Document MGjb674bXLX8k9p8ZaQr9aLvk

1. Specific Potential Problems ___________ TJh^reajt^ _ _____ 1. Raw Materials Received Probability Serious) ie a. Biphenyl 1) Variation in quality a) Moisture contaminated b) Impurity level 60 3 1B0 30 ' 1 30 50 9 ;I50 2) Availability 10 10' 100 b. Chlorine Snift Gas 1) Variation in quality a) Impurity level (Bromine) b) Sulfuric Acid content 100 100 5 9 900 9 900 9 `'5 2) Availability c. FeCl.3 10 10 loo * !) Particle size too large or too small 2) Moisture contamination 3) Availability d. Lime 1) Availability 2) Moisture contamination e. Porocel 1) Availability . 2) Moisture contamination 3) Particle size too large or too small 5 .5 10 5 5 5 5 10 5 25 10 50 10 100 10 50 2 10 10 50 9 45 5 50 2. Raw Materials In Storage a. Biphenyl 1) Moisture contamination 2) Storage tank freeze-up 10 10 100 10 3 30 TOWOLDMONOQ45306 * 3. Chlorinator Area . 2. H ________ _._Threat-p Probability 'Seriousness a. PeCl^ Mix Tank i) Inadequate catalyst supply to #6 chlorinator .5 10 90 b. Chlorinators 1) Unstable product 20 10 200 2) Crude 1142 out-of-spec on Sp. Gr. 3) Inadequate biphenyl feed to y/6 chlorinator 20 10 10 200 10 100 4) Inadequate temperature control 10 3 30 c. Intermediate Storage Tank 1) Cannot feed stills or head tank 10 ft 3 30 2) Cannot maintain proper aging temperature 10 6 6o 3) HC1 emissions 20 8 160 d. Blow Tank 1) Cannot feed stills at required rate 2) Cannot control level in tank 3) HC1 emissions 4) HC1 is not removed to desired level 10 10 20 10 8 8o '8 80 8 3.60 2 20 e. Off.-gas system 1) Cannot control off-gas temperature 10 5 50 2) Drowning jet will not handle full HC1 load 10 8 8o 3) High back pressure 4) Water in HC1 off-gas 10 9 90 10 10 100 TOWOLDMONOQ45307 Stills 3. ___________ Threat_______ ___ $ Probability Seriousness [o< 1) Erosion and/or pluggage of reboiler tubes 30 10 300 2) Cannot maintain vacuum 10 10 1 00 3) Cannot meet forward flow color spec. 10 10 100 ' 4) Cannot control temperature 10 8 8o Absorbers 1) Cannot meet electrical property specs 20 10 200 2) Cannot feed desired rate thru absorber 10 10 100 3) Cannot meet free chloride spec 10 10 100 Therminca Furnace 1) Coil failure 10 10 100 2) Cannot provide adequate heat for stills 10 10 100 Housekeeping 1) Unable to achieve acceptable level 10 8 8o 0l8`>1''6 TOWOLDMONOQ45308 Aroclor Expansion (CEA l800) Risk Analysis Worksheet h. Potential Problems Raw Matls. Reed, a. Biphenyl 1) Variation in quality 2) Availability ! Prevention Likely Causes j Take Preventive - Action or Accent 1 Risk 1. Anniston j 1. Accept risk operation 1 variances. j 2. Sample every i car 2. Tank car j coil failure i i 1. Anniston p'ro-i 1. Accept Risk duction out- j age | 2. Hold Associated 2. Rail Strike ! Sales & Dept. 3. Coil failure j Stg. Tks. at in Associated least 80$ Sales Stg.Tk.I full. Protection Set Contingent Action or Accent " Risk " 1. Review quality variation with Anniston 1. Transfer Associ ated Sales Matl. to WGK. 2. Hotify Anniston of low Biphenyl level. Provide for Information Trigger Contingent Lab identifies off-spec material Daily Inventory Sheet indicates quantity on hand below 600M# b. Chlorine Snift Gas 1) Variation in quality Chlorine Dept. operation variances ' 2) Availability | Chlorine Dept. * | outage | ! ' i r ! 1. Monitor bromine Raise chlorination i content of KCL temoerature to j shipments. 195C. | 2. Monitor number 1 ( of DeNora cells i | | 3- i on KOH. Sample snift gas chlorine supply 1t j i ! weekly. j 1. Accept Risk j Accept risk ;j i 2. Obtain priority [ i to use revapor- | S ized chlorine. ! !r ii 1. High bromine content in KCL 2. High bromine content in Cl2 gas 1. Notification of scheduled chlorine Dept. outage. 2. Low chlorine supply'pressure TOWOLDMONOQ45309 Potential Problems Likely Causes i Prevention (Take Preventive jAction or Accept i Risk Protection Set Contingent Action or Accept Risk 3. Chlorlnator Area a. FeCl^ Mix Tk. I 1. System pluggage i. Sightglass ! provided 2. Circulating pump failure 2. Motors alarmed 1. Inadequate catalyst 3. Agitator failure^. Temperature supply to indicated in #6 chlorin- t 4. Steam heating field ator system failure j4. Level recorded 5. Mix tank is on panel | 1. Accept Risk | 2. Manually add j catalyst to | each chlorin- ator i empty _ Catalyst flow 6. Catalyst flow controller failure timer on panel Catalyst feed valve alarm for abnormal position________ Provide for Information Trigger Contingent Lab identifies unstable product b. Chlorinators 1) Unstable product 1. Catalyst doesn' carry thru chlors 2. Inadequate cat- ' alyst feed to #6 chlorlnator 3. Chlorinationtemp too low. j 4. High bromine i content in j } chlorine supply.j I 5. Vapor phase : j chlorination ! 16. Sulfuric acid ! j in chlorine I j supply ! 17. Circulating ; i pump failure } 1. Accept Risk !1. Spare catalyst 2. a) Catalyst j addition nozzles tank level > provided on each recorded on > chlorlnator. panel. b) Catalyst flow timer i 2. Accept Risk II 13. u 14. Raise chlorina on panel tion temnerature c) Catalyst to 195C* feed valve alarm for 5. Raise overflow level in chlor abnormal inators to de position crease vapor d) Catalyst space. tank agitator_\S.. Accept Risk & pump motors: 7*. alarmed. Lab analysis indicates off-spec material. TOWOLDMONOQ45310 Potential Problems i Likely Causes Prevention Take Preventive Action or Accept Risk Protection Set Contingent Action or Accept Risk 6. Provide for information Trigger Contingent b. Chioiinators (Contd.) 8. Technology 2. e) Sightglass 8. Lab distill inadequate to in catalyst crude & analyze meet coruor- circulating loop. results. . ate goals. 3. Chlorinator 9. Initiate PR&D 9. Continuous temperature work to imorove chlorination recorded 8c technology. technology in- alarmed on 10. All the above. adequate to panel meet specifi- 4. a) Monitor 1 cation on DeKora cells 1 stability. ! on KoH b) Monitor KCL Bromide i Content i c) Monitor .! bromine con- 1 tent of chlorine i j supply. i ] s ! i5- Accent Risk 16. Brink mist ! eliminators in ! chlorine supply i 1 j line. j \ i7. Motors alarmed. |8. Accent Risk i >9- Continuous chlor- { ination demon- 1 1 1 ! strated at | Anniston :, li 2) Crude 1142 1. Chlorine feed ;1. Flow recorded . out of spec in each chlor- \ on panel. on sp.gr. inator too high \2. Accept Risk | or too low. 13- Flow recorded on j 1. Regulate flow i manually i 2. Run SD.gr. ; manually i Operator analysis : '"ndicates off-spec ` material. . i 2. Density control j panel. Low flow ? 3- Regulate flow system failure ! alarm. i * manually ! j 01*6151 i on #9 chlorin- ator 1 s4. Regulate level ; i manually j TOWOLDMONOQ45311 7. Potential Problems < j Likely Causes i ! ! Prevention iTake Preventive [Action or Accept i Sisk ` Protection Set Contingent Action or Accept Risk Provide for Information Trigger Contingent b. Chlorinators (Contd.) ' j 3. Biphenyl feed ;4. Intermediate rate to #6 Chlor4 Stg. Tk. level inator too high i recorded on ! or too low. . j panel. Hi/Lo ' 4. Level controller j level 'alarm failure on #9 f on Int. Stg. chlorinator. ! #9 Chlor. 5- Circulating pump failure 5. Motors alarmed. :6. Operator will I routinely ! analyze each j chlorinator I every two hrs. 5- Accept Risk 6. Have instrumenta tion system checked for repair. 7. Redesign Sp.Gr. control system if not adequate. 3) Inadeauate 1. Biphenyl feed !l. Motor alarmed Use Biphenyl Biphenyl pump failure i2. Stg. tank temper- transfer pump to feed to #6 2. Line pluggage j ature recorded feed #6 chlorina- . chlorinator 3. Flow controller" j on panel tor failure 3. Flow indicating 4. Feed tank empty i controller on 5- Rate of charg ing FeClj mix & head tanks i panel and at FeClg | i mix & head tanks, Lo flow alarm. ' ; is too high 4. Daily inventory. ! 4) Inadeauate temperature i 1. Circulating pump si. Motors alarmed failure 2. Hi/Lo tempera- il. Adjust number | of louvres control . ! 2. Temperature con- i ture alarms 1 troller failure 3. Tempe rature | attached to j controller. 13- Line pluggages recorded on pane^ |2. Change chlorine u. Air cooled heat 4. Two speed fans flow rates ! exchanger fan i provided ;3- Accept Risk speed "too fast 5. High temperature I or too slow. | chlorine shut- ! ** Too many or too j down. j few air cooler 6. Low temperature fj louvres attached : fan shutdown * to' controller 7. Chlorine flow ! ; recorded on panel Biphenyl flow recorder indicates low/high flow. Lo flow alarms. i i Temperature recorder indicates itemperature too !high/low. ; i | | j - TOWOLDMONOQ45312 Potential Problems b. Chlorinators (Contd.) 4) Inadequate ' temp. cont. 4.-Stills 1) Erosion and/ or pluggage of reboiler tubes 2) Cannot main tain vacuum o CaB \r j Prevention Likely Causes ! Take Preventive j Action or Accept ! jJ 6. Chlorine flow Risk ` is too high or j too low. l 7. Sulfuric acid i in Chlorine 1 supply ! i 1. Lime-catalyst j 1. Accept Risk slurry at high S 2. Accept Risk velocities j 3. Kotor alarmed 2. Tube diameter 3. Circulating pump failure 1. Vacuum jet i t 1i i 1. Spare jet pro . failure j vided 2. Pressure con- 2. Set up spare troller fail- j parts ure. } Pressure gauges 3. System leaks | provided 4. Receiver level 13. Accept Risk too high or [4. Hi & Lo level tank is empty j alarms provided 5. Condenser [5. Sightglass in freeze-up j forward flow 6. Receiver pump \ line. Forward packing leakage! flow temperature \7. Vacuum line ; recorded i pluggage j6. Accept Risk |8. High level in i7. Accept Risk j catch tanks ]8. Level gauge ! . i provided Protection Set Contingent Action or Accept Risk Provide for Information trigger Contingent . 1. Set up spare heat exchanger 2. Drill out tubes 3. Set up spare pump 4. Increase pump impeller size High pluggage frequency Tube failures 1. Change to spare Vacuum recorder jet indicates poor 2. Repair controlle : vacuum 3. Repair leaks 4. Isolate problem & resolve 5. Raise cooling water temperatur S 6. Repack pump 7. Clean-out lines 8. Drain tanks ' iic i l TOWOLDMONOQ45313 o Potential Problems Likely Causes Prevention Take Preventive Action or Accept Risk Protection Set Contingent Action or Accept Risk Provide for Information Trigger Contingent 3) Cannot meet forward flow color spec. 1. Entrainment separator run back line plugged 2. Inadeouate lime in still 1. Sight glass pro- 1. Clean out line vided 2. Re-lime still 2. Record lime charge. Modify re-lime Feed integrator frequency alarm on nanel Lab analysis indicates off-snec product 5.. Absorbers 1) Cannot meet electrical property specs* 1. Treating temper- 1. Column feed ature too high temnerature 2. Packing is wet controller 3- Clean-up filter backed up with not removing temperature norocel parti- recorder. cles 2. Analyze packing 4. In line analyzer for moisture malfunctioning prior to column 5. Packing is shot start up 3. Accept Risk 4. Accent Risk 5. In-line analyzer nrovided 2) Cannot feed 1. Treating temp. desired rate too low-high thru absorbers viscosity 2. Pilot plant c scale-up wrong 3. Pumps undersized j 4. Packing charge- j out tine too | long. Low on o> j stream time. 0* sT TT See #1 above. 2. Accent Risk 3. Accept Risk 4. Absorbers flexibly piped up < 1. Manually con- Lab analysis trol temoera- Indicates off-snec ture. material 2. Dry packing with nitrogen prior to start up. 3. Modify filter and/or change .cartridge micron retention size Change absorber sunnort screen size 4. Check results ?-n laboratory 5. Change racking! 1. Raise treating Flow controller temp, to reduce indicates below viscosity. MayS design feed rate also need to change electri - Low on stream time cal nronerty snecs. . 2. Run more than one absorber at a time 3. Change pumps 4. Install snare absorber TOWOLDMONOQ45314 Potential Problems (Likely Causes Prevention Take Preventive Action or Accept Risk 3) Cannot meet il. Bad Porocel 1. Accept Risk free chloride 12. Clean-un filter 2. spec. leaking thru j 6. Therminol Furnace i 1) Coil Failure 1. Flame safeguard . 1. Set up snare system failure coil. 2. Air pockets in i2- Fill system coil 1 under vacuum 3- Therminol degradation products ! 3. Analyze therS minol monthly i Protection i Set Contingent ! Action or Accept ! Risk 1 [Provide for information Trigger Contingent J1. Change packing Lab analysis l2. Change cartridges indicates off-spec | material i 11. Changeout coil Coil leakage i2. Accept Risk Lab analysis !3. Replace Therminol indicates off- spec FR-2 it i 2) Cannot provide ,1. Therminol feed 11. Motor alarmed. adequate heat pump failure Flow recorded for stills 2. Low gas pressure on panel. 3- Line pluggage ! 2. Low gas pressure A. Flow controller failure i shutdown. Pressure gauges 5. Furnace under- i in field sized -3. Low flow alarm iA. Accept Risk IT s5- t: Si. Changeout pump Cannot obtain |2. Notify utilities 25M#/yr. still ! dept. rate |3* Isolate problem 1 & resolve |4. Repair controller i5- Install still ! feed preheater | i!_______________________________ 7. Housekeeping I i. Processing .1) Unable to j problems achieve acceptaj- 2. Inadequate ble level j workforce 0186155 t U All pumps except 11. Accept Risk : j Low ratings in for one on ground 12. ModifyFacilities; housekeeping level. Drain pans ; | inspections provided for each [ j pump [ I 2 Trench sewers ; j provided on j ground level i i 3 Ground level curbed & floor j ' i j sloped to trenches j h Open structure design '5 Equipment layed-out with housekeeping problems in 1 j mind. TOWOLDMONOQ45315 . Potential Problems 7. Housekeeping (Contd.) n------------------------------------ Prevention i Likely Causes Take Preventive 1 Action or Accept Risk 1!t 6. Dumpster ramp for changing absorber [ ) ' ii packing provided 7. Provision made for draining transfer I lines, sample i points & catch | tanks into drums 8. HC1 emission sources tied into drowning jet 9- Housekeeping time alloted in work force study 10. Complete utility stations located at critical points 1 Protection [Provide for information 1 Set Contingent Trigger ! Action or Accent Contingent ! Risk ' i1 | o QD & \r O' ; i i 1 TOWOLDMONOQ45316