Document MJGeG36g8nK3G9vXX2p5v4ZgL

Document No. R8QP-2015 RO Effective Date 4/19/2016 EPA Region 8 402c Renovation, Repair, and Painting Rule Inspection List 1 OF 6 BASIC INSPECTION INFORMATION Inspection Date/Time: 3/9/2023 02:40 ICIS #: 3601516616 Presented EPA credentials to person in charge and explained purpose and scope of inspection Inspection Entry: Entry Permitted. Entry Denied. (Provide details in notes.) NOI signed by: Verbal Permission to Enter Regulated Entity Firm Name: Owner Name & Contact Information: On-Point Custom Contracting DBA or Former Names: Lucas Hoskinson 1112 S. 9th Street Canyon City, CO 81212 Firm Address + Contact Information (phone, website, email): Lucas Hoskinson 1112 S. 9th Street Canyon City, CO 81212 Additional Representatives: (phone number not available) # Employees: # Projects/Year: Type of job observed (include permit information, if available): Interior Prep/Painting & Possible Interior Remodel - Completed just prior to inspection Is the firm certified? Yes No Was a certified renovator assigned? Yes No Certificate(s) on site? Yes No Name(s) of renovator(s): Site Information Address of Property: Owner Name & Contact Information: 151 Cornell Circle Pueblo, CO 81005 Building Type: single family residence multi-family residence child-occupied facility other Year Built: 1963 Is the building occupied? Yes No Unknown If Yes, age of residents: Person(s) interviewed during inspection: Name & Title: Contact Information: Document No. R8QP-2015 RO Effective Date 4/19/2016 EPA Region 8 402c Renovation, Repair, and Painting Rule Inspection List 2 OF 6 Facility Name: On-Point Custom Contracting ICIS #: 3601516616 Work Practice Requirements What type of project is it? Interior Exterior Both (e.g. window replacement) Is RRP work involved? Yes No Is RRP work in progress? Yes No All Projects If RRP work is in progress, check the following: Comments: Are Warning Signs Posted? Are prohibited practices being used? Is waste properly contained? Are windows and doors in the work area closed and/or doors being used as an entrance covered with plastic? Is the floor in the work area covered with tapeddown plastic at least 6 ft. beyond the perimeter of surfaces undergoing renovation? Are all ducts opening in the work area covered with taped-down plastic? Are windows and doors within 20 ft. of the renovation closed? Are doors that are in use during the job covered with plastic, allowing workers to pass through while confining dust and debris? Is the ground covered with plastic sheeting extending 10 ft beyond the perimeter of surfaces undergoing renovation? Yes No Unknown Yes No Unknown Yes No Unknown Interior Projects Yes No Unknown Yes No Unknown Yes No Unknown Exterior Projects Yes No Unknown Yes No Unknown Yes No Unknown If the work is complete: Cleaning Requirements Comments: Is the work area cleaned so that no dust, debris, or residue remains? Are all paint chips and debris collected and sealed in a heavy-duty bag? Did a certified renovator perform a visual inspection and cleaning verification? (If yes, obtain documentation) Yes No Unknown Yes No Unknown Yes No Unknown Basic Recordkeeping Requirements Firm provided the following records (check all that apply): Determination that lead-based paint present on the components affected by the renovation The owner or tenant's signed acknowledgment of receipt of the EPA-approved lead hazard pamphlet Training certificate(s) for certified renovator(s) Documentation of training provided to uncertified workers Documentation of compliance with the requirements of RRP Work Practice Standards Document No. R8QP-2015 RO Effective Date 4/19/2016 EPA Region 8 402c Renovation, Repair, and Painting Rule Inspection List 3 OF 6 Facility Name: On-Point Custom Contracting ICIS #: 3601516616 Inspection Summary - Inspector Comments and Findings Inspector Maksimuk observed a construction truck in the driveway and a worker go in and out of the house. Maksimuk investigated and observed window(s) covered with over-spray craft paper indicating a painting project may be underway. Maksimuk observed the front door wide open with the contractor working inside. The contractor was Lucas Hoskinson of On-Point Contracting LTD. Mr. Hoskinson stated he just finished prep/painting the interior. He was vague about other activities which may have included an interior remodel. However, the interior of the house was very clean and no construction debris or paint chips were present. Mr. Hoskinson stated he was not aware of the RRP Rule. Maksimuk explained the Rule and left compliance assistance brochures with Mr. Hoskinson. Facility Name: On-Point Custom Contracting Photo #: Subject P3090683 Front of House with Door wide open PHOTO LOG Time 03:58 P3090684 Interior 03:59 ICIS #: 3601516616 Notes Date: 03/09/2023 4 OF 6 Facility Name: On-Point Custom Contracting Photo #: Subject PHOTO LOG Time ICIS #: 3601516616 Notes Date: 03/09/2023 Page BLANK 5 OF 6 Document No. R8QP-2015 RO Effective Date 4/19/2016 EPA Region 8 402c Renovation, Repair, and Painting Rule Inspection List 6 OF 6 Facility Name: On-Point Custom Contracting ICIS #: 3601516616 RECORD OF REVIEW Inspector Inspector who prepared report: Christopher Maksimuk Signature: Maksimuk, Christopher Reviewed by: Kristin Jendrek Digitally signed by Maksimuk, Christopher Date: 2023.05.18 15:12:10 -06'00' Reviewer Date report completed: Signature: Digitally signed by KRISTIN JENDREK Date: 2023.05.18 15:46:46 -06'00' Date: 05/18/2023 1/3/2020 11:04 AM