Document MJ48gVBzBgoq8YwxveEYrxD6x

DownloadRandom document
AR226-2083 .,_..:-;;^.-.' . .,^^^.,^AS^^&^A&^y^&Bi'~.--&.\.ir-defeiC-8 SAHPLIN6 PROJECT PA@E 1 OF 41 SUHHftRYOF SPECIAL C-8 SAHPHN6 PMMECT Jennifer Niehols Environmental Lab LSE 9-16-97 BID093252 EID137016 . ,.,. -..----. ..------.. .-.^........ -^^...^u^ _-iL .t_^^,----.-..MIUf C-8 SAMPLING PROJECT PAGE 2 OF 41 TABLE OF CONTENTS PAGE TITLE PAGE ..;.......-.....,..,,.*............,......... 1 TABLE OF CONTENTS ...................................... 2 INTRODUCTION .......................................... 3 SUMMARY OF AIR MONITORIN6 .............................. 4 SUMMARYOF WIPE SAMPLING ............................... 5 ATTACHMENT1; AIR SAMPLIN6 RESULTS ..................... 6 SUMMARYOF AIR SAHPLIN6 PATHSFORWARD.................... 24 ATTACHMENT2; INVESTI6ATION OF HVAC UNITS .............. 26 ATTACHMENT 3: SURFACEWIPE SAMPLING RESULTS ............ 30 WIPE SAMPLING CONCLUS10NS/PATHSFORWARD 36 ................. FI6URE I: ROOF HVAC SAHPLIH6 LOCATIONS (AIR) 37 ........... FIGURE 2: ROOF SAMPLIH6 LOCATIONS (WIPE) 38 ............................ FIGURE 3; PERCENT RECOVERY OF WIPE SAMPLES 39 FIGURE 4: AVERAGE VALUES AT ROOF LOCATIONS ............. 40 REFERENCES ............................................. 41 EID093253 ErD137017 ,..L-.- .... ..-^.^-- -- "-<-^^^i&..'fiA'.-'M-i.S^:^...-^:.,a. C-8 SAHPL1N6 PROJECT PA8E 3 OP 41 In response io the Summary of 1995 C-8 Blood Testing (Playtis, 1995) results, and subsequent 1996 Industrial Hygiene Follow-up Report (P1ayt1s 1996), an extensive sampling campaign for C-8 In air and on surfaces (wipe testing) was conducted In Teflon* areas. Areas/jobs that exhibited higher or lower than normal C-8 blood levels were studied In the follow-up report. Sampling priorities for this study were assigned based on the results of the follow-up. The Investigation was conducted by Environmental Lab LSE Jennifer Ntchols under the supervision of IH Lab Technician Becky Oines. EED093254 EID137018 C-8 SAMPLING PROJECT PA6E 4 OF 41 C-8 IN AIR MONITORING Sample locations* results and any conclusions/pathsforward that were determined are attached (attachment 1). Sampling was conducted using either the Oupont Alpha 2 or P200A pumps with flows set in the range of 200mL/rnin, +/-5mL/min. Sampling media used was conditioned Tenax* sorbent tubes supplied by the Teflon* lab. Analysis was conducted by Teflon* Lab personnel per method MU3627. Six sets of sampled tubes (206 samples total), along with sample blanks, were analyzed approximately every two weeks. it Set 4, analyzed August 5, 1997, was found to have a high value for the blank sample submitted. Upon investigation by Jennifer Nichols and Chemist Steve Peck, was found that approximately half of set 4 (including the blank sample) had been contaminated by an Impure reagent. For this report* the amount of contaminant in the blank sample will be deducted from each contaminated sample and shown In ( ). After the deduction, a number of samples still exhibited levels worth noting. The majority of the air samples were taken in FEP and Homopolymer Control Rooms where a considerable amount of the employee time is spent. Additional monitoring was conducted on roof HVAC units (at the intake) that supplied these control rooms. Because a possible route for C-8 exposure could be through the HVAC units, an investigation into these units was conducted and is attached (attachment 2). The focus was placed on the B-162 units because of their close proximity to the C-8 emissions stack located an B-124 (figure 1). Depending on prevailing wind patterns or weather conditions, it was observed that the emission from this stack looped down onto B-162. Weather conditions are summarized with the results (attachment 1); for more detail and observations see notebook $149 R located in Environmental Lab. B-3. The Monomer Control Room was added to the sampling list, although it was not originally a concern, because it has a roof intake that is dose. to the C-8 emission stack. Additional samples were taken on the C-8 Recovery Operator while changing HVAC filters, in the FP&D wax room, FP&D Dryer Operators while cleaning the dryers, Bl62 smoking area, and the FEP #3 slab drop while in use. Locations were chosen because of information from the industrial hygiene report, or from pathsforward from previous sampling not as extensive as this campaign. OD093255 EID137019 C-8 SMWLIMG PROJECT PAGE 5 OF 41 C-8 SURFACE WIPE SAMPLING Sample locations, results, and conclusi'ons/pathsforward determined are attached (attachment 3). Sampling was conducted using one to three SKC Smear Tabs per location. The-solvent used on the tabs was reagent quality methanol; reagent used In the analysis. A sampling template was cut to the size of 100ctn(2). Sampling techniques were adapted from OSHA's 'Sampling for Surface Contamination Guidelines*. Pink latex rubber gloves topped with a new pair of clear latex gloves per each sampled area were used to prevent cross contamination between locations. Forty-seven samples -- samples) and 16 from FEP -- 31 from Homopolymers (Includes roof along with a blank sample were submitted for analysis. Analysis was conducted by Teflon* Lab personnel using method WW3627. A recovery study was set up on Pyrex* dishes and If aluminum lab pans. Results Indicate that as concentrations Increase, the percent recovery decreases (figure 3). Many factors (such as evaporation, size of smear tab, dry time) may contribute to this. Because surface of the sample f d) i eld set t var ing i ab up l e a s t h(oi r. oeu.g. h conditions recovery s I t n u d th y e w ar oul e d a, b e t y t pe im e o f consuming. future wipe sampling campaigns are conducted and time permits, this should be considered in a pathforward. The locations chosen for the wipe sampling were coordinated with locations chosen for the air samples. Control rooms (excluding FEP*s previous oven and extruder control rooms which were in the process of removal), and the areas that surround the control rooms, were sampled. Additional locations Included lunch/breakrooms, a lounge, a smoking area, an office area, warehouses and roof locations. The roof locations were also chosen to coordi'nate with the air samples and so that as little weather conditions as possible would have affected them (figure 2), Because of shutdown (non-routine work and extensive equipment replacement) sampling locations were limited to those which still exhibited surface "dirtiness*. The type of material sampled was noted (along with results on attachment 3) and more detail with location sketches can be found in notebook S149 R located in the Environmental Lab B-3. Developing a limit, or concern level, for the dermal dose (amount absorbed through the skin) is not feasible due to the many variables involved* These include; amount of C-8 per area the skin is exposed to during a shift, be absorbed into the skin, and the fraction picked up from the surface. Calculating an could give a result that night deviate from degrees. Therefore, this study is designed a surface area, amount of fraction of C-8 that would of C-8 that would be estimated dermal dose a true value by several to Identify and compare surface areas that have more residual C-8 than others. HD093256 EID137020 C-8 SAHPLIN6 PROJECT PAGE 6 OF 41 ATTACHMENT 1: AIR SAMPLING RESULTS This attachment contains Individual charts for each sample location. Information on each chart Includes; sample date, result of the sample In moles per billion (MPB). wind direction In the morning and afternoon, weather conditions for that day, and any conclusions or pathsforward that were determined. BID093257 EID137021 DATE 07-08-97 07-17-97 08-05-97 08-08-97 C-8 SAHPHN6 PROJECT PACE 7 OF 41 C-8 RECOVERYOPERATOR rnro68/o8pn) RESULT MPB VINO HORN/AFTER ^ ^ ,WEATHER <0.0l 0.12 0.06 <0,0l NE/N6 NE/NE S,S6/S.SC S.SW/SM CLEAR CLEAR CLEAR CLEAR COHCLUSIOM/PATOFORMA* imAODtTtOHAL SAMPLING NEEDED * VARY PERSONNELTESTED EID093258 EID137022 "^ tt:fSf'':~~' "a :; i?-,*:.'. .-.-..--.- ~ -... -^:.,,'.-..'t-.''r4A.Bt't%e&'&*iiAi.A&SL^..J!i C-fl SAHPLIH6 PROJECT PAGE 8 OF 41 DATE 07-21*87 07-22-97 07-23-97 07-24-97 07-25-97 07-28-97 07-29-97 07-31-97 08-04-97 08-05-97 08-07-97 08-08-97 08-12-97 08-13-97 MNOMER COHTROl RMM (TM0100) RESULT MP3 WINO MORN/AFTER . <0.01 NE/NE <0.01 SW/NW.S 0.02 S/H <0.0l S/S 0.02 S/E 0.05 M/M,S (0.01) $/H (<0.01) S/N,NW <0.0l S/S.SE ^"""o^rrS^siE/S;SE^$ <0.0l S/N.NE <0.01 S.SW/SW <0.0l <0.0l S.SE/E S/SE WEATHER CLEAR CLOUDY CLOUDY RAIN CLOUDY CLOUDY CLEAR CLEAR STORMY CLEAR CLEAR CLEAR RAIN RAIN CONCLUSION/PATttFORMARD* RESULTS CONSISTENT * NO FURTHER SAHPLIN6 HEEDED ^(^sp EID137023 ^- C-8 SAMPLING PROJECT PA6E 9 OF 41 GRANULARPOLYKETTLECONTROL ROOM (TTFQ60) c^ Sx-y*^ DATE 07-08-97 07-09-97 07-10-97 07.11-97 07-21-97 07-22-97 07-23-97 07-24-97 07-25-97 07-28-97 07-29-97 07-31-97 08-04-97 08-05-97 08-07-97 08-08-97 08-12-87 08-13-97 RESULT NPB <0.01 1.91 <0.01 0.11 <0.01 <0.01 <0.01 <0.0l <0.01 <0.01 (1.80) (<0.01) <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 N{N0 NORN/AFTER NE/NE E/NW s/sw s/s NE/NE sw/Ny,s S/W S/S S/E N/N.S S/N, S/H,NW S/S,SE S.SE/S.SE S/N.NE S,SM/SW S,SE/E S/SE WEATHER CLEAR RAIN CLEAR CLEAR CLEAR CLOUDY CLOUDY RAIN CLOUDY CLOUDY CLEAR CLEAR STbRHY CLEAR CLEAR CLEAR RAIN RAIN CONCLUSION/PATHFORWARD* TNO HIGH RESULT INDICATE MORE SAMPLING HEEDED. * ONE HIGH RESULT WHILE RAINING, AND ONE HIGH RESULT MHILE CLEAR, INDICATES WEATHERNOT A FACTOR. ^(jro^L.tf^w-Lf 'yo-^ ^ EVD093260 EID137024 C-8 SAMPUN6 PROJECT PAGE 10 OF 41 FP&D AUTOCLAVE CONTROL ROOM(TTF010) DATE 07-09-97 07-10-97 07-11-97 07-21-97 07-22-97 07-23-97 07-24-97 07-25-97 07-28-97 07-29-97 07-31-97 08-04-97 08-05-97 08-07<97 08-08-97 08-l2-y 08-13-97 RESULT HP8 <0.01 <0.01 0.05 <0.01 <0.0l 0.02 0.02 0.04 0.01 (<0.01) (<0.01) - <0.01 <0.01 0.02 <0.0l <0.01 <0.01 HORN/AFTER E/m S/SM S/S NE/NE SU/NU,S S/M S/S s/ H/N.S S/N S/M.HW S/S.SE S.SE/S.SE S/H,HE S.SW/SW S,SE/E S/SE HEATHER RAIN CLEAR CLEAR CLEAR CLOUDY CLOUDY RAIN CLOUDY CLOUDY CLEAR CLEAR STORHY CLEAR CLEAR CLEAR RAIN RAIN COHCLUSION/PATHFORWAR* DRESULTS COMSISTENT * NO MORE SAMPLING NECESSARY EID093261 EID137025 C-8 SAMPLING PROJECT PAGE II OP 41 FINE POWDERFINISHINS (DRYER) CONTROLROOH (TTF031> DATE 07-09-97 07-10-97 07-11-97 07-21-97 .07-22-97 07-23-97 07-24-97 07-25-97 07-30-97 07-31-97 08-84-97 08-05-97 08-06-97 08-07-97 08-08-97 08-1Z-97 08-13-9y7 t> RESUIT MPB <0.0l 0.01 0.06 0.76 0.02 0.33 0.05 0.08 (0.11) (<0.0l) <0.01 <0.0l 0.03 0.04 <0.01 <0.01 <0.01 VINO HOIIN/AFT6R E/NW s/sw $/s NE/NE SW/NW,3 S/M S/S S/E s/s,sw S/N.HW S/S,SE S,SE/S,SE S/S.SE S/ME S,SN/SM S.SE/E S/SE WEATHER RAIN CLEAR CLEAR CLEAR CLOUDY CLOUDY RAIN CLOUDY CLEAR CLEAR STORHY CLEAR CLEAR CLEAR CLEAR RAIN RAIN CONCLUStON/PATHPORWARD* THO HIGH RESULTS INDICATE MORI SAMPLIM6 HEEDED EGD093262 EID137026 ^'s"^ ""-- '-;.^1&:'A'.' C-8 SAMPLIH6 PROJECT PAGE U OF 41 FINE POWDERFINISHING DRYER OPERATOR(TrF102/08Pt) DATE 07-14-97 07-14-97 07-2S-97 07-25-97 08-06-97 08-06-97 08-12*97 08-12-97 08-12-97 PAYROLL * 10008 4872 438Z 4824 10203 10177 10214 4382 4824 RESULT HPB <0.01 (^43^ '">--^ 0.26 0.18 0.16 0.06 0.06 <0.0l * <0.01 * * ROUTINE WORK, DID NOT CLEAN DRYER COMCLUSION/PATHPORWAR*D INCIDENT REPORT FOR 7/14 -------------------------- LEVEL INDICATES MECHANICAL INTEGRITY HAY HAVE BEEN RESPONSIBLEFOR ABOVE TLV RESULT * PLACE HI6H PRIORITY ON FOLLOW-UP * ADDITIONAL SAMPLING NEEDED WHEN DRYER IS BEING CLEANED HD093263 EID137027 >.,.-;a?';^^ ._ C-8 SAMPLING PROJECT PAGE 13 OF 41 DATE 07-09-97 07-10-97 07-11-97 07-21-97 07-22-97 07-23-97 07-Z4-97 07-25-97 08-04-97 ilftX ROOH (TTFOZ8) RESULT HPB 0.06 0.37 0.40 0.42 0.28 0.52 0.43 0.3S 0.41 WIND HORN/AFTER E/NM S/SW S/S NE/NE SW/NW.S S/li S/S S/E S/S,S6 HEATHER RAIN CLEAR CLEAR CLEAR CLOUDY CLOUDY RAIN CLOUDY STORHY COHCLUSIQH/PATHFORKAM) * CONSISTENT RESULTS * GIVE ROUTINE SAHPLIN6 FREQUENCY * SUGGEST ADHINISTRATIVE CONTROL LIMITING TINE INSIDE ^093264 EID137028 3.^\- < ^ - ^..^--.-"^^-""SL." .--..-^ ., . C-8 SAMPLIN6 PROJECT PA6E 14 OF 41 DATE 07-09-97 07-10-97 07-11-97 07-21-97 07-22-97 07-23-97 07-24-97 07-25-97 07-30-97 08-04-97 08-07-97 B162 2ND LEVEL OUTSIDE SMOKING AREA (TK004S1) RESULT MP8 0.43 0.26 0.32 0.17 0.15 0.23 0.22 0.23 0.01) O.OS 0.06 WIND HORN/AFTER E/NH S/SM S/$ HE/HE SW/Mf,S S/H S/S S/6 S/S,5M S/S.SE S/N.NE WEATHER RAIN CLEAR CLEAR CLEAR CLOUDY CLOUDY RAIN CLOUDY CLEAR STORMY CLEAR CONCLUSION/PATHFORHARO * RESULTS CONSISTENTLY CLOSE TO ACTION LEVEL * MOVING SMOKING AREA SUGGESTED * NO ADDITIONAL SAMPLING NEEDED ^093265 EID137029 C-8 SAMPLIH6 PROJECT PAGE 15 OF 41 BATE 07-09-97 07-10-97 07-11-97 07-21-97 07-22-97 07-23-97 07-24-97 07-25-97 H. OFFICES ROOF HYAC (TM0045) RESULT HPB 0.10 SPILLED' 0.13 0.15 0.07 0.11 0.14 (0.22) WIND MORN/AFTER E/NM s/sw s/s NE/NE SW/NN,S S/W S/S S/E WEATHER RAIN CLEAR CLEAR CLEAR CLOUDY CLOUDY RAIN CLOUDY COHCLUS10H/PATHFORHARD * CONSISTENT RESULTS * 00 FOLLOW-UP AIR SAMPLING IN OFFICE IN N. HALLWAY QD093266 EID137030 C-8 SAMPLIH6 PROJECT PA6E 16 OF 41 FPSO AUTOCLAVE CONTROL ROOH INTAKE (TH0045) DATE 07-22-97 07-23-97 07-24-97 07-25-97 07-29-97 08-08-97 RESULT MPB 0.19 0.51 0,96 2.90' (0.94) 0.30 HINO MORN/AFTER SW/NW.S S/H S/S S/E. S/H S,SE/S,SE WEATHER CLOUDY CLOUDY RAIN CLOUDY CLEAR CLEAR CONCLUSIOM/PATHFORWARP* HI6H RESULTS. * RESULTS SUPPORT AREA'S CONTINUINS EFFORTS TO REDUCE STACK EMISSIONS * FOLLOW-UP SAMPLING CAMPAIGN AFTER REMEDIATION BID093267 EID137031 C-8 SAMPLING PROJECT PACE 17 OF 41 DATE 07-21-97 07-22-97 07-23-97 07-24-97 07-25-97 07-29-97 08-05-97 MAX ROOMHVAC INTAKE (?0045) RESULT MPB 0.26 1.21 1.08 2.13 0.69 2.17 0.19 NINO MORN/AFTER ME/N? SM/NW,$ S/W s/s $/E S/N S.SE/S.SE WEATHER CLEAR CLOUDY CLOUDY RAIN CLOUDY CLEAR CLEAR CONCLUSION/PATHFQRHARO * HIGH RESULTS * RESULTS SUPIWT AREA'S COHTINUIN6 EFFORTS TO REOUCE STACK EMISSIONS * FOLLOW-UP SAHPLINS CAMPAIGN AFTER REMEOIATION QD093268 EXD137032 C-8 SAHPLIH6 PROJECT PAGE 18 OF 41 MONOMERCONTROL ROOM HVAC INTAKE (TH0045) DATE 07-21-97 07-22-97 07-23-97 07-24-97 07-25-97 07-Z9-*97 08-05-97 RESULT MPB 0.11 0.17 0.16 0.39 0.34 (0.45) 0.07 HIND HORH/APTER NE/NE SW/NW,S S/W S/S S/E S/N S.SE/S.SE WEATHER CLEAR CtOUDY CLOUDY RAIN CLOUDY CLEAR CLEAR CONCLUS10H/PATHFORMARD* -------------- COMPARINGTHE CONTROLROOM RESULTS TO THESE RESULTS, SHOWS THE HVAC FILTERS ARE SERVING A NECESSARY FUNCTION * FOLLOW-UP SAHPLIN6 CAMPAIGN AFTER REMEDIATION BfDQ93269 EID137033 r. -, '^/TR--'. C-8 SAHPLIN6 PROJECT PAGE 19 OF 41 DATE 07-14-97 07-16-97 07-17-97 07-18-97 07-28-97 07-29-97 07-30-97 07-31-97 06-04-97 08-06-97 08-07-97 08-08-97 08*12-97 08-13-97 NEW FEP CONTROL ROOM (TCP280) RESULT NPB 0.03 0.02 0.04 0.01 0.04 (<0.01) (0.01) (<0.01) <0.01 <0.01 <0.01 <0.01 <0.01 <0.0l WIND HORN/AFTER NE/NE NE/E NE/NE NE/NE H/N,S S/N S/S.SU S/W.NW S/S.SE S/S,SE S/H.NE s.sw/sy S.SE/E S/SE WEATHER CLEAR CLEAR CLEAR CLEAR CLOUDY CLEAR CLEAR CLEAR STORMY CLEAR CLEAR CLEAR RAIN RAIN eONCLUSION/PATHFORWA* RRDESULTS COHSISTENT . * MO FURTHER TEST1N6 NECESSARY ED0093270 EID137034 C-8 SAMPLING PROJECT PA6E 20 OF 41 FEP EXTRUDER CONTROL ROOM (TCP268) DATE 07-14-97 07-16-97 07-17-97 07-18-97 07-28-97 07-29-97 07-30-97 07-31-97 08-04-97 08-06-97 08-08-97 RESULT HP8 0.05 0.04 0.04 0.04 9.45 (<0.01) (<0.01) (<0.01) <0.01 <0.1 <0.01 HIND HORN/AFTER HE/HE NE/E NE/NE NE/HE H/N,S S/H S/S.SW S/N.NH S/S.SE S/S.SE S,SW/SW WEATHER CLEAR CLEAR CLEAR CLEAR CLOUDY CLEAR CLEAR CLEAR STORHY CLEAR CLEAR CONCLUSION/PATHFORWARD * SOME HIGH RESULTS, HOWEVERCOWTROLROOM NO LON6ER EXISTS (LOCATEDIN NEW CR) * NO FURTHER TESTING NEEDED ^09327] EID137035 C-8 SAMPLING PROJECT PA@ 21 OF 41 FEP OVEN CONTROL ROOM (TCP231) *POSITOH I IS EAST-LAR6E CONTROL PANEL DESK *POSITON 2 IS WEST-SHALL CONTROL PANEL DESK DATE 07-14-97 07-16-97 07-17-97 07-18-97 07-28-97 07-29-97 07-30-97 07-31-97 08-04-97 08-06-97 08-07-97 08-08-97 POSITIOM 1 HPB 0.09 0.07 4.31 0.06 0.19 (0.17) (0.12) (0.03) 0.02 0.05 0.04 <0.01 POSITION 2 HPB 0.18 0.16 0.08 1.S9 0.07 (0.2S) (<0.01) (0.07) 0.03 0.02 SPILLED 0.23 WIND MORN/AFTER NE/NE NE/E ME/NE NE/NE N/M.S S/H S/S.SH S/N,NM S/S.SE S/S.SE S/N.NE S.SW/SH WEATHER CLEAR CLEAR CLEAR CLEAR CLOUDY CLEAR CLEAR CLEAR STORMY CLEAR CLEAR CLEAR CONCLUSION/PATHFORMARD * *? * SOME HIGH RESULTS, HOWEVER CONTROL ROOM HAS BEEN MOVEOTO NEW CONTROL ROOM NO FURTHER TESTING NEEDED jBID093272 EID137036 C-8 SAHPLIN6 PROJECT PAS 22 OF 41 PEP POLYKETTLE CONTROL ROOM (TCP215) *POSITON 1 IS CONTROL PAKEL DESK *POSITON 2 IS WET FINISH DESK DATE POSITION 1 MPB POSITION 2 HPB UINO HORH/AFTER WEATHER 07-14-97 07-16-97 07-17-97 07-18-97 0.05 <0.01 <0.01 <0.01 <0.01 <0.0l 0.01 0.01 NE/NE NE/E NE/NE NE/NE CLEAR CLEAR CLEAR CLEAR - 07-28-97 07-29-97 07-30-97 07-31-97 08-04-97 08-06-97 08-07-97 08-08-97 08-12-97 08-13-97 <0.01 (0.29) (<0.01) (<0.01) 0.48 <0.01 0.23 0.01 <0.01 0.01 <0.01 (0.03) (0.01) (0.04) 0.12 <0.01 <0.01 <0.01 <0.01 <0.0l N/M,S S/M S/S.SM S/N,NW S/S.SE S/S.SE S/N.NE S.SM/SW S.SE/E S/SE CONCLUSION/PATHFORMARO* RESULTS NOT CONSISTEHT CLOUDY CLEAR CLEAR CLEAR STORHY CLEAR CLEAR CLEAR RAIN RAIN g Is) S * POSSIBLY MORE SAMPLIMfi, BUT LONER PRIORITY BID093273 EID137037 C-8 SAHPLIN6 PROIECT PAGE 13 OF 41 DATE 07-28-97 08-08-97 f3 SLAB DROP NHILE IN USE (TCP237) RESULT HPB 0.37 0.25 NOTES ONLY RAN PART OF SAMPLE TIME RAN ENTIRE SAMPLE TIME CONCLUSION/PATHFORHARD* CONSISTENT RESULTS * MORE SAMPLINfi NECESSARY BID093274 EID137038 C-8 SAMPLING PROJECT PAGE 24 OF 41 SUMMARYOF PATHFORWAROITEMS * ADDITIONAL SAMPLING IS NEEDED OH C-8 RECOVERYOPERATOR(08PH) WHILE CHAH6INB FILTERS. THE FOUR SAMPLES TAKEN WERE OH THE SAME OPERATOR. EACH AREA HAS OPERATORSWHO CHANGEFILTERS. TESTING ADDITIONAL PERSONNEL/FILTERCOMBINATIONS RECOMMENDED. * SOME AREAS HAD A PEW HIGH RESULTS WHILE MIXED IN WITH LOW RESULTS. ADDITIONAL SAMPLING IN THOSE AREAS IS NEEDED. THEY INCLUDE: GRANULAR POLYKETTLE CONTROt ROOM (TTF060) FINE POWDERFINISHIN6 (DRYER) CONTROL ROOM (TTF031) FEP POLYKETTLE CONTROL ROOM (TCP215)-1ow priority * IN THE PAST, THE WAX ROOM (TTF028) HAS SHOWNHIGH RESULTS. THIS IS CONFIRMED IN THAT EIGHT OF THE NINE SAMPLES IN THIS STUDY WERE OVER THE ACTION LEVEL. ADMINISTRATIVE CONTROLSARE SU66ESTED ON AMOUNT OF TIME SPENT INSIDE THE ROOM. RENEW FREQUENCFYOR ROUTINE SAMPLING. * THE #3 SLAB DROP (TCP237) IS A DIFFICULT SAMPLE TO 6ET DUE TO ITS LIMITED OPERATION. IT HAD BEEN TARGETED IN THE PAST AS A TROUBLE AREA AND THESE RESULTS CONFIRM THERE IS APPRECIABLE LEVELS. IT WAS BROUGHT TO OUR ATTENTION THAT THE BEST TIME TO SAMPLE THIS LOCATION WOULD BE WHEN THE PRODUCTS 100 OR S100 ARE RUNNING AS THEY ARE FINE POWDEREDAND RUN FAST. ADDITIONAL SAMPLING IS NEEDED DURING THESE CONDITIONS. * THE B-162 SECOND LEVEL SMOKING AREA (TM0048) SHOWED CONSISTENT VALUES CLOSE TO THE ACTION LEVEL (0.28 MPB) INDICATING THE NECESSITY TO FIND AN ALTERNATE SMOKING AREA. h. * ONE CONCERN IS THE FINE POWDERFINISHING DRYER OPERATOR (08PI) WHILE CLEANING THE DRYERS. ONE RESULT WAS HIGH (2.4 MPB) WHILE CLEANING DRYER i3. DRYER 3 CONTAINED A BELT (SHOULDMINIMIZE EXPOSURE.R) AWER THAN THE PAPER USED ON DRYER SINCE SHUTDOWN, BOTH DRYERS NOWCONTAIN THE BELT. INCIDENT REPORT, FOL970015. FOR THE HIGH RESULT INDICATED MECHANICAL INTEGRITY MAY HAVE BEEN RESPONSIBLE. THIS WAS TOE ONLY SAMPLETAKEN ON THE #3 DRYER, THEREFORE FOLLOW-UP SAMPLES ON THIS UNIT SHOULD BE DONE. A HIGH PRIORITY IS PLACED ON THIS FOLLOW-UP. * THE ROOF SAMPLES DEMONSTRATEA NEED FOR BETTER CONTROLSON THE C-8 STACK EMISSIONS AND/OR LIMITING THE TIME SPENT (WITHOUTA RESPIRATOR)OH THE ROOF. LOCATIONS CLOSEST TO THE STACK SHOWED LOWER LEVELS THAN THOSE TO THE SOUTH (FIGURE 4) DEMONSTRATINGA LOOPING EFFECT OF THE EMISSION. AS STATED BEFORE, ON SEVERAL OCCASIONS WHEN I WAS ON THE ROOF I WITNESSED THE EMISSION LOOPING EFFECT (DEPENDINGON THE WEATHER). FOLLOW-UP SAMPLING CAMPAIGN SUGGESTED AFTER REMEDIATION. EID093275 EID137039 C-8 SAMPLING PROJECT PAGE 25 OP 41 SAMPLING BROUGHTTO OUR ATTENTION BUT NOT ACCOHPLISHED IN THIS CAMPAIGN, INCLUDED THE JOB 90/50 PACKOUT BY THE MET FINISH OPERATOR. THIS PRODUCT IS INFREQUENTLYPRODUCEDMAKING SAMPLES DIFFICULT TO GET. FUTURE SAMPLES FOR C-8 AND NUISANCE DUST ARE NEEDED. * SPECIAL ATTENTION SHOULDBE PAID TO THE AREA WHEREFRESH C-8 IS STORED (OUTSIDE OF THE GRANULARPOLYKETTLE CONTROLROOM). IN THE DEC. 18, 1996 MEMORANDUM(FOLLOWUP TO BLOOD TESTING) IT WAS CONCLUDEDTHAT THERE WAS NO DRIP PAN UNDERTHE TANK*S SPIGOT AND ONE SHOULD BE PLACED THERE IMMEDIATELY. DURING AIR SAMPLING THERE HAS A BUCKET COLLECTING THE DRIP. DURING WIPE SAMPLING THE BUCKET WAS NO LONGERTHERE AND MET C-8 MAS DRIPPING AND ACCUMULATINGOH THE FLOOR. THIS IS A HIGH TRAFFIC AREA AND IT WOULDBE EASY TO TRACK DRIED C-8 INTO OFFICES. CONTROL ROOMS, ETC. NOT ONLY IS THE CATCH BUCKET VERY IMPORTANT. BUT IT IS RECOMMENDEDTO FIX THE SPIGOT TO REMEDIATE THE DRIP. EID093276 EID137040 ^ C-8 SAMPLING PROJECT PAGE 26 OF 41 ATTACHMENT2: INVESTleATIOH OF HVAC SYSTEMS This attachment contains information on HVAC systems supplying the control rooms and other pertinent locations sampled. The Inforwatlon was obtained by Interviewing various Teflon* personnel as no known single person has a thorough knowledge of the HVAC units. EID093277 EID137041 C-8 SAHPLINB PROJECT PA6E 27 OF 41 GRANULARPOLYKETTLE CONTROLROOM (TTF060) THIS CR HAS AN INTERNAL UNIT TO THE RIGHT AS YOU ENTER THE DOOR. AS YOU PASS INTO THE COMPUTER AREA YOU CAN SEE A VENT OF MAKE-UP AIR WHICH WAS TRACED INTO THE WAX ROOM VENTILATION SYSTEM. FP&D AUTOCLAVE CONTROL ROOM(HFOlO) THIS CR'S SYSTEH IS LOCATEDON THE ROOF (FIG. I). THE INTAKE IS LOCATEDON TOP OF THE RETURN FAN SYSTEH (AC UNIT IS CONNECTEDTO THIS). FINE POWDERFINISHING DRYER CONTROL ROOH (TTF031) THIS CR*S SYSTEM IS INTERNAL WITH (SUPPOSIBLY)NO MAKE-UP AIR. THE CR IS LOCATED BETWEENDRYER CORRIDORS. THERE IS A HVAC UNIT ON THE ROOF FOR THE DRYER AREA WHICH HAS ITS DUCT WORK RUNNING THROUGHTHE CEILING UNIT OF THE CR. IT THEN BRANCHES OFF AND HAN6S OVER TOP OF THE DRYERS ALONG EACH CORRIDOR. THERE IS A LARGE (SAUCERSIZE) HOLE IN THE CEILING OF THE CR WHICH COULD PROVIDE MAKE-UP AIR* THIS IS A SMALL CR WITH DOORS ON BOTH SIDES WHICH ARE FREQUENTLYUSED. WAX ROOM (TTF02B) THERE IS AN OUTSIDE DOOR WHICH IS FREQUENTLYLEFT OPEN FOR VENTILATION BUT OCCASIONALLY ITS BEEN SHUT. THE HVAC UNIT IS LOCATED ON THE ROOF (FIG. 1). N. OFFICES ROOF HVAC THIS UNIT IS ON THE SAME LEVEL AS OTHERS BUT APPEARS TO SIT LOWER BECAUSE IT IS FLUSH WITH THE GROUND. IT IS CLOSEST TO THE C-8 STACK (FIG. 1). EID093278 EID137042 C-8 SAMPLING PROJECT PAGE 28 OF 41 MONOMERCONTROL ROOM (TH010Q) I). THERE IS A ROOF UNIT MARKEDCCR AND COMPUTERH UNIT. A SECOND UNIT, WEST OF IT, IS MARKEDCOMPUTERU UNIT. THESE ARE DIRECTLY ACROSS FROM THE C-8 STACK (FIG. SMOKING AREA THIS AREA IS ONE MORE LEVEL COWN THAN THE SAMPLING AREA OF THE HVAC UNITS. THE C-8 STACK IS LOCATEDDIRECTLY UP AND A LITTLE LEFT. THERE IS A SHALL VENT (12" X 12') LOCATEDABOVEBLOWING OUT. IT WAS TRACED TO THE HEN'S RESTROOMIN THE NORTHOFFICES HALLWAY (1ST ON RIGHT), IT IS SUPPLIED BY THE N. OFFICES ROOF HVAC. HEW FEP CONTROL ROOM (TCP280) THIS CR HAS AM INTERNAL UNIT WITH NO MAKE-UP AIR. ON A SAMPLE DROP OFF, I NOTED A PAINT FUHE SHELL INSIDE THE CR. THE ODOR MAS NOT PRESENT JUST OUTSIDE THE CR IN THE EXTRUSION AREA. FEP EXTRUDERCONTROL ROOM (TCP268) THIS ROOM HAS TWO WINOOW UNITS'THAT COMPRISE ITS SYSTEM. EBD093279 EID137043 C-8 SAMPLIM6 PROJECT PAGE 29 OP 41 FEP OVEH CONTROLROOH <TCP231) HVAC UNIT IS LOCATED ON THE OUTSIDE OF THE NORTH WALL OF THE CONTROLROOH. IT IS BESIDE OP THE NUMBERTNO OVEN ENTRANCEAND SURROUNDEDBY THE CONVEYERSYSTEM THAT CARRIES THE PONDER PRODUCT INTO THE OVEN (AREA BETS VERY DUSTY AT TIMES). IT APPEARS THAT MAKE-UP AIR COMES FROM A UNIT LOCATEDJUST ABOVE THE AC. THERE IS WHITE RESIDUE ON THE INTAKE COVER, FEP POLYKETTLECONTROLROOM(TCP21S) THIS CONTROL ROOM HAS A ROOF UNIT LOCATION IS UNDETERMINED AT THIS POINT. * NOTE: BOTH THE FEP OVEN CR AND THE FEP EXTRUDERCR WILL BE MOVING INTO THE NEN CONTROL ROOMDURING SHUTDOWN. THE EXTRUDER CONTROL ROOM WILL BE COMPLETELYREMOVEDAND WE OVEN CONTROL ROOMNILL REMAIN TO HOUSE COMPUTER SYSTEMS. BQ5093280 EID13-7044 C-8 SWPLIN@ PROJECT PA6E 30 OF 41 ..^ ATTACHHEHT 3: SURFACEWIPE SAHPLIN6 RESULTS This attachment contains charts for samples In Hoinopolymers and Fep areas* Information on each chart Includes: a description of the location* the type of surface that was wiped, and the results reported In niicrograros (ug). 5 EID093281 5 EID137045 C-8 SAMPUN6 PROJECT PAKE 31 OF 41 HOHOPOt.YHER (BIDS 162) AREAS LOCATION SURFACE Fine Powder Finishing (Dryer) Control Room -top of monitor -In Foreman *s room adjacent to monitor room on top of cabinet in rear corner Dryer Area -behind Control Room at dean Room end of dryers on top of cabinets -Dry Screen Room on blue switch boxes for moisture analyzer -1n front of Dry Screen Room (wax Room end) on small metal shelf on (12 Dryer side -along west wall by i3 Dryer on top of yellow breathing a1r box Packout Dispersion Area -at small control panel (across from stairwell doorway) on top of face shield box plastic painted metal painted metal painted metal metal painted metal clear plastic Warehouse -behind the packout dispersion area on tan supply cabinet by desk ' Autoclave Control Room -on top of refrigerator -on top of long shelf that has monitors sitting on ft Autoclave/Polykettle Control Room area -on top of tan filing cabinet roughly In-between each Control Room painted metal painted metal laminated wood painted metal RESUlTS(uo) 62.2 40.1 310.2 36.8 124.8 29.3 27.2 31.1 23.2 48.3 28.6 ^093282 EID137046 C-8 SAMPLING PROJECT PA6E 32 OF 41 Polykettle Control Room Area -outside door on the stand that holds the fresh C-8 tank -small white refrigerator to the left of mixing hood by C-8 tank Polykettle Control Room -on top of Mack coat rack inside door -on top of microwave -doorknob, as you enter Control Room (roughly 100cm(2) area) Monomer Control Room -on top of monitor at far end (from door) of control panel -on top of monitor in middle of control panel -on top of monitor (under vent) In computer/monitor room adjacent to control area Lunchroom -(in Monomer Control Room area) on top of beige refrigerator N. Offices area -(off of corridor by Monomer Control Room) last office on left (Ruth) on filing cabinet right of desk Momens Lounge -(across from door to smoking area) on top of nricrowave Smoking area -on top of vent above the bench -collected sample of dust in vent (weighing 0.09351 grams) metal painted metal painted metal plastic covered metal plastic plastic plastic painted metal painted metal plastic covered metal 4476.8 77.4 4.5 21.2 I.I 23.4 8.4 15.3 16.3 17.5 26.9 25.8 11.0 BID093283 EID137047 C-8 SAMPLING PROJECT PACE 33 OF 41 :3^ C-8-oRnectoovperoy fCsomntarlol l sRilovomer box oa wa11 metal 154.8 to the right as you enter C-8 Recovery Control Room area -positioned approximately In the middle of the entire area on only flat surface that was dirty Roof area (see figure 2) "at west end of Monomer Control Room hvac unit on top of small box underneath of larger safety switch box metal metal 82.8 11.2 -on underside of the H. Offices hvac unit Intake metal 15.6 -on small ledge at bottom of Wax Room HVAC unTt*s Intake metal 16.4 -on base of the backside (wax unit side) of the FPOryer area and clave ingredient hood exhaust metal 28.5 -on Inside ledge of north end of AC part of the Autoclave Control Room HVAC unit metal 29.7 EID093284 EID137048 C-8 SAMPLING PROJECT PAGE 34 OP 41 FEP (BLOG. 163) AREAS LOCATION SURFACE New Control Room -on top of monitor along dividing wall #3 Slab Drop -inside on small ledge to left plastic painted metal Ovan Area -on top of breathing air station 34 black box in-between Oven #2 and conveyer system -on blue box on wall inbetween Oven #2 and the old Oven Control Room -on top of old Oven Control Room AC unit behind Control Room In front of conveyer system fl on blue 'check scale* panel box In-between conveyer system and Oven -on top of storage cabinets along back wall across from Oven f3 painted metal painted metal painted metal painted metal metal Warehouse -(warehouse along turnaround area) on top of box for safety glasses beside of door from turnaround area Extruder Area -on top of lockers against the wall beside of the old Extruder Control Room -on top of white exhaust vent on HVAC . uffit in southwest corner of area (to the side of doorway to hallway offices) painted wood painted metal painted metal RESULTS(ug) 1.9 18.3 Z.6 4.5 7.8 4.7 26.7 15.2 13.8 EDD093285 EID137049 C-8 SAMPLING PROJECT PAGE 35 OF 41 Dispersion Packout area -on top of desk/storage stand inbetween the Dispersion Packout pad and wash basin Dry Hake Packout area -on top of black air mask box at breathing air station 18 Stairwell -(in-between Dispersion Packout and Dry Flake Packout leading to .second floor) on ledge halfway up stairs Second Floor Polykettle Control Room -at far end (from door) of control area on top of box that houses two monitors Huff area -snail blue box under large blue box on wait around corner from breakroom across from stetcher Breakroom -(across from Polykettle Control Room) on top of brown vending machine *1 Flake Storage Hop -at front end of ilykettle Control Room metal painted metal metal laminated wood painted metal painted metal metal 26.5 8.2 25.5 6.1 9.9 4.1 83.4 EID093286 EID137050 C-8 SAMPLING PROJECT PAGE 36 OF 41 WIPE SAMPLING COHCLUSIOHS/PATHSFORMARP * Homopolyroers exhibited higher residual C-8 levels than FEP overall. * Wipe samples were collected well Into shutdown. Once Teflon* is up and running for a while, selecting a few locations sampled in this project to see how it would compare is recommended. * Setting a routine frequency for wipe sampling is not necessary. S S3 S EID093287 EID137051 C-&ortW:tNfc^ojfcCj' Wfob -XW E1D093288 EID137052 C-8WUA)fof&03ECr Pf^&.3&y^ ^ ^ s g> p j 4? ' 3 . 0- r ^ ECD093289 EID137053 s-s 5fiH^u^ p^fscr M6& 3^ ksiavas. % iiEIefen--_--_--__--o--r-- - Oh s ss gs^ SgSSSgggSSgs i s ^ ^ 5 m^*S a9--ta>>f^--iAiu"*ouatcB--t of rKtA<WrjSM^BMM^ >R5f<^inButffe ^ i^ (h> (a > IA K; a S S 6 o S ' fS Sr wS s ^1 g 5 S S 5 S S 3 5xt w S ^ ri ^ ;? ^ <a 3 ta ta 1u1f r^-i *u3> *mi ta S ^S ^8 3 3 a 5 S ta o (-- ^ EID093290 ^ ^ ^ 3. & ;> ^ A> 's5 or i^ I ^ e EID137054 ^ C-.S' 5rW\rLH^s. pecker n^S; % <y <^ FIGURE 4: AVERAGE VALUES AT ROOF LOCATIONS excludes contaminated samples LOCATION N.OFFICES HONQNERCR WAX ROOM AUTQCLAV6CR HOOO EXHAUST AIR(HPB) . .17 .21 1.10 .96 - WlPE(iw) 15.6 11*2 16.4 29.7 28.5 ?0 WCSL N --tf^aww t^- ------g 0 <2* . . .-. 5 vAreis(> AIR CM^ 1^^"1I,Ln n C J^ > ff <a> ^%& f3 0) 17 ^.'wipe jW-T AtR. 0.<^9 a R ; r '/A ^yiu.1wiisr. Slwi. ^ '// nr -------------^=3- 1 WIF6 2SSf WIPB Ifc.a Aft T. r>----1--^- EID093291 ... g ! EID137055 C-8 SAHPLING PROJECT PA6E 41 OF 41 -y REFERENCES PLAniS. A*J., SUHHARYOF 1995 C-8 BLOODTESTING. OuPONT, WASHIN6TON UOUKS. 199B: HAV 7.-------------- PLATTIS. A.J., yASHIHBTQH ET. ALl, WORKS. IMDUSTRlAl HYGIENE FOllOW-UP. 1996, DECEHBER18.----:-------- OuPOMT, Ett>093292 EID137056