Document MJBr5kMx574gGggD1z17d5EXy
Member
Insulation DistributorContractors National
Association
^ QUOTA T-^ N
WILLARD A. SELLE, Inc.
Insulation Contractors & Distributors
215 POPLAR ST. EL PASO, TEXAS 79901 * TELEPHONE 542-1877
February 23, 1971
Southwestern Industrial Contractors & Riggers, Inc.
P. 0. Box 1611
El Paso, Texas
Inlet Flue From Concrete Spray Chamber
Attn: Mr. VJheatley
Subject:To Existing Brick Flue, American Smelting & Refining Co.
Gentlemen:
We quote as follows applied insulation in connection with the above project:.
Total Sum............................................... $2,465.00
;
Applicable Taxes are included.
$ 17 i TSf---
The flue shall be covered with Owens Corning Fiberglas Corporation's
Industrial Insulation, Type 703, 2" thick, impaled over Nelson Studs. Insulating cement shall be applied over all insulated surfaces. Hexagonal wire netting shall be applied over the cement. The in sulation shall be weatherproofed by a coating of asphalt emulsion.
All work to be done in strict accordance with the plans and specifications unless otherwise noted. Respectfully submitted, WILLARD A. SELLE, INC
ASARCO ELP 0008778
Revised 3/63 TO:
APPROVED BY
1 e.. 1 Operating RETURN TO PURCHASING DEPARTMENT
Page 1 of 7
Construction or Repair Contract Form PD-I9 Under *100,000.00
ORDER NO
CONTRACT FOR
Enclosing HiLine Car Loading Point*
(Iqsert nine of job)
AMERICAN SMELTING AND REFINING COMPANY'S El P*o
.Plant
at___________ El Paso, Texas_________________________
(Insert town and state)
THIS AGREEMENT, made the, First------- day of--*rch, 19_ZL_,
by and between
Southwestern Industrial Contractors fc Riggers, Inc., whose address is
1730 Bassett Ave., P.O.Box 1611, El Paso, Texas 79948 (hereinafter called the
"Contractor") and AMERICAN SMELTING AND REFINING COMPANY, a corporation of the State of New Jersey, whose address is 120 Broadway, New York 5, N.Y. and P. O. Box 1111, El Paso, Texas 79999(hereinafter called the
(Insert address of plant or unit)
"Owner").
WITNESSETH:
The Contractor and Owner agree as follows:
Article 1. Scope of the work
The Contractor shall furnish all shop drawings, field engineering, labor,
tools, equipment, transportation, materials and other facilities, except such
items as are herjj,in^ft^,r^ij||c|
furnished or furnished and installed by
the Owner, for_ Loading Points(hereinafter called the "work")
(Insert name of job)
at the_____ El Pasoplant of the Owner at El Paso. Texas
(Insert town & state)
in accordance with the drawings and specifications listed below, all of which are incorporated herein by reference and made a part hereof:
(List Specifications and Drawings)
As Per Southwestern Quote of 18 January 1971
ASARCO ELP 0008779
Page 2 of 7
Article 2. Time of Completion The work shall be commenced
March 15, 1971and
shall be substantially completed---------March...3.1 >--1221-------------------
Article 5. Payment (to be deleted if progress payments are to be made). ..
The Owner shall pay the Contractor for the performance of this Contract, the sum of Six Thousand Five Hundred and Fiftydollars,
6550 30
), lawful money of the United States of America within .days after satisfactory completion of the work and sub
mission by the Contractor of evidence (including, if requested, complete releases of all liens arising out of or in connection with the work by all persons, firms or corporations on whose behalf such liens could be or were filed) satisfactory to the Owner that all charges for labor and material incorporated in the work and all other indebtedness connected with the work for which liens could be filed have been paid and that the work is free of all liens and encumbrances.
Article 5, Payments (to be deleted if progress payments are not to bejjtade)
The Owner shall pay the Contractor for the performance of tj3^ contract,
the sum oi
dollars, ($_
I, lawful money of the United States, as
follows:
On or about the'
.day of each calendar month, commencing
., 19.
the Owner shall pay the Contractor
.per cent
b) based on the contract prices, of the
labor and materials incorporated in 'tie'work and of materials suitably stored at the site thereof up to the end of/ths. next preceding calendar month, as estimated by the Owner, less the a^gregatbyof previous payments; and upon com pletion of the entire work, a sym sufficients^to increase the total payments to
.per cenfr(%)
the contract price. Final
payment of the remaining
Jjo) of theScontract price shall be due
days after completion of the works,
Before each/such payment is due, the Contractor 'bJqall submit evidence satisfactory to the Owner (including, if requested, partiaISwaivers, or in the case of final o^yment, complete releases, of all liens arisin^out of or in connection wtt'n the work by all persons, firms or corporations ok-whose behalf such lien^could be or were filed) that all charges for labor and material in corporated in the work and all other indebtedness (except, in the casS^f payments/other than final payment, indebtedness not then due) connected witS^the worjrfor which liens could be filed have been paid and that the work is free^of all liens and encumbrances.
ASARCO ELP 0008780
Page 3 of 7
Article 4. Payments Withheld
The Owr.er nay withhold all or part, of any payment to the extent neces sary to protect the Own-r from loss or damage on account of (a) damaged or de fective work not remed:cc, fl) claims filed or reasonable evidence indicating probable filing of claim;- by other parties against- the Contractor or the Owner (c) failure of the Contractor to make payments properly to Subcontractors or for material or labor, (d) a reasonable doubt that this contract can be com pleted for the balance then unpaid, or (e) damage to the Owner's property or the work of another contractor. Article 5. Liens
If any lien remain unsatisfied after payment of the full contract trice ;:as been made, the Contractor shall refund to the Owner all moneys that the ],.tt;.r may ue compelled to pay in discharging such lien, including all costs and a reasonable attorney's fee. The Contractor shall, at any time requested b\ the Owner, deliver a bond satisfactory to the Owner indemnifying it against any iien and expenses occasioned thereby.
.'or-1icle 6. Title to the Work
Title to all work completed-or in the course of construction shall be ;r. the Owner; and title to all machinery, equipment and materials to be in corporated in the work shall be in the Owner as soon as they are delivered on the site of the job.
Article 7. Inspection and Repair
The Contractor shall provide safe and proper facilities at all times for the inspection of the work by the Owner, and shall as soon as practicable after written notice from the Owner, at the Contractor's expense, replace and repair any materials or portions of the work which the Owner shall deem defec tive and make good all work damaged or destroyed thereby, whether or not there shall be a dispute with respect to any of the foregoing. Any such dispute shall be settled by arbitration.
Article 8. Protection by Contractor
The Contractor at all times shall maintain adequate protection of the work from damage and shall protect the Owner's property and all persons thereon from injury, damage or loss by reason of any act or omission of the Contractor or any Subcontractor. The Contractor shall be responsible, and reimburse the Owner, for any loss or expense to the Owner arising from damage to the work or other property of the Owner caused by the wrongful act or neglect of the Con tractor, any Subcontractor or the employees of the Contractor or any Subcon tractor. Where such damage includes damage to the work it shall be repaired at the expense of the Contractor.
The Contractor shall use its best judgement and skill in dealing with labor matters, and take all reasonable .steps to avoid labor dispute. In the event of any strike or threat of strike, slowdowns, featherbedding, or other like practices, the Contractor shall apprise the Owner of all relevent facts and implications of the particular labor problem involved, and shall consult in good faith with the Owner in an endeavor to reach a mutually satisfactory solu tion to such labor problem and, so far as reasonably possible, to protect the Owner against delays affecting the work or damage or losses to its other oper ations.
ASARCO ELP 0008781
Article 9. Contractor's Liability Insurance
Page 4 of 7
The Contractor shall maintain such insurance as will indemnify it against claims under workmen's compensation acts and against any other claims for damages for personal injury, including death, which may arise from opera tions under this contract, whether such operations be by the Contractor or any Subcontractor or anyone directly or indirectly employed by either of them.
Prior to commencement of this work the Contractor shall file with the Owner completed certificates of insurance in form of "Insurance Certificate" attached and shall provide insurance coverage in amounts not less then those stated therein.
Article 10. Indemnity by Contractor
The Contractor shall save harmless and indemnify the Owner from and against any expense, loss or damage on account of any claim, demand or suit made by any person whomsoever, including any employee of the Owner, which is in any way caused by or connected with, or grows out of the execution and per formance of this contract by the Contractor or any Subcontractor; provided, however, that the Contractor shall not be required to indemnify the Owner against any loss caused solely by the negligence of willful fault of the Owner or its employees. The Contractor accepts all risk of injury or damage and all responsibility for any claims for damages whatsoever resulting from the use, misuse, or failure of any hoist, rigging, blocking, scaffolding, or other like or unlike equipment used by the Contractor or any Subcontractor, even though such equipment be furnished or loaned to the Contractor or any such Subcon tractor by the Owner, and shall indemnify the Owner against all such claims.
Article 11. Owner's Responsibility for Certain Casualties
The Owner shall be responsible for all damage to the work, and to material, temporary structures, and equipment (excluding construction equipment not owned by the Owner) at the site of the job, which is caused by fire, wind storm, smoke, hail, aircraft, explosion, vehicles, riot or civil commotion.
Article 12. Compliance with Laws and Ordinances
The Contractor shall give all notices and comply with all laws, ordinances, rules, and regulations, bearing on the conduct of the work as drawn and specified. If the Contractor performs any work contrary to any such law, ordinance, rule or regulation, he shall bear all costs arising therefrom.
If for any reason the Contractor's or any Subcontractor's employees or agents acquire a status imposing liability on the Owner for employer's con tributions or taxes under the Federal Insurance Contributions Act, the Federal Unemployment Tax Act, any State Unemployment Tax Act, or any other Act, the Contractor shall be exclusively liable for, and shall indemnify the Owner against, the same and agrees to comply with all such laws and regulations so as to relieve the Owner from any and all liability therefor and from the re sponsibility of making reports or keeping records with respect thereto.
Article 13. Patents
The Contractor shall indemnify and save harmless the Owner against and from any and all claims, losses, costs, damages, expenses, actions or other proceedings, growing out of or resulting from infringement of any patent by the Contractor or any Subcontractor in the performance of this contract, except that this provision shall not apply to patented articles or processes specified in drawing or specifications furnished by the Owner.
ASARCO ELP 0008782
Article 14. Changes in the Ytork
Page 5 of 7
The Owner, without invalidating this contract, may at any time order extra work or make changes by altering, adding to or deducting from the work.
Such order may be made the Owner on its own behalf or at the request of the Con tractor, upon discovery by the Contractor of any discrepancy between the plans and the physical conditions encountered. If such extra work or changes involve a change in cost, the contract price shall be increased or decreased by the fair value thereof. The Owner will itemize the changes to be made and upon'receipt of written notice of same, the Contractor will submit promptly to the Owner, in triplicate, an itemized statement of his calculations of the adjustment in the contract price resulting from the changes or extra work. This must be done be fore work on the change is begun unless the Owner gives written order'to proceed immediately. No work or change shall be made, except by written orde'r of the Owner and no claim for an addition to the contract price shall be valid unless the additional work was so ordered. Any dispute under this Article shall be subject to arbitration.
Article 15. Owner's Right to Terminate Contract
If the Contractor should be adjudged a bankrupt, or make an assignment for the benefit of creditors, or if a receiver of the Contractor's property should be appointed or if the Contractor files a petition or if a trustee of the Contractor's property should be appointed under the reorganization or readjust ment provisions of the Bankruptcy Act, or if the Contractor at any time should refuse or neglect to supply enough properly skilled workmen or proper materials, or if he should fail to make prompt payments to Subcontractors or for material or labor, or disregard laws, ordinances or the instructions of the Owner, or otherwise be guilty of a substantial violation of any provision of the contract which he shall have failed to correct promptly after service of written notice thereof by the Owner, then the Owner may, without prejudice to any other right or remedy, terminate the employment of the Contractor for the Contractor's de fault and take possession of the,premises and of all materials, tools and ap pliances thereon and finish the work by whatever method the Owner may deem ex pedient. In such case, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the con tract price shall exceed all the general damages of the Owner caused by the Con tractor's default, including the expense of finishing the work and compensation to the Owner for the Owner's managerial and administrative service, such excess shall be paid to the Contractor. If such damages shall exceed such unpaid bal ance, the Contractor shall pay the difference to the Owner. In the event the Contractor and the Owner are unable to agree upon the amount to be paid or re imbursed the dispute shall be settled by arbitration.
Article 16. Correction of Work after Payment
Neither payment nor any provision in this contract shall relieve the Contractor of responsibility for faulty materials or workmanship and the Con tractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom which shall appear within one year from the date of completion of the Contractor's work hereunder. The Owner shall give notice of observed defects with reasonable promptness. Any dispute under this Article shall be subject to arbitration.
ASARCO ELP 0008783
Page 6 of 7
Article 17. Arbitration
All disputes which are herein stated to be subject to arbitration shall be submitted to and determined by arbitration. Except as and to the extent otherwise provided by the controlling state law, no party may have recourse to legal proceedings (other than to enforce this arbitration Article) unless and until an arbitration award has been made. There shall be one arbitrator who shall be chosen by the American Arbitration Association, whose arbitration rules shall be followed.
Article 18. Subcontracts
The Contractor will not employ any Subcontractor without the-'-prior written approval of the Owner and the Contractor shall require each Subcontractor to execute a contract in writing containing provisions similiar to all provisions of this contract which are in any way applicable to such Subcontractor and which will obligate such Subcontractor to comply with and perform all such provisions herein. Nothing herein shall create a contractual relationship between any Sub contractor and the Owner.
Article 19. Assignment
The Contractor shall not assign nor subcontract this contract in whole or in part nor shall the Contractor assign any moneys due or to become due Contractor hereunder without the prior written consent of the Owner.
Article 20. Coordination of Work
The Contractor shall conduct the work hereunder so as to cause a minimum of interference with the Owner's operation. Where interference with the Owner's operations become absolutely necessary, permission shall be requested by the Contractor not less than seventy-two (72) hours in advance.
Article 21. Undertakings by the Owner
The Owner agrees to obtain and pay for any permits, licenses and ease
ments required for permanent structures or changes, and, to the extent practic
able without interference with operations, to furnish the Contractor, free of
charge, for its use during construction, electricity, water, steam and compress
ed air required for construction purposes, at the voltage and pressure currently
available at Owner's said plant, to a point adjacent to or within
feet of
the site, but the Contractor will be required to make the necessary connections,
provide approved shut-off and safety devices and furnish and install all tempo
rary lines required to bring them to the point of use.
Article 22. Applicable Law
This contract shall be construed and enforced in accordance with the laws of the state where the work hereunder is to be performed.
Article 23. Entirety Clause
This contract constitutes the entire agreement between the parties, and except as may be specifically set forth herein no changes can be made herein except by an agreement in writing duly executed by the parties or their duly authorized agents.
Article 24. Additional Provisions
(Add such sdditionsl provisions, if any, as the particular job requires).
ASARCO ELP 0008784-
Page 7 of 7 IN WITNESS WHEREOF, the parties have executed this contract the day and year first above written.
SOUTHWESTERN INDUSTRIAL CONTRACTORS AND RIGGERS, INC.
Contractor ByTitle__________ President
AMERICAN SMELTING AND REFINING COMPANY Owner
By_ n u _AL
ASARCO ELP 0008785
AMERICAN SMELTING AND REFINING COMPANY FORM tt INSURANCE. 1 Ravi.ad 11/56INSURANCE-CERTIFICATE
AMERICAN SMELTING AND REFINING COMPANY REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS.
THIS IS TO TFRTIFY THAT THE POLICIES OF INSURANCE DESCRIBED REI.OW HAVE BEEN ISSUED TO Southwestern Industrial Contractors and Wiggars, Zoo.
THESE POLICIES ARE NOW IN FORCE. COVERING WORK BY THE ASSURED FOR AMERICAN SMELTING AND REFINING company ON contract for Bbcloaing Wodgs >MBtr loading Sroa: ax XI 9moo Smaltina Works
IF THESE POLICIES ARE CANCELLED OR CHANGED IN ANY WAY THAT WILL AFFECT THIS CERTIFICATE. TEN DAYS* PRIOR WRITTEN NOTICE WILL BE GIVEN BY THIS COMPANY TO AMERICAN SMELTING AND REFINING COMPANY. SAMUEL METZGER. JR., 120 BROADWAY, NEW YORK. N.Y.
KIND OF INSURANCE
NUMBER
DESCRIPTION OF POLICY
EXPIRES
LIMITS OF LIABILITY
REQUIRED MINIMUM
CONTRACTOR'S PUBLIC LIABILITY (COMPREHENSIVE
INCLUDING CONTRACTUAL)*
CGXr-551188
6/1/71
BODILY.INJURY
PROPERTY-DAMAGE contractor's PROTECTIVE LIABILITY
BODILY.INJURY
CGL-5511B8 6/1/71
PROPERTY-DAMAGE
EACH person $ 100,000 each accident $ 300,000 Seach accident 100,000
each person S 100,000 each accident $ 300,000 EACH ACCIDENT $ 100,000
$100,000 $300,000 $ 25.000
$100,000 $300,000 $ 25.000
AUTOMOBILE BODILY-INJURY PROPERTY-DAMAGE
CflF-591037 6/1/71
EACH PERSON $ 100,000 EACH ACCIDENT S 300,000
EACH ACCIDENT $ 100,000
$100,000 $300,000
$ 25.000
workmen's compensation AND
WC-58792
6/1/71
Statutory Limits
COMPLY W ITH
applicable
STATE LAW
employer's liability
date >abr^*y 24, 1971____________
EACH ACCIDENT S 1Q0f000
$ 25.000
moployers Casualty Coepany Texas toplayars Insurance Association
The Contractor ahall tare haraileaa and indemnify the Owner fro* and againat any expenae. lota or^daaage on account of any claim, demand or auit made by any peraon whomsoever, including any employee of the Owner, which ia in any way cauaed by or connected with, or growa out of the execution and performance of tbia contract by the Contractor or any Subcontractor; prowided, however, that the Contractor ahall not be required to indemnity the Owner againat any loaa cauaed aolely by negli gence or willful fault of the Owner or ita employees. The Contractor accepta all risk of injury or damage and all reaponaibzlity for any cltias for dsasges whatsoever resulting fro* the use, Misuse, or fsilure of sny hoist, rigging, blocking, scaffolding, or other like or unlike equipment used by the Contractor or any Subcontractor, even though such equipaent be furnished or loaned to the Contractor or any such Subcontractor by the Owner, and shall indeanify the Owner against all such claiaa.
ASARCO ELP 0008786
QUOTATION
SOUTHWESTERN
INDUSTRIAL CONTRACTORS AND RIGGERS, INC.
Formally: CONSTRUCTION DIVISION, SOUTHWESTERN TRANSFER CO., INC.
1730 Boston Avo.
P. O. Box 1611
El Paso, Texas 79948 (915) 532-3491
American Smelting and Refining Company_______________
24 March 1971
P. 0. Box 1111 El Paso. Texas
PROJECT____________________________________________ Duct Installation
_____________________________________
at East Hi Line Enclosure
Attn: Mr. Nasmyth
i nnATiniu
PflS Plant
We propose to furnish labor and equipment to install the 30" duct from the East Hi Line Enclosure to the existing 30" exhaust duct for $485.00.
Duct work to be furnished at jobsite by ASARCO. Necessary rerouting of wires to gain access for duct to be by others.
GRH:iz
G. R. Hatch
NORMAL CONDITIONS OF ACCEPTANCE, SALE AND PAYMENT ARE STATED ON REVERSE SIDE OF THIS QUOTATION.
ASARCO ELP 0008787