Document MJL8REmB3VqDoyKERYMoKVBKL
VINYL H PLANT CONSOLIDATED AUDIT PROGRAM
I. OPENING (TUESDAY, SEPTEMBER 10,1991 - 7:30 AM TO 10:30 AM) DOW CONFERENCE CENTER
ATTENDANCE:
Page 1
j. w J
Howard Wilkinson of the Audit Group began the opening session by expressing gratitude to the Vinyl II plant personnel for the time and effort put into completing all the pre-work involved in preparing for the consolidated audit The three day audit agenda was also reviewed and everyone introduced themselves.
n. VINYL II PLANT OVERVIEW PRESENTATIONS
ORGANIZATION & PLOT PLAN
PROCESS & UNIT OPERATIONS (Process Description, Flow Sheets, Chemistry Ir :iuding Side Reactions, Instrumentation and Critical Instruments)
*FURNACE AREA DISTILLATION *OXY ECOLOGY
REVIEW OF PLANT/DEPARTMENT POLICIES/PROCEDURES AND COMMUNICATIONS REVIEW OF TRAINING AND RETRAINING PROGRAMS
a>
n P3 o
n O g M 3
r>
1/6/94 INDICATES PRIORITY ITEM
rp*+f'
P3o3
CO
OC4O*i.
CD CO
Page 2
REVIEW OF SIGNIFICANT INCIDENTS/
MAJOR CONCERNS
losses
REACTIVE CHEMICALS
SAFETY
MEDICAL
Plant Superintendent of Vinyl II reviewed the plant organization/structure and some of the process control. Almost 30% of the plant process is controlled by Mod-5. Hie plant . operates with 6-operators per shift, 3-SOS's and 3-OS's.
t reviewed the process and unit operations which included Process Description, Flowsheets, Chemistry-Side Reactions, Instrumentation and Critical Instruments. Presentations included some Start-up and Shut-down procedures/checklists.
reviewed the plant Policies, Procedures, and Communications. Safety responsibility is
clearly defined in the Vinyl II Plant Safety Policy (Each employee is responsible for his/hefSafety
and that of co-workers).
t also reviewed the Vinyl n Safe Job Procedure Manual, Personal
Protective Equipment Policy, Industrial Hygiene Policy, and Training Policy. Procedures are
assigned to each shift to be up-dated. This is done by a Procedure Audit/Development Status- * _
Checksheet Different methods of communicating are used at Vinyl n (Control Room Operations
Logbook, Operations Instruction Logbook, Communications Manual, Daily Shift Tailgate
Meetings, Safety Meetings, Bulletin Boards and Letters). Weekly Maintenance and Project
Reviews are also held.
The Vinyl II Plant Safety, Project Review, and Key Parameter Programs looks to be extremely effective and driven by tine employees. Daily Production and Tailgate meetings are held. A plant representative attends the plant Contractor safety meetings. Goal Setting for all employees is on going and we support this effort. We also support your efforts to standardized your Red Tag System which is already in progress.
REDACTED
C O N F ID E N T IA L
1/6/94 * INDICATES PRIORITY ITEM
3D 4tCDD^
CO
Page 3
RECOMMENDATIONS: The following recommendations are based on the Vinyl II Plant defined opportunities for improvement. Other opportunities will be addressed during the audit sessions.
1. Consider centralizing all plant operating procedures to one location. During the pre-audit inspections, procedures were found to be in several places. Although in different books the operations procedures, red tag procedures, policies, etc. are in the control room and in the SafetyITraining Coordinator's office. Lab and loading procedures are in the lab and loading office respectively with copies in the Safety Coordinator's office.
2. We support your plans to up-date your Operations Manuals. Consider developing a timetable for this project and submit it with your action plans.
. This is answered in detail later. Basically, resources and overtime limit the ability to make much progress on this until Mod5 conversion is complete. The ModS conversion will update much ofthis, and it wasfelt that redundancy should be minimized.
TRAINING AND RETRAINING PROGRAMS: SUMMARY:
The Vinyl II Plant plans are to convert all training efforts to the the IPT (In-Plant-Training) concept. The Loading Area and Gold Hat Safety Training are now using the "IPT" concept All other employee (exempt and non-exempt) training is completed via checklist A new technical employee training checklist was recently developed. About 5% of the IPT modules are complete and an IPT Flowsheet has been developed. Some opportunities for improvement were identified in this area that will be addressed during the audit sessions.
1/6/94 INDICATES PRIORITY ITEM
CO NFIDENTIAL
R&S 149585
Page 4
SIGNIFICANT INCIDENTS/MAJOR CONCERNS: SUMMARY:
reviewed the current plant Statistics, Significant Incidents from 1990 - 1991, Repetitive Incident Causes, and Areas of Concern. Quality Performance Improvement Index data is generated to track the plant performance in several areas. Significant Incidents are broken down into key areas to help identify problem areas. Some opportunities for improvement were identified in this area that will be addressed during the audit sessions.
III. VINYL H PLANT TOUR (10:30 a.m. to 11:30 a.m.)
Before leaving for the plant tour the Vinyl 13 plant indoctrination video was reviewed by the audit teams. Excellent job on your overview presentations.
Thanks, LAD Consolidated Auditors
1/6/94 INDICATES PRIORITY ITEM
oo 'a:
si O S3 2 3
>
BU33>
cOP.
aO>J
REACTIVE CHEMICALS AUDIT (TUESDAY, SEPTEMBER 10, 1991 -- 12:00 PM - 4:00 PM) AUDIT TEAM:
PRESENTER: ATTENDANCE:
Page 5
REDACTED
WRITER:
*
The Reactive Chemicals Committee is very appreciative of the effort Vinyl II personnel put into this reactive chemicals review. Obviously there was a tremendous amount of work which went into the preparation. The presentation was . very well organized.
The Reactive Chemicals Committee agrees with all the opportunities for improvements listed in the packet The following are opportunities which were emphasized during the review.
ACCOMPLISHMENTS SINCE LAST 2 YEAR REVIEW
There was lots of improvements since the last 2 yr review such as increasing coke recycle length by reduction in carbon tet, more MOD V control, better furnace temperature/cracking control, improved catalyst change over to Kynar packing in C-211,02 analyzer on C270, new THROX scrubber train, bleed-valves to identify leaking PSV's
RECOMMENDATIONS:
* 1.
Consider developing a cross compatibility chart for all process chemicals in use at Vinyl II.
Texas Division has excellent compatibility charts based on the CHEMPAT computer
program that perhaps could be modified for your purposes. A contact which was
mentioned that may be of some assistance is
__ in Texas Reactive Chemicals
Lab. This chart could also be used in your reactive chemicals training program.
This chan will be developed by IQ 92. Responsibility: COMPLETED AS STATED, JANUARY 1992
2. It was mentioned that chlorine addition to C-255 is based on analytical results from grab sampling. It was also mentioned that rate changes make it difficult to exactly adjust the chlorine flow. Consideration should be given to implementing more reliable flow control.
The improvedflow control scheme is planned with implementation by IQ92. Responsibility: COMPLETED AND IN SERVICE AS STATED, JANUARY 1992
1/6/94 - INDICATES PRIORITY ITEM
C O N F ID E N T IA L
R&S149587
Page 6
* 3. * 4. * 5.
6.
Oxygen Service: Review P&ID's to make sure that spec breaks are located properly. Determine and indicate areas where oxygen can backflow and create a reactive chemicals hazard. This effort should also be extended to chlorine service.
Such a review will be conducted to identify potential hazards by 1Q92. Responsibility:
COMPLETED AS STATED, MARCH 1992
Chlorine service: Develop procedures for performing maintenance on chlorine lines.
Chlorine equipment maintenance procedures will be developed by 12131/91.
Responsibility:
CHANGE TO 1/93
COMPLETED, JULY 1992,
Chlorine service: A pipe spec for chlorine service does not currently exist at Vinyl n. Obtain a copy of the pipe spec which is used at CA 2 & 02 and implement at Vinyl II.
A chlorine service pipe spec will be obtained and implemented at Vinyl II. Responsibility: 12/31191.
COMPLETED, JULY 1992,
.. -J
Okygen reactivity: Implementation of dual flow meter on all feeds to OXY-EDC should be considered.
This project was delayed due to Mods delay. Anticipate 1993 or later approval. REVIEWED AGAIN AFTER LATEST RUPTURE DISC INCIDENT (10/93). STILL NO FINANCIAL SUPPORT FIRMED UP. CLOSE OUT THIS ITEM
REDACTED
C O N F ID E N T IA L
1/6/94 * INDICATES PRIORITY ITEM
3 pU) 4^
CO
CO CO
Page 7
* 7.
Consider obtaining documentation on the worse case credible scenarios which were used for sizing the reliefs on the Oxy-EDC reactor. This information should reside in the Vinyl II reactive chemicals file and could be used in your reactive chemicals training program.
Oxy-EDC reactor PSV sizing information will be obtained and included with reactive
chemicals data by 12131191. Responsibility:
THE OXY EDC DISC SIZING WAS OBTAINED;
FEBRUARY, 1992.
WORST-CASE SCENARIOS WERE EVALUATED IN 10/93 WITH CORRECTIVE
ACTIONS IDENTIFIED.
* 8.
Procedures should be developed which specify the time frame for changing out rupture
disks at Vinyl n. Also, ruptures disks should be an integral part of the pressure vessel
program.
Rupture discs will be included in the PSV program and changed at a minimum ofevery 2 years. Registration to be completed by 12131191. Responsibility:
COMLETE,
. MARCH 1992' .
* 9.
Consider developing procedures that address the adding of waste materials to T-410.- These procedures should address reactivity and flammability concerns. Written procedures should be established for minimizing the risk of inadvertently mixing together incompatible waste.
Waste storage guidelines and equipment labelingfor T410 will be developed by 12131191.
Responsibility: Jacques Bordelon. CHANGE TO
CHANGE TO 4! 93.
COMPLETE 4/93 BY
10. Consider performing positive identification tests on the Betz chemicals and also on sodium thiosulfate. Certificate of analysis is provided by the vendor but this is not considered fool proof.
Positive identification procedures will be implemented by 12131191. Responsibility:
A block policy will be written to address identification of vendor supplied process materials
by 11/1/91. Responsibility:
SODIUM THIOSULFATE PROCEDURES ARE IN PLACE. BETZ PROCEDURES
ARE NOT.
MARCH 1992
,/
O
CO NFIDENTIAL
R&S149589
1/6/94 INDICATES PRIORITY ITEM
Page 8
.11 The Reactive chemicals Reactive chemicals binder should be updated with more current reactive chemicals tests data.
Pertinent reactive chemical data will be reviewed and!or updated and included in the plant
binder by 2Q92. Responsibility:
THE BINDER WAS UPDATED,
JANUARY, 1992
.12 It was mentioned that Henry Hopper has a flow diagram for determining if an instrument
should be considered critical. Obtain this flow chart and discuss with
Review
the plant instrument list and determine the criticality of instruments in areas where key
reactive chemicals concerns exist.
Shortage ofI & E labor caused the list to be reduced in the past. Mod V will address critical instruments using redundancy. Completion depends onfundingfor Mod5. Area personnel have reviewed current list. Vinyl II does not agree with the critical instrumentflowsheet that requires triple instrumentation. CRITICAL INSTRUMENT LIST WAS REVIEWED MARCH 1992 BY
< *4*
ANOTHER UPDATE/REVIEW IS SCHEDULED FOR 1Q94 COMPLETION
* 13.
Due to the problems of stress crack corrosion the piping specs for Vinyl II should be reviewed to assure that stainless steel bolts are not being used in areas where this could be a problem.
Vinyl II piping specs will be reviewed and revised as necessary by 1Q92. This will include development ofprocedures to confirm spec compliance when materials arrive on site. Responsibility: Buddy Thompson and CH Maintenance Group. COMPLETE; MARCH 1992
14. Determine if the type of insulation used in the Dowtherm area is appropriate with respect to avoiding spontaneous ignition hazards.
Insulation type will be identified by 11/30/91. Responsibility: COMPLETE, 11/91
* 15.
In order to minimize the potential for acetylene/chlorine explosion problems in Vinyl n scrubber review operation of the Miracle column with respect to the possibility of chlorine being sent to Vinyl II. If this potential exists safeguards should be installed to avoid the hazard.
Miracle column specs will be reviewed with Solvents/EDCI to identify possible hazards by 2Q92. Responsibility: COMPLETE JANUARY 1992
REDACTED
CO NFIDENTIAL
R&S149590
1/6/94 INDICATES PRIORITY ITEM
16. Adsorbents used for spill clean-up at Vinyl II should be tested in the reactive chemicals lab to assure compatibility with plant chemicals.
Pads are used along with clay pellets and occasionally saw dust. No problems have been
experienced. No testing is planned at this time.
COMPLETE
JANUARY 1992
17. The Reactive Chemicals Committee agrees with the need for evaluating and documenting worse case scenarios for each area of the process.
Worse case scenarios will be evaluated and included in the reactive chemicals training
program by 2Q92. Responsibility:
4TH Q TRAINING PLAN 1193
COMPLETE OCTOBER, 1992
18. The Committee also agrees with the need to continue to develop, document and implement corrective action plans to address all relief system deficiencies.
This is ongoing and will take severalyears to complete. _
has completed
evaluation of the 10 worst with corrective actions to be implemented during the 1992 plant
shutdown. Fourteen more are now being evaluated.
PSV SYSTEMS NEEDING CORRECTION HAVE BEEN PRIORITIZED AND ------ -
SEVERAL HAVE BEEN COMPLETED. THE PLANT WILL PROCEED ON A
PRIORITY BASIS AS FUNDING ALLOWS. THIS IS A CONTINUING ITEM. FOR
PURPOSES OF THIS REVIEW, THIS ITEM SHOULD BE CLOSED OUT DECEMBER
1993 BY
19. Another area that is in need of improvement is training. The suggestion to consolidate pertinent reactive chemicals information into a dedicated training program is excellent and right on target. This could be included on C-9 checklist for documentation and follow-up. 4TH Q TRAINING PLAN 1/93
A reactive chemical training program will be developed and implemented by Responsibility: COMPLETE AS STATED
2Q92.
1/6/94 - INDICATES PRIORITY ITEM
ELECTRICAL RELIABILITY AUDIT:
(Tuesday, September 10, 1991-12:00 p.m. to 12:30 p.m.)
Audit Team:
Presenter:
Attendance:
Page 10
REDA CTED
Writer: ELECTRICAL RELIABILITY AUDIT SUMMARY:
ACCOMPLISHMENTS/IMPROVEMENTS SINCE LAST AUDIT (1989):
1. Excess equipment has been removed/relocated; the floor sections of computer room and.
building 6601 have been replaced; wiring is more orderly and the room is in good
condition.
--_
2. The 15 kv feeders have been replaced with new feeders.
3. The control room is clean, neat and except for the mezzanine deck, the random storage of miscellaneous items is more or less negligible. Panels and cabinetry are in an improved condition and wiring is more orderly.
4. For the most part, motor enclosures, conduits and auxiliary devices have been painted and the equipment is in good condition.
5. Marked improvement is visually apparent in all major categories except transformers, which remains the same.
GENERAL COMMENTS:
1. For the most part, cabling and cable tray installations throughout the plant are in good condition; however, some installations, such as those located at the subsfations and-at some of the transition points, are in need of attention. At these locations, cable trays tend to be overfilled and overloaded, Re.-NEC 318; cabling has not been installed in a neat and workmanlike manner, Re.-NEC 110-12, and in cable tray runs, other than horizontal, cables are not tied to transverse members of the cable trays, Re.-NEC 318-8(b). For additional details, see field wiring, item 1, this audit.
2. The Safety Electrical One Line Diagram (SEOLD), drawing no. B07-001-V51-001, is not in compliance with Dow's Safety and Loss Prevention Standard S-316-3.E. The drawing depicts transformer TR-1C and it's associated circuity; however, the transformer nomenclature has not been included; the most recent revision date on the drawing is August, 1990.
3. 1/6/94
Either the grounding conductors are hidden from view or seven of a total nine plant power transformer cases are not grounded. Motors are grounded; however, at least 80 percent are not grounded in accordance with Dow's preferred method for motor grounding.
* INDICATES PRIORITY ITEM
C O N F ID E N T IA L
p a s i 49592
Page 11
Re.-DES 7C-0101 (L) 5.4.2. Other audited electrical equipment (components and devices) appear to be adequately grounded and in compliance with established codes and standards.
4. Equipment labeling has either faded, fallen away, is incomplete or it has never been installed on numerous pieces/components of electrical equipment such as transformers, motors, local control stations, control panel and junction box enclosures, and the like. Proper equipment identification labeling is a mandatory requirement of the Louisiana Division, Safety and Loss Prevention Standard, S-316.
5. Both battery rooms/installations are in need of maintenance attention. In the old battery room - corrosion is present on the cell interconnecting bus linkages, the battery support racks, the exhaust fan, conduits and associated hardware!; the ceiling is in poor condition; one of two lighting fixtures is out and housekeeping can be improved. In the Mod5 Battery Room - Some of the cells have low electrolyte levels. Cold air is being drawn into the room from the adjoining switchgear room and condensation and/or high humidity is present
6. Vinyl n. Block 66, grounding wells were visually audited to determine the condition of
access and availability of each individual well. Results are identical to the results of the electrical audit performed in July, 1990 with one exception; two additional wells, not depicted on the reference drawing, dwg. no. B7-012-V51-001, Rev.P, are included as part of this audit.
7. Plant electrical equipment has been in service for some time and excluding overfilled and overloaded cable trays at transition points and at the substations, a corrosive effect in the furnace and cooling tower areas and a deteriorated condition with respect to the battery installations, plant electrical equipment appears to be in good condition and well maintained.
1/6/94 * INDICATES PRIORITY ITEM
n o
z wi 1
R&S149593
Page 12
RECOMMENDATIONS:
1. Investigate and determine reason for temperature differentials between radiator tubes/sections on transformers TR-1B and TR-3B. Corrective action requirements to be in accordance with investigation results.
The reasonfor the temperature differentials will be investigated by 11/15/91 and corrective actions identified as required. Responsibilitv: COMPLETE, 4/92.
2. Inspect integrity of transformer grounding. Transformers shall be grounded in accordance with Dow's engineering specification (D.E.S.) 7C-0101 (L) 5.6.
A transformer grounding inspection will be made by 1Q92. Responsibility:
CMPLETE 4/92
3. Rehabilitate the old battery room in building 6601, the batteries and all associated equipment/hardware. Rehabilitation should include sealing all conduits and wall openings between the batteries and adjacent rooms.
Wall openings and conduit will be sealed by 12/15/91. Additional rehabilitation will be evaluated and implemented in 1Q92. Responsibility: COMPLETE 1/92
4. Provide some form of follow-up/supervision to insure all batteries are properly maintained, Re. Safety and Loss Prevention (S&LP) references E-2 and C-9.
There are currently 3 battery bank maintenance requirements on the plant C-9 checklist. These checks will be performed in the future by the Division battery bank maintenance group with reporting to block I/E supervision. This will be implemented in 4Q91. Responsibility: COMPLETE 1/92
5. Seal cable tray and conduit entrances into electrical rooms, analyzer and instrument houses.
Cable tray and conduit entrances will be sealed by the end of 1Q92. Responsibility:
COMPLETE 3/92.
*. -/
RED ACTED
CO NFIDENTIAL
R&S149594
1/6/94 * INDICATES PRIORITY ITEM
Page 13
6. Update the Safety Electrical One Line diagram (SEOLD), dwg. No. B07-001-V51-001 and properly post in an appropriate accessible location in all electrical rooms, Re.-S&LP S-316-3.E.
The SEOLD will be updated by 12115/91 by COMPLETE 12/91
7. Label all-buildings, electrical equipment and devices in accordance with S&LP S-316-3.
This labeling will be done by the end of3Q92. Responsibility: CHANGE TO 6/93
COMPUTE 4/93
NOTE: The following general recommendations require long-term continuous attention and action but will result in a much improved electrical installation enhancing the overall electrical reliability of the plant.
8. When equipment is being removed from service or relocated, physically remove fiefti wiring and conduit that has been identified "for demolition". Also, refrain from futher overfilling and overloading of existing cable trays and conduits.
The plant will evaluate the needforfield demolition on ajob byjob basis andperform the
demolition in accordance with established priorities and availablefunds. New instrument
cable being run in new Mod5 cable tray. Responsibility:
NO FURTHER ACTION PLANNED-CLOSE OUT
12/93
9. All new motor installations and motor change outs/replacements should be grounded in accordance with Dow's preferred method for motor grounding, Re.-D.E.S. 7C-0101 (L) 5.4.,i.e., the grounding conductor should be connected directly to the motor frame. Field corrections should be made when feasible.
The plant will comply with D.E.S. 7C-0101 (L) 5.4 for new installations. Responsibility:
NO FURTHER ACTION PLANNED-CLOSE OUT
12/93
10. Discontinue the usage of beam type conduit clamps (koms) and the usage of unistrut and unistrut straps in weather exposed and corrosive atmospheres. Angle/channel iron and ubolts are recommended.
This recommendation will be reviewed with block IIE personnel by 10/31/91 and use of these items will be minimized where possible. Responsibility:
COMPLETE BUDDY THOMPSON 12/91
11. Continue existing PM program for motor starters, transformers, circuit breakers, etc. and in addition, attention should be directed towards formalizing an effective predictive and preventative maintenance (P/PM) program.
P/PM program emphasis should increase withformation of the Chlorinated
Hydrocarbons maintenance group.
COMPLETE 1/92
REDACTED
CONFIDENTIAL
R&s149595
1/6/94 INDICATES PRIORITY ITEM
LABORATORY AUDIT: (Wednesday, September 11,1991--7:30 a.m. to 8:00 a.m.)
Audit Team:
Presenter:
Attendance: -
Page 14
Writer:
The Vinyl II Plant Lab manual looks to be in very good condition. All lab procedures were reviewed and revised in January, 1991. Appropriate warning signs are posted throughout the lab. A lab instruction log was developed in March, 1991 and is being utilized.
RECOMMENDATIONS:
* 1.
Audit/Review the use of all hazardous chemical storage cabinets in the Vinyl II Plant with all employees at Vinyl H (Instrument and Shop employees should be included in such training).
Guidelines to be written and distributed to the plant, IIE, and Shop by 1/92. Responsibility:
COMPLETE 1/92
2. Consider replacing all rusted 55 gallon chemical drums stored outside the lab. Some drum labels were not in place also.
Label good drums and dispose of the balance by 1/92. Responsibility:
COMPLETE 1/92
J,,,/
REDACTED
c o n f id e n t ia l
1/6/94 * INDICATES PRIORITY ITEM
CpXOo CAO oC0O*7
Page 15
* 3. * 4.
5. * 6.
7.
Consider incorporating Dow's labeling system for lab chemicals.
To coordinate with vendors by 1/92. Alsofollowfor Dow containers. Responsibility:
COMPLETE 1/92
Consider installing a high temperature alarm on the lab refrigerator.
Will install high temperature alarm on the refrigerator by 2Q92. Responsibility: COMPLETE 3/92,
Consider storing hazardous chemicals below eye level.
Will move existing chemicals below eye level or have written exception report by 1/92. Responsibility: COMPLETE 3/92
Remove all excess flammables from the lab and store in outside solvents cabinet. KSmove
excess hazardous chemicals such as nitric acid, nitromethane, nitnoethane, vinylidene -
chloride, epoxy butene, etc. These chemicals should be removed from the Vinyl n Plant.
Contact R&D or Environmental Services for assistance.
--_
Will remove excessflammables to outside storage and dispose ofchemicals listed above and any others not required on afrequent basis by 11/1/91. Responsibility: COMPLETE 1/92.
New employees receive mostly hands on training and is reviewed by the lab specialist and supervision. Very little to no documentation of such training was found. Consider developing an IPT module for this training. Documentation should be kept in one location.
Will develop IPT'sfor lab training by 3Q92. Responsibility: COMPLETED & BEING REVIEWED 1/93
j
REDACTED
CO NFIDENTIAL
R&S149597
1/6/94 INDICATES PRIORITY ITEM
LOSS PREVENTION/FIRE/BURNER MANAGEMENT AUDIT (Wednesday, September 11,1991--8:00 a.m. to 11:30 a.m.)
Audit Team:
Presenter:
Attendance: -
Page 16
Writer:
The plant appears to be in good condition with no serious loss prevention concerns. The plant staff was very helpful in compiling the necessary pre-audit information and in evaluating the results to determine areas that need further attention.
There are some excellent programs in place in the plant to assure that process changes and "" modifications receive the necessary attention before implementation. Recent capital project activity that I have been involved with has been well organized and planned. The implementation of burner management programs has progressed very well within the framework of available capital. -- .
*
This list of recommendations will contain some but probably not all of the items that were identified as "Opportunities For Improvement" by the Vinyl II Plant. They should be added to the overall list of action items.
ELECTRICAL:
RECOMMENDATIONS:
The Electrical Emphasis group should be considered as supported by the Loss Prevention group. Refer to Electrical Reliability Audit Recommendations.
FIRE PROTECTION:
RECOMMENDATIONS:
1. Schedule Maintenance and Loss Prevention to review the condition of the plant fireproofing
and areas of protection.
-
An audit will be scheduled by 11115/91. Responsibility: COMPLETE 4/92
w, /
, REDACTED
C O N F ID E N T IA L i
1/6/94 INDICATES PRIORITY ITEM
Page 17
2. Initiate a program of annual inspection.
This will be included on the 1992 C-9 checklist. Responsibility: COMPLETE 1/92
* 3.
Sprinkler protection needs to be added to D-109. Contact Engineering and Loss Prevention to design coverage and arrange the installation.
Design ofthis additional coverage will be initiated by 12/31!91. Responsibility: DESIGN COMPLETE- ON HOLD FOR $.
ON HOLD-NO FURTHER ACTION PLANNED AT THIS TIME-,
12/93
* 4.
Review the existing Fire Protection drawing and update the coverage areas to include the new sprinkler systems that have been added. Set up a CHAMPS request to have Engineering update the Fire Protection drawings. This is an area where the insurance carrier has requested current information.
A CHAMPS request to engineering to update this drawing will be initiated by 101ST/91.
Responsibility:
COMPLETE
, 11/91
* 5.
Schedule a meeting with the Fire Protection Department and Loss Prevention to identify the 2-3 most likely fire situations to expect in Vinyl II and outline a plan of action for the different areas.
This meeting will be scheduled by 1092. Responsibility:
COMP 1/92
FIRED EQUIPMENT:
We have reviewed and support the list of items that were identified by the plant staff in the area of fired equipment.
RECOMMENDATIONS:
1. Consider compiling the individual documentation files, including calculations, for each furnace system.
Documentation package will be assembled by 1Q92. Responsibility:
COMPLETE 3/92 ,
^ _ ,/
REDACTED
CONFIDENTIAL
r&s 149599
1/6/94 INDICATES PRIORITY ITEM
Page 18
* 2. Schedule all Vinyl II Plant Employees for fire extinguisher training.
All Vinyl II Plant Employees will be scheduled in 1992. Responsibility: COMPLETE 9/91
3.Consider adding a fire wall between MOD V battery chargers.
To be completed by 2Q92 by
FURTHER INVESTIGATION'REVEALED NO WALL NEEDED.
COMPLETE
6/92
CRITICAL INSTRUMENTS:
reco:
ATIONSi
* 1.
The instrumentation testing procedures should be reviewed to be sure your specific intentions are being implemented. Many of the procedures are simple functions tests and do not appear to check a range of operation that may be needed in some cases. These should be reported back to a responsible plant or technical supervisor.
These have been reviewed and HE to expandprocedures by 2Q92. Responsibility: -- STILL WORKING- CHANGE TO 2Q/93 CHANGE TO
COMPLETE 6/93
* 2, Develop a plant policy for bypassing trips, shutdowns, alarms, etc.
Completed on September 12,1991 by
DRAINAGE:
RECOMMENDATIONS:
* 1.
Observe sprinkler operation to determine if this causes flooding conditions. Is it a problem that needs further correction? Would it create a further problem in the event of a fire in the area?
Sprinkler operation has been observed and some flooding is evident. However, the plant does not plan any additional actions regarding this minorflooding problem. COMPLETE 3/92
2.Continue to evaluate sealing/testing of dike walls.
The plant has a program to seal walls but no testing has been done. Testing will be evaluated by 2Q92. ResDonsibility: COMPLETE JUNE 92.
PRESSURE VESSELS/PSV's:
RECOMMENDATIONS:
* 1.
Develop a definite schedule to get unregistered vessels on the pressure vessel inspection program.
REDACTED
C O N F ID E N T IA L
R&S149600
1/6/94 - INDICATES PRIORITY HEM
Page 19
Unregistered vessels have been identified and the completion ofdata sheets is
in
progress with completion by 1111191. Resoonsibility:
Area Engineers.
COMPLETE 6/92
* 2.
Continue with the PSV review program to update calculations and documentation. What is the level of activity that is currently planned?
One engineer is assigned to this activity. Ten of the PSV's with the worst potential have
been evaluated and corrective measures identified. Corrective
actions on 20-30 PSV'sare
expected to be implemented during the 1992 shutdown. Responsibility:
COMPLETE 10/92
3. Add the steam boilers to the pressure vessel program as a way to prompt the annual required State Fire Marshall inspections by the insurance company.
The boilers will be added to the PVprogram by 12/31/91. Responsibility:
COMPLETE 12/91 .
_
""
CRITICAL EQUIPMENT:
RECOMMENDATIONS:
* 1.
Review Loss Prevention Principle 6.2.3B regarding protection for air cooled fan exchangers. Contact Maintenance Tech to see if there is reliable equipment available to comply with this recommendation.
IPP 623B will be reviewed and maintenance tech contacted by 1Q92. Purchase and installation ofsuch equipment will be subject to overall plantpriorty and availability of funds. Responsibility: COMPLETE 4/92
/
n
H
R&S149601
1/6/94 * INDICATES PRIORITY ITEM
Page 20
MAINTENANCE:
RECOMMENDATIONS:
1. An area of future anticipated interest is detailed inspection and testing of certain pipeline systems. What pipelines would you identify (in block and out of block) as candidates for more detailed routine inspections?
Plantpipeline inspection programs will be reviewed and modified ifappropriate by 2Q92. Responsibility: COMPLETE 4/92
INSURANCE PACKAGE:
RECOMMENDATIONS:
* 1.
Schedule a follow up meeting with me to compile a good original copy of the insurance
package to send to Midland.
-*
This meeting will be scheduled by 10/31191. Responsibility: COMPLETED 11/91,
------
REDACTED
CO NFIDENTIAL
R&SM9602
1/6/94 INDICATES PRIORITY ITEM
Page 21
OCCUPATIONAL HEALTH AUDIT
(Wednesday, September 11, 1991 12:00 - 4:00 p.m.)
Audit Team:
Presenter: Attendance:
Writer: EDUCATION AND TRAINING:
Employees receive Hazard Communication training in annual plant training review meetings. The
written Hazard Communication manual and MSDS's are current The plant orientation film is an
excellent example of addressing health and physical chemical hazards.
---
RECOMMENDATIONS:
* 1.
Documentation of Safety Meetings (include monthly, tailgate and pre-job) could be improved by providing a more detailed agenda describing the items covered, and name of presenter, along with your sign-up sheet.
A newform will be utilized starting 1 HI191. Responsibility: COMPLETED 12191,
* 2;
We support your plans to have a duplicate HAZCOM/MSDS Manual located in the control room to ensure that it is readily available to all employees. The MSDS section should be expanded to include maintenance and janitorial items.
We v til put a copy of this manual in the Control Room by 11130/91'. We will include the MSDSfor maintenance and janitorial items by 1Q92. Responsibility: COMPLETED 11/91,
3.Efforts to make the CPAI as complete and representative as possible for the job assignments will result in a helpful resource for indoctrination and annual training and for documentation purposes.
The CPAI will be updated 1092. ResDonsibility: COMPLETED 9192,
^
: REDACTED
C O N F ID E N T IA L
1/6/94 INDICATES PRIORITY ITEM
j0
tfi
A g
Page 22
4. The orientation film is very well done, but when it is updated it should include Asbestos and address the mouthbit respirator usage.
To be updated by 4Q92. Responsibility:
BY 1/93.
5. There arc various HAZCOM training aids and Industrial Hygiene is available to help assist you with items for better presentations.
Will use. *Responsibility: COMPLETED 12192,
* 6.
We noted several small brown bottles in the lab without labels. Also, several 55 gallon storage drums had weathered labels or no labels at all. Some of the drums were in poor condition.
We will identify and dispose ofproperly by 1130/92. Responsibility:
COMPLETED 1/92, _
~~
RESPIRATOR PROTECTION PROGRAM:
There is a written respiratory protection program which addresses the elements of S&LP Standard S-206. Personnel receive annual training and SCBA users must demonstrate proficiency. There is a designated cleaning station.
RECOMMENDATIONS:
* 1.
The written respirator program is in need of updating and should include name of reviewer, date, reference to OSHA 29CFR 1910.134 and 1910.1017 and LAD S&LP S-206, medical approval, frequency of fit testing, frequency of cartridge change, the policy that breathing air is used only with potential exposures to vinyl chloride, and add the Scott-O-Ramic. With completeness of this wntten program it should be referenced as pan of training documentation.
Respirator program will be updated by 1Q92. Responsibility: COMPLETED 3/92,
2. Respirator fit testing needs to be completed in 1991.
To be completed by the end of the year. Responsibility: COMPLETED 12191,
REDACTED
CONFIDENTIAL
R&S149604
1/6/94 * INDICATES PRIORITY ITEM
Page 23
* 3.
The SCBA units stored in the control room area need to be cleaned and placed in plastic bags. Masks need to be supported and not stored hanging by straps.
Complete, 12/91,
4. Scott-O-Vista respirators stored in personal lockers need to be stored in tight closing plastic bags, name of individual on facepiece and date cartridges were installed and stored so as not to distort-mask.
Update and communicate respirator storage policy. Audit of lockersfor compliance by 12131191. Responsibility: COMPLETED 1/92,.
5. When Vallen does annual inspection/service, include all of the community air line respirator regulators in this program. One of the egress air cylinders (in control room) is due for the 5 year inspection.
We will add community respirators to Vallen's inspection and have Vallen compleiecylinder inspection by 12/31/91. Responsibility: COMPLETED 12/92,
6. We support your continued efforts to engineer out potential exposures to EDC with vent recovery on pumps and closed loop sampling.
EDC TLVproject to be completed by 4Q92. Responsibility: COMPLETED 12/92,
7. To ensure that the proper respirator cleaning procedure is followed, it would be helpful to post the procedure on the cabinet above sink at the designated cleaning station. Consult manufacture's guidelines and recent division guidelines communicated through the Safety/l.H. network.
We will post the respirator cleaning procedure at the cleaning stations by 11/30/91. Responsibility: COMPLETED 11/91,
VENTILATION PROGRAM:
Special lab operations, such as woridng with vinyl chloride are done in a hood. The hood is equipped with a flow sensing device which alarms in the control room if air flow is lost. Ventilation fans have been installed in several of the analyzer houses.
./
>
n
a
o
o
z
25
t=i z H r
1/6/94 * INDICATES PRIORITY ITEM
Jff3o
CD
LCOOO>Oh)-
Page 24
RECOMMENDATIONS:
* 1.
Only one of the four lab hoods is equipped with a functioning flow indicators and all hoods need them. This needs to be completed ASAP so that hood surveys can be performed by I.H. and proper operation conditions obtained. It has been over a year since the last surveys.
Permanentflow indicators will be installed on the lab hood by 1Q92. Responsibility:
COMPLETED 3192,
2. We agree with your plans to implement weekly sensing device inspections and annual maintenance on your hoods (per the checklist).
After devices are installed, these will be added to the weekly checklist. Responsibility: COMPLETED 3192,
Maintenance andfume hood audit will be conducted annually. Responsibility: COMPLETED 12/91,
3. Housekeeping of the lab hoods need to be stressed. Shelves are being used to keep items up allowing air flow to the bottom baffel which is very good.
Weekly housekeeping audits will be conducted starting immediately. Responsibility: COMPLETED 12191,.
4. Several wall mounted fans and floor fans provide ventilation in the shop during welding. Floor fans disperse fumes rather than capture them and monitoring should be conducted to evaluate if current ventilation is good enough. Local ventilation at the source of the fume is the best engineering control.
Shop ventilation will be evaluated by personnel monitoring by 2092. Responsibility: COMPLETED 4192,
HEARING CONSERVATION:
Due to the number of areas with noise >90 dB(A), hearing protection is required in most areas
outside the control room (signs posted on door). The plant layout has been designed to strategically reduce noise levels. Personnel are included in hearing conservation program involving training and annual audiograms. Hearing protection signs are posted throughout the shop areas requiring hearing protection when using shop tools.
'
S hoJ ft o
C O N F ID E N T IA L
{
R&S 14960f
1/6/94 * INDICATES PRIORITY ITEM
Page 25
RECOMMENDATIONS:
* 1.
It has been several years since employees were evaluated for noise exposures using personal audio dosimeters and it is recommended that these profiles be re-established for each job assignment Histograms from the Quest M-27 will be helpful in pinpointing potential noise exposures. The written Hearing Conservation program should be updated using the new Division format.
Noise exposure profiles will be completed and hearing program updated by 3Q92.
Responsibility:
COMPLETED PROFILES- TO BE
REVIEWED WITH IH CHANGE TO.
COMPLETED 8192,
*2. 3. 4. 5. 6.
If noise exposures exceed 50% of the allowable daily dose (based on OSHA PEL 90 dB(A) as a 8-Hr. TWA), the OSHA Nose Standard 29CFR 1910.95 must be posted. It would be a good idea to post this standard at least until personal audio dosimeter data can re-confirm your earlier data.
Standard will be posted by 11130191. Responsibility: 11/91,
COMPLETED _
Since recreational noise also can contribute to hearing loss, it would be beneficial to include
off-the-job noise exposure information in the hearing conservation training program. A
program on off-the-job noise exposure is available through
. in the
Medical Department
Off-the-job noise exposure will be included in the updated hearing program by 3Q92.
Responsibility:
COMPLETED 12192,
We support your suggestion to have the Division Noise expert perform octave band analysis and make recommendations for engineering controls.
Based on area noise evaluations engineering controls will be evaluated by 3Q92.
Responsibility:
BY 1193. COMPLETED 1/93,
You may want to consider purchasing a noise dosimeter such as the Quest M-27 with data logger capability.
Will evaluate the purchase of this equipment by 12/31/91. Responsibility: COMPLETED 12/91,
When new equipment is purchased, emphasis should be made to ensure that the Division Engineering Spec of 85 dB(A) is adhered to.
Adherence to this spec is nowfollowed. COMPLETED 12/91,
s
PS o
>
o H
-ra
O 2 *3 O M 25 Hi--i
>r
1/6/94 * INDICATES PRIORITY ITEM
DO
cn
m-rk
<tO-*o7J)
Page 26
PERSONAL PROTECTIVE EQUIPMENT:
Personal protective equipment is required by job procedures and by safe work multi-permit.
RECOMMENDATIONS:
1. All of the different types of PPE used for various job tasks should be listed and then reviewed-with Industrial Hygiene to ensure the proper selection was made for the task and that back-up test performance data is available where applicable.
The types ofPPE will be listed and reviewed with Industrial Hygiene by IQ92.
Responsibility:
COMPLETED 3192,
2. A topic for a safety meeting might be on how to properly wear, care for and limitations of PPE. The training video "We've got you Covered" available from I.H. may be an appropriate resource.
If tape is available, will be reviewed in Safety Meeting by 12131191. Responsibility^ COMPLETED 12/91,
DATA GENERATION AND MONITORING:
-----
The I.H. contact performs exposure monitoring for the block. An early warning device system for VCM and EDC using a sequential area air monitors is used to alert personnel if a leak should occur.
RECOMMENDATIONS:
* 1.
An annual Industrial Hygiene report is currently being written for activities conducted in 1989 and 1990. This needs to be completed ASAP.
This report will be completed by 12131191. Responsibility: COMPLETED 12191,
2. As part of the planning process we agree with your plans to develop a current set of written process description, simplified flow sheets, floor layout and job descriptions with notations of potential sources of exposure.
A written plan will be developed which will identify potential sources of exposure by 1Q92.
Responsibility:
COMPLETED 3/92,
REDACTED
C O N F ID E N T IA L
R&suaeoe
1/6/94 INDICATES PRIORITY ITEM
Page 27
3. On-going monitoring activities should be identified (using CPAI) and annually structured to include such examples as VCM, EDC, alpha-tri, beta-tri, noise, welding fume and solvent cleaning operation.
An annual monitoring program will be developed and implemented by 1Q92.
Responsibility: _
COMPLETED 3192,
4. We suggest you consider using Environmental Services Lab 3502E to analyze your I.H. samples. A lot of time is required for you to comply with Good Laboratory Practices that
could be used on other I.H. related programs.
We will use the Environmental Services Labfor our IH. samples starting in 1Q92. COMPLETED 3192,
5. A helpful tool may be to develop a plant "I.H. - 9" (similar to the C-9) checklist to organize and keep track of I.H. activities.
These items have been included on the environmental checklist (E-9). COMPLETSb 1/92,
6. You should consider replacing some of the personnel sampling equipment as some ptifnps are fourteen years old and many have been repaired several times.
Monitoring equipment is being evaluated and will be replaced as necessary by 1Q92.
Responsibility:
COMPLETED 3/92,
ASBESTOS:
The plant asbestos management survey was updated in preparation for this audit. Transite siding, gaskets, oven insulation and floor tile glue are the known asbestos-containing materials in the plant and there is an active program to replace the gaskets with non-asbestos gaskets. We were impressed with the "purple"-cabinet of removal supplies and disposal container.
RECOMMENDATIONS:
* 1.
We suggest you move the personnel footlockers and tailgate activities from the proximity of the asbestos gaskets area. A more protective location is needed to prevent the escape of any friable fibers. Is it practical to consolidate all asbestos gaskets to one location? (We found some garlock gasket stored on a shelf in the material controllers area). Petrin can provide a service to vacuum the area on a regular basis.
Relocating tool boxes awayfrom asbestos gasket storage area and use of Petrin to vacuum
area will be evaluated by 12/31/91. Responsibility:
COMPLETED
12/91,
* 2. Asbestos warning signs should be posted in the asbestos gasket storage area.
Warning signs will be posted in the asbestos gasket storage area by 11/30/91.
Responsibility:
COMPLETED 11/91,
* 3.
Asbestos-containing materials (transite) should be labeled or asbestos signs posted at block entrances.
1/6/94 * INDICATES PRIORITY ITEM
Oo
Z
o zHI--4 >r
tSIoDo
A
COCCOTO)
Signs will be posted in appropriate areas by 12/31/91. Responsibility: COMPLETED 12/91,
4. The Asbestos Training documentation that we inspected also needed more detail agenda information and the name of presenter.
A newform will be developed to providefor more detailed documentation of the Industrial Hygiene-training classes by 12/31/91. Responsibility: COMPLETED 12/91,
RADIATION:
There are no radiation sources in the block.
GENERAL - INDUSTRIAL HYGIENE:
There, are designated areas for storing food and eating lunch and washrooms are strategically located. Dermatitis has not been a problem in the block. Solvents used for degreasing are used outside in well ventilated area and then immediately and properly disposed of.
The catalyst change-out using Catalyst Technology by vacuuming tubes has eliminated a labor* v intensive and dusty operation. The VCM closed sampling loop and reduced sampling frequency on tankcar loading has reduced the potential employee exposure.
RECOMMENDATIONS:
1. The IJL policy could be updated to include "good personal hygiene of washing before eating and using tobacco products".
Policy will be updated by 12/31191. Responsibility:
COMPLETED 12/91,
1/6/94 * INDICATES PRIORITY ITEM
Page 29
* 2. 3.
HAZWOPER items discussed during this section.
a. The written program has been written but needs to be typed.
Program will be tVDed by 10/31/91. Responsibility: 11/91,
COMPLETED
b. A summary of employee training needs to be developed to verify the 24 hours initial and 8 hr. refresher training.
Training summary will be developed and documented by 12131191. Responsibility: COMPLETED 12/91,.
c. Certificates need to be issued to all employees hired since March, 1990 who complete the training that satisfy the HAZWOPER requirements.
Certificate will be developed and issued by 12131191. Responsibility: COMPLETED 12/91,
~
d. HAZWOPER training needs to be included on the operator's checklist just as it is for
technical employees.
--.
This will be included on checklist by 11/1/91. Responsibility: COMPLETED 1/92, _
There may be opportunities for ergonomic evaluations of physically demanding jobs such as the loading rack. The plant should take advantage of the opportunity to have evaluate this area and they should poll the operations personnel regarding other potentially strenuous physical tasks. It is possible that some limited interventions such as a pre-work stretching program could decrease the likelihood of musculoskeletal injuries.
Rail car loading audit is scheduled and will be completed by 10122191. Responsibility:
Based on the results of this audit other areas of the plant may be studied. COMPLETED 10191,
REDACTED
C O N F ID E N T IA L
1/6/94 INDICATES PRIORITY ITEM
MEDICAL:
The block adheres to the Division Medical Department's requirements for medical surveillance and testing. Results of medical tests are communicated to employees in a timely manner.
RECOMMENDATIONS;
1. All employees need respirator fit testing, and this should be completed in 1991. Prior to performing these fit tests, the plant I.H. contact should get in touch with the Medical Department to be certain that all employees have medical approval for fit testing.
Fit testing will be completed by 12/31/91. Medical Department has been contacted to identify employees who are not approved for respiratorfit testing. Responsibility:
COMPLETED 1/92,
2. In the future, contractors will be responsible for their own medical surveillance. We will need to develop an auditing system (at the Division level with verification by the .plant) which will allow us to be certain that necessary medical surveillance and training is being performed.
Vinyl II will work with Division to develop audit system.
~
NON-DOW EMPLOYEES:
All non-Dow employees receive indoctrination training which includes required PPE, emergency response; and hazard communication. Hearing protection and gloves are supplied to permanent in block contractors. Non-Dow employees are included in I.H. monitoring program and results are communicated in a timely manner.
RECOMMENDATIONS:
1. Earlier comments regarding documentation of training would also apply here.
Training documentation for non-Dow employees will be upgraded along with the documentation for Dow employees. COMPLETED 11192,
1/6/94 * INDICATES PRIORITY ITEM
Page 31
VINYL CHLORIDE:
Other than Asbestos, vinyl chloride is the only OSHA regulated chemical used in the block. Vinyl chloride is handled in a closed system minimizing the potential for exposure (an example is the closed sampling loop). Breathing air is used as respiratory protection for potential exposures to VCM.
RECOMMENDATIONS:
1. Comments in the Data Generation and Training Documentation sections as the annual report documentation, on-going monitoring strategy, and training documentation with detailed agenda apply here.
Upgraded training documentation will be implemented as previously defined. COMPLETED 1U92, .
* 2.
We need to work with the Technology Center on the practical implementation of key
elements of the vinyl chloride standard.
-*
Tech Center will be consulted on this by 12131/91. Responsibility: CENTER WORKING ON THIS. COMPLETED 6192,
%
SAFETY/SECURITY AUDIT (Thursday, September 12,1991--7:30 a.m. to 11:30 a.m.)
TECH ------
Audit Team:
Presenter:
Attendance:
Writer: SAFETY PROGRAM FUNDAMENTALS: The plant has a safety mission statement. Also, a written safety policy.
REDACTED
C O N F ID E N T IA L
1/6/94 INDICATES PRIORITY ITEM
JO 0 GO
0C5D
CO
Page 32
RECOMMENDATIONS: None at this time.
EMPLOYEE RESPONSIBILITY FOR SAFETY:
Safety is a part of every job description. Individual safety goals are set and reviewed at least twice a year.
RECOMMENDATIONS:
* 1. Complete Safety JPR's for all employees in the plant per Safety Phase IH
The safety JPR has been implementedfor most plant personnel with plansfor
completion by 11/15/91. Safety JPR is no longer being used in the division.
Completed by:
12/93
PROGRAM STRUCTURE - ORGANIZATION - PLANNING:
The safety program is organized in accordance with the plant safety goals and set by a safety committee composed of a good cross-section of plant personnel (management, supervision, operations, etc.). Daily tailgate and monthly safety meetings along with good measurement and incentives strongly reinforce the program.
RECOMMENDATIONS
1. Utilize the Safety Performance Improvement Process (SPIP) in the plant and individual safety goal setting process.
The results of the initial SPIP survey will be reviewed and communicated to plant
teams by 11130191. Present goals already were addressing most areas that were deficient
on the SPIP. Responsibility:
COMPLETED 12/19,
2. Consider more involvement from operators in the goal setting process.
1992 preliminary goals were circulated to each team by COMPLETED 1/92, .
l
O H M O
n o
-.2! lMZ-JH
r>
1/6/94 * INDICATES PRIORITY ITEM
pXoI
CO
OCD)
Page 33
SAFETY TRAINING:
All new Dow and contract employees receive a block safety indoctrination. Daily tailgate, weekly and monthly safety meetings are used effectively. Staff ISA's are also effective. Special training is utilized in critical areas.
RECOMMENDATIONS:
1. Update block indoctrination video relative to harnesses and respirators. Also, develop and utilize a test to check comprehension of what is discussed in the indoctrination session (including video). An LPT module would be helpful.
An IPT module will be developed on the existing indoctrination video by 12131191.
Completed bv
January 1992
The indoctrination video and module will be updated by the end of3Q92.
Responsibility:
,, COMPLETED bv
2193
2. Check on the use of training aids for vessel entry, line opening and hot woik.
The safety coordinator will check with the safety department to identify any available, useful training aids by 12131191. Responsibility: Plant personel completed trainine on Safe Work Permits. Red Tagging and Confined Space. COMPLETED 20rtl91bv ,,
3. Obtain the updated LAD Safety & Loss Prevention Standards IPT and utilize.
S&LP IPT modules are currently undergoing revision. The updated modules will be
obtainedfor Vinyl II use when revision is complete. Responsibility: Safety Coordinator
COMPLETED The modules are now available on the vox.
____ 3193
4. Develop a training documentation system for documenting training at meetings, on procedures, on LPT's, etc.
A system for training documentation will be developed and implemented by 2Q92.
Responsibility:
COMPLETED 2092
5. Develop a timetable for completing all IPT modules.
The IPTprogram status is currently being updated. Yearly goalsfor IPT development will
be set. High overtimefor operators (25%) has caused this to be a low priority. Progress
will be slow until manpower can be increased. Responsibility:
Safety &
Training Coordinator COMPLETED 1/93 Timetable developed
1/6/94 INDICATES PRIORITY HEM
Page 34
OPERATING PROCEDURES:
Operating Procedures , Safe Job Procedures and Red Tag Procedures are utilized. Operators write/up-date procedures with involvement of supervisor and Safety Coordinator.
RECOMMENDATIONS:
* 1. Develop a plan for updating all procedures that are out of date and implement a system to assure updating on a regular basis.
The C-9 checklist currently callsfor yearly procedure review/update ofother procedures. A better documentation system is needed along with more specific responsibilities. A documentation guidelinefor plant procedures will be developed and implemented by 2Q92. Responsibility: COMPLETED bv6/93 All Safe Job Procedures have been updated
EMERGENCY PLAN:
A block emergency plan exists. Emergency drills are held on a quarterly basis.
RECOMMENDATIONS:
* 1.
Update block emergency plan and address explosions. Place a copy of the updated plan in the plant's copy of the LAD Emergency Plan Manual. Also, send a copy to Delaine Rawlings for the EOC.
Block emergency procedures will be incorporated into a plant emergency plan by 12/31/91.
Responsibility:
COMPLETED________ 1/92
2. Add review of the block emergency plan to the C-9 Checklist to assure updating and reviewing with employees on a yearly basis.
Emergency procedures are currently reviewed annually as part of C-9. This check will be
modified to include review ofthe emergency plan in 1992.
Responsibility:
COMPLETED by
1/93
* 3. Conduct a "hands-on" emergency drill at least once a year.
This will be included in the plant 1992 safety program when it is developed.
Responsibility:
Safety & Training Coordinator
COMPLETED bv_________ 9/93
j, < ) i
O> n
H
n oz
o
tz=i
H
>r
1/6/94 * INDICATES PRIORITY ITEM
33 cn
(D
cn
CT>
4. Develop an IPT for the block emergency plan.
This will be included in the IPTprogram development guideline by 12131191 and should
be developed by 1Q92. Responsibility:
IPT program is being developed
at this time^25%j:ompleted. 11/93 Expected Completion Date: 12/94
ACCIDENT/INCIDENT INVESTIGATION REPORTING:
Accidents/incidents are investigated promptly. Learning value is communicated and follow-up work is tracked to completion. Employees are encouraged to report minor injuries.
RECOMMENDATIONS:
1. Write-up accidents/incidents in Safe Working Style format.
The plant routinely does a thorough job ofincident investigation. There are no plans to
implement thisformat at Vinyl II. Completed bv
1/92 . ^
SAFETY STANDARDS, GUIDES, REQUIREMENTS:
LAD Safety & Loss Prevention Standards and safe job procedures are utilized.
"'
RECOMMENDATIONS:
1. Update safe job procedures.
The operating procedures manual has not been updated due to conversion to Mod5 and high operator overtime. No effortplanned on operating procedures until Mod5 conversion complete. The C-9 checklist currently callsfor yearly procedure review/update ofother procedures. A better documentation system is needed along with more specific responsibilities. /I documentation guideline for plant procedures will be developed and implemented by 2Q92. Responsibility: COMPLETED 6/93 Mike Cutter
2. Develop a plan for modifying sample points with quick open valves
The new EDC sampling system with quick opening valves is considered the safest
alternative available. Other sampling systems have tubing directed awayfrom the person
catching the sample making that system the safest alternative available. Installing new
sampling systems wherever practical. Most should be replaced by 4Q92. Responsibility:
Area personnel
COMPLETED 6193
1/6/94 * INDICATES PRIORITY ITEM
Page 36
HAZARD DETECTION PROGRAM:
Inspections are made by the Plant Superintendent, Engineers and Supervisors on a regular basis. C-9 Checklists are used as a tool. Staff JSA's are also effective.
RECOMMENDATIONS;
* 1.
Assure that all identified hazards are tracked to completion and the documentation exists to support the fact.
Proceduresforfollow-up documentationfor internal audits, USCR's, incident investigations, etc. will be defined and implemented by 12/31/91. Vinyl II will implement the Divisionformfor housekeeping audits andfollow-up which is currently being developed. Responsibility: COMPLETED 1/92
SAFETY SUGGESTION SYSTEM:
_
A Safety/Environmental Suggestion System exists. All suggestions are reviewed and tracked to* completion.
RECOMMENDATIONS:
1. Develop a system to be used in prioritizing suggestions.
This is currently beim developed and should be in place by 11/30/91. Responsibility: COMPLETED 1/92
AWARD/RECOGNITION SYSTEM:
The block has a safety incentive program for which awards/recognition is given. Also, outstanding safety/environmental and process suggestions have awards/recognition quarterly.
,
RECOMMENDATIONS: None at this time.
REDACTED
C O N F ID E N T IA L t
1/6/94 INDICATES PRIORITY ITEM
Sco CCOD
Page 37
CONTRACTOR SAFETY:
Contractors follow the same policies/standards as Dow employees. All contractors receive the block safety indoctrination. The contractors also have their own safety incentive program.
RECOMMENDATIONS:
1. Involve contractors more in plant safety programs.
An active plant contractor program exists. More participation in Safety Committee
meetings by contractors is currently being stressed. Responsibility:
Completed bv
1/92
OFF-THE-JOB SAFETY:
Off-the-job safety is emphasized. Off-the-job safety is included in regular and tailgate safety
meetings. Also, in the block safety incentive program.
.
RECOMMENDATIONS:
None at this time.
~
COMMUNICATIONS:
Closed circuit TV's and bulletin boards are utilized to communicate.
RECOMMENDATIONS:
* 1.
Develop a system (initial and date list, etc.) to communicate new or revised procedures, learning value items, new or revised regulations, ISA's, inspections, etc.
A documented review procedure will be developedfor use in plant communications
by 12191. Responsibility:.
. COMPLETED 12/91
i
n>O
H e
oo
*3
pi
z
H
>r
1/6/94 * INDICATES PRIORITY ITEM
39Cn=3
$
to CD
5
Page 38
HOUSEKEEPING:
Control Room:*Overall housekeeping is excellent. Some cleanup needed on catwalk behind the board.
To be completed by 1111191. Responsibility:
COMPLETED 11191 Active red tag masters are kept on a clipboard in the permit office and they are readily accessible to operators as well as contractors.
Long term masters are kept on a separate clipboard. Suggested
they consider disabling some equipment to reduce the number of long term masters.
Audit red tag masters by area personnel by 12131/91.
Responsibility:
_,
COMPLETED 1/92 All masters were checked and we found no discrepancies.
Permit area organized and neat
A couple of the permits checked indicated that no on-site inspection was done and that lines to be opened had not been positively identified. When questioned the issuers said that both had been done, if so we should mark the permit as such.
Office Area:
Complete. Stressed with permit writers.
Completed by;
12(92
All offices, conference rooms, closets and storage areas organized
and neat.
Bulletin board postings current. OSHA posting present -- GOOD!!!
One comer in the men's dressing room being used to store a box of air conditioner filters, some P&ID's and some other paraphernalia.
Rubber boot and old stencils in showers.
Some things complete. Will complete the remaining items by
11/1/91. Responsibility:
COMPLETED 1/92
* Ladies room had a slicker suit on the wash basin counter.
Complete. Completed by;
1/92
REDACTED
CO NFIDENTIAL
R&S149620
1/6/94 INDICATES PRIORITY ITEM
Page 39
Operating AreatSafety showers visible and in good condition, painting program in progress.
* Noted one ladder missing safety gate, suggest audit for others.
Safety gate will be installed on RE230 by 12/31191. Responsibility: Audit ladders throughout plant by 12131191. Responsibility:
COMPLETED by
12131
* Oil absorbent pads throughout need replaced.
Ongoing program part ofwritten outside round.
Completely.
____ 12191
* Some bleeds not plugged.
These are audited at least once per year. Sample points addressed in Safety Section ofthis audit. Completed by
Trash in all of vessel skirts.
Some completed. Others to be completed by 12/1/91. Responsibility: COMPLETED 12/91
Some water standing in Oxy area.
Not considered a serious problem. Will address by 2Q92.
Responsibility:
Completed 2092,
* Some unlabeled utility stations.
To be labeled by operations by 1Q92. Responsibility: COMPLETED 1092
* Plenty of signs (caution, directional, etc.). Many are faded and need restenciling or replacing.
To be completed by operations by 1Q92. Responsibility: COMPLETED 1092
* Wooden ladders laying against switchgear in MCC, electrical onelines need updating, one MCC had unsealed cables leading into
building.
Wooden ladder removed. Other items addressed in the Electrical Section of this audit.Completed bv: mi
Warehouse Area:
* Warehouse work area clean and neat, grinder tool rests needs
adjusting (to far from wheel). Warehouse east storage area needs
attention, it's full and pretty cluttered, the bin areas looked good.
1/6/94
* INDICATES PRIORITY ITEM
f
n
H
a
O o Z S3O M Z H
r
%9
CP
>l<?>>
Page 40
REDACTED
Have some things stored against open walls that need to be properly stored.
Warehouse area audit will be completed by 12/31/91.
Responsibility:
COMPLETED 1Q92
* Noted some flammables improperly stored on open shelves.
Proper storage to be investigated by 1Q92. Responsibility: Completed 1092
Flammables storage area O.K., need to verify proper amounts. No fire extinguisher in area.
Addressed in Lab Section of this audit. Fire extinguisher available inside lab.
Lab Area:
* Housekeeping fair.
* Hoods cluttered and dirty. Addressed in Lab Section of this audit.
*' -
* Flammables stored under hood which also has 1 lOv lights under it.
To investigate an alternate to NVM test by 3Q92. Responsibility: No Better Alternative COMPLETE 3Q92
* Doors on hoods were opened'beyond the 18 inch limit.
Install removable stops by 2Q92. Responsibility: COMPLETED 11/91
Safety Files:
* OSHA "Star" information needs to be compiled into one box (three years plus current). Need to initial and date paperwork upon completion of follow-up actions.
The OSHA Star information will be compiled and updated as
noted by 12/31191. Responsibility:
COMPLETED 12191
Good system for tracking follow-up test for plant indoctrination.
In the process ofdeveloping afollow-up testfor plant
indoctrination. Responsibility:
COMPLETED 1/92
* Posted C-9 checklist in not up to date, Safety coordinator keeps a master copy and it is up to date.
Keeping the C-9 checklist in the permit office will be emphasized
by 11/30/91. Responsibility:
COMPLETED 11/91
EMPLOYEE SURVEY SUMMARY:
1/6/94 INDICATES PRIORITY ITEM
> *3
CONFIDENTIAL
R&s 149522
Page 41
There were 27 safety surveys returned. The safety definitions indicated a good safety attitude at Vinyl II. Eighty eight percent rated supervisors views on safety high to excellent. Starting up and shutting down equipment was thought to be the part of the job that required the most caution and that a fall would be the next serious accident When asked if they notice a fellow employee performing work in a unsafe manner would they intervene, 100% of surveys said they would. 85% said they would explain other ways of performing the work in a safer manner. Some even stated some of the "Safe Working Styles" One Minute Manager Techniques. Only 30% of the surveys indicated that accidents could be prevented all the time and 70% some of the time.
1/6/94 INDICATES PRIORITY ITEM
HAZARDOUS MATERIAL TRANSPORTATION REVIEW (HMTR) (Thursday, September 12, 1991 12:45 p.m. to 2:20 p.m,)
Audit Team:
Presenter:
Attendance:
Page 42
Writer:
The Vinyl II plant made an excellent HMTR presentation. Thanks to
.
Bud Balentine and his in depth knowledge of the products and handling procedures. Information
concerning the distribution process was thorough and clear. Pre-planning and teamwork was *
evident in the way the plant conducts its business.
__
RE 'ATIQNS:
1. As noted in the review, there was concern generated relative to the correct materials of construction for marine vessels. Due to the recent increased attention being brought to our capabilities for emergency response, we would like to emphasize that the plant continue to work with the Marine Tech Center to identify the weakest areas that needs the most attention.
Plan to revise Vinyl 11VCM ship requirements including material of construction issue by
2Q92, Responsibility:
COMPLETED 10/19,
2. Consider conducting some sort of "Distribution Standards Audit" on all non-Dow shippers involved in swaps, tolls or trades.
Both major swap partners have been visited at least twice during the last two years. Will coordinate with product steward and marketing function and E/R by 1/93. Responsibility:
COMPLETED 1/93,
* 3.
Initial and retraining for loading/unloading as well as for tankcar securement should be documented and reviewed.
Evaluate D.O.T.fdm and training plan!documentation by 1/92. Responsibility: COMPLETED 1/92,
REDACTED
CO NFIDENTIAL
R&S 149624
1/6/94 * INDICATES' PRIORITY ITEM
CHEMICAL EXPOSURE INDEX AUDIT (Thursday, September 12, 1991--2:15 p.m. to 4:00 p.m.) Audit Team:
Presenter: 1 Attendance:
Page 43
Writer:
CHEMICAL EXPOSURE INDEX:
^
The operator interview, emergency drill, and documentation review were completed in a pre-audit meeting Wednesday, 9*4-91. The actual CEI Review on 9-12-91 concentrated on exceptions to the pre-audit questionnaire. In general, the Vinyl II plant appears to be in excellent shape from aCEI stand point Plant documentation is almost all up to date, operators are well trained and motivated, emergency procedures and drills are practiced, and many plant programs are in place that would act to decrease the potential of a CEI incident
Two potential problems with the calculation methods used were noted. First
. US
Area Loss Prevention Manager, asked if our dispersion models used the dense gas phase
corrections developed in Texas (contact
. Secondly,
noted that our spill
calculation methods across the LAD are not consistent and are not consistent with methods
published in open literature such as Perry's. Both of these questions will be turned over to the
appropriate engineering functions for resolution.
REDACTED
C O N F ID E N T IA L
R&S149625
1/6/94 INDICATES PRIORITY ITEM
Page 44
REDACTED
ACCOMPLISHMENTS/MAJOR CHANGES SINCE LAST REVIEW (1989):
The following notes are meant to be a supplement to _
presentation at the CEI Review
and to cover the portions of the review that took place in the pre-audit meeting.
1. No major changes have occurred in the plant to change the CEI scenarios since the review and follow-up in 1989.
2. Seven worst case credible scenarios resulting in releases of the following with CEI results as shown,
CHEMICAL
CEI VALUE
HCL VCM EDC CL2
162 192 144 288
3. Three of the above chemicals have odor thresholds that will extend past the fence line (HCL, EDC, and Chlorine).
4. An extensive area monitoring system exists for EDC and VCM (in addition to flammable gas detectors). No system exists for the detection of HCL and chlorine.
5. Several general Safe Job Procedures and policies books were readily available.
6. Most plant process type documentation was in very good shape. Many P&IDs were out of date.
7. Operators take a great deal of pride in their ability to run the plant. Self-directed work team concept has been a great success. Superb teamwork was shown during the Chlorine release drill.
8. Operators feel the plant training program is effective and gives them all the information they need to operate the plant.
9. Operators mentioned that the Project Review meeting is a great way to get ideas considered.
10. Operator training modules exist for many jobs. IPT concept partially implemented.-
11. Carrying of personal respirators is no longer required in plant. Safety indoctrination film is out of date.
12. Talk-through emergency drills are done on at least a quarterly basis by each shift.
13. Plant preventative maintenance program was in good order. Monitoring of critical process piping for corrosion/erosion is being done.
14. Very good emergency communication procedures exist within the plant. The procedures were posted and followed.
15. Emergency contact telephone list was out of date.
16. MOD V control 30% implemented. 1/6/94
* INDICATES PRIORITY ITEM
tJ. w I
C O N F ID E N T IA L
R&S149C26
Page 45
17. Installed new Chlorine distribution header and KO pot Added electrical heat tracing.
18. Replacing corroded pipe sections with monel as required.
19. New throx scrubbers installed.
20. Ordering-pew E-140 to replace exchanger.
RECOMMENDATIONS:
* 1.
Plant management should review the need for an area monitoring system covering HCL and chlorine releases in light of the CEI numbers and other reviews.
This will be evaluated by 12131191. Responsibility:
COMPLETED 12119,
* 2.
Add updating of the emergency contact phone list to a C-9 checklist
This will be updated by 11/30191. Responsibility:
COMPLETED 12/19,
^
3.
4. 5. * 6.
Plant management should review the need to carry a personal respirator in the plant and should update the plant indoctrination film accordingly.
This has been evaluated and we do notfeel there is a need to carry personal respirators at Vinyl II due to the design and layout ofthe plant. Respirators are availablefor anyone desiring to do so. The plant indoctrination film will be updated by 3Q92. Responsibility:
COMPLETED 12/92,
The plant should consider conducting a periodic walk-through drill simulating a CEI type incident.
We will have hands-on drill once per year in addition to our quarterly desk top drills.
Responsibility:
. COMPLETED 8192,
Review training of all plant personnel in the use of protective equipment for protection from liquid spills and vapor releases.
Will be included as a safety meetins topic during 1992. Responsibility: COMPLETED 12129,
Update the plant emergency communication procedure to include specific detection levels of VCM and EDC that require notifying.
This is not done nor is it planned at Vinyl II. NO FURTHER ACTION 11/92,
7. Review the policy for installing leak-clamps in the plant to guard against over-stressing pipe and vessel nozzles. Update the installation checklist if required to include Dow engineering review of unusual installations.
1/6/94 * INDICATES PRIORITY ITEM
Page 46
We use present checklist out of the Division S&LP which includes evaluating stresses. This would be a good addition to the Division checklist. NO FURTHER ACTION 11/92,
The following were copied from
; presentation and axe included for completeness.
8. Complete IPT modules for entire plant.
See answer Safety Training #5. NO FURTHER ACTION 11/92,
9. Video-tape or photograph leaks of different size to aid in estimating hole size.
Will do by 12/31/91. Responsibility:
COMPLETED 12/91, BY COOP
10. Add shoes or teflon sheets to existing pipe supports.
Planning to audit and correct hazardous service piping by 4Q93. Responsibility: COMPLETED 10/93, _ .
'
* 11. Evaluate double seals or seal-less pumps.
Will implement as required by regulation. NO FURTHER ACTION 11/92,
REDACTED
CONFIDENTIAL
1/6/94 * INDICATES PRIORITY ITEM
J) 9in co Cr0oD5
Page 47
12. Review spill scenarios with contractors and neighboring plants.
Review worst case CEI scenarios with LHC III, Poly C, LGTI, Cell Service and
contractors by 12/31192. Responsibility:
. COMPLETED 12/92,
13. Involve plant security in regular drills.
Will be invited to participate in annual hands-on drill. Responsibility: . COMPLETED 9/92,
14. Develop written procedures for spill mitigation.
Generic procedure to be developed by 12/31/92. Responsibility: SCHEDULE. COMPLETED 12/92,
ON
15. Review E/R personnel protective equipment with Industrial Hygiene.
See Industrial Hygiene section on Personal Protective Equipment Recommendation #1. NO FURTHER ACTION 11/92,
REDACTED
CONF1E>ent1AL
1/6/94 * INDICATES PRIORITY ITEM