STANDARD OIL COMPANY OF TEXAS ENGINEERING DEPARTMENT - EL PASO, TEXAS ADDENDUM NO. 2 TO SPECIFICATION NO. EP-246-M CONSTRUCTION OF THE EAST AND SOUTH OFF-PLOT PIPEWAY STRUCTURES January 22, 1971 Page 1 of 2.
Specification No. EP-246-M has bersturevised as follows: SECTION 1 - GENERAL REQUIREMENTS
1.1 SCOPE OF WORK 1.11 CONTRACTOR'S Scope of Work Items Nos. 7 and 8 have been revised to read as follows: IF a) This work includes-hut is not limited to: 7. Constructing and; completing the pipeway stanchions in the following ajjger: E-l, E-2, E-3, E-4, E-5, S-l, S-2, S-3, S-4 aid S-5. This sequence of completion is necessary in order to permit the initiation of process pipe installation at the earliest possible date. 8. Excavating the-entire length of the dirt bank under the South Pipeway gilt so that the toe of the 1.5 to 1.0 slope is at E2177'-6" instead of E2168'-6", and the west edge of thn^berm is at E2191'-0" instead of E2186'-0". Reconstruct the berm at the top of the slope in accordance with Section B of drawing PD-27220. Grading at the^Control House Area" level is limited to leveling and grading the area between E2168'-6" and E21771-6".
Chevron BB
015147
STANDARD OIL COMPANY OF TEXAS ENGINEERING DEPARTMENT - EL PASO, TEXAS
ADDENDUM NO. 2 TO SPECIFICATION NO. EP-246-M CONSTRUCTION OF THE EAST AND SOUTH OFF-PLOT. PIPEWAY STRUCTURES January 22, 1971 Page 2 of 2
APPENDIX A.2 CONSTRUCTION DRAWINGS .jj.
The following construction drawingsyiiave been revised to the revisions listed
below:
_T
DRAWING NUMBER
PA-13-28117-3 PA-13-28119-2 PD-13-28120-2 PA-13-28121-2 PD-13-28122-2
PA-13-28123-2
PD-13-28124-2
PA-13-28125-2 PD-13-28126-2 PA-13-28127-2
TITLE
Plan of Overhead Stanchions: "C", East & South Pipeways Foundation Layout & Details: East & South Pipeways Foundation R.eTWYorcing Schedule: East & South Pipeways Elevations & DgEails: East Pipeway Stanchions E-l thru E-5 Stanchion Reihjorcing Schedule: East Pipeway Stanchions E-l thru E-5 . z3: Elevations &7Datails: South Pipeway Stanchions S-2 thru S-5
Stanchion Reinforcing Schedule: South Pipeway Stanchions S-2 thru S-5.735: Elevations & Ditails: South Pipeway Stanchion S-l Stanchion Reinforcing Schedule: South Pipeway Stanchion S-l Steel Layout &~Details: East & South Pipeway
The following drawing is a new construction drawing:
DRAWING NUMBER
TITLE__________ _________________________________________________ _
PA-13-28168-0
Elevations & Details of Diagonal Bracing: East & South Pipeway Stanchions.
THIS PAGE ENDS1ADDENDUM NO. 2