Document MGjb674bXLX8k9p8ZaQr9aLvk
1.
Specific Potential Problems
___________ TJh^reajt^ _ _____
1. Raw Materials Received
Probability Serious) ie
a. Biphenyl
1) Variation in quality a) Moisture contaminated b) Impurity level
60 3 1B0
30 ' 1 30 50 9 ;I50
2) Availability
10 10' 100
b. Chlorine Snift Gas
1) Variation in quality
a) Impurity level (Bromine) b) Sulfuric Acid content
100 100
5
9 900 9 900 9 `'5
2) Availability c. FeCl.3
10 10 loo *
!) Particle size too large or too small
2) Moisture contamination
3) Availability
d. Lime
1) Availability
2) Moisture contamination
e. Porocel
1) Availability
.
2) Moisture contamination
3) Particle size too large or too small
5 .5 10
5 5
5 5 10
5 25 10 50 10 100
10 50 2 10
10 50 9 45 5 50
2. Raw Materials In Storage a. Biphenyl 1) Moisture contamination 2) Storage tank freeze-up
10 10 100 10 3 30
TOWOLDMONOQ45306
*
3. Chlorinator Area
.
2.
H ________ _._Threat-p Probability 'Seriousness
a. PeCl^ Mix Tank
i) Inadequate catalyst supply to #6 chlorinator
.5
10 90
b. Chlorinators
1) Unstable product
20 10 200
2) Crude 1142 out-of-spec on Sp. Gr. 3) Inadequate biphenyl feed to
y/6 chlorinator
20 10
10 200 10 100
4) Inadequate temperature control
10
3 30
c. Intermediate Storage Tank 1) Cannot feed stills or head tank
10
ft 3
30
2) Cannot maintain proper aging temperature
10 6 6o
3) HC1 emissions
20 8 160
d. Blow Tank 1) Cannot feed stills at required rate 2) Cannot control level in tank 3) HC1 emissions 4) HC1 is not removed to desired level
10 10 20 10
8 8o
'8
80
8 3.60
2 20
e. Off.-gas system 1) Cannot control off-gas temperature
10
5 50
2) Drowning jet will not handle full HC1 load
10
8 8o
3) High back pressure 4) Water in HC1 off-gas
10 9 90 10 10 100
TOWOLDMONOQ45307
Stills
3.
___________ Threat_______ ___ $ Probability Seriousness [o<
1) Erosion and/or pluggage of reboiler tubes
30 10 300
2) Cannot maintain vacuum
10 10 1 00
3) Cannot meet forward flow color spec.
10
10 100
' 4) Cannot control temperature
10 8 8o
Absorbers
1) Cannot meet electrical property specs
20
10 200
2) Cannot feed desired rate thru absorber
10
10 100
3) Cannot meet free chloride spec
10 10 100
Therminca Furnace
1) Coil failure
10 10 100
2) Cannot provide adequate heat for stills 10
10 100
Housekeeping
1) Unable to achieve acceptable level
10
8 8o
0l8`>1''6
TOWOLDMONOQ45308
Aroclor Expansion (CEA l800) Risk Analysis Worksheet
h.
Potential Problems
Raw Matls. Reed, a. Biphenyl
1) Variation in quality
2) Availability
! Prevention
Likely Causes j Take Preventive
- Action or Accent
1 Risk
1. Anniston
j 1. Accept risk
operation
1
variances.
j 2. Sample every
i car
2. Tank car
j
coil failure i
i
1. Anniston p'ro-i 1. Accept Risk
duction out- j
age | 2. Hold Associated
2. Rail Strike !
Sales & Dept.
3. Coil failure j
Stg. Tks. at
in Associated
least 80$
Sales Stg.Tk.I full.
Protection
Set Contingent
Action or Accent
" Risk
"
1. Review quality variation with Anniston
1. Transfer Associ ated Sales Matl. to WGK.
2. Hotify Anniston of low Biphenyl
level.
Provide for Information
Trigger
Contingent
Lab identifies off-spec material
Daily Inventory Sheet indicates quantity on hand below 600M#
b. Chlorine Snift Gas
1) Variation in quality
Chlorine Dept. operation variances
'
2) Availability | Chlorine Dept. * | outage
| ! '
i
r
! 1. Monitor bromine Raise chlorination
i content of KCL
temoerature to
j shipments.
195C.
| 2. Monitor number 1
( of DeNora cells i
| | 3-
i
on KOH. Sample snift gas
chlorine supply
1t
j i
! weekly.
j 1. Accept Risk
j Accept risk
;j
i 2. Obtain priority [
i to use revapor- |
S ized chlorine. !
!r
ii
1. High bromine content in KCL
2. High bromine content in Cl2 gas
1. Notification of scheduled chlorine Dept. outage.
2. Low chlorine supply'pressure
TOWOLDMONOQ45309
Potential Problems
Likely Causes
i Prevention (Take Preventive jAction or Accept i Risk
Protection Set Contingent Action or Accept
Risk
3. Chlorlnator Area a. FeCl^ Mix Tk.
I 1. System pluggage i. Sightglass
! provided 2. Circulating pump
failure
2. Motors alarmed
1. Inadequate
catalyst
3. Agitator failure^. Temperature
supply to
indicated in
#6 chlorin- t 4. Steam heating
field
ator
system failure
j4. Level recorded
5. Mix tank is
on panel
| 1. Accept Risk
| 2. Manually add
j catalyst to | each chlorin-
ator
i
empty
_
Catalyst flow
6. Catalyst flow controller failure
timer on panel
Catalyst feed valve alarm for abnormal position________
Provide for Information Trigger Contingent
Lab identifies unstable product
b. Chlorinators
1) Unstable product
1. Catalyst doesn'
carry thru chlors
2. Inadequate cat- '
alyst feed to
#6 chlorlnator
3. Chlorinationtemp
too low.
j
4. High bromine
i
content in
j
} chlorine supply.j
I 5. Vapor phase
:
j chlorination
!
16. Sulfuric acid !
j in chlorine
I
j supply
!
17. Circulating
;
i pump failure
}
1. Accept Risk !1. Spare catalyst
2. a) Catalyst j addition nozzles
tank level > provided on each
recorded on > chlorlnator.
panel. b) Catalyst flow timer
i 2. Accept Risk
II
13.
u
14. Raise chlorina
on panel
tion temnerature
c) Catalyst
to 195C*
feed valve alarm for
5. Raise overflow level in chlor
abnormal
inators to de
position
crease vapor
d) Catalyst
space.
tank agitator_\S.. Accept Risk
& pump motors: 7*.
alarmed.
Lab analysis
indicates off-spec material.
TOWOLDMONOQ45310
Potential Problems
i Likely Causes
Prevention Take Preventive Action or Accept
Risk
Protection
Set Contingent Action or Accept
Risk
6.
Provide for information Trigger Contingent
b. Chioiinators
(Contd.)
8. Technology
2. e) Sightglass
8. Lab distill
inadequate to
in catalyst
crude & analyze
meet coruor-
circulating loop.
results.
. ate goals.
3. Chlorinator
9. Initiate PR&D
9. Continuous
temperature
work to imorove
chlorination
recorded 8c
technology.
technology in-
alarmed on
10. All the above.
adequate to
panel
meet specifi- 4. a) Monitor
1 cation on
DeKora cells
1 stability. !
on KoH b) Monitor KCL Bromide
i
Content
i
c) Monitor
.!
bromine con-
1 tent of chlorine i
j supply.
i
] s !
i5- Accent Risk
16. Brink mist
! eliminators in ! chlorine supply i
1
j line.
j
\
i7. Motors alarmed.
|8. Accent Risk
i
>9- Continuous chlor-
{ ination demon-
1
1 1
! strated at | Anniston
:,
li
2) Crude 1142
1. Chlorine feed ;1. Flow recorded
. out of spec
in each chlor- \ on panel.
on sp.gr.
inator too high \2. Accept Risk
| or too low.
13- Flow recorded on
j 1. Regulate flow i manually i 2. Run SD.gr. ; manually
i Operator analysis
: '"ndicates off-spec ` material. .
i 2. Density control j panel. Low flow ? 3- Regulate flow
system failure ! alarm.
i * manually
! j
01*6151
i
on #9 chlorin-
ator
1
s4. Regulate level ;
i manually
j
TOWOLDMONOQ45311
7.
Potential Problems
<
j Likely Causes i !
! Prevention iTake Preventive [Action or Accept i Sisk `
Protection Set Contingent Action or Accept
Risk
Provide for Information Trigger Contingent
b. Chlorinators (Contd.)
'
j 3. Biphenyl feed ;4. Intermediate rate to #6 Chlor4 Stg. Tk. level
inator too high i recorded on
! or too low.
. j panel. Hi/Lo
' 4. Level controller j level 'alarm
failure on #9 f on Int. Stg.
chlorinator.
! #9 Chlor.
5- Circulating pump failure
5. Motors alarmed. :6. Operator will
I routinely
! analyze each
j chlorinator
I every two hrs.
5- Accept Risk
6. Have instrumenta tion system checked for repair.
7. Redesign Sp.Gr. control system if not adequate.
3) Inadeauate 1. Biphenyl feed
!l. Motor alarmed
Use Biphenyl
Biphenyl
pump failure
i2. Stg. tank temper- transfer pump to
feed to #6 2. Line pluggage j ature recorded
feed #6 chlorina-
. chlorinator 3. Flow controller" j on panel
tor
failure
3. Flow indicating
4. Feed tank empty i controller on
5- Rate of charg ing FeClj mix & head tanks
i panel and at FeClg
| i
mix & head tanks, Lo flow alarm.
' ;
is too high
4. Daily inventory. !
4) Inadeauate temperature
i
1. Circulating pump si. Motors alarmed
failure
2. Hi/Lo tempera-
il. Adjust number | of louvres
control .
! 2. Temperature con- i ture alarms 1 troller failure 3. Tempe rature
| attached to j controller.
13- Line pluggages recorded on pane^ |2. Change chlorine
u. Air cooled heat 4. Two speed fans
flow rates
! exchanger fan
i provided
;3- Accept Risk
speed "too fast 5. High temperature I
or too slow.
| chlorine shut-
!
**
Too many or too j down. j few air cooler 6. Low temperature
fj
louvres attached : fan shutdown
*
to' controller
7. Chlorine flow
! ; recorded on panel
Biphenyl flow
recorder indicates
low/high flow.
Lo flow alarms.
i i Temperature
recorder indicates itemperature too !high/low. ; i
| |
j
-
TOWOLDMONOQ45312
Potential Problems
b. Chlorinators (Contd.)
4) Inadequate ' temp. cont.
4.-Stills 1) Erosion and/ or pluggage of reboiler tubes
2) Cannot main tain vacuum
o CaB \r
j Prevention
Likely Causes
! Take Preventive
j Action or Accept
!
jJ
6. Chlorine flow
Risk
`
is too high or j
too low.
l
7. Sulfuric acid i
in Chlorine 1
supply
!
i
1. Lime-catalyst j 1. Accept Risk
slurry at high S 2. Accept Risk
velocities
j 3. Kotor alarmed
2. Tube diameter
3. Circulating pump failure
1. Vacuum jet
i t 1i i 1. Spare jet pro
.
failure
j vided
2. Pressure con- 2. Set up spare
troller fail- j parts
ure.
} Pressure gauges
3. System leaks | provided
4. Receiver level 13. Accept Risk
too high or
[4. Hi & Lo level
tank is empty j alarms provided
5. Condenser
[5. Sightglass in
freeze-up
j forward flow
6. Receiver pump \ line. Forward
packing leakage! flow temperature
\7. Vacuum line
; recorded
i pluggage
j6. Accept Risk
|8. High level in i7. Accept Risk
j catch tanks
]8. Level gauge
! . i provided
Protection
Set Contingent Action or Accept
Risk
Provide for Information
trigger
Contingent
.
1. Set up spare heat exchanger
2. Drill out tubes 3. Set up spare
pump 4. Increase pump
impeller size
High pluggage frequency
Tube failures
1. Change to spare Vacuum recorder
jet
indicates poor
2. Repair controlle : vacuum
3. Repair leaks
4. Isolate problem
& resolve
5. Raise cooling
water temperatur S
6. Repack pump
7. Clean-out lines
8. Drain tanks
'
iic
i
l
TOWOLDMONOQ45313
o
Potential Problems
Likely Causes
Prevention
Take Preventive Action or Accept
Risk
Protection
Set Contingent Action or Accept
Risk
Provide for Information Trigger Contingent
3) Cannot meet forward flow color spec.
1. Entrainment separator run back line plugged
2. Inadeouate lime in still
1. Sight glass pro-
1. Clean out line
vided
2. Re-lime still
2. Record lime charge.
Modify re-lime
Feed integrator
frequency
alarm on nanel
Lab analysis indicates off-snec product
5.. Absorbers
1) Cannot meet electrical property specs*
1. Treating temper- 1. Column feed
ature too high
temnerature
2. Packing is wet
controller
3- Clean-up filter
backed up with
not removing
temperature
norocel parti-
recorder.
cles
2. Analyze packing
4. In line analyzer
for moisture
malfunctioning
prior to column
5. Packing is shot
start up
3. Accept Risk
4. Accent Risk
5. In-line analyzer
nrovided
2) Cannot feed
1. Treating temp.
desired rate
too low-high
thru absorbers
viscosity
2. Pilot plant c
scale-up wrong
3. Pumps undersized
j 4. Packing charge-
j out tine too | long. Low on
o> j stream time. 0*
sT
TT See #1 above. 2. Accent Risk 3. Accept Risk 4. Absorbers flexibly
piped up
<
1. Manually con- Lab analysis
trol temoera- Indicates off-snec
ture.
material
2. Dry packing
with nitrogen
prior to start
up.
3. Modify filter
and/or change
.cartridge micron
retention size
Change absorber
sunnort screen size
4. Check results ?-n laboratory
5. Change racking!
1. Raise treating Flow controller
temp, to reduce indicates below
viscosity. MayS design feed rate
also need to
change electri - Low on stream time
cal nronerty snecs.
.
2. Run more than one
absorber at a time
3. Change pumps
4. Install snare
absorber
TOWOLDMONOQ45314
Potential Problems
(Likely Causes
Prevention Take Preventive Action or Accept
Risk
3) Cannot meet il. Bad Porocel
1. Accept Risk
free chloride 12. Clean-un filter 2.
spec.
leaking thru
j
6. Therminol Furnace i
1) Coil Failure 1. Flame safeguard . 1. Set up snare
system failure
coil.
2. Air pockets in i2- Fill system
coil
1 under vacuum
3- Therminol degradation products
! 3. Analyze therS minol monthly
i Protection
i Set Contingent ! Action or Accept ! Risk 1
[Provide for information Trigger Contingent
J1. Change packing
Lab analysis
l2. Change cartridges indicates off-spec | material
i
11. Changeout coil
Coil leakage
i2. Accept Risk
Lab analysis
!3. Replace Therminol indicates off-
spec FR-2
it
i
2) Cannot provide ,1. Therminol feed 11. Motor alarmed.
adequate heat
pump failure
Flow recorded
for stills
2. Low gas pressure
on panel.
3- Line pluggage ! 2. Low gas pressure
A. Flow controller
failure
i
shutdown. Pressure gauges
5. Furnace under- i in field
sized
-3. Low flow alarm
iA. Accept Risk
IT
s5-
t:
Si. Changeout pump
Cannot obtain
|2. Notify utilities 25M#/yr. still
! dept.
rate
|3* Isolate problem
1 & resolve
|4. Repair controller
i5- Install still
! feed preheater
| i!_______________________________
7. Housekeeping
I i. Processing
.1) Unable to
j problems
achieve acceptaj- 2. Inadequate
ble level
j workforce
0186155
t U All pumps except 11. Accept Risk
: j Low ratings in
for one on ground 12. ModifyFacilities; housekeeping
level. Drain pans ;
| inspections
provided for each [
j
pump
[
I
2 Trench sewers
;
j
provided on
j
ground level
i
i
3 Ground level curbed & floor
j '
i j
sloped to trenches j h Open structure design
'5 Equipment layed-out with housekeeping problems in
1 j
mind.
TOWOLDMONOQ45315
. Potential Problems
7. Housekeeping (Contd.)
n------------------------------------
Prevention
i Likely Causes
Take Preventive
1
Action or Accept Risk
1!t 6. Dumpster ramp for
changing absorber
[ ) ' ii
packing provided 7. Provision made for
draining transfer
I lines, sample
i points & catch
| tanks into drums
8. HC1 emission
sources tied into
drowning jet
9- Housekeeping time
alloted in work
force study
10. Complete utility
stations located
at critical points
1 Protection
[Provide for information
1 Set Contingent
Trigger
! Action or Accent Contingent
! Risk
'
i1
|
o QD & \r
O'
;
i i 1
TOWOLDMONOQ45316