NEWARK PLANT PIGMENT COLOR RESEARCH REPORT
BENZIDINE YELLOW YT-564-D and YT-571-P (A) 3,3f-dichlor benzidine^(aceto-acet-ortho-toluidide}2
| Period Covered: April 1947 -- May 194^.
FILE:
DATE:
2/24/49
N42189
2a/.
Serial No. KN-49-5 Copy No* i
Copy to:
#1 - Numerical File
2 Research Office (221.4)
3 - Library File
(221.4)
4 - #10 Building File
5 - V. Chalupski - Plant Files
o - D. B. Killian* Newark
7 - Extra
NEWARK PLANT PIOMSSIT COLOR RESEARCH REPORT
Final Report PLANT DEVELOPMENT
Title? BENZIDINE YELLOW YT-564-D and TT-571-P (A) 3,3,-dichlor benaidine^(aceto-acet-ortho-teluididejg
Period Covered: April 1947 - May 194#. Charge: A-IIC-220
SUBMITTED BY: A. D. MILLS
, " DATE SUBMITTED: 1/27/49
APPROVED BY : A, A. BRIZZOLARA
DATE ISSUED: 2/24/49
DUP050067148
IKTROPPCTION
After a brief semi-works development a satisfactory process was obtained in lot 9196* this formula Included the use of sulfamic acid to destroy the excess nitrous acid and a lower temperature of coupling (65 - 66F } was used, Plant development was undertaken on the 9190 process,
mmmMoomwsxms
(1) A total of 14 batches were made in the plant3 four on a
405# batch size and ten on an 10# size. Of the first four, two were
coupled at 6P and two at 66F. The process responded to tble variable and the (B) formula was Witten using a coupling temperature of 76F, The two batches coupled at the lower temperature of 6P, were s lighter and a weaker than those coupled at 66F. Ten batch# we#f made on the (B) process and all were satisfactory in quality,
(2) Following the development study the (C) procedure was written up on a 1,6 mol basis (1035#) with a 76F. coupling.
(3) A blend of 50 pounds each of the first four lots was mad and set up as current standard. This is YT-564-D (0), SD-40546* lot 02406 and was approved by the Sales Division,
(4) Production assumed supervision of the production of IT-564-D (C) on April 6, 1946*
(5) IT-571-P (A), which is tT-564-0 (C) press cake was accepted by Production on May 21, 1946*
REFERENCES
KN-49-3 Laboratory study of S-2402 KH-49-4 Semi-Works Development of YT-564-B* DSH-49-6 Plant Development of YT-564-D,
,