Document MJ4nNjbapeV4R1RGjDyrvyXR9
SClQS
212.441. 212.444. 212.44$. 212.446. 212.447. 212.448. 212.449. 212.450. 212.451. 212.452. 212.455.
212.456... 212.457... 212.181(a)
212.461(b).... 212.461(C).... 212.461(d)----212.461(e).... 212.461(0.... 212.461(g)----212.461(b)___ 212.462(a)-(d) 2.12.462(e)-----2l2.46)(a)-(c) 212.463(d)----212.681............ Appendix A....
Appendix B___
'Append 1 xC....
Illustration A Illustration 8 Illustration C
Rule
203(d)(5)(B)
203(d)(5)(C) , 203(d)(S)(0)
203(d)(5)(E) 203(d)(S)(F)
203(d)(5)(G) 203(d)(5)(H)
203(d)(5)(I) 203(d)(S)(J) .203(d)(S)(K) 203(f)(3)(E) Exception 203(d)(6)
203(d)(9) 203(d)(8) Preamble 203(d)(8)(A) 203(d)(8)(0) 203(d)(8)(E) 203(d)(8)(H)
. 203(d)(8)(I) 203(d)(8) (K)
203(d)(8)(L) , 203(d)(8)(B) . 203(d)(8)(F)i
203(d)(8)(C) 203(d)(8)(G) .. 203(d)(4) . Added In .Codification i Added in Codification 202(e). 203(C). 203(d)(3)(A)
& (B). 203(d)(5)(l)
6. (H).
203(d)(8)(J). 203(f)(3) Preamble. 203(f)(3)(F) Preamble. 203(1) 203(g)(1)(B)
203(a) 203(b)
Appendix C Past Compllance Oates
Rule 202(e). ...
Owners or operators of new emission sources were required to comply with the emission standards and limitations of Rule 202 by April 14. 1972.
Owners or operators of existing emission sources were, required to comply with the emission standards and limitations of Rule 202 by December 31. 1972; except that owners or operators of emission sources subject to Rule 203(g) were required to comply with the emission Standards and limitations of Rule 202-by Hay 30. 1975.
Rule 203(c)
Except as otherwise provided In Rule 203. every existing process emission source which was not
In compliance with Rule 203(b) as of'April >4. 1972. was required to comply with Rule 203(a). unless both of. the following conditions were me
a) The source was In.compllance, as of April u
1972. with the terms and conditions of a variance granted by the Board, or. by June 13. 1972. the source was the subject of a variance petition filed with the Board, which variance was subsequently granted; and.
b) As of April 14; 1972. construction was commenced on equipment dr modifications sufficient to achieve compliance with Rule
^ 203(b).
Rule 203(d)(3)(A) and (8)
Corn wet milling processes subject to Rule
i 203(d)(3) were subject to a standard of 0.3
: gr/sef of effluent gas from April 14. 1972 to
Hay 30. 1976;-------- ------
------
** i
Rule 203(d)(S)(l) and (M)
' - , Every owner or operator of an emission source the construction or modtficatlon qf which was
. coomenced after September 6. 1979. was required to comply with the emission standards and
limitations of Rule 203(d)(S)' upon coomencement of. operattwr; ~
'Every owner or operator of an emission source -i- 'the construictttfrt or operanworwhich was *"
`cbnmenced prior to September 6.' 1979.. was required to comply with the emission, standards and limitations, of Rule 203(dH5) no later than
December 31. 1982.
From the effective date of this Rule 203(d)(5) through December-'>982. full.compliance with an approved compl lance program and p'roJect completion schedule pursuant to Rule 104 for all
sources of partVculatelxemlssious subject to Rule 203(d)(5)-and 203(f) as amended under common ownership or control in the same air quality control reg ion const ituted eompVSancew-Vth-the..
emission standards and limitations contained in Part II if such compliance program and project
completion schedule;
I
"
-
' a) Provided for compliance by all sources of
. ' particulate matter subject to.Rule 203(d)(5)
! and 203(f). as amended, under common
ownership or control in the same air quality
' region, as expeditiously as ^practicable^
'Considering what:was economically reasonable
.and technically feasible, and
b) Provided for reasonable-further progress. Inachieving the reductions in particulate
emissions required by Rule 203(d)(5) and 203(f). as amended, including annual Increments of reductions such, that at least one-third-of the total reductions were achieved by December 3). 1980 and at least two-thirds of the total reductions were achieved by December 31.1981., unless the owner or. opecator. defflotistxaLed . ia. a., hearing.,,
before the 8oard that such increments were technically infeasible or economically unreasonable or unless the owner or operator demonstrated in a hearing before the Board
68