LIMIT SWITCH REPLACEMENT PHASE III Aberdeen Chemical Plant Purpose and Process Description Lack of positive valve position indication in the control room has the potential to cause safety, operational and environ mental problems. The existing limit switches indicate actuator position and not the actual valve stem position. If the coupling fails or is spread, the valve could be open or partially open and still give a closed signal. This design will provide each of the designated valves in section A of the following table with a new limit switch that indicates valve stem position. These new limit switches will provide accurate indication of valve position to the control room or the Modicon. The limit switches will be mounted on two separate brackets between the valve and the actuator. A typical drawing of a standard valve with the new limit switch is attached. Limit switches will be replaced on 80 valves. VAB.0001098833 II, Valve Location A. Valves that would cause quality, safety or environmental problems without proper indication. General Location Valve # Reactors 741, 742 1-6 743, 744, 745 & 700 Valve Description Rinse Supply Reason *2-valve leak, VCM enter rinse. Rinse supply valve leak, water dilute chem wash. 7-12 Chem Wash (CW) Supply 2-valve leak, VCM enter chem wash, Chem wash supply valve leak, CW in rinse. 13-18 Clean Reactor 2-valve leak, VCM enter rinse or CW, 2-valve leak, rinse or CW in reactor. 19-24 Clean Condenser 2-valve leak, VCM enter rinse or CW 2-valve leak, rinse or CW In reactor 25-30 Steam stripping 1-valve leak, steam in reactor or VCM in steam. 31-36 Emergency AMS Injection 1-valve leak, AMS in reactor * Two valves would have to leak in order for this to happen valve failure would cause VCM to enter rinse water. Such as rinse supply and reactor cleaning 2 Reactors 300, 400 500 and 600 37-40 Chem wash to Reactor 2-valve leak, VCM in chem was or chem wash in reactor 41-44 Chem wash to Condenser 2-valve leak, VCM In chem wash or chem wash in reactor 45-48 Rinse to Reactor 2-valve leak, VCM in rinse or rinse in reactor * 49-52 Rinse to Condenser 2-valve leak, VCM in rinse or rinse in reactor 53-56 57-60 Steam Stripping Emergency AMS Injection 1-valve leak, steam in reactor or VCM in steam 1-valve leak, AMS in reactor VAB.0001098834 General Location Valve No 3. Batch Hater Strip 61-64 pers (North & South) 65-66 67-68 69-70 71-74 75 4. Chem Hash Tank 5. Blowdown Tank 76-77 78 79 80 Valve Description To Sewer, To Centrate Fill Line VCM Bleed Recovery To ERS VCM Double Block and Bleed venting to BHS*s. Steam Pressurization To Reactors (New Module) To Reactor (Old Module) To Batch Water Strippers Reason 1- valve leak, VCM contaminated water to sewer* 2- valve leak, contaminate vessel in stripping mode 2-valve leak, contaminate vessel in stripping mode. 2-valve leak, contaminate vessel in stripping mode. 2-valve leak, contaminate vessel in stripping mode. Three way valve-if not in correct posi tion, contaminate vessel in stripping mode. 1-valve leak, contaminate vessel in stripping mode. 1-valve leak, safety hazzard when a reactor is blanked out. 1-valve leak, safety hazzard when a reactor is blanked out. 1-valve failure, lead to tank overpressuring and discharging to sewer. i 1 Remaining valves that are indicated on the panel or that are tied into the Hodicon that will not have limit switches replaced. General Location 1. New Module Valve No. Valve Description a. Chem Wash Tank 1 2 3 4 Tank Outlet Tank Bypass Tank Inlet Recirculation b. Blowdown Tank 5 Recirculation 6 To Emission Recovery System 7 To Recovery System 8 To Recovery System c. Reactors 741-745 9-13 14-18 Inert Vent Steam to Jacket d. Recovery System* 19 20 21 22 23 24 25 26 27 28 Compressor suction manifold Compressor suction manifold Suction north compressor Suction middle compressor Suction south compressor Pressure equalization valve Suction north vacuum pump Suction south vacuum pump Discharge north vacuum pump Discharge south vacuum pump * These valves have indication for the open position only. . e. Evacuation 29 EE-200 first stage steam 30 Evacuation valve to EE-200 General Location f. Colloid charge g. Hot water charge h* Rinse water 1. RVCM charge Old Module a. Chem Wash b. Batch water strippers c. Reactors d* Recovery system Valve No 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1 2 3 4 7-11 12-16 7 8 19 20 PVA pump discharge PVA makeup tank outlet PVA charge tank inlet Methocel pump discharge Methocel makeup tank outlet Methocel charge tank Inlet Pump suction Primary pump discharge Secondary pump discharge Hot water tank make-up Rinse water supply Rinse pump bypass To top of reactors Cold water swirl Pump discharge Tank outlet Tank inlet Tank bypass Chem wash from EA-357 to FA-776 Steam stripping Inert vent Steam to jacket Suction east compressor Suction west compressor To ERS From batch water strippers General Location e. Emission Recovery System f. Evacuation 8* Colloid Charge h. Hot water charge 1. Rinse water j. RVCM charge Valve No 21 22 23 24 25 26 27 28 29 30 31 32 33 VCM Tank farm recovery Batch water stripper recovery EE-100 first stage steam Evacuation valve to EE-100 Pump discharge Primary pump discharge Secondary pump discharge Pump suction Hot water tank make-up Hot water rinse Rinse supply Rinse pump bypass Pump discharge VAB.0001098838 Limit Switch Replacement - Phase III Aberdeen Chemical Plant hi. Instrument Specification Item PLS-101 through 180 Description Proximity Limit Switches A VAB.0001098839 4 j PLANT VJS1A VISTA CMMICAl COMPANY sptancxno* data she*t PROJECT NO. A.F.E NO. P.O. NO A UocjajWcjNrv ; i SPEC NOAEV. .0001098840 T '' I ('TAP mt VAB.0001098841 l { TAP ' <7 i* Plpn o' / S y+r u....................... r'4 Q- ^ & i l t .... 1 L i----------- T------- ^ J i \ iA/ } /, 9 if" t.o. r , && z LyftT/CW -Hi 'i PTA!L !TM (S) J l 1 mi 71 D StftO O rtfs 9/iUD 0# MtftftfTl Y \ AM /TfrtS /a/o/catsd. DATE Oti/4/MSU DESCRIPTION P/rP CKD APD VISIA Vista Polymers Abrdn,Mississippi <C r/o/v <.? fa ', pia/vt NW STYlf > /SO * n/PL /Aff Pi Pi? VAl i/P 'in -///- Ot, 7 w*mmmiurnn'm\n jbiih n i iwmi>#^n^i^npm HP-1 I* t'rr/s * 72$ Act- scale: appd: date: GPP039-/7 7 t VAB.0001098842